CN1162590C - Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile - Google Patents

Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile Download PDF

Info

Publication number
CN1162590C
CN1162590C CNB011373296A CN01137329A CN1162590C CN 1162590 C CN1162590 C CN 1162590C CN B011373296 A CNB011373296 A CN B011373296A CN 01137329 A CN01137329 A CN 01137329A CN 1162590 C CN1162590 C CN 1162590C
Authority
CN
China
Prior art keywords
pile
reinforced concrete
precast reinforced
concrete piles
boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB011373296A
Other languages
Chinese (zh)
Other versions
CN1352340A (en
Inventor
叶长生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB011373296A priority Critical patent/CN1162590C/en
Publication of CN1352340A publication Critical patent/CN1352340A/en
Application granted granted Critical
Publication of CN1162590C publication Critical patent/CN1162590C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The present invention relates to a technology for sinking a steel reinforced concrete prefabricated pile, which comprises the following steps: a soil taking process and a hole drilling process are carried out by a screw drilling machine on a pile position before a pile pressing process; the steel reinforced concrete prefabricated pile is planted into a drilled hole by a pile pressing machine, the pile pressing process is started, and the end of the pile is pressed into designed depth. The present invention widens the pile pressing condition and the use range of the steel reinforced concrete prefabricated pile and greatly reduces the soil squeezing problems of the steel reinforced concrete prefabricated pile in the pile pressing process, and the present invention also ensures the safety of facilities, such as periphery buildings, roads, pipe lines, etc., and greatly reduces the expense of soil squeezing protection.

Description

Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile
Affiliated technical field
The present invention relates to a kind of pile-sinking method of precast reinforced concrete piles.
Background technology
Advantages such as precast reinforced concrete piles is good with its pile quality, and job practices is simple, and workmanship guarantees that easily environment pollution is little, and construction costs is low are the first-selected stake types of coastal soft foundation always.But (compression coefficient of the soil body is greater than 0.3Mpa generally only to be applicable to the mucky soil body and the clay matter soil body for traditional pile pressing method (paddle type mill, static(al) are embraced pressure and roof pressure method etc.) -1), and (compression coefficient is not more than 0.2Mpa to the sand of tool low compressibility, gravel, boulder bed etc. -1) be to be difficult to make the stake end to pass through the sandstone interlayer.Many engineerings have to adopt cost height, environment pollution is big, workmanship is difficult to guarantee bored pile.This has just limited the range of application of precast reinforced concrete piles to a certain extent.
Summary of the invention
The objective of the invention is to overcome the above-mentioned defective of prior art, a kind of piling method of planting of precast reinforced concrete piles is provided, this method can make precast reinforced concrete piles penetrate thin sand, gravel, boulder bed, enters into thicker sand, gravel, boulder bed and as bearing stratum.
Method of the present invention is as follows: earlier before piling on the stake position with the spiral drilling machine boring of fetching earth, this aperture, hole is than the little 10-30mm in stake footpath, with pile press precast reinforced concrete piles is implanted to the Kong Weizhong that has bored then, the beginning piling makes the stake end be pressed into projected depth.
Advantage of the present invention is as follows:
1, solves the piling difficulty of precast reinforced concrete piles in sand, gravel, boulder bed, the piling degree of depth is greatly improved (piling degree of depth maximum of the present invention can greater than 70 meters), widened the piling condition and the scope of application of precast reinforced concrete piles.
2, owing to adopted prebored hole to fetch earth, reduce the soil compaction problem of precast reinforced concrete piles in the piling process significantly, guaranteed the safety of surrounding buildings thing and facilities such as road and pipeline, significantly reduced the spending of soil compaction protection expense.
The specific embodiment
Further illustrate particular content of the present invention below in conjunction with embodiment.
Prebored hole equipment adopts KD-1500 type suspension type spiral drilling machine in the present embodiment, and this rig walking is convenient, and construction is flexible, and drilling depth can reach about 50M, the efficient height, and the boring verticality easily guarantees, is particularly suitable for the boring of sand, gravel, boulder bed.Boring method adopts opening-closing type awl auger bucket type drill bit to fetch earth and creeps into, and injects mud off in the aperture, requires mud balance between 1.05-1.5, and present embodiment adopts best proportion 1.2, and mud viscosity is greater than 30S.The diameter of boring is less than stake footpath 10-30CM, and present embodiment adopts optimum size 15CM.The degree of depth of boring is undertaken by designing requirement.The central point of boring must be the central point of stake position.The deviation proportion of boring must be less than 5%.After boring is finished precast reinforced concrete piles being aimed at boring is pressed into pile body in the boring by pile press.

Claims (8)

1, a kind of pile-sinking method of precast reinforced concrete piles, it is characterized in that: method is as follows: earlier before piling on the stake position with the spiral drilling machine boring of fetching earth, with pile press precast reinforced concrete piles is implanted to the Kong Weizhong that has bored then, the beginning piling makes the stake end be pressed into projected depth.
2, the pile-sinking method of a kind of precast reinforced concrete piles according to claim 1 is characterized in that: boring method adopts opening-closing type awl auger bucket type drill bit to fetch earth and creeps into.
3, the pile-sinking method of a kind of precast reinforced concrete piles according to claim 1 is characterized in that: the diameter of boring is less than stake footpath 10-30CM.
4, the pile-sinking method of a kind of precast reinforced concrete piles according to claim 1 is characterized in that: inject mud off in the aperture, require mud balance between 1.05-1.5, mud viscosity is greater than 30S.
5, the pile-sinking method of a kind of precast reinforced concrete piles according to claim 1 is characterized in that: the deviation proportion of boring is less than 5%.
6, the pile-sinking method of a kind of precast reinforced concrete piles according to claim 1 is characterized in that: prebored hole equipment adopts KD-1500 type suspension type spiral drilling machine.
7, the pile-sinking method of a kind of precast reinforced concrete piles according to claim 3 is characterized in that: the diameter of boring is less than stake footpath 15CM.
8, the pile-sinking method of a kind of precast reinforced concrete piles according to claim 4 is characterized in that: mud balance is 1.2.
CNB011373296A 2001-11-30 2001-11-30 Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile Expired - Fee Related CN1162590C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB011373296A CN1162590C (en) 2001-11-30 2001-11-30 Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB011373296A CN1162590C (en) 2001-11-30 2001-11-30 Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile

Publications (2)

Publication Number Publication Date
CN1352340A CN1352340A (en) 2002-06-05
CN1162590C true CN1162590C (en) 2004-08-18

Family

ID=4674133

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB011373296A Expired - Fee Related CN1162590C (en) 2001-11-30 2001-11-30 Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile

Country Status (1)

Country Link
CN (1) CN1162590C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493452A (en) * 2011-11-30 2012-06-13 蔡嘉明 Grouting pile-grafting construction method and equipment
CN103628480A (en) * 2012-08-27 2014-03-12 上海中技桩业股份有限公司 Construction method and device for guide displacement pressure precast pile
CN103174139A (en) * 2013-04-16 2013-06-26 合肥建工集团有限公司 Construction technology capable of inserting pile through gravel bed via lead hole
CN105040699A (en) * 2015-08-14 2015-11-11 四川省建筑科学研究院 Drilling pile planting method

Also Published As

Publication number Publication date
CN1352340A (en) 2002-06-05

Similar Documents

Publication Publication Date Title
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN105862861B (en) A plant pile construction method
WO2021082767A1 (en) Method for constructing reinforced fiber and metakaolin-based pressurized cast-in-place pile
CN1986975A (en) Full sleeve large diameter vibration soil taking and filling pile construction method
CN103015413A (en) Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum
CN206784372U (en) Injection forming club-footed pile
CN102383431A (en) Sinking device and novel sinking method of center dug prestressed centrifuge pipe pile (square pile)
CN1265062C (en) Construction for making piles and tools
CN1195130C (en) Sand concrete free small pile foundation consolidation process by stone throwing and squeezing
CN1995689B (en) Pile forming method of pile forming mechanism with gyro bit
CN1162590C (en) Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile
CN205776216U (en) A kind of implantation equipment of rigid pile
CN105113492A (en) Construction method of composite pile applicable to cohesive soil, sandy soil and muddy soil foundations
CN1635228A (en) Bored under-reamed filling pile and fabricating method therefor
CN205576957U (en) Stake end pilework
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN100545357C (en) A kind of cement-soil build-in piling wall and job practices thereof that is used for pattern foundation pit supporting structure
CN103161163A (en) Prestressed tubular pile for spinning rock drilling and embedding rock socketing
CN215367226U (en) Well draw reaming body expanding pile of solid reinforcing of back slip casting root
CN1078282A (en) Pile shoe pouring process and special reinforcing steel cage thereof
CN200999592Y (en) Gyroscope drill and piling machine with gyroscope drill
CN107687168A (en) Inside hit and plant stake method and its application
CN106948768A (en) A kind of auger stem and steel pipe pile construction method
CN1158432C (en) High-pressure mortar spraying deposition process of prefabricated steel bar reinforced concrete pile

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee