CN116468329B - Intelligent management system for indoor decoration design construction - Google Patents

Intelligent management system for indoor decoration design construction Download PDF

Info

Publication number
CN116468329B
CN116468329B CN202310464037.9A CN202310464037A CN116468329B CN 116468329 B CN116468329 B CN 116468329B CN 202310464037 A CN202310464037 A CN 202310464037A CN 116468329 B CN116468329 B CN 116468329B
Authority
CN
China
Prior art keywords
decoration
quality
apparent
scheme
material information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310464037.9A
Other languages
Chinese (zh)
Other versions
CN116468329A (en
Inventor
陈明
温海洋
钟迪辉
刘文敏
许社胜
涂子尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhonghui Construction Group Co ltd
Original Assignee
Guangdong Yajian Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yajian Construction Technology Co ltd filed Critical Guangdong Yajian Construction Technology Co ltd
Priority to CN202310464037.9A priority Critical patent/CN116468329B/en
Publication of CN116468329A publication Critical patent/CN116468329A/en
Application granted granted Critical
Publication of CN116468329B publication Critical patent/CN116468329B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063112Skill-based matching of a person or a group to a task
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the field of decoration design management, and discloses an intelligent management system for indoor decoration design construction.

Description

Intelligent management system for indoor decoration design construction
Technical Field
The invention relates to the field of decoration design management, in particular to an intelligent management system for indoor decoration design construction.
Background
In finishing houses, the most important concern of owners is the effect and quality of finishing. The effect of the decoration needs to meet the expectations of the owners, and meanwhile, the quality of the decoration needs to be too hard.
To ensure the quality and effect of the decoration, the owner may choose to follow the decoration process in the whole course to understand the progress and quality of each process in the decoration, but the whole course follow can play a role in supervising the decoration team, and the owner can also know the progress of the decoration closely, but the whole course follow consumes a great deal of time and energy of the owner, which is not practical.
In addition, during decoration inspection, especially apparent mass, wall seams and levelness are inspected and accepted by owners through visual inspection, and the owners rely on subjective judgment, so that the whole inspection effect can be influenced by negligence.
When the decoration materials are managed, the subjective judgment of the owners is also relied on, and the owners are not professionals in this aspect, so that the effect of acceptance is poor, and the manpower and time are wasted when the professionals are consulted.
Disclosure of Invention
The invention aims to provide an intelligent management system for indoor decoration design construction, which solves the technical problems.
The aim of the invention can be achieved by the following technical scheme:
an intelligent management system for interior decoration design construction, comprising: and (3) a decoration design module: the method is used for selecting a decoration scheme;
the material selection module is used for checking and accepting materials in the decoration process;
the decoration data acquisition module:
the device comprises an apparent mass acquisition unit, a measuring unit and a control unit, wherein the apparent mass acquisition unit is used for verticality, flatness, joint width and joint height difference;
the waterway acquisition unit is used for detecting whether the water pressure of the kitchen and the toilet meets the requirement;
and the decoration quality evaluation module is used for finishing the evaluation of the decoration quality according to the decoration data acquired in the decoration data acquisition module.
According to the technical scheme, the management system provided by the invention completes a decoration scheme through the decoration design module before decoration, and selects the number of people of each work class according to the number of days of the decoration scheme and the number of days required by actual decoration, the material selection module is used for checking and accepting materials used for decoration in the decoration process, and the decoration data acquisition module and the decoration quality evaluation module are used for checking and accepting apparent decoration quality and hydraulic pressure quality after decoration is completed.
As a further description of the scheme of the invention, the decoration design module comprises a data uploading unit, a display unit and a display unit, wherein the data uploading unit is used for uploading a house type graph, decoration budget and decoration period by a house owner;
and the decoration style matching unit is used for outputting a decoration scheme meeting the requirements of the householder according to the decoration data uploaded by the householder as input quantity for the trained neural network model, and the householder selects a target decoration scheme according to own preference.
As a further description of the solution of the present invention, the material selection module includes a material information acquisition unit and a material information confirmation unit;
the material information acquisition unit is used for acquiring material information in a decoration scheme and decoration material information purchased by a constructor;
the material information confirming unit is used for judging whether the decoration material information purchased by the constructor accords with the material information in the decoration scheme.
As a further description of the scheme of the invention, the specific working process of the material information confirming unit is as follows:
specific information of each material in the decoration design scheme is obtained, a digital model is established, the digital model comprises a three-dimensional model, density and surface reflectivity of the material, and the appearance, the type and the surface treatment of the material are respectively judged;
acquiring a three-dimensional model, density and surface reflectivity of a finishing material purchased by a constructor, and inputting the parameters into a digital model;
judging whether the quality of the decoration materials purchased by a constructor meets the standard, and if the quality meets the standard, acquiring a quantity list required by each material in a decoration design scheme;
and acquiring a quantity list of finishing materials purchased by the constructor, and judging whether the quantity of the finishing materials purchased by the constructor meets the requirement.
Through the technical scheme, the three-dimensional model, the density and the surface reflectivity of the material are detected through the digital model, so that whether the appearance, the type and the surface treatment of the material meet the requirements or not is judged, if the quality meets the standards, a quantity list required by each material in the decoration design scheme is obtained, and whether the quantity of the decoration materials purchased by a constructor meets the requirements or not is judged.
As a further description of the scheme of the invention, the specific working process of the decoration quality evaluation module for evaluating the apparent quality of decoration is as follows:
obtaining apparent mass judgment index data: verticality a1, a2 … an; surface flatness b1, b2 … bn; seam widths c1, c2 … cn; seam height differences d1, d2 … dn;
respectively calculating the average value of each quality index:
substituting the average value of each quality index into the following formula:
wherein F is a decoration apparent quality evaluation index coefficient,the apparent mass judgment index data are respectively +.>Compensation coefficient of->Is the compensation coefficient of F by +.>So that F is E [0, 5]];
If F is E (4, 5), the apparent quality of the decoration is very good;
if F is E (3, 4), the apparent quality of decoration is better;
if F is E (2, 3), the apparent quality and the grade of decoration are indicated;
if F is E (1, 2), the apparent quality of decoration is poor;
if F is E (0, 1), the apparent quality of the decoration is very poor.
According to the technical scheme, the apparent mass judgment index data is obtained, the decoration apparent mass evaluation index coefficient is obtained through the index data, the decoration apparent mass evaluation index coefficient is converted into an evaluation value through a formula, and the evaluation value is compared with a preset value to judge whether the decoration apparent mass is good or bad.
As a further description of the scheme of the invention, the concrete working process of the decoration quality evaluation module for evaluating the water pressure is as follows:
under the condition that the water supply pressure of a water supply company is normal, acquiring the water flow speed of each position point in the water discharging process
Calculating average value of water flow velocity at each position pointAnd average the water flow velocity +.>And the corresponding standard [ ]>,/>]And (3) performing comparison:
if it is∈[/>,/>]The normal water pressure is indicated;
if it is∈(-∞,/>) The existing water pressure is too low;
if it is∈(/>) The existing water pressure is too high;
calculating standard deviation of water flow velocity of each position pointAnd water flow rate standard deviation->And corresponding standard->Absolute value of difference and preset threshold->And->And (3) performing comparison:
if it is≥/>Or->The water pressure is mostly unsatisfactory, and the installation quality of the water pipe is poor;
if it is∈(/>,/>) The water pressure and the water pressure meet the requirements, and the water pipe installation quality is good.
According to the technical scheme, the average value of the water flow speeds of all the position points is calculated by acquiring the water flow speeds of all the position points, the average value of the water flow speeds is compared with the corresponding standard, whether the water pressure is normal is judged, the standard deviation of the water flow speeds of all the position points is calculated, the absolute value of the standard deviation of the water flow speeds, the absolute value of the corresponding standard deviation and the preset threshold value are calculated, whether the positions where the water pressure is not required are too many is judged, and therefore the installation quality of the water pipe is judged.
As a further description of the solution of the present invention, the decoration design module further includes a decoration period management unit:
obtaining the number N of people of different kinds in a given decoration team 1 、N 2 …N n Substituting the time of completion of each work species into a period prediction model to obtain time t1 and t2 … tn respectively, and calculating to obtain total time t of the predicted completion A total;
let t Total (S) Comparing with the agreed time T, if T Total (S) If the time is less than T, the work can be completed within the period, if T Total (S) If the time limit is greater than T, the work can be completed within the time limit;
the number of people is increased for each work, and the number of people to be increased for N work is N n -1。
As a further description of the inventive arrangements, the periodic predictive model is a trained neural network model.
According to the technical scheme, the invention calculates the total time of the expected completion according to the time of completion of each work species, compares the total time of the expected completion with the appointed time, judges whether the work can be completed within the time limit, and if not, the number of people to be increased by the nth work species is N n -1。
The invention has the beneficial effects that:
1. according to the management system provided by the invention, a decoration scheme is finished through the decoration design module before decoration, the number of people of each work class is selected according to the number of days of the decoration scheme and the number of days required by actual decoration, the material selection module is used for checking and accepting materials used for decoration in the decoration process, and after the decoration is finished, the decoration apparent mass and the water pressure mass are checked and accepted through the decoration data acquisition module and the decoration quality evaluation module.
2. The invention detects the three-dimensional model, density and surface reflectivity of the material through the digital model, thereby judging whether the appearance, the type and the surface treatment of the material meet the requirements, if the quality meets the standards, acquiring a quantity list required by each material in the decoration design scheme, and judging whether the quantity of the decoration materials purchased by a constructor meets the requirements.
3. According to the invention, apparent quality judgment index data is obtained, a decoration apparent quality evaluation index coefficient is obtained through the index data, the decoration apparent quality evaluation index coefficient is converted into an evaluation value through a formula, and the evaluation value is compared with a preset value to judge whether the decoration apparent quality is good or bad.
4. According to the invention, the average value of the water flow speeds of all the position points is calculated by acquiring the water flow speeds of all the position points, the average value of the water flow speeds is compared with the corresponding standard to judge whether the water pressure is normal, the standard deviation of the water flow speeds of all the position points is calculated, the absolute value of the standard deviation of the water flow speeds and the corresponding standard deviation is compared with the preset threshold, and whether the positions where the water pressure is not required are excessive is judged, so that the water pipe installation quality is judged.
5. The invention calculates the total time of the expected completion by the time of each work category, compares the total time of the expected completion with the appointed time, judges whether the work can be completed within the time limit, if not, the number of people needed to be increased by the nth work category is N n -1。
Drawings
The invention is further described below with reference to the accompanying drawings.
Fig. 1 is a schematic structural diagram of an intelligent management system for indoor decoration design construction.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1, the present invention is an intelligent management system for indoor decoration design construction, which is characterized by comprising: and (3) a decoration design module: the method is used for selecting a decoration scheme;
the material selection module is used for checking and accepting materials in the decoration process;
the decoration data acquisition module:
the device comprises an apparent mass acquisition unit, a measuring unit and a control unit, wherein the apparent mass acquisition unit is used for verticality, flatness, joint width and joint height difference;
the waterway acquisition unit is used for detecting whether the water pressure of the kitchen and the toilet meets the requirement;
and the decoration quality evaluation module is used for finishing the evaluation of the decoration quality according to the decoration data acquired in the decoration data acquisition module.
According to the technical scheme, the management system provided by the invention completes a decoration scheme through the decoration design module before decoration, and selects the number of people of each work class according to the number of days of the decoration scheme and the number of days required by actual decoration, the material selection module is used for checking and accepting materials used for decoration in the decoration process, and the decoration data acquisition module and the decoration quality evaluation module are used for checking and accepting apparent decoration quality and hydraulic pressure quality after decoration is completed.
The decoration design module comprises a data uploading unit and is used for uploading house type diagrams, decoration budget and decoration period to a user;
and the decoration style matching unit is used for outputting a decoration scheme meeting the requirements of the householder according to the decoration data uploaded by the householder as input quantity for the trained neural network model, and the householder selects a target decoration scheme according to own preference.
The material selection module comprises a material information acquisition unit and a material information confirmation unit;
the material information acquisition unit is used for acquiring material information in a decoration scheme and decoration material information purchased by a constructor;
the material information confirming unit is used for judging whether the decoration material information purchased by the constructor accords with the material information in the decoration scheme.
The material information confirmation unit comprises the following specific working processes:
specific information of each material in the decoration design scheme is obtained, a digital model is established, the digital model comprises a three-dimensional model, density and surface reflectivity of the material, and the appearance, the type and the surface treatment of the material are respectively judged;
acquiring a three-dimensional model, density and surface reflectivity of a finishing material purchased by a constructor, and inputting the parameters into a digital model;
judging whether the quality of the decoration materials purchased by a constructor meets the standard, and if the quality meets the standard, acquiring a quantity list required by each material in a decoration design scheme;
and acquiring a quantity list of finishing materials purchased by the constructor, and judging whether the quantity of the finishing materials purchased by the constructor meets the requirement.
Through the technical scheme, the three-dimensional model, the density and the surface reflectivity of the material are detected through the digital model, so that whether the appearance, the type and the surface treatment of the material meet the requirements or not is judged, if the quality meets the standards, a quantity list required by each material in the decoration design scheme is obtained, and whether the quantity of the decoration materials purchased by a constructor meets the requirements or not is judged.
The specific working process of the decoration quality evaluation module for evaluating the apparent quality of decoration is as follows:
obtaining apparent mass judgment index data: verticality a1, a2 … an; surface flatness b1, b2 … bn; seam widths c1, c2 … cn; seam height differences d1, d2 … dn;
respectively calculating the average value of each quality index:
substituting the average value of each quality index into the following formula:
wherein F is a decoration apparent quality evaluation index coefficient,the apparent mass judgment index data are respectively +.>Compensation coefficient of->Is the compensation coefficient of F by +.>So that F is E [0, 5]];
If F is E (4, 5), the apparent quality of the decoration is very good;
if F is E (3, 4), the apparent quality of decoration is better;
if F is E (2, 3), the apparent quality and the grade of decoration are indicated;
if F is E (1, 2), the apparent quality of decoration is poor;
if F is E (0, 1), the apparent quality of the decoration is very poor.
According to the technical scheme, the apparent mass judgment index data is obtained, the decoration apparent mass evaluation index coefficient is obtained through the index data, the decoration apparent mass evaluation index coefficient is converted into an evaluation value through a formula, and the evaluation value is compared with a preset value to judge whether the decoration apparent mass is good or bad.
The concrete working process of the decoration quality evaluation module for evaluating the water pressure is as follows:
under the condition that the water supply pressure of a water supply company is normal, acquiring the water flow speed of each position point in the water discharging process
Calculating average value of water flow velocity at each position pointAnd average the water flow velocity +.>And the corresponding standard [ ]>,/>]And (3) performing comparison:
if it is∈[/>,/>]The normal water pressure is indicated;
if it is∈(-∞,/>) The existing water pressure is too low;
if it is∈(/>) The existing water pressure is too high;
calculating standard deviation of water flow velocity of each position pointAnd water flow rate standard deviation->And corresponding standard->Absolute value of difference and preset threshold->And->And (3) performing comparison:
if it is≥/>Or->The water pressure is mostly unsatisfactory, and the installation quality of the water pipe is poor;
if it is∈(/>,/>) The water pressure and the water pressure meet the requirements, and the water pipe installation quality is good.
According to the technical scheme, the average value of the water flow speeds of all the position points is calculated by acquiring the water flow speeds of all the position points, the average value of the water flow speeds is compared with the corresponding standard, whether the water pressure is normal is judged, the standard deviation of the water flow speeds of all the position points is calculated, the absolute value of the standard deviation of the water flow speeds, the absolute value of the corresponding standard deviation and the preset threshold value are calculated, whether the positions where the water pressure is not required are too many is judged, and therefore the installation quality of the water pipe is judged.
The decoration design module further comprises a decoration period management unit:
obtaining the number N of people of different kinds in a given decoration team 1 、N 2 …N n Substituting the time of completion of each work species into a period prediction model to obtain time t1 and t2 … tn respectively, and calculating to obtain total time t of the predicted completion A total;
let t Total (S) Comparing with the agreed time T, if T Total (S) If the time is less than T, the work can be completed within the period, if T Total (S) If the time limit is greater than T, the work can be completed within the time limit;
the number of people is increased for each work, and the number of people to be increased for N work is N n -1。
The periodic predictive model is a trained neural network model.
According to the technical scheme, the invention calculates the total time of the expected completion according to the time of completion of each work species, compares the total time of the expected completion with the appointed time, judges whether the work can be completed within the time limit, and if not, the number of people to be increased by the nth work species is N n -1。
The foregoing describes one embodiment of the present invention in detail, but the description is only a preferred embodiment of the present invention and should not be construed as limiting the scope of the invention. All equivalent changes and modifications within the scope of the present invention are intended to be covered by the present invention.

Claims (5)

1. An intelligent management system for interior decoration design construction, which is characterized by comprising: and (3) a decoration design module: the method is used for selecting a decoration scheme;
the material selection module is used for checking and accepting materials in the decoration process;
the decoration data acquisition module:
the device comprises an apparent mass acquisition unit, a measuring unit and a control unit, wherein the apparent mass acquisition unit is used for verticality, flatness, joint width and joint height difference;
the waterway acquisition unit is used for detecting whether the water pressure of the kitchen and the toilet meets the requirement;
the decoration quality evaluation module is used for completing the evaluation of decoration quality according to the decoration data acquired by the decoration data acquisition module;
the material selection module comprises a material information acquisition unit and a material information confirmation unit;
the material information acquisition unit is used for acquiring material information in a decoration scheme and decoration material information purchased by a constructor;
the material information confirming unit is used for judging whether the decoration material information purchased by the constructor accords with the material information in the decoration scheme;
the material information confirmation unit comprises the following specific working processes:
specific information of each material in the decoration design scheme is obtained, a digital model is established, the digital model comprises a three-dimensional model, density and surface reflectivity of the material, and the appearance, the type and the surface treatment of the material are respectively judged;
acquiring a three-dimensional model, density and surface reflectivity of a finishing material purchased by a constructor, and inputting the parameters into a digital model;
judging whether the quality of the decoration materials purchased by a constructor meets the standard, and if the quality meets the standard, acquiring a quantity list required by each material in a decoration design scheme;
acquiring a quantity list of finishing materials purchased by a constructor, and judging whether the quantity of the finishing materials purchased by the constructor meets the requirement;
the decoration design module comprises a decoration period management unit:
obtaining the number N of people of different kinds in a given decoration team 1 、N 2 …N n Substituting the time into a period prediction model to obtain the completion time of each work type as followst1, t2 … tn, the total time t of the expected completion is calculated Total (S)
Let t Total (S) Comparing with the agreed time T, if T Total (S) If the time is less than T, the work can be completed within the period, if T Total (S) If the time limit is greater than T, the work can be completed within the time limit;
the number of people is increased for each work, and the number of people to be increased for N work is N n -1。
2. The intelligent management system for indoor decoration design construction according to claim 1, wherein the decoration design module comprises a data uploading unit for uploading house type drawings, decoration budget and decoration period to a user;
and the decoration style matching unit is used for outputting a decoration scheme meeting the requirements of the householder according to the decoration data uploaded by the householder as input quantity for the trained neural network model, and the householder selects a target decoration scheme according to own preference.
3. The intelligent management system for indoor decoration design construction according to claim 1, wherein the specific working process of the decoration quality evaluation module for evaluating the appearance quality of the decoration is as follows:
obtaining apparent mass judgment index data: verticality a1, a2 … an; surface flatness b1, b2 … bn; seam widths c1, c2 … cn; seam height differences d1, d2 … dn;
respectively calculating the average value of each quality index:
substituting the average value of each quality index into the following formula:
wherein F is a decoration apparent quality evaluation index coefficient, and alpha, beta, gamma and delta are respectively apparent quality judgment index dataμ is the compensation coefficient of F, by μ such that F ε [0, 5]];
If F is E (4, 5), the apparent quality of the decoration is very good;
if F is E (3, 4), the apparent quality of decoration is better;
if F is E (2, 3), the apparent quality and the grade of decoration are indicated;
if F is E (1, 2), the apparent quality of decoration is poor;
if F is E (0, 1), the apparent quality of the decoration is very poor.
4. The intelligent management system for indoor decoration design construction according to claim 1, wherein the concrete working process of the decoration quality evaluation module for evaluating the water pressure is as follows:
under the condition that the water supply pressure of a water supply company is normal, in the water discharging process, acquiring the water flow speeds v1 and v2 … vn of all the position points;
calculating average value of water flow velocity at each position pointAnd average water flow velocity +.>And corresponding standard v x ,v y ]And (3) performing comparison:
if it isThe existing water pressure is normal;
if it isIt indicates that the existing water pressure is too low;
if it isThe existing water pressure is too high;
calculating standard deviation S of water flow velocity of each position point v And the water flow speed standard deviation S v And correspond to standard S 0 Absolute value of difference and preset threshold S x And S is y And (3) performing comparison:
if |S v -S 0 |≥S y Or |S v -S 0 |≤S x The water pressure is mostly unsatisfactory, and the installation quality of the water pipe is poor;
if |S v -S 0 |∈(S x ,S y ) The water pressure meets the requirement, and the water pipe has good installation quality.
5. The interior design construction intelligent management system according to claim 1, wherein the periodic prediction model is a trained neural network model.
CN202310464037.9A 2023-04-26 2023-04-26 Intelligent management system for indoor decoration design construction Active CN116468329B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310464037.9A CN116468329B (en) 2023-04-26 2023-04-26 Intelligent management system for indoor decoration design construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310464037.9A CN116468329B (en) 2023-04-26 2023-04-26 Intelligent management system for indoor decoration design construction

Publications (2)

Publication Number Publication Date
CN116468329A CN116468329A (en) 2023-07-21
CN116468329B true CN116468329B (en) 2024-01-30

Family

ID=87180597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310464037.9A Active CN116468329B (en) 2023-04-26 2023-04-26 Intelligent management system for indoor decoration design construction

Country Status (1)

Country Link
CN (1) CN116468329B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109389288A (en) * 2018-09-10 2019-02-26 张志联 A kind of finishing Integrated service platform steward system
KR20190081197A (en) * 2017-12-29 2019-07-09 주식회사 더리테리어 Management system for total interior service using mobile device
CN110059690A (en) * 2019-03-28 2019-07-26 广州智方信息科技有限公司 Floor plan semanteme automatic analysis method and system based on depth convolutional neural networks
CN114511199A (en) * 2022-03-09 2022-05-17 杭州易鼎行网络科技有限公司 Engineering project delivery acceptance management method, equipment and computer storage medium
CN115170759A (en) * 2022-07-22 2022-10-11 张朋千建筑设计咨询(上海)有限公司 BIM-based indoor decoration project intelligent management system
CN115841219A (en) * 2022-10-19 2023-03-24 北京国建建筑装饰工程有限公司 Monitoring method and device for decoration operation, electronic equipment and storage medium

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190081197A (en) * 2017-12-29 2019-07-09 주식회사 더리테리어 Management system for total interior service using mobile device
CN109389288A (en) * 2018-09-10 2019-02-26 张志联 A kind of finishing Integrated service platform steward system
CN110059690A (en) * 2019-03-28 2019-07-26 广州智方信息科技有限公司 Floor plan semanteme automatic analysis method and system based on depth convolutional neural networks
CN114511199A (en) * 2022-03-09 2022-05-17 杭州易鼎行网络科技有限公司 Engineering project delivery acceptance management method, equipment and computer storage medium
CN115170759A (en) * 2022-07-22 2022-10-11 张朋千建筑设计咨询(上海)有限公司 BIM-based indoor decoration project intelligent management system
CN115841219A (en) * 2022-10-19 2023-03-24 北京国建建筑装饰工程有限公司 Monitoring method and device for decoration operation, electronic equipment and storage medium

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
精装修住宅质量控制措施;鲁燕;贺成龙;聂晓燕;;价值工程(33);第99-100页 *

Also Published As

Publication number Publication date
CN116468329A (en) 2023-07-21

Similar Documents

Publication Publication Date Title
Haider et al. Cost comparison of a building project by manual and BIM
CN109297086B (en) Heating power station load time-interval rolling prediction and self-adaptive correction method and system
Kim et al. A discrepancy analysis of BIM-based quantity take-off for building interior components
CN112507442A (en) BIM project material and engineering cost statistical method
CN116468329B (en) Intelligent management system for indoor decoration design construction
CN106663142A (en) Method and apparatus for detecting building information
Lozinsky et al. Improving energy model calibration of multi-unit residential buildings through component air infiltration testing
Haugbølle et al. Construction productivity revisited: towards measuring performance of construction output
CN117469603B (en) Multi-water-plant water supply system pressure optimal control method based on big data learning
CN117609868B (en) House building BIM data classification method, system and medium based on subsection item logic
Lim et al. An experimental study for quality assurance of free-form concrete panels produced by CNC machine
CN116738555B (en) Intelligent home decoration design system
KR101835551B1 (en) Method and system for estimating 3D BIM-based repair and replacement cost
Kim et al. Development of estimation system for housing remodeling cost through influence analysis by design elements
CN104899464B (en) A kind of sampling study machine remote sensing quantitative inversion method under adaptation noise conditions
Shih et al. Using point cloud to inspect the construction quality of wall finish
CN107767415B (en) Method for determining positions of reinforcing steel bars in building wall and constructing space model
Vamsidhar et al. Study and rate analysis of escalation in construction industry
CN113269411A (en) Decoration system based on internet technology assembly decoration construction and convenient for customer quality inspection
JPH11194803A (en) Dam discharging flow rate prediction model constructing method and dam discharging flow rate predicting method
CN108678939A (en) The detection method and system of pump cavitation margin value
Thaddi et al. Evaluation of factors for Post occupancy Satisfaction analysis of a Residential Building–A review
Subcommittee Committee report: Defining model calibration
CN110017613B (en) Method for forecasting remaining bath time of water storage type water heater
CN117876053B (en) Intelligent mapping method and system for engineering cost

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240415

Address after: 502A, No. 324 Dunhe Road, Haizhu District, Guangzhou City, Guangdong Province, 510000 (for office use only and not for factory use)

Patentee after: Zhonghui Construction Group Co.,Ltd.

Country or region after: China

Address before: 510000 room 203A, No. 324, Dunhe Road, Haizhu District, Guangzhou City, Guangdong Province

Patentee before: Guangdong Yajian Construction Technology Co.,Ltd.

Country or region before: China