CN116244789A - Coal preparation plant multi-specialized construction drawing entrusted resource lifting method and device - Google Patents
Coal preparation plant multi-specialized construction drawing entrusted resource lifting method and device Download PDFInfo
- Publication number
- CN116244789A CN116244789A CN202211641070.6A CN202211641070A CN116244789A CN 116244789 A CN116244789 A CN 116244789A CN 202211641070 A CN202211641070 A CN 202211641070A CN 116244789 A CN116244789 A CN 116244789A
- Authority
- CN
- China
- Prior art keywords
- fund
- file
- design task
- funding
- entrusted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 158
- 238000000034 method Methods 0.000 title claims abstract description 72
- 239000003245 coal Substances 0.000 title claims abstract description 55
- 238000002360 preparation method Methods 0.000 title claims abstract description 51
- 238000013461 design Methods 0.000 claims abstract description 212
- 230000004048 modification Effects 0.000 claims description 49
- 238000012986 modification Methods 0.000 claims description 49
- 238000007689 inspection Methods 0.000 claims description 41
- 238000010586 diagram Methods 0.000 description 17
- 238000004590 computer program Methods 0.000 description 12
- 230000008569 process Effects 0.000 description 12
- 238000004891 communication Methods 0.000 description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 9
- 238000012545 processing Methods 0.000 description 8
- 238000010438 heat treatment Methods 0.000 description 7
- 230000006870 function Effects 0.000 description 6
- 230000008859 change Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 238000010295 mobile communication Methods 0.000 description 5
- 238000009423 ventilation Methods 0.000 description 5
- 238000007726 management method Methods 0.000 description 4
- 238000011144 upstream manufacturing Methods 0.000 description 4
- 238000011161 development Methods 0.000 description 3
- 239000000428 dust Substances 0.000 description 3
- 230000003287 optical effect Effects 0.000 description 3
- 238000004378 air conditioning Methods 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000013507 mapping Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000002035 prolonged effect Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 238000013473 artificial intelligence Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000010801 machine learning Methods 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 230000001953 sensory effect Effects 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/12—Geometric CAD characterised by design entry means specially adapted for CAD, e.g. graphical user interfaces [GUI] specially adapted for CAD
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/10—Constructive solid geometry [CSG] using solid primitives, e.g. cylinders, cubes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/02—CAD in a network environment, e.g. collaborative CAD or distributed simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/04—Constraint-based CAD
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/14—Pipes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Computer Hardware Design (AREA)
- Computational Mathematics (AREA)
- Architecture (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Computer Interaction (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Software Systems (AREA)
- Data Mining & Analysis (AREA)
- Computer Graphics (AREA)
- Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The disclosure relates to the technical field of building information model design, in particular to a multi-specialty construction drawing commission fund lifting method and device for a coal preparation plant. The coal preparation plant multi-specialty construction drawing entrust fund raising method comprises the following steps: obtaining a construction drawing entrusted design task; according to the construction drawing entrusted design task, calling a fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file; if at least one type of the specialization corresponding fund providing file meets the checking condition, generating a target fund providing drawing corresponding to the construction drawing entrusted design task according to the at least one type of the specialization corresponding fund providing file. By adopting the method and the device, the fund-providing period can be shortened, the fund-providing efficiency can be improved, and the error rate can be reduced.
Description
Technical Field
The disclosure relates to the technical field of building information model design, in particular to a multi-specialty construction drawing commission fund lifting method and device for a coal preparation plant.
Background
The engineering construction diagram design of coal preparation plants is mainly pipelined operation at present, and professional design contents have strong correlation and are required to mutually carry out the investment of construction diagram entrusted data. However, in the related coal-dressing plant construction drawing commission fund-raising process, after the design of the upstream professional is completed, the corresponding data commission can be submitted to the downstream professional, so that the fund-raising period is longer. Meanwhile, due to the fact that the investment-providing standards of all professions are not uniform, a large number of operations such as deleting, adjusting patterns, checking design proportions and the like are generated by downstream professions, the investment-providing efficiency is low, and the error rate is high.
Disclosure of Invention
The present disclosure provides a method and a device for entrusting and providing resources for multi-professional construction drawings of coal preparation plants, which mainly aims to shorten the resource providing period, improve the resource providing efficiency and reduce the error rate.
According to one aspect of the disclosure, there is provided a coal preparation plant multi-specialty construction drawing commission fund raising method, including:
obtaining a construction drawing entrusted design task;
according to the construction drawing entrusted design task, invoking an fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file;
and if the at least one type of the specialization corresponding fund drawing file meets the checking condition, generating a target fund drawing corresponding to the construction drawing entrusted design task according to the at least one type of the specialization corresponding fund drawing file.
Optionally, according to the task of entrusting the construction drawing, invoking the funding gallery to draw referring to the drawing standard configuration to obtain at least one specialized corresponding funding file, including:
determining the design authority corresponding to the construction drawing entrusted design task and at least one professional corresponding funding template;
and calling a fund drawing library, and drawing according to the design authority and the fund drawing template corresponding to the at least one specialty to obtain the fund drawing file corresponding to the at least one specialty.
Optionally, the job drawing commission design task includes a civil engineering main frame collaborative design task, an equipment professional lofting collaborative design task, and a professional pipeline collaborative design task, and according to the job drawing commission design task, the resource drawing gallery is called to draw referring to drawing standard configuration to obtain at least one resource drawing file corresponding to a professional, including:
respectively calling a lifting gallery to refer to drawing standard configuration for drawing according to the civil engineering main frame collaborative design task, the equipment professional lofting collaborative design task and the professional pipeline collaborative design task to obtain a first lifting file corresponding to the civil engineering main frame collaborative design task, and a second lifting file corresponding to the equipment professional lofting collaborative design task and a third lifting file corresponding to the professional pipeline collaborative design task;
and determining a fourth fund providing file according to the second fund providing file and the third fund providing file.
Optionally, the generating, according to the at least one specially-corresponding fund drawing file, a fund drawing corresponding to the construction drawing entrusted design task includes:
according to the summarizing rule, summarizing the fourth fund-raising file by taking the floor as a unit to obtain a fifth fund-raising file;
And generating a target fund drawing corresponding to the construction drawing entrusted design task according to the first fund file and the fifth fund file.
Optionally, after the obtaining at least one professional corresponding funding file, the method further includes:
checking and marking the at least one professional corresponding fund file to obtain at least one checking report corresponding to the at least one professional corresponding fund file, wherein the checking report corresponds to the fund file one by one;
and if any one of the at least one inspection report does not meet the inspection condition, issuing a file modification instruction, wherein the file modification instruction is used for indicating the modification of the funding file corresponding to the any one inspection report.
Optionally, the generating, according to the at least one specially-corresponding fund drawing file, a target fund drawing corresponding to the construction drawing entrusted design task includes:
generating an initial fund drawing corresponding to the construction drawing entrusted design task according to the fund file corresponding to the at least one specialty;
if the initial funding drawing meets the funding condition, determining that the initial funding drawing is a target funding drawing corresponding to the construction drawing entrusted design task.
Optionally, after generating the initial funding drawing corresponding to the construction drawing entrusted design task according to the funding file corresponding to the at least one specialty, the method further includes:
performing structure checking and collision checking on the initial funding drawing;
and if the initial funding drawing does not meet the structure checking and collision checking conditions, sending a drawing modification instruction, wherein the file modification instruction is used for indicating the modification of the initial funding drawing.
According to another aspect of the present disclosure, there is provided a coal preparation plant multi-specialty construction drawing commission fund raising device, comprising:
the task acquisition unit is used for acquiring a construction drawing entrusted design task;
the file drawing unit is used for entrusting a design task according to the construction drawing, calling a fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file;
and the drawing generation unit is used for generating a target fund drawing corresponding to the construction drawing entrusted design task according to the fund file corresponding to the at least one specialty if the fund file corresponding to the at least one specialty meets the checking condition.
Optionally, the file drawing unit is configured to invoke the fund drawing gallery to draw referring to drawing standard configuration according to the construction drawing commission design task, so as to obtain at least one fund drawing file corresponding to a specialty, where the file drawing unit is specifically configured to:
Determining the design authority corresponding to the construction drawing entrusted design task and at least one professional corresponding funding template;
and calling a fund drawing library, and drawing according to the design authority and the fund drawing template corresponding to the at least one specialty to obtain the fund drawing file corresponding to the at least one specialty.
Optionally, the construction drawing entrusted design task includes a civil engineering main frame collaborative design task, an equipment professional lofting collaborative design task, and a professional pipeline collaborative design task, and the file drawing unit is configured to call the resource drawing gallery to draw referring to drawing standard configuration according to the construction drawing entrusted design task, so as to obtain at least one resource drawing file corresponding to a professional, where the file drawing unit is specifically configured to:
respectively calling a lifting gallery to refer to drawing standard configuration for drawing according to the civil engineering main frame collaborative design task, the equipment professional lofting collaborative design task and the professional pipeline collaborative design task to obtain a first lifting file corresponding to the civil engineering main frame collaborative design task, and a second lifting file corresponding to the equipment professional lofting collaborative design task and a third lifting file corresponding to the professional pipeline collaborative design task;
And determining a fourth fund providing file according to the second fund providing file and the third fund providing file.
Optionally, the drawing generating unit is configured to generate, according to the at least one investment file corresponding to the specialty, an investment drawing corresponding to the task of consignment design of the construction drawing, where the investment drawing generating unit is specifically configured to:
according to the summarizing rule, summarizing the fourth fund-raising file by taking the floor as a unit to obtain a fifth fund-raising file;
and generating a target fund drawing corresponding to the construction drawing entrusted design task according to the first fund file and the fifth fund file.
Optionally, the multi-specialty construction drawing commission fund lifting device of the coal preparation plant further comprises a file checking unit and a file modifying unit, which are used for obtaining the fund lifting file corresponding to at least one specialty:
the file checking unit is used for checking and marking the at least one professional corresponding fund file to obtain at least one checking report corresponding to the at least one professional corresponding fund file, wherein the checking report corresponds to the fund file one by one;
the file modification unit is configured to issue a file modification instruction if any one of the at least one inspection report does not meet an inspection condition, where the file modification instruction is configured to instruct modification of a funding file corresponding to the any one inspection report.
Optionally, the drawing generating unit is configured to generate, according to the at least one investment file corresponding to the specialty, a target investment drawing corresponding to the task of consignment design of the construction drawing, where the target investment drawing is specifically configured to:
generating an initial fund drawing corresponding to the construction drawing entrusted design task according to the fund file corresponding to the at least one specialty;
if the initial funding drawing meets the funding condition, determining that the initial funding drawing is a target funding drawing corresponding to the construction drawing entrusted design task.
Optionally, the drawing generating unit is configured to, after generating the initial fund drawing corresponding to the construction drawing commission design task according to the fund file corresponding to the at least one specialty, further be configured to:
performing structure checking and collision checking on the initial funding drawing;
and if the initial funding drawing does not meet the structure checking and collision checking conditions, sending a drawing modification instruction, wherein the file modification instruction is used for indicating the modification of the initial funding drawing.
According to another aspect of the present disclosure, there is provided a terminal including:
at least one processor; and
a memory communicatively coupled to the at least one processor; wherein,,
The memory stores instructions executable by the at least one processor to enable the at least one processor to perform the method of any one of the preceding aspects.
According to another aspect of the present disclosure, there is provided a non-transitory computer-readable storage medium storing computer instructions for causing the computer to perform the method of any one of the preceding aspects.
According to another aspect of the present disclosure, there is provided a computer program product comprising a computer program which, when executed by a processor, implements the method of any one of the preceding aspects.
In one or more embodiments of the present disclosure, design tasks are delegated by obtaining a construction map; according to the construction drawing entrusted design task, calling a fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file; if at least one type of the specialization corresponding fund providing file meets the checking condition, generating a target fund providing drawing corresponding to the construction drawing entrusted design task according to the at least one type of the specialization corresponding fund providing file. Therefore, by synchronously drawing at least one professional corresponding fund file, the fund period can be shortened. Meanwhile, the fund drawing standard configuration is referred to by calling the fund drawing library to obtain the fund drawing file, so that the fund drawing symbols and rules can be unified, the fund drawing efficiency can be improved, and the error rate is reduced.
It should be understood that the description in this section is not intended to identify key or critical features of the embodiments of the disclosure, nor is it intended to be used to limit the scope of the disclosure. Other features of the present disclosure will become apparent from the following specification.
Drawings
The drawings are for a better understanding of the present solution and are not to be construed as limiting the present disclosure. Wherein:
fig. 1 illustrates a background schematic diagram of a coal preparation plant multi-major construction drawing commission fund raising method provided in an embodiment of the present disclosure
Fig. 2 is a schematic flow chart of a method for commission and funding of a multi-specialty construction drawing of a coal preparation plant according to an embodiment of the present disclosure;
fig. 3 is a schematic flow chart of a second multi-specialty construction drawing commission fund raising method of a coal preparation plant according to an embodiment of the disclosure;
fig. 4 shows a schematic structural diagram of a multi-professional construction drawing commission resource lifting tool for a coal preparation plant according to an embodiment of the present disclosure;
fig. 5 shows a schematic flow chart of a third multi-specialty construction drawing commission fund raising method of a coal preparation plant according to an embodiment of the present disclosure;
fig. 6 shows a schematic structural diagram of a multi-specialty construction drawing commission resource lifting device of a first coal preparation plant according to an embodiment of the present disclosure;
fig. 7 is a schematic structural diagram of a multi-professional construction drawing commission resource lifting device of a second coal preparation plant according to an embodiment of the disclosure;
Fig. 8 is a block diagram of a terminal for implementing a coal preparation plant multi-specialty construction drawing commission funding method in accordance with an embodiment of the present disclosure.
