CN116992694A - 一种隧道爆破质量评价及优化方法 - Google Patents
一种隧道爆破质量评价及优化方法 Download PDFInfo
- Publication number
- CN116992694A CN116992694A CN202311223077.0A CN202311223077A CN116992694A CN 116992694 A CN116992694 A CN 116992694A CN 202311223077 A CN202311223077 A CN 202311223077A CN 116992694 A CN116992694 A CN 116992694A
- Authority
- CN
- China
- Prior art keywords
- blasting
- tunnel
- data
- area
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005422 blasting Methods 0.000 title claims abstract description 162
- 238000000034 method Methods 0.000 title claims abstract description 44
- 238000013441 quality evaluation Methods 0.000 title claims abstract description 18
- 238000005457 optimization Methods 0.000 title claims abstract description 15
- 238000001514 detection method Methods 0.000 claims abstract description 58
- 239000011435 rock Substances 0.000 claims abstract description 41
- 238000011156 evaluation Methods 0.000 claims abstract description 27
- 230000015572 biosynthetic process Effects 0.000 claims description 5
- 238000013210 evaluation model Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 9
- 238000012549 training Methods 0.000 description 11
- 238000009412 basement excavation Methods 0.000 description 10
- 238000005553 drilling Methods 0.000 description 6
- 238000006243 chemical reaction Methods 0.000 description 5
- 238000013528 artificial neural network Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000004880 explosion Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 239000011229 interlayer Substances 0.000 description 3
- 238000013473 artificial intelligence Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000002360 explosive Substances 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013527 convolutional neural network Methods 0.000 description 1
- 238000005474 detonation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 230000009469 supplementation Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311223077.0A CN116992694B (zh) | 2023-09-21 | 2023-09-21 | 一种隧道爆破质量评价及优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311223077.0A CN116992694B (zh) | 2023-09-21 | 2023-09-21 | 一种隧道爆破质量评价及优化方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116992694A true CN116992694A (zh) | 2023-11-03 |
CN116992694B CN116992694B (zh) | 2024-03-08 |
Family
ID=88523406
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202311223077.0A Active CN116992694B (zh) | 2023-09-21 | 2023-09-21 | 一种隧道爆破质量评价及优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116992694B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117606946A (zh) * | 2024-01-24 | 2024-02-27 | 中铁开发投资集团有限公司 | 一种爆破数据测试系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104594913A (zh) * | 2015-01-16 | 2015-05-06 | 中交一公局第一工程有限公司 | 隧道纵向通风联络风道与正洞零净距立体交叉结构及施工方法 |
KR101550159B1 (ko) * | 2014-12-24 | 2015-09-04 | 강릉건설 주식회사 | 이종(異種) 쉴드 조합에 의한 복합 쉴드 tbm 터널 시공방법 및 그 시공방법에 이용되는 이종(異種) 쉴드 조합용 결합장치 |
CN112066830A (zh) * | 2020-08-27 | 2020-12-11 | 中铁三局集团广东建设工程有限公司 | 一种砂质板岩隧道施工方法 |
CN112966369A (zh) * | 2021-02-06 | 2021-06-15 | 中铁工程装备集团有限公司 | 一种隧道爆破质量评价及优化方法 |
CN113821977A (zh) * | 2021-09-28 | 2021-12-21 | 成都理工大学 | 一种用于tbm隧道施工的岩爆风险评估系统及方法 |
CN115596451A (zh) * | 2022-10-08 | 2023-01-13 | 中铁七局集团有限公司(Cn) | 隧道施工爆破方法 |
-
2023
- 2023-09-21 CN CN202311223077.0A patent/CN116992694B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101550159B1 (ko) * | 2014-12-24 | 2015-09-04 | 강릉건설 주식회사 | 이종(異種) 쉴드 조합에 의한 복합 쉴드 tbm 터널 시공방법 및 그 시공방법에 이용되는 이종(異種) 쉴드 조합용 결합장치 |
CN104594913A (zh) * | 2015-01-16 | 2015-05-06 | 中交一公局第一工程有限公司 | 隧道纵向通风联络风道与正洞零净距立体交叉结构及施工方法 |
CN112066830A (zh) * | 2020-08-27 | 2020-12-11 | 中铁三局集团广东建设工程有限公司 | 一种砂质板岩隧道施工方法 |
CN112966369A (zh) * | 2021-02-06 | 2021-06-15 | 中铁工程装备集团有限公司 | 一种隧道爆破质量评价及优化方法 |
CN113821977A (zh) * | 2021-09-28 | 2021-12-21 | 成都理工大学 | 一种用于tbm隧道施工的岩爆风险评估系统及方法 |
CN115596451A (zh) * | 2022-10-08 | 2023-01-13 | 中铁七局集团有限公司(Cn) | 隧道施工爆破方法 |
Non-Patent Citations (1)
Title |
---|
孟栋 等: "铁路立体交叉隧道施工爆破震动响应研究", 《合肥工业大学学报(自然科学版)》, vol. 38, no. 03, pages 363 - 368 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117606946A (zh) * | 2024-01-24 | 2024-02-27 | 中铁开发投资集团有限公司 | 一种爆破数据测试系统 |
CN117606946B (zh) * | 2024-01-24 | 2024-03-26 | 中铁开发投资集团有限公司 | 一种爆破数据测试系统 |
Also Published As
Publication number | Publication date |
---|---|
CN116992694B (zh) | 2024-03-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN116992694B (zh) | 一种隧道爆破质量评价及优化方法 | |
CN110400006B (zh) | 基于深度学习算法的油井产量预测方法 | |
CN107992536B (zh) | 基于张量分解的城市交通缺失数据填补方法 | |
AU2019312330B2 (en) | Method for predicting mine strata pressure behavior data of stoping tunnel | |
CN109635461A (zh) | 一种应用随钻参数来自动识别围岩级别的方法和系统 | |
CN110298503A (zh) | 基于微震信息和深度卷积神经网络的隧洞岩爆预警方法 | |
CN108614944A (zh) | 一种盾构轨迹轴线纠偏参数预测方法 | |
CN114358427B (zh) | 一种预测页岩气井最终可采储量的方法 | |
US20170146690A1 (en) | Method for generating secondary data in geostatistics using observed data | |
CN108595803A (zh) | 基于递归神经网络的页岩气井生产压力预测方法 | |
CN108960334A (zh) | 一种多传感器数据加权融合方法 | |
CN115878603A (zh) | 基于k近邻算法与gan网络的水质缺失数据插补算法 | |
CN109781044A (zh) | 边坡失稳的综合逐渐逼近预警方法 | |
CN111144001A (zh) | 一种基于bp神经网络的矿山井筒工程tbm控制方法 | |
CN117786794A (zh) | 一种盾构下穿既有隧道变形优化控制方法及系统 | |
CN111079783A (zh) | 一种基于多核集成学习识别地层岩性参数的方法 | |
CN114897007A (zh) | 一种复合信息分层卷积神经网络的钻机健康状况评估方法 | |
KR20200058258A (ko) | 지반 층상정보 예측 시스템, 방법, 및 상기 방법을 실행시키기 위한 컴퓨터 판독 가능한 프로그램을 기록한 저장 매체 | |
CN113886989A (zh) | 一种基于机器学习的石油钻井的参数优化方法及系统 | |
CN115481565A (zh) | 一种基于lstm和蚁群算法的土压平衡盾构机掘进参数预测方法 | |
CN115757604A (zh) | 一种基于夜光影像数据的gdp时空演变分析方法 | |
CN114580940A (zh) | 基于灰色关联度分析法的注浆效果模糊综合评价方法 | |
CN107330587B (zh) | 一种基于ais的近岸航道水深利用率计算方法 | |
CN113077091A (zh) | 一种基于机器学习的漏速概率分布预测方法和系统 | |
CN114488297A (zh) | 一种断层识别方法及装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Xu Daiming Inventor after: He Xiaoyong Inventor after: Li Minghui Inventor after: Li Chaohui Inventor after: Zhang Xuemin Inventor after: Yang Weiwei Inventor after: Shen Tao Inventor after: Ma Liangliang Inventor after: Han Miao Inventor before: Xu Daiming Inventor before: He Xiaoyong Inventor before: Li Minghui Inventor before: Li Zhaohui Inventor before: Zhang Xuemin Inventor before: Yang Weiwei Inventor before: Shen Tao Inventor before: Ma Liangliang Inventor before: Han Miao |
|
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Xu Daiming Inventor after: He Xiaoyong Inventor after: Li Minghui Inventor after: Li Chaohui Inventor after: Zhang Xuemin Inventor after: Yang Weiwei Inventor after: Shen Tao Inventor after: Ma Liangliang Inventor after: Han Miao Inventor before: Xu Daiming Inventor before: He Xiaoyong Inventor before: Li Minghui Inventor before: Li Chaohui Inventor before: Zhang Xuemin Inventor before: Yang Weiwei Inventor before: Shen Tao Inventor before: Ma Liangliang Inventor before: Han Miao |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |