CN116365569A - Method and device for controlling operation of optical storage charging station, electronic equipment and medium - Google Patents

Method and device for controlling operation of optical storage charging station, electronic equipment and medium Download PDF

Info

Publication number
CN116365569A
CN116365569A CN202310320771.8A CN202310320771A CN116365569A CN 116365569 A CN116365569 A CN 116365569A CN 202310320771 A CN202310320771 A CN 202310320771A CN 116365569 A CN116365569 A CN 116365569A
Authority
CN
China
Prior art keywords
load
power
charging station
photovoltaic output
optical storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310320771.8A
Other languages
Chinese (zh)
Inventor
吴永超
邢胜杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Anji Zhidian Holding Co Ltd
Original Assignee
Zhejiang Anji Zhidian Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Anji Zhidian Holding Co Ltd filed Critical Zhejiang Anji Zhidian Holding Co Ltd
Priority to CN202310320771.8A priority Critical patent/CN116365569A/en
Publication of CN116365569A publication Critical patent/CN116365569A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • H02J3/322Arrangements for balancing of the load in a network by storage of energy using batteries with converting means the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/51Photovoltaic means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/62Monitoring or controlling charging stations in response to charging parameters, e.g. current, voltage or electrical charge
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/10Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/40The network being an on-board power network, i.e. within a vehicle
    • H02J2310/48The network being an on-board power network, i.e. within a vehicle for electric vehicles [EV] or hybrid vehicles [HEV]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • H02J2310/60Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The application provides a control method and device for operation of an optical storage charging station, electronic equipment and medium, and relates to the technical field of optical storage charging operation control. The method can respond to the power consumption request of the load at the demand side to judge whether a dispatching instruction of the power grid demand response is received or not; if a dispatching instruction is received, determining an instruction type of the dispatching instruction, and matching a current optical storage station operation control strategy according to the instruction type of the dispatching instruction; the demand side load is powered based on the current light storage charging station operation control strategy. It can be seen that the embodiment of the application can respond to the power grid demand preferentially, match the current operation control strategy of the optical storage charging station according to the instruction type of the power grid demand dispatching instruction, realize the guarantee of the load demand of the user, respond to the power grid dispatching, realize peak clipping and valley filling in cooperation with the power grid, and improve the operation efficiency of the optical storage charging station and the grid connection.

Description

Method and device for controlling operation of optical storage charging station, electronic equipment and medium
Technical Field
The present disclosure relates to the field of optical storage charging operation control technologies, and in particular, to a method and an apparatus for controlling operation of an optical storage charging station, an electronic device, and a storage medium.
Background
New energy automobiles, such as electric automobiles or fuel cell automobiles, are considered to reduce air pollution and alleviate energy shortage. When the electric automobile is used, the electric automobile can charge the battery of the automobile through the charging pile of the charging station, and the charging station can generally acquire power from a power grid.
The electric automobile is taken as a green transportation tool to rapidly grow, and meanwhile, photovoltaic power generation is also an important point for new energy development due to the advantages of safety, cleanliness and the like. With the rapid development of photovoltaic technology, energy storage technology and charging technology, photovoltaic power generation and an energy storage system thereof are combined with an electric vehicle charging station to form an integrated device of the photovoltaic charging station.
In the grid-connected operation of the optical storage charging station and the power grid, how to optimally control the grid-connected operation of the optical storage charging station, and the improvement of the operation efficiency while ensuring the load demand becomes a technical problem to be solved urgently.
Disclosure of Invention
In view of the foregoing, the present application has been made in order to provide a control method and apparatus for operation of an optical storage station, an electronic device, and a storage medium that overcome or at least partially solve the foregoing problems. The technical scheme is as follows:
in a first aspect, a method for controlling operation of an optical storage charging station is provided, including:
Responding to a power consumption request of a load at a demand side, and judging whether a dispatching instruction of a power grid demand response is received or not;
if the dispatching instruction is received, determining the instruction type of the dispatching instruction, and matching the current optical storage station operation control strategy according to the instruction type of the dispatching instruction;
and supplying power to the load on the demand side based on the current light storage charging station operation control strategy.
In one possible implementation manner, if the instruction type of the scheduling instruction is a peak clipping instruction, the objective of the current optical storage charging station operation control strategy is to reduce the power acquired by the optical storage charging station from the power grid;
powering the demand side load based on the current light storage charging station operation control strategy, comprising:
if the photovoltaic output and/or the energy storage residual quantity meet the requirement of the load on the requirement side, the photovoltaic output and/or the energy storage residual quantity supply power to the load on the requirement side;
and if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, reducing the output power of the charging pile of the charging station according to the state of charge value of the electric car, and supplying power to the load on the demand side by the photovoltaic output and the energy storage residual quantity.
In one possible implementation manner, if the instruction type of the scheduling instruction is a valley filling instruction, the objective of the current optical storage station operation control strategy is to increase the optical storage station to obtain power from the power grid;
Powering the demand side load based on the current light storage charging station operation control strategy, comprising:
if the energy storage residual capacity exists, the power grid supplies power to the load on the demand side, and the power grid charges the energy storage system;
if no energy storage residual capacity exists, the power grid supplies power to the load on the demand side.
In one possible implementation manner, after determining whether a scheduling instruction of the grid demand response is received, if the scheduling instruction is not received, the method further includes:
according to the current time, matching the corresponding optical storage charging station period operation control strategy;
and operating a control strategy to supply power to the load on the demand side based on the matched light storage charging station period.
In one possible implementation, if the matched light storage charging station period operation control strategy is a light storage charging station peak period operation control strategy;
supplying power to the load on the demand side based on the light storage charging station peak time operation control strategy, comprising:
if the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, and the residual electricity of the photovoltaic output is connected with the network through a connecting wire of the photovoltaic output and the power grid;
if the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy of the stored energy supply power to the load on the requirement side;
And if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
In one possible implementation, if the matched optical storage charging station period operation control strategy is an optical storage charging station period operation control strategy;
supplying power to a load on a demand side based on the flat period operation control strategy of the light storage charging station, comprising:
if the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, whether the energy storage residual capacity exists or not is monitored, if the energy storage residual capacity exists, the photovoltaic output charges the energy storage system, and the residual power of the photovoltaic output is connected with the internet through a connecting wire of the photovoltaic output and a power grid; if the residual capacity of the energy storage is not available, the residual electricity of the photovoltaic output is connected with the grid through a connecting wire;
if the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy of the stored energy supply power to the load on the requirement side;
and if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
In one possible implementation, if the matched optical storage charging station period operation control strategy is an optical storage charging station valley period operation control strategy;
Supplying power to a demand side load based on the light storage charging station valley period operation control strategy, comprising:
the grid supplies the demand-side load.
In a second aspect, there is provided a control device for operation of an optical storage station, comprising:
the judging module is used for responding to the power utilization request of the load at the demand side and judging whether a dispatching instruction of the power grid demand response is received or not;
the first matching module is used for determining the instruction type of the dispatching instruction if the judging module judges that the dispatching instruction is received, and matching the current optical storage station operation control strategy according to the instruction type of the dispatching instruction;
and the first control module is used for supplying power to the load on the demand side based on the current operation control strategy of the light storage charging station.
In one possible implementation manner, if the instruction type of the scheduling instruction is a peak clipping instruction, the objective of the current optical storage charging station operation control strategy is to reduce the power acquired by the optical storage charging station from the power grid;
the first control module is further configured to:
if the photovoltaic output and/or the energy storage residual quantity meet the requirement of the load on the requirement side, the photovoltaic output and/or the energy storage residual quantity supply power to the load on the requirement side;
And if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, reducing the output power of the charging pile of the charging station according to the state of charge value of the electric car, and supplying power to the load on the demand side by the photovoltaic output and the energy storage residual quantity.
In one possible implementation manner, if the instruction type of the scheduling instruction is a valley filling instruction, the objective of the current optical storage station operation control strategy is to increase the optical storage station to obtain power from the power grid;
the first control module is further configured to:
if the energy storage residual capacity exists, the power grid supplies power to the load on the demand side, and the power grid charges the energy storage system;
if no energy storage residual capacity exists, the power grid supplies power to the load on the demand side.
In one possible implementation, the apparatus further includes:
the second matching module is used for matching the corresponding optical storage station period operation control strategy according to the current moment when the judging module judges that the scheduling instruction is not received;
and the second control module is used for supplying power to the load on the demand side based on the matched operation control strategy of the optical storage charging station period.
In one possible implementation, if the matched light storage charging station period operation control strategy is a light storage charging station peak period operation control strategy;
The second control module is further configured to:
if the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, and the residual electricity of the photovoltaic output is connected with the network through a connecting wire of the photovoltaic output and the power grid;
if the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy of the stored energy supply power to the load on the requirement side;
and if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
In one possible implementation, if the matched optical storage charging station period operation control strategy is an optical storage charging station period operation control strategy;
the second control module is further configured to:
if the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, whether the energy storage residual capacity exists or not is monitored, if the energy storage residual capacity exists, the photovoltaic output charges the energy storage system, and the residual power of the photovoltaic output is connected with the internet through a connecting wire of the photovoltaic output and a power grid; if the residual capacity of the energy storage is not available, the residual electricity of the photovoltaic output is connected with the grid through a connecting wire;
if the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy of the stored energy supply power to the load on the requirement side;
And if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
In one possible implementation, if the matched optical storage charging station period operation control strategy is an optical storage charging station valley period operation control strategy;
the second control module is further configured to:
the grid supplies the demand-side load.
In a third aspect, there is provided an electronic device comprising a processor and a memory, wherein the memory has stored therein a computer program, the processor being configured to run the computer program to perform the method of controlling the operation of the optical storage station of any one of the above.
In a fourth aspect, a storage medium is provided, the storage medium storing a computer program, wherein the computer program is configured to perform the method of controlling the operation of the optical storage station according to any one of the preceding claims when run.
By means of the technical scheme, the control method and device for the operation of the optical storage station, the electronic equipment and the storage medium can respond to the electricity utilization request of the load on the demand side to judge whether a dispatching instruction of the power grid demand response is received or not; if a dispatching instruction is received, determining an instruction type of the dispatching instruction, and matching a current optical storage station operation control strategy according to the instruction type of the dispatching instruction; the demand side load is powered based on the current light storage charging station operation control strategy. It can be seen that the embodiment of the application can respond to the power grid demand preferentially, match the current operation control strategy of the optical storage charging station according to the instruction type of the power grid demand dispatching instruction, realize the guarantee of the load demand of the user, respond to the power grid dispatching, realize peak clipping and valley filling in cooperation with the power grid, and improve the operation efficiency of the optical storage charging station and the grid connection.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings that are required to be used in the description of the embodiments of the present application will be briefly described below.
Fig. 1 shows a schematic diagram of grid connection of an optical storage station and a power grid provided in an embodiment of the present application;
FIG. 2 shows a flowchart of a method for controlling operation of an optical storage station according to an embodiment of the present application;
FIG. 3 illustrates a flow chart of a method for controlling operation of an optical storage station according to another embodiment of the present application;
FIG. 4 illustrates a flow chart of a peak hours operation control strategy under no grid demand response provided by an embodiment of the present application;
FIG. 5 shows a flow chart of a control strategy for the normal operation under no grid demand response provided by an embodiment of the present application;
FIG. 6 illustrates a flowchart of an operational control strategy for a photovoltaic storage station in response to grid demand provided by an embodiment of the present application;
FIG. 7 shows a block diagram of a control device for operation of an optical storage station provided by an embodiment of the present application;
FIG. 8 is a block diagram of a control device for operation of a light storage charging station according to another embodiment of the present application;
fig. 9 shows a block diagram of an electronic device according to an embodiment of the present application.
Detailed Description
Exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present application are shown in the drawings, it should be understood that the present application may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
It should be noted that the terms "first," "second," and the like in the description and claims of the present application and the above figures are used for distinguishing between similar objects and not necessarily for describing a particular sequential or chronological order. It is to be understood that such uses may be interchanged where appropriate such that embodiments of the present application described herein may be implemented in sequences other than those illustrated or described herein. Furthermore, the terms "include" and variations thereof are to be interpreted as open-ended terms that mean "include, but are not limited to.
As shown in fig. 1, the photovoltaic storage charging station combines renewable energy power generation facilities (such as photovoltaic modules and photovoltaic inverters) such as photovoltaic and the like with an electric vehicle charging station, and utilizes the charging load of an electric vehicle user to consume electric energy generated by photovoltaic power generation in situ, so that on one hand, the power supply pressure of a power grid to large-scale access of the electric vehicle is relieved, and on the other hand, fluctuation caused by grid connection of the photovoltaic to the power grid operation is reduced.
When the power supply in the optical storage station system (comprising the output of the photovoltaic module and the energy storage battery) does not meet the load demand, the power can be purchased from the power grid; when the photovoltaic output is excessive, power can be supplied to the power grid, the operation efficiency of the photovoltaic storage station and the grid connection is improved, and certain economic benefit is obtained. The photovoltaic and energy storage are combined, so that the system operation efficiency can be improved, the power fluctuation caused by photovoltaic randomness (namely 100% of fluctuation amplitude in the photovoltaic power generation day, obvious peak-valley characteristics, and uniform falling situation before and after noon in the afternoon and 0 output at night) is inhibited, the near digestion of renewable resource power generation and the low carbonization development of the electric automobile are promoted, the coupling synergy is realized, the optimal operation mode is achieved, the operation efficiency is improved, and the purpose of improving the operation economy is achieved.
In fig. 1, the energy management center may control the operation of the light storage charging station based on a light storage charging station operation control strategy; controlling the light storage charging station to access to a power grid through a grid-connected switch; the monitoring control center can monitor the operation of the whole optical storage charging station, generate monitoring data and timely inform and remind relevant staff.
As described above, how to optimally control the grid-connected operation of the optical storage station in the grid-connected operation of the optical storage station and the power grid, and to improve the operation efficiency while ensuring the load demand becomes a technical problem to be solved. In order to solve the technical problem, the embodiment of the present application provides a method for controlling operation of an optical storage charging station, as shown in fig. 2, the method for controlling operation of an optical storage charging station may include the following steps S201 to S203:
Step S201, responding to the electricity utilization request of the load at the demand side, judging whether a dispatching instruction of the power grid demand response is received, and if the dispatching instruction is received, continuing to execute step S202;
step S202, determining the instruction type of a dispatching instruction, and matching the current optical storage station operation control strategy according to the instruction type of the dispatching instruction;
step S203, supplying power to the demand side load based on the current optical storage charging station operation control strategy.
The demand side load mentioned in the above step S201 may be the electric vehicle charging load and other loads shown in fig. 1, or may be a load other than the electric vehicle charging load and other loads, which is not limited in this embodiment.
According to the embodiment of the application, the power grid demand can be responded preferentially, the current operation control strategy of the optical storage charging station is matched according to the instruction type of the power grid demand dispatching instruction, the load and the energy storage state of the demand side are combined, the load demand of a user is guaranteed, the power grid dispatching is responded, peak clipping and valley filling are achieved by matching with the power grid, and the operation efficiency of the optical storage charging station and the grid connection of the power grid is improved.
In addition, at present, the decomposition of the power grid dispatching plan is realized at the cloud end, the decomposition granularity and timeliness are not ideal, and the operation strategies of the optical storage charging station in the scheme of the embodiment of the application are executed at the edge side. According to the scheme, the application of the demand response control strategy under the charging station is realized through the cloud side system architecture, the strategy is adjusted in real time according to the load change condition in the power station, and the running efficiency of the optical storage station and the grid connection is further improved.
In this embodiment of the present application, a possible implementation manner is provided, if the instruction type of the scheduling instruction mentioned in the step S202 is a peak clipping instruction, and according to the instruction type of the scheduling instruction, the target of the current operation control policy of the optical storage charging station obtained by matching is to reduce the power acquired by the optical storage charging station from the power grid, and step S203 may specifically include the following steps A1 and A2 to supply power to the load on the demand side based on the current operation control policy of the optical storage charging station:
step A1, if the photovoltaic output and/or the energy storage residual quantity meet the requirement of a load on the requirement side, the photovoltaic output and/or the energy storage residual quantity supply power to the load on the requirement side;
and step A2, if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, reducing the output power of the charging pile of the charging station according to the charge state value of the electric car, and supplying power to the load on the demand side by the photovoltaic output and the energy storage residual quantity.
In this embodiment, when a peak clipping instruction is received and an electric load is available on the photo-storage charging station, the energy storage residual capacity can be considered, and if the energy storage system can meet the load demand, the energy storage capacity is released preferentially to reduce the power acquired from the power grid by the photo-storage charging station; if the energy storage system cannot meet the load demand, the output power of the charging pile is reduced according to the State of Charge (SOC) value of the electric vehicle, and the charging load power of the electric vehicle is reduced according to a certain proportion under the condition of ensuring the normal charging of the electric vehicle. The proportion may be 0.5 or 0.8, and may be specifically set according to practical requirements, which is not limited in this embodiment.
In this embodiment of the present application, a possible implementation manner is provided, if the instruction type of the scheduling instruction mentioned in the step S202 is a valley filling instruction, and according to the instruction type of the scheduling instruction, the target of the current operation control policy of the optical storage charging station obtained by matching is to increase the power acquired by the optical storage charging station from the power grid, and step S203 may specifically include the following steps B1 and B2:
step B1, if the residual energy storage capacity exists, the power grid supplies power to the load on the demand side, and the power grid charges an energy storage system;
and step B2, if no energy storage residual capacity exists, supplying power to the load on the demand side by the power grid.
In the embodiment, when a valley filling instruction is received and an electric load is applied to the optical storage station, considering the residual energy storage capacity, if the energy storage system has enough residual capacity, preferentially charging the energy storage system, and increasing the power acquired by the optical storage station from the power grid; if the energy storage system has no residual capacity and cannot be charged, the electric car owner is summoned to the charging station for charging through a preset scheme in the time of the demand response plan, and the optical storage charging station is increased to acquire power from the power grid.
After the step S201 above determines whether the scheduling instruction of the grid demand response is received, if the scheduling instruction is not received, as shown in fig. 3, the following steps S301 and S302 may be further included:
step S301, a corresponding optical storage charging station period operation control strategy is matched according to the current moment;
step S302, power is supplied to the demand side load based on the matched optical storage charging station period operation control strategy.
In this embodiment, under the condition of no power grid side demand response requirement, a day can be divided into three time periods of peak Gu Ping according to the time-of-use electricity price, the priority photovoltaic power generation is used as a principle that the power station load requirement is met, the energy storage state of charge is considered, the three time periods of peak Gu Ping are respectively analyzed to optimize the operation strategy, the load requirement of a user is guaranteed, the consumption of new energy is promoted, and the charging station load curve is smoother.
1. Electricity price peak time operation strategy
The electricity price peak period may be 8 a.m.: 00 to 12:00 and night 18:00 to 22:00, the electricity consumption peak is at this time, and the electricity consumption requirement is larger. Because the illumination condition in the morning is sufficient, photovoltaic power generation is preferentially adopted to supply power for the electric automobile load and other loads. When the photovoltaic output is insufficient, the energy storage system releases electric energy to supply the load demand, and only discharges in the peak electricity price period. The peak electricity price period listed here is 8 a.m.: 00 to 12:00 and night 18:00 to 22:00 are merely illustrative, and may be specifically set according to actual circumstances, which is not limited in this embodiment.
Specifically, if the matched optical storage charging station period operation control policy in step S302 is an optical storage charging station peak period operation control policy, the following steps C1 to C3 may be included:
step C1, if the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, and the residual electricity of the photovoltaic output is connected with the network through a connecting wire of the photovoltaic output and a power grid;
step C2, if the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy storage capacity supply power to the load on the requirement side;
and step C3, if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
FIG. 4 shows a flow chart of a peak hours operation control strategy under no grid demand response, P, provided by an embodiment of the present application L Representing other load power; p (P) EV Representing the charging power of the electric automobile; p (P) PV Representing photovoltaic power generation; p (P) ESS Representing the stored energy output power; p (P) G Representing the power off the grid.
In fig. 4, it is first determined whether the current time is a peak electricity price period, and if not, return is made; if the power price is in the peak period, judging whether other load power and electric vehicle charging power are larger than photovoltaic power generation power. If the other load power and the charging power of the electric automobile are not larger than the photovoltaic power generation power, the photovoltaic output power supplies power to the load on the demand side (namely other loads and charging loads), and the residual electricity of the photovoltaic output power is connected with the internet through a connecting wire with a power grid; if the other load power and the electric vehicle charging power are larger than the photovoltaic power generation power, continuing to judge whether the other load power and the electric vehicle charging power are larger than the photovoltaic power generation power and the energy storage output power. If the other load power and the charging power of the electric automobile are not larger than the photovoltaic power generation power and the energy storage output power, the photovoltaic output and the energy storage residual quantity supply power for the load on the demand side; if the other load power and the charging power of the electric automobile are larger than the photovoltaic power generation power and the energy storage output power, the photovoltaic output power, the energy storage residual capacity and the power grid supply power to the load on the demand side together.
2. Flat period operation strategy
The level period is 12:00 to 18:00, 23:00 to the next day 00:00. the whole load curve is stable and has no large fluctuation, so the load change caused by the demand response is not considered, and only the charging load and other loads of the electric automobile on the demand side of the system are considered. Under normal conditions, the afternoon illumination condition is also sufficient, and photovoltaic power generation is preferentially adopted to supply power for loads of electric automobiles and other loads. The operation strategy of the flat period focuses on the charge and discharge of the energy storage system, because the load demand is stable, and when the photovoltaic output is sufficient, the SOC value of the energy storage battery is considered, and then the operation state of the energy storage system is determined. The SOC value may be in a range of 0 to 1, and indicates that the energy storage battery is completely discharged when soc=0 and that the energy storage battery is completely charged when soc=1. Note that the level period exemplified here is 12:00 to 18:00, 23:00 to the next day 00:00 is merely illustrative, and may be specifically set according to practical circumstances, which is not limited in this embodiment.
Specifically, if the matched optical storage charging station period operation control policy in step S302 is an optical storage charging station period operation control policy, the following steps D1 to D3 may be included:
Step D1, if the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, whether the energy storage residual capacity exists or not is monitored, if the energy storage residual capacity exists, the photovoltaic output charges an energy storage system, and the residual power of the photovoltaic output is connected with the network through a connecting wire of the power grid; if the residual capacity of the energy storage is not available, the residual electricity of the photovoltaic output is connected with the grid through a connecting wire;
step D2, if the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy storage capacity supply power to the load on the requirement side;
and D3, if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
FIG. 5 shows a flow chart of a control strategy for the normal operation under no grid demand response, P L Representing other load power; p (P) EV Representing the charging power of the electric automobile; p (P) PV Representing photovoltaic power generation; p (P) ESS Representing the stored energy output power; p (P) G Representing the power of the power grid off the network; -P G Representing the power of the power grid; SOC represents the state of charge value of the energy storage battery; SOC (State of Charge) max Representing the maximum state of charge value of the energy storage battery.
In fig. 5, it is first judged whether the current time is a level period, and if not, return is made; if the power level period is the level period, judging whether other load power and electric automobile charging power are larger than photovoltaic power generation power or not. If the other load power and the charging power of the electric automobile are not larger than the photovoltaic power generation power, judging whether the charge state of the energy storage system is larger than the maximum charge state, namely judging whether the energy storage residual capacity exists. If the residual energy storage capacity exists, the photovoltaic output charges the energy storage system, and the residual electricity of the photovoltaic output is connected with the internet through a connecting wire with the power grid; and if the residual capacity of the stored energy does not exist, the residual electricity of the photovoltaic output is connected with the network through a connecting wire with the power grid. If the other load power and the electric vehicle charging power are larger than the photovoltaic power generation power, continuing to judge whether the other load power and the electric vehicle charging power are larger than the photovoltaic power generation power and the energy storage output power. If the other load power and the charging power of the electric automobile are not larger than the photovoltaic power generation power and the energy storage output power, the photovoltaic output and the energy storage residual quantity are used for supplying power to the load on the demand side (namely other loads and charging loads); if the other load power and the charging power of the electric automobile are larger than the photovoltaic power generation power and the energy storage output power, the photovoltaic output power, the energy storage residual capacity and the power grid supply power to the load on the demand side together.
3. Valley period operation strategy
The electricity price valley period is 00 in the early morning: 00 to 8 in the morning: 00. at the moment, the user power consumption requirement is low, the photovoltaic power generation system is influenced by the illumination environment and is in a night valley period, and the system power consumption requirement cannot be met. Considering the influence of the charge and discharge times on the service life of the energy storage battery, the energy storage system is not discharged any more in the period of night electricity consumption valley. If the state of charge of the energy storage battery does not reach the maximum value, the electric automobile load, other electricity loads and energy storage charging are simultaneously provided by the power grid. Note that the electricity price valley period listed here is 00 a.m.: 00 to 8 in the morning: 00 is merely illustrative, and may be specifically set according to practical circumstances, which is not limited in this embodiment.
Specifically, if the matched optical storage charging station period operation control policy in step S302 is the optical storage charging station valley period operation control policy, the following step E1 may be included:
and E1, supplying power to the load on the demand side by a power grid.
The demand side load here may be an electric vehicle load, other electric loads, stored energy charge, or the like, which is not limited in this embodiment.
FIG. 6 shows a flowchart of an operation control strategy of an optical storage station under grid demand response, P L Representing other load power; p (P) EV Representing the charging power of the electric automobile; p (P) PV Representing photovoltaic power generation; p (P) ESS Representing the stored energy output power; -P ESS Representing stored charge power; p (P) G Representing the power off the grid.
In fig. 6, it is first determined whether a scheduling instruction of a power grid demand response is received, and if the scheduling instruction is not received, an operation strategy under no power grid demand response, that is, an operation control strategy of step S301 and step S302 is adopted, which is not described in detail herein; if the scheduling instruction is received, judging and determining the instruction type of the scheduling instruction. If the instruction type of the scheduling instruction is a peak clipping instruction, when the electric load is available on the electric storage station, the energy storage residual quantity is considered, if the energy storage system can meet the load demand, the energy storage electric quantity is released preferentially to reduce the power acquired by the electric storage station from the power grid, and if the energy storage system cannot meet the load demand, the output power of the charging pile is reduced according to the SOC value of the electric car, and under the condition of ensuring the normal charging of the electric car, the charging load power of the electric car is reduced according to a certain proportion. If the instruction type of the dispatching instruction is a valley filling instruction, considering the residual energy storage capacity when the electric load exists in the optical storage station, and if the energy storage system has enough residual capacity, preferentially charging the energy storage system, and increasing the power acquired by the optical storage station from the power grid; if the energy storage system has no residual capacity and cannot be charged, the electric car owner is summoned to the power station for charging through a preset scheme in the time of the demand response plan, and the optical storage charging station is increased to acquire power from the power grid.
It should be noted that, the sequence number of each step in the above embodiment does not mean the sequence of execution sequence, and the execution sequence of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present application. In practical applications, all possible embodiments may be combined in any combination manner to form possible embodiments of the present application, which are not described in detail herein.
Based on the control method for the operation of the optical storage charging station provided by each embodiment, based on the same inventive concept, the embodiment of the application also provides a control device for the operation of the optical storage charging station.
Fig. 7 is a block diagram of a control device for operation of an optical storage station according to an embodiment of the present application. As shown in fig. 7, the control device for operating the optical storage charging station may specifically include a determining module 710, a first matching module 720, and a first control module 730.
The judging module 710 is configured to respond to the power consumption request of the load on the demand side, and judge whether a scheduling instruction of the power grid demand response is received;
the first matching module 720 is configured to determine an instruction type of the scheduling instruction if the determining module 710 determines that the scheduling instruction is received, and match a current optical storage station operation control policy according to the instruction type of the scheduling instruction;
A first control module 730 for powering the demand side load based on the current light storage charging station operation control strategy.
In the embodiment of the present application, a possible implementation manner is provided, and if the instruction type of the scheduling instruction is a peak clipping instruction, the objective of the current optical storage charging station operation control policy is to reduce the power acquired by the optical storage charging station from the power grid;
the first control module 730 is further configured to:
if the photovoltaic output and/or the energy storage residual quantity meet the requirement of the load on the requirement side, the photovoltaic output and/or the energy storage residual quantity supply power to the load on the requirement side;
and if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, reducing the output power of the charging pile of the charging station according to the state of charge value of the electric car, and supplying power to the load on the demand side by the photovoltaic output and the energy storage residual quantity.
In the embodiment of the present application, a possible implementation manner is provided, and if the instruction type of the scheduling instruction is a valley filling instruction, the objective of the current optical storage charging station operation control policy is to increase the optical storage charging station to obtain power from the power grid;
the first control module 730 is further configured to:
if the energy storage residual capacity exists, the power grid supplies power to the load on the demand side, and the power grid charges the energy storage system;
If no energy storage residual capacity exists, the power grid supplies power to the load on the demand side.
One possible implementation manner is provided in the embodiment of the present application, as shown in fig. 8, where the apparatus shown in fig. 7 above may further include a second matching module 810 and a second control module 820.
A second matching module 810, configured to, when the determining module 710 determines that the scheduling instruction is not received, match a corresponding optical storage charging station period operation control policy according to a current time;
a second control module 820 for operating a control strategy to power the demand side load based on the matched light storage charging station period.
The embodiment of the application provides a possible implementation manner, if the matched optical storage charging station period operation control strategy is an optical storage charging station peak period operation control strategy;
the second control module 820 is further configured to:
if the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, and the residual electricity of the photovoltaic output is connected with the network through a connecting wire of the photovoltaic output and the power grid;
if the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy of the stored energy supply power to the load on the requirement side;
and if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
The embodiment of the application provides a possible implementation manner, if the matched optical storage charging station period operation control strategy is an optical storage charging station period operation control strategy;
the second control module 820 is further configured to:
if the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, whether the energy storage residual capacity exists or not is monitored, if the energy storage residual capacity exists, the photovoltaic output charges the energy storage system, and the residual power of the photovoltaic output is connected with the internet through a connecting wire of the photovoltaic output and a power grid; if the residual capacity of the energy storage is not available, the residual electricity of the photovoltaic output is connected with the grid through a connecting wire;
if the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy of the stored energy supply power to the load on the requirement side;
and if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
The embodiment of the application provides a possible implementation manner, if the matched optical storage charging station period operation control strategy is an optical storage charging station valley period operation control strategy;
the second control module 820 is further configured to:
The grid supplies the demand-side load.
Based on the same inventive concept, the embodiment of the present application further provides an electronic device, including a processor and a memory, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the method for controlling the operation of the optical storage station according to any one of the above embodiments.
In an exemplary embodiment, there is provided an electronic apparatus, as shown in fig. 9, the electronic apparatus 900 shown in fig. 9 includes: a processor 901 and a memory 903. The processor 901 is coupled to a memory 903, such as via a bus 902. Optionally, the electronic device 900 may also include a transceiver 904. It should be noted that, in practical applications, the transceiver 904 is not limited to one, and the structure of the electronic device 900 is not limited to the embodiments of the present application.
The processor 901 may be a CPU (Central Processing Unit, central processor), general purpose processor, DSP (Digital Signal Processor, data signal processor), ASIC (Application Specific Integrated Circuit ), FPGA (Field Programmable Gate Array, field programmable gate array) or other programmable logic device, transistor logic device, hardware components, or any combination thereof. Which may implement or perform the various exemplary logic blocks, modules, and circuits described in connection with this disclosure. The processor 901 may also be a combination that implements computing functionality, e.g., comprising one or more microprocessor combinations, a combination of DSP and microprocessor, etc.
Bus 902 may include a path to transfer information between the components. Bus 902 may be a PCI (Peripheral Component Interconnect, peripheral component interconnect Standard) bus or an EISA (Extended Industry Standard Architecture ) bus, or the like. The bus 902 may be classified as an address bus, a data bus, a control bus, or the like. For ease of illustration, only one thick line is shown in fig. 9, but not only one bus or one type of bus.
The Memory 903 may be, but is not limited to, ROM (Read Only Memory) or other type of static storage device that can store static information and instructions, RAM (Random Access Memory ) or other type of dynamic storage device that can store information and instructions, EEPROM (Electrically Erasable Programmable Read Only Memory ), CD-ROM (Compact Disc Read Only Memory, compact disc Read Only Memory) or other optical disk storage, optical disk storage (including compact discs, laser discs, optical discs, digital versatile discs, blu-ray discs, etc.), magnetic disk storage media or other magnetic storage devices, or any other medium that can be used to carry or store desired program code in the form of instructions or data structures and that can be accessed by a computer.
The memory 903 is used for storing computer program codes for executing the present application and is controlled to be executed by the processor 901. The processor 901 is arranged to execute computer program code stored in the memory 903 to implement what is shown in the foregoing method embodiments.
Among them, electronic devices include, but are not limited to: mobile terminals such as mobile phones, notebook computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), in-vehicle terminals (e.g., in-vehicle navigation terminals), and the like, and stationary terminals such as digital TVs, desktop computers, and the like. The electronic device shown in fig. 9 is only an example, and should not impose any limitation on the functions and scope of use of the embodiments of the present application.
Based on the same inventive concept, the embodiments of the present application further provide a storage medium having a computer program stored therein, wherein the computer program is configured to execute the method for controlling the operation of the optical storage station of any one of the embodiments described above when running.
It will be clear to those skilled in the art that the specific working processes of the above-described systems, devices and modules may refer to the corresponding processes in the foregoing method embodiments, and are not described herein for brevity.
Those of ordinary skill in the art will appreciate that: the technical solution of the present application may be embodied in essence or in whole or in part in a software product stored in a storage medium, which includes program instructions for causing an electronic device (e.g., a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in the embodiments of the present application when the program instructions are executed. And the aforementioned storage medium includes: a usb disk, a removable hard disk, a read-only memory (ROM), a random-access memory (RAM), a magnetic disk, or an optical disk, etc.
Alternatively, all or part of the steps of implementing the foregoing method embodiments may be implemented by hardware (such as a personal computer, a server, or an electronic device such as a network device) associated with program instructions, where the program instructions may be stored in a computer-readable storage medium, and where the program instructions, when executed by a processor of the electronic device, perform all or part of the steps of the methods described in the embodiments of the present application.
The above embodiments are only for illustrating the technical solution of the present application, and not for limiting the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may be modified or some or all technical features may be replaced equally within the spirit and principles of the present application; such modifications and substitutions do not depart from the scope of the present application.

Claims (10)

1. A method of controlling operation of an optical storage charging station, comprising:
responding to a power consumption request of a load at a demand side, and judging whether a dispatching instruction of a power grid demand response is received or not;
if the dispatching instruction is received, determining the instruction type of the dispatching instruction, and matching the current optical storage station operation control strategy according to the instruction type of the dispatching instruction;
and supplying power to the load on the demand side based on the current light storage charging station operation control strategy.
2. The method of claim 1, wherein the current optical storage station operation control strategy is aimed at reducing the optical storage station's power drawn from the grid if the instruction type of the dispatch instruction is a peak clipping instruction;
powering the demand side load based on the current light storage charging station operation control strategy, comprising:
if the photovoltaic output and/or the energy storage residual quantity meet the requirement of the load on the requirement side, the photovoltaic output and/or the energy storage residual quantity supply power to the load on the requirement side;
and if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, reducing the output power of the charging pile of the charging station according to the state of charge value of the electric car, and supplying power to the load on the demand side by the photovoltaic output and the energy storage residual quantity.
3. The method of claim 1, wherein if the instruction type of the dispatch instruction is a valley fill instruction, the current optical storage station operation control strategy is aimed at increasing the optical storage station's power draw from the grid;
powering the demand side load based on the current light storage charging station operation control strategy, comprising:
if the energy storage residual capacity exists, the power grid supplies power to the load on the demand side, and the power grid charges the energy storage system;
if no energy storage residual capacity exists, the power grid supplies power to the load on the demand side.
4. The method of claim 1, wherein after determining whether a scheduling command for a grid demand response is received, if the scheduling command is not received, the method further comprises:
according to the current time, matching the corresponding optical storage charging station period operation control strategy;
and operating a control strategy to supply power to the load on the demand side based on the matched light storage charging station period.
5. The method of claim 4, wherein if the matched optical storage charging station period operation control strategy is an optical storage charging station peak period operation control strategy;
supplying power to the load on the demand side based on the light storage charging station peak time operation control strategy, comprising:
If the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, and the residual electricity of the photovoltaic output is connected with the network through a connecting wire of the photovoltaic output and the power grid;
if the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy of the stored energy supply power to the load on the requirement side;
and if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
6. The method of claim 4, wherein if the matched optical storage station period operational control strategy is an optical storage station period operational control strategy;
supplying power to a load on a demand side based on the flat period operation control strategy of the light storage charging station, comprising:
if the photovoltaic output meets the requirement of the load on the requirement side, the photovoltaic output supplies power to the load on the requirement side, whether the energy storage residual capacity exists or not is monitored, if the energy storage residual capacity exists, the photovoltaic output charges the energy storage system, and the residual power of the photovoltaic output is connected with the internet through a connecting wire of the photovoltaic output and a power grid; if the residual capacity of the energy storage is not available, the residual electricity of the photovoltaic output is connected with the grid through a connecting wire;
If the photovoltaic output does not meet the requirement of the load on the requirement side, the photovoltaic output and the residual energy of the stored energy supply power to the load on the requirement side;
and if the photovoltaic output and the energy storage residual quantity do not meet the requirements of the load on the demand side, the photovoltaic output, the energy storage residual quantity and the power grid supply power to the load on the demand side together.
7. The method of claim 4, wherein if the matched optical storage charging station period operation control strategy is an optical storage charging station valley period operation control strategy;
supplying power to a demand side load based on the light storage charging station valley period operation control strategy, comprising:
the grid supplies the demand-side load.
8. A control device for the operation of an optical storage station, comprising:
the judging module is used for responding to the power utilization request of the load at the demand side and judging whether a dispatching instruction of the power grid demand response is received or not;
the first matching module is used for determining the instruction type of the dispatching instruction if the judging module judges that the dispatching instruction is received, and matching the current optical storage station operation control strategy according to the instruction type of the dispatching instruction;
and the first control module is used for supplying power to the load on the demand side based on the current operation control strategy of the light storage charging station.
9. An electronic device comprising a processor and a memory, wherein the memory has stored therein a computer program, the processor being configured to run the computer program to perform the method of controlling the operation of the optical storage station of any one of claims 1 to 7.
10. A storage medium having a computer program stored therein, wherein the computer program is configured to, when run, perform the method of controlling operation of the light storage charging station of any one of claims 1 to 7.
CN202310320771.8A 2023-03-29 2023-03-29 Method and device for controlling operation of optical storage charging station, electronic equipment and medium Pending CN116365569A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310320771.8A CN116365569A (en) 2023-03-29 2023-03-29 Method and device for controlling operation of optical storage charging station, electronic equipment and medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310320771.8A CN116365569A (en) 2023-03-29 2023-03-29 Method and device for controlling operation of optical storage charging station, electronic equipment and medium

Publications (1)

Publication Number Publication Date
CN116365569A true CN116365569A (en) 2023-06-30

Family

ID=86914480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310320771.8A Pending CN116365569A (en) 2023-03-29 2023-03-29 Method and device for controlling operation of optical storage charging station, electronic equipment and medium

Country Status (1)

Country Link
CN (1) CN116365569A (en)

Similar Documents

Publication Publication Date Title
CN113060036A (en) Charging control method and device for optical storage charging station, server and storage medium
CN113400957A (en) Self-starting charging method and device for extended range vehicle, electronic equipment and medium
CN113067370A (en) Charging control method and device for V2G charging station, server and storage medium
CN102136754A (en) Operation system and method
CN113852135A (en) Virtual power plant energy scheduling method, device, storage medium and platform
CN114598008A (en) Energy storage power supply device, energy storage power supply control method and device and single chip microcomputer
CN113270884B (en) Power energy management system and method based on V2G microgrid system
CN114844078A (en) Method, device and system for scheduling electric energy in battery replacement station and battery replacement station
CN102555830A (en) Automobile power supply system based on double energy storage units and automobile power supply control method
CN116760111B (en) Distributed energy access and electric energy storage control method, device, equipment and medium
CN117293878A (en) Micro-grid-based energy scheduling method and device, electronic equipment and storage medium
CN116245304A (en) Optical storage charging power scheduling method and device, electronic equipment and storage medium
CN103181056A (en) Method for charging an electrical battery
CN115001113B (en) Power supply control method and device and power supply equipment
CN116365569A (en) Method and device for controlling operation of optical storage charging station, electronic equipment and medium
CN115912436A (en) Power grid dispatching operation optimization calculation method considering power demand response
CN112701709B (en) Power supply control method and device for base station and electronic equipment
CN114331757A (en) Energy management method, energy management device, computer equipment and computer readable storage medium
CN116418063A (en) Charging control method, system, electronic device and storage medium
CN113315194B (en) Electric energy distribution method and device
Gole et al. Reinforcement Learning Based Energy Management in Hybrid Electric Vehicle
CN116552316B (en) Charging control method and device and related equipment
CN113022359B (en) Electric vehicle charging and discharging control method and device, charging and discharging control equipment and medium
CN115912360B (en) Power supply control method, device, computer equipment and storage medium
CN113690934B (en) Control method, device, system and storage medium for hybrid power supply mode

Legal Events