CN116696279B - Temporary blocking operation method of long straight well section gas storage - Google Patents

Temporary blocking operation method of long straight well section gas storage Download PDF

Info

Publication number
CN116696279B
CN116696279B CN202310980873.2A CN202310980873A CN116696279B CN 116696279 B CN116696279 B CN 116696279B CN 202310980873 A CN202310980873 A CN 202310980873A CN 116696279 B CN116696279 B CN 116696279B
Authority
CN
China
Prior art keywords
temporary plugging
well
construction
injection
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310980873.2A
Other languages
Chinese (zh)
Other versions
CN116696279A (en
Inventor
张景臣
郭晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
Xinjiang Federeb Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Federeb Energy Technology Co ltd filed Critical Xinjiang Federeb Energy Technology Co ltd
Priority to CN202310980873.2A priority Critical patent/CN116696279B/en
Publication of CN116696279A publication Critical patent/CN116696279A/en
Application granted granted Critical
Publication of CN116696279B publication Critical patent/CN116696279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Pipe Accessories (AREA)
  • Examining Or Testing Airtightness (AREA)

Abstract

The invention discloses a temporary plugging operation method of a long straight well section gas storage, which comprises the following steps: injecting well-killing liquid into the sleeve, and performing well-killing construction operation of an injection production well; in the well-killing construction operation process of the injection and production well, a long-acting temporary plugging agent is put into the sleeve, meanwhile, the temporary plugging construction pressure change is monitored, when the temporary plugging construction pressure does not obviously rise, the short-acting temporary plugging agent is put in place, the injection displacement of the well-killing liquid is controlled, the temporary plugging construction pressure change is observed, and when the temporary plugging construction pressure obviously rises, the temporary plugging construction operation of the injection and production well is completed. According to the reservoir environment and construction requirements, the long-acting temporary plugging agent with good grading is selected to plug large tunnels and perforation holes of the stratum; according to the leakage condition in the temporary plugging construction operation process of the injection well, short-acting temporary plugging particles are added circularly to plug the leakage occurring in the construction period; the invention provides a method for composite temporary plugging safe operation for effectively plugging a long straight well section gas storage.

Description

Temporary blocking operation method of long straight well section gas storage
Technical Field
The invention relates to the technical field of oilfield gas reservoirs, in particular to a temporary plugging operation method of a long straight well section gas reservoir.
Background
The construction of the underground gas storage has great significance for the energy safety guarantee of China, but the gas invasion and well leakage phenomena caused by long-term injection and production are required to be effectively and reliably carried out on the injection and production well by utilizing the high-efficiency and reliable temporary plugging technology while the gas storage is continuously constructed, so that the normal operation of the gas storage is ensured.
In the gas storage well injection and production operation process, the oil sleeve and the lower packer are in a high-pressure environment for a long time, so that the problems of packer failure, downhole safety valve failure, sleeve deformation, sleeve leakage, wellhead leakage and the like are easy to occur, and therefore, necessary well repair operation is required to ensure safe production. Especially for the long straight well section that the perforation is densely arranged, if utilize temporary blocking technique to carry out the workover, lead to temporary blocking effect not good because of temporary blocking scheme's unreasonable design, cause waiting to block regional flow field more complicated to influence the normal operating of whole gas storage in later stage, cause huge economic loss.
In view of this, the present invention has been made.
Disclosure of Invention
In order to solve the problems, the invention provides a temporary plugging operation method of a long vertical well section gas storage, which adopts a composite temporary plugging safety operation method and provides a new thought and method for well repair operation of dense perforation of the long vertical well section gas storage.
Specifically, the following technical scheme is adopted:
a temporary plugging operation method of a long straight well section gas storage comprises the following steps:
injecting well-killing liquid into the sleeve, and performing well-killing construction operation of an injection production well;
in the well-killing construction process of the injection and production well, a long-acting temporary plugging agent is put into a sleeve, meanwhile, the temporary plugging construction pressure change is monitored, when the temporary plugging construction pressure does not rise obviously, the short-acting temporary plugging agent is put in place, the injection displacement of the well-killing liquid is controlled through displacement of the well-killing liquid, the temporary plugging construction pressure change is observed, and when the temporary plugging construction pressure rises obviously, the temporary plugging construction operation of the injection and production well is completed;
in the process of injection and production well killing construction, if an oil pipe at a wellhead of the injection and production well is not communicated with a sleeve, a steel wire operation is carried out to open an underground sliding sleeve, degassing between the sleeve and a gas storage is carried out for a preset time in a circulating way of killing fluid, in the process of injection and production well killing construction, a long-acting temporary plugging agent is replaced to the sliding sleeve in the killing fluid of the injection and production well killing construction, a sleeve gate is closed to be extruded positively, the discharge capacity is controlled, and the temporary plugging construction pressure change is monitored;
in the process of injection well killing construction operation and injection well temporary plugging construction operation, if an oil pipe at the wellhead of the injection well is in series connection with a sleeve, the injection well is constructed in a strong extrusion mode, a killing well hydraulic well is firstly introduced, then a long-acting temporary plugging agent is extruded to implement temporary plugging killing, the displacement is controlled, and the temporary plugging construction pressure change is monitored.
In the temporary plugging operation method of the long vertical well section gas storage, as an optional implementation mode of the invention, in the well killing operation process of the injection and production well, the oil pipe at the wellhead of the injection and production well is not in communication with the sleeve,
in the temporary plugging construction process of the injection production well, the long-acting temporary plugging agent is replaced in the well control fluid of the injection production well control construction operation to the sliding sleeve, the sleeve gate is closed to be extruded positively, the displacement is controlled, the temporary plugging construction pressure change is monitored, if the temporary plugging construction pressure rises to exceed the preset pressure upper limit value, the pump is stopped to observe the temporary plugging construction pressure drop condition, when the temporary plugging construction pressure drops to the preset pressure lower limit value, the pump is started again to inject the long-acting temporary plugging agent, and the operation is repeated until the temporary plugging construction pressure does not rise obviously, and the long-acting temporary plugging agent is put in.
In the temporary plugging operation method of the long vertical well section gas storage, after the temporary plugging operation of the injection and production well is completed, well control liquid circulates to be free of overflow, leakage and gas, the sleeve is opened for standing observation, the well control liquid circulates again, leakage and gas invasion conditions are recorded, and if enough safe time is confirmed, the wellhead installation blowout preventer stack is disassembled.
In the temporary plugging operation method of the long vertical well section gas storage, if the oil pipe at the wellhead of the injection and production well is not in series with the casing, a blanking plug is put in the steel wire operation, whether the production pipe string of the injection and production well leaks or not and whether the packer is out of seal is verified by positive pressing, the change condition of the casing pressure is observed, and if the casing pressure fluctuates along with the oil pressure, the packer is not out of seal; if the oil pipe is not pressed down, the oil pipe string is well sealed.
In the temporary plugging operation method of the long vertical well section gas storage, in the process of injection well killing operation and injection well temporary plugging operation, an oil pipe at a wellhead of the injection well is communicated with a sleeve, if the temporary plugging operation pressure rises above a preset pressure upper limit value, a pump is stopped to observe the condition of the temporary plugging operation pressure, when the temporary plugging operation pressure falls to a preset pressure lower limit value, the pump is started again to inject the long-term temporary plugging agent, and the method is repeated until the temporary plugging operation pressure does not rise obviously, and the long-term temporary plugging agent is put.
In the temporary plugging operation method of the long vertical well section gas storage, after the temporary plugging construction operation of the injection well is completed, the pressure drop condition of the sleeve is observed, and when the pressure of the sleeve is reduced to the lower limit value of the preset sleeve pressure, an oil pipe valve and a sleeve valve are opened to empty the gas accumulated in the well; and standing for observation, recording overflow or leakage conditions, pressing again to record the pressure rise condition of the casing, evaluating the well control effect, and confirming that enough safe time exists, and disassembling the wellhead to install the blowout preventer stack.
In the temporary plugging operation method of the long vertical well section gas storage, after the temporary plugging construction operation of the injection well is completed, well-killing liquid is introduced for circulating well flushing and degassing, leakage and gas invasion conditions are recorded, and after no overflow and no leakage exist, the production string of the injection well above the packer is started.
In the temporary plugging operation method of the long vertical well section gas storage, after the temporary plugging construction operation of the injection and production well is completed, a packer is sleeved, milled and salvaged to lower the production string of the injection and production well, leakage and gas invasion conditions are recorded in the construction process, and temporary plugging and fixation are carried out by adopting the circulation of well control liquid and short-term temporary plugging agents or extruding the short-term temporary plugging agents into leakage points.
In the temporary plugging operation method of the long vertical well section gas storage, the underground safety valve is closed, the production gate is opened, the oil pressure and the casing pressure change are observed, whether the production string of the injection well leaks or not and whether the packer is out of seal are judged, and if the production string of the injection well leaks or the packer is out of seal, the casing annulus is filled.
As an optional implementation mode of the invention, in the temporary plugging operation method of the long-straight-well section gas storage, the self-degradation time of the long-acting temporary plugging agent is longer than that of the short-acting temporary plugging agent;
according to the reservoir environment and construction requirements, selecting a long-acting temporary plugging agent to plug large tunnels and perforation holes of a stratum; according to the leakage condition in the temporary plugging construction operation process, a short-acting temporary plugging agent is added circularly to plug the leakage in the construction period.
Compared with the prior art, the invention has the beneficial effects that:
the invention provides a temporary plugging operation method of a long straight well section gas storage, wherein in the method, a long-acting temporary plugging agent with good grading is selected to plug large pore canals and perforation holes of a stratum according to the environment of a reservoir and construction requirements; then, according to the leakage condition in the temporary plugging construction operation process of the injection and production well, short-acting temporary plugging particles are added in a circulating manner to plug the leakage in the construction period; finally, after the temporary plugging construction operation of the injection and production well is completed, the long-acting temporary plugging agent and the short-acting temporary plugging agent can be automatically degraded in the well, and hydrolysis can be accelerated by adding HCl. The invention provides a composite temporary blocking safety operation method for effectively blocking a long straight well section gas storage, and provides a new thought and method for well repair operation of dense perforation of the long straight well section gas storage.
Drawings
FIG. 1 is a flow chart of a temporary plugging operation method of a long straight well section gas storage according to an embodiment of the invention;
FIG. 2 is a schematic diagram of an underground production string of an injection well of a long vertical well section gas storage;
FIG. 3 is a schematic construction diagram of a temporary plugging method for a long straight well section gas storage according to an embodiment of the present invention.
Reference numerals in the drawings illustrate: 1-a sleeve 2-an oil pipe 3-an underground safety valve 4-an underground sliding sleeve 5-a first setting nipple 6-a packer 7-an anti-seize antifriction device 8-a second setting nipple 9-a bell mouth and a ball seat 10-an artificial well bottom 11-a perforation 12-a well mouth 13-a long-acting temporary plugging agent 14-a short-acting temporary plugging agent 15-an underground reservoir.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more clear, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. It will be apparent that the described embodiments are some, but not all, embodiments of the invention.
Thus, the following detailed description of the embodiments of the invention is not intended to limit the scope of the invention, as claimed, but is merely representative of some embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that, under the condition of no conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.
It should be noted that: like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures.
In the description of the present invention, it should be noted that, the terms "upper", "lower", and the like indicate an azimuth or a positional relationship based on the azimuth or the positional relationship shown in the drawings, or an azimuth or a positional relationship conventionally put in use of the inventive product, or an azimuth or a positional relationship conventionally understood by those skilled in the art, such terms are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the apparatus or element to be referred must have a specific azimuth, be constructed and operated in a specific azimuth, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like, are used merely to distinguish between descriptions and should not be construed as indicating or implying relative importance.
Referring to fig. 1, a temporary plugging operation method for a long vertical well section gas storage according to this embodiment includes:
injecting well-killing liquid into the sleeve, and performing well-killing construction operation of an injection production well;
in the well-killing construction process of the injection and production well, a long-acting temporary plugging agent is put into a sleeve, meanwhile, the temporary plugging construction pressure change is monitored, when the temporary plugging construction pressure does not rise obviously, the short-acting temporary plugging agent is put in place, the injection displacement of the well-killing liquid is controlled through displacement of the well-killing liquid, the temporary plugging construction pressure change is observed, and when the temporary plugging construction pressure rises obviously, the temporary plugging construction operation of the injection and production well is completed;
in the process of injection and production well killing construction, if an oil pipe at a wellhead of the injection and production well is not communicated with a sleeve, a steel wire operation is carried out to open an underground sliding sleeve, degassing between the sleeve and a gas storage is carried out for a preset time in a circulating way of killing fluid, in the process of injection and production well killing construction, a long-acting temporary plugging agent is replaced to the sliding sleeve in the killing fluid of the injection and production well killing construction, a sleeve gate is closed to be extruded positively, the discharge capacity is controlled, and the temporary plugging construction pressure change is monitored;
in the process of injection well killing construction operation and injection well temporary plugging construction operation, if an oil pipe at the wellhead of the injection well is in series connection with a sleeve, the injection well is constructed in a strong extrusion mode, a killing well hydraulic well is firstly introduced, then a long-acting temporary plugging agent is extruded to implement temporary plugging killing, the displacement is controlled, and the temporary plugging construction pressure change is monitored.
The embodiment provides a temporary plugging operation method of a long straight well section gas storage, wherein long-acting temporary plugging agents with good grading are selected to plug large pore canals and perforation holes of a stratum according to the environment of a reservoir and construction requirements; then, according to the leakage condition in the temporary plugging construction operation process of the injection and production well, short-acting temporary plugging particles are added in a circulating manner to plug the leakage in the construction period; finally, after the temporary plugging construction operation of the injection and production well is completed, the long-acting temporary plugging agent and the short-acting temporary plugging agent can be automatically degraded in the well, and hydrolysis can be accelerated by adding HCl. The embodiment provides a composite temporary blocking safety operation method for effectively blocking the long straight well section gas storage, and provides a new thought and method for well repair operation of dense perforation of the long straight well section gas storage.
In the temporary plugging operation method of the long vertical well section gas storage of the embodiment, if the oil pipe at the wellhead of the injection well is not in communication with the casing during the injection well killing operation, the steel wire operation is carried out to open the underground sliding sleeve, and the killing fluid circulates for a preset time to degas the space between the casing and the gas storage;
in the temporary plugging construction process of the injection production well, the long-acting temporary plugging agent is replaced in the well control fluid of the injection production well control construction operation to the sliding sleeve, the sleeve gate is closed to be extruded positively, the displacement is controlled, the temporary plugging construction pressure change is monitored, if the temporary plugging construction pressure rises to exceed the preset pressure upper limit value, the pump is stopped to observe the temporary plugging construction pressure drop condition, when the temporary plugging construction pressure drops to the preset pressure lower limit value, the pump is started again to inject the long-acting temporary plugging agent, and the operation is repeated until the temporary plugging construction pressure does not rise obviously, and the long-acting temporary plugging agent is put in.
Further, according to the temporary plugging operation method of the long straight well section gas storage, the well killing effect under the condition that the wellhead oil pipe and the casing pipe of the injection and production well are not in communication is evaluated: after the temporary plugging construction operation of the injection and production well is completed, the well killing liquid is circulated until no overflow, no leakage and no gas are caused, the sleeve is opened for standing observation, the well killing liquid is circulated again, the leakage and gas invasion conditions are recorded, and the condition that enough safe time exists is confirmed, so that the wellhead installation blowout preventer stack is disassembled.
In the temporary plugging operation method of the long straight well section gas storage, if the oil pipe at the wellhead of the injection and production well is not in communication with the sleeve, the steel wire operation is carried out into the packer, whether the production pipe string of the injection and production well leaks or not and whether the packer is out of seal or not is verified by normal pressing, the change condition of the casing pressure is observed, and if the casing pressure fluctuates along with the oil pressure, the packer is not out of seal; if the oil pipe is not pressed down, the oil pipe string is well sealed.
In the temporary plugging operation method of the long vertical well section gas storage of the embodiment, if the well head oil pipe of the injection well is in series connection with the casing pipe and the well killing liquid cannot establish circulation in the injection well killing operation and the injection well temporary plugging operation, the forced extrusion mode is adopted for construction, the well killing liquid is firstly introduced, then the long-acting temporary plugging agent is extruded for implementing temporary plugging killing, the displacement is controlled, the temporary plugging operation pressure change is monitored, if the temporary plugging operation pressure rises above the preset pressure upper limit value, the pump is stopped for observing the temporary plugging operation pressure drop condition, and when the temporary plugging operation pressure drops below the preset pressure lower limit value, the pump is started again for injecting the long-acting temporary plugging agent, so the operation is repeated until the temporary plugging operation pressure does not rise obviously, and the long-acting temporary plugging agent is put in.
Further, according to the temporary plugging operation method of the long straight well section gas storage, the well killing effect under the condition that the oil pipe at the wellhead of the injection and production well is in series communication with the casing is evaluated: after the temporary plugging construction operation of the injection well is completed, observing the pressure drop condition of the sleeve, and opening an oil pipe valve and a sleeve valve when the sleeve pressure drops to a preset lower limit value of the sleeve pressure to empty the gas accumulation in the well; and standing for observation, recording overflow or leakage conditions, pressing again to record the pressure rise condition of the casing, evaluating the well control effect, and confirming that enough safe time exists, and disassembling the wellhead to install the blowout preventer stack.
According to the temporary plugging operation method for the long straight well section gas storage, after the temporary plugging construction operation of the injection and production well is completed, well control liquid is introduced for circulating well flushing and degassing, leakage and gas invasion conditions are recorded, and after the gas is not overflowed, leakage and gas are avoided, the production string of the injection and production well above the packer is started.
According to the temporary plugging operation method for the long vertical well section gas storage, after the temporary plugging construction operation of the injection and production well is completed, a packer is sleeved, milled and salvaged, a production string of the injection and production well is placed below the packer, leakage and gas invasion conditions are recorded in the construction process, well control liquid and short-term temporary plugging agent circulation are adopted, or the short-term temporary plugging agent is extruded to enter a leakage point, and temporary plugging and fixation are carried out.
In the temporary plugging operation method of the long straight well section gas storage, before injection well killing operation and injection well temporary plugging operation are carried out, an underground safety valve is closed, a production gate is opened, oil pressure and casing pressure changes are observed, whether the injection well production string leaks or not and whether a packer is out of seal is judged, and if the injection well production string leaks or the packer is out of seal, a casing annulus is filled.
In the temporary plugging operation method of the long-straight-well section gas storage, the self-degradation time of the long-acting temporary plugging agent is longer than that of the short-acting temporary plugging agent;
according to the reservoir environment and construction requirements, selecting a long-acting temporary plugging agent to plug large tunnels and perforation holes of a stratum; according to the leakage condition in the temporary plugging construction operation process, a short-acting temporary plugging agent is added circularly to plug the leakage in the construction period.
Specifically, the long-acting temporary plugging agent of the embodiment has larger particle size, is mainly used for plugging large pore canals and perforation holes of a stratum, has smaller particle size, can be used for plugging fine pores, and can effectively plug dense perforations of a long-straight-well section gas storage through a composite plugging mode of the long-acting temporary plugging agent and the short-acting temporary plugging agent.
The invention provides a novel method for carrying out efficient temporary plugging on an injection and production well of a long vertical well section gas storage so as to safely repair the well. After the actual inspection, the obtained result accords with the expected result, which shows that the method is effective and provides a brand new thought and method for the old well reconstruction in the gas storage construction.
Referring to fig. 2, an underground production string of an injection well of a long vertical well section gas storage of the embodiment is illustrated, the underground production string comprises a casing 1 and an oil pipe 2 arranged in the casing 1, wherein the oil pipe 2 is sequentially provided with an underground safety valve 3, an underground sliding sleeve 4, a first landing nipple 5, a packer 6, an anti-blocking antifriction device 7, a second landing nipple 8 and a bell mouth+ball seat 9 from top to bottom, the casing 1 penetrates into a stratum, an artificial well bottom 10 is formed at the bottommost end of the casing 1, the casing 1 is communicated with the gas storage through perforation holes 11, and the temporary plugging operation method of the long vertical well section gas storage of the embodiment is to plug the perforation holes 11 communicated between the casing 1 and the gas storage so as to perform well repairing operation of the injection well section gas storage.
Referring to fig. 3, a construction schematic diagram of a temporary plugging operation method of a long vertical well section gas storage in this embodiment is that a long-acting temporary plugging agent 13 and a short-acting temporary plugging agent 14 are injected into a well mouth 12 of an injection well, the long-acting temporary plugging agent 13 plugs a perforation 11 in an underground reservoir 15, which is communicated with a sleeve 1, and the short-acting temporary plugging agent 14 is used for plugging the temporary plugging of the long-acting temporary plugging agent 13 after construction.
Example 1
The temporary plugging operation method of the long straight well section gas storage comprises the following steps:
step one: and preparing construction materials, and finishing screening of the types of the temporary plugging agents with long and short effects and evaluating the temporary plugging performance according to reservoir environment and construction requirements.
Step two: before well repair operation, the underground safety valve is closed, the production gate is opened, the oil pressure and the sleeve pressure change are observed, and whether the wellhead oil pipe and the sleeve are in series connection is judged. If the wellhead oil pipe and the sleeve are not communicated, adopting a circulating well killing mode firstly, and then replacing the long-acting temporary plugging agent HC2108, and constructing in a forced extrusion mode; if the wellhead oil pipe and the sleeve are communicated, the construction is needed to be carried out in a forced extrusion mode; implementing the annular liquid level of the sleeve before construction, if the annular liquid level is deeper, the possibility of leakage of underground production pipe strings or loss of sealing of the packer is not eliminated. The annulus should be filled before step three is performed.
Step three: and in the second step, judging that the wellhead oil pipe and the casing are not in series, then the wire operation is carried out to put into the blanking plug, and the normal pressing is used for verifying whether the underground production pipe string leaks and whether the packer is in a loose state. If the underground production pipe string is not sealed, the change condition of the casing pressure is observed, and if the casing pressure obviously fluctuates along with the oil pressure, the possibility of the packer losing seal is small; if the oil pipe is not pressed down, the oil pipe string is well sealed, and the reason that the oil pipe and the casing are in series can be basically determined to be the loss of the sealing of the packer; annulus pressuring further validates the packer.
Step four: in the second step, under the condition that the wellhead oil pipe and the sleeve are not in communication, the underground sliding sleeve is opened in the steel wire operation, and the well killing fluid is circulated for two weeks for degassing. And the long-acting temporary plugging agent HC2108 20m with the concentration of 5% is positively replaced to the underground sliding sleeve. And (5) closing the sleeve gate to squeeze forward, controlling the displacement, and observing the pressure change. If the construction pressure obviously rises to 8-10Mpa, stopping the pump to observe the pressure drop. This is repeated 2-3 times. If the pressure does not have obvious rising process, a certain amount of short-acting temporary plugging agent GA1506 is added, well control fluid is used for displacing in place, the discharge capacity is controlled, the pressure change is observed, and the next working procedure is carried out after the pressure is obviously raised. In the second step, the wellhead oil pipe and the sleeve are judged to be communicated, and the circulation cannot be established, so that the construction can only be carried out in a forced extrusion mode. The well is forced to be pumped by the well-pumping liquid, then the long-acting temporary plugging agent HC2108 is squeezed into the well to implement temporary plugging well-pumping, the discharge capacity is controlled, the pressure is observed, the pressure is obviously increased to 8-10Mpa, and the pressure drop condition is observed when the pump is stopped. This is repeated 2-3 times.
Step five: and in the fourth step, if the construction is carried out under the condition that the wellhead oil pipe and the casing pipe are not in communication, the well is killed by using well killing liquid for circulation and degassing, after the well killing liquid is circulated until no overflow and no leakage are caused, the well is static and observed for 12 hours, leakage and gas invasion conditions are recorded again in a circulating way, and enough safe time is ensured, and the wellhead is disassembled to install the blowout preventer stack. In the fourth step, if the construction is performed under the condition of the string connection of the wellhead oil pipe and the sleeve, the pressure drop condition is observed, and when the pressure drops below 1Mpa, an oil sleeve valve is opened to empty the accumulated gas in the well. After 12 hours of silence, overflow or leakage is recorded. And (4) comparing the recorded pressure rising condition of the forward pressing with the previous construction, evaluating the well-killing effect, and detaching the wellhead installation blowout preventer stack after confirming that the safety time is enough.
Step six: and (3) carrying out well flushing and degassing by using well killing liquid circulation, recording leakage and gas invasion conditions, and after no overflow, no leakage and no gas, lifting out the production pipe string above the packer to finish the plug-in sealing operation.
Step seven: the production pipe column below the packer is sleeved, milled and salvaged, leakage and GAs invasion conditions are recorded at any time in the construction process, and a temporary plugging agent GA1506 is adopted for circulating by 5% of well control fluid or is extruded to enter a leakage point when needed, so that the temporary plugging and well control effect is ensured, and the safety production is ensured.
Example two
On the basis of the first embodiment, temporary plugging operation is completed for the target well. After the temporary plugging operation is completed, closing the target well for about 45 days, wherein the temporary plugging agent is self-degraded; if the degradation process is required to be completed in advance, HCl solution can be added into the well to accelerate the hydrolysis of the temporary plugging agent, and finally the temporary plugging and well repairing operation is completed.
The above embodiments are only for illustrating the present invention and not for limiting the technical solutions described in the present invention, and although the present invention has been described in detail in the present specification with reference to the above embodiments, the present invention is not limited to the above specific embodiments, and thus any modifications or equivalent substitutions are made to the present invention; all technical solutions and modifications thereof that do not depart from the spirit and scope of the invention are intended to be included in the scope of the appended claims.

Claims (4)

1. A temporary plugging operation method of a long straight well section gas storage is characterized by comprising the following steps:
injecting well-killing liquid into the sleeve, and performing well-killing construction operation of an injection production well;
in the well-killing construction process of the injection and production well, a long-acting temporary plugging agent is put into a sleeve, meanwhile, the temporary plugging construction pressure change is monitored, when the temporary plugging construction pressure does not rise obviously, the short-acting temporary plugging agent is put in place, the injection displacement of the well-killing liquid is controlled through displacement of the well-killing liquid, the temporary plugging construction pressure change is observed, and when the temporary plugging construction pressure rises obviously, the temporary plugging construction operation of the injection and production well is completed;
in the process of injection well killing construction, if an oil pipe at the wellhead of the injection well is not communicated with a sleeve, the underground sliding sleeve is opened by steel wire operation, degassing between the sleeve and a gas storage is carried out by killing fluid circulation for a preset time, a long-acting temporary plugging agent is replaced in killing fluid of injection well killing construction to the sliding sleeve in the process of injection well temporary plugging construction, a sleeve gate is closed to be extruded positively, the discharge capacity is controlled, and the temporary plugging construction pressure change is monitored; in the temporary plugging construction operation process of the injection and production well, if the temporary plugging construction pressure rises above the preset pressure upper limit value, stopping the pump to observe the descending condition of the temporary plugging construction pressure, and when the temporary plugging construction pressure descends to the preset pressure lower limit value, starting the pump again to inject the long-acting temporary plugging agent, repeating the steps until the temporary plugging construction pressure does not rise obviously, and ending the long-acting temporary plugging agent injection; after the temporary plugging construction operation of the injection and production well is completed, after the well killing liquid circulates to be free of overflow, leakage and gas, standing and observing the open sleeve, circulating the well killing liquid again, recording leakage and gas invasion conditions, and confirming that enough safe time exists, and disassembling the wellhead to install the blowout preventer stack; the steel wire operation is carried out, a blanking plug is put in, whether the production string of the injection and production well leaks or not and whether the packer is out of seal or not is verified by positive pressing, the change condition of the casing pressure is observed, and if the casing pressure fluctuates along with the oil pressure, the packer is not out of seal; if the oil pipe is not pressed down, the oil pipe string is well sealed;
in the process of carrying out injection well killing construction operation and injection well temporary plugging construction operation, if an oil pipe at the wellhead of the injection well is in series connection with a sleeve, adopting a strong extrusion mode for construction, firstly introducing a killing hydraulic well, then extruding a long-acting temporary plugging agent to implement temporary plugging killing, controlling the discharge capacity, and monitoring the pressure change of temporary plugging construction; in the process of injection well killing construction operation and injection well temporary plugging construction operation, if the temporary plugging construction pressure rises above the preset upper pressure limit value, stopping the pump to observe the descending condition of the temporary plugging construction pressure, and when the temporary plugging construction pressure descends to the preset lower pressure limit value, restarting pumping the long-acting temporary plugging agent, repeating the steps until the temporary plugging construction pressure does not rise obviously, and ending the long-acting temporary plugging agent throwing; after the temporary plugging construction operation of the injection well is completed, observing the pressure drop condition of the sleeve, and opening an oil pipe valve and a sleeve valve when the sleeve pressure drops to a preset lower limit value of the sleeve pressure to empty the gas accumulation in the well; standing for observation, recording overflow or leakage conditions, pressing again to record the pressure rising condition of the casing, evaluating the well control effect, and detaching the wellhead and installing the blowout preventer stack if enough safe time is confirmed;
the self-degradation time of the long-acting temporary plugging agent is longer than that of the short-acting temporary plugging agent; according to the reservoir environment and construction requirements, selecting a long-acting temporary plugging agent to plug large tunnels and perforation holes of a stratum; according to the leakage condition in the temporary plugging construction operation process, a short-acting temporary plugging agent is added circularly to plug the leakage in the construction period.
2. The temporary plugging operation method for the long straight well section gas storage according to claim 1, wherein after the temporary plugging construction operation of the injection and production well is completed, well-killing liquid is introduced for circulating well flushing and degassing, leakage and gas invasion conditions are recorded, and after no overflow, no leakage and no gas exist, the production string of the injection and production well above the packer is lifted.
3. The temporary plugging operation method for the long vertical well section gas storage according to claim 2, wherein after the temporary plugging construction operation of the injection and production well is completed, a packer is sleeved, milled and salvaged to lower the production string of the injection and production well, leakage and gas invasion conditions are recorded in the construction process, and temporary plugging and fixation is carried out by adopting a well control fluid and a short-term temporary plugging agent to circulate or extruding the short-term temporary plugging agent into a leakage point.
4. The temporary plugging operation method for the long vertical well section gas storage according to claim 1, wherein before injection well killing operation and injection well temporary plugging operation are carried out, a downhole safety valve is closed, a production gate is opened, oil pressure and casing pressure changes are observed, whether the injection well production string leaks or not and whether a packer is out of seal are judged, and if the injection well production string leaks or the packer is out of seal, a casing annulus is filled.
CN202310980873.2A 2023-08-07 2023-08-07 Temporary blocking operation method of long straight well section gas storage Active CN116696279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310980873.2A CN116696279B (en) 2023-08-07 2023-08-07 Temporary blocking operation method of long straight well section gas storage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310980873.2A CN116696279B (en) 2023-08-07 2023-08-07 Temporary blocking operation method of long straight well section gas storage

Publications (2)

Publication Number Publication Date
CN116696279A CN116696279A (en) 2023-09-05
CN116696279B true CN116696279B (en) 2024-01-26

Family

ID=87837868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310980873.2A Active CN116696279B (en) 2023-08-07 2023-08-07 Temporary blocking operation method of long straight well section gas storage

Country Status (1)

Country Link
CN (1) CN116696279B (en)

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3900050A1 (en) * 1989-01-03 1990-07-05 Kavernen Bau Betriebs Gmbh Method of cementing a pipe string and apparatus for carrying out the method
RU2081296C1 (en) * 1995-08-10 1997-06-10 Расим Шахимарданович Тугушев Method and device for strengthening bottom-hole zone of gas wells
CN103244071A (en) * 2012-02-09 2013-08-14 中国石油天然气股份有限公司 Method for plugging old underground gas storage well
CN103775023A (en) * 2013-01-30 2014-05-07 中国石油天然气股份有限公司 Method for pressing low-pressure oil and gas well
RU2580565C1 (en) * 2015-01-28 2016-04-10 Публичное акционерное общество "ГАЗПРОМ" (ПАО "ГАЗПРОМ") Well completion method
CN106845043A (en) * 2017-04-07 2017-06-13 东方宝麟科技发展(北京)有限公司 A kind of technological process of shale gas horizontal well refracturing and method for designing
CN108559469A (en) * 2018-05-21 2018-09-21 北京力会澜博能源技术有限公司封堵流体科技研发分公司 A kind of natural gas well suede bag pressure well liquid is not depressured kill-job technique
CN109337660A (en) * 2018-11-05 2019-02-15 西安石油大学 A kind of low pressure carbonate reservoir gas well temporarily stifled workover fluid and its preparation, application method
CN110984907A (en) * 2019-12-23 2020-04-10 南智(重庆)能源技术有限公司 Well repairing method based on low-leakage temporary plugging process
CN111205839A (en) * 2020-01-17 2020-05-29 中国石油天然气股份有限公司 Elastic gel temporary plugging well killing fluid used in combination with gas well and construction process
CN111648755A (en) * 2020-05-20 2020-09-11 中国石油化工股份有限公司 Method for promoting balanced expansion of multiple clusters of cracks through ball throwing and temporary plugging
CN111691865A (en) * 2020-06-29 2020-09-22 中国石油天然气股份有限公司 Perforation crack initiation-free method for cased well
CN111720102A (en) * 2020-06-05 2020-09-29 青岛鑫源晟石油科技有限公司 Fine temporary plugging volume fracturing process technology replacing mechanical packing
CN111963099A (en) * 2020-08-19 2020-11-20 中国石油天然气股份有限公司 Construction method of temporary plugging resin system for repairing natural gas well in ancient world
CN113550728A (en) * 2021-08-26 2021-10-26 中国石油大学(北京) Temporary plugging evaluation method and device
CN114427417A (en) * 2020-09-24 2022-05-03 中国石油化工股份有限公司 Multi-layer reservoir fracturing method with large stress difference and application
CN114737940A (en) * 2022-05-12 2022-07-12 美服(四川)能源技术有限公司 Three-dimensional well zone seepage temporary plugging volume fracturing method
GB202209351D0 (en) * 2021-10-27 2022-08-10 Univ Southwest Petroleum Method for optimizing the particle size of temporary plugging balls for fracture-opening diverting fracturing in deep shale gas horizontal well
CN115639083A (en) * 2022-12-06 2023-01-24 新疆斐德莱布能源科技有限公司 True triaxial hydraulic fracturing simulation experiment method and device for mine field level

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8807223B2 (en) * 2010-05-28 2014-08-19 David Randolph Smith Method and apparatus to control fluid flow from subsea wells
CN112175596B (en) * 2020-04-02 2022-11-04 中国石油大学(华东) Temporary plugging agent for efficiently plugging fractures in deep oil and gas reservoir seams, preparation method of temporary plugging agent and large-seam high-fracturing process

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3900050A1 (en) * 1989-01-03 1990-07-05 Kavernen Bau Betriebs Gmbh Method of cementing a pipe string and apparatus for carrying out the method
RU2081296C1 (en) * 1995-08-10 1997-06-10 Расим Шахимарданович Тугушев Method and device for strengthening bottom-hole zone of gas wells
CN103244071A (en) * 2012-02-09 2013-08-14 中国石油天然气股份有限公司 Method for plugging old underground gas storage well
CN103775023A (en) * 2013-01-30 2014-05-07 中国石油天然气股份有限公司 Method for pressing low-pressure oil and gas well
RU2580565C1 (en) * 2015-01-28 2016-04-10 Публичное акционерное общество "ГАЗПРОМ" (ПАО "ГАЗПРОМ") Well completion method
CN106845043A (en) * 2017-04-07 2017-06-13 东方宝麟科技发展(北京)有限公司 A kind of technological process of shale gas horizontal well refracturing and method for designing
CN108559469A (en) * 2018-05-21 2018-09-21 北京力会澜博能源技术有限公司封堵流体科技研发分公司 A kind of natural gas well suede bag pressure well liquid is not depressured kill-job technique
CN109337660A (en) * 2018-11-05 2019-02-15 西安石油大学 A kind of low pressure carbonate reservoir gas well temporarily stifled workover fluid and its preparation, application method
CN110984907A (en) * 2019-12-23 2020-04-10 南智(重庆)能源技术有限公司 Well repairing method based on low-leakage temporary plugging process
CN111205839A (en) * 2020-01-17 2020-05-29 中国石油天然气股份有限公司 Elastic gel temporary plugging well killing fluid used in combination with gas well and construction process
CN111648755A (en) * 2020-05-20 2020-09-11 中国石油化工股份有限公司 Method for promoting balanced expansion of multiple clusters of cracks through ball throwing and temporary plugging
CN111720102A (en) * 2020-06-05 2020-09-29 青岛鑫源晟石油科技有限公司 Fine temporary plugging volume fracturing process technology replacing mechanical packing
CN111691865A (en) * 2020-06-29 2020-09-22 中国石油天然气股份有限公司 Perforation crack initiation-free method for cased well
CN111963099A (en) * 2020-08-19 2020-11-20 中国石油天然气股份有限公司 Construction method of temporary plugging resin system for repairing natural gas well in ancient world
CN114427417A (en) * 2020-09-24 2022-05-03 中国石油化工股份有限公司 Multi-layer reservoir fracturing method with large stress difference and application
CN113550728A (en) * 2021-08-26 2021-10-26 中国石油大学(北京) Temporary plugging evaluation method and device
GB202209351D0 (en) * 2021-10-27 2022-08-10 Univ Southwest Petroleum Method for optimizing the particle size of temporary plugging balls for fracture-opening diverting fracturing in deep shale gas horizontal well
CN114737940A (en) * 2022-05-12 2022-07-12 美服(四川)能源技术有限公司 Three-dimensional well zone seepage temporary plugging volume fracturing method
CN115639083A (en) * 2022-12-06 2023-01-24 新疆斐德莱布能源科技有限公司 True triaxial hydraulic fracturing simulation experiment method and device for mine field level

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
暂堵工艺在川东地区低压井修井作业中的应用;刘东明;王瑞莲;胡嘉佩;;钻采工艺(第05期);第122页-124页 *

Also Published As

Publication number Publication date
CN116696279A (en) 2023-09-05

Similar Documents

Publication Publication Date Title
CN106948788B (en) Method for implementing secondary well cementation in horizontal well section
CN108915635B (en) Method for preventing gas channeling after cementing of high-pressure gas well tail pipe
CN108266173B (en) Method for segmented reconstruction of well completion
CN104632123A (en) Ultralow-pressure well leakage plugging method
CN110748315A (en) Method for treating casing damage of oil-water well
CA2894634C (en) Fluid plugs as downhole sealing devices and systems and methods including the same
CN106639971A (en) High pressure-bearing blocking method for perforation shot hole
CN111075364A (en) Clean well completion pipe string and process for high-temperature and high-pressure oil and gas well
CN116696279B (en) Temporary blocking operation method of long straight well section gas storage
CN215672164U (en) Jet pump lifting process pipe column capable of being repeatedly acidified in offshore oil field
CN107461182B (en) Layering fracturing sand control method
CN211692340U (en) Clean well completion tubular column of high temperature high pressure oil gas well
RU2441975C1 (en) Methods of well killing within the severe environment of gas and gas-condensate wells
US2087297A (en) Method of shutting off water sands in wells
CN109209284A (en) A kind of long well section casing damaged well subsidy bracing means
RU2741882C1 (en) Method for multi-stage cuff cementing of wells
CN114198051B (en) High-sulfur-content abandoned well sealing method
RU2397313C1 (en) Procedure for repair of annulus space of string borehole with two exposed formations
CN111411932A (en) Method and device for integrating segmented well completion and transformation of horizontal well
CN114109298A (en) Method for cementing lost-circulation zone well section
RU2626495C1 (en) Method of proppant washing from pipe string and bottom-hole zone after reservoir fracture
CN117188999B (en) Efficient well flushing method for U-shaped well for in-situ leaching uranium mining
CN111287690B (en) Method for injecting ash into open hole stratum of well drilling
RU2397314C1 (en) Procedure for repair of annulus space of string borehole with two exposed formations
CN111648740B (en) Oil pipe leakage stopping method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240315

Address after: 102249 Beijing city Changping District Road No. 18

Patentee after: China University of Petroleum (Beijing)

Country or region after: China

Address before: 834009 No. 42-13, Chuangye Garden, Sanping Town, Baijiantan District, Karamay City, Xinjiang Uygur Autonomous Region

Patentee before: Xinjiang federeb Energy Technology Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right