CN116245304A - Optical storage charging power scheduling method and device, electronic equipment and storage medium - Google Patents

Optical storage charging power scheduling method and device, electronic equipment and storage medium Download PDF

Info

Publication number
CN116245304A
CN116245304A CN202211710419.7A CN202211710419A CN116245304A CN 116245304 A CN116245304 A CN 116245304A CN 202211710419 A CN202211710419 A CN 202211710419A CN 116245304 A CN116245304 A CN 116245304A
Authority
CN
China
Prior art keywords
power
module
charging
energy storage
storage module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211710419.7A
Other languages
Chinese (zh)
Inventor
胡建辉
周清源
张蔓
李黎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Industry Investment Group Co ltd
Original Assignee
China Southern Power Grid Industry Investment Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Industry Investment Group Co ltd filed Critical China Southern Power Grid Industry Investment Group Co ltd
Priority to CN202211710419.7A priority Critical patent/CN116245304A/en
Publication of CN116245304A publication Critical patent/CN116245304A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0075Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source according to economic or energy efficiency considerations, e.g. economic dispatch
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Power Engineering (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The application provides an optical storage charging power scheduling method, an optical storage charging power scheduling device, electronic equipment and a storage medium, wherein the method comprises the following steps: determining a power scheduling object according to the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the energy storage module power and the charging module power; when the power scheduling object comprises a charging module and the energy storage module has a discharging condition, determining a system electric quantity output threshold according to the photovoltaic module power, the energy storage module power and the public power grid power; and determining target power of each charging pile in the charging module according to the system electric quantity output threshold and the power consumption load power, and carrying out power scheduling on the charging module according to the target power. The target power of the charging module is determined according to the system electric quantity output threshold and the fixed electric load power, so that the occurrence of system overpower operation is avoided, and the safety of the optical storage charging system and the power grid is improved.

Description

Optical storage charging power scheduling method and device, electronic equipment and storage medium
Technical Field
The present disclosure relates to the field of power dispatching technologies, and in particular, to a method and an apparatus for dispatching optical storage and charging power, an electronic device, and a storage medium.
Background
At present, electric vehicles are increased year by year due to the advantages of low carbon and environmental protection and the continuously-improved performance sales of the whole vehicle, and a large number of high-power charging piles of the electric vehicles have some new influences on the traditional power grid. The light storage charging system formed by the charging pile, the photovoltaic system, the energy storage system and the like provides a brand new idea for effectively solving the charging problem of the electric automobile. The light storage and charging system becomes an important development direction of public charging stations in the future.
However, in the intelligent light storage and charging system, the power grid at the peak part of electricity consumption has the characteristics of quick start and high power impact due to the increase of electricity consumption load, and the transient or long-time overload condition of the electricity load can occur, so that the safety of the light storage and charging system and the power grid is reduced.
Disclosure of Invention
The application provides an optical storage and charging power scheduling method, an optical storage and charging power scheduling device, electronic equipment and a storage medium, so that the defects that the safety of an optical storage and charging system and a power grid is reduced in the prior art are overcome.
The first aspect of the present application provides a method for scheduling optical storage and charging power, which is applied to an optical storage and charging system, wherein the optical storage and charging system comprises a photovoltaic module, an energy storage module and a charging module, the charging module comprises a plurality of charging piles, and the optical storage and charging system is integrated into a public power grid, and the method comprises:
acquiring power consumption load power, photovoltaic module power, energy storage module power, charging module power and public power grid power of the optical storage and charging system;
determining a power scheduling object according to the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the energy storage module power and the charging module power;
when the power scheduling object comprises a charging module and the energy storage module has a discharging condition, determining a system electric quantity output threshold according to the photovoltaic module power, the energy storage module power and the public power grid power;
and determining target power of each charging pile in the charging module according to the system electric quantity output threshold and the power consumption load power, and carrying out power scheduling on the charging module according to the target power.
Optionally, the determining the power scheduling object according to the total power supply quantity of the system represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the power storage module power and the power charging module power includes:
when the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is smaller than the total power consumption requirement represented by the accumulated result of the power consumption load power, the energy storage module power and the charging module power, but the total system power supply quantity is not smaller than the sum of the power consumption load power and the charging module power, determining that the power scheduling object comprises an energy storage unit;
and when the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is smaller than the total power consumption requirement represented by the accumulated result of the power consumption load power, the energy storage module power and the charging module power and the total system power supply quantity is smaller than the sum of the power consumption load power and the charging module power, determining that the scheduling object comprises the charging module.
Optionally, the determining, according to the system power output threshold and the power of the electric load, the target power of each charging pile in the charging module includes:
if the system electric quantity output threshold value is not smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of each charging pile in the charging module is the rated power of each charging pile;
if the system electric quantity output threshold value is smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of each charging pile in the charging module is the difference between the system electric quantity output threshold value and the power of the electric load;
when the energy storage module is determined to be in a preset discharging time period, the energy storage module is preferentially used for supplying power to the charging module, and when the electric quantity of the energy storage module is insufficient, the public power grid is used for supplying power to the charging module.
Optionally, the method further comprises:
judging whether the energy storage module is in a preset discharging time period or not;
when the energy storage module is in a preset discharging time period, the energy storage module is preferentially used for supplying power to the charging module, and when the electric quantity of the energy storage module is insufficient, the energy storage module is used for supplying power to the charging module based on a public power grid; the output power of the public power grid is the difference value between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the energy storage module;
when the energy storage module is not in a preset discharging period, the power supply for the charging module is preferentially based on the public power grid, and when the electric quantity of the public power grid is insufficient, the power supply for the charging module is based on the energy storage module; the output power of the energy storage module is the difference between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the public power grid.
Optionally, the method further comprises:
when the power scheduling object comprises a charging module and the energy storage module does not have a discharging condition, determining the total power supply quantity of the system as a system electric quantity output threshold;
and determining the difference between the system electric quantity output threshold and the power of the electric load as the target power of each charging pile in the charging module.
Optionally, the method further comprises:
when the power scheduling object comprises an energy storage module and the energy storage module is in a preset discharging time period, if the sum of the power of the photovoltaic module and the energy storage module is not smaller than the sum of the power of the charging module and the power of the electricity-consuming load, determining that the target power of the energy storage module is the difference between the power of the charging module and the power of the photovoltaic module;
and if the sum of the power of the photovoltaic module and the power of the energy storage module is smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of the energy storage module is the rated power of the energy storage module.
Optionally, the method further comprises:
when the power scheduling object comprises an energy storage module and the energy storage module has a charging requirement currently, determining the charging power of the energy storage module as a difference value between the total power supply quantity of the system and the sum of the power load power and the charging module power.
The second aspect of the present application provides an optical storage charging power dispatching device, which is applied to an optical storage charging system, the optical storage charging system comprises a photovoltaic module, an energy storage module and a charging module, the charging module comprises a plurality of charging piles, the optical storage charging system is integrated into a public power grid, and the device comprises:
the acquisition module is used for acquiring the power load power, the photovoltaic module power, the energy storage module power, the charging module power and the public power grid power of the optical storage and charging system;
the first determining module is used for determining a power scheduling object according to the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the energy storage module power and the charging module power;
the second determining module is used for determining a system electric quantity output threshold according to the power of the photovoltaic module, the power of the energy storage module and the power of the public power grid when the power scheduling object comprises a charging module and the energy storage module has a discharging condition;
and the scheduling module is used for determining the target power of each charging pile in the charging module according to the system electric quantity output threshold and the power consumption load power, and performing power scheduling on the charging module according to the target power.
Optionally, the first determining module is specifically configured to:
when the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is smaller than the total power consumption requirement represented by the accumulated result of the power consumption load power, the energy storage module power and the charging module power, but the total system power supply quantity is not smaller than the sum of the power consumption load power and the charging module power, determining that the power scheduling object comprises an energy storage unit;
and when the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is smaller than the total power consumption requirement represented by the accumulated result of the power consumption load power, the energy storage module power and the charging module power and the total system power supply quantity is smaller than the sum of the power consumption load power and the charging module power, determining that the scheduling object comprises the charging module.
Optionally, the scheduling module is specifically configured to:
if the system electric quantity output threshold value is not smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of each charging pile in the charging module is the rated power of each charging pile;
if the system electric quantity output threshold value is smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of each charging pile in the charging module is the difference between the system electric quantity output threshold value and the power of the electric load;
when the energy storage module is determined to be in a preset discharging time period, the energy storage module is preferentially used for supplying power to the charging module, and when the electric quantity of the energy storage module is insufficient, the public power grid is used for supplying power to the charging module.
Optionally, the scheduling module is further configured to:
judging whether the energy storage module is in a preset discharging time period or not;
when the energy storage module is in a preset discharging time period, the energy storage module is preferentially used for supplying power to the charging module, and when the electric quantity of the energy storage module is insufficient, the energy storage module is used for supplying power to the charging module based on a public power grid; the output power of the public power grid is the difference value between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the energy storage module;
when the energy storage module is not in a preset discharging period, the power supply for the charging module is preferentially based on the public power grid, and when the electric quantity of the public power grid is insufficient, the power supply for the charging module is based on the energy storage module; the output power of the energy storage module is the difference between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the public power grid.
Optionally, the scheduling module is further configured to:
when the power scheduling object comprises a charging module and the energy storage module does not have a discharging condition, 5 determining the total power supply quantity of the system as a system electric quantity output threshold value;
and determining the difference between the system electric quantity output threshold and the power of the electric load as the target power of each charging pile in the charging module.
Optionally, the scheduling module is further configured to:
when the power scheduling object comprises an energy storage module and the energy storage module is in a preset discharging time 0 section, if the sum of the power of the photovoltaic module and the energy storage module is not smaller than the power of the charging module and the electricity consumption
Determining that the target power of the energy storage module is the difference between the power of the charging module and the power of the photovoltaic module;
and if the sum of the power of the photovoltaic module and the power of the energy storage module is smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of the energy storage module is the rated power of the energy storage module.
5, optionally, the scheduling module is further configured to:
when the power scheduling object comprises an energy storage module and the energy storage module has a charging requirement currently, determining the charging power of the energy storage module as a difference value between the total power supply quantity of the system and the sum of the power load power and the charging module power.
A third aspect of the present application provides an electronic device, including: at least one processor and memory; 0 the memory stores computer-executable instructions;
the at least one processor executes the computer-executable instructions stored by the memory such that the at least one processor performs the method as described above in the first aspect and the various possible designs of the first aspect.
A fourth aspect of the present application provides a computer-readable storage medium having stored therein computer-executable instructions that, when executed by a processor, implement
The method as described above for the first aspect and the various possible designs of the first aspect.
The technical scheme of the application has the following advantages:
the application provides an optical storage charging power scheduling method, an optical storage charging power scheduling device, electronic equipment and a storage medium, wherein the optical storage charging power scheduling method comprises the following steps of
The method comprises the following steps: acquiring power utilization load power, photovoltaic module power, energy storage module power, 0 charging module power and public power grid power of the optical storage and charging system; determining a power scheduling object according to the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the energy storage module power and the charging module power; when the power scheduling object comprises a charging module and the energy storage module has a discharging condition, determining a system electric quantity output threshold according to the photovoltaic module power, the energy storage module power and the public power grid power; and determining target power of each charging pile in the charging module according to the system electric quantity output threshold and the power consumption load power, and carrying out power scheduling on the charging module according to the target power. According to the method provided by the scheme, the target power of the charging module is determined according to the system electric quantity output threshold and the fixed electric load power, so that the system overpower operation is avoided, and the safety of the optical storage charging system and the power grid is improved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief description will be given below of the drawings required for the embodiments or the description of the prior art, and it is obvious that the drawings in the following description are some embodiments of the present application, and other drawings may be obtained according to these drawings for a person having ordinary skill in the art.
Fig. 1 is a schematic structural diagram of an optical storage and charging power scheduling system according to an embodiment of the present application;
fig. 2 is a flow chart of an optical storage and charging power scheduling method according to an embodiment of the present application;
fig. 3 is an overall flow chart of an optical storage and charging power scheduling method according to an embodiment of the present application;
fig. 4 is a schematic structural diagram of an optical storage and charging power scheduling device according to an embodiment of the present application;
fig. 5 is a schematic structural diagram of an electronic device according to an embodiment of the present application.
Specific embodiments thereof have been shown by way of example in the drawings and will herein be described in more detail. These drawings and the written description are not intended to limit the scope of the disclosed concepts in any way, but to illustrate the concepts of the present application to those skilled in the art with reference to the specific embodiments.
Detailed Description
For the purposes of making the objects, technical solutions and advantages of the embodiments of the present application more clear, the technical solutions of the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is apparent that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by one of ordinary skill in the art based on the embodiments herein without making any inventive effort, are intended to be within the scope of the present application.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. In the following description of the embodiments, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
The following embodiments may be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments. Embodiments of the present invention will be described below with reference to the accompanying drawings.
First, a configuration of an optical storage/charging power scheduling system according to the present application will be described:
the method, the device, the electronic equipment and the storage medium for scheduling the optical storage and charging power are suitable for scheduling the power of the power utilization module in the optical storage and charging system so as to avoid the condition of super-power operation. Fig. 1 is a schematic structural diagram of an optical storage charging power dispatching system based on the embodiment of the application, and the optical storage charging power dispatching system mainly comprises an optical storage charging power dispatching device, a data acquisition device and an optical storage charging system, wherein the data acquisition device can comprise a photovoltaic inverter, a converter, a smart meter and other devices capable of acquiring electric parameters of the optical storage charging system. Specifically, the power scheduling device can collect the power load power, the photovoltaic module power, the energy storage module power, the charging module power and the public power grid power of the optical storage and charging system based on the data collection device, and send the collected data to the optical storage and charging power scheduling device, and the device performs power scheduling on the optical storage and charging system according to the obtained data.
The embodiment of the application provides an optical storage charging power scheduling method which is applied to an optical storage charging system, wherein the optical storage charging system comprises a photovoltaic module, an energy storage module and a charging module, the charging module comprises a plurality of charging piles, the optical storage charging system is integrated into a public power grid, and the method is used for performing power scheduling on an electricity utilization module in the optical storage charging system so as to avoid the condition of super-power operation. The execution body of the embodiment of the application is electronic equipment, such as a server, a desktop computer, a notebook computer, a tablet computer and other electronic equipment which can be used for carrying out power scheduling on the optical storage and charging system.
As shown in fig. 2, a flow chart of an optical storage and charging power scheduling method according to an embodiment of the present application is shown, where the method includes:
step 201, obtaining power of an electric load, power of a photovoltaic module, power of an energy storage module, power of a charging module and power of a public power grid of an optical storage and charging system.
Taking a public light storage charging point station of an electric automobile as an example, the electric load is electric equipment except a charging pile in the power station, such as an illuminating lamp and the like.
Step 202, determining a power scheduling object according to the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the energy storage module power and the charging module power.
It should be noted that, at present, in order to avoid the overpower operation of the optical storage and charging system, the power of each charging pile in the charging module is often selected to be reduced, and if the use power of the charging pile is limited, the impact of the starting of the charging pile cannot be avoided, so that the safety of the optical storage and charging system and the power grid cannot be ensured, the output power of the charging pile is reduced, and in order to solve the problem, in the embodiment of the application, the power adjustment object is selected according to the total power supply amount of the system and the power requirements of the power load power, the power of the energy storage module and the power characterization of the charging module. The power regulation object can be an energy storage module and/or a charging module, since the power of the electric load is not adjustable.
Specifically, in an embodiment, the utility power is denoted as P1, the photovoltaic module power is denoted as P2, the energy storage module power is denoted as P3, the charging module power is denoted as P4, the power consumption load power is denoted as P5, and when the total power supply amount of the system represented by the accumulated result of the utility power and the photovoltaic module power is smaller than the total power consumption requirement represented by the accumulated result of the power consumption load power, the energy storage module power and the charging module power (p1+p2 < p3+p4+p5), but the total power supply amount of the system is not smaller than the sum of the power consumption load power and the charging module power (p1+p2 is greater than or equal to p4+p5), it is determined that the power scheduling object includes the energy storage unit.
When the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is smaller than the total power consumption requirement (P1+P2 < P3+P4+P5) represented by the accumulated result of the electric load power, the energy storage module power and the charging module power, and the total system power supply quantity is smaller than the sum (P1+P2 < P4+P5) of the electric load power and the charging module power, determining that the scheduling object comprises the charging module, and at the moment, even if the energy storage module has the charging requirement, prohibiting the energy storage module from being charged.
When the total power supply quantity of the system represented by the accumulated result of the public power grid power and the photovoltaic module power is not smaller than the sum of the power consumption requirements represented by the power consumption load power, the power of the energy storage module and the power of the charging module (P1+P2 is more than or equal to P3+P4+P5), power scheduling is not needed at this time, each charging pile in the charging module can be normally started, and the energy storage system can be normally charged if the charging requirements exist.
In step 203, when the power scheduling object includes a charging module and the energy storage module has a discharging condition, a system electric quantity output threshold is determined according to the photovoltaic module power, the energy storage module power and the public power grid power.
Whether the energy storage module has a discharge condition or not can be determined according to the capacity of the energy storage unit, for example, when the current capacity of the energy storage module reaches a preset capacity threshold, it is determined that the energy storage module has a discharge condition.
Specifically, when the power scheduling object includes a charging module and the energy storage module has a discharging condition, the accumulated result of the photovoltaic module power, the energy storage module power and the public power grid power can be determined as a system electric quantity output threshold.
And 204, determining the target power of each charging pile in the charging module according to the system electric quantity output threshold and the power consumption load power, and carrying out power scheduling on the charging module according to the target power.
Specifically, the difference between the system electric quantity output threshold and the power of the electric load can be determined as the target power of each charging pile in the charging module, and then the charging module is subjected to corresponding power scheduling according to the target power.
Specifically, in an embodiment, when the power scheduling object includes a charging module and the energy storage module does not have a discharging condition, determining the total power supply amount of the system as a system power output threshold; and determining the difference between the system electric quantity output threshold value and the electric load power as the target power (P4=P1+P2-P5) of each charging pile in the charging module.
Specifically, when the energy storage module does not have a discharging condition, it can be determined that the energy storage module cannot be used as a power supply end of the charging module, so that the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is used as a system power quantity output threshold.
On the basis of the above embodiment, as a practical manner, in an embodiment, determining the target power of each charging pile in the charging module according to the system power output threshold and the electric load power includes:
step 2041, if the system electric quantity output threshold is not less than the sum of the power of the charging module and the power of the electric load (P1+P2+P3 is greater than or equal to P4+P5), determining that the target power of each charging pile in the charging module is the rated power of each charging pile;
in step 2042, if the system power output threshold is smaller than the sum of the power of the charging module and the power of the power load (p1+p2+p3 < p4+p5), the target power of each charging pile in the charging module is determined to be the difference between the system power output threshold and the power load (p4=p1+p2+p3-P5).
When the energy storage module is determined to be in the preset discharging time period, the energy storage module is preferentially used for supplying power to the charging module, when the electric quantity of the energy storage module is insufficient, the energy storage module is used for supplying power to the charging module based on the public power grid, and when the energy storage module is used for supplying power to the charging module based on the public power grid, the public power grid outputs power P1=P4+P5-P3-P2.
Specifically, when p1+p2+p3 is greater than or equal to p4+p5, the charging module is started normally, i.e. the target power of each charging pile is the rated power of each charging pile. Under the condition that P1+P2+P3 is less than P4+P5, the charging module is started in a power-limited mode, and the target power P4=P1+P2+P3-P5 of the charging module is obtained.
Specifically, in an embodiment, it may be determined whether the energy storage module is in a preset discharge period; when the energy storage module is in a preset discharging time period, the energy storage module is used for supplying power to the charging module preferentially, and when the electric quantity of the energy storage module is insufficient, the energy storage module is used for supplying power to the charging module based on a public power grid; the output power of the public power grid is the difference between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the energy storage module, namely P1=P4+P5-P3-P2.
When the energy storage module is not in a preset discharging time period, the power supply for the charging module is preferentially based on the public power grid, and when the electric quantity of the public power grid is insufficient, the power supply for the charging module is based on the energy storage module; the output power of the energy storage module is the difference between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the public power grid, namely P3=P4+P5-P1-P2.
It should be noted that, the energy storage unit utilizes the peak-valley electricity price difference to absorb low-price valley electricity and flat electricity, and releases electric energy when electricity consumption is high, so as to reduce electricity consumption cost, and the preset discharging time period of the energy storage unit is the electricity consumption peak time period. The energy storage module is not in a preset discharging time period, and directly supplies power to the charging module based on the public power grid, so that the consumption of charging and discharging resources of the energy storage module is reduced, and the running cost of the optical storage charging system is reduced to a certain extent.
The energy storage module is not in a preset discharging time period, but the public power grid is insufficient in electric quantity, and the energy storage module supplies power for the charging module, so that the charging module is ensured to stably operate, and the reliability of the whole optical storage charging system is improved.
On the basis of the above embodiment, as a practical implementation, in an embodiment, the method further includes:
step 301, when the power scheduling object includes an energy storage module and the energy storage module is in a preset discharging period (preferably based on power supply of the energy storage module), if the sum of the power of the photovoltaic module and the energy storage module is not less than the sum of the power of the charging module and the power of the electric load (p3+p2 is greater than or equal to p4+p5), determining that the target power of the energy storage module is the difference between the power of the charging module and the power of the photovoltaic module (p3=p4-p2);
step 302, if the sum of the power of the photovoltaic module and the power of the energy storage module is smaller than the sum of the power of the charging module and the power of the electric load (p3+p2 < p4+p5), determining that the target power of the energy storage module is the rated power of the energy storage module, i.e. the full power output of the energy storage module.
Specifically, when the power scheduling object includes the energy storage module and the energy storage module is not in the preset discharging period, the charging module can normally operate because P1+P2 is greater than or equal to P4+P5 at this time.
Specifically, in an embodiment, when the power scheduling object includes an energy storage module and the energy storage module currently has a charging requirement, the charging power of the energy storage module is determined as a difference value (p3=p1+p2-P4-P5) between the total system power supply amount and a sum of the power of the electric load and the power of the charging module.
It should be noted that, when the current capacity of the energy storage module is lower than the preset capacity lower limit value, it may be determined that the energy storage module has a current charging requirement.
Specifically, as shown in fig. 3, an overall flow chart of the optical storage and charge power scheduling method provided in the embodiment of the present application is shown, in fig. 3, the power grid is a public power grid, the energy storage is an energy storage module, the charging pile is a charging module, and the specific implementation manner of the flow shown in fig. 3 is referred to the above embodiment and is not repeated.
According to the optical storage and charging power scheduling method, the power of the electric load, the power of the photovoltaic module, the power of the energy storage module, the power of the charging module and the power of the public power grid of the optical storage and charging system are obtained; determining a power scheduling object according to the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the energy storage module power and the charging module power; when the power scheduling object comprises a charging module and the energy storage module has a discharging condition, determining a system electric quantity output threshold according to the photovoltaic module power, the energy storage module power and the public power grid power; and determining target power of each charging pile in the charging module according to the system electric quantity output threshold and the power consumption load power, and carrying out power scheduling on the charging module according to the target power. According to the method provided by the scheme, the target power of the charging module is determined according to the system electric quantity output threshold and the fixed electric load power, so that the system overpower operation is avoided, and the safety of the optical storage charging system and the power grid is improved. And moreover, the power scheduling can be performed on the energy storage module, the complementary power supply of the energy storage module and a public power grid is realized, the smooth power output of the system is realized, the power quality reduction caused by power grid impact or the influence on the safety of the power grid and the system is avoided, the power of the optical storage and charging system is fully scheduled, the charging requirement is met to the greatest extent, the charging operation efficiency is improved, and the power waste is reduced.
The embodiment of the application provides an optical storage and charging power scheduling device, which is used for executing the optical storage and charging power scheduling method provided by the embodiment.
Fig. 4 is a schematic structural diagram of an optical storage/charging power scheduling device according to an embodiment of the present application. The optical storage/charging power scheduling device 40 includes: an acquisition module 401, a first determination module 402, a second determination module 403, and a scheduling module 404.
The system comprises an acquisition module, a power storage module and a public power grid, wherein the acquisition module is used for acquiring the power of an electric load of the optical storage and charging system, the power of the photovoltaic module, the power storage module, the power of the charging module and the power of the public power grid; the first determining module is used for determining a power scheduling object according to the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the energy storage module power and the charging module power; the second determining module is used for determining a system electric quantity output threshold according to the power of the photovoltaic module, the power of the energy storage module and the power of the public power grid when the power scheduling object comprises a charging module and the energy storage module has a discharging condition; and the scheduling module is used for determining the target power of each charging pile in the charging module according to the system electric quantity output threshold and the power consumption load power, and performing power scheduling on the charging module according to the target power.
Specifically, in an embodiment, the first determining module is specifically configured to:
when the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is smaller than the total power consumption requirement represented by the accumulated result of the power consumption load power, the energy storage module power and the charging module power, but the total system power supply quantity is not smaller than the sum of the power consumption load power and the charging module power, determining that the power scheduling object comprises an energy storage unit;
and when the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is smaller than the total power consumption requirement represented by the accumulated result of the power consumption load power, the energy storage module power and the charging module power, and the total system power supply quantity is smaller than the sum of the power consumption load power and the charging module power, determining that the scheduling object comprises the charging module.
Specifically, in an embodiment, the scheduling module is specifically configured to:
if the system electric quantity output threshold value is not smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of each charging pile in the charging module is the rated power of each charging pile;
if the system electric quantity output threshold value is smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of each charging pile in the charging module is the difference between the system electric quantity output threshold value and the power of the electric load;
when the energy storage module is determined to be in the preset discharging time period, the energy storage module is preferentially used for supplying power to the charging module, and when the electric quantity of the energy storage module is insufficient, the public power grid is used for supplying power to the charging module.
Specifically, in an embodiment, the scheduling module is further configured to:
judging whether the energy storage module is in a preset discharging time period or not;
when the energy storage module is in a preset discharging time period, the energy storage module is used for supplying power to the charging module preferentially, and when the electric quantity of the energy storage module is insufficient, the energy storage module is used for supplying power to the charging module based on a public power grid; the output power of the public power grid is the difference between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the energy storage module;
when the energy storage module is not in a preset discharging time period, the power supply for the charging module is preferentially based on the public power grid, and when the electric quantity of the public power grid is insufficient, the power supply for the charging module is based on the energy storage module; the output power of the energy storage module is the difference between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the public power grid.
Specifically, in an embodiment, the scheduling module is further configured to:
when the power scheduling object comprises a charging module and the energy storage module does not have a discharging condition, determining the total power supply quantity of the system as a system electric quantity output threshold;
and determining the difference between the system electric quantity output threshold value and the power of the electric load as the target power of each charging pile in the charging module.
Specifically, in an embodiment, the scheduling module is further configured to:
when the power scheduling object comprises an energy storage module and the energy storage module is in a preset discharging time period, if the sum of the power of the photovoltaic module and the energy storage module is not smaller than the sum of the power of the charging module and the power of the electricity-consuming load, determining that the target power of the energy storage module is the difference between the power of the charging module and the power of the photovoltaic module;
and if the sum of the power of the photovoltaic module and the power of the energy storage module is smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of the energy storage module is the rated power of the energy storage module.
Specifically, in an embodiment, the scheduling module is further configured to:
when the power scheduling object comprises an energy storage module and the energy storage module has a charging requirement at present, determining the charging power of the energy storage module as a difference value between the total power supply quantity of the system and the sum of the power of the electric load and the power of the charging module.
The specific manner in which the respective modules perform the operations of the optical storage-charging power scheduling apparatus in this embodiment has been described in detail in the embodiments related to the method, and will not be described in detail here.
The optical storage and charge power scheduling device provided in the embodiment of the present application is configured to execute the optical storage and charge power scheduling method provided in the foregoing embodiment, and its implementation manner and principle are the same and are not repeated.
The embodiment of the application provides an electronic device for executing the optical storage and charging power scheduling method provided by the embodiment.
Fig. 5 is a schematic structural diagram of an electronic device according to an embodiment of the present application. The electronic device 50 includes: at least one processor 51 and a memory 52.
The memory stores computer-executable instructions; at least one processor executes computer-executable instructions stored in a memory, causing the at least one processor to perform the optical storage charging power scheduling method as provided by the above embodiments.
The implementation manner and principle of the electronic device provided in the embodiment of the present application are the same, and are not repeated.
The embodiment of the application provides a computer readable storage medium, wherein computer executable instructions are stored in the computer readable storage medium, and when a processor executes the computer executable instructions, the method for scheduling the optical storage and charging power provided by any embodiment is realized.
The storage medium including the computer executable instructions in the embodiments of the present application may be used to store the computer executable instructions of the optical storage charging power scheduling method provided in the foregoing embodiments, and the implementation manner and principle of the implementation are the same, and are not repeated.
In the several embodiments provided in this application, it should be understood that the disclosed apparatus and method may be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative, e.g., the division of the units is merely a logical function division, and there may be additional divisions when actually implemented, e.g., multiple units or components may be combined or integrated into another system, or some features may be omitted or not performed. Alternatively, the coupling or direct coupling or communication connection shown or discussed with each other may be an indirect coupling or communication connection via some interfaces, devices or units, which may be in electrical, mechanical or other form.
The units described as separate units may or may not be physically separate, and units shown as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
In addition, each functional unit in each embodiment of the present application may be integrated in one processing unit, or each unit may exist alone physically, or two or more units may be integrated in one unit. The integrated units may be implemented in hardware or in hardware plus software functional units.
The integrated units implemented in the form of software functional units described above may be stored in a computer readable storage medium. The software functional unit is stored in a storage medium, and includes several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) or a processor (processor) to perform part of the steps of the methods described in the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a random access Memory (Random Access Memory, RAM), a magnetic disk, or an optical disk, or other various media capable of storing program codes.
It will be apparent to those skilled in the art that, for convenience and brevity of description, only the above-described division of the functional modules is illustrated, and in practical application, the above-described functional allocation may be performed by different functional modules according to needs, i.e. the internal structure of the apparatus is divided into different functional modules to perform all or part of the functions described above. The specific working process of the above-described device may refer to the corresponding process in the foregoing method embodiment, which is not described herein again.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present application, and not for limiting the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some or all of the technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present application.

Claims (10)

1. An optical storage charging power scheduling method is applied to an optical storage charging system, the optical storage charging system comprises a photovoltaic module, an energy storage module and a charging module, the charging module comprises a plurality of charging piles, and the optical storage charging system is integrated into a public power grid, and the method is characterized by comprising the following steps:
acquiring power consumption load power, photovoltaic module power, energy storage module power, charging module power and public power grid power of the optical storage and charging system;
determining a power scheduling object according to the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the energy storage module power and the charging module power;
when the power scheduling object comprises a charging module and the energy storage module has a discharging condition, determining a system electric quantity output threshold according to the photovoltaic module power, the energy storage module power and the public power grid power;
and determining target power of each charging pile in the charging module according to the system electric quantity output threshold and the power consumption load power, and carrying out power scheduling on the charging module according to the target power.
2. The method of claim 1, wherein determining the power scheduling object from the total amount of system power supply characterized by the aggregate of utility power and photovoltaic module power and the power demand characterized by the electrical load power, energy storage module power, and charging module power comprises:
when the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is smaller than the total power consumption requirement represented by the accumulated result of the power consumption load power, the energy storage module power and the charging module power, but the total system power supply quantity is not smaller than the sum of the power consumption load power and the charging module power, determining that the power scheduling object comprises an energy storage unit;
and when the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power is smaller than the total power consumption requirement represented by the accumulated result of the power consumption load power, the energy storage module power and the charging module power and the total system power supply quantity is smaller than the sum of the power consumption load power and the charging module power, determining that the scheduling object comprises the charging module.
3. The method of claim 1, wherein determining the target power for each charging peg in the charging module based on the system charge output threshold and the electrical load power comprises:
if the system electric quantity output threshold value is not smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of each charging pile in the charging module is the rated power of each charging pile;
if the system electric quantity output threshold value is smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of each charging pile in the charging module is the difference between the system electric quantity output threshold value and the power of the electric load;
when the energy storage module is determined to be in a preset discharging time period, the energy storage module is preferentially used for supplying power to the charging module, and when the electric quantity of the energy storage module is insufficient, the public power grid is used for supplying power to the charging module.
4. A method according to claim 3, further comprising:
judging whether the energy storage module is in a preset discharging time period or not;
when the energy storage module is in a preset discharging time period, the energy storage module is preferentially used for supplying power to the charging module, and when the electric quantity of the energy storage module is insufficient, the energy storage module is used for supplying power to the charging module based on a public power grid; the output power of the public power grid is the difference value between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the energy storage module;
when the energy storage module is not in a preset discharging period, the power supply for the charging module is preferentially based on the public power grid, and when the electric quantity of the public power grid is insufficient, the power supply for the charging module is based on the energy storage module; the output power of the energy storage module is the difference between the sum of the power of the charging module and the power of the electric load and the sum of the power of the photovoltaic module and the power of the public power grid.
5. The method as recited in claim 1, further comprising:
when the power scheduling object comprises a charging module and the energy storage module does not have a discharging condition, determining the total power supply quantity of the system as a system electric quantity output threshold;
and determining the difference between the system electric quantity output threshold and the power of the electric load as the target power of each charging pile in the charging module.
6. The method as recited in claim 1, further comprising:
when the power scheduling object comprises an energy storage module and the energy storage module is in a preset discharging time period, if the sum of the power of the photovoltaic module and the energy storage module is not smaller than the sum of the power of the charging module and the power of the electricity-consuming load, determining that the target power of the energy storage module is the difference between the power of the charging module and the power of the photovoltaic module;
and if the sum of the power of the photovoltaic module and the power of the energy storage module is smaller than the sum of the power of the charging module and the power of the electric load, determining that the target power of the energy storage module is the rated power of the energy storage module.
7. The method as recited in claim 6, further comprising:
when the power scheduling object comprises an energy storage module and the energy storage module has a charging requirement currently, determining the charging power of the energy storage module as a difference value between the total power supply quantity of the system and the sum of the power load power and the charging module power.
8. The utility model provides a light stores up power dispatch device that fills, is applied to light stores up and fills the system, light stores up and fills the system and includes photovoltaic module, energy storage module and the module that charges, the module that charges includes a plurality of fills electric pile, light stores up and fills the system and merges public electric wire netting, its characterized in that, the device includes:
the acquisition module is used for acquiring the power load power, the photovoltaic module power, the energy storage module power, the charging module power and the public power grid power of the optical storage and charging system;
the first determining module is used for determining a power scheduling object according to the total system power supply quantity represented by the accumulated result of the public power grid power and the photovoltaic module power and the power consumption requirement represented by the power consumption load power, the energy storage module power and the charging module power;
the second determining module is used for determining a system electric quantity output threshold according to the power of the photovoltaic module, the power of the energy storage module and the power of the public power grid when the power scheduling object comprises a charging module and the energy storage module has a discharging condition;
and the scheduling module is used for determining the target power of each charging pile in the charging module according to the system electric quantity output threshold and the power consumption load power, and performing power scheduling on the charging module according to the target power.
9. An electronic device, comprising: at least one processor and memory;
the memory stores computer-executable instructions;
the at least one processor executing computer-executable instructions stored in the memory causes the at least one processor to perform the method of any one of claims 1 to 7.
10. A computer readable storage medium having stored therein computer executable instructions which when executed by a processor implement the method of any of claims 1 to 7.
CN202211710419.7A 2022-12-29 2022-12-29 Optical storage charging power scheduling method and device, electronic equipment and storage medium Pending CN116245304A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211710419.7A CN116245304A (en) 2022-12-29 2022-12-29 Optical storage charging power scheduling method and device, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211710419.7A CN116245304A (en) 2022-12-29 2022-12-29 Optical storage charging power scheduling method and device, electronic equipment and storage medium

Publications (1)

Publication Number Publication Date
CN116245304A true CN116245304A (en) 2023-06-09

Family

ID=86626873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211710419.7A Pending CN116245304A (en) 2022-12-29 2022-12-29 Optical storage charging power scheduling method and device, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN116245304A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116937632A (en) * 2023-09-18 2023-10-24 广东德九新能源有限公司 Light-storage integrated energy storage method, device, system and medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116937632A (en) * 2023-09-18 2023-10-24 广东德九新能源有限公司 Light-storage integrated energy storage method, device, system and medium
CN116937632B (en) * 2023-09-18 2023-11-28 广东德九新能源有限公司 Light-storage integrated energy storage method, device, system and medium

Similar Documents

Publication Publication Date Title
CN103522994B (en) Automatic group optimization system for power battery boxes in EV battery swap stations and operating method thereof
CN111016725B (en) Mode selection control method of energy storage type charging pile
CN109217290A (en) Meter and the microgrid energy optimum management method of electric car charge and discharge
CN111106620A (en) Electric automobile charging distributed management scheme based on block chain
CN105667330A (en) Control method and system for DCDC (direct current direct current)
CN111490576A (en) Charging station power allocation method suitable for demand response
CN116245304A (en) Optical storage charging power scheduling method and device, electronic equipment and storage medium
CN109353243B (en) Discharging algorithm for realizing bidirectional ordered charging and discharging of intelligent charging pile system
CN111756064A (en) Electric automobile-contained power grid optimized dispatching method and device based on time-of-use electricity price
CN114844078A (en) Method, device and system for scheduling electric energy in battery replacement station and battery replacement station
CN110707736B (en) Micro-grid operation method for intelligent community user demand side response
WO2024067741A1 (en) Smart charging method and system for charging pile, and electronic device and storage medium
CN113270884A (en) Power energy management system and method based on V2G microgrid system
CN115001113B (en) Power supply control method and device and power supply equipment
CN113381426B (en) Capacity configuration method of flywheel energy storage device, terminal and storage medium
CN115912436A (en) Power grid dispatching operation optimization calculation method considering power demand response
CN116198368A (en) Novel solar energy storage charging system and control method thereof
CN115423203A (en) Evaluation method and device for improving benefit of power system by utilizing power battery in echelon
CN108988425A (en) A kind of reuse method of stored energy power battery pack
CN114844059A (en) Double-layer optimization control method for participating in peak shaving of electric vehicle cluster
CN114331757A (en) Energy management method, energy management device, computer equipment and computer readable storage medium
CN113541175A (en) Electricity supplementing method and system for electricity changing station based on peak clipping and valley filling
CN113602127A (en) Charging pile energy management method and device
CN114683908A (en) Battery replacement capability evaluation method and system for battery replacement station, electronic device and medium
Sakai et al. Energy storage devices and systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination