CN116332000A - A double protective door device for construction elevators and floor door openings - Google Patents

A double protective door device for construction elevators and floor door openings Download PDF

Info

Publication number
CN116332000A
CN116332000A CN202310354368.7A CN202310354368A CN116332000A CN 116332000 A CN116332000 A CN 116332000A CN 202310354368 A CN202310354368 A CN 202310354368A CN 116332000 A CN116332000 A CN 116332000A
Authority
CN
China
Prior art keywords
door
protective door
floor
protective
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202310354368.7A
Other languages
Chinese (zh)
Inventor
李强
马卫华
门玉蕊
刘家鑫
朱志东
王尚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan University
Original Assignee
Tangshan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan University filed Critical Tangshan University
Priority to CN202310354368.7A priority Critical patent/CN116332000A/en
Priority to ZA2023/06072A priority patent/ZA202306072B/en
Publication of CN116332000A publication Critical patent/CN116332000A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/24Safety devices in passenger lifts, not otherwise provided for, for preventing trapping of passengers
    • B66B13/28Safety devices in passenger lifts, not otherwise provided for, for preventing trapping of passengers between car or cage and wells
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/30Constructional features of doors or gates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention relates to the technical field of building construction safety protection, and particularly discloses a double-protection door device for a construction elevator and a floor door opening, which comprises a hanging cage, door posts, an auxiliary door post, a first protection door, a rotating shaft, a second protection door, a fixing plate and an operation window.

Description

一种施工升降机与楼层门洞用双重防护门装置A double protective door device for construction elevators and floor door openings

技术领域technical field

本发明涉及建筑施工安全防护技术领域,具体为一种施工升降机与楼层门洞用双重防护门装置。The invention relates to the technical field of building construction safety protection, in particular to a double protective door device for construction elevators and floor door openings.

背景技术Background technique

建筑工程施工现场是安全生产事故的高发区域,“高处坠落伤害”作为建筑施工现场的五大伤害之一,已经成为当前安全管理工作的重中之重;施工升降机楼层运料平台防护门——作为“高处坠落伤害”的突出重点之一,其安全性能、使用方法可靠与否,直接关系人的生命,设备和财产安全。The construction site of a construction project is a high-incidence area of safety production accidents. As one of the five major injuries on the construction site, "falling from a height" has become the top priority of the current safety management work; the protective door of the construction elevator floor material delivery platform—— As one of the prominent points of "falling injury from height", its safety performance and method of use are reliable or not, directly related to human life, equipment and property safety.

施工电梯进行物料和作业人员的需要垂直运输,为保证安全施工,在升降机和各楼层运料平台出入口安装防护门,根据目前大部分施工场地使用的防护门形式,楼层防护门不能自动锁闭 ,作业人员随意进出运料平台,安全风险较高,为进一步确保安全,防止在建筑施工过程中,可能由于误触等原因导致升降机启动离开,从而导致施工人员坠落;或由于施工人员素质水平参差不齐,在经过培训后仍然存在不能及时关闭施工升降机的情况,现需开发设计一种施工升降机与楼层门洞用双重防护门装置,针对上述问题,在现有的装置基础上进行技术创新。Construction elevators carry out vertical transportation of materials and operators. In order to ensure safe construction, protective doors are installed at the entrances and exits of elevators and material delivery platforms on each floor. According to the form of protective doors currently used in most construction sites, floor protective doors cannot be automatically locked. Operators enter and leave the material transport platform at will, which has a high safety risk. In order to further ensure safety, prevent the elevator from starting to leave due to accidental touches and other reasons during the construction process, resulting in the construction personnel falling; or due to the uneven quality of the construction personnel. Qi, after the training, there is still the situation that the construction elevator cannot be closed in time. Now it is necessary to develop and design a double protective door device for the construction elevator and the floor door opening. In view of the above problems, technological innovation is carried out on the basis of the existing device.

发明内容Contents of the invention

本发明要解决的技术问题是提供一种施工升降机与楼层门洞用双重防护门装置,防止因误触等原因导致升降机启动离开,防护门未及时关闭,从而导致施工人员坠落。The technical problem to be solved by the present invention is to provide a double protective door device for the construction elevator and the floor doorway, so as to prevent the elevator from starting and leaving due to accidental touch and other reasons, and the protective door is not closed in time, resulting in the construction personnel falling.

为解决上述技术问题,本发明所采用的技术方案如下:In order to solve the problems of the technologies described above, the technical scheme adopted in the present invention is as follows:

一种施工升降机与楼层门洞用双重防护门装置,包括吊笼、门柱、附门柱、防护门一、转轴、防护门二、固定板、操作窗,其关键技术在于:所述升降机的吊笼上设有防护门一,所述门柱竖向设立在门洞外侧,所述附门柱竖向设立在门洞内测,所述防护门二活动安装在右侧门柱上,所述防护门一通过转轴与升降机的吊笼底板转动连接,所述防护门一与转轴固定连接,所述防护门一靠近升降机的吊笼顶部一侧设有操作窗。A double protective door device for a construction elevator and a floor door opening, including a hanging cage, a doorpost, an attached doorpost, a protective door, a rotating shaft, a protective door two, a fixing plate, and an operating window. The key technology of the elevator is: The cage is provided with protective door 1, the gate post is vertically set up outside the door opening, the attached door post is vertically set up inside the door opening, and the protective door 2 is movably installed on the right door post, and the protective door One is rotatably connected with the cage bottom plate of the elevator through the rotating shaft, the protective door is fixedly connected with the rotating shaft, and the protective door is provided with an operation window near the top side of the cage of the elevator.

优选地,所述防护门一上设有螺栓孔,所述楼层地面上设有螺栓孔,防护门一向门洞内侧方向转动至与楼层地面平行时,所述防护门一上的螺栓孔与楼层地面的螺栓孔对齐,所述防护门一上的螺栓孔上转动连接有固定螺栓。Preferably, the first protective door is provided with bolt holes, and the ground of the floor is provided with bolt holes. The bolt holes are aligned, and the bolt holes on the protective door one are rotatably connected with fixing bolts.

优选地,所述升降机的吊笼底板对应转轴处开设有与转轴尺寸匹配的滑槽,所述滑槽深度小于防护门一底部到操作窗之间的距离。Preferably, a chute matching the size of the rotating shaft is provided at the bottom plate of the elevator cage corresponding to the rotating shaft, and the depth of the chute is smaller than the distance from the bottom of the protective door to the operating window.

优选地,所述转轴右端与电机转动连接,所述电机通过控制器一控制。Preferably, the right end of the rotating shaft is rotationally connected with a motor, and the motor is controlled by a controller.

优选地,所述操作窗对应的防护门二的位置设有收纳槽,所述收纳槽内转动连接有推杆,所述推杆收纳在收纳槽内。Preferably, a storage slot is provided at the position of the protective door 2 corresponding to the operation window, and a push rod is rotatably connected to the storage slot, and the push rod is stored in the storage slot.

优选地,所述所述推杆为逆时针旋转180°的L型。Preferably, the push rod is L-shaped and rotates 180° counterclockwise.

优选地,所述所述推杆上设有把手。Preferably, a handle is provided on the push rod.

优选地,所述所述防护门二上设有观察窗。Preferably, the second protective door is provided with an observation window.

优选地,所述所述左侧门柱上和附门柱左侧面上分别设置有电磁铁,所述左侧门柱靠近升降机的吊笼左侧面一侧固设有永磁感应器,所述升降机的吊笼上借助固定板安装有感应块,所述感应块竖向运行时保持在永磁感应器的感应区域内,所述永磁感应器的信号输出端连接有控制器二,所述电磁铁通过电磁继电器连接电源。Preferably, electromagnets are respectively provided on the left side of the left doorpost and the left side of the attached doorpost, and a permanent magnetic sensor is fixed on the left side of the left side of the left doorpost close to the cage of the elevator. The cage of the elevator is equipped with an induction block by means of a fixed plate, and the induction block is kept in the induction area of the permanent magnetic inductor when running vertically, and the signal output end of the permanent magnetic inductor is connected to the controller 2, and the electromagnetic induction block The iron is connected to the power supply through the electromagnetic relay.

优选地,所述所述防护门二通过弹簧合页转动连接在右侧门柱上。Preferably, the second protective door is rotatably connected to the right doorpost through a spring hinge.

本发明与现有技术相比,所取得的技术进步在于:Compared with the prior art, the technical progress achieved by the present invention lies in:

本发明的施工升降机与楼层门洞用双重防护门装置通过先开启防护门二,再开启防护门一,并且使防护门一通过转轴与升降机的吊笼底板转动连接,防护门一与转轴固定连接,将防护门一连接升降机的吊笼与楼层地面,在防护门二保持开启状态时,可减少施工人员不注意导致坠落。The double protective door device for the construction elevator and the floor door opening of the present invention first opens the second protective door, then opens the first protective door, and makes the first protective door rotatably connected with the cage bottom plate of the elevator through the rotating shaft, and the first protective door is fixedly connected with the rotating shaft. Connect the protective door one to the hoisting cage of the elevator and the floor ground, and when the protective door two remains open, it can reduce the construction personnel's carelessness and cause the fall.

本发明通过在升降机的吊笼底板设置滑槽,开启防护门一后,将防护门推入滑槽,再通过固定螺栓将防护门一与楼层地面固定,可减少因误触等原因升降机的吊笼突然离开导致施工人员坠落类似意外的发生。In the present invention, a chute is provided on the bottom plate of the cage of the elevator, and after the protective door is opened, the protective door is pushed into the chute, and then the protective door is fixed to the floor by fixing bolts, so that the lifting of the elevator due to accidental touches and other reasons can be reduced. The sudden departure of the cage caused construction workers to fall and similar accidents occurred.

本发明防护门一的设计结合升降机的吊笼离开后防护门二自动锁闭,极大地增加了施工人员通过升降机的吊笼与楼层门洞时的安全系数。The design of protective door 1 of the present invention is combined with the automatic locking of protective door 2 after the cage of the elevator leaves, which greatly increases the safety factor when construction personnel pass through the cage of the elevator and the doorway of the floor.

附图说明Description of drawings

下面结合附图和具体实施方式对本发明作进一步详细的说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

图1为本发明实施例中双重防护门开启状态的结构示意图;Fig. 1 is the structural representation of the open state of the double protective door in the embodiment of the present invention;

图2为本发明实施例中双重防护门开启状态的上视图;Fig. 2 is the upper view of the open state of the double protective door in the embodiment of the present invention;

图3为本发明图2中D-D处的剖面图;Fig. 3 is the sectional view of D-D place in Fig. 2 of the present invention;

图4为本发明图3的Ⅱ处的局部视图;Fig. 4 is the partial view of II place of Fig. 3 of the present invention;

图5本发明实施例中双重防护门关闭状态的结构示意图;Fig. 5 is a schematic structural view of the closed state of the double protective door in the embodiment of the present invention;

图6为本发明实施例中双重防护门关闭状态的上视图;Fig. 6 is the upper view of the closed state of the double protective door in the embodiment of the present invention;

图7为本发明图6中C-C处的剖面图。Fig. 7 is a sectional view at C-C in Fig. 6 of the present invention.

图中:1、吊笼;1-1、固定板;1-2、感应块;2、防护门一;2-1、操作窗;2-2、螺栓孔;2-3、固定螺栓;3、转轴;3-1、电机;3-2、滑槽;4、门柱;4-1、永磁感应器;5、防护门二;5-1收纳槽;5-2、推杆;5-3、把手;5-4、观察窗;6、附门柱;6-1、电磁铁;7、楼层地面;8、门洞。In the figure: 1, hanging cage; 1-1, fixed plate; 1-2, induction block; 2, protective door 1; 2-1, operation window; 2-2, bolt hole; 2-3, fixing bolt; 3 , rotating shaft; 3-1, motor; 3-2, chute; 4, door post; 4-1, permanent magnetic sensor; 5, protective door two; 5-1 storage slot; 5-2, push rod; 5- 3. Handle; 5-4. Observation window; 6. Attached door post; 6-1. Electromagnet; 7. Floor ground; 8. Door opening.

具体实施方式Detailed ways

下面结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention are clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

如图1、5所示,一种施工升降机与楼层门洞8用双重防护门装置,包括门柱4、附门柱6、防护门一2、转轴3、防护门二5、固定板1-1、操作窗2-1,所述升降机的吊笼1上设有防护门一2,所述防护门一2通过转轴3与升降机的吊笼1底板转动连接,所述防护门一2与转轴3固定连接,在防护门一2上设置扶手,方便开启和关闭防护门一2,所述转轴3右端与小型电机3-1转动连接,所述电机3-1通过控制器一控制使防护门一2绕转轴3缓慢转动,实现防护门二5平稳地的开启和关闭,升降机的吊笼1所停靠的对应楼层门洞8外的两侧垂直楼层地面7设立有一对门柱4,在门洞8内的右侧垂直楼层地面7设立有附门柱6,所述防护门二5活动安装在右侧门柱4上,如图7所示,所述防护门一2靠近升降机的吊笼1顶部一侧设有操作窗2-1,施工人员在升降机的吊笼1内可通过操作窗2-1推开防护门二5;As shown in Figures 1 and 5, a double protective door device for a construction elevator and a floor door opening 8, including a door post 4, an attached door post 6, a protective door 2, a rotating shaft 3, a protective door 2 5, and a fixed plate 1-1 , the operation window 2-1, the cage 1 of the elevator is provided with a protective door-2, and the protective door-2 is rotatably connected with the bottom plate of the cage 1 of the elevator through the rotating shaft 3, and the protective door-2 is connected with the rotating shaft 3 Fixedly connected, armrests are set on the protective door-2 to facilitate the opening and closing of the protective door-2, the right end of the rotating shaft 3 is connected to the small motor 3-1 in rotation, and the motor 3-1 is controlled by the controller-1 to make the protective door-1 2. Rotate slowly around the rotating shaft 3 to realize the stable opening and closing of the protective door 25. A pair of door posts 4 are set up on the two sides of the vertical floor ground 7 outside the door opening 8 of the corresponding floor where the cage 1 of the elevator stops. The right side vertical floor ground 7 is provided with attached door post 6, and described protection door two 5 is movably installed on the right side door post 4, and as shown in Figure 7, described protection door one 2 is near the cage 1 top side of elevator An operation window 2-1 is provided, and construction workers can push open the protective door 25 through the operation window 2-1 in the cage 1 of the elevator;

作为进一步的优选方案,所述防护门二5借助于弹簧合页安装在右侧门柱4上,每个门洞8设置一套防护门二5,如图6、7所示,所述左侧门柱4上和附门柱6左侧面上分别固定设置有数量与防护门二5数量相同的电磁铁6-1,所述左侧门柱4上竖向布置数量与防护门数量相同的永磁感应器4-1,升降机的吊笼1借助固定板1-1安装有感应块1-2,感应块1-2竖向运行轨迹位于永磁感应器4-1的感应区域内;所述永磁感应器4-1信号输出端连接控制器二,每套电磁铁6-1均通过继电器连接电源,控制器二信号输出端连接电磁继电器控制端,本发明中的控制器二可以分层设置,也可以统一设置,可以根据具体情况进行选配,只要能够实现吊笼1经过永磁感应器4-1时,通过控制电磁继电器来实现对应电磁铁6-1得电和失电即可;As a further preferred solution, the protective door 2 5 is installed on the right door post 4 by means of a spring hinge, and each door opening 8 is provided with a set of protective door 2 5, as shown in Figures 6 and 7, the left side On the door post 4 and on the left side of the attached door post 6, electromagnets 6-1 with the same number as the number of protective doors 5 are respectively fixed, and the number of electromagnets 6-1 that are vertically arranged on the left side door post 4 is the same as that of the protective door. The permanent magnet inductor 4-1, the cage 1 of the elevator is equipped with an induction block 1-2 by means of the fixed plate 1-1, and the vertical running track of the induction block 1-2 is located in the sensing area of the permanent magnet inductor 4-1; The signal output end of the magnetic inductor 4-1 is connected to the controller two, and each set of electromagnets 6-1 is connected to the power supply through a relay, and the signal output end of the second controller is connected to the electromagnetic relay control end. The controller two in the present invention can be arranged in layers, It can also be set uniformly, and can be selected according to specific conditions, as long as it can be realized that when the hanging cage 1 passes the permanent magnetic inductor 4-1, the corresponding electromagnet 6-1 can be energized and de-energized by controlling the electromagnetic relay;

作为进一步的优选方案,如图3、4所示,通过在操作窗2-1对应的防护门二5的位置设置收纳槽5-1,且所述收纳槽5-1内转动连接有推杆5-2,所述推杆5-2为逆时针旋转180°的L型,所述推杆5-2收纳在收纳槽5-1内,施工人员可通过操作窗2-1先转动防护门二5上收纳槽5-1内的推杆5-2至与地面平行,可在推杆5-2上设置把手5-3方便转动推杆5-2,然后再推动推杆5-2将防护门二5推至附门柱6;As a further preferred solution, as shown in Figures 3 and 4, a storage slot 5-1 is provided at the position of the protective door 2 5 corresponding to the operation window 2-1, and a push rod is rotatably connected in the storage slot 5-1. 5-2, the push rod 5-2 is an L-shaped counterclockwise rotation of 180°, the push rod 5-2 is stored in the storage tank 5-1, and the construction personnel can first turn the protective door through the operation window 2-1 Two 5, the push rod 5-2 in the receiving groove 5-1 is parallel to the ground, handle 5-3 can be set on the push rod 5-2 to facilitate the rotation of the push rod 5-2, and then push the push rod 5-2 to The protective door 2 5 is pushed to the attached door post 6;

作为进一步的优选方案,在防护门二5上开设观察窗5-4,所述观察窗5-4方便施工人员在楼层内观察外面升降机的吊笼1的运行情况,做出准确判断防止意外发生;As a further preferred solution, an observation window 5-4 is provided on the protective door 25, and the observation window 5-4 is convenient for construction personnel to observe the operation of the cage 1 of the outside elevator in the floor, and make accurate judgments to prevent accidents from happening ;

作为进一步的优选方案,开启防护门一2转动至与楼层地面7平齐,如图2、3、6所示,在防护门一2和对应的楼层地面7上开设螺栓孔2-2,所述防护门一2上的螺栓孔2-2上转动连接有固定螺栓2-3,将所述固定螺栓2-3转动至楼层地面7的螺栓孔2-2内,可使防护门一2固定在楼层地面7上,避免因误触等原因升降机的吊笼1突然离开,导致施工人员坠落发生意外;As a further preferred solution, open the protective door-2 and turn it to be flush with the floor ground 7, as shown in Figures 2, 3, and 6, set the bolt holes 2-2 on the protective door-2 and the corresponding floor ground 7, so that The bolt hole 2-2 on the protective door-2 is rotatably connected with a fixed bolt 2-3, and the fixed bolt 2-3 is rotated into the bolt hole 2-2 on the floor ground 7, so that the protective door-2 can be fixed. On the floor ground 7, avoid the sudden departure of the hoisting cage 1 of the elevator due to accidental touch and other reasons, causing construction workers to fall and cause accidents;

作为进一步的优选方案,如图3所示,所述升降机的吊笼1底板对应转轴3处开设有与转轴3尺寸匹配的滑槽3-2,所述滑槽3-2深度为吊笼1底板深度的一半,开启防护门一2转动至与楼层地面7平齐后,将防护门一2推入滑槽3-2,再通过固定螺栓2-3固定,通过防护门一2增加升降机的吊笼1与楼层地面7之间的连接厚度,起到更好的加固作用;As a further preferred solution, as shown in Figure 3, the bottom plate of the elevator cage 1 corresponding to the rotating shaft 3 is provided with a chute 3-2 that matches the size of the rotating shaft 3, and the depth of the chute 3-2 is the same as that of the cage 1. Half of the depth of the bottom plate, open the protective door 1 and turn it to be flush with the floor ground 7, push the protective door 1 into the chute 3-2, and then fix it with the fixing bolt 2-3, and increase the height of the elevator through the protective door 1 2 The thickness of the connection between the hanging cage 1 and the floor ground 7 plays a better role in reinforcement;

本发明的工作过程如下:本发明提供的一种施工升降机与楼层门洞8用双重防护门装置,吊笼1运行时,永磁感应器4-1处于常开状态,左侧门柱4上电磁铁6-1对应的电磁继电器常闭点吸合,防护门二5电路接通,左侧门柱4上的电磁铁6-1得电,使防护门二5处于长期闭锁状态,吊笼1到达预设楼层停止后,感应块1-2与对应楼层的永磁感应器4-1感应,左侧门柱4上的电磁铁6-1对应的电磁继电器常闭点断开,防护门二5电路不通,左侧门柱4上的电磁铁6-1失电,由于防护门二5与左侧门柱4之间安装有弹簧合页,防护门二5依然紧贴左侧门柱4,在施工人员推动下才能开启防护门二5;同时,附门柱6上的电磁铁6-1对应的电磁继电器常开点吸合,附门柱6电路接通,附柱电磁铁6-1得电,施工人员通过操作窗2-1拉动把手5-3,使推杆5-2转动至与楼层地面7平行,然后推动把手5-3,带动防护门至附门柱6处,附门柱6上的电磁铁6-1吸合防护门二5,使防护门二5处于长期开启状态;The working process of the present invention is as follows: a kind of construction hoist provided by the present invention and floor door opening 8 use double protective door device, when hanging cage 1 moves, permanent magnetic inductor 4-1 is in normally open state, and electromagnet is placed on the left door post 4 The normally closed point of the electromagnetic relay corresponding to 6-1 is closed, the circuit of protective door 25 is connected, and the electromagnet 6-1 on the left doorpost 4 is energized, so that the protective door 25 is in a long-term locked state, and the cage 1 arrives. After the preset floor stops, the induction block 1-2 senses with the permanent magnetic sensor 4-1 of the corresponding floor, the electromagnetic relay normally closed point corresponding to the electromagnet 6-1 on the left door post 4 is disconnected, and the protective door 2 5 circuit Unreasonable, the electromagnet 6-1 on the left door post 4 loses power, because a spring hinge is installed between the protective door two 5 and the left door post 4, the protective door two 5 is still close to the left door post 4, in The protective door 2 5 can only be opened under the push of the construction personnel; meanwhile, the normally open point of the electromagnetic relay corresponding to the electromagnet 6-1 on the attached door post 6 is sucked in, and the attached door post 6 circuit is connected, and the attached post electromagnet 6-1 is Electricity, the construction worker pulls the handle 5-3 through the operation window 2-1, so that the push rod 5-2 is rotated to be parallel to the floor ground 7, and then pushes the handle 5-3 to drive the protective door to the 6 places of the attached door post, and the attached door post The electromagnet 6-1 on the 6 attracts the protective door 2 5, so that the protective door 2 5 is in a long-term open state;

施工人员操作控制器一使电机3-1驱动防护门一2开启,缓慢转动至与楼层地面7平齐,将防护门一2推入滑槽3-2,再用固定螺栓2-3固定防护门一2与楼层地面7,防护门一2处于长期开启,方便施工人员多次通过,且因防护门一2连接升降机的吊笼1与楼层地面7,可减少坠落事故的发生;The construction personnel operate the controller to make the motor 3-1 drive the protective door 12 to open, slowly rotate until it is flush with the floor 7, push the protective door 12 into the chute 3-2, and then fix the protective door 2 with the fixing bolt 2-3. Door 1 2 is connected to the floor ground 7, and the protective door 1 2 is open for a long time, which is convenient for construction personnel to pass through many times, and because the protective door 1 2 is connected to the hoisting cage 1 of the elevator and the floor ground 7, the occurrence of falling accidents can be reduced;

施工人员取下防护门一2上的固定螺栓2-3,并将防护门一2拉出滑槽3-2,然后进入升降机的吊笼1,操作控制器一使电机3-1驱动防护门一2关闭,缓慢转动至与楼层地面7垂直,防护门一2处于关闭状态;Construction workers remove the fixing bolts 2-3 on the protective door 1, pull the protective door 2 out of the chute 3-2, then enter the cage 1 of the elevator, and operate the controller 1 to make the motor 3-1 drive the protective door One 2 is closed, and it is slowly rotated to be perpendicular to the floor ground 7, and the protective door 1 2 is in a closed state;

吊笼1继续运行,感应块1-2离开永磁感应器4-1的感应区域后,附门柱6上的电磁铁6-1对应的电磁继电器常开点断开,附门柱6电路不通,附门柱6电磁铁6-1失电,防护门二5在弹簧合页的作用下自动向左侧门柱4方向运动并闭合,同时,门柱4电磁铁6-1对应的电磁继电器常闭点吸合,防护门二5电路接通,左侧门柱4上的电磁铁6-1得电,防护门二5自锁;进而实现防护门二5的自动锁闭和自动开启功能;另外一方面,本发明中的永磁感应器4-1和电磁铁6-1可以单独设置电源,在施工升降机不运行时,保证所有防护门处于锁闭状态。The hanging cage 1 continues to run, and after the induction block 1-2 leaves the induction area of the permanent magnet inductor 4-1, the normally open point of the electromagnetic relay corresponding to the electromagnet 6-1 on the attached doorpost 6 is disconnected, and the circuit of the attached doorpost 6 is disconnected , the attached door post 6 electromagnet 6-1 loses power, and the protective door 2 automatically moves to the left door post 4 and closes under the action of the spring hinge. At the same time, the electromagnetic relay corresponding to the door post 4 electromagnet 6-1 The normally closed point is closed, the protective door 25 circuit is connected, the electromagnet 6-1 on the left door post 4 is energized, and the protective door 25 is self-locked; thereby realizing the automatic locking and automatic opening functions of the protective door 25 On the other hand, the permanent magnet inductor 4-1 among the present invention and the electromagnet 6-1 can be provided with power supply separately, when construction hoist does not move, guarantees that all protective doors are in locked state.

最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明权利要求保护的范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the present invention, and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still The technical solutions recorded in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the claims of the present invention.

Claims (10)

1. The utility model provides a construction elevator and floor door opening are with dual guard gate device, includes cage, gatepost, attaches gatepost, guard gate one, pivot, guard gate two, fixed plate, operation window, its characterized in that: the lifting cage of the lifter is provided with a first protective door, the door post is vertically arranged on the outer side of the door opening, the auxiliary door post is vertically arranged in the door opening, the second protective door is movably arranged on the right door post, the first protective door is rotationally connected with the lifting cage bottom plate of the lifter through a rotating shaft, the first protective door is fixedly connected with the rotating shaft, and one side of the top of the lifting cage, close to the lifter, of the first protective door is provided with an operation window.
2. A double guard door apparatus for a construction hoist and a floor door opening according to claim 1, characterized in that: the first protective door is provided with a bolt hole, the floor surface is provided with a bolt hole, when the protective door rotates to be parallel to the floor surface in the inner side direction of a door opening, the first protective door is aligned with the floor surface, and the first protective door is connected with a fixing bolt in a rotating mode.
3. A double guard door apparatus for a construction hoist and a floor door opening according to claim 1, characterized in that: the lifting cage bottom plate of the lifter is provided with a chute matched with the size of the rotating shaft at the position corresponding to the rotating shaft, and the depth of the chute is smaller than the distance from the bottom of the protective door to the operation window.
4. A double guard door apparatus for a construction hoist and a floor door opening according to claim 1, characterized in that: the right end of the rotating shaft is rotationally connected with a motor, and the motor is controlled by a first controller.
5. A double guard door apparatus for a construction hoist and a floor door opening according to claim 1, characterized in that: the second position of the protective door corresponding to the operation window is provided with a storage groove, the push rod is rotationally connected in the storage groove, and the push rod is stored in the storage groove.
6. The double guard door apparatus for a construction hoist and a floor door opening according to claim 5, wherein: the push rod is L-shaped and rotates 180 degrees anticlockwise.
7. The double guard door apparatus for a construction hoist and a floor door opening according to claim 5, wherein: the push rod is provided with a handle.
8. A double guard gate arrangement for a construction hoist and a floor opening according to claim 1, characterized in that: and an observation window is arranged on the second protective door.
9. A double guard door apparatus for a construction hoist and a floor door opening according to claim 1, characterized in that: the electromagnetic type elevator door is characterized in that electromagnets are respectively arranged on the left door post and the left side face of the auxiliary door post, a permanent magnet inductor is fixedly arranged on one side of the left side door post, which is close to the left side face of a lifting cage of the elevator, an induction block is arranged on the lifting cage of the elevator by means of a fixing plate, the induction block is kept in an induction area of the permanent magnet inductor during vertical operation, a second controller is connected to a signal output end of the permanent magnet inductor, and the electromagnets are connected with a power supply through an electromagnetic relay.
10. A double guard door apparatus for a construction hoist and a floor door opening according to claim 1, characterized in that: the protective door is rotatably connected to the right door post through a spring hinge.
CN202310354368.7A 2023-04-04 2023-04-04 A double protective door device for construction elevators and floor door openings Withdrawn CN116332000A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202310354368.7A CN116332000A (en) 2023-04-04 2023-04-04 A double protective door device for construction elevators and floor door openings
ZA2023/06072A ZA202306072B (en) 2023-04-04 2023-06-08 Dual protective doors for construction elevators and floor construction entrances

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310354368.7A CN116332000A (en) 2023-04-04 2023-04-04 A double protective door device for construction elevators and floor door openings

Publications (1)

Publication Number Publication Date
CN116332000A true CN116332000A (en) 2023-06-27

Family

ID=86883980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310354368.7A Withdrawn CN116332000A (en) 2023-04-04 2023-04-04 A double protective door device for construction elevators and floor door openings

Country Status (2)

Country Link
CN (1) CN116332000A (en)
ZA (1) ZA202306072B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118255235A (en) * 2024-05-31 2024-06-28 河南省鲲鹏起重设备有限公司 Safe type lift of construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118255235A (en) * 2024-05-31 2024-06-28 河南省鲲鹏起重设备有限公司 Safe type lift of construction

Also Published As

Publication number Publication date
ZA202306072B (en) 2023-12-20

Similar Documents

Publication Publication Date Title
CN116332000A (en) A double protective door device for construction elevators and floor door openings
US4529065A (en) Elevator system
CN203021150U (en) Semi-automatic safety protection landing door
CN201560031U (en) Hinge landing door device for home elevator
JP5600778B1 (en) Elevator safety device
CN212315272U (en) Integrated car door lock sword
KR102009164B1 (en) opening and closing apparatus for construction door
CN108439158B (en) Elevator door opening limiter
CN111675071B (en) Automatic linkage opening and closing system for rotating shaft type sedan door and hall door
CN106927339B (en) High-rise energy-saving garbage elevator
CN207048494U (en) Track traffic list fans sliding door electromagnetic lock
CN206705469U (en) The electric self-closing protective door device of building hoist floor haul platform tools formula
CN214569980U (en) Self-closing door of construction elevator floor-stopping platform
CN205328426U (en) Automatic switching system of lift foundation for construction platform mouth door
CN109250613A (en) A kind of safeguard device of elevator
CN205241016U (en) Construction elevator floor door structure
CN212668914U (en) An automatic flip plate for the discharge door of a construction elevator
CN107572354A (en) A kind of asynchronous door knife linkage car door locking device
CN209009947U (en) Door lock is taken off with electromagnetic type is anti-on a kind of vertical lift
CN218931406U (en) Elevator cage with safety door lock
CN221940066U (en) Safety access control device for elevator
CN207293894U (en) A kind of people's goods elevator safety protective door
CN222389356U (en) Electromagnetic safety lock for layer door of construction building
CN222665095U (en) Construction lift intelligent machine in well and floor layer door linkage device thereof
CN219906644U (en) Building construction elevator well protective structure is built in building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20230627