CN116702276A - Bridge multifunctional control element construction method based on GIS system - Google Patents
Bridge multifunctional control element construction method based on GIS system Download PDFInfo
- Publication number
- CN116702276A CN116702276A CN202310619481.3A CN202310619481A CN116702276A CN 116702276 A CN116702276 A CN 116702276A CN 202310619481 A CN202310619481 A CN 202310619481A CN 116702276 A CN116702276 A CN 116702276A
- Authority
- CN
- China
- Prior art keywords
- control element
- target
- bridge
- gis system
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 44
- 238000013461 design Methods 0.000 claims abstract description 82
- 238000009877 rendering Methods 0.000 claims abstract description 45
- 238000000034 method Methods 0.000 claims description 44
- 238000012876 topography Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 29
- 230000006870 function Effects 0.000 description 9
- 230000003993 interaction Effects 0.000 description 7
- 230000000007 visual effect Effects 0.000 description 6
- 238000004891 communication Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 238000012545 processing Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000013507 mapping Methods 0.000 description 2
- 238000012790 confirmation Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T15/00—3D [Three Dimensional] image rendering
- G06T15/005—General purpose rendering architectures
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/10—Constructive solid geometry [CSG] using solid primitives, e.g. cylinders, cubes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Graphics (AREA)
- General Engineering & Computer Science (AREA)
- Databases & Information Systems (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Structural Engineering (AREA)
- Mathematical Analysis (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Software Systems (AREA)
- Computational Mathematics (AREA)
- Remote Sensing (AREA)
- Data Mining & Analysis (AREA)
- Processing Or Creating Images (AREA)
Abstract
The invention discloses a construction method of a multifunctional bridge control element based on a GIS (geographic information system), and belongs to the technical field of bridge engineering. When bridge design is carried out, a target GIS system is selected; acquiring an initial bridge design scheme and an original vector database of a target GIS system; determining target control element data according to the initial bridge design scheme and an original vector database; abstracting target control element data through a target GIS system to obtain target control element abstract data; the target GIS system is used for rendering the abstract data of the target control element to obtain a target control element instance, so that the construction of the control element is completed, the target GIS system is used for constructing the control element of the bridge, the standardized and unified abstract expression of the control element is realized, the structural interpretation of the control element in the image topography data is realized, the accuracy of the bridge scheme is improved, the quality of the bridge design is ensured, and the period of the bridge design is shortened.
Description
Technical Field
The invention relates to the technical field of bridge engineering, in particular to a method for constructing a multifunctional bridge control element based on a GIS system.
Background
The bridge structure belongs to an engineering structure crossing obstacles, and the bridge structure avoids the interference of the lower obstacles through the crossing of the structure to the lower structures, thereby ensuring the smoothness of the line. Taking a high-speed railway as an example, structures such as roads, rivers, railways, pipelines and the like which are required to cross the ground inevitably are required to ensure the smoothness of the line. The bridge engineering is mainly used for constructing the high-speed railway in China, and the purposes of saving land and realizing rapid standardized construction are achieved. According to statistics, the bridge engineering accounts for more than 80% of the high-speed railways such as jinghu and jingjin inter-city in China.
In the engineering implementation process, due to the geographic geological data acquisition precision or the adoption of historical data, control element structures such as roads, rivers and the like are displayed in the ground image data of a GIS (geographic information system ) system, but vector data in a database is absent or incomplete, and important structures are omitted by a bridge scheme designed based on the GIS system, so that the scheme of an affected zone is unreasonable, and even the scheme is invalidated as engineering accidents.
Disclosure of Invention
The invention mainly aims to provide a construction method of a multifunctional bridge control element based on a GIS system, which aims to solve the technical problem of unreasonable bridge design scheme in the prior art by solving the problem of missing vector control elements of a database of the GIS system.
In order to achieve the above purpose, the invention provides a method for constructing a multifunctional bridge control element based on a GIS system, which comprises the following steps:
selecting a target GIS system when designing a bridge;
acquiring an initial bridge design scheme and an original vector database of the target GIS system;
determining target control element data according to the initial bridge design scheme and the original vector database;
abstracting the target control element data through the target GIS system to obtain target control element abstract data;
rendering the abstract data of the target control element through the target GIS system to obtain a target control element instance, and completing construction of the control element.
Optionally, the rendering, by the target GIS system, the abstract data of the target control element to obtain a target control element instance includes:
when the abstract data of the target control element is the central axis of the control element, calling the target GIS system to draw the normal line at the intersection point of the central axis of the target control element and the line ground to generate an initial central axis;
obtaining an initial starting mileage line, an initial end mileage line and an initial influence line width position according to the abstract data of the target control elements;
The initial starting mileage and the initial end mileage are pulled back to the position of the initial influence line width, and a target starting mileage and a target end mileage are formed;
rotating the initial central axis around the intersection point by taking a space vertical coordinate as an axis, so that the initial central axis coincides with an actual central axis to obtain a target central axis, and synchronously rotating the target starting mileage and the target ending mileage to be kept parallel to the target central axis;
obtaining a control element name, a control element type and a control element level through the target control element abstract data;
determining a target central axis width and a display pattern according to the control element name, the control element type and the control element level;
and rendering the abstract data of the target control element according to the width of the central axis of the target and the display pattern to obtain a target control element instance.
Optionally, the rendering, by the target GIS system, the abstract data of the target control element to obtain a target control element instance includes:
inquiring the limit height and the limit width of the control element according to the control element type and the control element level;
Drawing a rectangular frame based on the limit height and the limit width by using the target GIS system, and generating a rectangular limit frame on a vertical face;
and rendering the rectangular bounding box by using the target GIS system to obtain a target control element instance.
Optionally, the abstracting, by the target GIS system, the target control element data to obtain target control element abstract data includes:
abstracting the target control element data through the target GIS system to obtain a control element name, a control element type, a control element level, a control element mileage, a control element crossing angle, an influence line width, a control element positive width, a starting point mileage, an end point mileage, a limit width, a limit height and a ground elevation;
the control element name, the control element type, the control element level, the control element mileage, the control element intersection angle, the influence line width, the control element positive width, the starting mileage, the ending mileage, the limit width, the limit height and the ground elevation are taken as target control element abstract data.
Optionally, the rendering the abstract data of the target control element by the target GIS system to obtain a target control element instance, and after completing the construction of the control element, further includes:
storing the target control element examples to generate a control element structure table;
and modifying the initial bridge design scheme through the control element structure table to obtain a target bridge design scheme.
Optionally, after the storing the target control element instance and generating the control element structure table, the method further includes:
independently storing the control element structure table;
performing authority auditing on the control element structure table to determine whether the data in the control element structure table has errors;
and when the data in the control element structure table has no error, storing the control element structure table into the original vector database for management.
Optionally, the determining target control element data according to the initial bridge design scheme and the original vector database includes:
determining structural information corresponding to the topographic image according to the initial bridge design scheme;
searching the structure information in the original vector database to determine vector data lacking in the original vector database;
The missing vector data is taken as target control element data.
In addition, in order to achieve the above purpose, the present invention also provides a device for constructing a multifunctional bridge control element based on a GIS system, where the device for constructing a multifunctional bridge control element based on a GIS system includes:
the selection module is used for selecting a target GIS system when the bridge design is carried out;
the acquisition module is used for acquiring an initial bridge design scheme and an original vector database of the target GIS system;
the determining module is used for determining target control element data according to the initial bridge design scheme and the original vector database;
the abstract module is used for abstracting the target control element data through the target GIS system to obtain target control element abstract data;
and the rendering module is used for rendering the abstract data of the target control element through the target GIS system to obtain a target control element instance and complete the construction of the control element.
In addition, in order to achieve the above purpose, the present invention also provides a device for constructing a multifunctional bridge control element based on a GIS system, where the device for constructing a multifunctional bridge control element based on a GIS system includes: the bridge multifunctional control element construction method based on the GIS comprises a memory, a processor and a bridge multifunctional control element construction program based on the GIS, wherein the bridge multifunctional control element construction program based on the GIS is stored in the memory and can run on the processor, and the bridge multifunctional control element construction program based on the GIS is configured to realize the steps of the bridge multifunctional control element construction method based on the GIS.
In addition, in order to achieve the above object, the present invention further provides a storage medium, on which a GIS-based bridge multi-function control element construction program is stored, which when executed by a processor, implements the steps of the GIS-based bridge multi-function control element construction method as described above.
When bridge design is carried out, a target GIS system is selected; acquiring an initial bridge design scheme and an original vector database of the target GIS system; determining target control element data according to the initial bridge design scheme and the original vector database; abstracting the target control element data through the target GIS system to obtain target control element abstract data; the target GIS system is used for rendering the abstract data of the target control element to obtain a target control element example, the construction of the control element is completed, the target GIS system is used for constructing the control element of the bridge, the standardized unified abstract expression of the control element is realized, the target GIS system is used, the software coding is simple to realize, the dependence on a platform is low, the functional interaction operation is friendly, the achievement is visual and the types are easy to distinguish, the popularization and the application are convenient, the structural interpretation of the control element in the image topography data is realized, the accuracy of the bridge scheme is improved, the quality of the bridge design is ensured, the period of the bridge design is shortened, and the method has good market value.
Drawings
Fig. 1 is a schematic structural diagram of a bridge multifunctional control element construction device based on a GIS system in a hardware operation environment according to an embodiment of the present invention;
FIG. 2 is a schematic flow chart of a first embodiment of a method for constructing a multifunctional bridge control element based on a GIS system;
FIG. 3 is a schematic diagram of an initial bridge design scheme generated in an embodiment of a method for constructing a multifunctional bridge control element based on a GIS system;
FIG. 4 is a schematic diagram of rendering effects of an example of control elements of an initial bridge design in an embodiment of a method for constructing a multifunctional control element of a bridge based on a GIS system;
FIG. 5 is a schematic diagram of rendering effects of examples of control elements of a design scheme of a target bridge in an embodiment of a method for constructing a multifunctional control element of a bridge based on a GIS system;
FIG. 6 is a schematic flow chart of a second embodiment of a method for constructing a multifunctional bridge control element based on a GIS system;
FIG. 7 is a diagram illustrating an exemplary selection of target control elements in an embodiment of a method for constructing a multifunctional control element for a bridge based on a GIS system according to the present invention;
FIG. 8 is a schematic diagram of generating an initial center axis and a starting point or ending point mileage line in an embodiment of a method for constructing a multifunctional bridge control element based on a GIS system according to the present invention;
FIG. 9 is a schematic diagram of a method for constructing a multifunctional control element of a bridge based on a GIS system according to an embodiment of the present invention, wherein the method comprises adjusting an initial central axis to an actual position to obtain a target central axis;
FIG. 10 is a schematic diagram of abstract expression of control elements in an embodiment of a method for constructing a multifunctional control element of a bridge based on a GIS system;
FIGS. 11 a-11 d are schematic diagrams illustrating central axes of different types of control elements in an embodiment of a method for constructing a multifunctional control element for a bridge based on a GIS system according to the present invention;
FIG. 12 is a schematic diagram of an example of control elements generated in an embodiment of a method for constructing a multifunctional control element for a bridge based on a GIS system according to the present invention;
FIG. 13 is a schematic diagram of a target bridge design scheme generated according to a target control element example in an embodiment of a method for constructing a multifunctional control element of a bridge based on a GIS system according to the present invention;
fig. 14 is a block diagram of a first embodiment of a device for constructing a multifunctional control element of a bridge based on a GIS system according to the present invention.
The achievement of the objects, functional features and advantages of the present invention will be further described with reference to the accompanying drawings, in conjunction with the embodiments.
Detailed Description
It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
Referring to fig. 1, fig. 1 is a schematic structural diagram of a bridge multifunctional control element construction device based on a GIS system in a hardware operation environment according to an embodiment of the present invention.
As shown in fig. 1, the bridge multifunctional control element construction apparatus based on the GIS system may include: a processor 1001, such as a central processing unit (Central Processing Unit, CPU), a communication bus 1002, a user interface 1003, a network interface 1004, a memory 1005. Wherein the communication bus 1002 is used to enable connected communication between these components. The user interface 1003 may include a Display, an input unit such as a Keyboard (Keyboard), and the optional user interface 1003 may further include a standard wired interface, a wireless interface. The network interface 1004 may optionally include a standard wired interface, a Wireless interface (e.g., a Wireless-Fidelity (Wi-Fi) interface). The Memory 1005 may be a high-speed random access Memory (Random Access Memory, RAM) or a stable nonvolatile Memory (NVM), such as a disk Memory. The memory 1005 may also optionally be a storage device separate from the processor 1001 described above.
It will be appreciated by those skilled in the art that the structure shown in fig. 1 does not constitute a limitation of the GIS system based bridge multi-function control element building apparatus, and may include more or fewer components than shown, or may combine certain components, or may be a different arrangement of components.
As shown in fig. 1, the memory 1005 as a storage medium may include an operating system, a network communication module, a user interface module, and a bridge multifunction control element construction program based on a GIS system.
In the bridge multifunctional control element construction device based on the GIS system shown in fig. 1, the network interface 1004 is mainly used for data communication with a network server; the user interface 1003 is mainly used for data interaction with a user; the processor 1001 and the memory 1005 in the bridge multifunctional control element construction device based on the GIS system can be arranged in the bridge multifunctional control element construction device based on the GIS system, and the bridge multifunctional control element construction device based on the GIS system calls the bridge multifunctional control element construction program based on the GIS system and stored in the memory 1005 through the processor 1001, and executes the bridge multifunctional control element construction method based on the GIS system.
The embodiment of the invention provides a method for constructing a multifunctional bridge control element based on a GIS system, and referring to FIG. 2, FIG. 2 is a flow diagram of a first embodiment of the method for constructing the multifunctional bridge control element based on the GIS system.
In this embodiment, the method for constructing the multifunctional bridge control element based on the GIS system includes the following steps:
step S10: and selecting a target GIS system when the bridge design is carried out.
The implementation subject of the embodiment is a GIS system for constructing the bridge multifunctional control element, and may be other devices or systems for constructing the bridge multifunctional control element, which is not limited in this embodiment, and the GIS system constructed by the bridge multifunctional control element is described as an example.
In a specific implementation, when a bridge design is required, a target GIS system may be selected, where the target GIS system may be an ArcGIS system or Skline software, or may be other systems or software with basic interaction functions of drawing points, lines, planes, and the like, which is not limited in this embodiment. Basic interaction functions such as drawing points, lines, planes and the like are provided through the target GIS system, so that the control elements can be constructed or rendered by using the target GIS system.
Step S20: and acquiring an initial bridge design scheme and an original vector database of the target GIS system.
It should be understood that the initial bridge design scheme can be designed according to the requirements of users, and the bridge design system based on the bim technology is realized in the GIS system by developing the bridge design system, so that the three-dimensional generation and rendering of the bridge design scheme are realized, and the initial bridge design scheme is obtained. The original vector database of the target GIS system refers to a database formed by vector data stored in the target GIS system, but is affected by data acquisition precision or adopts historical data, and the vector data in the original vector database is incomplete.
As shown in fig. 3, fig. 3 is a schematic diagram of an initial bridge design scheme generated in this embodiment, where the initial bridge design scheme is generated by combining a GIS system and a bim technology.
Step S30: and determining target control element data according to the initial bridge design scheme and the original vector database.
In a specific implementation, the data in the bridge solution area can be obtained through the initial bridge design scheme, and the data in the bridge solution area is compared with the vector data in the original vector database, so that the target control element data can be obtained. The target control element data refers to vector data that is missing from the original vector database.
Further, the step of determining target control element data according to the initial bridge design scheme and the original vector database specifically includes: determining structural information corresponding to the topographic image according to the initial bridge design scheme; searching the structure information in the original vector database to determine vector data lacking in the original vector database; the missing vector data is taken as target control element data.
The topographic image refers to a topographic image corresponding to a bridge solution area in the initial bridge design solution, and the corresponding structural information can be obtained according to the topographic image, and the structural information refers to control element structure information in the initial bridge design solution. The original vector database comprises collected vector data, the collected vector data can be searched in the original vector database according to the obtained structure information, whether the data in the structure information are in the original vector database is judged, when the data in the structure information cannot be searched in the original vector database, the vector data in the structure information are determined to be absent in the original vector database, and the absent vector data are used as target control element data.
The target control element data refers to the control element data of ground structures such as rivers, roads, railways, pipelines, houses and the like, which are under-bridge structures to be spanned by the bridge structures when bridge design is performed.
For river type control elements, including non-navigable rivers and navigable rivers, the non-navigable rivers are classified into a first-stage channel, a second-stage channel and the like, according to different classifications, different limit heights and limit widths are corresponding, specific parameters can be queried according to related technical standard files, and the technical standard files can be "inland navigable standard" and "sea and river navigable standard" and the like.
For the control elements of the road types, the grades are mainly divided into expressways, provincial roads, national roads, rural roads and the like, and different limit heights and limit widths are corresponding according to different classifications and specific conditions. Whether the road is planned or not can be distinguished according to the road, and only the corresponding column attribute needs to be added.
For the control elements of railway types, the grades are mainly divided into high-speed railways, inter-city railways, passenger-cargo common railways, heavy-load railways, special lines, city railways and the like, and according to different classifications, different limit heights and limit widths are corresponding, and specific parameters can be consulted by consulting technical standard files such as high-speed railway design specifications and the like.
For control elements of a pipeline type, the pipeline type is a generic term for a pipe type and a line type. The grades of the pipelines are mainly classified according to the pressure grades of liquid or gas in the pipelines, the pipelines can be classified according to a self-defined classification mode, the types of the pipelines are mainly electric wires, and specific grades can be classified according to voltage.
Step S40: and abstracting the target control element data through the target GIS system to obtain target control element abstract data.
It should be noted that, the functional module constructed by the control element is developed in the target GIS system, and the abstract processing can be performed on the target control element data by the functional module constructed by the control element, so as to obtain the abstract control element, that is, the abstract data of the target control element.
Specifically, the step of abstracting the target control element data through the target GIS system to obtain target control element abstract data specifically includes: abstracting the target control element data through the target GIS system to obtain a control element name, a control element type, a control element level, a control element mileage, a control element crossing angle, an influence line width, a control element positive width, a starting point mileage, an end point mileage, a limit width, a limit height and a ground elevation; the control element name, the control element type, the control element level, the control element mileage, the control element intersection angle, the influence line width, the control element positive width, the starting mileage, the ending mileage, the limit width, the limit height and the ground elevation are taken as target control element abstract data.
The target control element data may be abstracted by using a function module constructed by the control element, so that a control element name, a control element type, a control element level, a control element mileage, a control element crossing angle, an influence line width, a control element positive width, a starting point mileage, an end point mileage, a limit width, a limit height, a ground elevation, and the like may be abstracted, and the control element name, the control element type, the control element level, the control element mileage, the control element crossing angle, the influence line width, the control element positive width, the starting point mileage, the end point mileage, the limit width, the limit height, and the ground elevation may be used as the target control element abstract data.
In specific implementation, the mileage of the control element is the central axis of the control element abstracted by the ground structure, the included angle between the central axis and the line is the included angle of the control element, the central axis of the control element is the datum line for positioning the control element, the mileage position and the crossing angle of the control element on the line are determined, the central axis of the control element can be set with a certain width, and different representative patterns are selected according to different control element types, so that different effects can be rendered for type discrimination through texture mapping, arrow symbols can be attached in the texture mapping, and direction information such as the water flow direction of a river, the vehicle flow direction of a road and the supply direction of the pipeline can be expressed.
The influence line width is calculated mainly through the geometric triangular relation between the positive width of the control element and the crossing angle of the control element, and the starting mileage and the end mileage are calculated through the influence line width of +/-0.5 times of the control element.
Step S50: rendering the abstract data of the target control element through the target GIS system to obtain a target control element instance, and completing construction of the control element.
After the target control element abstract data is obtained, the target GIS system can be used for rendering the target control element abstract data, and the target control element abstract data is intuitively rendered, so that a target control element instance is obtained, and the target control element instance refers to the rendered target control element.
Further, after the target control element instance is obtained, the obtained target control element instance information can be stored, so that the subsequent data query is facilitated, and after the control element is constructed, the method further comprises the steps of: storing the target control element examples to generate a control element structure table; and modifying the initial bridge design scheme through the control element structure table to obtain a target bridge design scheme.
In a specific implementation, after the target control element instance is obtained, a structured table corresponding to the control element may be generated, and the structured table may be stored, and may be transferred to a relational database, for example mysql, to be stored, and in order to distinguish the control element instance data generated by current supplement from the data in the original vector database, the method further includes, after the control element structure table is generated: independently storing the control element structure table; performing authority auditing on the control element structure table to determine whether the data in the control element structure table has errors; and when the data in the control element structure table has no error, storing the control element structure table into the original vector database for management.
It should be understood that the generated control element structure table may be an independently established table, the control element structure table may be temporarily stored alone, and since it is uncertain whether the generated control element instance data is accurate, authority checking may be performed on the control element structure table, whether there is an error in the data in the control element structure table is determined, and when there is no error in the data in the control element structure table, the control element structure table is stored in the original vector database to perform unified scheduling management or the control element structure table is permanently stored. If the data in the control element structure table has errors, the data with errors can be collected again, and the data are abstracted and rendered again, so that the control element structure table is generated until the data have no errors.
In specific implementation, after the control element structure table is generated, the initial bridge design scheme can be supplemented and modified through the control element structure table, rendering display or non-display is automatically selected according to the display size of each element in the bridge scheme, the unified management capability of the GIS system on the original vector database is utilized, the control element records in the original vector database are called, and all control element examples are automatically avoided by utilizing the design function of the system, particularly the hole crossing arrangement function, so that the final bridge design scheme, namely the target bridge design scheme is obtained.
Fig. 4 is a schematic diagram of an example rendering effect of an initial bridge design control element in the embodiment, fig. 5 is a schematic diagram of an example rendering effect of a target bridge design control element in the embodiment, as shown in fig. 5. The control elements are constructed, so that the initial bridge design scheme can be supplemented and modified, the accuracy of the bridge scheme is improved, the quality of the bridge design is ensured, and the period of the bridge design is shortened.
As shown in table 1, table 1 is a control element structure table, and records in each row of the control element structure table correspond to examples of each control element, and the control elements mainly include a highway, and the like, and obtain corresponding parameters by querying corresponding technical standard files.
Table 1 control element Structure Table
In the embodiment, when bridge design is performed, a target GIS system is selected; acquiring an initial bridge design scheme and an original vector database of the target GIS system; determining target control element data according to the initial bridge design scheme and the original vector database; abstracting the target control element data through the target GIS system to obtain target control element abstract data; the target GIS system is used for rendering the abstract data of the target control element to obtain a target control element example, the construction of the control element is completed, the target GIS system is used for constructing the control element of the bridge, the standardized unified abstract expression of the control element is realized, the target GIS system is used, the software coding is simple to realize, the dependence on a platform is low, the functional interaction operation is friendly, the achievement is visual and the types are easy to distinguish, the popularization and the application are convenient, the structural interpretation of the control element in the image topography data is realized, the accuracy of the bridge scheme is improved, the quality of the bridge design is ensured, the period of the bridge design is shortened, and the method has good market value.
Referring to fig. 6, fig. 6 is a schematic flow chart of a second embodiment of the method for constructing a multifunctional control element of a bridge based on a GIS system according to the present invention.
Based on the first embodiment, the step S50 of the method for constructing the multifunctional bridge control element based on the GIS system in this embodiment specifically includes:
step S501: and when the abstract data of the target control element is the central axis of the control element, calling the target GIS system to draw the normal line at the intersection point of the central axis of the target control element and the line ground, and generating an initial central axis.
After the abstract data of the target control element is obtained, the corresponding target control element can be selected, and when the target control element is the central axis of the control element, the marking function of the GIS system can be called to draw the normal line at the intersection point of the central axis of the target control element and the line ground line, so as to generate the initial central axis. As shown in fig. 7, fig. 7 is an exemplary diagram of selecting a target control element in the present embodiment, and after selecting the target control element, the target control element may be subjected to operations such as abstraction and rendering.
Step S502: and obtaining an initial starting mileage line, an initial end mileage line and an affected line width position according to the abstract data of the target control element.
In a specific implementation, the initial starting mileage, the initial ending mileage and the affected line width position can be obtained through abstract data of the target control element.
As shown in fig. 8, fig. 8 is a schematic diagram of generating an initial central axis and an initial starting point or an initial end point mileage according to the present embodiment, and the initial central axis and the initial starting point (end point) mileage are generated by constructing a function module and drawing points, lines, surfaces, etc. using control elements of the target GIS system.
Step S503: and pulling the initial starting mileage and the initial end mileage away from each other to the position affecting the width of the line, so as to form a target starting mileage and a target end mileage.
In the implementation, after the initial starting mileage line, the initial ending mileage line and the position affecting the width of the line are obtained, a mouse can be dragged on the interface of the target GIS system, the initial starting mileage line and the initial ending mileage line are pulled back to each other to the position affecting the width of the line, and the position is determined by pressing the left button of the mouse, so that the target starting mileage line and the target ending mileage line are formed.
Step S504: and rotating the initial central axis around the intersection point by taking a space vertical coordinate as an axis, so that the initial central axis coincides with the actual central axis to obtain a target central axis, and synchronously rotating the target starting mileage and the target ending mileage to be kept parallel to the target central axis.
In a specific implementation, the spatial vertical Z coordinate is taken as an axis, and the initial central axis is rotated around the intersection point of the central axis and the line ground, so that the initial central axis coincides with the actual central axis, and the position is determined according to the left mouse button, so as to obtain the target central axis, as shown in fig. 9, fig. 9 is a schematic diagram of adjusting the initial central axis to the actual position, so as to obtain the target central axis. And (3) moving the initial central axis to the actual central axis by rotating the initial central axis around the intersection point, overlapping the initial central axis with the actual central axis to obtain a target central axis, and synchronously rotating a target starting mileage and a target ending mileage to be kept parallel to the target central axis.
Step S505: and obtaining the control element name, the control element type and the control element level through the target control element abstract data.
In the implementation, the control element name, the control element type and the control element level can be obtained according to the abstract data of the target control element, after the target central axis is generated, a dialog box is popped up by the target GIS system, the control element name, the control element type and the control element level information are interactively input, and the confirmation key is pressed for input.
Step S506: and determining a target central axis width and a display pattern according to the control element name, the control element type and the control element level.
In this embodiment, different control elements may set different target central axis widths and different display patterns, and then the corresponding target central axis widths and display patterns may be determined according to the control element names, the control element types, and the control element levels.
Step S507: and rendering the abstract data of the target control element according to the width of the central axis of the target and the display pattern to obtain a target control element instance.
In a specific implementation, the abstract data of the target control element can be rendered according to the width of the central axis of the target and the display pattern, so as to obtain an example of the target control element, and the drawing of the target control element can be completed to form a simplified symbolic representation, as shown in fig. 10, fig. 10 is a schematic diagram of abstract expression of the control element in this embodiment, 1 is a line, 2 is a central axis, a horizontal arrow is a ground, the central axes of different types of control elements can be provided with different widths, as shown in fig. 11a-11d, fig. 11a-11d are schematic diagrams of the central axes of different types of control elements, fig. 11a is a schematic diagram of the central axes of railway type control elements, as shown in fig. 11b is a schematic diagram of the central axes of highway type control elements, fig. 11c is a schematic diagram of the central axes of channel type control elements, and fig. 11d is a schematic diagram of the central axes of river type control elements.
Specifically, after the control element name, the control element type and the control element level are obtained, the target control element instance may be rendered by using a target GIS system according to the control element name, the control element type and the control element level, and the specific steps include: inquiring the limit height and the limit width of the control element according to the control element type and the control element level; drawing a rectangular frame based on the limit height and the limit width by using the target GIS system, and generating a rectangular limit frame on a vertical face; and rendering the rectangular bounding box by using the target GIS system to obtain a target control element instance.
It should be understood that the bounding height and bounding width of the control element can be queried according to the type and the level of the control element, the function of drawing the rectangle by using the target GIS system is used for drawing the rectangle frame based on the bounding height and the bounding width, the rectangle bounding frame on the vertical face is generated, the target GIS system is used for rendering the rectangle bounding frame, the target control element instance is obtained, whether the bottom plate of the beam part structure of the bridge conflicts with the bounding height or not can be checked conveniently according to the rendering result, and whether the bridge pier boundary of the bridge conflicts with the bounding width or not.
As shown in fig. 12, fig. 12 is a schematic diagram of a control element instance generated by abstracting and rendering target control element data. As shown in fig. 13, fig. 13 is a schematic diagram of a target bridge design scheme generated according to a target control element example, and a target GIS system is used to construct a bridge multifunctional control element, so that standardized unified abstract expression of bridge engineering river, road, pipeline, railway and other under-bridge structures is realized, corresponding structured information and graphic symbols based on the GIS system are formed, visual rendering expression is further realized, and specific functions are further realized through software coding. The software coding is simple to realize, has low dependence on a platform, has friendly functional interaction operation, visual results, is easy to distinguish types, is convenient to popularize and apply, realizes the structural interpretation of control elements in image topographic data, compensates the problem of vector data deficiency of the control elements in the existing GIS system, is matched with the intelligent bridge design module of the GIS system, can realize the professional virtual investigation, virtual investigation and virtual design of the bridge, improves the accuracy of a bridge scheme, ensures the quality of the bridge design, shortens the period of the bridge design, and has good market value.
In the embodiment, when the abstract data of the target control element is the central axis of the control element, the target GIS system is called to draw the normal line at the intersection point of the central axis of the target control element and the line ground, so as to generate an initial central axis; obtaining an initial starting mileage line, an initial end mileage line and an affected line width position according to the abstract data of the target control elements; the initial starting mileage and the initial end mileage are pulled back to the position affecting the width of the line, and a target starting mileage and a target end mileage are formed; rotating the initial central axis around the intersection point by taking a space vertical coordinate as an axis, so that the initial central axis coincides with an actual central axis to obtain a target central axis, and synchronously rotating the target starting mileage and the target ending mileage to be kept parallel to the target central axis; obtaining a control element name, a control element type and a control element level through the target control element abstract data; determining a target central axis width and a display pattern according to the control element name, the control element type and the control element level; rendering the abstract data of the target control element according to the width of the central axis of the target and the display pattern to obtain a target control element instance, realizing standardized unified abstract expression of under-bridge structures such as a bridge engineering river, a road, a pipeline, a railway and the like, and forming corresponding structured information and graphic symbol visual rendering expression based on a GIS system.
Referring to fig. 14, fig. 14 is a block diagram illustrating a construction of a first embodiment of a bridge multi-function control element construction apparatus based on a GIS system according to the present invention.
As shown in fig. 14, the bridge multifunctional control element construction device based on the GIS system according to the embodiment of the present invention includes:
the selection module 10 is configured to select a target GIS system when performing bridge design.
And the acquisition module 20 is used for acquiring the initial bridge design scheme and the original vector database of the target GIS system.
A determining module 30, configured to determine target control element data according to the initial bridge design scheme and the original vector database.
The abstract module 40 is configured to abstract the target control element data through the target GIS system to obtain target control element abstract data.
And the rendering module 50 is used for rendering the abstract data of the target control element through the target GIS system to obtain a target control element instance and complete the construction of the control element.
In the embodiment, when bridge design is performed, a target GIS system is selected; acquiring an initial bridge design scheme and an original vector database of the target GIS system; determining target control element data according to the initial bridge design scheme and the original vector database; abstracting the target control element data through the target GIS system to obtain target control element abstract data; the target GIS system is used for rendering the abstract data of the target control element to obtain a target control element example, the construction of the control element is completed, the target GIS system is used for constructing the control element of the bridge, the standardized unified abstract expression of the control element is realized, the target GIS system is used, the software coding is simple to realize, the dependence on a platform is low, the functional interaction operation is friendly, the achievement is visual and the types are easy to distinguish, the popularization and the application are convenient, the structural interpretation of the control element in the image topography data is realized, the accuracy of the bridge scheme is improved, the quality of the bridge design is ensured, the period of the bridge design is shortened, and the method has good market value.
In an embodiment, the rendering module 50 is further configured to, when the abstract data of the target control element is the central axis of the control element, invoke the target GIS system to draw a normal line at the intersection point of the central axis of the target control element and the line ground, and generate an initial central axis; obtaining a starting mileage line, an ending mileage line and a position affecting the width of a line according to the abstract data of the target control element; the initial starting mileage and the initial end mileage are pulled back to the position affecting the width of the line, and a target starting mileage and a target end mileage are formed; rotating the initial central axis around the intersection point by taking a space vertical coordinate as an axis, so that the initial central axis coincides with an actual central axis to obtain a target central axis, and synchronously rotating the target starting mileage and the target ending mileage to be kept parallel to the target central axis; obtaining a control element name, a control element type and a control element level through the target control element abstract data; determining a target central axis width and a display pattern according to the control element name, the control element type and the control element level; and rendering the abstract data of the target control element according to the width of the central axis of the target and the display pattern to obtain a target control element instance.
In an embodiment, the rendering module 50 is further configured to query a bounding height and a bounding width of the control element according to the control element type and the control element level; drawing a rectangular frame based on the limit height and the limit width by using the target GIS system, and generating a rectangular limit frame on a vertical face; and rendering the rectangular bounding box by using the target GIS system to obtain a target control element instance.
In an embodiment, the abstraction module 40 is further configured to abstract the target control element data through the target GIS system to obtain a control element name, a control element type, a control element level, a control element mileage, a control element intersection angle, an influence line width, a control element positive width, a starting point mileage, an end point mileage, a limit width, a limit height, and a ground elevation; the control element name, the control element type, the control element level, the control element mileage, the control element intersection angle, the influence line width, the control element positive width, the starting mileage, the ending mileage, the limit width, the limit height and the ground elevation are taken as target control element abstract data.
In an embodiment, the rendering module 50 is further configured to store the target control element instance, and generate a control element structure table; and modifying the initial bridge design scheme through the control element structure table to obtain a target bridge design scheme.
In an embodiment, the rendering module 50 is further configured to store the control element structure table separately; performing authority auditing on the control element structure table to determine whether the data in the control element structure table has errors; and when the data in the control element structure table has no error, storing the control element structure table into the original vector database for management.
In an embodiment, the determining module 30 is further configured to determine structural information corresponding to the topographic image according to the initial bridge design scheme; searching the structure information in the original vector database to determine vector data lacking in the original vector database; the missing vector data is taken as target control element data.
In addition, in order to achieve the above purpose, the present invention also provides a device for constructing a multifunctional bridge control element based on a GIS system, where the device for constructing a multifunctional bridge control element based on a GIS system includes: the bridge multifunctional control element construction method based on the GIS comprises a memory, a processor and a bridge multifunctional control element construction program based on the GIS, wherein the bridge multifunctional control element construction program based on the GIS is stored in the memory and can run on the processor, and the bridge multifunctional control element construction program based on the GIS is configured to realize the steps of the bridge multifunctional control element construction method based on the GIS.
The bridge multifunctional control element construction equipment based on the GIS system adopts all the technical schemes of all the embodiments, so that the bridge multifunctional control element construction equipment at least has all the beneficial effects brought by the technical schemes of the embodiments, and is not described in detail herein.
In addition, the embodiment of the invention also provides a storage medium, wherein the storage medium is stored with a bridge multifunctional control element construction program based on the GIS system, and the steps of the bridge multifunctional control element construction method based on the GIS system are realized when the bridge multifunctional control element construction program based on the GIS system is executed by a processor.
Because the storage medium adopts all the technical schemes of all the embodiments, the storage medium has at least all the beneficial effects brought by the technical schemes of the embodiments, and the description is omitted here.
It should be understood that the foregoing is illustrative only and is not limiting, and that in specific applications, those skilled in the art may set the invention as desired, and the invention is not limited thereto.
It should be noted that the above-described working procedure is merely illustrative, and does not limit the scope of the present invention, and in practical application, a person skilled in the art may select part or all of them according to actual needs to achieve the purpose of the embodiment, which is not limited herein.
In addition, technical details which are not described in detail in the embodiment can be referred to the method for constructing the multifunctional bridge control element based on the GIS system provided in any embodiment of the present invention, and are not described here again.
Furthermore, it should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or system that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or system. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or system that comprises the element.
The foregoing embodiment numbers of the present invention are merely for the purpose of description, and do not represent the advantages or disadvantages of the embodiments.
From the above description of the embodiments, it will be clear to those skilled in the art that the above-described embodiment method may be implemented by means of software plus a necessary general hardware platform, but of course may also be implemented by means of hardware, but in many cases the former is a preferred embodiment. Based on such understanding, the technical solution of the present invention may be embodied essentially or in a part contributing to the prior art in the form of a software product stored in a storage medium (e.g. Read Only Memory)/RAM, magnetic disk, optical disk) and including several instructions for causing a terminal device (which may be a mobile phone, a computer, a server, or a network device, etc.) to perform the method according to the embodiments of the present invention.
The foregoing description is only of the preferred embodiments of the present invention, and is not intended to limit the scope of the invention, but rather is intended to cover any equivalents of the structures or equivalent processes disclosed herein or in the alternative, which may be employed directly or indirectly in other related arts.
Claims (10)
1. The method for constructing the multifunctional bridge control element based on the GIS system is characterized by comprising the following steps of:
selecting a target GIS system when designing a bridge;
acquiring an initial bridge design scheme and an original vector database of the target GIS system;
determining target control element data according to the initial bridge design scheme and the original vector database;
abstracting the target control element data through the target GIS system to obtain target control element abstract data;
rendering the abstract data of the target control element through the target GIS system to obtain a target control element instance, and completing construction of the control element.
2. The method for constructing the multifunctional bridge control element based on the GIS system according to claim 1, wherein the rendering the abstract data of the target control element by the target GIS system to obtain the target control element instance comprises the following steps:
When the abstract data of the target control element is the central axis of the control element, calling the target GIS system to draw the normal line at the intersection point of the central axis of the target control element and the line ground to generate an initial central axis;
obtaining an initial starting mileage line, an initial end mileage line and an initial influence line width position according to the abstract data of the target control elements;
the initial starting mileage and the initial end mileage are pulled back to the position affecting the width of the line, and a target starting mileage and a target end mileage are formed;
rotating the initial central axis around the intersection point by taking a space vertical coordinate as an axis, so that the initial central axis coincides with an actual central axis to obtain a target central axis, and synchronously rotating the target starting mileage and the target ending mileage to be kept parallel to the target central axis;
obtaining a control element name, a control element type and a control element level through the target control element abstract data;
determining a target central axis width and a display pattern according to the control element name, the control element type and the control element level;
And rendering the abstract data of the target control element according to the width of the central axis of the target and the display pattern to obtain a target control element instance.
3. The method for constructing the bridge multifunctional control element based on the GIS system according to claim 2, wherein the rendering the abstract data of the target control element by the target GIS system to obtain the target control element instance comprises the following steps:
inquiring the limit height and the limit width of the control element according to the control element type and the control element level;
drawing a rectangular frame based on the limit height and the limit width by using the target GIS system, and generating a rectangular limit frame on a vertical face;
and rendering the rectangular bounding box by using the target GIS system to obtain a target control element instance.
4. The method for constructing the multifunctional bridge control element based on the GIS system according to claim 1, wherein the abstracting the target control element data by the target GIS system to obtain target control element abstract data comprises the following steps:
abstracting the target control element data through the target GIS system to obtain a control element name, a control element type, a control element level, a control element mileage, a control element crossing angle, an influence line width, a control element positive width, a starting point mileage, an end point mileage, a limit width, a limit height and a ground elevation;
The control element name, the control element type, the control element level, the control element mileage, the control element intersection angle, the influence line width, the control element positive width, the starting mileage, the ending mileage, the limit width, the limit height and the ground elevation are taken as target control element abstract data.
5. The method for constructing a multifunctional bridge control element based on a GIS system according to claim 1, wherein the rendering the abstract data of the target control element by the target GIS system to obtain a target control element instance, after completing the construction of the control element, further comprises:
storing the target control element examples to generate a control element structure table;
and modifying the initial bridge design scheme through the control element structure table to obtain a target bridge design scheme.
6. The method for constructing a multifunctional bridge control element based on a GIS system according to claim 5, wherein after storing the target control element instance and generating the control element structure table, further comprises:
independently storing the control element structure table;
Performing authority auditing on the control element structure table to determine whether the data in the control element structure table has errors;
and when the data in the control element structure table has no error, storing the control element structure table into the original vector database for management.
7. The GIS-based bridge multi-function control element construction method according to any one of claims 1 to 6, wherein the determining target control element data from the initial bridge design scheme and the raw vector database includes:
determining structural information corresponding to the topographic image according to the initial bridge design scheme;
searching the structure information in the original vector database to determine vector data lacking in the original vector database;
the missing vector data is taken as target control element data.
8. The utility model provides a bridge multi-functional control element construction device based on GIS system which characterized in that, bridge multi-functional control element construction device based on GIS system includes:
the selection module is used for selecting a target GIS system when the bridge design is carried out;
the acquisition module is used for acquiring an initial bridge design scheme and an original vector database of the target GIS system;
The determining module is used for determining target control element data according to the initial bridge design scheme and the original vector database;
the abstract module is used for abstracting the target control element data through the target GIS system to obtain target control element abstract data;
and the rendering module is used for rendering the abstract data of the target control element through the target GIS system to obtain a target control element instance and complete the construction of the control element.
9. The utility model provides a bridge multi-functional control element construction equipment based on GIS system which characterized in that, bridge multi-functional control element construction equipment based on GIS system includes: the bridge multifunctional control element construction method based on the GIS comprises a memory, a processor and a bridge multifunctional control element construction program based on the GIS, wherein the bridge multifunctional control element construction program based on the GIS is stored in the memory and can run on the processor, and the bridge multifunctional control element construction program based on the GIS is configured to realize the bridge multifunctional control element construction method based on the GIS according to any one of claims 1 to 7.
10. A storage medium, wherein a GIS-based bridge multi-function control element construction program is stored on the storage medium, and when the GIS-based bridge multi-function control element construction program is executed by a processor, the GIS-based bridge multi-function control element construction method according to any one of claims 1 to 7 is implemented.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310619481.3A CN116702276A (en) | 2023-05-29 | 2023-05-29 | Bridge multifunctional control element construction method based on GIS system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310619481.3A CN116702276A (en) | 2023-05-29 | 2023-05-29 | Bridge multifunctional control element construction method based on GIS system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116702276A true CN116702276A (en) | 2023-09-05 |
Family
ID=87838475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310619481.3A Pending CN116702276A (en) | 2023-05-29 | 2023-05-29 | Bridge multifunctional control element construction method based on GIS system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116702276A (en) |
-
2023
- 2023-05-29 CN CN202310619481.3A patent/CN116702276A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5278946A (en) | Method of presenting multimedia data in a desired form by comparing and replacing a user template model with analogous portions of a system | |
Huisman et al. | Principles of geographic information systems | |
CN106779417A (en) | The collection of engineering investigation information digitalization, management and integrated application method | |
CN104408564A (en) | Digital water resource system | |
CN110516015B (en) | Method for manufacturing geographical PDF map based on map graphic data and DLG | |
CN102779148A (en) | Method of generating a database, navigation device and method of determining height information | |
CN108711356B (en) | Geographic target and symbol graph registration method in vector geographic PDF map making | |
CN113626455A (en) | Method and device for updating picture library in linkage manner, electronic equipment and storage medium | |
CN113157988B (en) | Method and device for representing geographic information by OFD format file | |
CN201820263U (en) | Field pipeline data acquisition and update system based on topological relation | |
CN109446286B (en) | Visualization method and device for highway road network map | |
CN116702276A (en) | Bridge multifunctional control element construction method based on GIS system | |
CN113158840B (en) | Inland river shoreline resource utilization type extraction method based on high-definition remote sensing image | |
CN103714494B (en) | Power circuit method for building up and device | |
Morang et al. | Regional Morphology Analysis Package (RMAP). Version 3, User's guide and tutorial | |
CN105468693B (en) | A kind of efficient topological relationship calculation method | |
Song et al. | Research on the construction of virtual three-dimensional model of aging housing transformation in Northeast China based on mobile communication technology | |
CN118051556B (en) | DXF file conversion method and device for map engine visual interaction | |
Li et al. | WebGIS Application in Urban Planning Management | |
CN105786954A (en) | Intersection file presentation method | |
Lei et al. | System development of making an image map based on google earth | |
Huang et al. | Research on the Parametric Data Acquisition Technology for Rural Real Estate Fieldwork | |
Wei | Application of geographic information system in distribution power network automation | |
Xia et al. | Time efficiency optimization technique of mass data rendering by Mobile GIS | |
CN116932629A (en) | Application method for applying APP to natural resources and planning data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |