CN116427676A - Building interior wall decoration construction device and construction method - Google Patents
Building interior wall decoration construction device and construction method Download PDFInfo
- Publication number
- CN116427676A CN116427676A CN202310401319.4A CN202310401319A CN116427676A CN 116427676 A CN116427676 A CN 116427676A CN 202310401319 A CN202310401319 A CN 202310401319A CN 116427676 A CN116427676 A CN 116427676A
- Authority
- CN
- China
- Prior art keywords
- rod
- rotating
- plate
- construction
- drives
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/18—Scaffolds primarily resting on the ground adjustable in height
- E04G1/22—Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/02—Scaffold feet, e.g. with arrangements for adjustment
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
- E04G5/061—Consoles; Brackets specially adapted for attachment to scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/242—Scaffolds movable on wheels or tracks
- E04G2001/244—Scaffolds movable on wheels or tracks mechanically operated
- E04G2001/246—Scaffolds movable on wheels or tracks mechanically operated human powered
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Toys (AREA)
Abstract
本发明公开了一种建筑内墙面装修装饰施工装置及施工方法,其中,一种建筑内墙面装修装饰施工装置,包括配重底座,所述配重底座的顶部安装有平行设置的两个滑轨,两个滑轨上滑动安装有移动底板,所述移动底板的上方设置有施工平台,所述施工平台与移动底板之间设置有两组升降机构,升降机构包括两个交叉转动连接的转动杆,两个转动杆的一端均安装有滑轮,且两个滑轮分别滑动安装在移动底板的顶部和施工平台的底部,两个移动杆的另一端分别转动安装有安装块和固定安装有转动齿轮,且安装块固定安装在施工平台底部靠近中心位置。本发明结构简单,操作方便,能够满足操作者独立操作装置的升降、移动和区域调节,安全稳定,便于不同环境的操作使用。
The invention discloses a building interior wall decoration construction device and a construction method, wherein the building interior wall decoration construction device includes a counterweight base, and two Slide rails, two slide rails are slidably installed with a mobile bottom plate, a construction platform is arranged above the mobile bottom plate, and two sets of lifting mechanisms are arranged between the construction platform and the mobile bottom plate, and the lifting mechanism includes two cross-rotation connected Turning rods, pulleys are installed at one end of the two rotating rods, and the two pulleys are respectively slidably installed on the top of the mobile floor and the bottom of the construction platform, and the other ends of the two moving rods are respectively installed with a mounting block and a fixed mounting block. gear, and the installation block is fixedly installed at the bottom of the construction platform near the center. The invention has simple structure and convenient operation, can satisfy the lifting, moving and area adjustment of the operator's independent operation device, is safe and stable, and is convenient for operation and use in different environments.
Description
技术领域technical field
本发明涉及建筑施工技术领域,尤其涉及一种建筑内墙面装修装饰施工装置及施工方法。The invention relates to the technical field of building construction, in particular to a building interior wall decoration construction device and construction method.
背景技术Background technique
建筑施工完成后,为对墙面起到保护作用,同时增加墙面的美观性,需要对墙面进行装修,常用的装修方式有刷涂料、贴墙纸、铺板材等。其中,刷涂料是最为传统且常用的一种装修方式,需要经过抹腻子、打磨、乳胶漆涂刷等步骤,其中抹腻子、打磨等工序都需要人工进行操作。After the building construction is completed, in order to protect the wall surface and increase the aesthetics of the wall surface, it is necessary to decorate the wall surface. The commonly used decoration methods include painting, wallpapering, and laying boards. Among them, brushing paint is the most traditional and commonly used decoration method. It needs to go through steps such as putting on putty, polishing, and latex paint brushing.
目前人工操作时,内墙面高处位置需借用到脚手架、梯子等辅助增高器械,传统的增高施工装置具有如下问题:At present, during manual operation, auxiliary height-increasing devices such as scaffolding and ladders need to be borrowed for the high position of the inner wall. The traditional height-increasing construction devices have the following problems:
1、传统的增高施工装置装配较为复杂,需现场组装,费时费力,施工结束后还需拆卸运走;1. The assembly of the traditional height-increasing construction device is relatively complicated, and it needs to be assembled on site, which is time-consuming and laborious. After the construction is completed, it needs to be disassembled and transported away;
2、传统装置结构不稳定,如脚手架、梯子底部无承重部分,施工人员施工时,大幅度操作时容易晃动等情况,施工安全不到位;2. The structure of the traditional device is unstable, such as the scaffolding and the bottom of the ladder without load-bearing parts, and the construction personnel are easy to shake during large-scale operations during construction, and the construction safety is not in place;
3、传统的装置,在施工人员在操作时,只能进行相应区域的位置进行施工,需要施工人员来回上下架子进行移动位置,或者需要工友辅助进行移动,费时费力,且施工人员工作时辅助移动也不安全;3. With the traditional device, when the construction personnel are operating, they can only carry out the construction in the position of the corresponding area, and the construction personnel need to go back and forth to move up and down the shelf, or need the assistance of the workers to move, which is time-consuming and laborious, and the construction personnel assist in the movement when working not safe;
因此,本技术方案通过设计一种建筑内墙面装修装饰施工装置及施工方法用于解决上述问题。Therefore, this technical solution is used to solve the above-mentioned problems by designing a construction device and construction method for interior wall decoration of a building.
发明内容Contents of the invention
基于背景技术存在的技术问题,本发明提出了一种建筑内墙面装修装饰施工装置及施工方法。Based on the technical problems existing in the background technology, the present invention proposes a construction device and construction method for interior wall decoration of a building.
本发明提出的一种建筑内墙面装修装饰施工装置,包括配重底座,所述配重底座的顶部安装有平行设置的两个滑轨,两个滑轨上滑动安装有移动底板,所述移动底板的上方设置有施工平台,所述施工平台与移动底板之间设置有两组升降机构,升降机构包括两个交叉转动连接的转动杆,两个转动杆的一端均安装有滑轮,且两个滑轮分别滑动安装在移动底板的顶部和施工平台的底部,两个移动杆的另一端分别转动安装有安装块和固定安装有转动齿轮,且安装块固定安装在施工平台底部靠近中心位置,所述移动底板的顶部中心位置安装有两个支架板,转动齿轮通过转动轴转动安装在支架板上,两组升降机构上设置有升降调节机构,所述施工平台的顶部设置有脚踏机构,且脚踏机构与升降调节机构相连接,所述配重底座的底部四角位置均设置有行走机构,且行走机构上设置有方向调节机构。The present invention proposes a construction device for building interior wall decoration, comprising a counterweight base, two slide rails arranged in parallel are installed on the top of the counterweight base, and a movable bottom plate is slidably installed on the two slide rails. A construction platform is arranged above the mobile base plate, and two sets of lifting mechanisms are arranged between the construction platform and the mobile base plate. The two pulleys are respectively slidably installed on the top of the mobile floor and the bottom of the construction platform, and the other ends of the two moving rods are respectively installed with a mounting block and a rotating gear fixedly, and the mounting block is fixedly installed at the bottom of the construction platform near the center. Two support plates are installed at the center of the top of the mobile bottom plate, and the rotating gear is installed on the support plate through the rotation of the rotating shaft. The two sets of lifting mechanisms are provided with a lifting adjustment mechanism, and the top of the construction platform is provided with a pedal mechanism, and The pedal mechanism is connected with the lifting adjustment mechanism, and the four corners of the bottom of the counterweight base are all provided with a running mechanism, and the running mechanism is provided with a direction adjusting mechanism.
优选的,所述升降调节机构包括位于两组升降机构之间的活动板,活动板竖直设置,且活动板的底部固定安装有下齿条板,活动板的顶部固定安装有上齿条板,且下齿条板和上齿条板分别位于两个转动齿轮的底部和顶部,并相互啮合,所述活动板上固定安装有螺纹套,螺纹套上螺纹套接有螺纹杆,且螺纹杆的一端固定安装有连杆,所述连杆远离螺纹杆的一端固定安装有竖直设置的第一衔接盘,第一衔接盘的上方设有水平设置的第二衔接盘,且第一衔接盘与第二衔接盘的四周通过L型衔接杆活动连接。Preferably, the lifting adjustment mechanism includes a movable plate located between two groups of lifting mechanisms, the movable plate is vertically arranged, and the bottom of the movable plate is fixedly installed with a lower rack plate, and the top of the movable plate is fixedly installed with an upper rack plate , and the lower rack plate and the upper rack plate are respectively located at the bottom and top of the two rotating gears, and mesh with each other. The movable plate is fixed with a threaded sleeve, and the threaded sleeve is connected with a threaded rod, and the threaded rod One end of the connecting rod is fixedly installed with a connecting rod, and the end of the connecting rod away from the threaded rod is fixedly installed with a vertically arranged first connecting plate, and a horizontally arranged second connecting plate is arranged above the first connecting plate, and the first connecting plate It is flexibly connected with the surroundings of the second connecting plate through an L-shaped connecting rod.
优选的,所述第一衔接盘与第二衔接盘的四周均环形开设有活动孔,L型衔接杆的两端分别贯穿第一衔接盘和第二衔接盘上的活动孔,并固定安装有挡块。Preferably, movable holes are ring-shaped around the first connecting disk and the second connecting disk, and the two ends of the L-shaped connecting rod respectively pass through the movable holes on the first connecting disk and the second connecting disk, and are fixedly installed with Stoppers.
优选的,所述连杆上转动套接有支撑架,且支撑架安装在移动底板上,所述下齿条板的底部固定安装有滑条,移动底板的顶部开设有滑槽,滑条滑动安装在滑槽内。Preferably, a support frame is rotatably socketed on the connecting rod, and the support frame is installed on the moving bottom plate, a sliding bar is fixedly installed on the bottom of the lower rack plate, and a chute is opened on the top of the moving bottom plate, and the sliding bar slides Installed in the chute.
优选的,所述脚踏机构包括开设在施工平台上的转动孔,转动孔内转动安装有伸缩转杆,伸缩转杆的底部与第二衔接盘相连接,伸缩转杆的顶部延伸至施工平台的上方,且固定安装有圆台,圆台的一侧固定安装有连接推块,连接推块上转动连接有连接夹,连接夹上连接有推动杆,推动杆远离连接夹的一端连接有转块,且转块转动连接有顶块,所述顶块的底部连接有摆动杆,摆动杆的底部固定连接有转动轴承,所述转动轴承上转动套接有转动套架,且转动套架安装在施工平台上,所述转动轴承远离摆动杆的一端固定安装有圆柱块,圆柱块的一侧连接有踩踏臂,且踩踏臂的一端固定安装有脚踏板,所述转动轴承上套接有扭簧,扭簧的一端固定安装在转动套架上,扭簧的另一端固定安装在转动轴承上,所述伸缩转杆包括第一转杆和滑动安装在第一转杆内的第二转杆,第二转杆的两侧均固定安装有竖直滑块,第一转杆的两侧内壁上均开设有竖直槽,竖直滑块滑动安装在竖直槽内。Preferably, the pedal mechanism includes a rotating hole opened on the construction platform, and a telescopic rotating rod is installed in rotation in the rotating hole, the bottom of the telescopic rotating rod is connected with the second connecting plate, and the top of the telescopic rotating rod extends to the construction platform and a round table is fixedly installed on one side of the round table, a connecting push block is fixedly installed on one side of the round table, a connecting clip is connected to the connecting push block, a push rod is connected to the connecting clip, and a turning block is connected to the end of the pushing rod away from the connecting clip. And the turning block is rotatably connected with a top block, the bottom of the top block is connected with a swing rod, and the bottom of the swing rod is fixedly connected with a rotating bearing, and the rotating sleeve is rotatably connected to the rotating sleeve, and the rotating sleeve is installed in the construction On the platform, a cylindrical block is fixedly installed on the end of the rotating bearing away from the swing rod, a stepping arm is connected to one side of the cylindrical block, and a pedal is fixedly installed on one end of the stepping arm, and a torsion spring is sleeved on the rotating bearing One end of the torsion spring is fixedly installed on the rotating sleeve, and the other end of the torsion spring is fixedly installed on the rotating bearing. The telescopic rotating rod includes a first rotating rod and a second rotating rod slidingly installed in the first rotating rod, Vertical sliders are fixedly installed on both sides of the second rotating rod, and vertical grooves are provided on the inner walls of both sides of the first rotating rod, and the vertical sliders are slidably installed in the vertical grooves.
优选的,所述转动孔的一侧开设有伸缩槽,伸缩槽内沿水平方向滑动安装有定位杆,定位杆的一端为半圆形结构,伸缩转杆的四周环形均匀开设有多个三角形卡槽,且定位杆与三角形卡槽相适配,所述伸缩槽的顶部开设有通孔,通孔内滑动安装有竖杆,且竖杆的顶部延伸至施工平台的上方,且固定安装有踏板,竖杆上套接有第一弹簧,且第一弹簧的一端你给的安装在踏板上,另一端固定在施工平台上,定位杆的顶部开设有三角槽,且三角槽与竖杆的底部相适配,所述伸缩槽内壁上固定安装有第二弹簧,且第二弹簧与定位杆相连接。Preferably, one side of the rotating hole is provided with a telescopic slot, and a positioning rod is slidably installed in the telescopic slot along the horizontal direction. One end of the positioning rod is a semicircular structure, and a plurality of triangular clips are uniformly provided around the telescopic rotating rod. slot, and the positioning rod is adapted to the triangular card slot, the top of the telescopic slot is provided with a through hole, and a vertical bar is slidably installed in the through hole, and the top of the vertical bar extends to the top of the construction platform, and a pedal is fixedly installed , the first spring is sleeved on the vertical rod, and one end of the first spring is installed on the pedal, and the other end is fixed on the construction platform, and the top of the positioning rod is provided with a triangular groove, and the triangular groove and the bottom of the vertical rod Matchingly, a second spring is fixedly installed on the inner wall of the telescopic groove, and the second spring is connected with the positioning rod.
优选的,所述行走机构包括固定安装在配重底座的两个竖架,两个竖架之间固定安装有同一个圆环,圆环的顶部设置有限位圆板,且限位圆板的底部固定安装有两个车轮架,且两个车轮架延伸至圆环的下方,两个车轮架之间安装有同一个车轮轴,且车轮轴上转动套接有车轮,两个车轮架上固定套接有同一个圆环齿轮,位于同一侧的两个圆弧齿轮一侧设置有同一个异形杆,且异形杆的两端分别设置有啮齿,异形杆两端的啮齿分别与两个圆弧齿轮相啮合,所述异形杆的一侧固定连接有操作杆,操作杆为伸缩杆,且操作杆的顶部垂直固定连接有手柄杆,施工平台的顶部安装有调节轨道,且手柄杆滑动安装在施工平台的顶部调节轨道上。Preferably, the walking mechanism includes two vertical frames fixedly installed on the counterweight base, the same circular ring is fixedly installed between the two vertical frames, and a limiting circular plate is arranged on the top of the circular ring, and the limiting circular plate There are two wheel frames fixedly installed at the bottom, and the two wheel frames extend to the bottom of the ring, the same wheel shaft is installed between the two wheel frames, and the wheels are rotatably sleeved on the wheel shafts, and the two wheel frames are fixed on the two wheel frames. The same ring gear is sleeved, and the two arc gears on the same side are provided with the same special-shaped rod on one side, and the two ends of the special-shaped rod are respectively provided with teeth, and the teeth at both ends of the special-shaped rod are respectively connected to the two circular-arc gears. One side of the special-shaped rod is fixedly connected with an operating rod, the operating rod is a telescopic rod, and the top of the operating rod is vertically fixedly connected with a handle rod, and the top of the construction platform is equipped with an adjustment track, and the handle rod is slidably installed on the construction platform. The top of the platform is adjusted on the track.
优选的,所述移动底板的一侧转动安装有转动盘,转动盘的偏心位置转动连接有连接杆,连接杆远离转动盘的一端转动连接有转动座,且转动座安装在配重底座上,所述转动盘的中心位置转动安装有转动连杆,且转动连杆为伸缩杆,转动连杆的顶部延伸至施工平台的上方,且固定安装有调节盘,所述转动连杆上转动套接有套管,且套管安装在施工平台的底部。Preferably, one side of the moving bottom plate is rotatably installed with a rotating disk, the eccentric position of the rotating disk is rotatably connected to a connecting rod, and the end of the connecting rod away from the rotating disk is rotatably connected to a rotating seat, and the rotating seat is installed on the counterweight base, The center position of the rotating disk is rotated with a rotating connecting rod, and the rotating connecting rod is a telescopic rod. The top of the rotating connecting rod extends to the top of the construction platform, and an adjusting disk is fixedly installed. There is a casing, and the casing is installed at the bottom of the construction platform.
优选的,所述移动底板的底部安装有两个滑块,且两个滑块分别滑动套接在两个滑轨上,所述滑块的底部开设有卡槽,卡槽的两侧内壁上固定安装有卡块,所述滑轨的两侧均开设有滑动槽,两个卡块滑动安装在两个滑动槽内。Preferably, two sliders are installed on the bottom of the mobile bottom plate, and the two sliders are respectively slidably socketed on the two slide rails, and the bottom of the sliders is provided with a card slot, and the inner walls on both sides of the card slot Blocks are fixedly installed, sliding grooves are provided on both sides of the slide rail, and two blocking blocks are slidably installed in the two sliding grooves.
一种建筑内墙面装修装饰施工装置的施工方法,包括如下步骤:A construction method of a building interior wall decoration construction device, comprising the following steps:
S1使用时,配重底座入场,将配置底座放在所需位置,施工人员站在施工平台上,然后,通过脚踩脚踏板,脚踏板带动踩踏臂基于圆柱块转动,圆柱块带动转动轴承转动,转动轴承带动摆动杆基于转动轴承转动,摆动杆通过顶块和转块带动推动杆移动,推动杆通过连接夹和连接推块推动圆台进行转动,圆台带动伸缩转杆进行转动;When S1 is in use, the counterweight base enters the site, and the configuration base is placed on the required position. The construction personnel stand on the construction platform, and then, by stepping on the pedal, the pedal drives the pedal arm to rotate based on the cylindrical block, and the cylindrical block drives The rotating bearing rotates, the rotating bearing drives the swing rod to rotate based on the rotating bearing, the swing rod drives the push rod to move through the top block and the turning block, the push rod pushes the round table to rotate through the connecting clip and the connecting push block, and the round table drives the telescopic rotating rod to rotate;
S2伸缩转杆转动的同时,带动第二衔接盘转动,第二衔接盘通过L型衔接杆带动第一衔接盘进行转动,第一衔接盘带动连杆进行转动,连杆带动螺纹杆转动,螺纹杆在螺纹套内转动,螺纹杆水平位置不变,则带动螺纹套水平方向移动,即带动活动板移动,活动板带动下齿条板和上齿条板移动,从而使得两个转动齿轮转动,同步带动两个升降机构进行上升,调整到施工平台所需高度;While the S2 telescopic rotating rod rotates, it drives the second connecting plate to rotate, the second connecting plate drives the first connecting plate to rotate through the L-shaped connecting rod, the first connecting plate drives the connecting rod to rotate, the connecting rod drives the threaded rod to rotate, and the thread The rod rotates in the threaded sleeve, and the horizontal position of the threaded rod remains unchanged, which drives the threaded sleeve to move horizontally, that is, drives the movable plate to move, and the movable plate drives the lower rack plate and the upper rack plate to move, so that the two rotating gears rotate. Synchronously drive the two lifting mechanisms to rise and adjust to the required height of the construction platform;
S3施工过程中,通过转动施工平台上的调节盘,能够带动转动连杆转动,转动连杆带动转动盘进行转动,从而使得连接杆基于转动座进行转动,达到调节施工平台水平位置的目的;During the construction of S3, by turning the adjusting disc on the construction platform, the rotating connecting rod can be driven to rotate, and the rotating connecting rod can drive the rotating disc to rotate, so that the connecting rod can rotate based on the rotating seat, so as to achieve the purpose of adjusting the horizontal position of the construction platform;
S4区域位置施工结束后,通过调节手柄杆在调节轨道上的位置,使得手柄杆带动异形杆进行移动,异形杆通过啮齿带动圆弧齿轮进行转动,圆弧齿轮通过车轮架带动车轮进行角度方向调节,调整配置底座同一侧的车轮方向,通过施工人员借助建筑内墙面进行推进移动,从而达到调节施工区域位置的目的;After the construction in the S4 area, adjust the position of the handle rod on the adjustment track so that the handle rod drives the special-shaped rod to move, and the special-shaped rod drives the arc gear to rotate through the teeth, and the arc gear drives the wheel through the wheel frame to adjust the angle direction , adjust the direction of the wheels on the same side of the configuration base, and use the construction personnel to advance and move with the help of the inner wall of the building, so as to achieve the purpose of adjusting the position of the construction area;
S5施工结束后,可通过脚踩踏板,使得踏板带动竖杆挤压三角槽,使得定位杆移出三角形卡槽,伸缩转杆无限位后进行自转,带动第二衔接盘反向转动,第二衔接盘通过L型衔接杆带动第一衔接盘进行反向转动,第一衔接盘带动连杆进行反向转动,连杆带动螺纹杆反向转动,螺纹杆在螺纹套内反向转动,螺纹杆水平位置不变,则带动螺纹套水平方向移动,即带动活动板移动,活动板带动下齿条板和上齿条板反向移动,从而使得两个转动齿轮反向转动,同步带动两个升降机构进行下降,方便施工人员落地。After the construction of S5 is completed, the pedal can be stepped on, so that the pedal drives the vertical rod to squeeze the triangular groove, so that the positioning rod moves out of the triangular slot, and the telescopic rotating rod rotates without limit, driving the second connecting plate to rotate in reverse, and the second connecting plate The disk drives the first connecting disk to rotate reversely through the L-shaped connecting rod, the first connecting disk drives the connecting rod to rotate reversely, the connecting rod drives the threaded rod to rotate reversely, the threaded rod rotates reversely in the threaded sleeve, and the threaded rod is horizontal If the position remains unchanged, it will drive the threaded sleeve to move horizontally, that is, drive the movable plate to move, and the movable plate will drive the lower rack plate and the upper rack plate to move in the opposite direction, so that the two rotating gears will rotate in the opposite direction and drive the two lifting mechanisms synchronously Descend to facilitate the construction workers to land.
本发明中,所述一种建筑内墙面装修装饰施工装置及施工方法具有如下优点:In the present invention, the construction device and construction method for interior wall decoration of a building have the following advantages:
1、通过配重底座、移动底板和施工平台一体化设计,使得装置无需现场组装,移动方便,通过设置不同大小的配置底座即可满足不同环境下的操作使用;1. Through the integrated design of the counterweight base, mobile floor and construction platform, the device does not require on-site assembly and is easy to move. By setting different sizes of configuration bases, it can meet the operation and use in different environments;
2、通过设置有配置底座,能够增加装置的稳定性,同时,施工平台是基于配置底座进行移动操作,因此,施工平台结构稳定安全;2. By setting the configuration base, the stability of the device can be increased. At the same time, the construction platform is moved based on the configuration base, so the structure of the construction platform is stable and safe;
3、通过设置有升降机构、升降调节机构、脚踏机构、行走机构和方向调节机构,使得装置能够达到操作者独立操作装置的升降、移动和区域调节的目的。3. By setting up a lifting mechanism, a lifting adjustment mechanism, a pedal mechanism, a walking mechanism and a direction adjustment mechanism, the device can achieve the purpose of the operator's independent operation of the device's lifting, moving and area adjustment.
本发明结构简单,操作方便,能够满足操作者独立操作装置的升降、移动和区域调节,安全稳定,便于不同环境的操作使用。The invention has simple structure and convenient operation, can satisfy the lifting, moving and area adjustment of the operator's independent operation device, is safe and stable, and is convenient for operation and use in different environments.
附图说明Description of drawings
图1为本发明提出的一种建筑内墙面装修装饰施工装置的俯视结构示意图;Fig. 1 is the top view structure schematic diagram of a kind of building interior wall decoration decoration construction device that the present invention proposes;
图2为本发明提出的一种建筑内墙面装修装饰施工装置的正视结构示意图;Fig. 2 is the front view structure schematic diagram of a kind of building interior wall decoration decoration construction device proposed by the present invention;
图3为本发明提出的一种建筑内墙面装修装饰施工装置的A部分结构示意图;Fig. 3 is a structural schematic diagram of part A of a building interior wall decoration construction device proposed by the present invention;
图4为本发明提出的一种建筑内墙面装修装饰施工装置的B部分结构示意图;Fig. 4 is a schematic diagram of the structure of part B of a building interior wall decoration construction device proposed by the present invention;
图5为本发明提出的一种建筑内墙面装修装饰施工装置的C部分结构示意图;Fig. 5 is a structural schematic diagram of part C of a building interior wall decoration construction device proposed by the present invention;
图6为本发明提出的一种建筑内墙面装修装饰施工装置的C1部分结构示意图;Fig. 6 is a structural schematic diagram of part C1 of a building interior wall decoration construction device proposed by the present invention;
图7为本发明提出的一种建筑内墙面装修装饰施工装置的D部分结构示意图;Fig. 7 is a schematic diagram of the structure of part D of a building interior wall decoration construction device proposed by the present invention;
图8为本发明提出的一种建筑内墙面装修装饰施工装置的定位杆与三角形卡槽连接结构示意图;Fig. 8 is a schematic diagram of the connection structure between the positioning rod and the triangular card slot of a building interior wall decoration construction device proposed by the present invention;
图9为本发明提出的一种建筑内墙面装修装饰施工装置的异形杆结构示意图;Fig. 9 is a structural schematic diagram of a special-shaped rod of a building interior wall decoration construction device proposed by the present invention;
图10为本发明提出的一种建筑内墙面装修装饰施工装置的脚踏机构结构示意图;Fig. 10 is a structural schematic diagram of a pedal mechanism of a building interior wall decoration construction device proposed by the present invention;
图11为本发明提出的一种建筑内墙面装修装饰施工装置的滑轨和滑块连接结构示意图;Fig. 11 is a schematic diagram of the connection structure of a slide rail and a slide block of a building interior wall decoration construction device proposed by the present invention;
图12为本发明提出的一种建筑内墙面装修装饰施工装置的施工平台水平位置调节结构示意图;Fig. 12 is a structural schematic diagram of the horizontal position adjustment of the construction platform of a building interior wall decoration construction device proposed by the present invention;
图13为本发明提出的一种建筑内墙面装修装饰施工装置的伸缩转杆结构示意图。Fig. 13 is a structural schematic diagram of a telescopic rotating rod of a building interior wall decoration construction device proposed by the present invention.
图中:1配重底座、2滑轨、3滑块、4移动底板、5施工平台、6转动盘、7连接杆、8转动座、9转动杆、10安装块、11滑轮、12异形杆、13啮齿、14手柄杆、15调节轨道、16操作杆、17支架板、18转动轴、19转动齿轮、20活动板、21下齿条板、22上齿条板、23螺纹套、24螺纹杆、25连杆、26滑条、27支撑架、28第一衔接盘、29第二衔接盘、30L型衔接杆、31伸缩转杆、32转动孔、33圆台、34连接推块、35连接夹、36推动杆、37转块、38顶块、39摆动杆、40转动轴承、41转动套架、42圆柱块、43三角形卡槽、44伸缩槽、45定位杆、46第二弹簧、47三角槽、48通孔、49竖杆、50踏板、51第一弹簧、52竖架、53圆环、54限位圆板、55车轮架、56车轮、57车轮轴、58圆弧齿轮、59卡块、60滑动槽、61扭簧、62踩踏臂、63脚踏板、64转动连杆、65调节盘、66套管、311第一转杆、312第二转杆、313竖直滑块。In the figure: 1 counterweight base, 2 slide rails, 3 sliders, 4 mobile bottom plate, 5 construction platform, 6 rotating disc, 7 connecting rod, 8 rotating seat, 9 rotating rod, 10 installation block, 11 pulley, 12 special-shaped rod , 13 teeth, 14 handle rod, 15 adjustment track, 16 operating rod, 17 bracket plate, 18 rotating shaft, 19 rotating gear, 20 movable plate, 21 lower rack plate, 22 upper rack plate, 23 thread sleeve, 24 thread Rod, 25 connecting rod, 26 sliding bar, 27 support frame, 28 first connecting plate, 29 second connecting plate, 30L type connecting rod, 31 telescopic rotating rod, 32 rotating hole, 33 round platform, 34 connecting push block, 35 connecting Clip, 36 push rod, 37 turn block, 38 top block, 39 swing rod, 40 rotation bearing, 41 rotation sleeve frame, 42 cylindrical block, 43 triangular card slot, 44 telescopic slot, 45 positioning rod, 46 second spring, 47 Triangular slot, 48 through hole, 49 vertical rod, 50 pedal, 51 first spring, 52 vertical frame, 53 ring, 54 limit circular plate, 55 wheel frame, 56 wheel, 57 wheel axle, 58 arc gear, 59 Block, 60 sliding groove, 61 torsion spring, 62 pedal arm, 63 pedal, 64 rotating connecting rod, 65 adjusting disc, 66 bushing, 311 first rotating rod, 312 second rotating rod, 313 vertical slider .
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.
参照图1-13,一种建筑内墙面装修装饰施工装置,包括配重底座1,配置底座1的大小可根据环境进行选择,同时,配置底座1的配重部分可单独设置,配置底座1可折叠收纳,配重底座1的顶部安装有平行设置的两个滑轨2,两个滑轨2上滑动安装有移动底板4,移动底板4的底部安装有两个滑块3,且两个滑块3分别滑动套接在两个滑轨2上,滑块3的底部开设有卡槽,卡槽的两侧内壁上固定安装有卡块59,滑轨2的两侧均开设有滑动槽60,两个卡块59滑动安装在两个滑动槽60内,通过在滑轨2两端设置堵头,便于滑块3的安全移动,拆卸时,可通过去掉堵头,将移动底板4移出配置底座1,其余相连部分,可通过螺栓拆卸满足移出条件,移动底板4的上方设置有施工平台5,施工平台5与移动底板4之间设置有两组升降机构,升降机构包括两个交叉转动连接的转动杆9,两个转动杆9的一端均安装有滑轮11,且两个滑轮11分别滑动安装在移动底板4的顶部和施工平台5的底部,两个移动杆9的另一端分别转动安装有安装块10和固定安装有转动齿轮19,且安装块10固定安装在施工平台5底部靠近中心位置,移动底板4的顶部中心位置安装有两个支架板17,转动齿轮19通过转动轴18转动安装在支架板17上,两组升降机构上设置有升降调节机构,施工平台5的顶部设置有脚踏机构,且脚踏机构与升降调节机构相连接,配重底座1的底部四角位置均设置有行走机构,且行走机构上设置有方向调节机构。Referring to Figure 1-13, a construction device for building interior wall decoration, including a
参照图1-4、13,升降调节机构包括位于两组升降机构之间的活动板20,活动板20竖直设置,且活动板20的底部固定安装有下齿条板21,活动板20的顶部固定安装有上齿条板22,且下齿条板21和上齿条板22分别位于两个转动齿轮19的底部和顶部,并相互啮合,活动板20上固定安装有螺纹套23,螺纹套23上螺纹套接有螺纹杆24,且螺纹杆24的一端固定安装有连杆25,连杆25远离螺纹杆24的一端固定安装有竖直设置的第一衔接盘28,第一衔接盘28的上方设有水平设置的第二衔接盘29,且第一衔接盘28与第二衔接盘29的四周通过L型衔接杆30活动连接,第一衔接盘28与第二衔接盘29的四周均环形开设有活动孔,L型衔接杆30的两端分别贯穿第一衔接盘28和第二衔接盘29上的活动孔,并固定安装有挡块,连杆25上转动套接有支撑架27,且支撑架27安装在移动底板4上,下齿条板21的底部固定安装有滑条26,移动底板4的顶部开设有滑槽,滑条26滑动安装在滑槽内,便于稳固下齿条板21的滑动,通过脚踏机构带动圆台33转动,圆台33带动伸缩转杆31转动的同时,带动第二衔接盘29转动,第二衔接盘29通过L型衔接杆30带动第一衔接盘28进行转动,第一衔接盘28带动连杆25进行转动,连杆25带动螺纹杆24转动,螺纹杆24在螺纹套23内转动,螺纹杆24水平位置不变,则带动螺纹套23水平方向移动,即带动活动板20移动,活动板20带动下齿条板21和上齿条板22移动,从而使得两个转动齿轮19转动,同步带动两个升降机构进行上升,调整到施工平台5所需高度。With reference to Fig. 1-4, 13, the lifting adjustment mechanism comprises
参照图1-2、4-6、8、10,脚踏机构包括开设在施工平台5上的转动孔32,转动孔32内转动安装有伸缩转杆31,伸缩转杆31的底部与第二衔接盘29相连接,伸缩转杆31的顶部延伸至施工平台5的上方,且固定安装有圆台33,圆台33的一侧固定安装有连接推块34,连接推块34上转动连接有连接夹35,连接夹35上连接有推动杆36,推动杆36远离连接夹35的一端连接有转块37,且转块37转动连接有顶块38,顶块38的底部连接有摆动杆39,摆动杆39的底部固定连接有转动轴承40,转动轴承40上转动套接有转动套架41,且转动套架41安装在施工平台5上,转动轴承40远离摆动杆39的一端固定安装有圆柱块42,圆柱块42的一侧连接有踩踏臂62,且踩踏臂62的一端固定安装有脚踏板63,转动轴承40上套接有扭簧61,扭簧61的一端固定安装在转动套架41上,扭簧61的另一端固定安装在转动轴承40上,伸缩转杆31包括第一转杆311和滑动安装在第一转杆311内的第二转杆312,第二转杆312的两侧均固定安装有竖直滑块313,第一转杆311的两侧内壁上均开设有竖直槽,竖直滑块313滑动安装在竖直槽内,转动孔32的一侧开设有伸缩槽44,伸缩槽44内沿水平方向滑动安装有定位杆45,定位杆45的一端为半圆形结构,伸缩转杆31的四周环形均匀开设有多个三角形卡槽43,且定位杆45与三角形卡槽43相适配,伸缩槽44的顶部开设有通孔48,通孔48内滑动安装有竖杆49,且竖杆49的顶部延伸至施工平台5的上方,且固定安装有踏板50,竖杆49上套接有第一弹簧51,且第一弹簧51的一端你给的安装在踏板50上,另一端固定在施工平台5上,定位杆45的顶部开设有三角槽47,且三角槽47与竖杆49的底部相适配,伸缩槽44内壁上固定安装有第二弹簧46,且第二弹簧46与定位杆45相连接,通过脚踩脚踏板63,脚踏板63带动踩踏臂62基于圆柱块42转动,圆柱块42带动转动轴承40转动,转动轴承40带动摆动杆39基于转动轴承40转动,摆动杆39通过顶块38和转块37带动推动杆36移动,推动杆36通过连接夹35和连接推块34推动圆台33进行转动,圆台33带动伸缩转杆31进行转动;因此,脚踏机构带动升降调节机构,使得同步带动两个升降机构进行上升,调整到施工平台5所需高度。Referring to Fig. 1-2, 4-6, 8, 10, pedal mechanism comprises the turning
参照图1-2、7、9,行走机构包括固定安装在配重底座1的两个竖架52,两个竖架52之间固定安装有同一个圆环53,圆环53的顶部设置有限位圆板54,且限位圆板54的底部固定安装有两个车轮架55,且两个车轮架55延伸至圆环53的下方,两个车轮架55之间安装有同一个车轮轴57,且车轮轴57上转动套接有车轮56,两个车轮架55上固定套接有同一个圆环齿轮58,位于同一侧的两个圆弧齿轮58一侧设置有同一个异形杆12,且异形杆12的两端分别设置有啮齿13,异形杆12两端的啮齿13分别与两个圆弧齿轮58相啮合,异形杆12的一侧固定连接有操作杆16,操作杆16为伸缩杆,且操作杆16的顶部垂直固定连接有手柄杆14,施工平台5的顶部安装有调节轨道15,且手柄杆14滑动安装在施工平台5的顶部调节轨道15上,通过调节手柄杆14在调节轨道15上的位置,使得手柄杆14带动异形杆12进行移动,异形杆12通过啮齿13带动圆弧齿轮58进行转动,圆弧齿轮58通过车轮架55带动车轮56进行角度方向调节,调整配置底座1同一侧的车轮56方向,通过施工人员借助建筑内墙面进行推进移动,从而达到调节施工区域位置的目的。Referring to Figures 1-2, 7, and 9, the traveling mechanism includes two
参照图1-2、12,本发明中,移动底板4的一侧转动安装有转动盘6,转动盘6的偏心位置转动连接有连接杆7,连接杆7远离转动盘6的一端转动连接有转动座8,且转动座8安装在配重底座1上,转动盘6的中心位置转动安装有转动连杆64,且转动连杆64为伸缩杆,转动连杆64的顶部延伸至施工平台5的上方,且固定安装有调节盘65,转动连杆64上转动套接有套管66,且套管66安装在施工平台5的底部,套管66也可为伸缩杆,用于限制转动连杆64和调节盘65位置,通过转动施工平台5上的调节盘65,能够带动转动连杆64转动,转动连杆24带动转动盘6进行转动,从而使得连接杆7基于转动座8进行转动,达到调节施工平台5水平位置的目的。Referring to Fig. 1-2, 12, in the present invention, one side of the moving
一种建筑内墙面装修装饰施工装置的施工方法,包括如下步骤:A construction method of a building interior wall decoration construction device, comprising the following steps:
S1使用时,配重底座1入场,将配置底座1放在所需位置,施工人员站在施工平台5上,然后,通过脚踩脚踏板63,脚踏板63带动踩踏臂62基于圆柱块42转动,圆柱块42带动转动轴承40转动,转动轴承40带动摆动杆39基于转动轴承40转动,摆动杆39通过顶块38和转块37带动推动杆36移动,推动杆36通过连接夹35和连接推块34推动圆台33进行转动,圆台33带动伸缩转杆31进行转动;When S1 is in use, the
S2伸缩转杆31转动的同时,带动第二衔接盘29转动,第二衔接盘29通过L型衔接杆30带动第一衔接盘28进行转动,第一衔接盘28带动连杆25进行转动,连杆25带动螺纹杆24转动,螺纹杆24在螺纹套23内转动,螺纹杆24水平位置不变,则带动螺纹套23水平方向移动,即带动活动板20移动,活动板20带动下齿条板21和上齿条板22移动,从而使得两个转动齿轮19转动,同步带动两个升降机构进行上升,调整到施工平台5所需高度;When the S2 telescopic
S3施工过程中,通过转动施工平台5上的调节盘65,能够带动转动连杆64转动,转动连杆24带动转动盘6进行转动,从而使得连接杆7基于转动座8进行转动,达到调节施工平台5水平位置的目的;In the construction process of S3, by rotating the
S4区域位置施工结束后,通过调节手柄杆14在调节轨道15上的位置,使得手柄杆14带动异形杆12进行移动,异形杆12通过啮齿13带动圆弧齿轮58进行转动,圆弧齿轮58通过车轮架55带动车轮56进行角度方向调节,调整配置底座1同一侧的车轮56方向,通过施工人员借助建筑内墙面进行推进移动,从而达到调节施工区域位置的目的;After the construction of the S4 area position is completed, by adjusting the position of the
S5施工结束后,可通过脚踩踏板50,使得踏板50带动竖杆49挤压三角槽47,使得定位杆45移出三角形卡槽43,伸缩转杆31无限位后进行自转,带动第二衔接盘29反向转动,第二衔接盘29通过L型衔接杆30带动第一衔接盘28进行反向转动,第一衔接盘28带动连杆25进行反向转动,连杆25带动螺纹杆24反向转动,螺纹杆24在螺纹套23内反向转动,螺纹杆24水平位置不变,则带动螺纹套23水平方向移动,即带动活动板20移动,活动板20带动下齿条板21和上齿条板22反向移动,从而使得两个转动齿轮19反向转动,同步带动两个升降机构进行下降,方便施工人员落地。After the construction of S5 is completed, the pedal 50 can be stepped on, so that the pedal 50 drives the
本发明中,施工人员在施工平台5作业时,也可通过调节手柄杆14在调节轨道15上的位置,使得手柄杆14带动异形杆12进行移动,异形杆12通过啮齿13带动圆弧齿轮58进行转动,圆弧齿轮58通过车轮架55带动车轮56进行角度方向调节,调整配置底座1同一侧的车轮56方向,使得两侧的车轮56垂直设置,即可使得装置稳定不移动。In the present invention, when the construction personnel are working on the
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, any person familiar with the technical field within the technical scope disclosed in the present invention, according to the technical solution of the present invention Any equivalent replacement or change of the inventive concepts thereof shall fall within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310401319.4A CN116427676B (en) | 2023-04-15 | 2023-04-15 | Building interior wall decoration construction device and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310401319.4A CN116427676B (en) | 2023-04-15 | 2023-04-15 | Building interior wall decoration construction device and construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN116427676A true CN116427676A (en) | 2023-07-14 |
| CN116427676B CN116427676B (en) | 2025-09-09 |
Family
ID=87090389
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310401319.4A Active CN116427676B (en) | 2023-04-15 | 2023-04-15 | Building interior wall decoration construction device and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116427676B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121290622A (en) * | 2025-11-27 | 2026-01-09 | 北京住宏建筑装饰工程有限公司 | A drilling device for prefabricated wall panels used in building decoration |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2733530A1 (en) * | 1995-04-27 | 1996-10-31 | Isoglass | Adjustable scaffolding for light work in building |
| JP2009299371A (en) * | 2008-06-13 | 2009-12-24 | Yoshinobu Sato | Lifting platform device |
| CN105034004A (en) * | 2015-08-05 | 2015-11-11 | 清华大学深圳研究生院 | Clamping manipulator capable of realizing cooperative work |
| CN109083386A (en) * | 2018-09-03 | 2018-12-25 | 刘振功 | A kind of interior decoration Lifting scaffold device |
| CN209179450U (en) * | 2018-11-15 | 2019-07-30 | 浙江原创空间装饰设计工程有限公司 | A kind of construction equipment for decorating inner and external walls engineering construction |
| CN110499906A (en) * | 2019-08-26 | 2019-11-26 | 安徽群升建筑工程有限公司 | A kind of building wall construction Miniature lifting platform and its application method |
| CN210286668U (en) * | 2019-06-29 | 2020-04-10 | 河南达成建设有限公司 | Foot control type lifting device for constructional engineering |
| CN111962848A (en) * | 2020-08-19 | 2020-11-20 | 王�忠 | Building platform of adjustable interior decoration building |
| CN212715826U (en) * | 2020-07-23 | 2021-03-16 | 张军华 | Building floor concrete placement operation rack is built in room |
| CN113620217A (en) * | 2021-08-23 | 2021-11-09 | 刘伟 | Safe construction platform for building construction |
| JP3235721U (en) * | 2021-07-29 | 2022-02-03 | 悦治 和田 | Elevator |
| CN115262926A (en) * | 2022-08-26 | 2022-11-01 | 北京住宏建筑装饰工程有限公司 | Building decorative wall whitewashing machine |
-
2023
- 2023-04-15 CN CN202310401319.4A patent/CN116427676B/en active Active
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2733530A1 (en) * | 1995-04-27 | 1996-10-31 | Isoglass | Adjustable scaffolding for light work in building |
| JP2009299371A (en) * | 2008-06-13 | 2009-12-24 | Yoshinobu Sato | Lifting platform device |
| CN105034004A (en) * | 2015-08-05 | 2015-11-11 | 清华大学深圳研究生院 | Clamping manipulator capable of realizing cooperative work |
| CN109083386A (en) * | 2018-09-03 | 2018-12-25 | 刘振功 | A kind of interior decoration Lifting scaffold device |
| CN209179450U (en) * | 2018-11-15 | 2019-07-30 | 浙江原创空间装饰设计工程有限公司 | A kind of construction equipment for decorating inner and external walls engineering construction |
| CN210286668U (en) * | 2019-06-29 | 2020-04-10 | 河南达成建设有限公司 | Foot control type lifting device for constructional engineering |
| CN110499906A (en) * | 2019-08-26 | 2019-11-26 | 安徽群升建筑工程有限公司 | A kind of building wall construction Miniature lifting platform and its application method |
| CN212715826U (en) * | 2020-07-23 | 2021-03-16 | 张军华 | Building floor concrete placement operation rack is built in room |
| CN111962848A (en) * | 2020-08-19 | 2020-11-20 | 王�忠 | Building platform of adjustable interior decoration building |
| JP3235721U (en) * | 2021-07-29 | 2022-02-03 | 悦治 和田 | Elevator |
| CN113620217A (en) * | 2021-08-23 | 2021-11-09 | 刘伟 | Safe construction platform for building construction |
| CN115262926A (en) * | 2022-08-26 | 2022-11-01 | 北京住宏建筑装饰工程有限公司 | Building decorative wall whitewashing machine |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121290622A (en) * | 2025-11-27 | 2026-01-09 | 北京住宏建筑装饰工程有限公司 | A drilling device for prefabricated wall panels used in building decoration |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116427676B (en) | 2025-09-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110541552A (en) | mobile operation platform | |
| CN116427676A (en) | Building interior wall decoration construction device and construction method | |
| CN114086748A (en) | Cantilever frame device for construction engineering construction | |
| CN216864831U (en) | Scaffold for road and bridge engineering | |
| CN114348894A (en) | Steel pipe lifting positioning device for building | |
| CN118933317B (en) | A scaffold for construction engineering capable of being lifted, lowered and folded | |
| CN213539631U (en) | A kind of civil engineering building construction support | |
| CN211393770U (en) | Garden lifter | |
| CN113353811A (en) | Lifting type engineering machinery transfer device | |
| CN220319068U (en) | Antiskid steel structure scaffold | |
| CN207332274U (en) | Climbing type CONSTRUCTION OPERATIONS platform outside a kind of building | |
| CN214885309U (en) | A construction mobile platform | |
| CN116556643A (en) | An adjustable steel frame | |
| CN219471492U (en) | A building construction support | |
| CN211080948U (en) | Lifting platform for house building construction | |
| CN224078654U (en) | Light steel construction scaffold frame is with mobile device convenient to detach | |
| CN221116721U (en) | Auxiliary frame for hoisting travelling crane beam and upright column in underground chamber of mine | |
| CN114101740B (en) | Carrier processing device of mobile phone vibration motor | |
| CN223907825U (en) | Installation equipment for aluminum veneer curtain wall | |
| CN222224294U (en) | Automatic tower climbing equipment | |
| CN112376873A (en) | Outdoor decoration safety kit and working method thereof | |
| CN223837072U (en) | Bridge crane maintenance tools | |
| CN220631715U (en) | A three-dimensional display engineering management platform | |
| CN221370494U (en) | A lifting platform for bridge engineering operations | |
| CN223227006U (en) | An assembled building construction platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |