CN103279846A - Project acceptance method and system based on BIM model - Google Patents

Project acceptance method and system based on BIM model Download PDF

Info

Publication number
CN103279846A
CN103279846A CN2013102452600A CN201310245260A CN103279846A CN 103279846 A CN103279846 A CN 103279846A CN 2013102452600 A CN2013102452600 A CN 2013102452600A CN 201310245260 A CN201310245260 A CN 201310245260A CN 103279846 A CN103279846 A CN 103279846A
Authority
CN
China
Prior art keywords
project
examination
bim model
acceptance
data message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102452600A
Other languages
Chinese (zh)
Inventor
邓绍伦
杨瀚波
杨波
周军
吴辉科
陈祥婷
李望强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JIANKE ENGINEERING CONSULTING Co Ltd
Original Assignee
SHANGHAI JIANKE ENGINEERING CONSULTING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JIANKE ENGINEERING CONSULTING Co Ltd filed Critical SHANGHAI JIANKE ENGINEERING CONSULTING Co Ltd
Priority to CN2013102452600A priority Critical patent/CN103279846A/en
Publication of CN103279846A publication Critical patent/CN103279846A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a project acceptance method based on a BIM model. The project acceptance method comprises the steps of reading data information relevant to a project to be accepted in the BIM model; judging whether the data information relevant to the project to be accepted exists or not in the BIM model, and if the data information relevant to the project to be accepted does not exist, outputting a 'disqualification' result of the accepted project; if the data information relevant to the project to be accepted exists, judging whether the data information accords with a standard format, if not, outputting the 'disqualification' result of the accepted project, and if yes, outputting a 'qualification' result of the accepted project. According to the project acceptance method based on the BIM model, a BIM technology is applied to a project acceptance link, the efficiency of project acceptance can be improved, operation is simple, and cost is saved.

Description

A kind of acceptance of work method and system based on the BIM model
Technical field
The present invention relates to the construction work areas of information technology, more specifically, the present invention relates to a kind of acceptance of work method and system based on the BIM model.
Background technology
Architecture information modeling (Building Information Modeling is called for short BIM) is the new technology of greatly developing in the world, is representing the developing direction of building industry, is a kind of revolutionary engineering.At present China builds in the industry and has begun progressively to be familiar with, to accept, to use this technology, and along with carrying out that the BIM technology is used at home, it will produce far-reaching influence to work such as the design of construction work, construction.By can comprising the information of the various aspects of this model in the engineering model of BIM technology to drawing, thereby the BIM technology is built efficiently compiling and sharing and providing possible of overall process data message for solving.
Building Trade in China is huge, and for a long time, extensive construction mode causes the behavior constraint of each unit of taking part in building in the process of construction to become a mere formality, and the Various types of data that accumulates in the process of construction can't be carried out the collection of overall process high-efficiency information and be shared.For example, in the acceptance of work stage, it is the most critical stage that data acquisition gathers, transmits, examines.In traditional acceptance of work process, because the data message amount in examination and the delivery process is big, the examination running program is complicated and changeable, participate in factors such as unit is numerous, tend to cause inefficiency, cost height, the communication difficulty of examination and the work of payment, even can check and accept situation not in place, as can not to reflect the engineering actual conditions, thereby in the follow-up construction of engineering and use, bury many hidden dangers.
Therefore, be badly in need of a kind of method of can be efficiently, easily engineering being carried out an acceptance inspection in this area.
Summary of the invention
For this reason, technical matters to be solved by this invention provides a kind of acceptance of work method based on the BIM model, the BIM technology is applied to check and accept pays link, with inefficiency, cost height, the changeable defective of complicated operation that solves traditional acceptance of work method.
For achieving the above object, the acceptance of work method based on the BIM model of the present invention comprises the steps: that (a) reads in the BIM model about waiting the data message of the project of checking and accepting; (b) judge whether have the data message of waiting the project of checking and accepting about this in the BIM model; (c) if not, then export the result that this treats examination project " defective "; (d) if judge further then whether this data message is consistent with standard format; (e) if not, then export the result that this treats examination project " defective "; (f) if then export the result that this treats examination project " qualified ".
As a kind of improvement, method of the present invention also comprises, in step (c) and (e) afterwards, respectively described " defective " result feedback outputed to the step in the BIM model.
As a kind of improvement, method of the present invention also comprises, in step (f) afterwards, described " qualified " result is fed back the step that outputs in the BIM model.
In addition, the present invention also provides a kind of acceptance of work system based on the BIM model, and this system comprises device, is used for reading relevant this of BIM model and waits the data message of the project of checking and accepting; Device is used for judging whether the BIM model has relevant this and wait the data message of the project of checking and accepting; Device is used for exporting the result that this treats examination project " defective " not having relevant this when waiting the data message of the project of checking and accepting; Device is used for judging having relevant this when waiting the data message of the project of checking and accepting whether this data message is consistent with standard format; Device is used for exporting the result of this items for acceptance " defective " when this data message and standard format are inconsistent; And device, be used for when this data message is consistent with standard format, exporting the result of this items for acceptance " qualified ".
As a kind of improvement, system of the present invention also comprises: device is used for described " defective " result feedback is outputed to the BIM model.
As a kind of improvement, system of the present invention also comprises: device is used for described " qualified " result feedback is outputed to the BIM model.
The examination project for the treatment of among the present invention includes but not limited to that fire-fighting special is checked and accepted, lightning protection is is specially checked and accepted, environmental protection is is specially checked and accepted, greening is is specially checked and accepted, planning is specially tested, special examinations of civil defence, the final acceptance of construction of environment sanitation facility, preventative health special check and accept and be completed pay examination.
In sum, the beneficial effect of the acceptance of work method and system based on the BIM model provided by the present invention is: can improve the acceptance of work efficient, simple to operate, save cost.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing and exemplary embodiment.
Fig. 1 is the process flow diagram of exemplary a kind of acceptance of work method based on the BIM model of the present invention; And
Fig. 2 A-2B is the synoptic diagram that is suitable for implementing the computer system of method of the present invention.
Embodiment
Specifically describe the specific embodiment of the present invention below in conjunction with accompanying drawing.Described the specific embodiment of the present invention is exemplary embodiment hereinafter, and it should not be regarded as limitation of the present invention.
The present invention is to provide a kind of acceptance of work method and system based on the BIM model.BIM model wherein refers to utilize the model of BIM technical design formation, for example, and BUILDINGS MODELS etc.
Referring to Fig. 1, it shows the process flow diagram according to a kind of exemplary acceptance of work method based on the BIM model of the present invention.This method comprises the steps.
In step 110, read the data message of waiting the project of checking and accepting in the BIM model about this.This project to be checked and accepted can comprise that multiple for example can be fire-fighting examination, lightning protection examination, environmental protection inspection and acceptance, greening examination, planning examination, civil defence examination, the final acceptance of construction of environment sanitation facility, the examination of preventative health, the payment examination etc. of being completed.
Do you in step 120, judge to have the data message of waiting the project of checking and accepting about this in the BIM model? if do not have the data message of waiting the project of checking and accepting about this, then export result's (referring to step 130) of this items for acceptance " defective "; Wait the data message of the project of checking and accepting if having relevant this, then judge this data message be consistent with standard format (referring to step 140)? if do not meet, then export result's (referring to step 150) of this items for acceptance " defective "; If meet, then export result's (referring to step 160) of this items for acceptance " qualified ".
In one embodiment, said method can also be included in and respectively " defective " result be outputed to the step in the BIM model after step 130 or 150 and/or " qualified " result outputed to step in the BIM model after step 160.
In one exemplary embodiment, for example available said method is tested to the related data in the final acceptance of construction project, as " " construction project final acceptance of construction report " " in wherein " data is prepared in unit in charge of construction's final acceptance of construction " tested: at first from the BIM model, read corresponding " construction project final acceptance of construction report " file attachment, the form that checking has corresponding documentation and this data conforms to standard format, then exports the information of this " qualified ".And, alternatively, this qualified information feedback can be outputed in the BIM model.Do not meet if the BIM model lacks " construction project final acceptance of construction report " or this file and standard format, then export the information of this " defective ", and, alternatively, this defective information feedback can be outputed in the BIM model.
Acceptance of work method based on the BIM model of the present invention can be implemented by the computer system computer program, and Fig. 2 A illustrates a kind of possible physical form of this computer system.Certainly, the many physical form in this computer system can have from integrated circuit, printed circuit board (PCB) and small hand held devices to huge supercomputer scope.Computer system 1300 comprises monitor 1302, display 1304, cabinet 1306, disc driver 1308, keyboard 1310 and mouse 1312.Disk 1314 is to import computer-readable medium with outgoi8ng data into computer system 1300.
Fig. 2 B is an example of the block diagram of computer system 1300.What be connected to system bus 1320 is various subsystems.Processor 1322(is also referred to as CPU (central processing unit), or CPU) be connected to memory device, comprise storer 1324.Storer 1324 comprises random access storage device (RAM) and ROM (read-only memory) (ROM).As known in the art, ROM is used as to CPU one-way transmission data and instruction, and RAM is commonly used to transmit data and instruction in two-way mode.This storer of two types can comprise any suitable computer-readable medium that describes below.Fixed disk 1326 also is the two-way CPU1322 of being connected to; It provides extra data storage and also comprises any computer-readable medium that describes below.Fixed disk 1326 can be used to storage program, data etc., and secondary storage media (as hard disk) normally, and it is slower than primary memory.Be understandable that the information that is retained in the fixed disk 1326 can be combined in the storer 1324 as the mode of virtual memory with standard in appropriate circumstances.
CPU1322 is also connected to various input-output apparatus, as display 1304, keyboard 1310, mouse 1312 and loudspeaker 1330.Usually, input-output apparatus can be following any: video display, trace ball, mouse, keyboard, microphone, touch display, converter card reader, tape or paper tape reader, clipboard, contact pilotage, voice or handwriting recognizer, biometric reader or other computing machines.CPU1322 can use network interface 1340 to be connected to another computing machine or communication network alternatively.Utilize such network interface, plan in carrying out said method step ground process, CPU can be from network receiving information or to network output information.In addition, method embodiment of the present invention can carried out separately on the CPU1322 or can carry out with the remote cpu of sharing this processing part on as the network of Internet.
The present invention also provides a kind of acceptance of work system based on the BIM model, should comprise based on the acceptance of work system of BIM model: device is used for reading the BIM model and waits the data message of the project of checking and accepting about this; Device is used for judging whether the BIM model has the data message of waiting the project of checking and accepting about this; Device is used for exporting the result that this treats examination project " defective " not having when waiting the data message of the project of checking and accepting about this; Device is used for judging having when waiting the data message of the project of checking and accepting about this whether this data message is consistent with standard format; Device is used for exporting the result of this items for acceptance " defective " when this data message and standard format are inconsistent; And device, be used for when this data message is consistent with standard format, exporting the result of this items for acceptance " qualified ".
In further embodiment, described acceptance of work system also can comprise device, is used for described " qualified " result feedback is outputed to the BIM model, and/or is used for described " defective " result feedback is outputed to the device of BIM model.
Below by reference to the accompanying drawings the preferred embodiments of the disclosure has been done detailed description, but the present invention is not limited to above-mentioned embodiment, in the ken that those skilled in the art possess, can also make a variety of changes without departing from the inventive concept of the premise.

Claims (8)

1. the acceptance of work method based on the BIM model comprises the steps:
(a) read in the described BIM model about waiting the data message of the project of checking and accepting;
(b) judge in the described BIM model whether have the data message of waiting the project of checking and accepting about this;
(c) if not, then export the result that this treats examination project " defective ";
(d) if judge further then whether this data message is consistent with standard format;
(e) if not, then export the result that this treats examination project " defective ";
(f) if then export the result that this treats examination project " qualified ".
2. method according to claim 1 is characterized in that also comprising, in step (c) and (e) afterwards, respectively described " defective " result feedback is outputed to the step in the BIM model.
3. method according to claim 1 and 2 is characterized in that also comprising, in step (f) afterwards, described " qualified " result is fed back the step that outputs in the BIM model.
4. method according to claim 1, it is characterized in that the described examination project for the treatment of includes but not limited to fire-fighting examination, lightning protection examination, environmental protection inspection and acceptance, greening examination, planning examination, civil defence examination, the final acceptance of construction of environment sanitation facility, the examination of preventative health and the payment examination of being completed.
5. acceptance of work system based on the BIM model comprises:
Device is used for the described BIM of reading model and waits the data message of the project of checking and accepting about this;
Device is used for judging whether described BIM model has the data message of waiting the project of checking and accepting about this;
Device is used for exporting the result that this treats examination project " defective " not having when waiting the data message of the project of checking and accepting about this;
Device is used for judging having when waiting the data message of the project of checking and accepting about this whether this data message is consistent with standard format;
Device is used for exporting the result of this items for acceptance " defective " when this data message and standard format are inconsistent; And
Device is used for exporting the result of this items for acceptance " qualified " when this data message is consistent with standard format.
6. system according to claim 5 is characterized in that also comprising: install, be used for described " defective " result feedback is outputed to the BIM model.
7. according to claim 5 or 6 described methods, it is characterized in that also comprising: device is used for described " qualified " result feedback is outputed to the BIM model.
8. method according to claim 6, it is characterized in that the described examination project for the treatment of includes but not limited to fire-fighting examination, lightning protection examination, environmental protection inspection and acceptance, greening examination, planning examination, civil defence examination, the final acceptance of construction of environment sanitation facility, the examination of preventative health and the payment examination of being completed.
CN2013102452600A 2013-06-19 2013-06-19 Project acceptance method and system based on BIM model Pending CN103279846A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102452600A CN103279846A (en) 2013-06-19 2013-06-19 Project acceptance method and system based on BIM model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102452600A CN103279846A (en) 2013-06-19 2013-06-19 Project acceptance method and system based on BIM model

Publications (1)

Publication Number Publication Date
CN103279846A true CN103279846A (en) 2013-09-04

Family

ID=49062357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102452600A Pending CN103279846A (en) 2013-06-19 2013-06-19 Project acceptance method and system based on BIM model

Country Status (1)

Country Link
CN (1) CN103279846A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104091215A (en) * 2014-07-22 2014-10-08 上海建科工程咨询有限公司 Project planning management system based on building information model
CN104392338A (en) * 2014-12-17 2015-03-04 公安部四川消防研究所 Building fire protection check and acceptance system and method, check terminal and mobile acceptance terminal
CN104599045A (en) * 2014-12-30 2015-05-06 东莞市亚欧装饰设计工程有限公司 Project real scene acceptance inspection method
CN104680322A (en) * 2015-02-13 2015-06-03 上海同筑信息科技有限公司 Project acceptance system and method based on BIM
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology
CN105678482A (en) * 2016-04-01 2016-06-15 上海建科工程咨询有限公司 Method and corresponding device for processing project data information
CN105931030A (en) * 2016-05-31 2016-09-07 上海建科工程咨询有限公司 BIM technology-based project acceptance and delivery integrated information management method
CN110319818A (en) * 2019-07-17 2019-10-11 伟志股份公司 A kind of Finish Construction Survey of Underground Pipeline system and method
CN110348739A (en) * 2019-07-12 2019-10-18 武汉新江城环境事务咨询有限责任公司 Construction project completion environment-friendly acceptance assessment method and system and storage medium
CN110852539A (en) * 2018-08-20 2020-02-28 国网北京市电力公司 Drawing processing method and device
CN111861365A (en) * 2020-06-03 2020-10-30 河南诺盾科技有限公司 Fire control is checked and is accepted record and spot check integration system
CN111967839A (en) * 2020-07-16 2020-11-20 译筑信息科技(上海)有限公司 BIM-based construction quality acceptance method and system for building components
CN112381356A (en) * 2020-10-24 2021-02-19 上海东方投资监理有限公司 Completion acceptance method, completion acceptance system, server and storage medium for engineering project

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080059220A1 (en) * 2006-08-30 2008-03-06 Plancheck International Corporation Building plan compliance system and method
CN102609417A (en) * 2011-01-21 2012-07-25 清华大学 Engine device and method for data integration and exchange of building information mode based on IFC (industry foundation classes) standards
US20120265707A1 (en) * 2011-04-13 2012-10-18 Bushnell Christopher G Systems and Methods for Propagating Information Between Various Levels of a Construction Specification

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080059220A1 (en) * 2006-08-30 2008-03-06 Plancheck International Corporation Building plan compliance system and method
CN102609417A (en) * 2011-01-21 2012-07-25 清华大学 Engine device and method for data integration and exchange of building information mode based on IFC (industry foundation classes) standards
US20120265707A1 (en) * 2011-04-13 2012-10-18 Bushnell Christopher G Systems and Methods for Propagating Information Between Various Levels of a Construction Specification

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
卢祝清: "BIM在铁路建设项目中的应用分析", 《铁道标准设计》 *
张建平等: "BIM在工程施工中的应用", 《施工技术》 *
沈艳丽: "建筑工程交竣工档案中的常见问题与解决办法", 《土木工程建造管理:2007年辽宁省土木建筑学会建筑施工专业委员会论文集》 *
过俊: "BIM在国内建筑全生命周期的典型应用", 《建筑技艺》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104091215A (en) * 2014-07-22 2014-10-08 上海建科工程咨询有限公司 Project planning management system based on building information model
CN104392338B (en) * 2014-12-17 2017-12-01 公安部四川消防研究所 Building Fire Protection examination & verification Acceptance Test System, method, audit terminal and mobile examination terminal
CN104392338A (en) * 2014-12-17 2015-03-04 公安部四川消防研究所 Building fire protection check and acceptance system and method, check terminal and mobile acceptance terminal
CN104599045A (en) * 2014-12-30 2015-05-06 东莞市亚欧装饰设计工程有限公司 Project real scene acceptance inspection method
CN104680322A (en) * 2015-02-13 2015-06-03 上海同筑信息科技有限公司 Project acceptance system and method based on BIM
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology
CN105678482A (en) * 2016-04-01 2016-06-15 上海建科工程咨询有限公司 Method and corresponding device for processing project data information
CN105931030A (en) * 2016-05-31 2016-09-07 上海建科工程咨询有限公司 BIM technology-based project acceptance and delivery integrated information management method
CN110852539A (en) * 2018-08-20 2020-02-28 国网北京市电力公司 Drawing processing method and device
CN110348739A (en) * 2019-07-12 2019-10-18 武汉新江城环境事务咨询有限责任公司 Construction project completion environment-friendly acceptance assessment method and system and storage medium
CN110319818A (en) * 2019-07-17 2019-10-11 伟志股份公司 A kind of Finish Construction Survey of Underground Pipeline system and method
CN111861365A (en) * 2020-06-03 2020-10-30 河南诺盾科技有限公司 Fire control is checked and is accepted record and spot check integration system
CN111967839A (en) * 2020-07-16 2020-11-20 译筑信息科技(上海)有限公司 BIM-based construction quality acceptance method and system for building components
CN112381356A (en) * 2020-10-24 2021-02-19 上海东方投资监理有限公司 Completion acceptance method, completion acceptance system, server and storage medium for engineering project

Similar Documents

Publication Publication Date Title
CN103279846A (en) Project acceptance method and system based on BIM model
CN107436762B (en) Register code file generation method and device and electronic equipment
CN102096593A (en) Flex technology-based Web end service flow graphical editing framework system and method
CN107179910A (en) The logic configuration method that a kind of online editing comes into force immediately
CN111985194A (en) Data storage method and device, electronic equipment and storage medium
CN109683917A (en) For the method for being deployed in application server, equipment and medium will to be applied
CN108536715B (en) Preview page generation method, device, equipment and storage medium
CN104112176A (en) Enterprise information construction system and method
CN104112177A (en) Enterprise informatization construction system
CN111666520A (en) Method and device for generating electronic form based on form image
CN111191299A (en) Automatic generation method for computer interlocking system cabinet production drawing
CN110083874A (en) A kind of cable system component digitlization designing system
CN116244789A (en) Coal preparation plant multi-specialized construction drawing entrusted resource lifting method and device
CN104965742A (en) Automated script and apparatus for processing front-end tasks
CN115576837A (en) Batch number making method and device, computer equipment and storage medium
CN114567374A (en) Method for checking operating conditions of a facility point, and associated device
US8495033B2 (en) Data processing
CN201556207U (en) Automatic generating equipment of declaration form of railway drivers
CN112988145A (en) Method for generating aeroengine software architecture and aeroengine control device
CN109948251A (en) Data processing method, device, equipment and storage medium based on CAD
CN102135935A (en) Software optimizing and debugging method and device
CN114475710B (en) Method, device and storage medium for displaying device state based on graphic configuration
CN202205237U (en) Industrial vegetable trade tracing terminal machine
CN105678482A (en) Method and corresponding device for processing project data information
CN115277469A (en) Weak network visualization control method and device, electronic equipment and readable storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130904