CN116258610B - Construction project platform management method and system - Google Patents

Construction project platform management method and system Download PDF

Info

Publication number
CN116258610B
CN116258610B CN202310537418.5A CN202310537418A CN116258610B CN 116258610 B CN116258610 B CN 116258610B CN 202310537418 A CN202310537418 A CN 202310537418A CN 116258610 B CN116258610 B CN 116258610B
Authority
CN
China
Prior art keywords
management
data
verification
construction project
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310537418.5A
Other languages
Chinese (zh)
Other versions
CN116258610A (en
Inventor
邢海霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qingke Zhucheng Technology Co ltd
Original Assignee
Beijing Qingke Zhucheng Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Qingke Zhucheng Technology Co ltd filed Critical Beijing Qingke Zhucheng Technology Co ltd
Priority to CN202310537418.5A priority Critical patent/CN116258610B/en
Publication of CN116258610A publication Critical patent/CN116258610A/en
Application granted granted Critical
Publication of CN116258610B publication Critical patent/CN116258610B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/31User authentication
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Computer Security & Cryptography (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Primary Health Care (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of construction management, and particularly discloses a construction project platform management method and system. The invention tracks and monitors the progress of the construction project through the construction project platform, and determines the current construction stage; acquiring key management data according to the current construction stage; generating management verification data and sending the management verification data to a construction project platform; performing authority verification to obtain management processing data corresponding to management verification data; and performing management verification on the management processing data, and performing corresponding management processing according to a management verification result. The project process tracking monitoring can be carried out through the construction project platform, key management data in the current construction stage are obtained, management verification data are generated, corresponding management processing data are obtained, management verification is carried out on the management processing data, whether management of the construction project platform has artificial or machine careless mistakes is analyzed, inaccuracy of the management data is found in time conveniently, and unreasonable organization coordination of construction projects is avoided.

Description

Construction project platform management method and system
Technical Field
The invention belongs to the technical field of construction management, and particularly relates to a construction project platform management method and system.
Background
The construction management is an important component of the operation management of construction enterprises, and in order to complete the construction task of building products, the enterprises perform the organization management work of production transactions around construction objects and construction sites in the whole process from the acceptance of the construction task to the acceptance of the engineering, and the targeted organization coordination control is implemented, so that the work can achieve the expected effect according to quality and quantity on time.
The construction project platform is a platform for assisting in construction management, and management personnel usually use the construction project platform to perform organization coordination control of construction projects, so that the management of the construction projects can be conveniently performed, but due to the fact that the management is manually combined with the common management of computers, management careless mistakes are possibly caused due to human reasons or computer reasons, management data of the construction project platform are inaccurate, and the organization coordination of the construction projects is possibly unreasonable.
Disclosure of Invention
The embodiment of the invention aims to provide a construction project platform management method and system, and aims to solve the problems in the background technology.
In order to achieve the above object, the embodiment of the present invention provides the following technical solutions:
a construction project platform management method specifically comprises the following steps:
tracking and monitoring the progress of a construction project through a construction project platform, and determining the current construction stage;
acquiring key management data according to the current construction stage;
generating management verification data according to the key management data, and sending the management verification data to a construction project platform;
performing authority verification to obtain management processing data corresponding to the management verification data;
and performing management verification on the management processing data, and performing corresponding management processing according to a management verification result.
By further limiting the technical scheme of the embodiment of the invention, the track monitoring of the progress of the construction project is realized through the construction project platform, and the determination of the current construction stage specifically comprises the following steps:
acquiring construction planning data of a construction project through a construction project platform;
based on the construction planning data, carrying out construction project tracking monitoring to obtain a construction project progress;
and determining the current construction stage according to the construction project progress.
As a further limitation of the technical solution of the embodiment of the present invention, the acquiring key management data according to the current construction stage specifically includes the following steps:
acquiring management record data of the current construction stage through a construction project platform;
classifying and analyzing the management record data to determine a plurality of management classification categories;
identifying a required frequency for recording a plurality of management classification categories;
and comparing the multiple required frequencies, and extracting key management data according to the comparison result.
As a further limitation of the technical solution of the embodiment of the present invention, the generating management verification data according to the key management data, and sending the management verification data to the construction project platform specifically includes the following steps:
standard management data corresponding to the key management data are obtained;
processing according to the standard management data to generate standard verification data;
marking the standard verification data to generate management verification data;
and sending the management verification data to a construction project platform.
As a further limitation of the technical solution of the embodiment of the present invention, the performing authority verification, and obtaining management processing data corresponding to the management verification data specifically includes the following steps:
acquiring processing feedback data of a construction project platform;
performing management authority verification to generate an authority verification result;
and extracting management processing data corresponding to the management verification data from the processing feedback data according to the authority verification result after verification is passed.
As a further limitation of the technical solution of the embodiment of the present invention, the performing management verification on the management processing data, and performing corresponding management processing according to a management verification result specifically includes the following steps:
acquiring guiding processing data corresponding to the management verification data;
based on the guiding processing data, performing management verification on the management processing data to generate a management verification result;
judging whether the management verification passes or not according to the management verification result;
and when the management verification fails, suspending the use of the construction project platform, and detecting historical data of the construction project platform.
The system comprises a process tracking and monitoring unit, a key data acquisition unit, a verification data transmission unit, a right verification processing unit and a management verification processing unit, wherein:
the progress tracking and monitoring unit is used for tracking and monitoring the progress of the construction project through the construction project platform and determining the current construction stage;
the key data acquisition unit is used for acquiring key management data according to the current construction stage;
the verification data transmitting unit is used for generating management verification data according to the key management data and transmitting the management verification data to the construction project platform;
the right verification processing unit is used for carrying out right verification and obtaining management processing data corresponding to the management verification data;
and the management verification processing unit is used for performing management verification on the management processing data and performing corresponding management processing according to a management verification result.
As a further limitation of the technical solution of the embodiment of the present invention, the key data acquisition unit specifically includes:
the record data acquisition module is used for acquiring management record data in the current construction stage through the construction project platform;
the classification analysis module is used for carrying out classification analysis on the management record data and determining a plurality of management classification categories;
the frequency recording module is used for identifying and recording the required frequency of a plurality of management classification categories;
and the comparison processing module is used for comparing the multiple required frequencies and extracting key management data according to the comparison result.
As a further limitation of the technical solution of the embodiment of the present invention, the permission verification processing unit specifically includes:
the feedback data acquisition module is used for acquiring the processing feedback data of the construction project platform;
the permission verification module is used for performing management permission verification and generating a permission verification result;
and the data extraction module is used for extracting management processing data corresponding to the management verification data from the processing feedback data according to the authority verification result after verification is passed.
As a further limitation of the technical solution of the embodiment of the present invention, the management verification processing unit specifically includes:
the instruction data acquisition module is used for acquiring instruction processing data corresponding to the management verification data;
the management verification module is used for carrying out management verification on the management processing data based on the guiding processing data to generate a management verification result;
the result judging module is used for judging whether the management verification passes or not according to the management verification result;
and the management processing module is used for suspending the use of the construction project platform and detecting the historical data of the construction project platform when the management verification is not passed.
Compared with the prior art, the invention has the beneficial effects that:
according to the embodiment of the invention, the progress of a construction project is tracked and monitored through the construction project platform, and the current construction stage is determined; acquiring key management data according to the current construction stage; generating management verification data and sending the management verification data to a construction project platform; performing authority verification to obtain management processing data corresponding to management verification data; and performing management verification on the management processing data, and performing corresponding management processing according to a management verification result. The project process tracking monitoring can be carried out through the construction project platform, key management data in the current construction stage are obtained, management verification data are generated, corresponding management processing data are obtained, management verification is carried out on the management processing data, whether management of the construction project platform has artificial or machine careless mistakes is analyzed, inaccuracy of the management data is found in time conveniently, and unreasonable organization coordination of construction projects is avoided.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following description will briefly introduce the drawings that are needed in the embodiments or the description of the prior art, and it is obvious that the drawings in the following description are only some embodiments of the present invention.
Fig. 1 shows a flowchart of a method provided by an embodiment of the present invention.
FIG. 2 shows a flow chart of a construction project process tracking analysis in a method provided by an embodiment of the invention.
Fig. 3 shows a flowchart of acquiring key management data in the method according to the embodiment of the present invention.
Fig. 4 shows a flowchart of managing generation and transmission of verification data in the method according to the embodiment of the present invention.
Fig. 5 shows a flowchart of acquiring management processing data in the method according to the embodiment of the present invention.
Fig. 6 shows a flowchart of a management verification and management process in the method according to the embodiment of the present invention.
Fig. 7 shows an application architecture diagram of a system provided by an embodiment of the present invention.
Fig. 8 is a block diagram showing a structure of an important data acquisition unit in the system according to the embodiment of the present invention.
Fig. 9 is a block diagram of a rights verification processing unit in the system according to the embodiment of the present invention.
Fig. 10 is a block diagram showing a configuration of a management authentication processing unit in the system according to the embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
It can be understood that in the prior art, the construction project platform is usually used by a manager to perform organization coordination control of the construction project, and although management of the construction project can be conveniently performed, due to common management of manual work and a computer, some management careless mistakes may be caused due to human reasons or reasons of the computer, so that management data of the construction project platform is inaccurate, and further, organization coordination of the construction project may be unreasonable.
In order to solve the problems, the embodiment of the invention tracks and monitors the progress of a construction project through a construction project platform and determines the current construction stage; acquiring key management data according to the current construction stage; generating management verification data according to key management data, and sending the management verification data to a construction project platform; performing authority verification to obtain management processing data corresponding to management verification data; and performing management verification on the management processing data, and performing corresponding management processing according to a management verification result. The project process tracking monitoring can be carried out through the construction project platform, key management data in the current construction stage are obtained, management verification data are generated, corresponding management processing data are obtained, management verification is carried out on the management processing data, whether management of the construction project platform has artificial or machine careless mistakes is analyzed, inaccuracy of the management data is found in time conveniently, and unreasonable organization coordination of construction projects is avoided.
Fig. 1 shows a flowchart of a method provided by an embodiment of the present invention.
Specifically, in a preferred embodiment provided by the present invention, a construction project platform management method specifically includes the following steps:
step S101, tracking and monitoring the progress of a construction project through a construction project platform, and determining the current construction stage.
In the embodiment of the invention, the construction project platform needs to carry out organization coordination control of the construction project according to preset construction planning through the operation of management personnel, construction planning data of the construction project can be obtained through the construction project platform, the construction project is tracked and monitored by taking the construction planning data as project process reference, the construction project process is obtained, and then the current construction stage in the construction planning is determined through the construction project process.
Specifically, fig. 2 shows a flowchart of a construction project process tracking analysis in the method provided by the embodiment of the invention.
In the preferred embodiment provided by the invention, the track monitoring construction project progress through the construction project platform determines that the current construction stage specifically comprises the following steps:
step S1011, acquiring construction planning data of a construction project through a construction project platform.
Step S1012, based on the construction planning data, carrying out construction project tracking monitoring to obtain a construction project progress.
Step S1013, determining a current construction stage according to the construction project progress.
Further, the construction project platform management method further comprises the following steps:
step S102, acquiring key management data according to the current construction stage.
In the embodiment of the invention, in the project construction process, a construction project platform is required to carry out management record of the construction process, management record data of the current construction stage can be obtained through the construction project platform, classification analysis is carried out on the management record data, a plurality of management classification categories for project construction management are determined in the current construction stage, the required frequency corresponding to the record is identified in the construction project platform according to the plurality of management classification categories, the plurality of required frequencies are compared, the management classification category with the most required frequency is determined, and data corresponding to the management classification category with the most required frequency is extracted and arranged from the management record data to obtain key management data.
Specifically, fig. 3 shows a flowchart of acquiring key management data in the method provided by the embodiment of the present invention.
In a preferred embodiment of the present invention, the acquiring key management data according to the current construction stage specifically includes the following steps:
step S1021, obtaining management record data of the current construction stage through the construction project platform.
Step S1022, performing classification analysis on the management record data, and determining a plurality of management classification categories.
Step S1023, identifying and recording the required frequency of a plurality of the management classification categories.
And step S1024, comparing the plurality of required frequencies, and extracting key management data according to the comparison result.
Further, the construction project platform management method further comprises the following steps:
and step S103, generating management verification data according to the key management data, and sending the management verification data to a construction project platform.
According to the management classification corresponding to the key management data, the corresponding standard management data is obtained in a preset standard database, standard verification data is randomly generated according to a standard framework of the standard management data, guiding processing data correctly corresponding to the standard verification data is recorded, the standard verification data is marked, the management verification data is generated, and the management verification data is sent to a construction project platform.
Specifically, fig. 4 shows a flowchart of managing generation and transmission of verification data in the method provided by the embodiment of the invention.
In the preferred embodiment of the present invention, the step of generating management verification data according to the key management data and sending the management verification data to a construction project platform specifically includes the following steps:
step S1031, obtaining standard management data corresponding to the key management data.
And S1032, processing according to the standard management data to generate standard verification data.
And step S1033, marking the standard verification data to generate management verification data.
And step S1034, transmitting the management verification data to a construction project platform.
Further, the construction project platform management method further comprises the following steps:
step S104, performing authority verification and obtaining management processing data corresponding to the management verification data.
In the embodiment of the invention, after receiving the management verification data, the construction project platform processes a plurality of pieces of data acquired at the same time and including the management verification data according to normal management data under the management operation of a manager, generates and records processing feedback data, and when the management personnel need to manage and verify the processing feedback data, firstly acquires the identity information of the corresponding manager, carries out management authority verification on the identity information, judges whether the management authority has corresponding level authority, generates an authority verification result, and extracts management processing data obtained by processing the management verification data from the processing feedback data according to the mark of the management verification data under the condition that the management authority verification result has corresponding level authority.
Specifically, fig. 5 shows a flowchart of acquiring management processing data in the method provided by the embodiment of the present invention.
In a preferred embodiment of the present invention, the performing authority verification, and obtaining management processing data corresponding to the management verification data specifically includes the following steps:
step S1041, obtaining processing feedback data of the construction project platform.
Step S1042, performing management authority verification to generate an authority verification result.
Step S1043, extracting management processing data corresponding to the management verification data from the processing feedback data according to the authority verification result after verification is passed.
Further, the construction project platform management method further comprises the following steps:
step S105, performing management verification on the management processing data, and performing corresponding management processing according to a management verification result.
According to the embodiment of the invention, the management verification is carried out by importing the guiding processing data corresponding to the management verification data, carrying out management verification on the correctness of the management processing data based on the guiding processing data, judging whether the management processing data is consistent with the guiding processing data, generating a management verification result, judging that the management verification is not passed when the management processing data is inconsistent with the guiding processing data according to the management verification result, suspending the use of the construction project platform at the moment, acquiring the history data of the construction project platform, extracting part of the history data after the last detection from the history data, and carrying out verification on part of the history data.
Specifically, fig. 6 shows a flowchart of a management verification and management process in the method provided by the embodiment of the present invention.
In the preferred embodiment of the present invention, the performing management verification on the management processing data, and performing corresponding management processing according to a management verification result specifically includes the following steps:
step S1051, acquiring instruction processing data corresponding to the management verification data.
Step S1052, performing management verification on the management processing data based on the instruction processing data, and generating a management verification result.
Step S1053, according to the management verification result, it is determined whether the management verification is passed.
And step S1054, suspending the use of the construction project platform and detecting the historical data of the construction project platform when the management verification is not passed.
Further, fig. 7 shows an application architecture diagram of the system provided by the embodiment of the present invention.
In another preferred embodiment of the present invention, a construction project platform management system includes:
the progress tracking and monitoring unit 101 is configured to track and monitor the progress of a construction project through the construction project platform, and determine a current construction stage.
In the embodiment of the invention, the construction project platform needs to carry out organization coordination control of the construction project according to preset construction planning through the operation of management personnel, the process tracking and monitoring unit 101 obtains the construction planning data of the construction project through the construction project platform, tracks and monitors the construction project by taking the construction planning data as project process reference, obtains the construction project process, and further determines the current construction stage in the construction planning through the construction project process.
And an important data obtaining unit 102, configured to obtain important management data according to the current construction stage.
In the embodiment of the invention, in the project construction process, a construction project platform is required to carry out management record of the construction process, the key data acquisition unit 102 can acquire management record data of the current construction stage through the construction project platform, then carries out classification analysis on the management record data, determines a plurality of management classification categories for project construction management in the current construction stage, identifies the required frequency corresponding to the record in the construction project platform according to the plurality of management classification categories, compares the plurality of required frequencies, determines the management classification category with the most required frequency, and then extracts and sorts the data corresponding to the management classification category with the most required frequency from the management record data to obtain key management data.
Specifically, fig. 8 shows a block diagram of the key data acquisition unit 102 in the system according to the embodiment of the present invention.
In a preferred embodiment of the present invention, the key data obtaining unit 102 specifically includes:
the record data obtaining module 1021 is configured to obtain management record data of a current construction stage through the construction project platform.
The classification analysis module 1022 is configured to perform classification analysis on the management record data, and determine a plurality of management classification categories.
The frequency recording module 1023 is used for identifying and recording the required frequency of a plurality of the management classification categories.
And a comparison processing module 1024, configured to compare the multiple required frequencies, and extract key management data according to the comparison result.
Further, the construction project platform management system further includes:
and the verification data sending unit 103 is used for generating management verification data according to the key management data and sending the management verification data to the construction project platform.
In the embodiment of the present invention, the verification data sending unit 103 obtains corresponding standard management data in a preset standard database according to the management classification corresponding to the key management data, then randomly generates standard verification data according to the standard framework of the standard management data, records guiding processing data correctly corresponding to the standard verification data, marks the standard verification data, generates management verification data, and then sends the management verification data to the construction project platform.
And the authority verification processing unit 104 is configured to perform authority verification, and obtain management processing data corresponding to the management verification data.
In the embodiment of the invention, after receiving the management verification data, the construction project platform processes a plurality of pieces of data acquired at the same time and including the management verification data according to normal management data under the management operation of a manager, generates and records processing feedback data, and the authority verification processing unit 104 extracts management processing data obtained by processing the management verification data from the processing feedback data according to the authority verification result and the mark of the management verification data when the management personnel need to manage and verify the processing feedback data by acquiring the identity information of the corresponding manager, performing management authority verification on the identity information, judging whether the corresponding level authority exists or not, generating the authority verification result, and extracting the management processing data obtained by processing the management verification data according to the authority verification result and the mark of the management verification data under the condition of the corresponding level authority.
Specifically, fig. 9 shows a block diagram of the authority verification processing unit 104 in the system according to the embodiment of the present invention.
In a preferred embodiment of the present invention, the authority verification processing unit 104 specifically includes:
the feedback data obtaining module 1041 is configured to obtain processing feedback data of the construction project platform.
The rights verification module 1042 is used for performing management rights verification and generating a rights verification result.
And a data extraction module 1043, configured to extract management processing data corresponding to the management verification data from the processing feedback data according to the authority verification result after verification is passed.
Further, the construction project platform management system further includes:
and the management verification processing unit 105 is used for performing management verification on the management processing data, and performing corresponding management processing according to a management verification result.
In the embodiment of the present invention, the management verification processing unit 105 performs management verification on the correctness of the management processing data by importing the guiding processing data corresponding to the management verification data, judging whether the management processing data is consistent with the guiding processing data, generating a management verification result, judging that the management verification is not passed when the management processing data is inconsistent with the guiding processing data according to the management verification result, suspending the use of the construction project platform at this time, acquiring the history data of the construction project platform, extracting part of the history data after the last detection from the history data, and performing verification on part of the history data.
Specifically, fig. 10 shows a block diagram of the management verification processing unit 105 in the system according to the embodiment of the present invention.
In a preferred embodiment of the present invention, the management verification processing unit 105 specifically includes:
a guiding data obtaining module 1051, configured to obtain guiding processing data corresponding to the management verification data.
And a management verification module 1052, configured to perform management verification on the management processing data based on the instruction processing data, and generate a management verification result.
And a result judging module 1053, configured to judge whether the management verification passes according to the management verification result.
The management processing module 1054 is configured to suspend use of the construction project platform and perform historical data detection on the construction project platform when management verification fails.
It should be understood that, although the steps in the flowcharts of the embodiments of the present invention are shown in order as indicated by the arrows, these steps are not necessarily performed in order as indicated by the arrows. The steps are not strictly limited to the order of execution unless explicitly recited herein, and the steps may be executed in other orders. Moreover, at least some of the steps in various embodiments may include multiple sub-steps or stages that are not necessarily performed at the same time, but may be performed at different times, nor do the order in which the sub-steps or stages are performed necessarily performed in sequence, but may be performed alternately or alternately with at least a portion of the sub-steps or stages of other steps or other steps.
Those skilled in the art will appreciate that all or part of the processes in the methods of the above embodiments may be implemented by a computer program for instructing relevant hardware, where the program may be stored in a non-volatile computer readable storage medium, and where the program, when executed, may include processes in the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the various embodiments provided herein may include non-volatile and/or volatile memory. The nonvolatile memory can include Read Only Memory (ROM), programmable ROM (PROM), electrically Programmable ROM (EPROM), electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double Data Rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous Link DRAM (SLDRAM), memory bus direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), among others.
The technical features of the above-described embodiments may be arbitrarily combined, and all possible combinations of the technical features in the above-described embodiments are not described for brevity of description, however, as long as there is no contradiction between the combinations of the technical features, they should be considered as the scope of the description.
The foregoing examples illustrate only a few embodiments of the invention and are described in detail herein without thereby limiting the scope of the invention. It should be noted that it will be apparent to those skilled in the art that several variations and modifications can be made without departing from the spirit of the invention, which are all within the scope of the invention. Accordingly, the scope of protection of the present invention is to be determined by the appended claims.
The foregoing description of the preferred embodiments of the invention is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the invention.

Claims (10)

1. The construction project platform management method is characterized by comprising the following steps of:
tracking and monitoring the progress of a construction project through a construction project platform, and determining the current construction stage;
acquiring key management data according to the current construction stage;
generating management verification data according to the key management data, and sending the management verification data to a construction project platform;
according to the management classification corresponding to the key management data, acquiring corresponding standard management data in a preset standard database, randomly generating standard verification data according to a standard framework of the standard management data, recording guiding processing data correctly corresponding to the standard verification data, marking the standard verification data, generating management verification data, and transmitting the management verification data to a construction project platform;
performing authority verification to obtain management processing data corresponding to the management verification data;
after receiving the management verification data, the construction project platform processes a plurality of pieces of data acquired at the same time and including the management verification data according to normal management data under the management operation of a manager, generates and records processing feedback data, and when the manager needs to manage and verify the processing feedback data, firstly acquires identity information of the corresponding manager, manages and verifies the identity information, judges whether the manager has corresponding level authority, generates an authority verification result, and extracts management processing data obtained by processing the management verification data from the processing feedback data according to the mark of the management verification data under the condition that the manager has corresponding level authority according to the authority verification result;
and performing management verification on the management processing data, and performing corresponding management processing according to a management verification result.
2. The construction project platform management method according to claim 1, wherein the step of tracking and monitoring the progress of the construction project through the construction project platform, and the step of determining the current construction stage specifically comprises the steps of:
acquiring construction planning data of a construction project through a construction project platform;
based on the construction planning data, carrying out construction project tracking monitoring to obtain a construction project progress;
and determining the current construction stage according to the construction project progress.
3. The construction project platform management method according to claim 1, wherein the acquiring key management data according to the current construction stage specifically comprises the steps of:
acquiring management record data of the current construction stage through a construction project platform;
classifying and analyzing the management record data to determine a plurality of management classification categories;
identifying a required frequency for recording a plurality of management classification categories;
and comparing the multiple required frequencies, and extracting key management data according to the comparison result.
4. The construction project platform management method according to claim 1, wherein the generating management verification data according to the key management data, and transmitting the management verification data to the construction project platform specifically comprises the following steps:
standard management data corresponding to the key management data are obtained;
processing according to the standard management data to generate standard verification data;
marking the standard verification data to generate management verification data;
and sending the management verification data to a construction project platform.
5. The construction project platform management method according to claim 1, wherein the performing authority verification, and obtaining management processing data corresponding to the management verification data, specifically comprises the following steps:
acquiring processing feedback data of a construction project platform;
performing management authority verification to generate an authority verification result;
and extracting management processing data corresponding to the management verification data from the processing feedback data according to the authority verification result after verification is passed.
6. The construction project platform management method according to claim 1, wherein the performing management verification on the management processing data, and performing corresponding management processing according to a management verification result, specifically comprises the following steps:
acquiring guiding processing data corresponding to the management verification data;
based on the guiding processing data, performing management verification on the management processing data to generate a management verification result;
judging whether the management verification passes or not according to the management verification result;
and when the management verification fails, suspending the use of the construction project platform, and detecting historical data of the construction project platform.
7. The construction project platform management system is characterized by comprising a process tracking and monitoring unit, a key data acquisition unit, a verification data transmission unit, a permission verification processing unit and a management verification processing unit, wherein:
the progress tracking and monitoring unit is used for tracking and monitoring the progress of the construction project through the construction project platform and determining the current construction stage;
the key data acquisition unit is used for acquiring key management data according to the current construction stage;
the verification data transmitting unit is used for generating management verification data according to the key management data and transmitting the management verification data to the construction project platform;
the verification data transmitting unit acquires corresponding standard management data from a preset standard database according to the management classification corresponding to the key management data, randomly generates standard verification data according to a standard framework of the standard management data, records guiding processing data correctly corresponding to the standard verification data, marks the standard verification data to generate management verification data, and transmits the management verification data to the construction project platform;
the right verification processing unit is used for carrying out right verification and obtaining management processing data corresponding to the management verification data;
after receiving the management verification data, the construction project platform processes a plurality of pieces of data acquired at the same time and including the management verification data according to normal management data under the management operation of a manager, generates and records processing feedback data, and when the manager needs to manage and verify the processing feedback data, the authority verification processing unit firstly acquires identity information of the corresponding manager, performs management authority verification on the identity information, judges whether the manager has corresponding level authority, generates an authority verification result, and extracts management processing data obtained by processing the management verification data from the processing feedback data according to the mark of the management verification data according to the authority verification result and the condition that the manager has corresponding level authority;
and the management verification processing unit is used for performing management verification on the management processing data and performing corresponding management processing according to a management verification result.
8. The construction project platform management system according to claim 7, wherein the key data acquisition unit specifically comprises:
the record data acquisition module is used for acquiring management record data in the current construction stage through the construction project platform;
the classification analysis module is used for carrying out classification analysis on the management record data and determining a plurality of management classification categories;
the frequency recording module is used for identifying and recording the required frequency of a plurality of management classification categories;
and the comparison processing module is used for comparing the multiple required frequencies and extracting key management data according to the comparison result.
9. The construction project platform management system according to claim 7, wherein the authority verification processing unit specifically comprises:
the feedback data acquisition module is used for acquiring the processing feedback data of the construction project platform;
the permission verification module is used for performing management permission verification and generating a permission verification result;
and the data extraction module is used for extracting management processing data corresponding to the management verification data from the processing feedback data according to the authority verification result after verification is passed.
10. The construction project platform management system according to claim 7, wherein the management verification processing unit specifically comprises:
the instruction data acquisition module is used for acquiring instruction processing data corresponding to the management verification data;
the management verification module is used for carrying out management verification on the management processing data based on the guiding processing data to generate a management verification result;
the result judging module is used for judging whether the management verification passes or not according to the management verification result;
and the management processing module is used for suspending the use of the construction project platform and detecting the historical data of the construction project platform when the management verification is not passed.
CN202310537418.5A 2023-05-15 2023-05-15 Construction project platform management method and system Active CN116258610B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310537418.5A CN116258610B (en) 2023-05-15 2023-05-15 Construction project platform management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310537418.5A CN116258610B (en) 2023-05-15 2023-05-15 Construction project platform management method and system

Publications (2)

Publication Number Publication Date
CN116258610A CN116258610A (en) 2023-06-13
CN116258610B true CN116258610B (en) 2023-07-25

Family

ID=86684638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310537418.5A Active CN116258610B (en) 2023-05-15 2023-05-15 Construction project platform management method and system

Country Status (1)

Country Link
CN (1) CN116258610B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150033377A (en) * 2013-09-24 2015-04-01 중소기업은행 Apparatus and method for verifying management result

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104484524B (en) * 2014-12-09 2017-08-01 张家驰 A kind of method and system interacted based on BIM simulation models with site operation
CN107103410A (en) * 2017-04-06 2017-08-29 杨军 A kind of supervisory systems and method of construction engineering quality detection
CN112149212B (en) * 2020-09-22 2022-08-05 广西路桥工程集团有限公司 Visual construction management platform for engineering project
CN112184175B (en) * 2020-10-13 2023-11-24 广东天衡工程建设咨询管理有限公司 Whole process project management platform
CN112287440A (en) * 2020-10-26 2021-01-29 中国水利水电第一工程局有限公司 Subway construction progress management system based on BIM and small-size unmanned vehicles

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150033377A (en) * 2013-09-24 2015-04-01 중소기업은행 Apparatus and method for verifying management result

Also Published As

Publication number Publication date
CN116258610A (en) 2023-06-13

Similar Documents

Publication Publication Date Title
CN109783338B (en) Recording processing method and device based on service information and computer equipment
CN111177714B (en) Abnormal behavior detection method and device, computer equipment and storage medium
CN110443109A (en) Abnormal behaviour monitor processing method, device, computer equipment and storage medium
TW201730766A (en) Method and apparatus for abnormal access detection
CN109359866B (en) Risk hidden danger monitoring method and device based on leasing equipment and computer equipment
US11119843B2 (en) Verifying application behavior based on distributed tracing
CN114201090B (en) Product production abnormality early warning system, method, computer device and storage medium
US20140129295A1 (en) System for automated process mining
CN112632330A (en) Method and device for routing inspection of ATM equipment, computer equipment and storage medium
CN116258610B (en) Construction project platform management method and system
CN113946492A (en) Intelligent operation and maintenance method, device, equipment and storage medium
CN116719968A (en) Construction supervision method and system
CN115587898B (en) Financial data secure sharing method and system based on cloud service
CN117240527A (en) Network security risk prevention system and method
CN115578158B (en) Construction machinery circulation management method and system
Genga et al. Towards a systematic process-aware behavioral analysis for security
CN110941543A (en) Log processing method and device, computer equipment and storage medium
CN115827770A (en) Data visualization method and device
CN111786991B (en) Block chain-based platform authentication login method and related device
CN116012971B (en) Mechanical equipment detection management method and system
JP6501159B2 (en) Analysis and translation of operation records of computer devices, output of information for audit and trend analysis device of the system.
CN116993297B (en) Task data generation method and system based on electronic conference record
CN117979254B (en) Internet of things networking method and system of gas detector
CN116090907B (en) Building construction quality traceability management method and system
CN117473550A (en) Test data management method, system, equipment and medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant