CN117010065A - Construction method of mechanical and electrical pipeline of narrow corridor of hospital based on BIM technology - Google Patents

Construction method of mechanical and electrical pipeline of narrow corridor of hospital based on BIM technology Download PDF

Info

Publication number
CN117010065A
CN117010065A CN202310987498.4A CN202310987498A CN117010065A CN 117010065 A CN117010065 A CN 117010065A CN 202310987498 A CN202310987498 A CN 202310987498A CN 117010065 A CN117010065 A CN 117010065A
Authority
CN
China
Prior art keywords
pipeline
pipe section
model
electromechanical
hospital
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310987498.4A
Other languages
Chinese (zh)
Inventor
郜强
孔繁锋
朱鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202310987498.4A priority Critical patent/CN117010065A/en
Publication of CN117010065A publication Critical patent/CN117010065A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/14Pipes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14Force analysis or force optimisation, e.g. static or dynamic forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a construction method of an electromechanical pipeline of a narrow corridor of a hospital based on a BIM technology, and belongs to the technical field of hospital engineering. The method comprises the following steps: s1: building a BIM model; s2: detecting collision; s3: deep construction design; s4: positioning a reserved hole; s5: designing a comprehensive support; s6: prefabricating a pipe section; s7: numbering the pipe sections; s8: and (5) installing a pipe section. According to the invention, through accurate positioning of the upper space of a narrow corridor of a hospital, the pipeline position, the bracket form and the hole position are optimized in advance, and the construction sequence and the material processing sequence can be reasonably arranged through virtual construction, so that factory prefabrication processing is realized; the method can reduce the waste of the materials of the electromechanical pipeline, simultaneously define the work tasks in the construction period arrangement, avoid the field reworking phenomenon and save the construction period.

Description

Construction method of mechanical and electrical pipeline of narrow corridor of hospital based on BIM technology
Technical Field
The invention relates to the technical field of hospital engineering, in particular to a construction method of an electromechanical pipeline in a narrow corridor of a hospital based on a BIM technology.
Background
Along with the rapid development of the building industry in China, the building scale is larger and larger, the building functions are more and more diversified, and the electromechanical integrated system in the building is complicated. The current situation of the electromechanical engineering of the hospital project is as follows: the engineering comprises a plurality of professions such as wind, water, electricity, medical special items and the like, wherein the wind professions comprise up to 13 systems, the water professions comprise up to 28 systems, the electricity professions comprise up to 12 systems and the medical special items comprise 6 systems, the corridor pipeline of the equipment area is complex and compact in space, and the construction is performed by a plurality of professional units, so that the cross construction exists. The construction units cannot be coordinated uniformly, construction procedures are disordered, the phenomenon of on-site disassembly and reworking is serious, and the cost is increased, the material is wasted and the construction period is prolonged.
Disclosure of Invention
The invention aims to provide a construction method of a narrow corridor electromechanical pipeline of a hospital based on BIM technology, which can reduce waste of electromechanical pipeline materials, and meanwhile, clear work tasks in construction period arrangement, avoid site reworking phenomenon, save construction period and solve the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: a construction method of an electromechanical pipeline in a narrow corridor of a hospital based on BIM technology comprises the following steps:
s1: building a BIM model, and building the BIM model of a building according to a building structure and a construction diagram of electromechanical engineering, wherein the BIM model comprises an electromechanical pipeline model;
s2: collision detection, namely performing collision detection on the structure and the pipeline and between the pipeline and the pipeline by utilizing a Navisworks collision detection function, and determining the optimized part of the pipeline;
s3: the construction deepening design is carried out, and integration in the private industry and between the private industry is carried out based on the BIM three-dimensional model; carrying out deepened design of complex pipeline arrangement in the upper space of a narrow corridor of a hospital according to a design principle, a construction acceptance specification and a pipeline arrangement principle;
s4: after the reserved hole positioning and deepening design scheme is confirmed, the position of a pipeline penetrating through a secondary structural wall body in the model is secondarily deepened based on the optimization scheme, so that conflicts with structural columns, constructional columns, ring beams and the like are avoided, the accurate positioning of the reserved hole is completed, and a reserved hole positioning map is output for secondary masonry construction;
s5: after the comprehensive support design and the electromechanical pipeline arrangement scheme are completed, the comprehensive support and hanger design is carried out, the comprehensive support and hanger section specification is selected according to the pipeline specialty and the load type, the arrangement form of the comprehensive support is respectively carried out on the mechanical property analysis and the stress calculation of the support aiming at different design schemes, and the optimal scheme is selected to complete the arrangement of the support and hanger space position;
s6: after the pipe section prefabrication, the spatial arrangement of the pipeline and the spatial arrangement scheme of the supporting and hanging frame are completed, the pipeline is broken according to the specified length, and the arrangement of the valve and the pipe fitting is fully considered; outputting a pipe section sectional diagram, and blanking and processing the pipe section sectional diagram by a processing plant to realize prefabrication of a pipeline factory;
s7: the pipe section is numbered, the processed pipe section is numbered and marked according to the sequence of the area and the system after the size and the position of the processed pipe section are checked to be correct by a quality department, and the pipe section is stacked in order;
s8: and (3) installing the pipe section, conveying the pipe section processed by the factory to an installation site, assembling the pipe section into a large module according to the number, and installing the large module once again, conveying the prefabricated pipeline and the accessory module to corresponding areas during the assembly, assembling the pipe section and the accessory module according to the code number on site, checking the pipe section and the accessory module with a BIM model after the assembly, and checking whether the position, the size, the elevation and the space positioning are consistent.
Further, in the step S2, the collision detection method based on the pipeline model specifically includes the steps of:
s2.1: deriving each specialized model in the three-dimensional BIM model, including a building model and an electromechanical model;
s2.2: integrating each professional model into a comprehensive pipeline model and performing collision detection;
s2.3: synchronously recording and displaying collision detection results; the collision detection result includes collision pipe type and collision position information.
Further, in the step S3, when the electromechanical pipelines are arranged, the arrangement principle that the air pipe with the upper air inlet is arranged on the upper layer, the air pipe with the lower air inlet is arranged on the lowest layer, the strong and weak bridge is arranged on the second layer and the water pipe is arranged on the third layer is followed, the heat preservation layer is added to the air pipe and the water pipe, the distance between the upper air pipe and the bottom of the structural beam is 100mm, the distance between the parallel pipelines is 100mm, and the distance between the pipeline layers is 150-200mm; 300-400mm of overhaul space is reserved in the middle of the corridor.
Further, in the step S4, the precise positioning of the reserved hole is performed on the secondary structure wall body traversed by the electromechanical pipeline after the electromechanical pipeline is arranged.
Further, in the step S5, according to the comprehensive bracket arrangement principle, the distance between adjacent brackets is set to be 4m, wherein the arrangement design scheme of the support and hanger specifically includes the following steps:
s5.1: calculating the weight of the section pipeline according to the weight parameters of the cable bridge, the water pipe and the air pipe;
s5.2: selecting channel steel;
s5.3: and importing the load data into load calculation software to perform calculation rechecking.
Further, in the step S6, outputting a pipe section model in the three-dimensional BIM model as an electronic version drawing, and processing according to an electronic layout paper factory to obtain a prefabricated pipe section.
Further, in the step S7, the pipe section number includes a pipe section installation area, a pipe section system number, a pipe section length, and a pipe section spatial location.
Further, in S8, the prefabricated pipe section in S6 is transported to a construction site, and according to the pipe section number in S7, the prefabricated pipe section in S6 is connected to the ground and installed to the top of the building.
Compared with the prior art, the invention has the following beneficial effects:
according to the invention, through accurate positioning of the upper space of a narrow corridor of a hospital, the pipeline position, the bracket form and the hole position are optimized in advance, and the construction sequence and the material processing sequence can be reasonably arranged through virtual construction, so that factory prefabrication processing is realized; the method can reduce the waste of the materials of the electromechanical pipeline, simultaneously define the work tasks in the construction period arrangement, avoid the field reworking phenomenon and save the construction period.
Drawings
FIG. 1 is a flow chart of the method of the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1, the construction method of the mechanical and electrical pipeline of the narrow corridor of the hospital based on the BIM technology of the present embodiment includes the following steps:
s1: building a BIM model, and building the BIM model of a building according to a building structure and a construction diagram of electromechanical engineering, wherein the BIM model comprises an electromechanical pipeline model;
s2: collision detection, namely performing collision detection on the structure and the pipeline and between the pipeline and the pipeline by utilizing a Navisworks collision detection function, and determining the optimized part of the pipeline;
s3: the construction deepening design is carried out, and integration in the private industry and between the private industry is carried out based on the BIM three-dimensional model; carrying out deepened design of complex pipeline arrangement in the upper space of a narrow corridor of a hospital according to a design principle, a construction acceptance specification and a pipeline arrangement principle;
s4: after the reserved hole positioning and deepening design scheme is confirmed, the position of a pipeline penetrating through a secondary structural wall body in the model is secondarily deepened based on the optimization scheme, so that conflicts with structural columns, constructional columns, ring beams and the like are avoided, the accurate positioning of the reserved hole is completed, and a reserved hole positioning map is output for secondary masonry construction;
s5: after the comprehensive support design and the electromechanical pipeline arrangement scheme are completed, the comprehensive support and hanger design is carried out, the comprehensive support and hanger section specification is selected according to the pipeline specialty and the load type, the arrangement form of the comprehensive support is respectively carried out on the mechanical property analysis and the stress calculation of the support aiming at different design schemes, and the optimal scheme is selected to complete the arrangement of the support and hanger space position;
s6: after the pipe section prefabrication, the spatial arrangement of the pipeline and the spatial arrangement scheme of the supporting and hanging frame are completed, the pipeline is broken according to the specified length, and the arrangement of the valve and the pipe fitting is fully considered; outputting a pipe section sectional diagram, and blanking and processing the pipe section sectional diagram by a processing plant to realize prefabrication of a pipeline factory;
s7: the pipe section is numbered, the processed pipe section is numbered and marked according to the sequence of the area and the system after the size and the position of the processed pipe section are checked to be correct by a quality department, and the pipe section is stacked in order;
s8: and (3) installing the pipe section, conveying the pipe section processed by the factory to an installation site, assembling the pipe section into a large module according to the number, and installing the large module once again, conveying the prefabricated pipeline and the accessory module to corresponding areas during the assembly, assembling the pipe section and the accessory module according to the code number on site, checking the pipe section and the accessory module with a BIM model after the assembly, and checking whether the position, the size, the elevation and the space positioning are consistent.
In S2, the collision detection method based on the pipeline model specifically includes the steps of:
s2.1: deriving each specialized model in the three-dimensional BIM model, including a building model and an electromechanical model;
s2.2: integrating each professional model into a comprehensive pipeline model and performing collision detection;
s2.3: synchronously recording and displaying collision detection results; the collision detection result includes collision pipe type and collision position information.
In S3, when electromechanical pipelines are arranged, an insulating layer is added to the air pipes and the water pipes according to the arrangement principle that the air pipes with the upper air openings are arranged on the upper layer, the air pipes with the lower air openings are arranged on the lowest layer, the strong and weak bridges are arranged on the second layer and the water pipes are arranged on the third layer, the distance between the upper air pipes and the parallel pipelines is 100mm, and the distance between the pipeline layers is 150-200mm; 300-400mm of overhaul space is reserved in the middle of the corridor.
In S4, the accurate positioning of the reserved holes is carried out on the secondary structure wall body penetrated by the electromechanical pipeline after the electromechanical pipeline is distributed.
In S5, according to the comprehensive bracket arrangement principle, the distance between adjacent brackets is set to be 4m, wherein the arrangement design scheme of the support and hanger specifically comprises the following steps:
s5.1: calculating the weight of the section pipeline according to the weight parameters of the cable bridge, the water pipe and the air pipe;
s5.2: selecting channel steel;
s5.3: and importing the load data into load calculation software to perform calculation rechecking.
In S6, outputting a pipe section model in the three-dimensional BIM model as an electronic edition drawing, and processing according to an electronic territory paper factory to obtain a prefabricated pipe section.
In S7, the pipe segment number includes a pipe segment installation area, a pipe segment system number, a pipe segment length, and a pipe segment spatial location.
In S8, the prefabricated pipe section in S6 is transported to the construction site, and the prefabricated pipe section in S6 is connected to the ground and installed to the top of the building according to the pipe section number in S7.
In conclusion, the implementation method is more scientific and reasonable, the pipeline position, the bracket form and the hole position are optimally arranged in advance through the accurate positioning of the upper space of the narrow corridor of the hospital, and the construction sequence and the material processing sequence can be reasonably arranged through virtual construction, so that factory prefabrication processing is realized; the method can reduce the waste of the materials of the electromechanical pipeline, simultaneously define the work tasks in the construction period arrangement, avoid the field reworking phenomenon and save the construction period.
The invention and its embodiments have been described above by way of illustration and not limitation, and the invention is illustrated in the accompanying drawings and described in the drawings in which the actual structure is not limited thereto. Therefore, if one of ordinary skill in the art is informed by this disclosure, the structural mode and the embodiments similar to the technical scheme are not creatively designed without departing from the gist of the present invention.

Claims (8)

1. A construction method of an electromechanical pipeline in a narrow corridor of a hospital based on BIM technology is characterized by comprising the following steps: the method comprises the following steps:
s1: building a BIM model, and building the BIM model of a building according to a building structure and a construction diagram of electromechanical engineering, wherein the BIM model comprises an electromechanical pipeline model;
s2: collision detection, namely performing collision detection on the structure and the pipeline and between the pipeline and the pipeline by utilizing a Navisworks collision detection function, and determining the optimized part of the pipeline;
s3: the construction deepening design is carried out, and integration in the private industry and between the private industry is carried out based on the BIM three-dimensional model; carrying out deepened design of complex pipeline arrangement in the upper space of a narrow corridor of a hospital according to a design principle, a construction acceptance specification and a pipeline arrangement principle;
s4: after the reserved hole positioning and deepening design scheme is confirmed, the position of a pipeline penetrating through a secondary structural wall body in the model is secondarily deepened based on the optimization scheme, so that conflicts with structural columns, constructional columns, ring beams and the like are avoided, the accurate positioning of the reserved hole is completed, and a reserved hole positioning map is output for secondary masonry construction;
s5: after the comprehensive support design and the electromechanical pipeline arrangement scheme are completed, the comprehensive support and hanger design is carried out, the comprehensive support and hanger section specification is selected according to the pipeline specialty and the load type, the arrangement form of the comprehensive support is respectively carried out on the mechanical property analysis and the stress calculation of the support aiming at different design schemes, and the optimal scheme is selected to complete the arrangement of the support and hanger space position;
s6: after the pipe section prefabrication, the spatial arrangement of the pipeline and the spatial arrangement scheme of the supporting and hanging frame are completed, the pipeline is broken according to the specified length, and the arrangement of the valve and the pipe fitting is fully considered; outputting a pipe section sectional diagram, and blanking and processing the pipe section sectional diagram by a processing plant to realize prefabrication of a pipeline factory;
s7: the pipe section is numbered, the processed pipe section is numbered and marked according to the sequence of the area and the system after the size and the position of the processed pipe section are checked to be correct by a quality department, and the pipe section is stacked in order;
s8: and (3) installing the pipe section, conveying the pipe section processed by the factory to an installation site, assembling the pipe section into a large module according to the number, and installing the large module once again, conveying the prefabricated pipeline and the accessory module to corresponding areas during the assembly, assembling the pipe section and the accessory module according to the code number on site, checking the pipe section and the accessory module with a BIM model after the assembly, and checking whether the position, the size, the elevation and the space positioning are consistent.
2. The hospital narrow corridor electromechanical pipeline construction method based on BIM technology according to claim 1, wherein the method comprises the following steps: in the step S2, the collision detection method based on the pipeline model specifically includes the steps of:
s2.1: deriving each specialized model in the three-dimensional BIM model, including a building model and an electromechanical model;
s2.2: integrating each professional model into a comprehensive pipeline model and performing collision detection;
s2.3: synchronously recording and displaying collision detection results; the collision detection result includes collision pipe type and collision position information.
3. The hospital narrow corridor electromechanical pipeline construction method based on BIM technology according to claim 1, wherein the method comprises the following steps: in the step S3, when the electromechanical pipelines are arranged, the arrangement principle that an upper air pipe is arranged on an upper layer, a lower air pipe is arranged on a lowest layer, a strong and weak bridge is arranged on a second layer and a water pipe is arranged on a third layer is followed, an insulating layer is added to the air pipe and the water pipe, the distance between the upper air pipe and the bottom of a structural beam is 100mm, the distance between parallel pipelines is 100mm, and the distance between the pipeline layers is 150-200mm; 300-400mm of overhaul space is reserved in the middle of the corridor.
4. The hospital narrow corridor electromechanical pipeline construction method based on BIM technology according to claim 1, wherein the method comprises the following steps: in the step S4, the accurate positioning of the reserved holes is carried out on the secondary structure wall body penetrated by the electromechanical pipeline after the electromechanical pipeline is distributed.
5. The hospital narrow corridor electromechanical pipeline construction method based on BIM technology according to claim 1, wherein the method comprises the following steps: in the step S5, according to the comprehensive bracket arrangement principle, the distance between adjacent brackets is set to be 4m, wherein the arrangement design scheme of the support and hanger specifically comprises the following steps:
s5.1: calculating the weight of the section pipeline according to the weight parameters of the cable bridge, the water pipe and the air pipe;
s5.2: selecting channel steel;
s5.3: and importing the load data into load calculation software to perform calculation rechecking.
6. The hospital narrow corridor electromechanical pipeline construction method based on BIM technology according to claim 1, wherein the method comprises the following steps: and in the S6, outputting a pipe section model in the three-dimensional BIM model as an electronic edition drawing, and processing according to an electronic territory paper factory to obtain a prefabricated pipe section.
7. The hospital narrow corridor electromechanical pipeline construction method based on BIM technology according to claim 1, wherein the method comprises the following steps: in S7, the pipe section number includes a pipe section installation area, a pipe section system number, a pipe section length, and a pipe section spatial location.
8. The hospital narrow corridor electromechanical pipeline construction method based on BIM technology according to claim 1, wherein the method comprises the following steps: in S8, the prefabricated pipe section in S6 is transported to a construction site, and according to the pipe section number in S7, the prefabricated pipe section in S6 is connected to the ground and installed on top of a building.
CN202310987498.4A 2023-08-08 2023-08-08 Construction method of mechanical and electrical pipeline of narrow corridor of hospital based on BIM technology Pending CN117010065A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310987498.4A CN117010065A (en) 2023-08-08 2023-08-08 Construction method of mechanical and electrical pipeline of narrow corridor of hospital based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310987498.4A CN117010065A (en) 2023-08-08 2023-08-08 Construction method of mechanical and electrical pipeline of narrow corridor of hospital based on BIM technology

Publications (1)

Publication Number Publication Date
CN117010065A true CN117010065A (en) 2023-11-07

Family

ID=88570755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310987498.4A Pending CN117010065A (en) 2023-08-08 2023-08-08 Construction method of mechanical and electrical pipeline of narrow corridor of hospital based on BIM technology

Country Status (1)

Country Link
CN (1) CN117010065A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118014773A (en) * 2024-04-08 2024-05-10 中交四航局第六工程有限公司 Modularized installation method of electromechanical comprehensive pipeline
CN118111100A (en) * 2024-04-29 2024-05-31 中建安装集团有限公司 Modularized efficient low-carbon construction method for fireproof heat-preservation air duct
CN118171380A (en) * 2024-05-15 2024-06-11 北京市第三建筑工程有限公司 Deep design method for bridge direction conversion pipe fitting in narrow electric well space

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118014773A (en) * 2024-04-08 2024-05-10 中交四航局第六工程有限公司 Modularized installation method of electromechanical comprehensive pipeline
CN118111100A (en) * 2024-04-29 2024-05-31 中建安装集团有限公司 Modularized efficient low-carbon construction method for fireproof heat-preservation air duct
CN118171380A (en) * 2024-05-15 2024-06-11 北京市第三建筑工程有限公司 Deep design method for bridge direction conversion pipe fitting in narrow electric well space

Similar Documents

Publication Publication Date Title
CN117010065A (en) Construction method of mechanical and electrical pipeline of narrow corridor of hospital based on BIM technology
CN109614723A (en) A kind of comprehensive construction method based on BIM technology
CN111859507A (en) Assembly type building construction scheme based on BIM technology
CN105677978A (en) Horizontal multi-pipe support and prefabricating construction method thereof based on BIM
CN105888317A (en) Central refrigeration machine room modular prefabrication and assembled construction method
CN113204820A (en) Intelligent arrangement checking method for building electric fire-fighting fire alarm detection point
CN115758553B (en) Modularized assembly type machine room implementation method based on BIM technology
CN111104709A (en) BIM-based large-scale refrigeration machine room digital assembly method and system
CN110107972B (en) Cabin type refrigerating machine room and construction method thereof
CN103485414A (en) Prefabricated assembled type steel structure house building system and construction method thereof
CN111724124A (en) BIM technology-based pipeline comprehensive construction method
CN113435757A (en) BIM-based building masonry design and construction method
CN112613100A (en) Integrated pipeline integral assembly method based on BIM technology
Su et al. Research on integrated design of modular steel structure container buildings based on BIM
CN113293998A (en) Discrete type prefabrication distributed construction method for high-density refrigeration machine room
CN100570757C (en) The modular construction method that is used for nuclear island of nuclear power station
CN101736925B (en) Modular construction method for nuclear island of nuclear power station
CN101752017B (en) Modularization construction method for nuclear power station nuclear island
CN101664776A (en) Method for bending large-diameter arc pipe in site and large-diameter arc pipe fixing device
CN210152028U (en) Bolt joint method cell cube GRC curtain wall construction
CN111931316A (en) Modular assembly type machine room equipment and pipeline construction method
CN116861542A (en) Peripheral wall panel design method and system based on BIM
CN101748915A (en) Modularization construction method for nuclear power station nuclear island
CN110321620B (en) Design construction method of assembled house building
JPS6244636B2 (en)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination