CN116523195A - Construction project environment-friendly supervision method, system, equipment and storage medium - Google Patents

Construction project environment-friendly supervision method, system, equipment and storage medium Download PDF

Info

Publication number
CN116523195A
CN116523195A CN202310250047.2A CN202310250047A CN116523195A CN 116523195 A CN116523195 A CN 116523195A CN 202310250047 A CN202310250047 A CN 202310250047A CN 116523195 A CN116523195 A CN 116523195A
Authority
CN
China
Prior art keywords
project
research
construction
target
criticizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310250047.2A
Other languages
Chinese (zh)
Inventor
孙昕远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN202310250047.2A priority Critical patent/CN116523195A/en
Publication of CN116523195A publication Critical patent/CN116523195A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063112Skill-based matching of a person or a group to a task
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Game Theory and Decision Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a construction project environment-friendly supervision method, a system, equipment and a storage medium, wherein the method comprises the following steps: acquiring project data of a target construction project; according to project data, judging whether related works of criticism approval are involved or not; if yes, carrying out project research and judgment on the target construction project to obtain a project research and judgment result; and according to the project research and judgment result, performing project transaction of the environmental protection matters, and building a project ledger of the target construction project. Because the invention automatically identifies whether the project relates to the related work of the criticizing approval according to the construction site of the target construction project, the industry type of the project and the construction content of the project, if so, the project is researched and judged, the project handling of the environmental protection matters is carried out according to the research and judgment result, and the project ledger is established.

Description

Construction project environment-friendly supervision method, system, equipment and storage medium
Technical Field
The invention relates to the technical field of electronic information, in particular to a construction project environment-friendly supervision method, system, equipment and storage medium.
Background
In recent years, environmental authorities continue to work well, but the following problems remain in the actual operation. Firstly, the prior information interaction channel is not opened. In the management of construction projects, enterprises do not know whether the construction projects need to participate in the ring review batch or not, and the multi-party information is blocked, so that part of the construction projects are not built in advance in the ring review, and the continuous management of environmental quality is not facilitated. Secondly, the efficiency of the ring review batch is not high. Part of enterprises know about the process of handling the ring review approval in advance, but the approval office involves a plurality of approval departments, and the business handling process is time-consuming and labor-consuming, which is not beneficial to improving the ring review approval efficiency of the management department. Thirdly, the pollution discharge supervision of the post construction project is insufficient. After the ring review batch is finished, the ecological environment department has management responsibility for supervising the completion acceptance condition of the construction project submitted by the enterprises, and part of the enterprises do not submit the acceptance material of the construction project, so that the ecological environment department has difficulty in knowing whether the enterprises discharge sewage according to the certificate.
Therefore, there is a need for an environmental protection supervision method for construction projects, which realizes integration of construction project resources across departments, creates a one-stop management mode for construction projects with integrated whole period, whole chain and whole elements, and constructs a closed-loop management platform integrating ecological environment admission, administrative approval, post-incident supervision and enterprise consultation services, thereby practically improving the effectiveness of the criticizing supervision and convenience service.
Disclosure of Invention
The invention mainly aims to provide a construction project environment-friendly supervision method, a system, equipment and a storage medium, and aims to solve the technical problem of low criticizing efficiency caused by low information intercommunication degree in management of construction projects in the prior art.
In order to achieve the above purpose, the invention provides a construction project environment-friendly supervision method, which comprises the following steps:
acquiring project data of a target construction project, wherein the project data comprises a construction site of the project, an industry type to which the project belongs and construction content of the project;
according to the project data, whether related works of criticizing approval are related or not is judged;
if yes, carrying out project research and judgment on the target construction project to obtain a project research and judgment result;
if not, informing the enterprise that the target construction project does not need to be approved by criticizing;
and according to the project research and judgment result, performing project transaction of the environmental protection matters, and constructing a project ledger of the target construction project.
Optionally, before the step of obtaining the project data of the target construction project, the method further includes:
acquiring item details of an item to be built input by a target enterprise;
obtaining an admission research judgment result of the item to be built according to the item details and based on a preset mode;
and feeding back the admission research judgment result to the target enterprise.
Optionally, before the step of performing project research and judgment on the target construction project to obtain a project research and judgment result, the method further includes:
notifying related matters of the target enterprise ring review batch through a short message and preset application software;
according to the related matters, the target enterprise feeds back a criticizing organization through preset application software;
basic information of a target construction project input by the criticizing establishment unit in preset application software and an uploaded signed contract are obtained;
and obtaining the criticizing report of the criticizing compiling unit in a preset approval system.
Optionally, if yes, performing project research and judgment on the target construction project to obtain a project research and judgment result, including:
if yes, the relevant data of the criticizing approval of the target construction item is returned through a resource catalog platform;
generating a criticizing report of the target construction project according to the related data and the criticizing report;
and performing project research and judgment according to the criticizing report to obtain a project research and judgment result.
Optionally, the step of performing item research and judgment according to the criticizing report to obtain an item research and judgment result specifically includes:
and according to the criticizing report, carrying out project research and judgment, and judging whether the target construction project relates to pollution discharge license declaration, pollution discharge right transaction, solid waste management plan filing, emergency plan filing and completion environment protection acceptance, so as to obtain project research and judgment results.
Optionally, the step of feeding back the admission grinding result to the target enterprise includes:
judging whether the item to be built meets the admission requirement or not according to the admission research judgment result;
if yes, generating a ring review batch notification and a handling procedure explanation notification of the item to be built;
if the project to be built does not meet the admission requirement, informing the enterprise that the project to be built does not meet the admission requirement;
and sending the ring review batch notification and the handling procedure explanation notification to the target enterprise through a short message notification and a mobile terminal related application.
Optionally, the step of performing project transaction of environmental protection matters and constructing a project ledger of the target construction project according to the project research and judgment result includes:
according to the item research and judgment result, carrying out item handling of environmental protection matters, and displaying the item handling condition through visualization;
and docking business data handled by the project through a data collaboration platform, and constructing a project ledger of the target construction project.
In addition, in order to achieve the above object, the present invention also provides a construction project environmental protection supervision system, the system comprising:
the data acquisition module is used for acquiring project data of a target construction project, wherein the project data comprises a construction site of the project, an industry type to which the project belongs and construction content of the project;
the ring evaluation module is used for researching and judging whether related works of ring evaluation approval are related according to the project data;
the project research and judgment module is used for carrying out project research and judgment on the target construction project if yes, and obtaining a project research and judgment result;
and the standing book construction module is used for carrying out project transaction of environmental protection matters according to the project research and judgment result and constructing a project standing book of the target construction project.
In addition, in order to achieve the above object, the present invention also provides a construction project environmental protection supervision apparatus, the apparatus comprising: a memory, a processor, and a construction project environmental protection supervisory program stored on the memory and executable on the processor, the construction project environmental protection supervisory program configured to implement the steps of the construction project environmental protection supervisory method as described above.
In addition, in order to achieve the above object, the present invention also proposes a storage medium having stored thereon a construction project environment protection supervision program which, when executed by a processor, implements the steps of the construction project environment protection supervision method as described above.
Compared with the prior art, the invention has the following beneficial effects:
the method comprises the steps of obtaining project data of a target construction project, wherein the project data comprise construction sites of the project, industry types of the project and construction contents of the project; according to the project data, whether related works of criticizing approval are related or not is judged; if yes, carrying out project research and judgment on the target construction project to obtain a project research and judgment result; and according to the project research and judgment result, performing project transaction of the environmental protection matters, and constructing a project ledger of the target construction project. Because the invention automatically identifies whether the project relates to the related work of the criticizing approval or not according to the construction site of the target construction project, the industry type of the project and the construction content of the project, if so, the project is researched and judged, the project handling of the environmental protection matters is carried out according to the research and judgment result, and the project ledger is established.
Drawings
FIG. 1 is a schematic structural diagram of a construction project environmental protection supervision device of a hardware operating environment according to an embodiment of the present invention;
FIG. 2 is a schematic flow chart of a first embodiment of the environmental protection supervision method for construction projects according to the present invention;
FIG. 3 is a schematic flow chart of a second embodiment of the environmental protection supervision method for construction projects according to the present invention;
FIG. 4 is a schematic flow chart of a third embodiment of the environmental protection supervision method for construction projects according to the present invention;
FIG. 5 is a block diagram of a first embodiment of the environmental protection supervisory system for construction projects according to the present invention;
fig. 6 is a flowchart of the environmental protection supervision method criticizing tracking business of the construction project.
The achievement of the objects, functional features and advantages of the present invention will be further described with reference to the accompanying drawings, in conjunction with the embodiments.
Description of the embodiments
It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
Referring to fig. 1, fig. 1 is a schematic structural diagram of a construction project environment-friendly supervision device of a hardware operation environment according to an embodiment of the present invention.
As shown in fig. 1, the software operation behavior auditing apparatus may include: a processor 1001, such as a central processing unit (Central Processing Unit, CPU), a communication bus 1002, a user interface 1003, a network interface 1004, a memory 1005. Wherein the communication bus 1002 is used to enable connected communication between these components. The user interface 1003 may include a Display, an input unit such as a Keyboard (Keyboard), and the optional user interface 1003 may further include a standard wired interface, a wireless interface. The network interface 1004 may optionally include a standard wired interface, a Wireless interface (e.g., a Wireless-Fidelity (WI-FI) interface). The Memory 1005 may be a high-speed random access Memory (Random Access Memory, RAM) or a stable nonvolatile Memory (NVM), such as a disk Memory. The memory 1005 may also optionally be a storage device separate from the processor 1001 described above.
It will be appreciated by those skilled in the art that the structure shown in fig. 1 does not constitute a limitation of the construction project environmental protection supervisory apparatus, and may include more or fewer components than shown, or certain components may be combined, or a different arrangement of components.
As shown in fig. 1, an operating system, a network communication module, a user interface module, and a construction project environment protection supervisor may be included in the memory 1005 as one type of storage medium.
In the construction project environment-friendly supervision apparatus shown in fig. 1, the network interface 1004 is mainly used for data communication with a network server; the user interface 1003 is mainly used for data interaction with a user; the processor 1001 and the memory 1005 in the construction project environment protection supervision device of the present invention may be disposed in the construction project environment protection supervision device, and the construction project environment protection supervision device calls the construction project environment protection supervision program stored in the memory 1005 through the processor 1001 and executes the construction project environment protection supervision method provided by the embodiment of the present invention.
The embodiment of the invention provides a construction project environment-friendly supervision method, and referring to fig. 2, fig. 2 is a schematic flow chart of a first embodiment of the construction project environment-friendly supervision method.
In this embodiment, the construction project environment-friendly supervision method includes the following steps:
step S10: acquiring project data of a target construction project, wherein the project data comprises a construction site of the project, an industry type to which the project belongs and construction content of the project;
it should be noted that, the execution body of the embodiment may be a computing service device with functions of data processing, network communication and program running, such as a server, a tablet computer, a personal computer, or an electronic device, a construction project environment-friendly supervision device, or the like, which can implement the above functions. This embodiment and the following embodiments will be exemplified by environment-friendly monitoring equipment for construction projects.
It is understood that a construction project is an ensemble of individual projects that are constructed in accordance with a separate "ensemble design" at one or more construction sites. It is the basis for determining and constructing a building unit, and usually one building project is one building unit. An enterprise (or a corporate enterprise), a business entity, or a separate project is typically used as a construction project. Such as a factory, a national farm, a stand-alone hydraulic engineering, a railway, etc. Several construction projects which do not belong to the same overall design and are respectively calculated cannot be combined into one construction project; nor can it divide each project within the same general design scope into several construction projects.
It should be explained that the project data may be obtained from an engineering construction project approval management system of an investment project online approval and supervision platform through an IRS platform, or may be obtained from other websites or databases, which is not limited in this embodiment.
Step S20: according to the project data, whether related works of criticizing approval are related or not is judged;
it should be explained that the ring review batch refers to the administrative behavior of examining and approving the environmental impact report of the target construction project.
Further, the above-mentioned related work of criticizing includes:
whether the environmental protection related laws and regulations are met. Relates to a natural protection area, a scenic spot area, a life drinking water source protection area and other areas needing special protection which are defined by law, and whether corresponding primary people governments or authorities agree; (2) Project site selection, line selection and layout are in accordance with the overall planning of the region, the river basin and the city, and are in accordance with the environmental and ecological functional areas; (3) Whether the national industrial policy and the clean production requirements are met; (4) Whether the environmental quality of the area where the project is located can meet the corresponding environmental function division standard or not; (5) Whether the pollution prevention measures to be adopted can ensure that the pollutant emission reaches the emission standard regulated by the state and the place, and the total amount control requirement is met; (5) Whether the ecological protection measures to be taken can effectively prevent and control ecological damage.
In specific implementation, whether the target construction project relates to related work of criticizing approval is judged according to the construction site of the target construction project, the industry type of the target construction project and the construction content research of the target construction project through a preset program algorithm.
Step S30: if yes, carrying out project research and judgment on the target construction project to obtain a project research and judgment result;
if not, it means that the project data research and judgment does not involve the related work of the criticizing approval, and the project research and judgment on the target construction project is not needed.
It should be noted that, in order to improve the efficiency of the ring review and approval, and improve the approval efficiency of the management department, if the above-mentioned target construction project involves the relevant work of the ring review and approval, notify the relevant matters of the ring review and approval of the target enterprise through the short message and preset application software; according to the related matters, the target enterprise feeds back a criticizing organization through preset application software; basic information of a target construction project input by the criticizing establishment unit in preset application software and an uploaded signed contract are obtained; and obtaining the criticizing report of the criticizing compiling unit in a preset approval system.
For example: if the target construction project relates to the related work of the annular evaluation approval, notifying related matters of the annular evaluation approval of the enterprise through a short message and software applied by an annular evaluation approval department related to the construction project; the enterprise feeds back the criticizing unit through preset application software; the criticizing establishment unit inputs basic information of a target construction project by establishing preset application software and uploads a signed contract; the environmental protection approval system of the construction project inputs the compiled environmental assessment report according to the related requirements of the environmental assessment approval by the environmental assessment compilation unit, and the environmental assessment report passes the approval in turn.
The software related to the ring review batch application for the construction project may be software related to the ring review batch application in a certain place or a certain province.
The criticizing and compiling unit refers to a unit for hosting and compiling an environmental impact report (table), and comprises a technical unit for hosting and compiling the environmental impact report (table) and a construction unit for self-hosting and compiling the environmental impact report (table).
The environmental impact evaluation report is a predictive evaluation of the impact of new, expanded and reconstructed projects on the environment.
It should be explained that, performing project study and judgment on the target construction project includes: whether the target construction project relates to a pollution discharge license claim, whether the target construction project relates to a pollution discharge right transaction, whether the target construction project relates to a solid waste management plan record, whether the target construction project relates to an emergency preparation record and whether the target construction project relates to completion environment protection acceptance.
Step S40: and according to the project research and judgment result, performing project transaction of the environmental protection matters, and constructing a project ledger of the target construction project.
It should be noted that, before step S40, the method further includes: notifying related matters of the target enterprise ring review batch through a short message and preset application software; according to the related matters, the target enterprise feeds back a criticizing organization through preset application software; basic information of a target construction project input by the criticizing establishment unit in preset application software and an uploaded signed contract are obtained; and obtaining the criticizing report of the criticizing compiling unit in a preset approval system.
Further, according to the item research and judgment result, carrying out item handling of the environmental protection item, and displaying the item handling condition through visualization; and docking business data handled by the project through a data collaboration platform, and constructing a project ledger of the target construction project.
It should be explained that, according to the above-mentioned research and judgment result, the project of the environmental protection item is handled, and the handled project information and the handled result are entered into the corresponding system, and meanwhile, the third party data is automatically obtained, so as to avoid the repeated entry of data by the staff, for example: if the research and judgment result of the target construction project is that the target construction project relates to the declaration of the pollution discharge license, the pollution discharge license data confirmation of the target construction project is automatically handled through a related platform, the project information is input into a national pollution discharge license management information platform, and meanwhile, the data of the national pollution discharge license management information platform are automatically acquired, so that repeated input of the data by workers is avoided.
Further, the project ledger comprises project basic information, criticizing unit information, criticizing information and business data of pollution discharge license, pollution discharge right transaction, solid waste management plan record, emergency preparation record and completion environment protection acceptance related to the project.
In a specific implementation, the above construction project environment-friendly supervision method may also be implemented by a preset algorithm, which is not limited in this embodiment.
According to the embodiment, project data of a target construction project are obtained, wherein the project data comprise construction sites of the project, industry types of the project and construction contents of the project; according to the project data, whether related works of criticizing approval are related or not is judged; if yes, carrying out project research and judgment on the target construction project to obtain a project research and judgment result; if not, informing the enterprise that the target construction project does not need to be approved by criticizing; and according to the project research and judgment result, performing project transaction of the environmental protection matters, and constructing a project ledger of the target construction project. According to the method, whether the project relates to related work of criticizing approval or not is automatically identified according to the construction site of the target construction project, the industry type of the project and the construction content of the project, if so, project research and judgment are carried out, project handling of environmental protection matters is carried out according to the research and judgment result, and a project ledger is established; if the project to be built does not meet the admission requirement, informing the enterprise that the project to be built does not meet the admission requirement; compared with the prior art, the method and the device not only improve the efficiency of the ring review batch, but also realize the tracking management of the ring review batch of the construction project.
Referring to fig. 3, fig. 3 is a schematic flow chart of a second embodiment of the environmental protection supervision method for construction projects according to the present invention.
Based on the first embodiment, in this embodiment, before step S10, the method further includes:
step S01: acquiring item details of an item to be built input by a target enterprise;
it is understood that the project details include target enterprise information, contents of the project to be built, scale, construction site, construction plan, and the like.
Step S02: obtaining an admission research judgment result of the item to be built according to the item details and based on a preset mode;
when the project admittance research judgment is that the enterprise does not declare the construction project, the enterprise is supported to enter the construction project information by itself to enter the admittance research judgment, and whether the construction project of the enterprise meets the admittance requirement can be informed in advance through the project admittance research judgment, so that the project admittance problem is solved in advance.
The admission research and judgment result comprises that the item to be built meets the admission requirement and the item to be built does not meet the admission requirement.
Step S03: and feeding back the admission research judgment result to the target enterprise.
In a specific implementation, in order to effectively notify the target enterprise to solve the target construction project admittance problem, step S03 includes:
step S031: judging whether the item to be built meets the admission requirement or not according to the admission research judgment result;
step S032: if yes, generating a ring review batch notification and a handling procedure explanation notification of the item to be built;
in a specific implementation, if the item to be built does not meet the admission requirement, the admission research result can be informed to the enterprise that the item to be built does not meet the admission requirement.
Step S033: and sending the ring review batch notification and the handling procedure explanation notification to the target enterprise through a short message notification and a mobile terminal related application.
The embodiment obtains the project details of the project to be built, which are input by the target enterprise; obtaining an admission research judgment result of the item to be built according to the item details and based on a preset mode; feeding back the admission research result to the target enterprise; acquiring project data of a target construction project, wherein the project data comprises a construction site of the project, an industry type to which the project belongs and construction content of the project; according to the project data, whether related works of criticizing approval are related or not is judged; if yes, carrying out project research and judgment on the target construction project to obtain a project research and judgment result; and according to the project research and judgment result, performing project transaction of the environmental protection matters, and constructing a project ledger of the target construction project. According to the method, the admission research and judgment result of the item to be built is obtained based on a preset mode, then whether the item relates to related work of annular evaluation approval or not is automatically identified according to the construction site of the target construction item, the industry type of the item and the construction content of the item, if so, the item research and judgment is carried out, the item handling of environmental matters is carried out according to the research and judgment result, and the item account is established.
Referring to fig. 4, fig. 4 is a schematic flow chart of a third embodiment of the environmental protection supervision method for construction projects according to the present invention.
Based on the above embodiments, in this embodiment, the step S30 includes:
step S301: if yes, the relevant data of the criticizing approval of the target construction item is returned through a resource catalog platform;
step S302: generating a criticizing report of the target construction project according to the related data and the criticizing report;
it should be noted that criticism is the authority of the ecological environment department to the new project. The criticizing is the management authority of the ecological environment department on the new starting project; the newly started project is subjected to environmental impact assessment by related experts, an environmental impact report is compiled, and an ecological environment department is reported for auditing, and whether the project is approved by the ecological environment department is criticized.
Step S303: and carrying out project research and judgment according to the criticizing report to obtain a project research and judgment result.
It can be understood that the project research and judgment are carried out according to the criticizing report, whether the target construction project relates to pollution discharge license declaration, pollution discharge right transaction, solid waste management plan filing, emergency plan filing and completion environment protection acceptance are judged, and project research and judgment results are obtained.
Referring to fig. 6, fig. 6 is a flowchart of a construction project environmental protection supervision method criticizing and tracking service, and the construction project environmental protection supervision method relates to three roles, namely a management department, a construction unit and a criticizing and compiling unit, and comprises five stages of criticizing and judging: the management department accesses the item and researches and judges whether the criticism approval is related; confirmation critique unit: the management department informs the enterprise through the software of the short message and the construction project related to the annular review batch department application, and informs the user personnel to record the annular review editing unit, the enterprise searches the feedback annular review editing unit through the software, and the annular review editing unit fills project information in the software and uploads the contract; criticizing: the management department notifies the criticizing organization, composes the criticizing file, and primarily judges the environmental protection means involved after criticizing, then the management department criticizes the criticizing file, and notifies the enterprise of the procedure required to be transacted for criticizing by using a short message; handling: a pollution discharge license (whether to confirm the check-in), a pollution discharge transaction right (whether to confirm the check-in), a solid waste management plan record (whether to confirm the check-in), and a completion environment protection acceptance (whether to confirm the check-in); criticizing score: the management department scores the criticism making units, and the construction unit, namely the enterprise scores the criticism making units.
The embodiment obtains the project details of the project to be built, which are input by the target enterprise; obtaining an admission research judgment result of the item to be built according to the item details and based on a preset mode; feeding back the admission research result to the target enterprise; acquiring project data of a target construction project, wherein the project data comprises a construction site of the project, an industry type to which the project belongs and construction content of the project; according to the project data, whether related works of criticizing approval are related or not is judged; if yes, the relevant data of the criticizing approval of the target construction item is returned through a resource catalog platform; generating a criticizing report of the target construction project according to the related data and the criticizing report; performing project research and judgment according to the criticizing report to obtain a project research and judgment result; and according to the project research and judgment result, performing project transaction of the environmental protection matters, and constructing a project ledger of the target construction project. According to the invention, the admission research and judgment result of the item to be built is obtained based on a preset mode, then whether the item relates to related work of annular evaluation approval or not is automatically identified according to the construction site of the target construction item, the industry type of the item and the construction content of the item, if so, the item research and judgment is carried out, the project handling of environmental matters is carried out according to the research and judgment result, and the project account is established.
In addition, the embodiment of the invention also provides a storage medium, wherein the storage medium is stored with a construction project environment-friendly supervision program, and the construction project environment-friendly supervision program realizes the steps of the construction project environment-friendly supervision method when being executed by a processor.
Referring to fig. 5, fig. 5 is a block diagram illustrating a construction project environment-friendly supervisory system according to a first embodiment of the invention.
As shown in fig. 5, the construction project environment-friendly supervision system provided by the embodiment of the invention includes: a data acquisition module 501, a ring judgment module 502, a project research judgment module 503 and a ledger construction module 504.
The data acquisition module is used for acquiring project data of a target construction project, wherein the project data comprises a construction site of the project, an industry type to which the project belongs and construction content of the project;
the ring evaluation module is used for researching and judging whether related works of ring evaluation approval are related according to the project data;
the project research and judgment module is used for carrying out project research and judgment on the target construction project if yes, and obtaining a project research and judgment result;
and the standing book construction module is used for conducting project transaction of environmental protection matters according to the project research and judgment result and constructing a project standing book of the target construction project.
According to the embodiment, project data of a target construction project are obtained, wherein the project data comprise construction sites of the project, industry types of the project and construction contents of the project; according to the project data, whether related works of criticizing approval are related or not is judged; if yes, carrying out project research and judgment on the target construction project to obtain a project research and judgment result; and according to the project research and judgment result, performing project transaction of the environmental protection matters, and constructing a project ledger of the target construction project. Because the invention automatically identifies whether the project relates to the related work of the criticizing approval or not according to the construction site of the target construction project, the industry type of the project and the construction content of the project, if so, the project is researched and judged, the project handling of the environmental protection matters is carried out according to the research and judgment result, and the project ledger is established.
Based on the first embodiment of the construction project environment-friendly supervision system, a second embodiment of the construction project environment-friendly supervision system is provided.
In this embodiment, the data obtaining module 501 is further configured to obtain item details of an item to be built input by a target enterprise; obtaining an admission research judgment result of the item to be built according to the item details and based on a preset mode; and feeding back the admission research judgment result to the target enterprise.
The data obtaining module 501 is further configured to determine, according to the admission research determination result, whether the item to be built meets an admission requirement; if yes, generating a ring review batch notification and a handling procedure explanation notification of the item to be built; and sending the ring review batch notification and the handling procedure explanation notification to the target enterprise through a short message notification and a mobile terminal related application.
Other embodiments or specific implementation manners of the construction project environment-friendly supervision system of the present invention may refer to the above method embodiments, and will not be described herein.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or system that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or system. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or system that comprises the element.
The foregoing embodiment numbers of the present invention are merely for the purpose of description, and do not represent the advantages or disadvantages of the embodiments.
From the above description of embodiments, it will be clear to a person skilled in the art that the above embodiment method may be implemented by means of software plus a necessary general hardware platform, but may of course also be implemented by means of hardware, but in many cases the former is a preferred embodiment. Based on this understanding, the technical solution of the present invention may be embodied essentially or in a part contributing to the prior art in the form of a software product stored in a storage medium (e.g. read-only memory/random-access memory, magnetic disk, optical disk), comprising several instructions for causing a terminal device (which may be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to perform the method according to the embodiments of the present invention.
The foregoing description is only of the preferred embodiments of the present invention, and is not intended to limit the scope of the invention, but rather is intended to cover any equivalents of the structures or equivalent processes disclosed herein or in the alternative, which may be employed directly or indirectly in other related arts.

Claims (10)

1. An environmental protection supervision method for construction projects, which is characterized by comprising the following steps:
acquiring project data of a target construction project, wherein the project data comprises a construction site of the project, an industry type to which the project belongs and construction content of the project;
according to the project data, whether related works of criticizing approval are related or not is judged;
if yes, carrying out project research and judgment on the target construction project to obtain a project research and judgment result;
if not, informing the enterprise that the target construction project does not need to be approved by criticizing;
and according to the project research and judgment result, performing project transaction of the environmental protection matters, and constructing a project ledger of the target construction project.
2. The method of claim 1, wherein prior to the step of obtaining project data for the target construction project, further comprising:
acquiring item details of an item to be built input by a target enterprise;
obtaining an admission research judgment result of the item to be built according to the item details and based on a preset mode;
and feeding back the admission research judgment result to the target enterprise.
3. The method of claim 2, wherein the step of performing project research on the target construction project to obtain a project research result further comprises:
notifying related matters of the target enterprise ring review batch through a short message and preset application software;
according to the related matters, the target enterprise feeds back a criticizing organization through preset application software;
basic information of a target construction project input by the criticizing establishment unit in preset application software and an uploaded signed contract are obtained;
and obtaining the criticizing report of the criticizing compiling unit in a preset approval system.
4. The method of claim 3, wherein if yes, performing project research on the target construction project to obtain a project research result, and the step of obtaining the project research result includes:
if yes, the relevant data of the criticizing approval of the target construction item is returned through a resource catalog platform;
generating a criticizing report of the target construction project according to the related data and the criticizing report;
and performing project research and judgment according to the criticizing report to obtain a project research and judgment result.
5. The method of claim 4, wherein the step of performing project research based on the criticizing report to obtain a project research result comprises:
and according to the criticizing report, carrying out project research and judgment, and judging whether the target construction project relates to pollution discharge license declaration, pollution discharge right transaction, solid waste management plan filing, emergency plan filing and completion environment protection acceptance, so as to obtain project research and judgment results.
6. The method of claim 2, wherein the step of feeding back the admission grinding result to the target enterprise comprises:
judging whether the item to be built meets the admission requirement or not according to the admission research judgment result;
if yes, generating a ring review batch notification and a handling procedure explanation notification of the item to be built;
if the project to be built does not meet the admission requirement, informing the enterprise that the project to be built does not meet the admission requirement;
and sending the ring review batch notification and the handling procedure explanation notification to the target enterprise through a short message notification and a mobile terminal related application.
7. The method of any one of claims 1 to 6, wherein the step of performing project transaction of environmental matters and constructing a project ledger of the target construction project according to the project research result comprises:
according to the item research and judgment result, carrying out item handling of environmental protection matters, and displaying the item handling condition through visualization;
and docking business data handled by the project through a data collaboration platform, and constructing a project ledger of the target construction project.
8. A construction project environmental protection supervisory system, the system comprising:
the data acquisition module is used for acquiring project data of a target construction project, wherein the project data comprises a construction site of the project, an industry type to which the project belongs and construction content of the project;
the ring evaluation module is used for researching and judging whether related works of ring evaluation approval are related according to the project data;
the project research and judgment module is used for carrying out project research and judgment on the target construction project if yes, and obtaining a project research and judgment result;
and the standing book construction module is used for carrying out project transaction of environmental protection matters according to the project research and judgment result and constructing a project standing book of the target construction project.
9. A construction project environmental protection supervisory apparatus, the apparatus comprising: a memory, a processor and a construction project environmental protection supervisory program stored on the memory and executable on the processor, the construction project environmental protection supervisory program configured to implement the steps of the construction project environmental protection supervisory method as claimed in any one of claims 1 to 7.
10. A storage medium having stored thereon a construction project environmental protection supervisory program which when executed by a processor implements the steps of the construction project environmental protection supervisory method according to any of claims 1 to 7.
CN202310250047.2A 2023-03-15 2023-03-15 Construction project environment-friendly supervision method, system, equipment and storage medium Pending CN116523195A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310250047.2A CN116523195A (en) 2023-03-15 2023-03-15 Construction project environment-friendly supervision method, system, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310250047.2A CN116523195A (en) 2023-03-15 2023-03-15 Construction project environment-friendly supervision method, system, equipment and storage medium

Publications (1)

Publication Number Publication Date
CN116523195A true CN116523195A (en) 2023-08-01

Family

ID=87398289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310250047.2A Pending CN116523195A (en) 2023-03-15 2023-03-15 Construction project environment-friendly supervision method, system, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN116523195A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363373A (en) * 2019-04-29 2019-10-22 兰州环境能源交易中心有限公司 A kind of investment projects of capital assets carbon assessment system
CN110414842A (en) * 2019-07-30 2019-11-05 杭州一骑轻尘信息技术有限公司 Air control management method and system
CN113222524A (en) * 2021-01-20 2021-08-06 安徽北途信息科技有限公司 Project declaration evaluation method and system based on big data
CN114511286A (en) * 2022-01-26 2022-05-17 广西博环环境咨询服务有限公司 Environmental assessment industry project management system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363373A (en) * 2019-04-29 2019-10-22 兰州环境能源交易中心有限公司 A kind of investment projects of capital assets carbon assessment system
CN110414842A (en) * 2019-07-30 2019-11-05 杭州一骑轻尘信息技术有限公司 Air control management method and system
CN113222524A (en) * 2021-01-20 2021-08-06 安徽北途信息科技有限公司 Project declaration evaluation method and system based on big data
CN114511286A (en) * 2022-01-26 2022-05-17 广西博环环境咨询服务有限公司 Environmental assessment industry project management system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
环评那些事: "环评,看懂十个问题就够了!推荐收藏!", pages 1, Retrieved from the Internet <URL:https://baijiahao.baidu.com/s?id=1669160652839844871&wfr=spider&for=pc> *

Similar Documents

Publication Publication Date Title
Xu et al. Schedule risk analysis of infrastructure projects: A hybrid dynamic approach
Fung et al. Towards a better reliability of risk assessment: Development of a qualitative & quantitative risk evaluation model (Q2REM) for different trades of construction works in Hong Kong
Rajendran Sustainable construction safety and health rating system
Ballan A value map for communication systems in construction
Bajjou et al. Exploring the critical waste factors affecting construction projects
Wamuziri Factors that influence safety culture in construction
Shrahily et al. Managing construction site communication using the responsibility assignment matrix (RAM) system
Thaheem et al. Sustainable repair & maintenance of buildings in the developing countries: a risk management perspective and proposal of customized framework
Toakley et al. Towards total project quality–a review of research needs
CN116523195A (en) Construction project environment-friendly supervision method, system, equipment and storage medium
Patricks-E et al. Evaluation of safety performance of Nigerian construction industry-a case study of the niger delta region
Lam et al. The TQM journey of Hong Kong building contractors: from a self‐assessment perspective
Ghansah et al. Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic
Wilbanks Safety prequalification factors for the selection of contractors within the steel industry
CN111639832B (en) Elevator information safety management system and method
Mbatha et al. The practice of conflict management in construction projects in Kenya
Sui Pheng et al. ISO 9000 quality assurance in Singapore’s construction industry: an update
Gross Building structural failures—their cause and prevention
Horry et al. Contributions of environmental management systems (ISO 14001) towards the delivery of sustainable development goal 12
Islam et al. Identifying factors and mitigation measures of safety practices for sustainable building construction
Muntoha et al. Integrating House of Risk Method with PESTLE and CIMOSA for Risk Assessment of Java-Bali i Power Plant Construction Project
Hon Improving mental health and safety in the construction industry: A study in Australia
Melchers Influence of organization on project implementation
Shohet et al. On-site mobile application for command, control and communication of safety and quality
Ji et al. A software project management simulation model based on team climate factors analysis

Legal Events