Detailed Description
Exemplary embodiments of the present disclosure are described below in conjunction with the accompanying drawings, which include various details of the embodiments of the present disclosure to facilitate understanding, and should be considered as merely exemplary. Accordingly, one of ordinary skill in the art will recognize that various changes and modifications of the embodiments described herein can be made without departing from the scope and spirit of the present disclosure. Also, descriptions of well-known functions and constructions are omitted in the following description for clarity and conciseness.
The building information model (Building Information Modeling, BIM) is a building industry management information system, and based on the flow of the intelligent three-dimensional model, engineering construction professionals can acquire relevant insight analysis and tools, so that buildings and infrastructures can be planned, designed, built and managed more efficiently.
In the field of BIM forward design of coal preparation plants, the engineering construction diagram design of the coal preparation plants is mainly pipelined operation at present, and professional design contents have stronger association and need to mutually carry out the investment of construction diagram entrusted data. Under the support of the existing design tool and design method, the consignment and fund-raising flow of the multi-professional construction diagram of the related coal preparation plant is shown in the figure 1, and comprises the following fund-raising links:
And (3) a first investment lifting link: the coal preparation professional process arrangement entrusts to carry out data, and equipment professions carry out lofting design;
and a second investment lifting link: providing materials from the equipment 1 to the equipment n, wherein n is a positive integer;
and (3) a resource lifting link: receiving and confirming data by civil engineering profession;
and a resource lifting link: the method comprises the steps of (1) re-drawing information of each equipment foundation, embedded parts, holes and the like by taking a workshop plane layer as a unit according to the civil engineering drawing standard by civil engineering identification equipment belonging to workshops, equipment positions and equipment information;
and step five of resource collection: initially completing construction drawing design and providing construction drawing data by civil engineering profession;
and a resource lifting link: receiving the building map by coal dressing, water, heating and electricity professions, and carrying out secondary 'map repair' on the building map according to the professional requirements;
and a step seven of resource collection: and (3) carrying out pipeline design on coal dressing, water, heating and electric professions, carrying out pipeline hole and embedded part resource lifting, and returning to a resource lifting link five so as to finish the civil engineering drawing design.
It is easy to understand that, as shown in the second, fourth and fifth resource lifting links, since the drawing standards between the equipment and the civil engineering profession are not uniform and the data transmission and receiving modes are not matched, the civil engineering profession still needs to perform a large amount of work such as identification, conversion and drawing on the data information after receiving the data, so that the repeated workload is increased, the design period is prolonged, the risk of error in information identification and drawing is increased, and the quality problem of the design of the construction drawing such as embedded parts, holes and foundations is difficult to control.
In addition, as shown in the investment-raising step five, civil engineering professions often need to submit building diagram data commission to professions such as a process (pipeline), water supply and drainage, fire protection (water), heating ventilation, air conditioning, electric industry and the like after the professional design is basically completed, and because the period of the civil engineering professional design is longer, great restrictions are often formed on development of downstream professional design work.
And secondly, as shown in the sixth step of resource collection, due to the lack of constraint of resource collection rules, and the requirement of comprehensive expression of drawing information, the civil engineering professional building map usually carries a complete set of information to be transmitted to downstream professions (including building outlines, embedded parts, holes, various marks, comments and the like), and meanwhile, the drawing patterns are generally inconsistent with the downstream professions, so that the downstream professions produce a great deal of work of deleting, adjusting patterns, checking design proportion and the like, and the working efficiency is reduced.
And, as shown in the seventh resource-providing link, the process (pipeline), water supply and drainage, fire (water), heating ventilation, air conditioning, electric and other professions submit holes, embedded parts and other data to the civil engineering profession, and the data entrustment is delayed to the civil engineering design procedure, so that the completion node of the civil engineering professional construction diagram is delayed, and the design period is prolonged.
In conclusion, the related multi-specialty construction drawing entrusted resource-providing flow of the coal-dressing plant has the problems of non-uniform resource-providing standard, non-standard resource-providing process and resource-providing version management, large data information identification workload, large repeated drawing workload, multiple quality problems of missing drawing and misprinting of the party receiving the data, low work flow efficiency, long design period and the like.
The present disclosure is described in detail below with reference to specific examples.
In a first embodiment, as shown in fig. 2, fig. 2 shows a schematic flow chart of a method for commission and fund of a multi-professional construction map of a coal preparation plant according to an embodiment of the disclosure, where the method may be implemented by a computer program and may be operated on a device for performing the method for commission and fund of a multi-professional construction map of a coal preparation plant. The computer program may be integrated in the application or may run as a stand-alone tool class application.
The multi-specialized construction drawing consignment and resource lifting device of the coal preparation plant can be a terminal with the multi-specialized construction drawing consignment and resource lifting function of the coal preparation plant, and the terminal comprises, but is not limited to: wearable devices, handheld devices, personal computers, tablet computers, vehicle-mounted devices, smart phones, computing devices, or other processing devices connected to a wireless modem, etc. Terminals may be called different names in different networks, for example: a user equipment, an access terminal, a subscriber unit, a subscriber station, a mobile station, a remote terminal, a mobile device, a user terminal, a wireless communication device, a user agent or user equipment, a cellular telephone, a cordless telephone, a personal digital assistant (personal digital assistant, PDA), a fifth Generation mobile communication technology (5th Generation Mobile Communication Technology,5G) network, a fourth Generation mobile communication technology (the 4th Generation mobile communication technology,4G) network, a third Generation mobile communication technology (3 rd-Generation, 3G) network, or a terminal in a future evolution network, etc.
Specifically, the multi-specialty construction drawing entrusting and providing method for the coal preparation plant comprises the following steps:
s101, obtaining a construction drawing entrusted design task;
according to some embodiments, the task of consignment design of the construction drawing refers to the issued task received by the terminal when the coal preparation professional performs the process arrangement consignment and the fund. The work drawing entrusts design tasks without specifying a certain fixed task. For example, the work sheet commission design task may change when a process arrangement commission changes.
It is easy to understand that when the terminal performs multi-specialty construction drawing commission and fund lifting of the coal-dressing plant, the construction drawing commission design task can be obtained.
S102, entrusting a design task according to a construction drawing, and calling a fund drawing library to draw referring to drawing standard configuration to obtain at least one specialized corresponding fund file;
according to some embodiments, the funding gallery refers to a graphic gallery and corresponding labeling rules.
In some embodiments, the mapping standard configuration refers to a configuration formed after the mapping standards of the professions are unified.
In some embodiments, the funding file is a file obtained after the design task is committed to be drawn according to the construction drawing.
It is easy to understand that when the terminal obtains the construction drawing entrusted design task, the construction drawing entrusted design task can be called to draw the drawing standard configuration of the drawing gallery according to the construction drawing entrusted design task, so as to obtain at least one drawing file corresponding to the profession.
And S103, if the at least one type of the specialization corresponding fund drawing file meets the checking condition, generating a target fund drawing corresponding to the construction drawing entrusted design task according to the at least one type of the specialization corresponding fund drawing file.
According to some embodiments, the check condition refers to a condition for determining whether the funding file is available. The inspection conditions are not particularly specific to a certain fixed condition. For example, the inspection condition may change when the funding file changes.
In some embodiments, the target funding drawing refers to a funding drawing required for a job-drawing commission design task generated from at least one professionally-corresponding funding document. The target funding drawing is not specific to a certain fixed drawing. For example, the target funding drawing may change as the work drawing commission design task changes.
It is easy to understand that when the terminal obtains the at least one type of special-purpose corresponding fund file, if the terminal determines that the at least one type of special-purpose corresponding fund file meets the inspection condition, the terminal may generate a target fund drawing corresponding to the construction drawing entrusted design task according to the at least one type of special-purpose corresponding fund file.
In summary, the method provided by the embodiment of the disclosure entrusts design tasks by acquiring the construction drawing; according to the construction drawing entrusted design task, calling a fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file; if at least one type of the specialization corresponding fund providing file meets the checking condition, generating a target fund providing drawing corresponding to the construction drawing entrusted design task according to the at least one type of the specialization corresponding fund providing file. Therefore, by synchronously drawing at least one professional corresponding fund file, the fund period can be shortened. Meanwhile, the fund drawing standard configuration is referred to by calling the fund drawing library to obtain the fund drawing file, so that the fund drawing symbols and rules can be unified, the fund drawing efficiency can be improved, and the error rate is reduced.
Referring to fig. 3, fig. 3 is a schematic flow chart of a second multi-major construction drawing commission and fund raising method for a coal preparation plant according to an embodiment of the disclosure. Specifically, the multi-specialty construction drawing entrusting and providing method for the coal preparation plant comprises the following steps:
s201, obtaining a construction drawing entrusted design task;
according to some embodiments, fig. 4 illustrates a schematic structural diagram of a multi-specialty construction drawing commission and lifting tool for a coal preparation plant provided in an embodiment of the disclosure. The tool may be run in a terminal. As shown in fig. 4, it includes a funding flow driving module, which includes a flow guiding sub-module.
In some embodiments, the flow guidance submodule embeds workflow-driven rules including, but not limited to, funding task delivery, funding authority management, funding template creation, funding design development.
It is easy to understand that when the terminal performs the multi-professional construction drawing commission and the resource lifting of the coal-dressing plant, the flow guiding sub-module can reach the construction drawing commission design task under the program driving function.
S202, determining design authority corresponding to a construction drawing entrusted design task and at least one investment providing template corresponding to a specialty;
according to some embodiments, as shown in fig. 4, the workflow, the file template and the authority rules are built in the flow guiding sub-module. Therefore, when the engineering drawing is issued to entrust with the design task, the flow guiding sub-module can also set the design authority and create the upstream professional funding template.
S203, calling a fund drawing library, and drawing according to the design authority and at least one specialized corresponding fund drawing template to obtain at least one specialized corresponding fund drawing file;
according to some embodiments, as shown in fig. 4, the funding process driving module further includes a funding design submodule, in which a funding gallery and a standard are built. Therefore, after the flow guiding submodule finishes setting the design authority and creating the upstream professional resource-extracting template, the resource-extracting design submodule can call a resource-extracting drawing library through a program, draw professional equipment foundations, embedded parts, equipment and pipeline hole construction drawing entrusted materials of coal dressing, equipment, electricity, water supply and drainage, fire protection, heating ventilation, dust removal and the like by referring to drawing standard configuration, and obtain the resource-extracting file corresponding to at least one professional.
In some embodiments, the funding gallery and criteria include, but are not limited to, embedments, holes, notes, sizing rules, and graphic libraries.
In some embodiments, the funding design sub-module may also implement interactive referencing in the funding design link.
S204, checking and marking at least one type of professional corresponding fund file to obtain at least one check report corresponding to at least one type of professional corresponding fund file;
According to some embodiments, as shown in fig. 4, the multi-specialty construction drawing commission fund raising tool of the coal preparation plant further comprises a fund raising checking module, wherein the fund raising checking module is internally provided with a checking workflow, a consistency checking rule, a checking mark-keeping tool (such as a checking opinion electronic mark-keeping tool) and a report tool.
In some embodiments, the inspection reports are in one-to-one correspondence with the funding files. In particular, the inspection report may be generated from inspection opinions.
It is easy to understand that when the flow guiding sub-module obtains the at least one specialized corresponding fund file, the workflow status of the fund file is changed from "design" to "inspection", and the fund inspection module can inspect and mark the at least one specialized corresponding fund file to obtain at least one inspection report corresponding to the at least one specialized corresponding fund file.
S205, if any one of at least one inspection report does not meet the inspection condition, issuing a file modification instruction;
according to some embodiments, the file modification instruction is configured to instruct modification of the funding file corresponding to any inspection report. The file modification instruction does not refer specifically to a fixed instruction. For example, when a modification instruction for a file modification instruction is obtained, the file modification instruction may change.
In some embodiments, when the funding inspection module determines that any inspection report in the at least one inspection report does not meet the inspection condition, the funding inspection module may issue a file modification instruction to instruct modification of the funding file corresponding to the any inspection report until all inspection reports meet the inspection condition.
S206, if at least one type of the specialization corresponding fund drawing file meets the checking condition, generating an initial fund drawing corresponding to the construction drawing entrusted design task according to at least one type of the specialization corresponding fund drawing file;
according to some embodiments, as shown in fig. 4, the multi-professional construction drawing commission fund raising tool of the coal preparation plant further comprises a fund raising adoption module, wherein the fund raising adoption module is internally provided with classification reference rules, summarization reference rules, sub-floor reference rules and classification reference rules.
In some embodiments, if the fund-providing inspection module determines that all inspection reports meet the inspection conditions, the fund-providing adoption module may automatically collect the entrusted content of the upstream professional construction map in units of floors according to the built-in rule, that is, collect the fund-providing files corresponding to at least one professional of each floor, generate an initial fund-providing drawing of an embedded part, a hole and the like, and automatically establish a reference.
S207, performing structure checking and collision checking on the initial funding drawing;
it is easy to understand that when the terminal obtains the initial funding drawing, the terminal can perform structural calculation and collision check on the initial funding drawing.
S208, if the initial funding drawing does not meet the structure checking and collision checking conditions, a drawing modification instruction is sent out;
according to some embodiments, the document modification instruction is for indicating a modification to the initial funding drawing. The file modification instruction does not refer specifically to a fixed instruction. For example, when a modification instruction for a file modification instruction is obtained, the file modification instruction may change.
It is easy to understand that when the terminal performs structure checking and collision checking on the initial funding drawing, if the terminal determines that the initial funding drawing does not meet the structure checking and collision checking conditions, the terminal may issue a drawing modification instruction.
S209, if the initial funding drawing meets the funding condition, determining that the initial funding drawing is a target funding drawing corresponding to the construction drawing entrusted design task.
It is easy to understand that when the terminal performs structure checking and collision checking on the initial fund drawing, if the terminal determines that the initial fund drawing meets the structure checking and collision checking conditions, the terminal can determine that the initial fund drawing is a target fund drawing corresponding to the construction drawing entrusted design task.
In summary, the method provided by the embodiment of the disclosure entrusts design tasks by acquiring the construction drawing; determining a design authority corresponding to a construction drawing entrusted design task and at least one investment-providing template corresponding to a specialty; calling a fund drawing library, and drawing according to the design authority and at least one specialized corresponding fund drawing template to obtain at least one specialized corresponding fund drawing file; checking and marking at least one professional corresponding fund file to obtain at least one checking report corresponding to the at least one professional corresponding fund file; if any one of the at least one inspection report does not meet the inspection condition, a file modification instruction is sent out; if at least one type of the specialization corresponding fund-providing files meets the checking condition, generating an initial fund-providing drawing corresponding to the construction drawing entrusted design task according to the at least one type of the specialization corresponding fund-providing files; carrying out structure checking and collision checking on the initial funding drawing; if the initial funding drawing does not meet the structure checking and collision checking conditions, a drawing modification instruction is sent; if the initial fund drawing meets the fund drawing conditions, determining the initial fund drawing as a target fund drawing corresponding to the construction drawing entrusted design task. Therefore, the funding flow is standardized through program driving; compiling unified resource-lifting symbols and rules, and arranging the unified resource-lifting symbols and rules in templates and a gallery, and realizing calling under program driving; automatically realizing data classification, automatically establishing a reference relation according to the need, and automatically summarizing professional resource-providing data by taking floors as units, wherein the summarized data can be directly adopted; compared with the traditional design method, the method reduces the secondary drawing operation links of the data receiving party, reduces the repeated drawing workload of the data lifting among professions, avoids the error risk caused by secondary drawing, shortens the design period, improves the data lifting efficiency and reduces the error rate.
Referring to fig. 5, fig. 5 is a schematic flow chart of a third multi-major construction drawing commission and resource-providing method for a coal preparation plant according to an embodiment of the disclosure. Specifically, the multi-specialty construction drawing entrusting and providing method for the coal preparation plant comprises the following steps:
s301, obtaining a construction drawing entrusted design task;
according to some embodiments, the work drawing commission design task includes, but is not limited to, a civil engineering main frame co-design task, an equipment specialty loft co-design task, and a specialty pipeline co-design task.
It is easy to understand that when the terminal performs multi-specialty construction drawing commission and resource lifting of the coal-dressing plant, the terminal can acquire a civil engineering main frame collaborative design task, an equipment specialty lofting collaborative design task and a specialty pipeline collaborative design task.
S302, respectively calling a lifting map library to draw by referring to drawing standard configuration according to a civil engineering main frame collaborative design task, an equipment professional lofting collaborative design task and a professional pipeline collaborative design task to obtain a first lifting file corresponding to the civil engineering main frame collaborative design task, a second lifting file corresponding to the equipment professional lofting collaborative design task and a third lifting file corresponding to the professional pipeline collaborative design task;
according to some embodiments, when drawing is performed by respectively calling the fund drawing gallery to reference drawing standard configuration according to a civil engineering main frame collaborative design task, an equipment professional lofting collaborative design task and a professional pipeline collaborative design task, professional synchronous development of building structures, equipment and pipeline designs of civil engineering, equipment, coal preparation (pipelines), water supply and drainage, fire protection, heating ventilation, dust removal, electric and the like can be performed, and a first fund drawing file, a second fund drawing file and a third fund drawing file can be obtained.
In some embodiments, when designing the second and third lifting files, the design of the construction drawing entrusted data such as the embedded part, the load, the hole and the like can be performed by referring to each other in real time, so as to obtain the first lifting file.
S303, determining a fourth funding file according to the second funding file and the third funding file;
according to some embodiments, the fourth file is a second file obtained after the design of civil engineering, equipment, coal (pipeline), water supply and drainage, fire protection, heating ventilation and dust removal, electric and other professions develop equipment and pipelines, and a file obtained after the third file is summarized.
S304, if at least one professional corresponding fund-providing file meets the checking condition, summarizing the fourth fund-providing file by taking the floor as a unit according to a summarizing rule to obtain a fifth fund-providing file;
it is easy to understand that when the first and fourth files are obtained, if the terminal determines that the first and fourth files meet the inspection condition, the terminal may automatically classify, collect, and automatically establish a reference relationship to the fourth file to obtain a fifth file.
S305, generating a target fund drawing corresponding to the construction drawing entrusted design task according to the first fund file and the fifth fund file.
According to some embodiments, when the fifth resource file is obtained, the secondary beam design may be performed according to the construction drawing entrusting data of the embedded part, the load, the hole and the like in the first resource file and the construction drawing entrusting data of the equipment, the pipeline and the like of each layer in the fifth resource file, so as to obtain a sixth resource file corresponding to the secondary beam design.
In some embodiments, the target funding drawing corresponding to the construction drawing entrusted design task can be generated according to the obtained first funding file, the obtained fifth funding file and the obtained sixth funding file, entering the structure inspection and the collision inspection.
In summary, the method provided by the embodiment of the disclosure entrusts design tasks by acquiring the construction drawing; respectively calling a lifting map library to draw referring to drawing standard configuration according to a civil engineering main frame collaborative design task, an equipment professional lofting collaborative design task and a professional pipeline collaborative design task to obtain a first lifting file corresponding to the civil engineering main frame collaborative design task, a second lifting file corresponding to the equipment professional lofting collaborative design task and a third lifting file corresponding to the professional pipeline collaborative design task; determining a fourth fund-providing file according to the second fund-providing file and the third fund-providing file; if at least one professional corresponding fund file meets the checking condition, summarizing the fourth fund file by taking the floor as a unit according to a summarizing rule to obtain a fifth fund file; and generating a target fund drawing corresponding to the construction drawing entrusted design task according to the first fund file and the fifth fund file. Therefore, by converting the equipment-by-equipment fund transfer into the construction drawing commission fund transfer by floor unit and according to the standard built in the module, the construction drawing commission data design standard can be unified. Meanwhile, the reference relation is automatically received, classified and summarized and automatically established according to the requirement, so that the error risk generated by secondary drawing of the data can be avoided while the flow is simplified and the workload of working civil engineering is reduced, and the error rate can be reduced. In addition, the construction, equipment and pipeline designs are synchronously and cooperatively developed, the real-time mutual reference is adopted, the intervention points of the pipeline designs move forward greatly, the civil engineering profession can receive the data feedback of loads, holes and embedded parts without waiting for the design of the pipeline construction drawing, the pipeline designs can be developed without the prior construction drawing data, the secondary modification work of the construction drawing during the pipeline design is avoided, the design period can be shortened, and the resource lifting efficiency is improved.
In the technical scheme of the disclosure, the related processes of collecting, storing, using, processing, transmitting, providing, disclosing and the like of the personal information of the user accord with the regulations of related laws and regulations, and the public order colloquial is not violated.
The following are device embodiments of the present disclosure that may be used to perform method embodiments of the present disclosure. For details not disclosed in the embodiments of the apparatus of the present disclosure, please refer to the embodiments of the method of the present disclosure.
Fig. 6 is a schematic structural diagram of a multi-professional construction drawing commission and resource lifting device of a first coal preparation plant according to an embodiment of the disclosure. The multi-specialized construction drawing commission resource lifting device of the coal preparation plant can be realized into all or part of the device through software, hardware or the combination of the software and the hardware. The multi-specialty construction drawing entrusted resource lifting device 600 of the coal preparation plant comprises a task acquisition unit 601, a file drawing unit 602 and a drawing generation unit 603, wherein:
a task obtaining unit 601, configured to obtain a task of entrusting design of a construction map;
the file drawing unit 602 is configured to delegate a design task according to a construction drawing, invoke a resource drawing gallery to draw referring to drawing standard configuration, and obtain at least one resource drawing file corresponding to a specialty;
the drawing generating unit 603 is configured to generate a target fund drawing corresponding to the construction drawing commission design task according to the fund file corresponding to the at least one specialty if the fund file corresponding to the at least one specialty meets the inspection condition.
Optionally, the file drawing unit 602 is configured to invoke the fund drawing gallery to draw referring to the drawing standard configuration according to the task of entrusting the construction drawing, so as to obtain at least one specialized corresponding fund drawing file, which is specifically configured to:
determining a design authority corresponding to a construction drawing entrusted design task and at least one investment-providing template corresponding to a specialty;
and calling a fund drawing library, and drawing according to the design authority and at least one fund drawing template corresponding to the profession to obtain at least one fund drawing file corresponding to the profession.
Optionally, the job drawing commission design task includes a civil engineering main frame collaborative design task, an equipment professional lofting collaborative design task, and a professional pipeline collaborative design task, and the file drawing unit 602 is configured to call the resource drawing gallery to draw referring to drawing standard configuration according to the job drawing commission design task, so as to obtain at least one resource drawing file corresponding to a professional, where the file drawing unit is specifically configured to:
respectively calling a lifting map library to draw referring to drawing standard configuration according to a civil engineering main frame collaborative design task, an equipment professional lofting collaborative design task and a professional pipeline collaborative design task to obtain a first lifting file corresponding to the civil engineering main frame collaborative design task, a second lifting file corresponding to the equipment professional lofting collaborative design task and a third lifting file corresponding to the professional pipeline collaborative design task;
And determining a fourth funding file according to the second funding file and the third funding file.
Optionally, the drawing generating unit 603 is configured to generate, according to at least one type of fund file corresponding to a professional, a fund drawing corresponding to a task of consignment design of a construction drawing, where the method is specifically configured to:
according to the summarizing rule, summarizing the fourth fund-raising file by taking the floor as a unit to obtain a fifth fund-raising file;
and generating a target fund drawing corresponding to the construction drawing entrusted design task according to the first fund file and the fifth fund file.
Optionally, fig. 7 is a schematic structural diagram of a second multi-major construction drawing commission resource lifting device for a coal preparation plant according to an embodiment of the disclosure. As shown in fig. 7, the multi-specialty construction drawing commission fund raising device 600 of the coal preparation plant further includes a document checking unit 604 and a document modifying unit 605, configured to, after obtaining at least one type of fund raising document corresponding to a specialty:
a file checking unit 604, configured to check and mark at least one type of the finance file corresponding to the specialty, so as to obtain at least one type of check report corresponding to the at least one type of the finance file corresponding to the specialty, where the check report corresponds to the finance file one by one;
and a file modification unit 605, configured to issue a file modification instruction if any one of the at least one inspection report does not meet the inspection condition, where the file modification instruction is used to instruct modification of the funding file corresponding to any one inspection report.
Optionally, the drawing generating unit 603 is configured to generate, according to at least one type of investment file corresponding to a major, a target investment drawing corresponding to a task of consignment design of a construction drawing, where the target investment drawing is specifically configured to:
generating an initial fund drawing corresponding to a construction drawing entrusted design task according to at least one specialized fund file;
if the initial fund drawing meets the fund drawing conditions, determining the initial fund drawing as a target fund drawing corresponding to the construction drawing entrusted design task.
Optionally, the drawing generating unit 603 is configured to, after generating an initial funding drawing corresponding to the construction drawing commission design task according to at least one funding file corresponding to a major, further be configured to:
carrying out structure checking and collision checking on the initial funding drawing;
if the initial funding drawing does not meet the structure checking and collision checking conditions, a drawing modification instruction is sent out, wherein the file modification instruction is used for indicating the modification of the initial funding drawing.
It should be noted that, when the multi-professional construction drawing commission and investment providing device for a coal preparation plant provided in the above embodiment executes the multi-professional construction drawing commission and investment providing method for a coal preparation plant, only the division of the above functional modules is used for illustration, in practical application, the above functional allocation may be completed by different functional modules according to needs, that is, the internal structure of the device is divided into different functional modules, so as to complete all or part of the functions described above. In addition, the multi-professional construction drawing commission and fund providing device for the coal preparation plant and the multi-professional construction drawing commission and fund providing method embodiment for the coal preparation plant provided in the above embodiments belong to the same conception, and detailed implementation processes are shown in the method embodiment, and are not repeated here.
In summary, the device provided by the embodiment of the present disclosure is configured to obtain a task of entrusting a design of a construction map through a task obtaining unit; the file drawing unit is used for entrusting a design task according to the construction drawing, calling a fund drawing library to draw referring to drawing standard configuration, and obtaining at least one fund drawing file corresponding to a specialty; and the drawing generation unit is used for generating a target fund drawing corresponding to the construction drawing entrusted design task according to the fund file corresponding to the at least one specialty if the fund file corresponding to the at least one specialty meets the checking condition. Therefore, by synchronously drawing at least one professional corresponding fund file, the fund period can be shortened. Meanwhile, the fund drawing standard configuration is referred to by calling the fund drawing library to obtain the fund drawing file, so that the fund drawing symbols and rules can be unified, the fund drawing efficiency can be improved, and the error rate is reduced.
In the technical scheme of the disclosure, the related processes of collecting, storing, using, processing, transmitting, providing, disclosing and the like of the personal information of the user accord with the regulations of related laws and regulations, and the public order colloquial is not violated.
According to embodiments of the present disclosure, the present disclosure also provides a terminal, a readable storage medium and a computer program product.
Fig. 8 shows a schematic block diagram of an example terminal 800 that may be used to implement embodiments of the present disclosure. The components shown herein, their connections and relationships, and their functions, are meant to be exemplary only, and are not meant to limit implementations of the disclosure described and/or claimed herein.
As shown in fig. 8, the terminal 800 includes a computing unit 801 that can perform various appropriate actions and processes according to a computer program stored in a Read Only Memory (ROM) 802 or a computer program loaded from a storage unit 808 into a Random Access Memory (RAM) 803. In the RAM 803, various programs and data required for the operation of the terminal 800 can also be stored. The computing unit 801, the ROM 802, and the RAM 803 are connected to each other by a bus 804. An input/output (I/O) interface 805 is also connected to the bus 804.
Various components in terminal 800 are connected to I/O interface 805, including: an input unit 806 such as a keyboard, mouse, etc.; an output unit 807 such as various types of displays, speakers, and the like; a storage unit 808, such as a magnetic disk, optical disk, etc.; and a communication unit 809, such as a network card, modem, wireless communication transceiver, or the like. The communication unit 809 allows the terminal 800 to exchange information/data with other devices through a computer network such as the internet and/or various telecommunication networks.
The computing unit 801 may be a variety of general and/or special purpose processing components having processing and computing capabilities. Some examples of computing unit 801 include, but are not limited to, a Central Processing Unit (CPU), a Graphics Processing Unit (GPU), various specialized Artificial Intelligence (AI) computing chips, various computing units running machine learning model algorithms, a Digital Signal Processor (DSP), and any suitable processor, controller, microcontroller, etc. The computing unit 801 performs the various methods and processes described above, such as the coal preparation plant multi-specialty construction drawing commission funding method. For example, in some embodiments, the coal preparation plant multi-specialty construction drawing commission funding method may be implemented as a computer software program, tangibly embodied on a machine-readable medium, such as storage unit 808. In some embodiments, part or all of the computer program may be loaded and/or installed onto the terminal 800 via the ROM 802 and/or the communication unit 809. When the computer program is loaded into RAM 803 and executed by computing unit 801, one or more steps of the coal preparation plant multi-specialty construction map commission funding method described above may be performed. Alternatively, in other embodiments, the computing unit 801 may be configured to perform the coal preparation plant multi-specialty construction map commission funding method in any other suitable manner (e.g., by means of firmware).
Various implementations of the systems and techniques described here above may be implemented in digital electronic circuitry, integrated circuit systems, field Programmable Gate Arrays (FPGAs), application Specific Integrated Circuits (ASICs), application Specific Standard Products (ASSPs), systems On Chip (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and/or combinations thereof. These various embodiments may include: implemented in one or more computer programs, the one or more computer programs may be executed and/or interpreted on a programmable system including at least one programmable processor, which may be a special purpose or general-purpose programmable processor, that may receive data and instructions from, and transmit data and instructions to, a storage system, at least one input device, and at least one output device.
Program code for carrying out methods of the present disclosure may be written in any combination of one or more programming languages. These program code may be provided to a processor or controller of a general purpose computer, special purpose computer, or other programmable data processing apparatus such that the program code, when executed by the processor or controller, causes the functions/operations specified in the flowchart and/or block diagram to be implemented. The program code may execute entirely on the machine, partly on the machine, as a stand-alone software package, partly on the machine and partly on a remote machine or entirely on the remote machine or server.
In the context of this disclosure, a machine-readable medium may be a tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device. The machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. The machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any suitable combination of the foregoing. More specific examples of a machine-readable storage medium would include an electrical connection based on one or more wires, a portable computer diskette, a hard disk, a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
To provide for interaction with a user, the systems and techniques described here can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to a user; and a keyboard and pointing device (e.g., a mouse or trackball) by which a user can provide input to the computer. Other kinds of devices may also be used to provide for interaction with a user; for example, feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form, including acoustic input, speech input, or tactile input.
The systems and techniques described here can be implemented in a computing system that includes a background component (e.g., as a data server), or that includes a middleware component (e.g., an application server), or that includes a front-end component (e.g., a user computer having a graphical user interface or a web browser through which a user can interact with an implementation of the systems and techniques described here), or any combination of such background, middleware, or front-end components. The components of the system can be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: local Area Networks (LANs), wide Area Networks (WANs), the internet, and blockchain networks.
The computer system may include a client and a server. The client and server are typically remote from each other and typically interact through a communications network 5. By computer programs running on respective computers and having a client-server relationship to each other
The relationship of the client and the server is generated sequentially. The server can be a cloud server, also called a cloud computing server or a cloud host, and is a host product in a cloud computing service system, so that the defects of high management difficulty and weak service expansibility in the traditional physical hosts and VPS service ("Virtual Private Server" or simply "VPS") are overcome. The server may also be a server of a distributed system or a server that incorporates a blockchain.
0 it should be appreciated that various forms of the flow shown above may be used to reorder, add or delete steps. For example, the number of the cells to be processed,
the steps described in the present disclosure may be performed in parallel, sequentially, or in a different order, so long as the desired results of the technical solutions of the present disclosure are achieved, and are not limited herein.
The above detailed description should not be taken as limiting the scope of the present disclosure. It will be apparent to those skilled in the art that various modifications, combinations, sub-combinations and alternatives are possible, depending on design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present disclosure 5 are intended to be included within the scope of the present disclosure.
Claims (10)
1. The method for entrusting and providing the investment for the multi-specialized construction drawing of the coal preparation plant is characterized by comprising the following steps of:
obtaining a construction drawing entrusted design task;
according to the construction drawing entrusted design task, invoking an fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file;
and if the at least one type of the specialization corresponding fund drawing file meets the checking condition, generating a target fund drawing corresponding to the construction drawing entrusted design task according to the at least one type of the specialization corresponding fund drawing file.
2. The method according to claim 1, wherein said invoking the funding gallery to draw referring to the drawing standard configuration according to the construction drawing commission design task, to obtain at least one specialized corresponding funding file, comprises:
determining the design authority corresponding to the construction drawing entrusted design task and at least one professional corresponding funding template;
and calling a fund drawing library, and drawing according to the design authority and the fund drawing template corresponding to the at least one specialty to obtain the fund drawing file corresponding to the at least one specialty.
3. The method according to claim 1, wherein the construction drawing commission design task includes a civil engineering main frame collaborative design task, an equipment professional lofting collaborative design task, and a professional pipeline collaborative design task, and the calling the fund drawing library according to the construction drawing commission design task refers to drawing standard configuration to draw, so as to obtain at least one professional corresponding fund drawing file, including:
respectively calling a lifting gallery to refer to drawing standard configuration for drawing according to the civil engineering main frame collaborative design task, the equipment professional lofting collaborative design task and the professional pipeline collaborative design task to obtain a first lifting file corresponding to the civil engineering main frame collaborative design task, and a second lifting file corresponding to the equipment professional lofting collaborative design task and a third lifting file corresponding to the professional pipeline collaborative design task;
And determining a fourth fund providing file according to the second fund providing file and the third fund providing file.
4. The method of claim 3, wherein generating the funding drawing corresponding to the construction drawing commission design task according to the funding file corresponding to the at least one specialty comprises:
according to the summarizing rule, summarizing the fourth fund-raising file by taking the floor as a unit to obtain a fifth fund-raising file;
and generating a target fund drawing corresponding to the construction drawing entrusted design task according to the first fund file and the fifth fund file.
5. The method of claim 1, further comprising, after said obtaining at least one specialized corresponding funding file:
checking and marking the at least one professional corresponding fund file to obtain at least one checking report corresponding to the at least one professional corresponding fund file, wherein the checking report corresponds to the fund file one by one;
and if any one of the at least one inspection report does not meet the inspection condition, issuing a file modification instruction, wherein the file modification instruction is used for indicating the modification of the funding file corresponding to the any one inspection report.
6. The method of claim 1, wherein generating the target funding drawing corresponding to the construction drawing commission design task according to the funding file corresponding to the at least one specialty comprises:
generating an initial fund drawing corresponding to the construction drawing entrusted design task according to the fund file corresponding to the at least one specialty;
if the initial funding drawing meets the funding condition, determining that the initial funding drawing is a target funding drawing corresponding to the construction drawing entrusted design task.
7. The method of claim 6, further comprising, after the generating the initial funding drawing corresponding to the work drawing commission design task according to the funding file corresponding to the at least one specialty:
performing structure checking and collision checking on the initial funding drawing;
and if the initial funding drawing does not meet the structure checking and collision checking conditions, sending a drawing modification instruction, wherein the file modification instruction is used for indicating the modification of the initial funding drawing.
8. The utility model provides a coal preparation factory multi-major construction drawing entrusts and carries resource device which characterized in that includes:
the task acquisition unit is used for acquiring a construction drawing entrusted design task;
The file drawing unit is used for entrusting a design task according to the construction drawing, calling a fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file;
and the drawing generation unit is used for generating a target fund drawing corresponding to the construction drawing entrusted design task according to the fund file corresponding to the at least one specialty if the fund file corresponding to the at least one specialty meets the checking condition.
9. A terminal, comprising:
at least one processor; and
a memory communicatively coupled to the at least one processor; it is characterized in that the method comprises the steps of,
the memory stores instructions executable by the at least one processor to enable the at least one processor to perform the method of any one of claims 1-7.
10. A non-transitory computer readable storage medium storing computer instructions for causing the computer to perform the method of any one of claims 1-7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211641070.6A CN116244789A (en) | 2022-12-20 | 2022-12-20 | Coal preparation plant multi-specialized construction drawing entrusted resource lifting method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211641070.6A CN116244789A (en) | 2022-12-20 | 2022-12-20 | Coal preparation plant multi-specialized construction drawing entrusted resource lifting method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116244789A true CN116244789A (en) | 2023-06-09 |
Family
ID=86626733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211641070.6A Pending CN116244789A (en) | 2022-12-20 | 2022-12-20 | Coal preparation plant multi-specialized construction drawing entrusted resource lifting method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116244789A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117349923A (en) * | 2023-09-26 | 2024-01-05 | 中机中联工程有限公司 | Intelligent design method, system, equipment and medium for industrial building process equipment |
-
2022
- 2022-12-20 CN CN202211641070.6A patent/CN116244789A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117349923A (en) * | 2023-09-26 | 2024-01-05 | 中机中联工程有限公司 | Intelligent design method, system, equipment and medium for industrial building process equipment |
CN117349923B (en) * | 2023-09-26 | 2024-06-11 | 中机中联工程有限公司 | Intelligent design method, system, equipment and medium for industrial building process equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103279846A (en) | Project acceptance method and system based on BIM model | |
Jansson et al. | Requirements management for the design of energy efficient buildings | |
KR101714400B1 (en) | BIM based real time generation system and method of energy performance statement report | |
JP2018081693A (en) | Automated process control hardware engineering using schema-represented requirements | |
CN113642069B (en) | Building wind load rapid iteration design method based on BIM and heterogeneous system | |
CN102646144A (en) | ObjectARX-based standardized intelligent design method for rural power network engineering | |
CN116244789A (en) | Coal preparation plant multi-specialized construction drawing entrusted resource lifting method and device | |
CN112860356B (en) | API call control method and device, electronic equipment and storage medium | |
CN117035318A (en) | Robot automation flow design and scheduling method and device based on large language model | |
CN113610388A (en) | BIM-based prefabricated part design quality management method, device and equipment | |
CN115587456A (en) | BIM (building information modeling) forward design method and system for outdoor water supply and drainage pipe network | |
CN115374499A (en) | Dimension marking method and device, electronic equipment and storage medium | |
CN111753344B (en) | Method for generating assembly type component data set, CAD platform and storage medium | |
US11327471B2 (en) | Building and tracking of an automation engineering environment | |
CN112883447A (en) | Method for rapidly generating drawing based on-site survey data | |
KR20220100285A (en) | 3D Model Viewer System for Ship Design Validation | |
CN111753343B (en) | Window-based assembly type component data set creation method, device and storage medium | |
CN112835007B (en) | Point cloud data conversion method and device, electronic equipment and storage medium | |
CN111428412B (en) | Energy dissipation pore plate structure optimization method, storage medium and electronic equipment | |
CN108537389B (en) | Power grid optimization method, optimization equipment and storage medium based on homoeogram | |
CN117057452B (en) | Method and system for optimizing labor-hour computer under limiting condition | |
CN115496054B (en) | Multidisciplinary design optimization method, multidisciplinary design optimization system, electronic equipment and storage medium | |
CN114721942A (en) | Test data generation method, device, equipment and storage medium | |
CN116821226A (en) | ETL-based welding line virtual process environment construction method, equipment and storage medium | |
CN117193726A (en) | Parallel design method and device of software, electronic equipment and medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |