CN116752784A CN202310647360.XA CN202310647360A CN116752784A CN 116752784 A CN116752784 A CN 116752784A CN 202310647360 A CN202310647360 A CN 202310647360A CN 116752784 A CN116752784 A CN 116752784A
Authority
CN
China
Prior art keywords
plate
shell
positioning
locating
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310647360.XA
Other languages
Chinese (zh)
Other versions
CN116752784B (en
Inventor
徐周春
刘霞
任凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangyin Urban Construction Group Co ltd
Original Assignee
Jiangyin Urban Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangyin Urban Construction Group Co ltd filed Critical Jiangyin Urban Construction Group Co ltd
Priority to CN202310647360.XA priority Critical patent/CN116752784B/en
Publication of CN116752784A publication Critical patent/CN116752784A/en
Application granted granted Critical
Publication of CN116752784B publication Critical patent/CN116752784B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/22Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application relates to the field of building construction, in particular to a green construction device for a building masonry, which comprises a positioning plate and a dust removing device, wherein the dust removing device comprises a shell with an opening at the top, a water bag, a water pump, a spray head, a water inlet hose and a water outlet hose, one side of the shell is arranged in an open way, the positioning plate is hinged at the open part of the shell, the water bag is arranged in the shell, one end of the water inlet hose is connected to the water pump, the other end of the water inlet hose is inserted into the water bag, the spray head is connected to the positioning plate through a positioning frame, one end of the water outlet hose is connected with the spray head, the other end of the water outlet hose is connected with the water pump, a positioning component for positioning the positioning plate to keep the positioning plate in a vertical state is detachably connected between the shell and the positioning plate, and the positioning component is detached from the shell and the positioning plate.

Description

Green construction equipment of building brickwork
Technical Field
The application relates to the field of building construction, in particular to a green construction device for building masonry.
Background
Masonry engineering is the engineering of building by bricks, and in order to build the process smoothly, improves and builds efficiency, and more people use appurtenance in the process of building by laying bricks or stones, i.e. the green construction equipment of building brickwork, can make the brick about, the brick aligns fast through using the green construction equipment of building brickwork to reach the purpose of shortening the time of building by laying bricks or stones.
The Chinese patent with the bulletin number of CN113668862A discloses a green construction device of building masonry, which comprises a masonry body, masonry body one side is provided with a plurality of supporting component, supporting component includes the butt board with masonry body lateral wall butt and sets up in the bracing piece that the butt board kept away from masonry body one side, one side fixedly connected with locating piece that the bracing piece is close to the butt board, the locating slot that is used for supplying the locating piece to inlay to establish is offered along width direction to one side that the butt board kept away from the masonry body, one side that the butt board kept away from the masonry body is provided with the locking piece that is used for fixed locating piece to be located the locating slot.
The construction site tends to be large in dust, and the green construction device for the building masonry can only assist in masonry, so that the problem that the dust is large in the construction process of masonry cannot be improved, the sanitation of surrounding environment is affected, and environmental protection is not facilitated.
Disclosure of Invention
In order to solve the problem that dust is large in the construction process and is not beneficial to environmental protection, the application provides a green construction device for building masonry.
The application provides a green construction device for building masonry, which adopts the following technical scheme:
the utility model provides a green construction equipment of building brickwork, includes locating plate and dust collector, dust collector includes open-top's shell, water bag, water pump, shower nozzle, water inlet hose and play water hose, one side of shell is open setting, the locating plate articulates the uncovered department at the shell, the water bag sets up in the shell, water inlet hose's one end is connected on the water pump, the other end inserts in the water bag, the shower nozzle is connected on the locating plate through the locating rack, the shower nozzle is connected to water outlet hose's one end, the water pump is connected to the other end, can dismantle between shell and the locating plate and be connected with the locating component that is used for keeping the locating plate in vertical state to the locating plate location, dismantle locating component from between shell and the locating plate, and when there is not water in the water bag, the locating plate can be accomodate in the shell.
Through adopting above-mentioned technical scheme, during the use, rotate the locating plate, rotate out and make the locating plate be vertical state in the follow shell, fix a position the locating plate through locating component, make the locating plate keep vertical state, water bag arrangement in the shell is again, water injection in the water bag, accomplish the preparation work, when the workman builds by laying bricks or stones, can use vertical locating plate as supplementary instrument of building by laying bricks or stones, simultaneously, insert the water bag with the hose that intakes in, start the water pump, the water pump is through intaking in the hose draws the water in the water bag to the play water hose, finally spout through the shower nozzle, can carry out dust fall around the locating plate through shower nozzle spun water, the great problem of dust has been improved in the construction process of building by laying bricks or stones, reduce the influence to surrounding environment health, be favorable to environmental protection.
Optionally, the shell is connected with a positioning piece, the positioning piece comprises a positioning piece and a positioning screw rod, the positioning screw rod penetrates through the side wall of the shell and is in threaded connection with the side wall of the shell, one end of the positioning screw rod, which is positioned in the shell, is connected with the positioning piece, and the side wall of the water bag, which is positioned between the side wall of the shell and the positioning piece, is clamped by the positioning piece
Through adopting above-mentioned technical scheme, during the use, rotate the locating screw, leave great space between messenger's spacer and the shell lateral wall, insert between spacer and the shell lateral wall with the water bag lateral wall, rotate the locating screw again, change the position of spacer, make the spacer press from both sides water bag lateral wall tight to realize the purpose of fixed water bag lateral wall, avoid the water bag lateral wall to collapse, lead to water accident to flow, influence the environment in building site.
Optionally, can dismantle on the shell lateral wall and be connected with the receiver, the water pump sets up in the receiver, goes out water hose and shower nozzle and can dismantle and be connected.
Through adopting above-mentioned technical scheme, in the construction process of building by laying bricks or stones, set up the water pump in the receiver, can protect the water pump, reduce the possibility that the water pump was damaged, and receiver and shell lateral wall can dismantle the connection, after the construction of building by laying bricks or stones, can dismantle the play water hose from the shower nozzle, tear receiver and shell open to separately deposit, bring the convenience for the user.
Optionally, the locating plate is last to be detachably connected with the arc, is equipped with the constant head tank on the locating plate, is connected with the mounting panel on the arc, is connected with the locating piece on the mounting panel, and the locating piece slides and inserts to establish in the constant head tank.
Through adopting above-mentioned technical scheme, arc and locating plate can dismantle the connection, when building by laying bricks or stones the building, if will build the plane, then can dismantle the arc from the locating plate, use locating plate assistance-localization real-time, if will build the cambered surface, then can install the arc on the locating plate, use arc assistance-localization real-time to supplementary construction worker builds the building of different shapes.
Optionally, be equipped with the arc track on the mounting panel, be equipped with the arc wall on the arc, the arc passes through arc wall and arc track sliding fit, is connected with the arc rack on the arc, is connected with the motor on the mounting panel, is connected with first gear on the motor, first gear and arc rack meshing.
Through adopting above-mentioned technical scheme, start the motor, the motor drives the arc rack through first gear and removes, and the arc rack drives the arc along arc track removal to change the position of arc, realize removing the purpose of arc under the condition of not removing the locating plate, bring the convenience for the masonry work progress of masonry workman.
Optionally, the locating plate includes bottom plate and upset board, the bottom plate articulates on the shell, be connected with the connecting axle on the upset board, the connecting axle rotates the both sides of connecting at the bottom plate, be connected with adjustment mechanism on the bottom plate, adjustment mechanism includes the lead screw, the nut piece, adjust the pole, adjust rack and second gear, second gear connection is on the connecting axle, adjust rack sliding connection on the bottom plate, second gear and adjust rack meshing, the lead screw rotates to be connected on the bottom plate, nut piece threaded connection is on the lead screw, and nut piece and bottom plate sliding fit, the one end of adjusting the pole is articulated with the nut piece, the other end is articulated with the adjust rack.
Through adopting above-mentioned technical scheme, when building with the turning is built to needs, rotate the lead screw, the lead screw drives the nut piece and removes, the nut piece drives the regulation rack through adjusting the pole and removes, the regulation rack drives the second gear and rotates, thereby drive the connecting axle of bottom plate both sides and rotate, make the upset board rotate, thereby change the relative position before upset board and the bottom plate, the workman of building by laying bricks or stones can adjust the angle between upset board and the bottom plate according to the demand, so as to satisfy different user demands, when building by laying bricks or stones, bottom plate and upset board all can play the auxiliary effect, the building by laying bricks or stones the building surface that bottom plate and upset board correspond can go on simultaneously, help improving and build by laying bricks or stones efficiency.
Optionally, the adjusting rod is detachably connected with the nut block
Through adopting above-mentioned technical scheme, when rotating the lead screw, can drive the connecting axle of bottom plate both sides and rotate simultaneously to adjust the upset board of bottom plate both sides simultaneously, when only needing the upset board of adjusting bottom plate one side, dismantle the regulation pole that the upset board that will not need to adjust corresponds from the nut piece, so that realize adjusting a upset board, keep the purpose that another upset board position is motionless.
Optionally, the locating component includes locating lever, first magnet piece and second magnet piece, all is equipped with the holding tank on shell and the locating plate, and first magnet piece sets up at the holding tank, and the second magnet piece sets up at the both ends of locating lever, and the locating lever inserts and establishes at the holding tank, and first magnet piece and second magnet piece adsorb each other.
Through adopting above-mentioned technical scheme, when needs are to the locating plate location, insert corresponding holding tank with the locating lever in, make first magnet piece and second magnet piece adsorb together, thereby accomplish the installation of locating lever, the locating lever can support the locating plate this moment, make the locating plate keep vertical state, and when need not use the locating plate, take out the water that remains in the water bag, directly stimulate the locating lever, first magnet piece and second magnet piece separation, pull out the locating lever from the holding tank, thereby remove the location to the locating plate, make the locating plate rotate to the shell in, realize accomodating the locating plate, and the water bag is extruded by the locating plate and is taken out deformation at this moment, can not influence the accomodating of locating plate.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the water bag is used, the locating plate is rotated out of the shell and is in a vertical state, the locating plate is located through the locating component, the locating plate is kept in a vertical state, then the water bag in the shell is tidied, water is injected into the water bag, preparation work is completed, when a worker builds a brick, the vertical locating plate can be used as an auxiliary building tool, meanwhile, the water inlet hose is inserted into the water bag, the water pump is started, the water pump pumps water in the water bag into the water outlet hose through the water inlet hose, finally, dust fall can be carried out on the periphery of the locating plate through the water sprayed out by the spray head, the problem of large dust in the building construction process is solved, the influence on sanitation of surrounding environment is reduced, and the water bag is favorable for environmental protection.
2. When the water bag is used, the positioning screw is rotated, so that a large gap is reserved between the positioning sheet and the side wall of the shell, the water bag side wall is inserted between the positioning sheet and the side wall of the shell, and then the positioning screw is rotated, so that the position of the positioning sheet is changed, the positioning sheet clamps the water bag side wall, the purpose of fixing the water bag side wall is realized, the water bag side wall is prevented from collapsing, water is prevented from flowing out accidentally, and the environment of a masonry site is influenced.
3. The arc can be dismantled with the locating plate and be connected, when building by laying bricks or stones the plane, then can dismantle the arc from the locating plate, use locating plate assistance-localization real-time, if want to build the cambered surface, then can install the arc on the locating plate, use arc assistance-localization real-time to supplementary construction worker builds by laying bricks or stones the building of different shapes.
Drawings
Fig. 1 is a schematic structural view of a green construction apparatus for embodying a building masonry in this embodiment.
Fig. 2 is a schematic structural view for embodying the positional relationship between the base plate and the housing in the present embodiment.
Fig. 3 is a schematic structural view for embodying the connection relationship between the roll-over panel and the base plate in the present embodiment.
Fig. 4 is a schematic structural diagram showing a connection relationship between the positioning rod and the base plate in the present embodiment.
Fig. 5 is an enlarged view of a portion a in fig. 3.
Fig. 6 is an enlarged view of a portion B of fig. 1.
Fig. 7 is a schematic structural diagram for showing a connection relationship between the storage box and the housing in the present embodiment.
Reference numerals illustrate:
1. a positioning plate; 2. a housing; 3. a water bag; 4. a water pump; 5. a spray head; 6. a water inlet hose; 7. a water outlet hose; 8. a bottom plate; 9. a turnover plate; 10. a positioning rod; 11. a first magnet piece; 12. a second magnet piece; 13. a holding groove; 14. a connecting shaft; 15. a screw rod; 16. a nut block; 17. an adjusting rod; 18. adjusting the rack; 19. a second gear; 20. a first dovetail groove; 21. a first dovetail block; 22. a second dovetail groove; 23. a second dovetail block; 24. a mounting groove; 25. an arc-shaped plate; 26. a positioning groove; 27. a mounting plate; 28. a positioning block; 29. an arc-shaped track; 30. an arc-shaped groove; 31. an arc-shaped rack; 32. a motor; 33. a first gear; 34. a positioning sheet; 35. positioning a screw; 36. a storage box; 37. a third dovetail groove; 38. a third dovetail block; 39. a middle tube; 40. a header pipe; 41. and a positioning frame.
Detailed Description
The embodiment of the application discloses a green construction device for building masonry.
Referring to fig. 1, a green construction apparatus for a building masonry includes a positioning plate 1 and a dust removing device.
Referring to fig. 1 and 2, the dust removing apparatus includes a housing 2 having an open top, a water bag 3, a water pump 4, a spray head 5, a water inlet hose 6, and a water outlet hose 7.
Referring to fig. 1, 2 and 3, one side of the housing 2 is provided with an opening, the positioning plate 1 is hinged at the opening of the housing 2, specifically, the positioning plate 1 includes a bottom plate 8 and a turnover plate 9, the bottom plate 8 is hinged on the housing 2, a positioning assembly is detachably connected between the housing 2 and the bottom plate 8, and the positioning assembly is used for positioning the bottom plate 8, so that the bottom plate 8 is kept in a vertical state.
Referring to fig. 1, 2 and 4, the positioning assembly comprises a positioning rod 10, a first magnet piece 11 and a second magnet piece 12, wherein holding grooves 13 are formed in the shell 2 and the bottom plate 8, the first magnet piece 11 is arranged in the holding grooves 13, the second magnet piece 12 is arranged at two ends of the positioning rod 10, the positioning rod 10 is inserted into the holding grooves 13, and the first magnet piece 11 and the second magnet piece 12 are mutually adsorbed.
When the bottom plate 8 is positioned, the bottom plate 8 is rotated to be in a vertical state, two ends of the positioning rod 10 are inserted into the bottom plate 8 and the holding groove 13 on the shell 2, the first magnet piece 11 and the second magnet piece 12 are adsorbed together, so that the installation of the positioning rod 10 is completed, and at the moment, the positioning rod 10 can support the bottom plate 8, so that the bottom plate 8 is kept in a vertical state.
When the positioning of the bottom plate 8 is not required, the positioning rod 10 is directly pulled, the first magnet piece 11 is separated from the second magnet piece 12, and the positioning rod 10 is pulled out from the holding groove 13, so that the positioning of the bottom plate 8 is released, and the bottom plate 8 can freely rotate.
Referring to fig. 3 and 5, the connecting shaft 14 is connected to the turnover plate 9, the connecting shaft 14 is rotatably connected to two sides of the bottom plate 8, the bottom plate 8 is connected with the adjusting mechanism, the adjusting mechanism comprises a screw rod 15, a nut block 16, an adjusting rod 17, an adjusting rack 18 and a second gear 19, two adjusting rods 17, the adjusting rack 18 and the second gear 19 are arranged, one second gear 19 is connected to the connecting shaft 14, the adjusting rack 18 is slidably connected to the bottom plate 8, a first dovetail groove 20 is formed in the bottom plate 8, a first dovetail block 21 is connected to the adjusting rack 18, the first dovetail block 21 is located in the first dovetail groove 20 and is slidably matched with the first dovetail groove 20, the second gear 19 is meshed with the adjusting rack 18, the screw rod 15 is rotatably connected to the bottom plate 8, the nut block 16 is in threaded connection with the screw rod 15, the nut block 16 is slidably matched with the bottom plate 8, the second dovetail block 22 is arranged on the bottom plate 8, the second dovetail block 23 is connected to the nut block 16, the second dovetail block 23 is located in the second dovetail groove 22 and slidably matched with the second dovetail groove 22, one end of the adjusting rod 17 is provided with a threaded hole 24, and one end of the adjusting rod 16 is inserted into the threaded hole 24, and is connected to the threaded hole 24 of the threaded hole of the adjusting rod 16, and the threaded hole is connected to the threaded hole 16 through the threaded nut block 16, and the threaded hole is provided with the threaded hole 16. When the flipping panel 9 is not in use, the flipping panel 9 is parallel to the base panel 8.
The screw rod 15 is rotated, the screw rod 15 drives the nut block 16 to move, the second dovetail block 23 slides in the second dovetail groove 22, so that the moving direction of the nut block 16 is guided, the nut block 16 drives the adjusting rack 18 to move through the adjusting rod 17, the first dovetail block 21 slides in the first dovetail groove 20, so that the moving direction of the adjusting rack 18 is guided, the adjusting rack 18 drives the corresponding second gear 19 to rotate in the moving process, so that the connecting shafts 14 on two sides of the bottom plate 8 are driven to rotate, the connecting shafts 14 drive the overturning plate 9 to rotate, the relative position between the overturning plate 9 and the bottom plate 8 is changed, and the purpose of adjusting the relative position between the overturning plate 9 and the bottom plate 8 is achieved.
Referring to fig. 1, 3 and 6, the positioning plate 1 is detachably connected with an arc plate 25, specifically, a positioning groove 26 is formed in the turnover plate 9, a mounting plate 27 is connected to the arc plate 25, a positioning block 28 is connected to the mounting plate 27, the positioning block 28 is slidably inserted into the positioning groove 26, and the sections of the positioning block 28 and the positioning groove 26 are both T-shaped.
Referring to fig. 1, 3 and 6, the arc plate 25 is in sliding fit with the mounting plate 27, the mounting plate 27 is connected with an arc track 29, an arc groove 30 is formed in the arc plate 25, the arc plate 25 is in sliding fit with the arc track 29 through the arc groove 30, an arc rack 31 is further connected to the arc plate 25, a motor 32 is connected to the mounting plate 27, a first gear 33 is connected to the motor 32, and the first gear 33 is meshed with the arc rack 31.
When the arc plate 25 is needed, the positioning block 28 is inserted into the positioning groove 26, the mounting plate 27 is pushed, the arc plate 25 and the mounting plate 27 synchronously move, and the installation of the arc plate 25 is completed, so that the arc plate 25 is convenient to use, when the arc plate 25 is not needed, the mounting plate 27 is pulled, the positioning block 28 is separated from the positioning groove 26, and therefore the mounting plate 27 is detached from the turnover plate 9, and the detachment of the arc plate 25 is completed.
The motor 32 is started, the motor 32 drives the first gear 33 to rotate, the first gear 33 drives the arc-shaped rack 31 to move in the rotating process, and the arc-shaped rack 31 drives the arc-shaped plate 25 to move along the arc-shaped track 29, so that the position of the arc-shaped plate 25 is changed, and the purpose of adjusting the position of the arc-shaped plate 25 is achieved.
Referring to fig. 1 and 2, the water bag 3 is disposed in the housing 2, specifically, the bottom of the water bag 3 is adhered to the bottom of the housing 2 by glue, so as to fix the position of the water bag 3, detach the positioning assembly from between the housing 2 and the bottom plate 8, and when no water is in the water bag 3, the positioning plate 1 can be accommodated in the housing 2, and at this time, the water bag 3 is deformed by being pressed down.
Referring to fig. 1 and 2, a positioning piece is connected to the housing 2, the positioning piece can fix the side wall of the water bag 3, the positioning piece comprises a positioning piece 34 and a positioning screw rod 35, the positioning screw rod 35 penetrates through the side wall of the housing 2 and is in threaded connection with the side wall of the housing 2, one end of the positioning screw rod 35 located in the housing 2 is connected with the positioning piece 34, and the side wall of the water bag 3 is located between the side wall of the housing 2 and the positioning piece 34 and clamped by the positioning piece 34.
When the side wall of the water bag 3 is required to be clamped, the positioning screw 35 is rotated, so that a larger gap is reserved between the positioning sheet 34 and the side wall of the shell 2, the side wall of the water bag 3 is inserted between the positioning sheet 34 and the side wall of the shell 2, and then the positioning screw 35 is rotated to change the position of the positioning sheet 34, so that the positioning sheet 34 clamps the side wall of the water bag 3, and the side wall of the water bag 3 is clamped. When the side wall of the water bag 3 is not required to be clamped, the positioning screw 35 is rotated again, so that a larger gap is reserved between the positioning piece 34 and the side wall of the shell 2, the side wall of the water bag 3 is taken out from the space between the positioning piece 34 and the side wall of the shell 2, and the clamping of the side wall of the water bag 3 is relieved.
Referring to fig. 1, 2 and 7, a storage box 36 is detachably connected to the side wall of the housing 2, a third dovetail groove 37 is formed in the side wall of the housing 2, a third dovetail block 38 is connected to the storage box 36, the third dovetail block 38 is located in the third dovetail groove 37 and is in sliding fit with the third dovetail groove 37, and when the storage box 36 is detached, the storage box 36 is pulled to pull the third dovetail block 38 out of the third dovetail groove 37, so that the storage box 36 is detached.
Referring to fig. 1, 2 and 3, the water pump 4 is disposed in the storage box 36, one end of the water inlet hose 6 is connected to the water pump 4, the other end is inserted into the water bag 3, the spray head 5 is connected to the bottom plate 8 through the positioning frame 41, the positioning frame 41 is connected with the main pipe 40, the spray head 5 is connected to the main pipe 40, one end of the water outlet hose 7 is connected to the main pipe 40, the other end is connected to the water pump 4, the water outlet hose 7 is detachably connected to the main pipe 40, the water outlet hose 7 is connected with the middle pipe 39, and the middle pipe 39 is in threaded connection with the main pipe 40.
The implementation principle of the green construction device for the building masonry of the embodiment of the application is as follows: when the positioning device is used, the bottom plate 8 is rotated out of the shell 2, the positioning plate 1 is in a vertical state, the positioning rod is inserted into the holding groove 13, and the first magnet piece 11 and the second magnet piece 12 are mutually adsorbed, so that the bottom plate 8 is positioned.
According to the use requirement, whether the arc-shaped plate 25 is installed or not and whether the relative position between the turnover plate 9 and the bottom plate 8 is adjusted are selected, if a plane is to be built, the arc-shaped plate 25 is not installed, and the relative position between the turnover plate 9 and the bottom plate 8 is not required to be adjusted, so that the turnover plate 9 is parallel to the bottom plate 8; if a building with corners is to be built, the screw rod 15 is rotated, so that the turnover plate 9 is driven to rotate, the relative position between the turnover plate 9 and the bottom plate 8 is changed, a building worker can adjust the angle between the turnover plate 9 and the bottom plate 8 according to the requirement, so that the building with the corners of different angles can be built, and the bottom plate 8 and the turnover plate 9 can play an auxiliary role in building; if the cambered surface building is to be built, the cambered plate 25 is arranged on the turnover plate 9, and the motor 32 is started again, so that the position of the cambered plate 25 is adjusted, a building worker can adjust the position of the cambered plate 25 according to requirements, and the cambered plate 25 can play an auxiliary role in building the building.
After the bottom plate 8 is positioned, the water bag 3 in the casing 2 is arranged, the side wall of the water bag 3 is clamped through a positioning piece, water is injected into the water bag 3, the storage box 36 is arranged on the casing 2, the middle pipe 39 is connected to the spray head 5, the water inlet hose 6 is inserted into the water bag 3 to finish preparation work, when a worker performs masonry, the positioning plate 1 or the arc plate 25 can be used as an auxiliary masonry tool, meanwhile, the water pump 4 is started, the water pump 4 pumps water in the water bag 3 into the water outlet hose 7 through the water inlet hose 6, finally, the spray head 5 sprays out, dust can be reduced around the positioning plate 1 through the water sprayed out by the spray head 5, the problem of larger dust in the masonry construction process is solved, the influence on surrounding environmental sanitation is reduced, and environmental protection is facilitated.
After the construction is finished, if the arc-shaped plate 25 is used, the arc-shaped plate 25 is detached at the moment, the middle pipe 39 is detached from the spray head 5, the storage box 36 is detached from the shell 2, the storage box 36, the water pump 4, the water inlet hose 6 and the water outlet hose 7 can be independently stored, the clamping of the positioning piece on the side wall of the water bag 3 is released, water in the water bag 3 is discharged, the positioning rod 10 is detached, the bottom plate 8 is rotated, the bottom plate 8 can be rotated into the shell 2, storage of the positioning plate 1 is achieved, the water bag 3 is extruded by the positioning plate 1 to deform at the moment, and storage of the positioning plate 1 is not affected, so that the water bag is more convenient to store.

Claims (8)

1. The utility model provides a green construction equipment of building brickwork which characterized in that: including locating plate (1) and dust collector, dust collector includes open-top's shell (2), water bag (3), water pump (4), shower nozzle (5), intake hose (6) and play water hose (7), one side of shell (2) is uncovered setting, locating plate (1) articulates the uncovered department at shell (2), water bag (3) set up in shell (2), the one end of intake hose (6) is connected on water pump (4), the other end inserts in water bag (3), shower nozzle (5) are connected on locating plate (1) through locating rack (41), shower nozzle (5) are connected to the one end of play water hose (7), water pump (4) are connected to the other end, can dismantle between shell (2) and the locating plate (1) and be connected with and be used for keeping locating plate (1) the locating component of vertical state, dismantle locating component from between shell (2) and the locating plate (1), and when there is not water in water bag (3), locating plate (1) can be accomodate in shell (2).
2. The green construction device for building masonry according to claim 1, wherein: the utility model discloses a water bag, including shell (2), be connected with the setting element on shell (2), the setting element includes spacer (34) and locating screw (35), locating screw (35) run through shell (2) lateral wall and with shell (2) lateral wall threaded connection, one end that locating screw (35) are located shell (2) is connected spacer (34), water bag (3) lateral wall is located between shell (2) lateral wall and spacer (34) and is pressed from both sides tightly by spacer (34).
3. The green construction device for building masonry according to claim 1, wherein: the side wall of the shell (2) is detachably connected with a storage box (36), the water pump (4) is arranged in the storage box (36), and the water outlet hose (7) is detachably connected with the spray head (5).
4. The green construction device for building masonry according to claim 1, wherein: the positioning plate (1) is detachably connected with an arc-shaped plate (25), the positioning plate (1) is provided with a positioning groove (26), the arc-shaped plate (25) is connected with a mounting plate (27), the mounting plate (27) is connected with a positioning block (28), and the positioning block (28) is slidably inserted into the positioning groove (26).
5. The green construction device for building masonry according to claim 4, wherein: be equipped with arc track (29) on mounting panel (27), be equipped with arc wall (30) on arc board (25), arc board (25) are connected with arc rack (31) on arc board (25) through arc wall (30) and arc track (29) sliding fit, are connected with motor (32) on mounting panel (27), are connected with first gear (33) on motor (32), first gear (33) and arc rack (31) meshing.
6. The green construction device for building masonry according to claim 1, wherein: the locating plate (1) comprises a bottom plate (8) and a turnover plate (9), the bottom plate (8) is hinged to the shell (2), a connecting shaft (14) is connected to the turnover plate (9), the connecting shaft (14) is connected to two sides of the bottom plate (8) in a rotating mode, an adjusting mechanism is connected to the bottom plate (8) and comprises a screw rod (15), a nut block (16), an adjusting rod (17), an adjusting rack (18) and a second gear (19), the second gear (19) is connected to the connecting shaft (14), the adjusting rack (18) is connected to the bottom plate (8) in a sliding mode, the second gear (19) is meshed with the adjusting rack (18), the screw rod (15) is connected to the bottom plate (8) in a rotating mode, the nut block (16) is connected to the screw rod (15) in a threaded mode, the nut block (16) is in sliding fit with the bottom plate (8), one end of the adjusting rod (17) is hinged to the nut block (16), and the other end of the adjusting rod is hinged to the adjusting rack (18).
7. The green construction device for building masonry according to claim 6, wherein: the adjusting rod (17) is detachably connected with the nut block (16).
8. The green construction device for building masonry according to claim 1, wherein: the positioning assembly comprises a positioning rod (10), a first magnet piece (11) and a second magnet piece (12), wherein the shell (2) and the positioning plate (1) are respectively provided with a holding groove (13), the first magnet piece (11) is arranged in the holding grooves (13), the second magnet piece (12) is arranged at two ends of the positioning rod (10), the positioning rod (10) is inserted into the holding grooves (13), and the first magnet piece (11) and the second magnet piece (12) are mutually adsorbed.
CN202310647360.XA 2023-06-02 2023-06-02 Green construction equipment of building brickwork Active CN116752784B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310647360.XA CN116752784B (en) 2023-06-02 2023-06-02 Green construction equipment of building brickwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310647360.XA CN116752784B (en) 2023-06-02 2023-06-02 Green construction equipment of building brickwork

Publications (2)

Publication Number Publication Date
CN116752784A true CN116752784A (en) 2023-09-15
CN116752784B CN116752784B (en) 2023-11-21

Family

ID=87946964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310647360.XA Active CN116752784B (en) 2023-06-02 2023-06-02 Green construction equipment of building brickwork

Country Status (1)

Country Link
CN (1) CN116752784B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117684766A (en) * 2024-02-02 2024-03-12 山西八建集团有限公司 Green construction equipment of building brickwork

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649397A (en) * 2015-10-28 2016-06-08 国网山东安丘市供电公司 Electric power overhauling electric pole centralizer capable of being freely assembled for rural power
JP2017048520A (en) * 2015-08-31 2017-03-09 鹿島建設株式会社 Protection apparatus with water sprinkling function
CN209585638U (en) * 2019-07-19 2019-11-05 湖南金格工程有限公司 Support is used in a kind of casting of assembled architecture component
CN212105253U (en) * 2019-12-17 2020-12-08 浙江久鑫建筑科技有限公司 Be applied to strutting arrangement of building engineering reinforced wall body
CN213527887U (en) * 2020-09-12 2021-06-25 济南七彩贝壳工贸有限公司 Material collecting bag clamping device of bag type dust collector
CN113428452A (en) * 2021-06-29 2021-09-24 谭伟 Cement and preparation process thereof
CN113585160A (en) * 2021-09-11 2021-11-02 自然资源部第二海洋研究所 Adjustable support structure of concrete template for port and support method thereof
CN113668862A (en) * 2021-08-30 2021-11-19 大昌建设集团有限公司 Green construction equipment of building brickwork
CN114856147A (en) * 2022-06-08 2022-08-05 江西旺泰建筑工程有限公司 Supporting structure and assembled dust fall equipment for building engineering construction
CN114876231A (en) * 2022-04-25 2022-08-09 冯艾明 Stable connection structure is consolidated to building
CN115522747A (en) * 2022-09-01 2022-12-27 江苏天启建设有限公司 Guide structure for building engineering tie bar

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017048520A (en) * 2015-08-31 2017-03-09 鹿島建設株式会社 Protection apparatus with water sprinkling function
CN105649397A (en) * 2015-10-28 2016-06-08 国网山东安丘市供电公司 Electric power overhauling electric pole centralizer capable of being freely assembled for rural power
CN209585638U (en) * 2019-07-19 2019-11-05 湖南金格工程有限公司 Support is used in a kind of casting of assembled architecture component
CN212105253U (en) * 2019-12-17 2020-12-08 浙江久鑫建筑科技有限公司 Be applied to strutting arrangement of building engineering reinforced wall body
CN213527887U (en) * 2020-09-12 2021-06-25 济南七彩贝壳工贸有限公司 Material collecting bag clamping device of bag type dust collector
CN113428452A (en) * 2021-06-29 2021-09-24 谭伟 Cement and preparation process thereof
CN113668862A (en) * 2021-08-30 2021-11-19 大昌建设集团有限公司 Green construction equipment of building brickwork
CN113585160A (en) * 2021-09-11 2021-11-02 自然资源部第二海洋研究所 Adjustable support structure of concrete template for port and support method thereof
CN114876231A (en) * 2022-04-25 2022-08-09 冯艾明 Stable connection structure is consolidated to building
CN114856147A (en) * 2022-06-08 2022-08-05 江西旺泰建筑工程有限公司 Supporting structure and assembled dust fall equipment for building engineering construction
CN115522747A (en) * 2022-09-01 2022-12-27 江苏天启建设有限公司 Guide structure for building engineering tie bar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117684766A (en) * 2024-02-02 2024-03-12 山西八建集团有限公司 Green construction equipment of building brickwork
CN117684766B (en) * 2024-02-02 2024-04-19 山西八建集团有限公司 Green construction equipment of building brickwork

Also Published As

Publication number Publication date
CN116752784B (en) 2023-11-21

Similar Documents

Publication Publication Date Title
CN116752784B (en) Green construction equipment of building brickwork
CN110053171B (en) Water jet cutting robot for building wall grooving and grooving method thereof
CN110359329A (en) Abolish device, breaking system and restructuring bankrupt in unballasted track bed plate post-cast strip
CN215803326U (en) Assembled wall body installation auxiliary assembly
CN111120296B (en) Anti-blocking water pump
CN111992400B (en) A construction panel paint spraying apparatus for building engineering
CN211286502U (en) Plastering device for building construction
CN214415930U (en) Construction raise dust administers device
CN114570151A (en) Dust removal area adjustable environment-friendly dust device for building decoration
CN211275114U (en) Panel paint spraying apparatus is used to building engineering fitment
CN112627556A (en) Building anti-seismic wall construction device
CN114718294B (en) Steel structure template connecting and supporting system
JPH0355679Y2 (en)
CN216043520U (en) Radial drilling orientation device
CN111021547A (en) Telescopic wall
CN112643904B (en) Portable environment-friendly concrete cutting machine
CN220216539U (en) Moving mechanism on steel bar bender
CN216099745U (en) Cutting machine for construction
CN220889312U (en) Paint spraying device of spraying machine for real stone paint
CN220805576U (en) Dust-free perforating device for constructional engineering
CN115387616B (en) Construction method of building outer wall engineering for decorating curtain wall
CN217121815U (en) Formula hydraulic pressure drilling equipment is stepped on to foot
CN220993998U (en) Fireproof brick clamping device
CN218479282U (en) Pre-buried drainage structure
CN220814995U (en) Wall body masonry equipment for construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant