CN116317082A - Method, system and equipment for generating hybrid standby power supply configuration strategy - Google Patents

Method, system and equipment for generating hybrid standby power supply configuration strategy Download PDF

Info

Publication number
CN116317082A
CN116317082A CN202310142013.1A CN202310142013A CN116317082A CN 116317082 A CN116317082 A CN 116317082A CN 202310142013 A CN202310142013 A CN 202310142013A CN 116317082 A CN116317082 A CN 116317082A
Authority
CN
China
Prior art keywords
power supply
discharge
load
type
supply device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310142013.1A
Other languages
Chinese (zh)
Other versions
CN116317082B (en
Inventor
姚锋
解贵林
聂黎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huadian Engineering Group Co Ltd
Original Assignee
China Huadian Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huadian Engineering Group Co Ltd filed Critical China Huadian Engineering Group Co Ltd
Priority to CN202310142013.1A priority Critical patent/CN116317082B/en
Publication of CN116317082A publication Critical patent/CN116317082A/en
Application granted granted Critical
Publication of CN116317082B publication Critical patent/CN116317082B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/061Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for DC powered loads
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/345Parallel operation in networks using both storage and other dc sources, e.g. providing buffering using capacitors as storage or buffering devices
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Direct Current Feeding And Distribution (AREA)

Abstract

The invention discloses a method, a system and equipment for generating a hybrid standby power supply configuration strategy, wherein the method comprises the following steps: acquiring a first voltage, a second voltage and direct current load data of each load, wherein the direct current load data comprises discharge duration and load current; classifying all loads according to the discharge duration of each load and a preset discharge duration threshold value, and selecting power supply equipment corresponding to each type of load; when a first power supply device of a preset type exists, acquiring a plurality of candidate discharge currents of the first power supply device, and nominal capacitance of the first power supply device; selecting parameters from a plurality of parameters to form a target parameter set according to the type of the power supply equipment; determining the actual discharge capacity corresponding to each type of power supply equipment according to the target parameter set corresponding to each type of power supply equipment; and generating a hybrid standby power supply configuration strategy according to each type of power supply equipment and the actual discharge capacity of each type of power supply equipment.

Description

Method, system and equipment for generating hybrid standby power supply configuration strategy
Technical Field
The invention relates to the field of power supply, in particular to a method, a system and equipment for generating a hybrid standby power supply configuration strategy.
Background
The standby power supply system is characterized in that after an external power supply stops supplying power due to faults, the standby power supply is continuously used for supplying power to facilities so as to ensure continuous operation of the facilities and safety of the whole system, and the standby power supply system is widely applied to the scenes of power plants, substations, communication base stations and the like.
In general, the standby power supply can adopt a storage battery or a super capacitor, but as the storage battery and the super capacitor have advantages and disadvantages, a hybrid power supply formed by the storage battery and the super capacitor is adopted as the standby power supply in most cases, and the advantages of the storage battery and the super capacitor can be effectively combined by the standby power supply, so that the performance characteristics of the super capacitor and the storage battery are fully exerted.
However, how to reasonably distribute the capacities of the super capacitor and the storage battery can enable the mixed standby power supply formed by the super capacitor and the storage battery to reduce the occupied area of the mixed standby power supply, prolong the service life of the standby power supply, and just meet the power consumption requirement in an application environment, so that the mixed standby power supply becomes a problem to be solved at present.
Disclosure of Invention
Therefore, the technical problem to be solved by the invention is to overcome the defect that the mixed standby power supply in the prior art cannot determine the reasonable configuration electric quantity, so as to provide a method, a system and equipment for generating the configuration strategy of the mixed standby power supply.
In a first aspect, the present invention provides a method for generating a hybrid standby power configuration policy, including: acquiring a first voltage of a power bus, a second voltage of the power bus and direct current load data corresponding to each load in a plurality of loads, wherein the direct current load data comprises discharge time length and load current, the first voltage is the voltage of the power bus before power failure, and the second voltage is the voltage of the power bus after power failure; classifying all loads according to the discharge duration of each load and a preset discharge duration threshold value, and selecting power supply equipment corresponding to each type of load; when a first power supply device of a preset type exists, acquiring a plurality of candidate discharge currents corresponding to the first power supply device and a nominal capacitance corresponding to the first power supply device; selecting a plurality of parameters from a first voltage, a second voltage, a preset discharge time threshold, a discharge time of each load in a class of loads corresponding to the first power supply equipment, a load current of each load in each class of loads, a plurality of candidate discharge currents and a nominal capacitance to form a target parameter set according to the type of the power supply equipment, wherein the type of the power supply equipment comprises a preset type and other types except the preset type; determining the actual discharge capacity corresponding to each type of power supply equipment according to the target parameter set corresponding to each type of power supply equipment; and generating a hybrid standby power supply configuration strategy according to each type of power supply equipment and the actual discharge capacity of each type of power supply equipment.
The invention completes classification of all loads by comparing the acquired discharge time length corresponding to each load with a preset discharge time length threshold value, and selects power supply equipment corresponding to each type of load according to the classification result; by the method, the loads with the same discharging characteristics are classified, so that the selected power supply equipment corresponding to each type of load can be well matched with the discharging characteristics of each type of load. After that, a target parameter set matched with the type of the power supply device is selected from the plurality of parameters according to the type of each power supply device, and the actual discharge electric quantity corresponding to each power supply device is determined according to the target parameter set. And finally, generating a configuration strategy of the hybrid standby power supply through the type of each power supply device and the actual discharge electric quantity corresponding to each type of power supply device. Because the power supply equipment corresponds to the discharge characteristics of the load, the target parameter set corresponding to the power supply equipment is selected according to the type of the power supply equipment, and the discharge electric quantity of the power supply equipment determined based on the target parameter set can necessarily meet the electricity consumption requirement of a type of load corresponding to the power supply equipment, so that the reasonable configuration of the hybrid standby power supply in the aspect of electric quantity can be completed according to the calculated actual discharge electric quantity of each power supply equipment, the configured hybrid standby power supply can fully exert the performance characteristics of each power supply equipment, the best power supply effect and the minimum equipment installation size are realized, the discharge characteristics of all loads can be combined well, and the electricity consumption requirement of the current environment is reasonably met.
With reference to the first aspect, in a first embodiment of the first aspect, classifying all loads according to a discharge duration of each load and a preset discharge duration threshold includes: comparing the discharge time of each load with a preset discharge time threshold; all loads with discharge time length longer than a preset discharge time length threshold are determined to be first-type loads; and determining all loads with discharge time length smaller than or equal to a preset discharge time length threshold value as the second type of load.
With reference to the first aspect, in a second embodiment of the first aspect, when the power supply device is not a second power supply device of a preset type, according to the type of the power supply device, selecting a plurality of parameters from a first voltage, a second voltage, a preset discharge duration threshold, a discharge duration of each load of a class of loads corresponding to the first power supply device, a load current of each load of each class of loads, a plurality of candidate discharge currents, and a nominal capacitance to form a target parameter set, including: and selecting the first voltage, the second voltage, a preset discharge time threshold value and the load current of each load in the class of loads corresponding to the second power supply equipment to form a target parameter set.
With reference to the first aspect, in a third embodiment of the first aspect, when the power supply device is a first power supply device of a preset type, according to the type of the power supply device, a plurality of parameters are selected from a first voltage, a second voltage, a preset discharge duration threshold, a discharge duration of each load of a class of loads corresponding to the first power supply device, a load current of each load of each class of loads, a plurality of candidate discharge currents, and a nominal capacitance to form a target parameter set, including: and selecting a second voltage, the discharge duration of each load in the class of loads corresponding to the first power supply equipment, the load current of each load in the class of loads corresponding to the first power supply equipment, a plurality of candidate discharge currents and a nominal capacitance to form a target parameter set.
With reference to the first aspect, in a fourth embodiment of the first aspect, determining, according to a target parameter set corresponding to each type of power supply apparatus, an actual discharge capacity corresponding to each type of power supply apparatus includes: screening out the maximum discharge duration from the discharge duration of each load in the class of loads corresponding to the first power supply equipment, and taking the maximum discharge duration as a reference discharge duration; selecting a target discharge current of the first power supply equipment in a reference discharge time period from a plurality of candidate discharge currents based on the second voltage, the load current of each load in a class of loads corresponding to the first power supply equipment and the reference discharge time period; and determining the actual discharge capacity corresponding to the first power supply equipment according to the reference discharge time length, the load current of each load in the class of loads corresponding to the first power supply equipment, the target discharge current and the nominal capacity of the first power supply equipment.
With reference to the first aspect, in a fifth embodiment of the first aspect, determining the actual discharge capacity corresponding to the first power supply device according to the reference discharge time period, the load current of each load in the class of loads corresponding to the first power supply device, the target discharge current, and the nominal capacity of the first power supply device includes: determining a first load current based on a load current of each load in a class of loads corresponding to the first power supply device, the first load current being an actual current output by the first power supply device; comparing the target discharge current with a first load current; and when the target discharge current is greater than or equal to the first load current, determining the actual discharge capacity of the first power supply equipment directly based on the nominal capacity of the first power supply equipment, the nominal hours corresponding to the nominal capacity and the reference discharge duration.
With reference to the first aspect, in a sixth embodiment of the first aspect, determining the actual discharge capacity corresponding to the first power supply device according to the reference discharge time period, the load current of each load in the class of loads corresponding to the first power supply device, the target discharge current, and the nominal capacity of the first power supply device, further includes: determining a number of first power supply devices based on the first load current and the target discharge current when the target discharge current is less than the first load current; determining a corresponding discharge capacity of the first power supply device within a reference discharge duration based on a nominal capacity of the first power supply device, a nominal number of hours corresponding to the nominal capacity, and the reference discharge duration; the actual discharge capacity of the first power supply device is determined based on the number of first power supply devices and the discharge capacity of the first power supply device corresponding to the reference discharge duration.
In a second aspect, the present invention provides a generating device of a hybrid standby power configuration policy, including: the power supply device comprises a first acquisition module, a second acquisition module and a first control module, wherein the first acquisition module is used for acquiring a first voltage of a power supply bus, a second voltage of the power supply bus and direct current load data corresponding to each load in a plurality of loads, the direct current load data comprise discharge time length and load current, the first voltage is the voltage of the power supply bus before power failure, and the second voltage is the voltage of the power supply bus after power failure; the classification module is used for classifying all the loads according to the discharge duration of each load and a preset discharge duration threshold value, and selecting power supply equipment corresponding to each type of load; the second acquisition module is used for acquiring a plurality of candidate discharge currents corresponding to the first power supply equipment and nominal capacitance corresponding to the first power supply equipment when the first power supply equipment of the preset type exists; the screening module is used for selecting a plurality of parameters from a first voltage, a second voltage, a preset discharge time threshold value, a discharge time of each load in a class of loads corresponding to the first power supply equipment, a load current of each load in each class of loads, a plurality of candidate discharge currents and a nominal capacitance according to the type of the power supply equipment to form a target parameter set, wherein the type of the power supply equipment comprises a preset type and other types except the preset type; the determining module is used for determining the actual discharge capacity corresponding to each type of power supply equipment according to the target parameter set corresponding to each type of power supply equipment; and the generation module is used for generating a mixed standby power supply configuration strategy according to each type of power supply equipment and the actual discharge capacity of each type of power supply equipment.
In a third aspect, the present invention provides a computer device comprising: the system comprises a memory and a processor, wherein the memory and the processor are in communication connection, the memory is used for storing a computer program, and the computer program enables the processor to execute the method for generating the hybrid standby power supply configuration strategy according to any one of the invention when the computer program is executed by the processor.
In a fourth aspect, the present invention provides a computer readable storage medium storing computer instructions that, when executed by a processor, implement a method of generating a hybrid backup power configuration strategy as in any of the summary.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are needed in the description of the embodiments or the prior art will be briefly described, and it is obvious that the drawings in the description below are some embodiments of the present invention, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
FIG. 1 is a flowchart of a method for generating a hybrid backup power configuration policy according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of a hybrid backup power system according to an embodiment of the present invention;
FIG. 3 is a device connection diagram for generating a hybrid backup power configuration strategy according to an embodiment of the present invention;
fig. 4 is a connection diagram of a computer device according to an embodiment of the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made apparent and fully in view of the accompanying drawings, in which some, but not all embodiments of the invention are shown. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
The invention discloses a method for generating a hybrid standby power supply configuration strategy, as shown in fig. 1, comprising the following steps:
s1: and acquiring the first voltage of the power bus, the second voltage of the power bus and direct current load data corresponding to each load in the plurality of loads.
Specifically, the first voltage is the voltage of the power bus before power failure; the second voltage is the voltage of the power bus after power failure; each load corresponds to a group of direct current load data, and the direct current load data comprises data such as discharge duration, load current and the like. The discharge duration is the continuous discharge duration corresponding to the load during working, and the load current can be obtained based on the power and voltage calculation of the load, and can also be obtained by direct measurement.
S2: classifying all loads according to the discharge duration of each load and a preset discharge duration threshold value, and selecting power supply equipment corresponding to each type of load.
Specifically, in an alternative embodiment, the discharge duration of each load is compared with a preset discharge duration threshold, all loads with discharge durations greater than the preset discharge duration threshold are determined to be the first type of load, and all loads with discharge durations less than or equal to the preset discharge duration threshold are determined to be the second type of load. And finally, selecting power supply equipment corresponding to the discharge characteristics by combining the discharge characteristics corresponding to each type of load.
The preset discharge duration threshold is related to the application scene, and the corresponding preset discharge duration thresholds in different scenes are different. The preset discharge time threshold is the discharge time required for starting/stopping certain loads after power failure to ensure the safety of the equipment. If the application scene is a reservoir, if the reservoir gate needs to be opened to discharge water, the reservoir gate needs to be closed to ensure the safety of life and property when a power failure occurs, and because the reservoir gate needs to be closed for 15-20 seconds, in this embodiment, the preset discharge time threshold can be set to 25 seconds.
Illustratively, in an alternative embodiment, the preset discharge time period threshold is 10 seconds. And comparing the discharge time length corresponding to each load contained in the application scene with 10 seconds, determining all loads with discharge time length longer than 10 seconds as first type loads, and determining all loads with discharge time length less than or equal to 10 seconds as second type loads.
The first type of load may be considered to be all loads that require a long duration of discharge after a power outage, including but not limited to control protection systems, communication systems, power supplies for computer systems, and the like. The load has the characteristics of long discharge time and continuous and stable discharge current, and is suitable for being supplied by equipment with long discharge duration such as a storage battery. In this embodiment, a storage battery may be selected as the power supply device corresponding to the first type of load. The second type of load can be considered as all loads which need to be discharged in a short time in the early stage of power failure, and the second type of load comprises, but is not limited to, an operating mechanism power supply of a circuit breaker, a direct current lubricating oil pump and the like, and the loads are high-power loads which need to be supplied in a short time, and can rapidly cope with accidents in a few seconds or even a few milliseconds in the early stage of the accidents, so that the load is suitable for being supplied by equipment with a large discharge current, such as a super capacitor and the like. In the embodiment, the storage battery and the super capacitor are combined to generate the hybrid standby power supply, so that the hybrid standby power supply not only can output larger electricity quantity at the initial stage of power failure, but also can ensure longer-time current output at the later stage of power failure, and can achieve a good effect.
S3: when a first power supply device of a preset type exists, a plurality of candidate discharge currents corresponding to the first power supply device and a nominal capacitance corresponding to the first power supply device are acquired.
For example, in an alternative embodiment, the first power supply device may be a battery.
S4: and selecting a plurality of parameters from the first voltage, the second voltage, a preset discharge duration threshold, the discharge duration of each load in a class of loads corresponding to the first power supply equipment, the load current of each load in each class of loads, a plurality of candidate discharge currents and the nominal capacitance according to the type of the power supply equipment to form a target parameter set, wherein the type of the power supply equipment comprises a preset type and other types except the preset type.
In another alternative embodiment, the second voltage, the discharge duration of each load of the class of loads corresponding to the first power supply device, the load current of each load of the class of loads corresponding to the first power supply device, the plurality of candidate discharge currents, and the nominal capacitance are selected to form the target parameter set when the power supply device is a first power supply device of a preset type.
In an alternative embodiment, when the power supply device is not a second power supply device of a preset type, the first voltage, the second voltage, the preset discharge duration threshold value, and the load current of each load of a class of loads corresponding to the second power supply device are selected to form the target parameter set.
S5: and determining the actual discharge capacity corresponding to each type of power supply equipment according to the target parameter set corresponding to each type of power supply equipment.
S6: and generating a hybrid standby power supply configuration strategy according to each type of power supply equipment and the actual discharge capacity of each type of power supply equipment.
Specifically, the hybrid standby power supply configuration policy is a policy of configuring the hybrid standby power supply according to the determined power supply apparatuses, the capacity of each power supply apparatus and the number of required power supply apparatuses.
The invention completes classification of all loads by comparing the acquired discharge time length corresponding to each load with a preset discharge time length threshold value, and selects power supply equipment corresponding to each type of load according to the classification result; by the method, the loads with the same discharging characteristics are classified, so that the selected power supply equipment corresponding to each type of load can be well matched with the discharging characteristics of each type of load. After that, a target parameter set matched with the type of the power supply device is selected from the plurality of parameters according to the type of each power supply device, and the actual discharge electric quantity corresponding to each power supply device is determined according to the target parameter set. And finally, generating a configuration strategy of the hybrid standby power supply through the type of each power supply device and the actual discharge electric quantity corresponding to each type of power supply device. Because the power supply equipment corresponds to the discharge characteristics of the load, the target parameter set corresponding to the power supply equipment is selected according to the type of the power supply equipment, and the discharge electric quantity of the power supply equipment determined based on the target parameter set can necessarily meet the electricity consumption requirement of a type of load corresponding to the power supply equipment, so that the reasonable configuration of the hybrid standby power supply in the aspect of electric quantity can be completed according to the calculated actual discharge electric quantity of each power supply equipment, the configured hybrid standby power supply can fully exert the performance characteristics of each power supply equipment, the best power supply effect and the minimum equipment installation size are realized, the discharge characteristics of all loads can be combined well, and the electricity consumption requirement of the current environment is reasonably met.
In an alternative embodiment, when the power supply device is not the second power supply device of the preset type, determining the actual discharge capacity corresponding to each type of power supply device according to the target parameter set corresponding to each type of power supply device includes:
determining a second load current corresponding to the second power supply equipment by summing the load currents of each load in the class of loads corresponding to the second power supply equipment;
and determining the actual discharge capacity corresponding to the second power supply equipment based on the first voltage, the second voltage, the preset discharge time threshold and the second load current.
For example, in an alternative embodiment, a specific implementation manner of determining the actual discharge capacity corresponding to the second power supply device is as follows:
Figure BDA0004087858120000111
wherein F is the corresponding capacity of the second power supply equipment, K 2 Is of a reliable coefficient (K when the second power supply device is a super capacitor 2 2.0) can be taken, U 1 U is the voltage of a power bus before power failure 2 For the voltage of the power bus after power failure, I 2 For the second load current, t 2 And presetting a discharge duration threshold.
In an alternative embodiment, when the power supply device is a first power supply device of a preset type, determining an actual discharge capacity corresponding to each type of power supply device according to a target parameter set corresponding to each type of power supply device, including the following steps:
S21: and screening out the maximum discharge duration from the discharge duration of each load in the class of loads corresponding to the first power supply equipment, and taking the maximum discharge duration as the reference discharge duration.
Specifically, the reference discharge duration is the discharge duration corresponding to the first power supply device.
S22: and selecting a target discharge electric quantity of the first power supply equipment in the reference discharge time period from the plurality of candidate discharge currents based on the second voltage, the load current of each load in the class of loads corresponding to the first power supply equipment and the reference discharge time period.
Specifically, first, a corresponding discharge characteristic curve of the first power supply device under each candidate discharge current is obtained, wherein the abscissa of the discharge characteristic curve is a discharge duration, the ordinate is a load voltage, and one candidate discharge current corresponds to one discharge characteristic curve.
Secondly, taking the sum of load currents of each load in a class of loads corresponding to the first power supply equipment as a first load current corresponding to the first power supply equipment;
thirdly, acquiring load voltages corresponding to each discharge characteristic curve respectively when the discharge duration is equal to the reference discharge duration from the discharge characteristic curves corresponding to each candidate discharge current; and comparing each load voltage with the second voltage, and screening out candidate discharge current corresponding to the load voltage which is greater than or equal to the second voltage as target candidate current of the first power supply equipment in the reference discharge time period.
And finally, calculating the absolute difference value of each target candidate current and the first load current, and determining the target candidate current corresponding to the smallest absolute difference value as the target discharge current. Wherein, the absolute difference value is the absolute value of the difference value and only represents the numerical distance between the two values.
S23: and determining the actual discharge capacity corresponding to the first power supply equipment according to the reference discharge time length, the load current of each load in the class of loads corresponding to the first power supply equipment, the target discharge current and the nominal capacity of the first power supply equipment.
In an alternative embodiment, determining the actual discharge capacity corresponding to the first power supply device according to the reference discharge time period, the load current of each load in the class of loads corresponding to the first power supply device, the target discharge current, and the nominal capacity of the first power supply device includes:
determining a first load current based on a load current of each load in a class of loads corresponding to the first power supply device, the first load current being an actual current output by the first power supply device; comparing the target discharge current with a first load current; and when the target discharge current is greater than or equal to the first load current, determining the actual discharge capacity of the first power supply equipment directly based on the nominal capacity of the first power supply equipment, the nominal hours corresponding to the nominal capacity and the reference discharge duration.
Illustratively, in an alternative embodiment, when the target discharge current is greater than or equal to the first load current, the actual discharge capacity of the first power supply device is achieved as follows:
Figure BDA0004087858120000131
wherein C is the actual discharge capacity of the first power supply device, K 1 Is a reliability coefficient, t 1 For reference discharge time length C 10 The nominal capacity of the first power supply device is of a preset model.
In an alternative embodiment, determining the actual discharge capacity corresponding to the first power supply device according to the reference discharge time period, the load current of each load in the class of loads corresponding to the first power supply device, the target discharge current, and the nominal capacity of the first power supply device, further includes:
determining a number of first power supply devices based on the first load current and the target discharge current when the target discharge current is less than the first load current; determining a corresponding discharge capacity of the first power supply device within a reference discharge duration based on a nominal capacity of the first power supply device, a nominal number of hours corresponding to the nominal capacity, and the reference discharge duration; the actual discharge capacity of the first power supply device is determined based on the number of first power supply devices and the discharge capacity of the first power supply device corresponding to the reference discharge duration.
Illustratively, in an alternative embodiment, when the target discharge current is less than the first load current, the actual discharge capacity of the first power supply device is achieved as follows:
Figure BDA0004087858120000141
wherein C is the actual discharge capacity of the first power supply device, K 1 As a reliability coefficient, I 1 For the first load current, I is the target discharge current, t 1 For reference discharge time length C 10 The nominal capacity of the first power supply device is of a preset model.
Through the calculation to each power supply equipment capacity, can be comparatively accurate confirm current scene in the power failure initial stage and the demand of power failure later stage different stages to the electric quantity, can select the power supply equipment of the capacity size that is fit for current application scene from the power supply equipment of the class that corresponds to each stage according to the demand to the electric quantity to reduce equipment overall area, improve the reliability, reduce comprehensive cost, extension equipment life.
In an alternative embodiment, the method for generating the configuration policy of the hybrid standby power supply is applied to a hybrid standby power supply system, as shown in fig. 2, where the system includes a standby power supply bus, a charger, a storage battery, a super capacitor, a dc power supply loop, a first circuit breaker and a second circuit breaker, where the standby power supply bus is directly connected to the charger and the dc power supply loop, and is connected to the first circuit breaker and the super capacitor, and is connected to the second circuit breaker and is used for transmitting electric quantity.
And when the power is not cut off, the charger charges the super capacitor and the storage battery through the standby power bus.
When the power failure occurs, the first circuit breaker and the second circuit breaker are in a closed state, the super capacitor and the storage battery transmit electric quantity to the direct current power supply loop through the standby power bus at the same time in the initial period of the power failure, and the super capacitor outputs larger electric quantity in the transmission process of the electric quantity in the initial period of the power failure. When the power of the super capacitor is completely output, the power supply is stopped, at the moment, the power enters the later period of power failure, the power is transmitted to the direct current power supply loop through the standby power bus by the storage battery, and the direct current power supply loop supplies power to external equipment until the power of the storage battery is exhausted or the external power is restored.
In a second aspect, the present invention provides an apparatus for generating a configuration policy of a hybrid standby power supply, as shown in fig. 3, where the apparatus includes:
the first obtaining module 31 is configured to obtain a first voltage of the power bus, a second voltage of the power bus, and dc load data corresponding to each of the plurality of loads, where the dc load data includes a discharge duration and a load current, the first voltage is a voltage of the power bus before a power failure, and the second voltage is a voltage of the power bus after the power failure.
The classification module 32 is configured to classify all the loads according to the discharge duration of each load and a preset discharge duration threshold, and select a power supply device corresponding to each type of load.
The second obtaining module 33 is configured to obtain, when a first power supply device of a preset type exists, a plurality of candidate discharge currents corresponding to the first power supply device, and a nominal capacitance corresponding to the first power supply device.
The screening module 34 is configured to select, according to a type of the power supply device, a plurality of parameters from a first voltage, a second voltage, a preset discharge duration threshold, a discharge duration of each load in a class of loads corresponding to the first power supply device, a load current of each load in each class of loads, a plurality of candidate discharge currents, and a nominal capacitance to form a target parameter set, where the type of the power supply device includes a preset type and other types than the preset type.
A determining module 35, configured to determine an actual discharge capacity corresponding to each type of power supply device according to the target parameter set corresponding to each type of power supply device.
A generating module 36, configured to generate a hybrid standby power configuration policy according to each type of power supply device and the actual discharge capacity of each type of power supply device.
In an alternative embodiment, classification module 32 includes:
a comparing sub-module 321, configured to compare a discharge duration of each load with a preset discharge duration threshold; a first determining submodule 322, configured to determine all loads with discharge time longer than a preset discharge time threshold as a first type of load; the second determining submodule 323 determines all loads with the discharge duration less than or equal to the preset discharge duration threshold as the second type of load.
In an alternative embodiment, the screening module 34 includes: the first screening sub-module 341 is configured to select a first voltage, a second voltage, a preset discharge duration threshold, and a load current of each load in a class of loads corresponding to the second power supply device, to form a target parameter set.
In an alternative embodiment, the screening module 34 includes: the second screening sub-module 342 is configured to select a second voltage, a discharge duration of each load in a class of loads corresponding to the first power supply device, a load current of each load in a class of loads corresponding to the first power supply device, a plurality of candidate discharge currents, and a nominal capacitance to form a target parameter set.
In an alternative embodiment, the determining module 35 includes: the first screening submodule 351 is configured to screen out a maximum discharge duration from discharge durations of each load in the class of loads corresponding to the first power supply device, and take the maximum discharge duration as a reference discharge duration; a second screening submodule 352, configured to select a target discharge current of the first power supply device within a reference discharge duration from a plurality of candidate discharge currents based on the second voltage, a load current of each load in a class of loads corresponding to the first power supply device, and the reference discharge duration; the determining submodule 353 is configured to determine an actual discharge capacity corresponding to the first power supply device according to the reference discharge duration, the load current of each load in the class of loads corresponding to the first power supply device, the target discharge current, and the nominal capacity of the first power supply device.
In an alternative embodiment, determining submodule 353 includes: a first determining unit 3531 for determining a first load current based on a load current of each of a class of loads corresponding to the first power supply device, the first load current being an actual current output by the first power supply device; a comparison unit 3532 for comparing the target discharge current with the first load current; the second determining unit 3533 is configured to determine, when the target discharge current is greater than or equal to the first load current, an actual discharge capacity of the first power supply device directly based on the nominal capacity of the first power supply device, a nominal number of hours corresponding to the nominal capacity, and the reference discharge duration.
In an alternative embodiment, determining submodule 353 further includes: a third determining unit 3534 for determining the number of first power supply devices based on the first load current and the target discharge current when the target discharge current is smaller than the first load current; a fourth determining unit 3535 for determining a corresponding discharge capacity of the first power supply device within the reference discharge duration based on the nominal capacity of the first power supply device, the nominal hours corresponding to the nominal capacity, and the reference discharge duration; a fifth determining unit 3536 for determining an actual discharge capacity of the first power supply device based on the number of the first power supply devices and the discharge capacities of the first power supply devices corresponding to the reference discharge duration.
The present embodiment provides a computer device, as shown in fig. 4, which may include at least one processor 41, at least one communication interface 42, at least one communication bus 43 and at least one memory 44, where the communication interface 42 may include a Display screen (Display), a Keyboard (Keyboard), and the optional communication interface 42 may further include a standard wired interface, a wireless interface. The memory 44 may be a high-speed RAM memory (Random Access Memory, volatile random access memory) or a non-volatile memory (non-volatile memory), such as at least one disk memory. The memory 44 may alternatively be at least one memory device located remotely from the aforementioned processor 41. Wherein processor 41 may be as described in connection with fig. 4, application programs are stored in memory 44, and processor 41 invokes program code stored in memory 44 for performing the method of generating a hybrid backup power configuration strategy of any of the method embodiments described above.
The communication bus 43 may be a peripheral component interconnect standard (peripheral component interconnect, PCI) bus, an extended industry standard architecture (extended industry standard architecture, EISA) bus, or the like. The communication bus 43 may be classified into an address bus, a data bus, a control bus, and the like. For ease of illustration, only one thick line is shown in fig. 4, but not only one bus or one type of bus.
Wherein the memory 44 may include volatile memory (English) such as random-access memory (RAM); the memory may also include a nonvolatile memory (english: non-volatile memory), such as a flash memory (english: flash memory), a hard disk (english: hard disk drive, abbreviated as HDD) or a solid state disk (english: solid-state drive, abbreviated as SSD); memory 44 may also include a combination of the types of memory described above.
The processor 41 may be a central processor (English: central processing unit, abbreviated: CPU), a network processor (English: network processor, abbreviated: NP) or a combination of CPU and NP.
The processor 41 may further include a hardware chip. The hardware chip may be an application-specific integrated circuit (ASIC), a Programmable Logic Device (PLD), or a combination thereof (English: programmable logic device). The PLD may be a complex programmable logic device (English: complex programmable logic device, abbreviated: CPLD), a field programmable gate array (English: field-programmable gate array, abbreviated: FPGA), a general-purpose array logic (English: generic array logic, abbreviated: GAL), or any combination thereof. Optionally, the memory 44 is also used for storing program instructions. Processor 41 may invoke program instructions to implement the hybrid backup power configuration policy generation method in any of the embodiments of the present invention.
The present embodiment provides a computer-readable storage medium storing computer-executable instructions that can perform the method for generating a hybrid backup power configuration policy in any of the above-described method embodiments. The storage medium may be a magnetic Disk, an optical Disk, a Read-Only Memory (ROM), a random access Memory (Random Access Memory, RAM), a Flash Memory (Flash Memory), a Hard Disk (HDD), or a Solid State Drive (SSD); the storage medium may also comprise a combination of memories of the kind described above.
It is apparent that the above examples are given by way of illustration only and are not limiting of the embodiments. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. While still being apparent from variations or modifications that may be made by those skilled in the art are within the scope of the invention.

Claims (10)

1. A method for generating a hybrid backup power configuration strategy, comprising:
Acquiring a first voltage of a power bus, a second voltage of the power bus and direct current load data corresponding to each load in a plurality of loads, wherein the direct current load data comprises discharge time and load current, the first voltage is the voltage of the power bus before power failure, and the second voltage is the voltage of the power bus after power failure;
classifying all loads according to the discharge duration of each load and a preset discharge duration threshold value, and selecting power supply equipment corresponding to each type of load;
when a first power supply device of a preset type exists, acquiring a plurality of candidate discharge currents corresponding to the first power supply device and a nominal capacitance corresponding to the first power supply device;
selecting a plurality of parameters from the first voltage, the second voltage, the preset discharge duration threshold, the discharge duration of each load in a class of loads corresponding to the first power supply equipment, the load current of each load in each class of loads, a plurality of candidate discharge currents and the nominal capacitance to form a target parameter set according to the type of the power supply equipment, wherein the type of the power supply equipment comprises a preset type and other types except the preset type;
Determining the actual discharge capacity corresponding to each type of power supply equipment according to the target parameter set corresponding to each type of power supply equipment;
and generating a mixed standby power supply configuration strategy according to each type of power supply equipment and the actual discharge capacity of each type of power supply equipment.
2. The method of generating a hybrid backup power configuration strategy according to claim 1, wherein classifying all loads according to a discharge duration of each load and a preset discharge duration threshold value comprises:
comparing the discharge duration of each load with the preset discharge duration threshold;
determining all loads with the discharge time length larger than the preset discharge time length threshold as first-class loads;
and determining all loads with the discharge time length smaller than or equal to the preset discharge time length threshold value as a second type of load.
3. The method according to claim 1 or 2, wherein when the power supply device is not a second power supply device of a preset type, the selecting, according to the type of the power supply device, a plurality of parameters from the first voltage, the second voltage, the preset discharge duration threshold, a discharge duration of each of a class of loads corresponding to the first power supply device, a load current of each of the loads of each class, a plurality of the candidate discharge currents, and the nominal capacitance to form a target parameter set includes:
And selecting the first voltage, the second voltage, the preset discharge duration threshold value and the load current of each load in a class of loads corresponding to the second power supply equipment to form the target parameter set.
4. The method according to claim 1 or 2, wherein when the power supply device is a first power supply device of a preset type, the selecting, according to the type of the power supply device, a plurality of parameters from the first voltage, the second voltage, the preset discharge duration threshold, a discharge duration of each of a class of loads corresponding to the first power supply device, a load current of each of the loads of each class, a plurality of the candidate discharge currents, and the nominal capacitance to form a target parameter set includes:
and selecting the second voltage, the discharge duration of each load in the class of loads corresponding to the first power supply equipment, the load current of each load in the class of loads corresponding to the first power supply equipment, the plurality of candidate discharge currents and the nominal capacitance to form the target parameter set.
5. The method of generating a hybrid backup power configuration strategy according to claim 4, wherein determining an actual discharge capacity corresponding to each type of power supply device from the target parameter set corresponding to each type of power supply device comprises:
screening out the maximum discharge duration from the discharge duration of each load in the class of loads corresponding to the first power supply equipment, and taking the maximum discharge duration as a reference discharge duration;
selecting a target discharge current of the first power supply device within the reference discharge period from a plurality of candidate discharge currents based on the second voltage, a load current of each of a class of loads corresponding to the first power supply device, and the reference discharge period;
and determining the actual discharge capacity corresponding to the first power supply equipment according to the reference discharge duration, the load current of each load in the class of loads corresponding to the first power supply equipment, the target discharge current and the nominal capacity of the first power supply equipment.
6. The method of generating a hybrid backup power supply configuration strategy according to claim 5, wherein determining the actual discharge capacity corresponding to the first power supply device based on the reference discharge time period, the load current of each of the loads in the class of loads corresponding to the first power supply device, the target discharge current, and the nominal capacity of the first power supply device comprises:
Determining a first load current based on a load current of each load in a class of loads corresponding to the first power supply equipment, wherein the first load current is an actual current output by the first power supply equipment;
comparing the target discharge current with the first load current;
and when the target discharge current is greater than or equal to the first load current, determining the actual discharge capacity of the first power supply equipment directly based on the nominal capacity of the first power supply equipment, the nominal hours corresponding to the nominal capacity and the reference discharge duration.
7. The method of generating a hybrid backup power configuration strategy according to claim 6, wherein when the target discharge current is less than the first load current, the method further comprises:
determining a number of the first power supply devices based on the first load current and the target discharge current;
determining a corresponding discharge capacity of the first power supply device within the reference discharge duration based on a nominal capacity of the first power supply device, a nominal number of hours corresponding to the nominal capacity, and the reference discharge duration;
and determining the actual discharge capacity of the first power supply equipment based on the number of the first power supply equipment and the corresponding discharge capacity of the first power supply equipment in the reference discharge duration.
8. A hybrid backup power configuration policy generation apparatus, comprising:
the power supply device comprises a first acquisition module, a second acquisition module and a first control module, wherein the first acquisition module is used for acquiring a first voltage of a power supply bus, a second voltage of the power supply bus and direct current load data corresponding to each load in a plurality of loads, the direct current load data comprise discharge time length and load current, the first voltage is a voltage of the power supply bus before power failure, and the second voltage is a voltage of the power supply bus after power failure;
the classification module is used for classifying all the loads according to the discharge duration of each load and a preset discharge duration threshold value, and selecting power supply equipment corresponding to each type of load;
the second acquisition module is used for acquiring a plurality of candidate discharge currents corresponding to the first power supply equipment and nominal capacitance corresponding to the first power supply equipment when the first power supply equipment of a preset type exists;
a screening module, configured to select, according to the type of the power supply device, a plurality of parameters from the first voltage, the second voltage, the preset discharge duration threshold, a discharge duration of each load in a class of loads corresponding to the first power supply device, a load current of each load in each class of loads, a plurality of candidate discharge currents, and the nominal capacitance to form a target parameter set, where the type of the power supply device includes a preset type and other types outside the preset type;
The determining module is used for determining the actual discharge capacity corresponding to each type of power supply equipment according to the target parameter set corresponding to each type of power supply equipment;
and the generation module is used for generating a mixed standby power supply configuration strategy according to each type of power supply equipment and the actual discharge capacity of each type of power supply equipment.
9. A computer device, comprising: a memory and a processor in communication with each other, the memory being configured to store a computer program which, when executed by the processor, causes the processor to perform the method of generating a hybrid backup power configuration strategy as claimed in any one of claims 1 to 7.
10. A computer readable storage medium storing computer instructions which, when executed by a processor, implement a method of generating a hybrid backup power configuration strategy as claimed in any one of claims 1 to 7.
CN202310142013.1A 2023-02-14 2023-02-14 Method, system and equipment for generating hybrid standby power supply configuration strategy Active CN116317082B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310142013.1A CN116317082B (en) 2023-02-14 2023-02-14 Method, system and equipment for generating hybrid standby power supply configuration strategy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310142013.1A CN116317082B (en) 2023-02-14 2023-02-14 Method, system and equipment for generating hybrid standby power supply configuration strategy

Publications (2)

Publication Number Publication Date
CN116317082A true CN116317082A (en) 2023-06-23
CN116317082B CN116317082B (en) 2023-09-26

Family

ID=86812372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310142013.1A Active CN116317082B (en) 2023-02-14 2023-02-14 Method, system and equipment for generating hybrid standby power supply configuration strategy

Country Status (1)

Country Link
CN (1) CN116317082B (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6028499B2 (en) * 2012-04-06 2016-11-16 ソニー株式会社 Power supply
CN106451508B (en) * 2016-10-13 2020-02-04 深圳职业技术学院 Distributed hybrid energy storage system configuration and charging and discharging method and device

Also Published As

Publication number Publication date
CN116317082B (en) 2023-09-26

Similar Documents

Publication Publication Date Title
CN104216499B (en) Rack and its power control method
EP3553911A1 (en) Microgrid system, and method for managing malfunction
CN113054706A (en) Balance monitoring control system and method for power battery
CN110224461B (en) Battery power limiting method and device, computer equipment and storage medium
CN113193633A (en) Battery cluster access method and device, energy storage power station, equipment and storage medium
US20230198279A1 (en) Method for controlling battery power limit value
Lai et al. Design and planning strategy for energy storage system in a shipboard dc hybrid power system
CN116317082B (en) Method, system and equipment for generating hybrid standby power supply configuration strategy
US20220077703A1 (en) Method, rated voltage adjusting device, and electric storage device
CN116298538B (en) On-line monitoring method of intelligent capacitance compensation device
CN116054173B (en) Energy storage converter control method and energy storage converter
CN107731260B (en) SSD power supply method and system and SSD
CN109557399A (en) A kind of distribution network failure monitoring method and device
CN114597904A (en) Controllable energy dissipation device of alternating current system and application method thereof
CN113050562B (en) Internet of things power allocation method, system and device
CN113381434B (en) Method and device for optimizing operation mode of flexible direct-current power grid
CN114825510A (en) Redundant energy storage system and dynamic redundancy control method
Awad et al. A framework to determine maximum capacity of interconnecting DGs in distribution networks
CN110796833B (en) Method for reporting power supply abnormal event
CN113169556B (en) Method for feeding a wind energy system and wind energy system
CN108469570B (en) Power grid fault processing method and system based on inverter
CN113193643B (en) Spare power automatic switching device switching method and device based on transformer substation
Aldeen et al. Voltage stability margins and risk assessment in smart power grids
CN217282225U (en) Controllable energy dissipation device of alternating current system
CN117117843A (en) Power grid optimization control method and system based on power big data analysis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant