CN116290829A - Large-area purline XYZ direction installation device - Google Patents
Large-area purline XYZ direction installation device Download PDFInfo
- Publication number
- CN116290829A CN116290829A CN202310454229.1A CN202310454229A CN116290829A CN 116290829 A CN116290829 A CN 116290829A CN 202310454229 A CN202310454229 A CN 202310454229A CN 116290829 A CN116290829 A CN 116290829A
- Authority
- CN
- China
- Prior art keywords
- tensioning
- steel
- wall
- guide
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 72
- 239000010959 steel Substances 0.000 claims abstract description 72
- 230000003014 reinforcing effect Effects 0.000 claims description 16
- 238000009435 building construction Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to the technical field of building construction, in particular to a large-area purline XYZ-direction mounting device which comprises a sliding mechanism, two first tensioning upright posts and two second tensioning upright posts, wherein second steel strands are mounted on the outer walls of one ends of the two first tensioning upright posts and the two second tensioning upright posts opposite to each other, two guide steel pipes are respectively sleeved outside the second steel strands, two first steel strands are mounted on the outer walls of one sides of the two opposite guide steel pipes, and the sliding mechanism comprises a support frame sleeved outside the first steel strands. In addition, the first traction rope and the second traction rope in the plane can be manually pulled, when the purline is installed on the roof with large height difference, a winch is required to be used for pulling the traction rope, and the installation efficiency is improved.
Description
Technical Field
The invention relates to the technical field of house construction, in particular to a large-area purline XYZ-direction mounting device.
Background
Because the current roof purline installation all adopts the automobile crane to install, to the purline on the intensive roofing truss of large tracts of land or the rack, traditional installation method catches the front of a garment and breaks through the elbow, can't go on, and hoisting machinery can't stretch to the installation region and carry out the installation of purline, simultaneously because of the area is great, purline feed opening is plugged up, only few partial feed opening.
Disclosure of Invention
The invention aims to provide a large-area purline XYZ-direction mounting device, which aims to solve the problems in the background technology.
The technical scheme of the invention is as follows: the device for installing the purline in the XYZ direction in a large area comprises a sliding mechanism, two first tensioning upright posts and two second tensioning upright posts, wherein second steel strands are arranged on the outer walls of the opposite ends of the two first tensioning upright posts and the two second tensioning upright posts;
the two guide steel pipes are respectively sleeved outside the second steel strands, two first steel strands are arranged on the outer wall of one side, opposite to the two guide steel pipes, of the sliding mechanism, a support frame is arranged outside the first steel strands in a sleeved mode, the inner walls of the two ends of the support frame are rotationally connected with the same first guide wheel matched with the first steel strands, a reinforcing rod is arranged on the outer wall of one end, opposite to the two support frames, of the two guide steel pipes, a second traction rope is arranged on the outer wall of one side of the reinforcing rod, and a first hook is arranged on the outer wall of the bottom of the support frame;
the two third tensioning upright posts, two the same third steel strand rope is installed on the outer wall of one end of each third tensioning upright post, two fixing frames are sleeved on the outer wall of each third steel strand rope, second hooks are installed on the outer wall of the bottom of each fixing frame, second guide wheels matched with the third steel strand ropes are installed on the inner walls of two sides of each fixing frame, the same supporting frame is installed on the outer walls of the tops of the two fixing frames, and first traction ropes are installed on the outer walls of two ends of each supporting frame.
Preferably, two first reinforcing columns are arranged on one side of the first tensioning upright column, a first steel wire rope is arranged on the outer wall of one side of the first reinforcing column, and the other end of the first steel wire rope is fixedly connected with the outer wall of the corresponding guide steel pipe.
Preferably, two counterforce columns are arranged on one side of the third tensioning column, a second steel wire rope is arranged on the outer wall of one side of the counterforce column, and the other end of the second steel wire rope is fixedly connected with the outer wall of the corresponding guide steel pipe.
Preferably, a guide column is arranged between the second tensioning upright column and the counter-force upright column, a third guide wheel is arranged on the outer wall of the top of the guide column, and the third guide wheel is matched with the second traction rope.
Preferably, the heights of the third tensioning upright post, the second tensioning upright post, the guide post and the counter-force upright post are sequentially increased, and the height of the third tensioning upright post is higher than that of the first tensioning upright post.
The invention provides a large-area purline XYZ direction installation device through improvement, which has the following improvement and advantages compared with the prior art:
the invention firstly adopts a tensioner to stretch the first steel strand to be tight, and simultaneously adopts a first steel wire rope which counteracts the counterforce upright post of the first steel strand reversely to stretch the first steel strand in the pulley block direction to be tight, the pulley block is pulled by the first traction rope and the second traction rope to slide in the XY direction of the purline, and the purline is installed by replacing the purline in the X and Y directions through a chain block. In addition, the first traction rope and the second traction rope in the plane can be manually pulled, when the purline is installed on the roof with large height difference, a winch is required to be used for pulling the traction rope, and the installation efficiency is improved.
Drawings
The invention is further explained below with reference to the drawings and examples:
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of a partially enlarged construction of the reinforcing rod, second traction rope and first hitch of the present invention;
FIG. 3 is a schematic view of a partial enlarged structure of the guide steel pipe, the second guide wheel, the first traction rope and the third steel strand according to the present invention;
FIG. 4 is a schematic top view of the present invention;
fig. 5 is a schematic elevational view of the present invention.
Reference numerals illustrate:
1. a first reinforcing column; 2. a first wire rope; 3. guiding the steel pipe; 4. a first steel strand; 5. a sliding mechanism; 6. a guide post; 7. a second wire rope; 8. a reaction column; 9. a third tensioning column; 10. a first tensioning column; 11. a second tensioning column; 12. a first hook; 13. a support frame; 14. a first guide wheel; 15. a reinforcing rod; 16. a second steel strand; 17. a support frame; 18. a second guide wheel; 19. a first traction rope; 20. a third steel strand; 21. a second hook; 22. a fixing frame; 23. a third guide wheel; 24. and a second traction rope.
Detailed Description
The following detailed description of the present invention clearly and fully describes the technical solutions of the embodiments of the present invention, and it is apparent that the described embodiments are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
The invention provides a large-area purline XYZ direction installation device by improving the device, which comprises the following technical scheme:
as shown in fig. 1-5, an installation device for a purline in XYZ direction with a large area comprises a sliding mechanism 5, two first tensioning upright posts 10 and two second tensioning upright posts 11, wherein second steel stranded wires 16 are installed on outer walls of opposite ends of the two first tensioning upright posts 10 and the two second tensioning upright posts 11, and further comprises;
the two guide steel pipes 3 are respectively sleeved outside the second steel strands 16, two first steel strands 4 are arranged on the outer wall of one side opposite to the two guide steel pipes 3, the sliding mechanism 5 is provided with a supporting frame 13 which is sleeved outside the first steel strands 4, the inner walls of the two ends of the supporting frame 13 are rotationally connected with the same first guide wheel 14 matched with the first steel strands 4, a reinforcing rod 15 is arranged on the outer wall of one end opposite to the two supporting frames 13, a second traction rope 24 is arranged on the outer wall of one side of the reinforcing rod 15, and a first hook 12 is arranged on the outer wall of the bottom of the supporting frame 13;
the two third tensioning upright posts 9, the same third steel stranded rope 20 is arranged on the outer wall of one end, opposite to the two third tensioning upright posts 9, of each third steel stranded rope 20, two fixing frames 22 are sleeved on the outer wall of each third steel stranded rope 20, second hooks 21 are arranged on the outer wall of the bottom of each fixing frame 22, second guide wheels 18 matched with the third steel stranded ropes 20 are arranged on the inner walls of two sides of each fixing frame 22, the same supporting frame 17 is arranged on the outer walls of the tops of the two fixing frames 22, and first traction ropes 19 are arranged on the outer walls of two ends of each supporting frame 17.
Further, two first reinforcing columns 1 are arranged on one side of the first tensioning upright post 10, a first steel wire rope 2 is installed on the outer wall of one side of the first reinforcing column 1, and the other end of the first steel wire rope 2 is fixedly connected with the outer wall of the corresponding guide steel tube 3.
Further, two counterforce columns 8 are arranged on one sides of the third tensioning columns 9, a second steel wire rope 7 is arranged on the outer wall of one side of each counterforce column 8, and the other ends of the second steel wire ropes 7 are fixedly connected with the outer walls of the corresponding guide steel pipes 3.
Further, a guide post 6 is arranged between the second tensioning upright post 11 and the counter-force upright post 8, a third guide wheel 23 is arranged on the outer wall of the top of the guide post 6, and the third guide wheel 23 is matched with the second traction rope 24.
Further, the heights of the third tensioning column 9, the second tensioning column 11, the guide column 6 and the reaction column 8 are sequentially increased, and the height of the third tensioning column 9 is higher than that of the first tensioning column 10.
Working principle: when the novel purlin is used, the purlin is hung on the X-direction supporting frame 13 and the first hook 12, the first guide wheel 14 on the reinforcing rod 15 is driven to slide on the first steel strand 4 through the second traction rope 24, the purlin on the first hook 12 can be driven to move in the X direction and slide below the Y-direction supporting frame 17 and the second guide wheel 18, the purlin is hooked on the Y-direction supporting frame 17 and the second hook 21 by adopting a guide chain, and is moved to an installation position under the action of the second traction rope 24, and a tool such as a chain block is adopted to be lowered and installed to a design position; after the purline is installed in the Y-direction pulley block direction, the first steel wire ropes 2 on the counter-force upright posts 8 on the first steel wire strands 4 are offset through tensioning, so that the forces on the first steel wire ropes 2 at the two ends are different, and the guiding Y-direction pulley block and the first steel wire strands 4 move along with the guiding steel pipes 3 in the X direction and are installed by repeating the steps after moving to the next installation area.
Claims (5)
1. The device for installing the purline in the XYZ direction in a large area comprises a sliding mechanism (5), two first tensioning upright posts (10) and two second tensioning upright posts (11), wherein second steel strands (16) are arranged on the outer walls of the opposite ends of the two first tensioning upright posts (10) and the two second tensioning upright posts (11);
the two guide steel pipes (3) are respectively sleeved outside the second steel strands (16), two first steel strands (4) are arranged on the outer wall of one side, opposite to the two guide steel pipes (3), of the sliding mechanism (5), the sliding mechanism is arranged outside the first steel strands (4) in a sleeved mode, the supporting frames (13) are connected with first guide wheels (14) matched with the first steel strands (4) in a rotating mode on the inner walls of the two ends of the supporting frames (13), reinforcing rods (15) are arranged on the outer walls of one ends, opposite to the two supporting frames (13), of the two end faces, second traction ropes (24) are arranged on the outer walls of one side of the reinforcing rods (15), and first hooks (12) are arranged on the outer walls of the bottom of the supporting frames (13);
the two third tensioning stand columns (9), two same third steel twisted rope (20) are installed to the relative one end outer wall of third tensioning stand column (9), and two mounts (22) have been cup jointed to the outer wall of third steel twisted rope (20), and second couple (21) are installed to the bottom outer wall of mount (22), second leading wheel (18) with third steel twisted rope (20) assorted are installed to mount (22) both sides inner wall, and same braced frame (17) are installed to two mount (22) top outer walls, and first haulage rope (19) are all installed to braced frame (17) both ends outer wall.
2. The large-area purlin XYZ-direction mounting device according to claim 1, characterized in that: two first reinforcing columns (1) are arranged on one side of the first tensioning upright column (10), a first steel wire rope (2) is arranged on the outer wall of one side of the first reinforcing column (1), and the other end of the first steel wire rope (2) is fixedly connected with the outer wall of the corresponding guide steel tube (3).
3. The large-area purlin XYZ-direction mounting device according to claim 1, characterized in that: and two counterforce columns (8) are arranged on one side of the third tensioning column (9), a second steel wire rope (7) is arranged on the outer wall of one side of the counterforce column (8), and the other end of the second steel wire rope (7) is fixedly connected with the outer wall of the corresponding guide steel tube (3).
4. A large area purlin XYZ-direction mounting assembly as defined in claim 3 wherein: a guide column (6) is arranged between the second tensioning upright column (11) and the counter-force upright column (8), a third guide wheel (23) is mounted on the outer wall of the top of the guide column (6), and the third guide wheel (23) is matched with the second traction rope (24).
5. A large area purlin XYZ-direction mounting assembly as defined in claim 3 wherein: the heights of the third tensioning upright post (9), the second tensioning upright post (11), the guide post (6) and the counter-force upright post (8) are sequentially increased, and the height of the third tensioning upright post (9) is higher than that of the first tensioning upright post (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310454229.1A CN116290829B (en) | 2023-04-25 | Large-area purline XYZ direction installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310454229.1A CN116290829B (en) | 2023-04-25 | Large-area purline XYZ direction installation device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116290829A true CN116290829A (en) | 2023-06-23 |
CN116290829B CN116290829B (en) | 2024-05-10 |
Family
ID=
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06288076A (en) * | 1993-03-31 | 1994-10-11 | Takenaka Komuten Co Ltd | Delivery and mounting method of riser unit |
US6041568A (en) * | 1998-03-31 | 2000-03-28 | Owens Corning Fiberglas Technology, Inc. | Apparatus for moving a carriage along the length of purlins of a roof structure and method of using same |
CN104818860A (en) * | 2015-05-07 | 2015-08-05 | 浙江精工钢结构集团有限公司 | Building aerial ropeway and construction method thereof |
CN109488038A (en) * | 2018-11-27 | 2019-03-19 | 北京市建筑工程研究院有限责任公司 | Across the mounting structure and installation method of the beam string flexible cable of existing building |
CN209053444U (en) * | 2018-09-17 | 2019-07-02 | 中建一局华江建设有限公司 | A kind of steel construction purlin lifting device |
CN109958219A (en) * | 2019-04-11 | 2019-07-02 | 中国十七冶集团有限公司 | A kind of complex environment roofing truss lower part liner plate suspension cable installation method |
CN210001454U (en) * | 2019-05-06 | 2020-01-31 | 中建钢构有限公司 | Purlin lifting device |
CN111441594A (en) * | 2020-04-21 | 2020-07-24 | 中铁大桥局第七工程有限公司 | Construction method of multilayer sectional type main cable |
CN217148358U (en) * | 2022-04-11 | 2022-08-09 | 中国建筑一局(集团)有限公司 | Linear steel structure lifting device for telescopic narrow space |
CN115492404A (en) * | 2022-10-14 | 2022-12-20 | 上海宝冶集团有限公司 | Rapid paving method for roof purlines of factory building |
CN115562361A (en) * | 2022-08-26 | 2023-01-03 | 江苏协统新能源科技有限公司 | Solar photovoltaic flexible double-shaft tracker |
CN218205893U (en) * | 2022-09-09 | 2023-01-03 | 河北两山能源环保科技有限公司 | Light roof purline reinforcing structure |
CN218841490U (en) * | 2022-11-15 | 2023-04-11 | 中建新疆建工(集团)有限公司 | Building material hoist and mount direction hawser mechanism |
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06288076A (en) * | 1993-03-31 | 1994-10-11 | Takenaka Komuten Co Ltd | Delivery and mounting method of riser unit |
US6041568A (en) * | 1998-03-31 | 2000-03-28 | Owens Corning Fiberglas Technology, Inc. | Apparatus for moving a carriage along the length of purlins of a roof structure and method of using same |
CN104818860A (en) * | 2015-05-07 | 2015-08-05 | 浙江精工钢结构集团有限公司 | Building aerial ropeway and construction method thereof |
CN209053444U (en) * | 2018-09-17 | 2019-07-02 | 中建一局华江建设有限公司 | A kind of steel construction purlin lifting device |
CN109488038A (en) * | 2018-11-27 | 2019-03-19 | 北京市建筑工程研究院有限责任公司 | Across the mounting structure and installation method of the beam string flexible cable of existing building |
CN109958219A (en) * | 2019-04-11 | 2019-07-02 | 中国十七冶集团有限公司 | A kind of complex environment roofing truss lower part liner plate suspension cable installation method |
CN210001454U (en) * | 2019-05-06 | 2020-01-31 | 中建钢构有限公司 | Purlin lifting device |
CN111441594A (en) * | 2020-04-21 | 2020-07-24 | 中铁大桥局第七工程有限公司 | Construction method of multilayer sectional type main cable |
CN217148358U (en) * | 2022-04-11 | 2022-08-09 | 中国建筑一局(集团)有限公司 | Linear steel structure lifting device for telescopic narrow space |
CN115562361A (en) * | 2022-08-26 | 2023-01-03 | 江苏协统新能源科技有限公司 | Solar photovoltaic flexible double-shaft tracker |
CN218205893U (en) * | 2022-09-09 | 2023-01-03 | 河北两山能源环保科技有限公司 | Light roof purline reinforcing structure |
CN115492404A (en) * | 2022-10-14 | 2022-12-20 | 上海宝冶集团有限公司 | Rapid paving method for roof purlines of factory building |
CN218841490U (en) * | 2022-11-15 | 2023-04-11 | 中建新疆建工(集团)有限公司 | Building material hoist and mount direction hawser mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111576243A (en) | Bridge tensioning trolley with simple support and continuous negative moment | |
CN105003082A (en) | Glass curtain wall mounting equipment and glass curtain mounting method | |
CN2923635Y (en) | Single-column towing type elevator | |
CN116290829B (en) | Large-area purline XYZ direction installation device | |
CN116290829A (en) | Large-area purline XYZ direction installation device | |
CN103288002A (en) | Simple combination portal upper-air heavy-article hoisting device | |
CN1800555A (en) | Large span suspended cable structure and its construction method | |
CN217028004U (en) | Annular hanging basket suspension device for curtain wall construction of super high-rise building | |
CN216403632U (en) | Split type cable carries loop wheel machine | |
CN215366850U (en) | A installing the system for cable-stay bridge suspension cable outer tube | |
CN113979193A (en) | Line erecting device for wind power generation | |
CN214364873U (en) | Lifting and hanging device of climbing frame for building | |
CN104481417B (en) | Linear guide rail type speed apparatus for feeding for vehicle-mounted drilling machine for coal bed gas | |
CN108868098B (en) | Support frame used outside hoistway and mounting method thereof | |
CN205889510U (en) | Automatic cover mould system of taking off of concrete pipe pile | |
CN2825591Y (en) | Metal pressing plate lifter | |
CN105668772A (en) | Lifting device of aerating system | |
CN218538894U (en) | Self-lifting unloading platform | |
CN116838110B (en) | Method for installing large-span steel truss roof lower air pipe | |
CN205590401U (en) | Aeration systems's hoisting device | |
CN219864157U (en) | Spacing support is used in precast beam installation | |
CN220377124U (en) | Suspension bridge PPWS strand circulation traction system | |
CN215854964U (en) | High-altitude operation platform of assembled tower | |
CN215631510U (en) | Steel construction canopy construction platform | |
CN217924509U (en) | Steel construction metal roofing roof boarding material loading cableway device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |