Disclosure of Invention
The invention aims to provide an intelligent management system for indoor decoration design construction, which solves the technical problems.
The aim of the invention can be achieved by the following technical scheme:
an intelligent management system for interior decoration design construction, comprising: and (3) a decoration design module: the method is used for selecting a decoration scheme;
the material selection module is used for checking and accepting materials in the decoration process;
the decoration data acquisition module:
the device comprises an apparent mass acquisition unit, a measuring unit and a control unit, wherein the apparent mass acquisition unit is used for verticality, flatness, joint width and joint height difference;
the waterway acquisition unit is used for detecting whether the water pressure of the kitchen and the toilet meets the requirement;
and the decoration quality evaluation module is used for finishing the evaluation of the decoration quality according to the decoration data acquired in the decoration data acquisition module.
According to the technical scheme, the management system provided by the invention completes a decoration scheme through the decoration design module before decoration, and selects the number of people of each work class according to the number of days of the decoration scheme and the number of days required by actual decoration, the material selection module is used for checking and accepting materials used for decoration in the decoration process, and the decoration data acquisition module and the decoration quality evaluation module are used for checking and accepting apparent decoration quality and hydraulic pressure quality after decoration is completed.
As a further description of the scheme of the invention, the decoration design module comprises a data uploading unit, a display unit and a display unit, wherein the data uploading unit is used for uploading a house type graph, decoration budget and decoration period by a house owner;
and the decoration style matching unit is used for outputting a decoration scheme meeting the requirements of the householder according to the decoration data uploaded by the householder as input quantity for the trained neural network model, and the householder selects a target decoration scheme according to own preference.
As a further description of the solution of the present invention, the material selection module includes a material information acquisition unit and a material information confirmation unit;
the material information acquisition unit is used for acquiring material information in a decoration scheme and decoration material information purchased by a constructor;
the material information confirming unit is used for judging whether the decoration material information purchased by the constructor accords with the material information in the decoration scheme.
As a further description of the scheme of the invention, the specific working process of the material information confirming unit is as follows:
specific information of each material in the decoration design scheme is obtained, a digital model is established, the digital model comprises a three-dimensional model, density and surface reflectivity of the material, and the appearance, the type and the surface treatment of the material are respectively judged;
acquiring a three-dimensional model, density and surface reflectivity of a finishing material purchased by a constructor, and inputting the parameters into a digital model;
judging whether the quality of the decoration materials purchased by a constructor meets the standard, and if the quality meets the standard, acquiring a quantity list required by each material in a decoration design scheme;
and acquiring a quantity list of finishing materials purchased by the constructor, and judging whether the quantity of the finishing materials purchased by the constructor meets the requirement.
Through the technical scheme, the three-dimensional model, the density and the surface reflectivity of the material are detected through the digital model, so that whether the appearance, the type and the surface treatment of the material meet the requirements or not is judged, if the quality meets the standards, a quantity list required by each material in the decoration design scheme is obtained, and whether the quantity of the decoration materials purchased by a constructor meets the requirements or not is judged.
As a further description of the scheme of the invention, the specific working process of the decoration quality evaluation module for evaluating the apparent quality of decoration is as follows:
obtaining apparent mass judgment index data: verticality a1, a2 … an; surface flatness b1, b2 … bn; seam widths c1, c2 … cn; seam height differences d1, d2 … dn;
respectively calculating the average value of each quality index:
;
;
;
;
substituting the average value of each quality index into the following formula:
;
wherein F is a decoration apparent quality evaluation index coefficient,the apparent mass judgment index data are respectively +.>Compensation coefficient of->Is the compensation coefficient of F by +.>So that F is E [0, 5]];
If F is E (4, 5), the apparent quality of the decoration is very good;
if F is E (3, 4), the apparent quality of decoration is better;
if F is E (2, 3), the apparent quality and the grade of decoration are indicated;
if F is E (1, 2), the apparent quality of decoration is poor;
if F is E (0, 1), the apparent quality of the decoration is very poor.
According to the technical scheme, the apparent mass judgment index data is obtained, the decoration apparent mass evaluation index coefficient is obtained through the index data, the decoration apparent mass evaluation index coefficient is converted into an evaluation value through a formula, and the evaluation value is compared with a preset value to judge whether the decoration apparent mass is good or bad.
As a further description of the scheme of the invention, the concrete working process of the decoration quality evaluation module for evaluating the water pressure is as follows:
under the condition that the water supply pressure of a water supply company is normal, acquiring the water flow speed of each position point in the water discharging process;
Calculating average value of water flow velocity at each position pointAnd average the water flow velocity +.>And the corresponding standard [ ]>,/>]And (3) performing comparison:
if it is∈[/>,/>]The normal water pressure is indicated;
if it is∈(-∞,/>) The existing water pressure is too low;
if it is∈(/>) The existing water pressure is too high;
calculating standard deviation of water flow velocity of each position pointAnd water flow rate standard deviation->And corresponding standard->Absolute value of difference and preset threshold->And->And (3) performing comparison:
if it is≥/>Or->The water pressure is mostly unsatisfactory, and the installation quality of the water pipe is poor;
if it is∈(/>,/>) The water pressure and the water pressure meet the requirements, and the water pipe installation quality is good.
According to the technical scheme, the average value of the water flow speeds of all the position points is calculated by acquiring the water flow speeds of all the position points, the average value of the water flow speeds is compared with the corresponding standard, whether the water pressure is normal is judged, the standard deviation of the water flow speeds of all the position points is calculated, the absolute value of the standard deviation of the water flow speeds, the absolute value of the corresponding standard deviation and the preset threshold value are calculated, whether the positions where the water pressure is not required are too many is judged, and therefore the installation quality of the water pipe is judged.
As a further description of the solution of the present invention, the decoration design module further includes a decoration period management unit:
obtaining the number N of people of different kinds in a given decoration team 1 、N 2 …N n Substituting the time of completion of each work species into a period prediction model to obtain time t1 and t2 … tn respectively, and calculating to obtain total time t of the predicted completion A total;
let t Total (S) Comparing with the agreed time T, if T Total (S) If the time is less than T, the work can be completed within the period, if T Total (S) If the time limit is greater than T, the work can be completed within the time limit;
the number of people is increased for each work, and the number of people to be increased for N work is N n -1。
As a further description of the inventive arrangements, the periodic predictive model is a trained neural network model.
According to the technical scheme, the invention calculates the total time of the expected completion according to the time of completion of each work species, compares the total time of the expected completion with the appointed time, judges whether the work can be completed within the time limit, and if not, the number of people to be increased by the nth work species is N n -1。
The invention has the beneficial effects that:
1. according to the management system provided by the invention, a decoration scheme is finished through the decoration design module before decoration, the number of people of each work class is selected according to the number of days of the decoration scheme and the number of days required by actual decoration, the material selection module is used for checking and accepting materials used for decoration in the decoration process, and after the decoration is finished, the decoration apparent mass and the water pressure mass are checked and accepted through the decoration data acquisition module and the decoration quality evaluation module.
2. The invention detects the three-dimensional model, density and surface reflectivity of the material through the digital model, thereby judging whether the appearance, the type and the surface treatment of the material meet the requirements, if the quality meets the standards, acquiring a quantity list required by each material in the decoration design scheme, and judging whether the quantity of the decoration materials purchased by a constructor meets the requirements.
3. According to the invention, apparent quality judgment index data is obtained, a decoration apparent quality evaluation index coefficient is obtained through the index data, the decoration apparent quality evaluation index coefficient is converted into an evaluation value through a formula, and the evaluation value is compared with a preset value to judge whether the decoration apparent quality is good or bad.
4. According to the invention, the average value of the water flow speeds of all the position points is calculated by acquiring the water flow speeds of all the position points, the average value of the water flow speeds is compared with the corresponding standard to judge whether the water pressure is normal, the standard deviation of the water flow speeds of all the position points is calculated, the absolute value of the standard deviation of the water flow speeds and the corresponding standard deviation is compared with the preset threshold, and whether the positions where the water pressure is not required are excessive is judged, so that the water pipe installation quality is judged.
5. The invention calculates the total time of the expected completion by the time of each work category, compares the total time of the expected completion with the appointed time, judges whether the work can be completed within the time limit, if not, the number of people needed to be increased by the nth work category is N n -1。
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1, the present invention is an intelligent management system for indoor decoration design construction, which is characterized by comprising: and (3) a decoration design module: the method is used for selecting a decoration scheme;
the material selection module is used for checking and accepting materials in the decoration process;
the decoration data acquisition module:
the device comprises an apparent mass acquisition unit, a measuring unit and a control unit, wherein the apparent mass acquisition unit is used for verticality, flatness, joint width and joint height difference;
the waterway acquisition unit is used for detecting whether the water pressure of the kitchen and the toilet meets the requirement;
and the decoration quality evaluation module is used for finishing the evaluation of the decoration quality according to the decoration data acquired in the decoration data acquisition module.
According to the technical scheme, the management system provided by the invention completes a decoration scheme through the decoration design module before decoration, and selects the number of people of each work class according to the number of days of the decoration scheme and the number of days required by actual decoration, the material selection module is used for checking and accepting materials used for decoration in the decoration process, and the decoration data acquisition module and the decoration quality evaluation module are used for checking and accepting apparent decoration quality and hydraulic pressure quality after decoration is completed.
The decoration design module comprises a data uploading unit and is used for uploading house type diagrams, decoration budget and decoration period to a user;
and the decoration style matching unit is used for outputting a decoration scheme meeting the requirements of the householder according to the decoration data uploaded by the householder as input quantity for the trained neural network model, and the householder selects a target decoration scheme according to own preference.
The material selection module comprises a material information acquisition unit and a material information confirmation unit;
the material information acquisition unit is used for acquiring material information in a decoration scheme and decoration material information purchased by a constructor;
the material information confirming unit is used for judging whether the decoration material information purchased by the constructor accords with the material information in the decoration scheme.
The material information confirmation unit comprises the following specific working processes:
specific information of each material in the decoration design scheme is obtained, a digital model is established, the digital model comprises a three-dimensional model, density and surface reflectivity of the material, and the appearance, the type and the surface treatment of the material are respectively judged;
acquiring a three-dimensional model, density and surface reflectivity of a finishing material purchased by a constructor, and inputting the parameters into a digital model;
judging whether the quality of the decoration materials purchased by a constructor meets the standard, and if the quality meets the standard, acquiring a quantity list required by each material in a decoration design scheme;
and acquiring a quantity list of finishing materials purchased by the constructor, and judging whether the quantity of the finishing materials purchased by the constructor meets the requirement.
Through the technical scheme, the three-dimensional model, the density and the surface reflectivity of the material are detected through the digital model, so that whether the appearance, the type and the surface treatment of the material meet the requirements or not is judged, if the quality meets the standards, a quantity list required by each material in the decoration design scheme is obtained, and whether the quantity of the decoration materials purchased by a constructor meets the requirements or not is judged.
The specific working process of the decoration quality evaluation module for evaluating the apparent quality of decoration is as follows:
obtaining apparent mass judgment index data: verticality a1, a2 … an; surface flatness b1, b2 … bn; seam widths c1, c2 … cn; seam height differences d1, d2 … dn;
respectively calculating the average value of each quality index:
;
;
;
;
substituting the average value of each quality index into the following formula:
;
wherein F is a decoration apparent quality evaluation index coefficient,the apparent mass judgment index data are respectively +.>Compensation coefficient of->Is the compensation coefficient of F by +.>So that F is E [0, 5]];
If F is E (4, 5), the apparent quality of the decoration is very good;
if F is E (3, 4), the apparent quality of decoration is better;
if F is E (2, 3), the apparent quality and the grade of decoration are indicated;
if F is E (1, 2), the apparent quality of decoration is poor;
if F is E (0, 1), the apparent quality of the decoration is very poor.
According to the technical scheme, the apparent mass judgment index data is obtained, the decoration apparent mass evaluation index coefficient is obtained through the index data, the decoration apparent mass evaluation index coefficient is converted into an evaluation value through a formula, and the evaluation value is compared with a preset value to judge whether the decoration apparent mass is good or bad.
The concrete working process of the decoration quality evaluation module for evaluating the water pressure is as follows:
under the condition that the water supply pressure of a water supply company is normal, acquiring the water flow speed of each position point in the water discharging process;
Calculating average value of water flow velocity at each position pointAnd average the water flow velocity +.>And the corresponding standard [ ]>,/>]And (3) performing comparison:
if it is∈[/>,/>]The normal water pressure is indicated;
if it is∈(-∞,/>) The existing water pressure is too low;
if it is∈(/>) The existing water pressure is too high;
calculating standard deviation of water flow velocity of each position pointAnd water flow rate standard deviation->And corresponding standard->Absolute value of difference and preset threshold->And->And (3) performing comparison:
if it is≥/>Or->The water pressure is mostly unsatisfactory, and the installation quality of the water pipe is poor;
if it is∈(/>,/>) The water pressure and the water pressure meet the requirements, and the water pipe installation quality is good.
According to the technical scheme, the average value of the water flow speeds of all the position points is calculated by acquiring the water flow speeds of all the position points, the average value of the water flow speeds is compared with the corresponding standard, whether the water pressure is normal is judged, the standard deviation of the water flow speeds of all the position points is calculated, the absolute value of the standard deviation of the water flow speeds, the absolute value of the corresponding standard deviation and the preset threshold value are calculated, whether the positions where the water pressure is not required are too many is judged, and therefore the installation quality of the water pipe is judged.
The decoration design module further comprises a decoration period management unit:
obtaining the number N of people of different kinds in a given decoration team 1 、N 2 …N n Substituting the time of completion of each work species into a period prediction model to obtain time t1 and t2 … tn respectively, and calculating to obtain total time t of the predicted completion A total;
let t Total (S) Comparing with the agreed time T, if T Total (S) If the time is less than T, the work can be completed within the period, if T Total (S) If the time limit is greater than T, the work can be completed within the time limit;
the number of people is increased for each work, and the number of people to be increased for N work is N n -1。
The periodic predictive model is a trained neural network model.
According to the technical scheme, the invention calculates the total time of the expected completion according to the time of completion of each work species, compares the total time of the expected completion with the appointed time, judges whether the work can be completed within the time limit, and if not, the number of people to be increased by the nth work species is N n -1。
The foregoing describes one embodiment of the present invention in detail, but the description is only a preferred embodiment of the present invention and should not be construed as limiting the scope of the invention. All equivalent changes and modifications within the scope of the present invention are intended to be covered by the present invention.