CN116732986A - Construction method for realizing rock entering of anchor rod static pressure pile - Google Patents

Construction method for realizing rock entering of anchor rod static pressure pile Download PDF

Info

Publication number
CN116732986A
CN116732986A CN202310804723.6A CN202310804723A CN116732986A CN 116732986 A CN116732986 A CN 116732986A CN 202310804723 A CN202310804723 A CN 202310804723A CN 116732986 A CN116732986 A CN 116732986A
Authority
CN
China
Prior art keywords
pile
anchor rod
rock
static pressure
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310804723.6A
Other languages
Chinese (zh)
Inventor
高作平
谭星舟
卢凌岳
张畅
吴博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuda Jucheng Structure Co ltd
Original Assignee
Wuda Jucheng Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuda Jucheng Structure Co ltd filed Critical Wuda Jucheng Structure Co ltd
Priority to CN202310804723.6A priority Critical patent/CN116732986A/en
Publication of CN116732986A publication Critical patent/CN116732986A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/20Placing by pressure or pulling power
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/005Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a construction method for realizing rock entering of a static pressure pile of an anchor rod. After the static pressure pile of the anchor rod reaches the top surface of the rock layer, a drill bit is put into the rock layer, and a concrete filled steel tube pile integrally embedded into the rock is poured. On the basis of the existing advantages of the static pressure pile, the invention not only reduces the disturbance of the existing building reinforcement by adopting the whole-process drilling pile to the surrounding environment, but also solves the problem that the anchor rod static pressure pile can not be pressed into rock, improves the single pile bearing capacity of the static pressure pile, and provides a novel reinforcement method for the existing building foundation reinforcement with complex environment and limited operation space.

Description

Construction method for realizing rock entering of anchor rod static pressure pile
Technical Field
The invention relates to the technical field of buildings, in particular to a construction method for realizing rock entering of a static pressure pile of an anchor rod.
Background
In the existing building foundation reinforcement, anchor rod static pressure piles are often adopted for foundation treatment or foundation underpinning. The pile pressing frame is fixed by embedding anchor rods on a foundation, dead weight load exerted by a building is used as pile pressing counter force, pile sections are pressed into soil section by section from pile pressing holes reserved or cut in the foundation by using a jack, and then piles and the foundation are connected together, so that the purposes of improving the bearing capacity of the foundation and controlling sedimentation are achieved. Compared with the bored pile, the method has the advantages of light and flexible construction machine, convenient construction, small working surface, indoor construction, low energy consumption, no vibration, no noise, no pollution, no workshop stop during construction, no relocation of residents and the like. However, the anchor rod static pressure pile cannot enter continuously when being pressed to a rock layer or hit a stone, and cannot be used as a rock-socketed pile, so that the single pile bearing capacity of the small-diameter or medium-diameter friction pile is small.
Disclosure of Invention
The invention aims at providing a construction method of an anchor rod static pressure pile which has small disturbance to surrounding environment following foundation and can be embedded into rock aiming at the construction technology of the existing anchor rod static pressure pile.
In order to achieve the above object, the technical solution of the present invention is: the construction method for realizing rock entering of the anchor rod static pressure pile is characterized by comprising the following steps of:
step one, determining a pile position hole and positioning;
step two, drilling a pile hole, and burying an anchor rod;
step three, installing a pile pressing frame;
fourthly, positioning and correcting the first pile section, pressing the pile, and recording the depth and the pressure value;
fifthly, positioning and correcting the next pile, welding the pile, pressing the pile, and recording depth and pressure values. Repeating the step until the pile bottom reaches the top surface of the rock layer;
and step six, a drill bit and a drill rod are arranged in the steel pipe, and a rock layer is drilled to the designed depth. Pouring grouting material into the bottom;
and seventh, filling ordinary concrete into the pile, and sealing the pile.
In the first step, the pile position hole is lofted and positioned on site according to the design drawing, and the plane deviation between the pile position hole and the design position is not more than +/-20 mm.
In the second step, if the pile is pressed on the existing foundation, a pile hole is needed to be drilled; and if the pile is a newly built pile cap, reserving pile pressing holes. The anchor rod is preferably made of finish rolled deformed steel bar.
And thirdly, the pile pressing frame is kept vertical, and nuts of the anchor bolts are uniformly screwed.
And in the fourth step, the pile tip of the first pile is a plain concrete pile tip. The pile section must be held in place vertically so that the jack is held on the same vertical line as the pile section axis and is not biased.
And in the fifth step, the welding pile should remove the rust on the surface, and full welding is carried out to ensure the welding quality.
And in the step six, the lower part of the drill rod is a small steel sleeve slightly smaller than the steel pipe pile, and the range of the small steel sleeve extends from the drill bit to 1.5m in the steel pipe pile. The top of the small steel sleeve is provided with a mechanical rotary locking device which is connected with the small-diameter drill rod. And after drilling into the rock layer to the designed depth, reversely rotating the small-diameter drill rod until the small-diameter drill rod is separated from the small steel sleeve, and taking out the drill rod. The drill bit and small steel casing remain in the hole as part of the steel pipe pile embedded in the rock. Then, pouring inorganic grouting material to the top of the small steel pipe.
The pile head exposed in the step seven must be cut after the design unit agrees. Before pile sealing, sundries in pile pressing holes must be cleaned, and then micro-expansion concrete pile sealing is poured.
The construction method for realizing rock entering of the anchor rod static pressure pile has the following beneficial effects:
according to the construction method for realizing rock entering of the anchor rod static pressure pile, the anchor rod static pressure pile is drilled, so that the anchor rod static pressure pile can be embedded into rock, disturbance of the surrounding environment and the building caused by the whole process of drilling pile adopted in existing building reinforcement is reduced on the basis of the existing advantages of the static pressure pile, the problem that the anchor rod static pressure pile cannot be pressed into the rock is solved, the single pile bearing capacity of the static pressure pile is improved, and a novel reinforcement method is provided for the existing building foundation reinforcement with complex environment and limited operation space.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the following description will briefly explain the drawings used in the embodiments or the description of the prior art, and it is obvious that the drawings in the following description are only some embodiments of the invention, and that other drawings can be obtained according to these drawings without inventive effort to a person skilled in the art.
FIG. 1 is a schematic diagram of a step of realizing rock entering of a pile end of a static pressure pile of an anchor rod;
Detailed Description
The following description of the embodiments of the present invention will clearly and fully describe the technical aspects of the embodiments of the present invention, and it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present invention without making any inventive effort, are intended to fall within the scope of the present invention.
The present invention will be further described with reference to the accompanying drawings, in order to make the objects, technical solutions and advantages of the present invention more apparent.
Step one, determining pile position holes and positioning. According to the on-site lofting and positioning of the design drawing, the plane deviation between the pile position hole and the design position is not more than +/-20 mm;
and step two, cutting a pile hole, and burying an anchor rod. If the pile is pressed on the existing foundation, a pile hole is needed to be cut; and if the pile is a newly built pile cap, reserving pile pressing holes. The anchor rod is preferably made of finish-rolled deformed steel bar, and the screw thread at the top of the finish-rolled deformed steel bar is more convenient for fixing the pile pressing frame;
and step three, installing a pile pressing frame. The pile pressing frame is kept vertical and the nuts of the anchor bolts are uniformly screwed. The loose screw cap should be screwed at any time in the pile pressing construction process;
and fourthly, positioning and correcting the first pile section 1, pressing the pile, and recording depth and pressure values. The first pile tip adopts a plain concrete pile tip 2. The pile section 1 must be kept in position vertically, the vertical deviation must not exceed 1.5% of the pile section length, so that the jack and the pile section 1 axis remain on the same vertical line and must not be biased. When pile is pressed, a plurality of pile presses are not suitable to be simultaneously constructed on the same independent column base. The sum of pile pressing force should not exceed the dead weight sum of the foundation and the upper structure, so as to prevent the foundation from being damaged by the structure caused by lifting. The middle pause is avoided, and the process should be completed once;
fifthly, positioning and correcting the next pile, welding the pile, pressing the pile, and recording depth and pressure values. This step is repeated until the pile bottom reaches the top surface of the rock layer 3. The preliminary criterion for whether the rock layer 3 is reached is that the jack pressure gauge suddenly increases and the pile body is no longer displaced downwards. At this time, the actual pile length and the design and prospecting data should be combined together. The welding pile should remove the surface rust, carry out full-scale welding, ensure welding quality.
And step six, a drill bit 4 and a drill rod are arranged in the steel pipe pile 1. The drilling machine generally adopts a small geological drilling machine. The lower part of the drill rod is a small steel sleeve 5 slightly smaller than the steel pipe pile, which extends from the drill bit 4 to 1.5m inside the steel pipe pile 1. The top of the small steel sleeve 5 is provided with a mechanical rotary locking device 6 which is connected with a small-diameter drill rod 7. After the drill bit 4 drills through the plain concrete pile tip 2 into the rock layer 3 to a designed depth, the small-diameter drill rod 7 is reversely rotated until the small-diameter drill rod 7 is separated from the small steel sleeve 5, and the small drill rod 7 is taken out. The drill bit 4 and the small steel casing 5 remain in the hole as part of the rock embedding of the steel pipe pile 1. Subsequently, the inorganic grouting material 8 is poured on top of the small steel pipe 5.
And seventhly, cutting the exposed pile head after the pile head is agreed by a design unit, and enabling the pile head to be embedded into the bearing platform to be larger than 50mm. Before cutting the pile head, the pile should be fixed by wedges so as to remove the pile head, and the pile head is forbidden to be randomly cut under the condition of a cantilever. And filling ordinary concrete 9 into the pile body. Before pile sealing, sundries in pile pressing holes must be cleaned, accumulated water is removed, floating slurry on hole walls and pile faces is cleaned, and then micro-expansion concrete pile sealing is poured.
Finally, it should be noted that the foregoing is merely a preferred embodiment of the present invention, and the present invention has been described in detail with reference to the embodiment, but it should be understood that modifications, equivalents, improvements and modifications to the technical solution described in the foregoing embodiments or equivalents of some of the technical features may be made within the spirit and principles of the present invention.

Claims (5)

1. The construction method for realizing rock entering of the anchor rod static pressure pile is characterized by comprising the following steps of:
step one, determining a pile position hole and positioning;
step two, drilling a pile hole, and burying an anchor rod;
step three, installing a pile pressing frame;
fourthly, positioning and correcting the first pile section, pressing the pile, and recording the depth and the pressure value;
fifthly, positioning and correcting the next pile, welding the pile, pressing the pile, and recording depth and pressure values. Repeating the step until the pile bottom reaches the top surface of the rock layer;
and step six, a drill bit and a drill rod are arranged in the steel pipe, and a rock layer is drilled to the designed depth. Pouring grouting material into the bottom;
and seventh, filling ordinary concrete into the pile, and sealing the pile.
2. A construction method for realizing rock-entering of a static pile of an anchor rod according to claim 1, wherein: the pile tip is embedded in the rock.
3. A construction method for realizing rock-entering of a static pile of an anchor rod according to claim 1, wherein: the construction machine is light and flexible, convenient to construct, small in working area, capable of being constructed indoors, low in energy consumption, free of pollution, free of production stopping in workshops and free of movement of residents during construction.
4. A construction method for realizing rock-entering of a static pile of an anchor rod according to claim 1, wherein: the pile driver adopts a small geological drilling machine, and the drill bit and part of drill rods are not taken out after the drilling is completed.
5. A construction method for realizing rock-entering of a static pile of an anchor rod according to claim 1, wherein: the steel pipe pile consists of a static pressure steel pipe pile section and a drilling steel pipe pile section, and inorganic grouting material and common concrete are poured into the steel pipe.
CN202310804723.6A 2023-06-30 2023-06-30 Construction method for realizing rock entering of anchor rod static pressure pile Pending CN116732986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310804723.6A CN116732986A (en) 2023-06-30 2023-06-30 Construction method for realizing rock entering of anchor rod static pressure pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310804723.6A CN116732986A (en) 2023-06-30 2023-06-30 Construction method for realizing rock entering of anchor rod static pressure pile

Publications (1)

Publication Number Publication Date
CN116732986A true CN116732986A (en) 2023-09-12

Family

ID=87918429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310804723.6A Pending CN116732986A (en) 2023-06-30 2023-06-30 Construction method for realizing rock entering of anchor rod static pressure pile

Country Status (1)

Country Link
CN (1) CN116732986A (en)

Similar Documents

Publication Publication Date Title
US7326004B2 (en) Apparatus for providing a rammed aggregate pier
US8573892B2 (en) Method of providing a support column
CN108330973B (en) Pile pulling equipment and quick pile pulling method under low clearance height
CN111206575A (en) Construction method of long spiral pressure-grouting pile
CN114517472B (en) Construction method of carrier pile
CN107938666B (en) Pile end inner hammering pile sinking with pile shoe and synchronous end grouting structure and process
CN113668525A (en) Construction method of anti-floating anchor rod with water-drop-shaped enlarged head based on PSB finish-rolled deformed steel bar
CN112411529A (en) Rock-entering pore-forming method of hard bedrock socketed pile small-diameter down-the-hole hammer auxiliary rotary drilling rig
CN113502817B (en) Method for automatically constructing prestressed pile
CN111519612B (en) Construction method of full-casing follow-up long spiral drilling pressure-grouting secant pile
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN217974323U (en) Interior prefabricated tubular pile structure of back slip casting and pile foundation of hammering stake point into rock
CN116732986A (en) Construction method for realizing rock entering of anchor rod static pressure pile
CN116378016A (en) Technical quality control method for inserting reinforcement cage after long spiral drilling bored concrete pile
CN216339582U (en) Combined inclined support for foundation pit support
CN112252312B (en) Construction method for enhancing integral stress performance of PHC pipe pile
WO2014174525A2 (en) Slotted holes mesh filtered steel pile
CN211773974U (en) Building inclination correcting and sinking accelerating device
CN215593986U (en) Steel pipe anchor rod static pressure pile
CN220433745U (en) Structure for resisting floating by supporting piles during construction of cyclone well
CN116856434B (en) Slope reinforcement device and reinforcement method thereof
CN109944283B (en) Indoor model test device and method for simulating long spiral drilling and pressing cast-in-place pile forming
CN212506228U (en) Prestress reinforcement high-pressure jet grouting combined uplift pile for existing building
CN112459051A (en) Construction method for solving problem of excessive irrigation and sediment of pile foundation in karst area
CN117488769A (en) Static pressure pore-forming vibration impact solid sand pebble expanding grouting and static pressure pile technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Jucheng Building, No. 4 Wudayuan Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430223

Applicant after: Wuhan Jucheng Structure Group Co.,Ltd.

Address before: Jucheng Building, No. 4 Wudayuan Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430223

Applicant before: WUDA JUCHENG STRUCTURE Co.,Ltd.

CB02 Change of applicant information