CN116865193A - Distribution network planning device based on distribution network frame - Google Patents

Distribution network planning device based on distribution network frame Download PDF

Info

Publication number
CN116865193A
CN116865193A CN202311126784.8A CN202311126784A CN116865193A CN 116865193 A CN116865193 A CN 116865193A CN 202311126784 A CN202311126784 A CN 202311126784A CN 116865193 A CN116865193 A CN 116865193A
Authority
CN
China
Prior art keywords
distribution network
fixed
plate
plates
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202311126784.8A
Other languages
Chinese (zh)
Other versions
CN116865193B (en
Inventor
张智恒
吴一波
宋雷
刘利平
薛聪
周高攀
刘烨枫
盛春光
张鹏超
李斌
周常兴
杨彬
赵艳红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dezhou Xinyu Electrical Automation Equipment Co ltd
Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Original Assignee
Dezhou Xinyu Electrical Automation Equipment Co ltd
Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dezhou Xinyu Electrical Automation Equipment Co ltd, Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd filed Critical Dezhou Xinyu Electrical Automation Equipment Co ltd
Priority to CN202311126784.8A priority Critical patent/CN116865193B/en
Publication of CN116865193A publication Critical patent/CN116865193A/en
Application granted granted Critical
Publication of CN116865193B publication Critical patent/CN116865193B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers
    • H02G7/205Installation of electric cables, extending along a pole
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • H02G7/053Suspension clamps and clips for electric overhead lines not suspended to a supporting wire

Landscapes

  • Patch Boards (AREA)

Abstract

The invention discloses a power distribution network planning device based on a power distribution network frame, which comprises a fixed cylinder, wherein two fixed plates are symmetrically and fixedly connected to the outer side of the fixed cylinder, fixed grooves are formed in the upper sides of the two fixed plates, the fixed grooves are arranged in a vertically penetrating mode, a plurality of threaded cylinders are sleeved in the fixed grooves, threaded rods are sleeved in the threaded cylinders in a threaded mode, the threaded rods penetrate through the threaded cylinders, rotating plates are arranged on the upper side and the lower side of the threaded rods in a rotating mode, two arc-shaped plates are arranged on one side, away from the threaded cylinders, of each rotating plate, the two arc-shaped plates are arranged oppositely, and one arc-shaped plate is fixedly connected with the rotating plate. The invention completes the simple fixing operation of the long rod and the wire in the installation process of the main net rack by matching the two arc plates, thereby providing convenience for the subsequent installation process, reducing the workload of workers, ensuring firm and reliable whole, convenient installation and disassembly and good practical effect.

Description

Distribution network planning device based on distribution network frame
Technical Field
The invention relates to the technical field of power distribution networks, in particular to a power distribution network planning device based on a power distribution network frame.
Background
The grid planning of the power distribution network is to determine what type of line and the number of loops are built in time and place so as to achieve the power transmission capability required in a planning period, the cost of the system is minimized on the premise of meeting various technical indexes, the content of the grid planning of the power distribution network is to determine the power transmission mode in a city, select the power grid voltage, determine the layout and the scale of a transformer substation and determine the network structure, and the key point of the grid planning of the power distribution network is to plan the main grid. In the planning process of the grid frame of the power distribution network, the manual mode is mainly utilized for assembly operation, workers need to control corresponding long rods and wires, the whole workload is large, time and labor are wasted, the power distribution network is frequently in high-altitude operation, and the safety performance is low.
Disclosure of Invention
The invention aims to solve the defects existing in the prior art, such as: the manual mode is utilized to carry out assembly operation, the worker needs to control corresponding long rods and wires, the whole workload is large, time and labor are wasted, the operation is frequently carried out at high altitude, the safety performance is low, and the power distribution network planning device based on the power distribution network frame is provided.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
distribution network planning device based on distribution rack, including a fixed section of thick bamboo, fixed section of thick bamboo outside symmetry fixed connection is equipped with two fixed plates, two the upside of fixed plate is equipped with the fixed slot, pass through the setting from top to bottom in the fixed slot, the fixed slot endotheca is equipped with a plurality of screw thread barrels, a plurality of screw thread barrel internal thread cover is equipped with the threaded rod, the threaded rod runs through in the screw thread barrel setting, the upper and lower both sides of threaded rod all rotate the connection and are equipped with the rotor plate, one side that the screw thread barrel was kept away from to the rotor plate is equipped with two arcs, two the arc sets up relatively, one of them arc and rotor plate fixed connection set up, another one side fixed connection that the threaded rod was kept away from to the arc is equipped with the control panel, be equipped with the cavity in the control panel, sliding connection is equipped with two slide plates are close to one side fixed connection of rotor plate is equipped with the mounting panel, the mounting panel runs through in the cavity setting, the lateral wall of mounting panel is equipped with a plurality of mounting holes, the left and right sides of rotor plate all is equipped with the mounting groove, two the mounting groove sets up from top to bottom, two the mounting groove is kept away from top to bottom one side of rotor plate is equipped with the mounting panel fixed connection in the mounting bar, and passes through the mounting hole.
Preferably, the cavity internal rotation connection is equipped with the regulation and control pole, the regulation and control pole runs through in the cavity setting, the regulation and control pole is located cavity internal fixation cover and is equipped with the gear, two the slide is close to one side fixed connection of counterparty and is equipped with the rack, the rack is located the front and back both sides and the gear engagement contact connection setting of gear, one side fixed connection that the control board was kept away from to the regulation and control pole is equipped with the regulation and control board, the outside upper and lower slip cap of regulation and control pole is equipped with the saw gear, the saw gear is located and sets up between control board and the regulation and control board, just saw gear and control board contact connection set up, the saw gear is connected the setting through first spring and regulation and control board, one side symmetry fixed connection that the arc was kept away from to the control board is equipped with two clamping bars, two clamping bars and saw gear engagement contact connection set up.
Preferably, both sides all are equipped with the spout around in the fixed slot, two sliding connection is equipped with a plurality of slide bars in the spout, and a plurality of the slide bar runs through in the spout setting, a plurality of slide bar and screw thread section of thick bamboo match fixed connection setting.
Preferably, the outside symmetry fixed connection of screw thread section of thick bamboo is equipped with two cardboards, two the cover that slides from top to bottom is equipped with the movable rod in the cardboard, the movable rod runs through in the cardboard setting, the downside fixed connection of movable rod is equipped with the movable plate, the movable plate passes through the second spring and is connected the setting with the cardboard, the downside of fixed plate evenly is equipped with a plurality of movable grooves, the movable rod runs through in movable groove and movable groove matching relative setting.
Preferably, the fixed connection is equipped with the locating plate in the fixed cylinder, the upside fixed connection of locating plate is equipped with the dead lever, the dead lever runs through in the fixed cylinder setting, the left and right sides of locating plate is all rotated and is connected and be equipped with the dwang, the outside thread bush of dwang is equipped with the clamp lever, the clamp lever runs through in the fixed cylinder upside setting.
Preferably, the inner sides of the two arc plates are fixedly connected with rubber pads.
Compared with the prior art, the invention has the beneficial effects that: through mutually supporting between two arc, accomplish the simple fixed operation to main network rack installation, stock and wire, for follow-up installation is convenient, reduce workman's work load, in utilizing the arc to carry out the centre gripping in-process, utilize fixed section of thick bamboo earlier, dead lever and clamping lever, accomplish the holistic installation operation to the device, then select the arc of suitable quantity wholly according to actual operational aspect, and can also accomplish the adjustment and the fixed operation to arc position according to actual operational aspect, improve the holistic stability of device, wholly firm reliably, the installation is convenient with dismantling, the practical function is good.
Drawings
Fig. 1 is a schematic structural diagram of a power distribution network planning device based on a power distribution network frame according to the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1;
FIG. 3 is an enlarged view of the structure at B in FIG. 2;
fig. 4 is a schematic side view connection diagram of a fixing plate and a screw cylinder in a power distribution network planning device based on a power distribution network frame;
fig. 5 is a schematic diagram of top connection of cavities in a power distribution network planning device based on a power distribution network frame according to the present invention.
In the figure: 1 fixed cylinder, 2 locating plate, 3 dead lever, 4 dwang, 5 clamp lever, 6 dead plate, 7 fixed slot, 8 spout, 9 screw thread cylinder, 10 threaded rod, 11 dwang, 12 arc, 13 control panel, 14 cavity, 15 slide, 16 mounting panel, 17 mounting hole, 18 mounting groove, 19 installation pole, 20 regulation and control pole, 21 gear, 22 rack, 23 regulation and control board, 24 first spring, 25 saw gear, 26 clamping pole, 27 slide bar, 28 cardboard, 29 movable rod, 30 movable plate, 31 second spring, 32 movable slot.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1-5, a power distribution network planning device based on a power distribution network frame comprises a fixed cylinder 1, wherein two fixed plates 6 are symmetrically and fixedly connected to the outer side of the fixed cylinder 1, a fixed groove 7 is formed in the upper side of the two fixed plates 6, the fixed groove 7 is arranged in a penetrating manner up and down, a plurality of thread cylinders 9 are sleeved in the fixed groove 7, a threaded rod 10 is sleeved in the plurality of thread cylinders 9, the threaded rod 10 penetrates through the thread cylinders 9, rotating plates 11 are rotatably connected to the upper side and the lower side of the threaded rod 10, two arc plates 12 are arranged on one side, far from the thread cylinders 9, of the rotating plates 11, the two arc plates 12 are oppositely arranged, one arc plate 12 is fixedly connected with the rotating plates 11, one side, far from the rotating plates 10, of the other arc plate 12 is fixedly connected with a control plate 13, a cavity 14 is formed in the control plate 13, two sliding connection plates 15 are arranged in the left and right sides of the cavity 14, a mounting plate 16 is fixedly connected with one side, the mounting plate 16 penetrates through the cavity 14, a plurality of mounting holes 17 are formed in the side wall of the mounting plate 16, the rotating plates 11 are respectively provided with mounting grooves 18 on the left and right sides of the threaded rod 9, the two mounting grooves 18 are oppositely arranged on the two mounting grooves 18, the two mounting holes 19 are oppositely arranged in the mounting holes 19, and the mounting holes 19 are matched with the mounting holes 17 are correspondingly arranged between the mounting plates and the mounting plates 17, and the mounting holes 17 are correspondingly arranged, and the mounting holes are correspondingly arranged between the mounting holes 17 and the mounting holes are arranged by the mounting holes 17;
the cavity 14 is internally and fixedly sleeved with a gear 21, one side, close to each other, of the two sliding plates 15 is fixedly connected with a rack 22, the rack 22 is arranged on the front side and the rear side of the gear 21 and is in meshed contact connection with the gear 21, the two sliding plates 15 are in movable control operation by matching between the gear 21 and the rack 22, one side, far away from the control plate 13, of the regulating rod 20 is fixedly connected with a regulating plate 23, a saw gear 25 is sleeved on the outer side of the regulating rod 20 in a sliding manner, the saw gear 25 is arranged between the control plate 13 and the regulating plate 23, the saw gear 25 is in contact connection with the control plate 13, the saw gear 25 is connected with the regulating plate 23 through a first spring 24, one side, far away from the arc plate 12, of the control plate 13 is symmetrically and fixedly connected with two clamping rods 26, the two clamping rods 26 are in meshed contact connection with the saw gear 25, and the regulation and the fixed operation of the control plate 20 and 13 are completed by matching between the regulating gear 25 and the clamping rods 26;
the sliding grooves 8 are arranged on the front side and the rear side in the fixed groove 7, a plurality of sliding rods 27 are arranged in sliding connection with the two sliding grooves 8, the sliding rods 27 penetrate through the sliding grooves 8, the sliding rods 27 are fixedly connected with the threaded cylinder 9 in a matching manner, and the movement track of the threaded cylinder 9 is determined and limited;
the outer side of the threaded cylinder 9 is symmetrically and fixedly connected with two clamping plates 28, a movable rod 29 is sleeved in the two clamping plates 28 in a vertically sliding manner, the movable rod 29 penetrates through the clamping plates 28, a movable plate 30 is fixedly connected to the lower side of the movable rod 29, the movable plate 30 is connected with the clamping plates 28 through a second spring 31, a plurality of movable grooves 32 are uniformly formed in the lower side of the fixed plate 6, the movable rod 29 penetrates through the movable grooves 32 and the movable grooves 32 to be matched and oppositely arranged, and the movable rod 29 is matched with the movable grooves 32 to finish the fixing operation between the threaded cylinder 9 and the fixed plate 6;
the fixing cylinder 1 is internally and fixedly connected with the positioning plate 2, the upper side of the positioning plate 2 is fixedly connected with the fixing rod 3, the fixing rod 3 penetrates through the fixing cylinder 1, the left side and the right side of the positioning plate 2 are rotatably connected with the rotating rod 4, the outer side of the rotating rod 4 is sleeved with the clamping rod 5, the clamping rod 5 penetrates through the upper side of the fixing cylinder 1, and the clamping rod 5 is matched with the fixing rod 3 or the clamping rod 5 and the fixing cylinder 1 to finish the integral installation and fixing operation of the device;
the inner sides of the two arc plates 12 are fixedly connected with rubber pads, so that the arc plates 12 are more tightly connected with the clamped object.
In the invention, when the device is required to be used for integrally fixing the wires on the main network frame, the specific operation is as follows: the device is integrally arranged on the upper side of the net rack, according to the actual working condition, the fixed cylinder 1 and the clamping rod 5 or the fixed rod 3 and the clamping rod 5 are sleeved on the corresponding net rack, the rotating rod 4 is rotated, the rotating rod 4 drives the clamping rod 5 to move until the fixed cylinder 1 and the clamping rod 5 or the fixed rod 3 and the clamping rod 5 are fixedly connected with the corresponding net rack, the moving plate 30 is moved downwards, the moving plate 30 stretches the second spring 31 and simultaneously drives the moving rod 29 to move downwards until the moving rod 29 is moved out of the moving groove 32, the threaded cylinder 9 is moved left and right until the position of the threaded cylinder 9 meets the working requirement, the moving plate 30 is released, the moving plate 30 drives the moving rod 29 to move under the action of the second spring 31, the moving rod 29 enters the corresponding moving groove 32, the threaded rod 10 is rotated, and the threaded rod 10 is further moved downwards, until the position of the arc plates 12 meets the working requirement, a wire is placed between the two arc plates 12, the saw gear 25 is moved in a direction away from the control plate 13, the saw gear 25 compresses the first spring 24 until the saw gear 25 and the clamping rod 26 are disconnected, the regulating plate 23 is rotated, the regulating plate 23 drives the rack 22 to move through the regulating rod 20 and the gear 21, the rack 22 drives the two sliding plates 15 to move in a direction away from each other, the arc plates 12 on the lower side are moved until the arc plates 12 and the wire are closely contacted and connected, the regulating plate 23 is rotated again, the regulating plate 23 drives the rack 22 to move through the regulating rod 20 and the gear 21, the rack 22 drives the mounting plate 16 to move, the mounting rod 19 enters the corresponding mounting hole 17, the regulating plate 23 is loosened, the clamping rod 26 is meshed and connected with the saw gear 25 again under the action of the first spring 24, thereby completing the fixing operation of the lead.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should make equivalent substitutions or modifications according to the technical scheme of the present invention and the inventive concept thereof, and should be covered by the scope of the present invention.

Claims (6)

1. Distribution network planning device based on distribution network frame, including fixed section of thick bamboo (1), its characterized in that, fixed section of thick bamboo (1) outside symmetry fixed connection is equipped with two fixed plates (6), two the upside of fixed plate (6) is equipped with fixed slot (7), penetrating setting from top to bottom, fixed slot (7) endotheca is equipped with a plurality of screw thread section of thick bamboo (9), a plurality of screw thread section of thick bamboo (9) internal thread cover is equipped with threaded rod (10), threaded rod (10) run through in screw thread section of thick bamboo (9) setting, the upper and lower both sides of threaded rod (10) are all rotated and are connected and are equipped with rotating plate (11), one side that rotating plate (11) kept away from screw thread section of thick bamboo (9) is equipped with two arc plates (12), two arc plates (12) set up relatively, one of them arc plates (12) and rotating plate (11) fixed connection sets up, one side fixed connection that threaded rod (10) was kept away from to arc plates (12) is equipped with control panel (13), be equipped with cavity (14) in control panel (13), be equipped with cavity (14) internal right side sliding connection is equipped with two slide plates (15) and is equipped with two slide plates (16) and is close to one side of connecting plate (16), the side wall of mounting panel (16) is equipped with a plurality of mounting holes (17), the left and right sides of rotor plate (11) all is equipped with mounting groove (18), two mounting groove (18) pass through from top to bottom and set up, two fixed connection is equipped with installation pole (19) in mounting groove (18), mounting panel (16) run through in mounting groove (18) setting, just installation pole (19) run through in mounting hole (17) and mounting hole (17) match relative setting.
2. The power distribution network planning device based on the power distribution network frame according to claim 1, characterized in that, the cavity (14) is rotationally connected and is equipped with regulation and control pole (20), regulation and control pole (20) run through in cavity (14) setting, regulation and control pole (20) are located cavity (14) internal fixation cover and are equipped with gear (21), two one side fixed connection that slide (15) are close to each other is equipped with rack (22), rack (22) are located the front and back both sides of gear (21) and gear (21) meshing contact connection setting, one side fixed connection that one side that control pole (20) kept away from control board (13) is equipped with regulation and control board (23), the outside upper and lower slip cap of regulation and control pole (20) is equipped with saw gear (25), saw gear (25) are located and regulation and control board (23) between setting, just saw gear (25) and control board (13) contact connection setting, saw gear (25) are connected through first spring (24) and regulation and control board (23) and are set up, one side that control board (13) kept away from control board (12) is equipped with two card symmetrical bars (26) and two saw bars (25) contact connection setting.
3. The power distribution network planning device based on the power distribution network frame according to claim 1, wherein sliding grooves (8) are formed in the front side and the rear side in the fixed groove (7), a plurality of sliding rods (27) are arranged in the sliding grooves (8) in a sliding connection mode, the sliding rods (27) penetrate through the sliding grooves (8), and the sliding rods (27) are fixedly connected with the threaded cylinders (9) in a matching mode.
4. The distribution network planning device based on the distribution network frame according to claim 1, characterized in that, the outside symmetry fixed connection of screw thread section of thick bamboo (9) is equipped with two cardboard (28), two slip cap is equipped with movable rod (29) from top to bottom in cardboard (28), movable rod (29) run through in cardboard (28) setting, the downside fixed connection of movable rod (29) is equipped with movable plate (30), movable plate (30) are connected through second spring (31) and cardboard (28) and are set up, the downside of fixed plate (6) evenly is equipped with a plurality of movable grooves (32), movable rod (29) run through in movable groove (32) and movable groove (32) match relative setting.
5. The distribution network planning device based on the distribution network frame according to claim 1, characterized in that a positioning plate (2) is fixedly connected in the fixed cylinder (1), a fixing rod (3) is fixedly connected to the upper side of the positioning plate (2), the fixing rod (3) penetrates through the fixed cylinder (1), rotating rods (4) are rotatably connected to the left side and the right side of the positioning plate (2), clamping rods (5) are sleeved on the outer side threads of the rotating rods (4), and the clamping rods (5) penetrate through the upper side of the fixed cylinder (1).
6. The power distribution network planning device based on the power distribution network frame according to claim 1, wherein rubber pads are fixedly connected to the inner sides of the two arc-shaped plates (12).
CN202311126784.8A 2023-09-04 2023-09-04 Distribution network planning device based on distribution network frame Active CN116865193B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311126784.8A CN116865193B (en) 2023-09-04 2023-09-04 Distribution network planning device based on distribution network frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311126784.8A CN116865193B (en) 2023-09-04 2023-09-04 Distribution network planning device based on distribution network frame

Publications (2)

Publication Number Publication Date
CN116865193A true CN116865193A (en) 2023-10-10
CN116865193B CN116865193B (en) 2023-11-03

Family

ID=88221940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311126784.8A Active CN116865193B (en) 2023-09-04 2023-09-04 Distribution network planning device based on distribution network frame

Country Status (1)

Country Link
CN (1) CN116865193B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106936106A (en) * 2017-03-29 2017-07-07 谭泮 A kind of conductor spacer of adjustable in length
CN112838545A (en) * 2021-03-24 2021-05-25 盐城市珂玥琛贸易有限公司 Cable with interval changed by spacer and capable of improving protection capability
CN114256800A (en) * 2021-12-24 2022-03-29 武汉誉城千里建工有限公司 Cable supporting device suitable for trenchless power tunnel and construction method
CN216215770U (en) * 2021-11-04 2022-04-05 林淞 Cable erection supporting device for electromechanical installation
CN216530451U (en) * 2021-09-05 2022-05-13 乐山福瑞德机电有限责任公司 Low-voltage cable hook for high-speed railway
CN114673451A (en) * 2022-04-11 2022-06-28 中国煤炭地质总局第一勘探局科教中心 Hole expanding device for geological exploration sampling
CN114992467A (en) * 2022-06-23 2022-09-02 徐州工程学院 Supervision device for building quality safety management
CN218470801U (en) * 2022-09-13 2023-02-10 苏州新能先锋检测科技有限公司 New forms of energy group battery arranges and detects anchor clamps

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106936106A (en) * 2017-03-29 2017-07-07 谭泮 A kind of conductor spacer of adjustable in length
CN112838545A (en) * 2021-03-24 2021-05-25 盐城市珂玥琛贸易有限公司 Cable with interval changed by spacer and capable of improving protection capability
CN216530451U (en) * 2021-09-05 2022-05-13 乐山福瑞德机电有限责任公司 Low-voltage cable hook for high-speed railway
CN216215770U (en) * 2021-11-04 2022-04-05 林淞 Cable erection supporting device for electromechanical installation
CN114256800A (en) * 2021-12-24 2022-03-29 武汉誉城千里建工有限公司 Cable supporting device suitable for trenchless power tunnel and construction method
CN114673451A (en) * 2022-04-11 2022-06-28 中国煤炭地质总局第一勘探局科教中心 Hole expanding device for geological exploration sampling
CN114992467A (en) * 2022-06-23 2022-09-02 徐州工程学院 Supervision device for building quality safety management
CN218470801U (en) * 2022-09-13 2023-02-10 苏州新能先锋检测科技有限公司 New forms of energy group battery arranges and detects anchor clamps

Also Published As

Publication number Publication date
CN116865193B (en) 2023-11-03

Similar Documents

Publication Publication Date Title
CN207139294U (en) Numerically controlled lathe work holder
CN206686478U (en) A kind of electrical control cabinet for being easy to wiring
CN116865193B (en) Distribution network planning device based on distribution network frame
CN206344070U (en) A kind of horizontal automatic screw nailing device
CN206180432U (en) Block terminal convenient to installation inner member
CN206104591U (en) A rectify frock for passenger train passenger door
CN211166118U (en) Auxiliary device for art design drawing
CN111059435A (en) VR locator strutting arrangement
CN111360102A (en) Repair device of archaize building aluminum component
CN211949555U (en) Temporary passing jumping frame for house building construction
CN203660233U (en) Crimping device
CN112470767A (en) Planting simulation device based on visual wisdom agriculture
CN209478468U (en) A kind of overlapping board mold
CN221717031U (en) Canvas production is with cutting flattening device
CN208276060U (en) A kind of door and window plate corner combining machine
CN208427946U (en) A kind of device for screwing up
CN218025869U (en) Split ceramic core welding positioning tool
CN219314213U (en) Steel cord winding displacement positioning machine
CN209125037U (en) A kind of cutter device of valve processing
CN220397198U (en) Adjustable control access control machine mounting structure
CN220840952U (en) Municipal administration tile material cutting mechanism
CN209375080U (en) A kind of power transmission line corner mounting structure
CN214618893U (en) Internet data monitoring equipment adjusting device capable of being adjusted in multiple directions
CN220358694U (en) Weak current wire wiring device for machine room
CN103346579A (en) Distribution network reactive power optimization closed loop control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant