CN116579831A - Intelligent climbing frame management system - Google Patents
Intelligent climbing frame management system Download PDFInfo
- Publication number
- CN116579831A CN116579831A CN202310477827.0A CN202310477827A CN116579831A CN 116579831 A CN116579831 A CN 116579831A CN 202310477827 A CN202310477827 A CN 202310477827A CN 116579831 A CN116579831 A CN 116579831A
- Authority
- CN
- China
- Prior art keywords
- climbing frame
- module
- climbing
- management
- client
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 205
- 238000012544 monitoring process Methods 0.000 claims abstract description 23
- 238000013475 authorization Methods 0.000 claims abstract description 17
- 238000012423 maintenance Methods 0.000 claims description 14
- 230000001174 ascending effect Effects 0.000 claims description 4
- 230000002159 abnormal effect Effects 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 230000007547 defect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/0645—Rental transactions; Leasing transactions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/30—Administration of product recycling or disposal
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Engineering & Computer Science (AREA)
- Marketing (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Finance (AREA)
- Theoretical Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Development Economics (AREA)
- Sustainable Development (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention belongs to the technical field of intelligent climbing frames, and particularly relates to an intelligent climbing frame management system which comprises an enterprise end, a client end and an operation end, wherein the enterprise end comprises a cost management module, a climbing frame management module and a climbing frame management authorization module, the operation end comprises a climbing frame control module and a climbing frame supervision module, and the client end comprises a lease cost reminding module, a monitoring equipment management module and a climbing frame power supervision module; the system overcomes the defects of the prior art, is provided with a climbing frame management module, a climbing frame management authorization module and an operation end, and the whole authority and part authority of the climbing frame management module are authorized to the operation end through the climbing frame management authorization module, so that the operation end is convenient to complete the actual control of the climbing frame.
Description
Technical Field
The invention belongs to the technical field of intelligent climbing frames, and particularly relates to an intelligent climbing frame management system.
Background
The climbing frame is called a lifting frame, and can be divided into hydraulic, electric and manual lifting frames according to the power source. The novel scaffold system is developed in recent years and is mainly applied to high-rise shear wall type building trays. It can climb up or down along the building. This system allows a complete improvement of the scaffold technology: firstly, the frame does not need to be turned over; secondly, the disassembly and assembly process of the scaffold (the scaffold is used until the construction is finished after one-time assembly) is avoided, the scaffold is not limited by the height of a building, and the manpower and materials are greatly saved. And also has a great improvement over traditional scaffolds in terms of safety. Has great development advantages in high-rise buildings.
The climbing frames used in a plurality of building sites are rented, so that the cost is saved, corresponding climbing frame renting companies are also transported, wherein the existing climbing frame management system mainly collects data of service regions to form economic models of different regions, and the climbing frame management is more flexible according to the local actual condition accounting cost; according to the conditions of different clients, different leasing modes are formed, so that later-stage climbing frame management and money return are facilitated, and the income created by climbing frame fixed assets is maximized; by evaluating the credit of the client, hierarchical differentiation management is realized, so that funds return is smoother.
However, the technology can directly control the total power control module to forcibly cut off the climbing frame power system through the enterprise end so as to prevent the climbing frame from working to achieve the aim of money.
Disclosure of Invention
The invention aims to provide an intelligent climbing frame management system, which overcomes the defects of the prior art, is provided with a climbing frame management module, a climbing frame management authorization module and an operation end, and the climbing frame management authorization module is used for authorizing all rights and part of rights of the climbing frame management module to the operation end, so that the operation end can conveniently complete the actual control of the climbing frame.
In order to solve the problems, the technical scheme adopted by the invention is as follows:
the intelligent climbing frame management system comprises an enterprise end, a client end and an operation end, wherein the enterprise end comprises a cost management module, a climbing frame management module and a climbing frame management authorization module, the operation end comprises a climbing frame control module and a climbing frame supervision module, and the client end comprises a lease cost reminding module, a monitoring equipment management module and a climbing frame power supervision module;
the expense management module is used for managing the record and management of the manufacturing cost, depreciation cost, lease expense, lease period and selling expense of the climbing frame;
the climbing frame management module comprises a total power control module, a climbing frame lifting control module, a climbing frame maintenance module and a climbing frame operation data module;
the total power control module is used for controlling the starting and closing of the total power of the climbing frame;
the climbing frame lifting control module is used for controlling the climbing frame to ascend and descend;
the climbing frame maintenance module is used for analyzing the abnormal use information of the climbing frame and giving out a solution; arranging maintenance personnel and arranging daily maintenance;
the climbing frame operation data module is used for recording working data of the climbing frame and monitoring the state of the climbing frame;
the climbing frame management authorization module is used for authorizing other ports to be connected with the climbing frame management module;
the climbing frame control module controls the climbing frame through the climbing frame management authorization module and the climbing frame management module, and the management end has the authority of controlling the climbing frame after being authorized by the enterprise end;
the climbing frame supervision module comprises a climbing frame GPS positioning module, a climbing frame height positioning module and a climbing frame time recording module;
the climbing frame GPS positioning module is used for monitoring the specific position of the climbing frame and performing positioning monitoring when the climbing frame is used;
the climbing frame height positioning module is used for recording the height of the climbing frame and is convenient for knowing the actual floor where the climbing frame works currently;
the climbing frame time recording module is used for recording climbing frame lease starting date, actual use days and climbing frame time required by each ascending or descending work;
the lease expense reminding module is connected with the expense management module and is used for providing a client to finish subsequent expense payment when expense expires;
the monitoring equipment management module is used for managing and displaying the monitoring equipment on the climbing frame, forming a working log for uploading and storing, manually reporting errors and automatically reporting errors, finding potential safety hazards, and applying for maintenance.
Preferably, the authority for controlling the climbing frame is divided into partial operation authority and full operation authority.
Preferably, the climbing frame height positioning module and the climbing frame time recording module are connected with a climbing frame each layer of stay period display module through a calculation module.
Preferably, the client side further comprises a climbing frame power supervision module, and the climbing frame power supervision module is used for recording power data of the climbing frame during working.
Preferably, the client side further comprises a climbing frame information receiving module, wherein the climbing frame information receiving module is connected with the climbing frame monitoring module, and the climbing frame monitoring module data are shared and used for knowing the service condition of the climbing frame for the client side.
Preferably, the operation end is directly connected with the client, and the client directly shares all modules and rights of the operation end and is used for the client to directly operate the work of the climbing frame.
Compared with the prior art, the invention has the following beneficial effects:
1. the climbing frame management module, the climbing frame management authorization module and the operation end are arranged, all the authority and part of the authority of the climbing frame management module are authorized to the operation end through the climbing frame management authorization module, and therefore the operation end can conveniently complete actual control of the climbing frame;
2. the independent operation end can enable enterprise technicians to provide specific operation support for clients, and also enable the clients to find people to operate the climbing frame, so that people can flexibly select from the operation or enterprise assistance operation according to the actual situation of the clients;
3. the operation end is directly connected with the client, the client directly shares all modules and rights of the operation end, the client can directly operate the climbing frame by using the client, the actual requirement of the construction area can be maximized, and the waste period of personnel mobilization is reduced;
4. the display module of the residence period of each layer of the climbing frame is arranged, and the time interval between each ascending or descending of the climbing frame is recorded, so that a customer can conveniently know the construction condition of each layer, and the integration and supervision of the whole construction period are facilitated;
5. the climbing frame management authorization module is arranged, so that rights can be effectively granted according to the sincere of the client, the repayment and the operation limitation on the managed client are facilitated, if the repayment is continuously carried out, the lifting of the climbing frame can be limited, the client can be reminded, and the client cannot be completely disabled, so that the relation is stiff;
6. the lease expense reminding module is arranged, and the client is provided with the function of automatic reminding when the expense is expired and the client needs to finish the subsequent expense payment, so that the expense reminding module can lighten the expense reminding pressure of service personnel.
Drawings
Fig. 1 is a schematic structural diagram of an intelligent climbing frame management system.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
As shown in the figure, the intelligent climbing frame management system comprises an enterprise end, a client end and an operation end, wherein the enterprise end comprises a cost management module, a climbing frame management module and a climbing frame management authorization module, the operation end comprises a climbing frame control module and a climbing frame supervision module, and the client end comprises a lease cost reminding module, a monitoring equipment management module and a climbing frame power supervision module;
the expense management module is used for managing the record and management of the manufacturing cost, depreciation cost, lease expense, lease period and selling expense of the climbing frame;
the climbing frame management module comprises a total power control module, a climbing frame lifting control module, a climbing frame maintenance module and a climbing frame operation data module;
the total power control module is used for controlling the starting and closing of the total power of the climbing frame;
the climbing frame lifting control module is used for controlling the climbing frame to ascend and descend;
the climbing frame maintenance module is used for analyzing the abnormal use information of the climbing frame and giving out a solution; arranging maintenance personnel and arranging daily maintenance;
the climbing frame operation data module is used for recording working data of the climbing frame and monitoring the state of the climbing frame;
the climbing frame management authorization module is used for authorizing other ports to be connected with the climbing frame management module;
the climbing frame control module controls the climbing frame through the climbing frame management authorization module and the climbing frame management module, and the management end has the authority of controlling the climbing frame after being authorized by the enterprise end;
the climbing frame supervision module comprises a climbing frame GPS positioning module, a climbing frame height positioning module and a climbing frame time recording module;
the climbing frame GPS positioning module is used for monitoring the specific position of the climbing frame and performing positioning monitoring when the climbing frame is used;
the climbing frame height positioning module is used for recording the height of the climbing frame and is convenient for knowing the actual floor where the climbing frame works currently;
the climbing frame time recording module is used for recording climbing frame lease starting date, actual use days and climbing frame time required by each ascending or descending work;
the lease expense reminding module is connected with the expense management module and is used for providing a client to finish subsequent expense payment when expense expires;
the monitoring equipment management module is used for managing and displaying the monitoring equipment on the climbing frame, forming a working log for uploading and storing, manually reporting errors and automatically reporting errors, finding potential safety hazards, and applying for maintenance.
Preferably, the authority for controlling the climbing frame is divided into partial operation authority and full operation authority.
Preferably, the climbing frame height positioning module and the climbing frame time recording module are connected with a climbing frame each layer of stay period display module through a calculation module.
Preferably, the client side further comprises a climbing frame power supervision module, and the climbing frame power supervision module is used for recording power data of the climbing frame during working.
Preferably, the client side further comprises a climbing frame information receiving module, wherein the climbing frame information receiving module is connected with the climbing frame monitoring module, and the climbing frame monitoring module data are shared and used for knowing the service condition of the climbing frame for the client side.
Preferably, the operation end is directly connected with the client, and the client directly shares all modules and rights of the operation end and is used for the client to directly operate the work of the climbing frame.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. The utility model provides an intelligence climbs frame management system, includes enterprise's end and customer end, its characterized in that: the enterprise terminal comprises a cost management module, a climbing frame management module and a climbing frame management authorization module, the operation terminal comprises a climbing frame control module and a climbing frame supervision module, and the client comprises a lease cost reminding module, a monitoring equipment management module and a climbing frame power supervision module;
the expense management module is used for managing the record and management of the manufacturing cost, depreciation cost, lease expense, lease period and selling expense of the climbing frame;
the climbing frame management module comprises a total power control module, a climbing frame lifting control module, a climbing frame maintenance module and a climbing frame operation data module;
the total power control module is used for controlling the starting and closing of the total power of the climbing frame;
the climbing frame lifting control module is used for controlling the climbing frame to ascend and descend;
the climbing frame overhaul module is used for analyzing the abnormal use information of the climbing frame and giving out a solution; arranging maintenance personnel and arranging daily maintenance;
the climbing frame operation data module is used for recording working data of the climbing frame and monitoring the state of the climbing frame;
the climbing frame management authorization module is used for authorizing other ports to be connected with the climbing frame management module;
the climbing frame control module is connected with the climbing frame management module through the climbing frame management authorization module, and the management end has the authority of controlling the climbing frame after being authorized by the enterprise end;
the climbing frame supervision module comprises a climbing frame GPS positioning module, a climbing frame height positioning module and a climbing frame time recording module;
the climbing frame GPS positioning module is used for monitoring the specific position of the climbing frame and performing positioning monitoring when the climbing frame is used;
the climbing frame height positioning module is used for recording the height of the climbing frame and is convenient for knowing the actual floor where the climbing frame works currently;
the climbing frame time recording module is used for recording climbing frame lease starting date, actual use days and climbing frame time required by each ascending or descending work;
the lease expense reminding module is connected with the expense management module and is used for providing a client to finish subsequent expense payment when expense expires;
the monitoring equipment management module is used for managing and displaying the monitoring equipment on the climbing frame, forming a work log for uploading and storing, manually reporting errors and automatically reporting errors, finding potential safety hazards, and applying for maintenance.
2. The intelligent climbing rack management system according to claim 1, wherein: wherein the authority of the control climbing frame is divided into partial operation authority and full operation authority.
3. The intelligent climbing rack management system according to claim 1, wherein: the climbing frame height positioning module and the climbing frame time recording module are connected with a climbing frame each layer of stay period display module through a calculation module.
4. The intelligent climbing rack management system according to claim 1, wherein: the client also comprises a climbing frame power supervision module, and the climbing frame power supervision module is used for recording power data of the climbing frame during working.
5. An intelligent climbing rack management system according to any one of claims 1 or 4, wherein: the client side further comprises a climbing frame information receiving module, wherein the climbing frame information receiving module is connected with the climbing frame supervision module, and the climbing frame supervision module data are shared and used for knowing the use condition of the climbing frame for the client side.
6. An intelligent climbing rack management system according to any one of claims 1 to 4, wherein: the operation end is directly connected with the client, and the client directly shares all modules and rights of the operation end and is used for the client to directly operate the climbing frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310477827.0A CN116579831A (en) | 2023-04-28 | 2023-04-28 | Intelligent climbing frame management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310477827.0A CN116579831A (en) | 2023-04-28 | 2023-04-28 | Intelligent climbing frame management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116579831A true CN116579831A (en) | 2023-08-11 |
Family
ID=87538907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310477827.0A Pending CN116579831A (en) | 2023-04-28 | 2023-04-28 | Intelligent climbing frame management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116579831A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117115863A (en) * | 2023-10-24 | 2023-11-24 | 中建三局集团华南有限公司 | Intelligent monitoring method and system for climbing frame |
-
2023
- 2023-04-28 CN CN202310477827.0A patent/CN116579831A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117115863A (en) * | 2023-10-24 | 2023-11-24 | 中建三局集团华南有限公司 | Intelligent monitoring method and system for climbing frame |
CN117115863B (en) * | 2023-10-24 | 2024-02-09 | 中建三局集团华南有限公司 | Intelligent monitoring method and system for climbing frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111861358A (en) | Building information integration platform based on BIM technology | |
CN111145062A (en) | Wisdom garden platform planning design system | |
CN116579831A (en) | Intelligent climbing frame management system | |
CN109086895A (en) | A kind of operation management system and method for heating ventilation air-conditioning system | |
CN109214679A (en) | A kind of projects management system based on Building Information Model | |
CN105974869A (en) | Energy-saving monitoring center applied to building environment adaptive energy-saving management system | |
CN108196494B (en) | Building management and control platform | |
CN109214040A (en) | A kind of fabricated construction real-time monitoring system and method based on BIM | |
CN112508486A (en) | Secondary spare part inventory management system for power system enterprise | |
CN113409179A (en) | ETC portal operation state monitoring system for expressway | |
CN110705838A (en) | Comprehensive evaluation system for evaluating power supply service level | |
CN112132526A (en) | Wisdom factory management system | |
CN115439182A (en) | Climbing frame management system and management method thereof | |
CN112581304A (en) | Manufacturing workshop informatization management system and use method thereof | |
CN106960311A (en) | A kind of acquisition terminal of creation data, collecting statistical system and method | |
CN110705725A (en) | Elevator maintenance system, method and equipment | |
CN113450485B (en) | Intelligent property system based on owner independent rights management | |
CN116224922A (en) | Information management system and method for intelligent factory | |
CN113869887B (en) | Cloud-built big data management system and method thereof | |
CN114493138A (en) | Land-air integrated intelligent construction system and management method | |
CN113988430A (en) | Access control authority management method and system based on associated production business | |
CN114349083A (en) | Distributed rural sewage facility operation and maintenance management and control platform | |
CN103854124A (en) | Elevator installation management system | |
EP3909011A1 (en) | Efficient creation of a building configuration | |
CN113112855A (en) | Parking space identification system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |