CN116485049A - 一种基于人工智能的电能计量误差预测与优化系统 - Google Patents
一种基于人工智能的电能计量误差预测与优化系统 Download PDFInfo
- Publication number
- CN116485049A CN116485049A CN202310748466.9A CN202310748466A CN116485049A CN 116485049 A CN116485049 A CN 116485049A CN 202310748466 A CN202310748466 A CN 202310748466A CN 116485049 A CN116485049 A CN 116485049A
- Authority
- CN
- China
- Prior art keywords
- error
- electric energy
- energy metering
- time
- real
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005457 optimization Methods 0.000 title claims abstract description 27
- 238000013473 artificial intelligence Methods 0.000 title claims abstract description 15
- 238000012549 training Methods 0.000 claims abstract description 47
- 239000002245 particle Substances 0.000 claims description 42
- 238000000605 extraction Methods 0.000 claims description 24
- 230000007613 environmental effect Effects 0.000 claims description 7
- 239000000284 extract Substances 0.000 claims description 6
- 230000006870 function Effects 0.000 claims description 4
- 238000003062 neural network model Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 description 14
- 230000008569 process Effects 0.000 description 5
- 238000012937 correction Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- YHXISWVBGDMDLQ-UHFFFAOYSA-N moclobemide Chemical compound C1=CC(Cl)=CC=C1C(=O)NCCN1CCOCC1 YHXISWVBGDMDLQ-UHFFFAOYSA-N 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000007781 pre-processing Methods 0.000 description 3
- 230000004913 activation Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 238000013528 artificial neural network Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000010801 machine learning Methods 0.000 description 1
- 238000013178 mathematical model Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F18/00—Pattern recognition
- G06F18/20—Analysing
- G06F18/21—Design or setup of recognition systems or techniques; Extraction of features in feature space; Blind source separation
- G06F18/214—Generating training patterns; Bootstrap methods, e.g. bagging or boosting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F18/00—Pattern recognition
- G06F18/20—Analysing
- G06F18/24—Classification techniques
- G06F18/241—Classification techniques relating to the classification model, e.g. parametric or non-parametric approaches
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/004—Artificial life, i.e. computing arrangements simulating life
- G06N3/006—Artificial life, i.e. computing arrangements simulating life based on simulated virtual individual or collective life forms, e.g. social simulations or particle swarm optimisation [PSO]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/0499—Feedforward networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/08—Learning methods
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Business, Economics & Management (AREA)
- Evolutionary Computation (AREA)
- Artificial Intelligence (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Computational Linguistics (AREA)
- Biomedical Technology (AREA)
- Software Systems (AREA)
- Mathematical Physics (AREA)
- Human Resources & Organizations (AREA)
- Biophysics (AREA)
- Strategic Management (AREA)
- Computing Systems (AREA)
- Molecular Biology (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Bioinformatics & Computational Biology (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Biology (AREA)
- Tourism & Hospitality (AREA)
- Operations Research (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Quality & Reliability (AREA)
- Entrepreneurship & Innovation (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Power Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310748466.9A CN116485049B (zh) | 2023-06-25 | 2023-06-25 | 一种基于人工智能的电能计量误差预测与优化系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310748466.9A CN116485049B (zh) | 2023-06-25 | 2023-06-25 | 一种基于人工智能的电能计量误差预测与优化系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116485049A true CN116485049A (zh) | 2023-07-25 |
CN116485049B CN116485049B (zh) | 2024-04-19 |
Family
ID=87219963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310748466.9A Active CN116485049B (zh) | 2023-06-25 | 2023-06-25 | 一种基于人工智能的电能计量误差预测与优化系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116485049B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117131926A (zh) * | 2023-10-24 | 2023-11-28 | 山东计保电气有限公司 | 一种基于数据存储的电能计量误差分析方法 |
CN118244183A (zh) * | 2024-05-21 | 2024-06-25 | 湖南智焜能源科技有限公司 | 一种基于智能量测开关的fct测试方法、系统和介质 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112734135A (zh) * | 2021-01-26 | 2021-04-30 | 吉林大学 | 一种电力负荷预测方法、智能终端及计算机可读存储介质 |
CN114399032A (zh) * | 2022-03-23 | 2022-04-26 | 武汉格蓝若智能技术有限公司 | 一种电能表计量误差预测方法及系统 |
CN115018209A (zh) * | 2022-08-08 | 2022-09-06 | 国网湖北省电力有限公司营销服务中心(计量中心) | 一种数字化电能计量系统运行误差长期预测方法及设备 |
CN115932704A (zh) * | 2022-10-31 | 2023-04-07 | 武汉理工大学 | 一种基于模型和数据双驱动的cvt误差测量方法及系统 |
CN116068481A (zh) * | 2023-03-14 | 2023-05-05 | 国网福建省电力有限公司 | 一种电流互感器误差定量评估方法、系统、设备和介质 |
-
2023
- 2023-06-25 CN CN202310748466.9A patent/CN116485049B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112734135A (zh) * | 2021-01-26 | 2021-04-30 | 吉林大学 | 一种电力负荷预测方法、智能终端及计算机可读存储介质 |
CN114399032A (zh) * | 2022-03-23 | 2022-04-26 | 武汉格蓝若智能技术有限公司 | 一种电能表计量误差预测方法及系统 |
CN115018209A (zh) * | 2022-08-08 | 2022-09-06 | 国网湖北省电力有限公司营销服务中心(计量中心) | 一种数字化电能计量系统运行误差长期预测方法及设备 |
CN115932704A (zh) * | 2022-10-31 | 2023-04-07 | 武汉理工大学 | 一种基于模型和数据双驱动的cvt误差测量方法及系统 |
CN116068481A (zh) * | 2023-03-14 | 2023-05-05 | 国网福建省电力有限公司 | 一种电流互感器误差定量评估方法、系统、设备和介质 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117131926A (zh) * | 2023-10-24 | 2023-11-28 | 山东计保电气有限公司 | 一种基于数据存储的电能计量误差分析方法 |
CN118244183A (zh) * | 2024-05-21 | 2024-06-25 | 湖南智焜能源科技有限公司 | 一种基于智能量测开关的fct测试方法、系统和介质 |
Also Published As
Publication number | Publication date |
---|---|
CN116485049B (zh) | 2024-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN116485049B (zh) | 一种基于人工智能的电能计量误差预测与优化系统 | |
CN110221225B (zh) | 一种航天器锂离子电池循环寿命预测方法 | |
CN109308522B (zh) | 一种基于循环神经网络的gis故障预测方法 | |
CN110943453B (zh) | 面向迁移学习的电力系统故障样本生成和模型构建方法 | |
CN107918103B (zh) | 一种基于灰色粒子滤波的锂离子电池剩余寿命预测方法 | |
CN107145720B (zh) | 连续退化和未知冲击共同作用下的设备剩余寿命预测方法 | |
CN110222883A (zh) | 基于风驱动优化bp神经网络的电力系统负荷预测方法 | |
CN112149883A (zh) | 基于fwa-bp神经网络的光伏功率预测方法 | |
CN113177675A (zh) | 一种基于天牛群算法优化神经网络的空调冷负荷预测方法 | |
CN109066651A (zh) | 风电-负荷场景的极限传输功率的计算方法 | |
CN115908051A (zh) | 一种电力系统储能容量确定方法 | |
CN113759708B (zh) | 系统的优化控制方法、装置和电子设备 | |
CN114578249A (zh) | 一种基于稳定特征和as-tcn模型的锂电池健康状态估计方法 | |
CN117744856A (zh) | 锂电池剩余寿命预测方法、系统、计算机设备和存储介质 | |
CN116046018B (zh) | 一种应用于mems陀螺仪的温度补偿方法 | |
Li et al. | Research on SOC estimation of lithium battery based on GWO-BP neural network | |
CN115935811A (zh) | 一种基于数学模型的分布式风电机组功率预测方法 | |
CN115481796A (zh) | 基于贝叶斯混合神经网络的电池剩余使用寿命预测方法 | |
CN114692729A (zh) | 基于深度学习的新能源场站不良数据辨识与修正方法 | |
CN115101136A (zh) | 一种大型铝电解槽全局阳极效应预测方法 | |
CN110543724A (zh) | 面向总体设计的卫星结构性能预测方法 | |
CN116595883B (zh) | 数值反应堆实时在线系统状态修正方法 | |
CN117455719A (zh) | 基于生成式人工智能推演的电力大数据模型构建技术 | |
CN117077859A (zh) | 一种新能源发电功率预测优化方法及系统 | |
CN116937538A (zh) | 基于arima-bp-lstm多特征融合的超短期风功率预测方法及设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20240401 Address after: No.2328, Biyuan Third Road, high tech Zone, Xi'an, Shaanxi 710000 Applicant after: Shaanxi Yinhe Power Instruments and Meters Stock Co.,Ltd. Country or region after: China Address before: Room A1108-6, Building 2, No. 1, Smart New City, Zhangcha Street, Foshan City, Guangdong Province, 528012 (Building T16) Applicant before: FOSHAN LONGSHENG GUANGQI TECHNOLOGY CO.,LTD. Country or region before: China Applicant before: Luliang comprehensive inspection and Testing Center |
|
GR01 | Patent grant | ||
GR01 | Patent grant |