CN116523273B - 一种面向工业用户的需求响应特性分析方法 - Google Patents
一种面向工业用户的需求响应特性分析方法 Download PDFInfo
- Publication number
- CN116523273B CN116523273B CN202310806384.5A CN202310806384A CN116523273B CN 116523273 B CN116523273 B CN 116523273B CN 202310806384 A CN202310806384 A CN 202310806384A CN 116523273 B CN116523273 B CN 116523273B
- Authority
- CN
- China
- Prior art keywords
- load
- demand response
- response
- industrial
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000004044 response Effects 0.000 title claims abstract description 147
- 238000004458 analytical method Methods 0.000 title claims abstract description 15
- 230000005284 excitation Effects 0.000 claims abstract description 19
- 238000000034 method Methods 0.000 claims description 38
- 238000004364 calculation method Methods 0.000 claims description 9
- 230000008569 process Effects 0.000 claims description 7
- 238000000354 decomposition reaction Methods 0.000 claims description 5
- 238000012360 testing method Methods 0.000 claims description 5
- 230000008859 change Effects 0.000 claims description 4
- 230000005611 electricity Effects 0.000 claims description 4
- 230000002068 genetic effect Effects 0.000 claims description 3
- 230000036316 preload Effects 0.000 claims description 3
- 238000012887 quadratic function Methods 0.000 claims description 3
- 238000012163 sequencing technique Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 7
- 239000004973 liquid crystal related substance Substances 0.000 description 16
- 238000011065 in-situ storage Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310806384.5A CN116523273B (zh) | 2023-07-04 | 2023-07-04 | 一种面向工业用户的需求响应特性分析方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310806384.5A CN116523273B (zh) | 2023-07-04 | 2023-07-04 | 一种面向工业用户的需求响应特性分析方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116523273A CN116523273A (zh) | 2023-08-01 |
CN116523273B true CN116523273B (zh) | 2023-09-22 |
Family
ID=87401554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310806384.5A Active CN116523273B (zh) | 2023-07-04 | 2023-07-04 | 一种面向工业用户的需求响应特性分析方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116523273B (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107578288A (zh) * | 2017-09-08 | 2018-01-12 | 东南大学 | 一种考虑用户用电模式差异的非侵入式负荷分解方法 |
CN108062627A (zh) * | 2017-12-16 | 2018-05-22 | 广西电网有限责任公司电力科学研究院 | 一种基于非侵入式用电数据的需求响应分析方法 |
CN109508908A (zh) * | 2018-12-25 | 2019-03-22 | 深圳市城市公共安全技术研究院有限公司 | 非侵入式负荷识别模型训练方法、负荷监测方法及装置 |
CN110460045A (zh) * | 2019-08-12 | 2019-11-15 | 国网上海市电力公司 | 一种基于回归分析法的基线负荷模型的负荷辨识方法 |
CN110705792A (zh) * | 2019-09-30 | 2020-01-17 | 重庆大学 | 一种计及分时定价的动态需求响应求解方法 |
CN111612052A (zh) * | 2020-05-12 | 2020-09-01 | 国网河北省电力有限公司电力科学研究院 | 一种基于改进遗传算法的非侵入式负荷分解方法 |
CN111952978A (zh) * | 2020-07-08 | 2020-11-17 | 中国电力科学研究院有限公司 | 一种考虑用户响应特性的需求响应激励方法及系统 |
CN115423539A (zh) * | 2022-11-03 | 2022-12-02 | 南昌工程学院 | 一种考虑用户满意度的需求响应激励价格确定方法及装置 |
CN116070888A (zh) * | 2023-04-06 | 2023-05-05 | 国网浙江省电力有限公司金华供电公司 | 基于决策树的虚拟电厂可调容量分析方法、装置及介质 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10879698B2 (en) * | 2017-11-30 | 2020-12-29 | Abb Schweiz Ag | Systems and methods for performing building power management |
-
2023
- 2023-07-04 CN CN202310806384.5A patent/CN116523273B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107578288A (zh) * | 2017-09-08 | 2018-01-12 | 东南大学 | 一种考虑用户用电模式差异的非侵入式负荷分解方法 |
CN108062627A (zh) * | 2017-12-16 | 2018-05-22 | 广西电网有限责任公司电力科学研究院 | 一种基于非侵入式用电数据的需求响应分析方法 |
CN109508908A (zh) * | 2018-12-25 | 2019-03-22 | 深圳市城市公共安全技术研究院有限公司 | 非侵入式负荷识别模型训练方法、负荷监测方法及装置 |
CN110460045A (zh) * | 2019-08-12 | 2019-11-15 | 国网上海市电力公司 | 一种基于回归分析法的基线负荷模型的负荷辨识方法 |
CN110705792A (zh) * | 2019-09-30 | 2020-01-17 | 重庆大学 | 一种计及分时定价的动态需求响应求解方法 |
CN111612052A (zh) * | 2020-05-12 | 2020-09-01 | 国网河北省电力有限公司电力科学研究院 | 一种基于改进遗传算法的非侵入式负荷分解方法 |
CN111952978A (zh) * | 2020-07-08 | 2020-11-17 | 中国电力科学研究院有限公司 | 一种考虑用户响应特性的需求响应激励方法及系统 |
CN115423539A (zh) * | 2022-11-03 | 2022-12-02 | 南昌工程学院 | 一种考虑用户满意度的需求响应激励价格确定方法及装置 |
CN116070888A (zh) * | 2023-04-06 | 2023-05-05 | 国网浙江省电力有限公司金华供电公司 | 基于决策树的虚拟电厂可调容量分析方法、装置及介质 |
Non-Patent Citations (2)
Title |
---|
考虑用户用电特性的基线负荷计算方法;刘顺桂;杨佳驹;王磊;;电力需求侧管理(03);全文 * |
考虑用户用电特性的基线负荷计算方法;芦兴;何刚;;供用电(04);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN116523273A (zh) | 2023-08-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Das et al. | Day-ahead optimal bidding strategy of microgrid with demand response program considering uncertainties and outages of renewable energy resources | |
Dong et al. | Wind power day-ahead prediction with cluster analysis of NWP | |
Jota et al. | Building load management using cluster and statistical analyses | |
CN104657788B (zh) | 基于行业景气指数的重点行业用电量预测方法 | |
Wang et al. | Analysis of conservation voltage reduction effects based on multistage SVR and stochastic process | |
CN110097297A (zh) | 一种多维度窃电态势智能感知方法、系统、设备及介质 | |
CN102999791A (zh) | 一种电力行业中基于客户分群的电力负荷预测方法 | |
JP7114956B2 (ja) | 電力需要算出装置およびプログラム | |
CN114372360A (zh) | 用于电力负荷预测的方法、终端及存储介质 | |
CN105184388A (zh) | 一种城市电力负荷短期预测的非线性回归方法 | |
CN111582548A (zh) | 一种基于多元用户行为画像的用电负荷预测方法 | |
CN115222106A (zh) | 一种自适应模型的用户日前负荷预测方法 | |
CN115496627A (zh) | 一种可调资源响应潜力的评估方法及系统 | |
Ibrahim et al. | Short-term individual household load forecasting framework using LSTM deep learning approach | |
CN110533247A (zh) | 一种采用气温数据异常点补偿的月度用电量预测方法 | |
CN114595861A (zh) | 基于mstl和lstm模型的中长期电力负荷预测方法 | |
Bashawyah et al. | Machine learning based short-term load forecasting for smart meter energy consumption data in london households | |
CN114186733A (zh) | 一种短期负荷预测方法和装置 | |
CN104252647B (zh) | 基于反距离权重插值法的用电负荷预测方法 | |
Aritonang et al. | An application of backpropagation neural network for sales forecasting rice miling unit | |
CN116523273B (zh) | 一种面向工业用户的需求响应特性分析方法 | |
CN115829418A (zh) | 适用于负荷管理的电力用户负荷特性画像构建方法和系统 | |
CN115358476A (zh) | 需求响应潜力预测方法、装置、计算机设备和存储介质 | |
CN115392546A (zh) | 基于气象因子的降温电量预测及需求侧管理方法及装置 | |
Kuo et al. | A novel framework short-term load forecasting for micro-grid energy management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231211 Address after: 510620, No. two, No. 2, Tianhe South Road, Guangzhou, Guangdong, Tianhe District Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd. Address before: 510620, No. two, No. 2, Tianhe South Road, Guangzhou, Guangdong, Tianhe District Patentee before: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd. Patentee before: NORTH CHINA ELECTRIC POWER University Patentee before: Beijing Huadian energy Internet Research Institute Co.,Ltd. |
|
TR01 | Transfer of patent right |