CN116480098A - Construction method of wind shaft partition wall in fan room of civil air defense engineering in coastal buildings - Google Patents
Construction method of wind shaft partition wall in fan room of civil air defense engineering in coastal buildings Download PDFInfo
- Publication number
- CN116480098A CN116480098A CN202310466622.2A CN202310466622A CN116480098A CN 116480098 A CN116480098 A CN 116480098A CN 202310466622 A CN202310466622 A CN 202310466622A CN 116480098 A CN116480098 A CN 116480098A
- Authority
- CN
- China
- Prior art keywords
- air
- partition wall
- wind
- pipe
- defense engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/04—Air-ducts or air channels
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/06—Gully gratings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Ventilation (AREA)
- Duct Arrangements (AREA)
Abstract
Description
技术领域technical field
本发明提供沿海建筑人防工程风机房风井隔墙施工方法,涉及人防工程风机房建筑施工技术领域。The invention provides a construction method for an air shaft partition wall of a fan room of a civil air defense project in a coastal building, and relates to the technical field of building construction of a fan room of a civil air defense project.
背景技术Background technique
沿海建筑人防工程空气调节系统的风管安装,在出风口处,常规的做法为:将风管一端利用吊杆固定在沿海建筑人防工程混凝土顶板上,另一端直接搁置在地风井隔墙上,再进行隔墙施工。众所周知,沿海建筑人防工程通风是利用风机通过风管和风井进行送排风的,若不采取一定的措施,往往会导致老鼠和夜行飞禽钻进风管对风机运行产生影响,再者恶劣天气,雨水倒灌进出风室,造成风机房渗漏并长时间潮湿影响连接管道使用寿命。The air duct installation of the air conditioning system of coastal civil air defense projects is at the air outlet. The conventional method is: one end of the air duct is fixed on the concrete roof of coastal civil air defense engineering with a boom, and the other end is directly placed on the partition wall of the ground air shaft, and then the partition wall is constructed. As we all know, the ventilation of civil air defense projects in coastal buildings uses fans to supply and exhaust air through the air ducts and air shafts. If certain measures are not taken, mice and night birds will often enter the air ducts and affect the operation of the fans. In addition, in bad weather, rainwater will flow back into and out of the air chambers, causing leakage in the fan room and prolonged humidity affecting the service life of the connecting pipes.
有鉴于此特提出本发明。In view of this, the present invention is proposed.
发明内容Contents of the invention
本发明所要解决的技术问题是:1、找出风井隔墙上的风管水平准确位置;2、要解决如何进出出风室内的问题,以便进行防鼠网安装更换和出风室内的后期清理。The technical problems to be solved by the present invention are: 1. find out the horizontal and accurate position of the air duct on the partition wall of the air shaft;
为了解决上述技术问题,发明人经过实践和总结得出本发明的技术方案,本发明公开了为解决上述技术问题,本发明采用技术方案的基本构思是:In order to solve the above-mentioned technical problems, the inventor draws the technical solution of the present invention through practice and summarization, and the present invention discloses that in order to solve the above-mentioned technical problems, the basic idea of the technical solution adopted by the present invention is:
沿海建筑人防工程风机房风井隔墙施工方法,包括以下步骤:The construction method of the wind shaft partition wall of the fan room of the coastal building civil air defense project includes the following steps:
步骤一:提前在风机房与出风室之间的风井隔墙部位浇筑400㎜高C30混凝土止水坎;Step 1: Pour 400mm high C30 concrete water stop sill on the partition wall of the air shaft between the fan room and the air outlet room in advance;
步骤二:待400㎜高C30混凝土止水坎强度达标后,砌筑风井隔墙至风管底部位置;Step 2: After the strength of the 400mm high C30 concrete water stop reaches the standard, build the partition wall of the air shaft to the bottom of the air pipe;
步骤三:在风机房内安装连接管道,并将风管的一端搁置在风井隔墙上,另一端利用帆布伸缩管与连接管道连接;Step 3: Install the connecting pipe in the fan room, place one end of the air pipe on the partition wall of the wind shaft, and connect the other end to the connecting pipe with a canvas telescopic tube;
步骤四:继续砌筑风井隔墙直至结束;Step 4: Continue to build the wind shaft partition wall until the end;
步骤五:在风管出口处出风室一侧,利用膨胀螺栓在风井隔墙安装钢制防鼠网;Step 5: On the side of the air outlet chamber at the outlet of the air duct, use expansion bolts to install steel anti-rat nets on the partition wall of the air shaft;
步骤六:在400㎜高C30混凝土止水坎内预留的Φ100PVC排水管风机房一侧加装阀门,并引导至沿海建筑人防工程排水沟内,出风室一侧安装排水篦子;Step 6: Install a valve on the side of the Φ100PVC drainage pipe fan room reserved in the 400mm high C30 concrete water stop, and guide it to the drainage ditch of the coastal building civil air defense project, and install a drainage grate on the side of the air outlet room;
步骤七:在出风室外侧风井外墙上安装带钢丝网百叶窗。Step 7: Install louvers with wire mesh on the outer wall of the air shaft outside the air outlet chamber.
本发明是针对现有常规的沿海建筑人防工程风机房风井隔墙完工后,容易造成老鼠和夜行飞禽钻进风管对风机运行产生影响,恶劣天气下雨水倒灌进出风室,造成风机房渗漏并长时间潮湿影响连接管道使用寿命,而采取沿海建筑人防工程风机房风井隔墙施工技术,采用在风管出口的隔墙外侧增加防鼠网和出风室外墙上设置带钢丝网的百叶窗防止老鼠和夜行飞禽,在风机房与风井隔墙底部加装排水管消除恶劣天气下出风室长期积水现象,保证沿海建筑人防工程风机长期安全有效运行。本发明在设置出风室,存在可移动的空间。The present invention is aimed at the completion of the air shaft partition wall of the fan room of the existing conventional coastal civil air defense engineering, which may easily cause mice and night birds to drill into the air duct and affect the operation of the fan. In bad weather, rainwater will pour into and out of the air room, causing leakage of the fan room and long-term humidity. Drainage pipes are installed at the bottom of the partition wall to eliminate the phenomenon of long-term water accumulation in the air outlet chamber in bad weather, and ensure the long-term safe and effective operation of the fans in civil air defense projects in coastal buildings. The present invention is provided with air outlet chamber, and there is movable space.
在更进一步的技术方案中,所述风管内安装有排风扇,所述连接管道内安装有固定板,所述固定板上安装有电机,所述电机的输出端适于驱动排风扇;In a further technical solution, an exhaust fan is installed in the air duct, a fixing plate is installed in the connecting duct, a motor is installed on the fixing plate, and the output end of the motor is suitable for driving the exhaust fan;
所述帆布伸缩管适于可拆卸连接在连接管道和风管之间。The canvas expansion tube is suitable for detachable connection between the connecting pipe and the air duct.
在更进一步的技术方案中,所述连接管道外安装有吊架,所述吊架的顶部与风机房的顶部相固定;In a further technical solution, a hanger is installed outside the connecting pipe, and the top of the hanger is fixed to the top of the fan room;
所述吊架的底部安装有槽钢架,所述吊架的底部穿过槽钢架并在底部安装有锁紧螺母锁紧。A channel steel frame is installed at the bottom of the hanger, and the bottom of the hanger passes through the channel steel frame and is locked with a locking nut at the bottom.
在更进一步的技术方案中,所述风管的底部安装有底部体,所述底部体内设置有容积腔,所述容积腔与风管相连通;In a further technical solution, a bottom body is installed at the bottom of the air duct, and a volume cavity is provided in the bottom body, and the volume cavity communicates with the air duct;
所述容积腔与风管连接处安装有滤网,所述底部体的底部安装有下管道,所述下管道的底部设置有接口一,所述Φ100PVC排水管的顶部安装有接口二,所述接口一与接口二适于相连接。A filter screen is installed at the connection between the volume cavity and the air pipe, and a lower pipe is installed at the bottom of the bottom body. The bottom of the lower pipe is provided with an interface 1, and the top of the Φ100 PVC drainage pipe is equipped with an interface 2, and the interface 1 and the interface 2 are suitable for connection.
在更进一步的技术方案中,所述接口二位于Φ100PVC排水管上阀门远离排水篦子的一侧。In a further technical solution, the second interface is located on the side of the valve on the Φ100 PVC drain pipe away from the drain grate.
在更进一步的技术方案中,在步骤二中,砌筑风井隔墙至风管底部,在风井隔墙上安装框架板,在框架板内定位安装风管,后继续砌筑至风机房的顶部。In a further technical solution, in step 2, the air shaft partition wall is built to the bottom of the air duct, the frame plate is installed on the air shaft partition wall, the air duct is positioned and installed in the frame plate, and then the masonry is continued to the top of the fan room.
在更进一步的技术方案中,所述框架板包括边线板,边线板设置有四组且安装为矩形,在相邻两组的边线板的连接处安装有直角形状的夹块套,相邻的边线板适于安装在夹块套内并锁紧;In a further technical solution, the frame board includes side boards, four groups of side boards are installed in a rectangular shape, and right-angled clamping block sleeves are installed at the joints of two adjacent groups of side boards, and adjacent side boards are suitable for being installed in the clamping block sleeves and locked;
所述边线板上可拆卸安装有伸缩杆,所述伸缩杆远离边线板的一端安装有定位片。A telescopic rod is detachably installed on the sideboard, and a positioning piece is installed on the end of the telescopic rod away from the sideboard.
在更进一步的技术方案中,所述定位片设置有四组适于定位贴合在风管的四侧。In a further technical solution, the positioning pieces are provided with four groups suitable for positioning and adhering to the four sides of the air duct.
有益效果:Beneficial effect:
本发明通过在风管出口的隔墙外侧增加防鼠网、在风机房与出风室隔墙底部加装排水管、出风室外墙上设置带钢丝网的百叶窗等措施,保证风管内无老鼠和夜行飞禽闯入、出风室内无长期积水现象,达到沿海建筑人防工程风机长期安全有效运行目标。The invention adopts measures such as adding anti-rodent nets on the outside of the partition wall at the outlet of the air duct, adding drain pipes at the bottom of the partition wall between the fan room and the air outlet room, and setting louvers with steel wire mesh on the outer wall of the air outlet, so as to ensure that no rats and nocturnal birds intrude into the air duct and no long-term water accumulation in the air outlet room, and achieve the goal of long-term safe and effective operation of fans in civil air defense projects in coastal buildings.
采用在风管出口增加防鼠网和出风室外墙设置带钢丝网的百叶窗的双重保护下,消除了任何小动物进入风机内的可能性,利用隔墙底部加装排水管,有目的引导积水,保证沿海建筑人防工程风机房内干燥,确保风管连接管道长期安全有效运行,达到后期运行过程中减少频繁更换和维修连接管道的目标,经济效果显著。Under the dual protection of adding rodent-proof nets at the outlet of the air duct and setting louvers with steel wire mesh on the outer wall of the air outlet, the possibility of any small animals entering the fan is eliminated. The bottom of the partition wall is equipped with a drainage pipe to guide the accumulated water purposefully, ensuring the dryness of the fan room in the coastal civil air defense project, ensuring the long-term safe and effective operation of the connecting pipes of the air pipes, and achieving the goal of reducing frequent replacement and maintenance of connecting pipes in the later operation process. The economic effect is remarkable.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or prior art. Obviously, for those of ordinary skill in the art, other drawings can also be obtained based on these drawings without creative work.
图1为本发明的实施例1的风机房的安装剖视图;Fig. 1 is the installation sectional view of the fan house of embodiment 1 of the present invention;
图2为本发明的连接管道和风管的部分剖视图;Fig. 2 is a partial sectional view of the connecting duct and the air duct of the present invention;
图3为本发明的实施例2的连接管道、风管、底部体的部分剖视图;Fig. 3 is the partial cross-sectional view of connecting duct, air duct, bottom body of embodiment 2 of the present invention;
图4为本发明的实施例3的示意图;Fig. 4 is the schematic diagram of embodiment 3 of the present invention;
图5为本发明的实施例3的风井隔墙的侧视图。Fig. 5 is a side view of an air shaft partition wall according to Embodiment 3 of the present invention.
图中:1、风机房;2、风井隔墙;3、400㎜高C30混凝土止水坎;4、风管;5、风井外墙;6、带钢丝网百叶窗;7、沿海建筑人防工程排水沟;8、Φ100PVC排水管;9、排水篦子;10、阀门;11、钢制防鼠网;12、膨胀螺栓;13、连接管道;14、帆布伸缩管;15、出风室;In the figure: 1. Fan room; 2. Air shaft partition wall; 3. 400mm high C30 concrete water-stop sill; 4. Air duct; 5. Air shaft outer wall;
16、排风扇;17、电机;18、固定板;19、吊架;20、槽钢架;21、底部体;22、下管道;23、接口二;24、边线板;25、夹块套;26、伸缩杆;27、定位片。16. exhaust fan; 17. motor; 18. fixed plate; 19. hanger; 20. channel steel frame; 21. bottom body; 22. lower pipe;
具体实施方式Detailed ways
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
下面结合附图及具体实施例对本发明的应用原理作进一步描述。The application principle of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
实施例1Example 1
如图1至图2所示,为本发明的一种实施方案,沿海建筑人防工程风机房风井隔墙施工方法,包括以下步骤:As shown in Fig. 1 to Fig. 2, it is a kind of embodiment of the present invention, and the construction method of wind shaft partition wall of fan room of coastal building civil air defense project comprises the following steps:
步骤一:提前在风机房1与出风室15之间的风井隔墙2部位浇筑400㎜高C30混凝土止水坎3;Step 1: Pour 400mm high C30 concrete water stop sill 3 at the wind shaft partition wall 2 between the fan room 1 and the air outlet room 15 in advance;
步骤二:待400㎜高C30混凝土止水坎3强度达标后,砌筑风井隔墙2至风管4底部位置;Step 2: After the strength of the 400mm high C30 concrete water stop sill 3 reaches the standard, build the air shaft partition wall 2 to the bottom of the air duct 4;
步骤三:在风机房1内安装连接管道13,并将风管4的一端搁置在风井隔墙2上,另一端利用帆布伸缩管14与连接管道13连接;Step 3: Install the connecting pipe 13 in the fan room 1, place one end of the air pipe 4 on the wind shaft partition wall 2, and connect the other end to the connecting pipe 13 with a canvas telescopic pipe 14;
步骤四:继续砌筑风井隔墙2直至结束;Step 4: Continue to build the wind shaft partition wall 2 until the end;
步骤五:在风管4出口处出风室15一侧,利用膨胀螺栓12在风井隔墙2安装钢制防鼠网11;Step 5: On the side of the air outlet chamber 15 at the outlet of the air duct 4, use the expansion bolt 12 to install the steel anti-rat net 11 on the air shaft partition wall 2;
步骤六:在400㎜高C30混凝土止水坎3内预留的Φ100PVC排水管8风机房1一侧加装阀门10,并引导至沿海建筑人防工程排水沟7内,出风室15一侧安装排水篦子9;Step 6: Install a valve 10 on one side of the Φ100 PVC drainage pipe 8 reserved in the 400mm high C30 concrete water stop 3, and guide it to the drainage ditch 7 of the coastal civil air defense project, and install a drainage grate 9 on the side of the air outlet chamber 15;
步骤七:在出风室15外侧风井外墙5上安装带钢丝网百叶窗6。Step 7: Install the shutters 6 with wire mesh on the outer wall 5 of the air shaft outside the air outlet chamber 15 .
在更进一步的技术方案中,所述风管4内安装有排风扇16,所述连接管道13内安装有固定板18,所述固定板18上安装有电机17,所述电机17的输出端适于驱动排风扇16;帆布伸缩管14适于可拆卸连接在连接管道13和风管4之间。所述连接管道13外安装有吊架19,所述吊架19的顶部与风机房1的顶部相固定;吊架19的底部安装有槽钢架20,所述吊架19的底部穿过槽钢架20并在底部安装有锁紧螺母锁紧。In a further technical solution, an exhaust fan 16 is installed in the air duct 4, a fixed plate 18 is installed in the connecting duct 13, a motor 17 is installed on the fixed plate 18, and the output end of the motor 17 is suitable for driving the exhaust fan 16; the canvas telescopic tube 14 is suitable for detachable connection between the connecting duct 13 and the air duct 4. A hanger 19 is installed outside the connecting pipe 13, and the top of the hanger 19 is fixed to the top of the fan room 1; the bottom of the hanger 19 is equipped with a channel steel frame 20, and the bottom of the hanger 19 passes through the channel steel frame 20 and is locked with a lock nut at the bottom.
实施例2Example 2
如图3所示,为本发明的另一种实施方案,在实施例1的基础上,进一步的为了排出可能飞溅,需及时向沿海建筑人防工程排水沟7排出,所述风管4的底部安装有底部体21,所述底部体21内设置有容积腔,所述容积腔与风管4相连通;As shown in Figure 3, be another kind of embodiment of the present invention, on the basis of embodiment 1, further in order to discharge possible splash, need to be discharged to coastal building civil air defense engineering gutter 7 in time, the bottom of described air duct 4 is equipped with bottom body 21, is provided with volume chamber in described bottom body 21, and described volume chamber communicates with air pipe 4;
所述容积腔与风管4连接处安装有滤网,滤网底部为导槽口,适于向下排水,尽量与排风扇具备间距,所述底部体21的底部安装有下管道22,所述下管道22的底部设置有接口一,所述Φ100PVC排水管8的顶部安装有接口二23,所述接口一与接口二23适于相连接。所述接口二23位于Φ100PVC排水管8上阀门10远离排水篦子9的一侧。A filter screen is installed at the connection between the volume chamber and the air pipe 4, and the bottom of the filter screen is a guide slot opening, which is suitable for draining water downwards and has a distance from the exhaust fan as much as possible. The bottom of the bottom body 21 is equipped with a lower pipe 22, and the bottom of the lower pipe 22 is provided with an interface one. The top of the Φ100 PVC drain pipe 8 is equipped with an interface two 23, and the interface one and the interface two 23 are suitable for being connected. The second interface 23 is located on the side of the valve 10 away from the drain grate 9 on the Φ100 PVC drain pipe 8 .
实施例3Example 3
如图4和图5所示,为本发明的另一种实施方案,在实施例1的基础上,在更进一步的技术方案中,在步骤二中,砌筑风井隔墙2至风管4底部,在风井隔墙2上安装框架板,在框架板内定位安装风管4,后继续砌筑至风机房1的顶部。As shown in Figures 4 and 5, it is another embodiment of the present invention. On the basis of Example 1, in a further technical solution, in step 2, build the air shaft partition wall 2 to the bottom of the air duct 4, install a frame plate on the air shaft partition wall 2, position and install the air duct 4 in the frame plate, and then continue to build to the top of the fan room 1.
如图5所示,所述框架板包括边线板24,边线板24设置有四组且安装为矩形,在相邻两组的边线板24的连接处安装有直角形状的夹块套25,相邻的边线板24适于安装在夹块套25内并锁紧;所述边线板24上可拆卸安装有伸缩杆26,所述伸缩杆26远离边线板24的一端安装有定位片27。所述定位片27设置有四组适于定位贴合在风管4的四侧。As shown in Fig. 5, described frame plate comprises edge plate 24, and edge plate 24 is provided with four groups and is installed as a rectangle, and the joint of adjacent two groups of edge plates 24 is provided with clamp cover 25 of right-angle shape, and adjacent limit plate 24 is suitable for being installed in clamp block cover 25 and locks; Described edge plate 24 is detachably equipped with telescopic rod 26, and the end of described telescopic rod 26 away from edge plate 24 is equipped with positioning piece 27. The positioning pieces 27 are provided with four groups suitable for positioning and adhering to the four sides of the air duct 4 .
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。It will be apparent to those skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments, but that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, no matter from which point of view, all the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so all changes within the meaning and scope of the equivalent elements of the claims are intended to be included in the present invention.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this description is described according to implementation modes, not each implementation mode only includes an independent technical solution. This description in the description is only for the sake of clarity. Those skilled in the art should take the description as a whole, and the technical solutions in the various embodiments can also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310466622.2A CN116480098B (en) | 2023-04-27 | 2023-04-27 | Construction method of partition wall of wind shaft in wind machine room of civil air defense project in coastal buildings |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310466622.2A CN116480098B (en) | 2023-04-27 | 2023-04-27 | Construction method of partition wall of wind shaft in wind machine room of civil air defense project in coastal buildings |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN116480098A true CN116480098A (en) | 2023-07-25 |
| CN116480098B CN116480098B (en) | 2025-08-05 |
Family
ID=87215350
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310466622.2A Active CN116480098B (en) | 2023-04-27 | 2023-04-27 | Construction method of partition wall of wind shaft in wind machine room of civil air defense project in coastal buildings |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116480098B (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5934993A (en) * | 1996-05-10 | 1999-08-10 | Maruyama; Noboru | Aeration structure in buildings |
| CN207794542U (en) * | 2017-12-25 | 2018-08-31 | 四川观堂建筑工程设计股份有限公司 | A kind of underground chamber ventilated ventilating shaft goes out ground structure |
| CN114457975A (en) * | 2022-04-12 | 2022-05-10 | 中建八局第二建设有限公司 | Hidden underground works ventilating shaft structure |
| CN217175512U (en) * | 2021-11-25 | 2022-08-12 | 上海同潇建筑设计有限公司 | Ventilation shaft of underground garage equipment room |
-
2023
- 2023-04-27 CN CN202310466622.2A patent/CN116480098B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5934993A (en) * | 1996-05-10 | 1999-08-10 | Maruyama; Noboru | Aeration structure in buildings |
| CN207794542U (en) * | 2017-12-25 | 2018-08-31 | 四川观堂建筑工程设计股份有限公司 | A kind of underground chamber ventilated ventilating shaft goes out ground structure |
| CN217175512U (en) * | 2021-11-25 | 2022-08-12 | 上海同潇建筑设计有限公司 | Ventilation shaft of underground garage equipment room |
| CN114457975A (en) * | 2022-04-12 | 2022-05-10 | 中建八局第二建设有限公司 | Hidden underground works ventilating shaft structure |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116480098B (en) | 2025-08-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7134245B2 (en) | Method and system for managing water infiltration at window openings | |
| JP5319221B2 (en) | Method for airtightness verification of building structures | |
| US20090293182A1 (en) | Method for Air Removal from a Water-Closet Bowl and a Device for air removal from a water-closet bowl | |
| CN211368777U (en) | A kind of comprehensive pipe gallery | |
| CN116480098A (en) | Construction method of wind shaft partition wall in fan room of civil air defense engineering in coastal buildings | |
| CN206616594U (en) | A kind of service shaft well | |
| CN218176110U (en) | Waterproof drainage structure for balcony | |
| CN217423531U (en) | Fan room structure | |
| CN213015639U (en) | A vertical centralized pipe gallery parking system | |
| CN210562583U (en) | An air-conditioning panel with drainage and ventilation function for building assembly | |
| CN109881867B (en) | Clear away interior foul smell's of downstairs engineering ditch device | |
| CN210602172U (en) | Outdoor air pipe rainwater-proof backward flow connecting device | |
| CN112681370A (en) | Utility tunnel | |
| CN223447087U (en) | A smoke exhaust ventilation system for a small-section confined space tunnel | |
| CN220079894U (en) | Temporary water interception device for underground garage | |
| CN221035986U (en) | Air conditioner capable of preventing dust from entering into fresh air duct | |
| CN222504197U (en) | Residential basement ventilation system | |
| CN207409986U (en) | A kind of cable duct for being capable of automatic dehumidifying ventilation | |
| JPH0426295U (en) | ||
| CN219677915U (en) | Power transformation module box and module device | |
| CN221702906U (en) | A waterproof structure for house construction | |
| CN223330014U (en) | A water intercepting device for a construction site opening | |
| CN216238643U (en) | Based on building information ization underground pipe gallery guardianship waterproof construction | |
| CN219638145U (en) | Waterproof piece of building | |
| CN220768651U (en) | Structure for preventing horizontal expansion joint of flat roof from leaking |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |