CN116232916A CN202310224214.6A CN202310224214A CN116232916A CN 116232916 A CN116232916 A CN 116232916A CN 202310224214 A CN202310224214 A CN 202310224214A CN 116232916 A CN116232916 A CN 116232916A
Authority
CN
China
Prior art keywords
information
upgrading
feasibility
coefficient
evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310224214.6A
Other languages
Chinese (zh)
Inventor
包军
赵宇
刘昌军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DATANG HUNCHUN POWER PLANT
Original Assignee
DATANG HUNCHUN POWER PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DATANG HUNCHUN POWER PLANT filed Critical DATANG HUNCHUN POWER PLANT
Priority to CN202310224214.6A priority Critical patent/CN116232916A/en
Publication of CN116232916A publication Critical patent/CN116232916A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/14Network analysis or design
    • H04L41/145Network analysis or design involving simulating, designing, planning or modelling of a network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • H04L41/0813Configuration setting characterised by the conditions triggering a change of settings
    • H04L41/082Configuration setting characterised by the conditions triggering a change of settings the condition being updates or upgrades of network functionality
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention provides a feasibility evaluation method and a system for network system upgrade, which relate to the technical field of network systems, and the method comprises the following steps: the method comprises the steps of constructing a network system upgrading evaluation platform, acquiring operation information of a target network system through a system information acquisition module, acquiring operation upgrading information of the network system, classifying attributes, acquiring operation equipment information of the network system, operation environment information of the system and safety information of system data, transmitting the acquired three information to a feasibility evaluation module through data, acquiring a system upgrading feasibility evaluation model, analyzing and evaluating the acquired three information, acquiring a system upgrading feasibility coefficient, upgrading and controlling the target network system.

Description

Feasibility assessment method and system for network system upgrade
Technical Field
The invention relates to the technical field of network systems, in particular to a feasibility evaluation method and a feasibility evaluation system for upgrading a network system.
Background
With the development of scientific technology, especially the development of network system upgrading technology, the system performance degradation caused by the aging of system equipment is degraded. Because of the production specificity of the power generation industry, the system works in a live mode all the year round, and is subjected to the service life limitation of electronic components, the mutual influence of self-heating and generated magnetic fields in the operation of system equipment, the equipment damage caused by frequent operation and misoperation, so that the service life of the system equipment is often lower than a design value, and the performance degradation phenomenon of the system equipment also causes the tendency of explosive and comprehensive rising after reaching a certain stage.
After the system is put into operation, because the system software is required to be upgraded, the software and hardware are matched with the requirement and the requirement of the machine room environment, the capacity space of the system is occupied, the margin of communication, calculation processing and the like can be influenced, the operation load is continuously increased, the processing rate of the system is reduced, even the network system operation environment is difficult to reform and upgrade when serious, the feasibility evaluation can not be carried out on the upgrading result, and meanwhile, the operation environment of the machine room is required to be ensured to be in a healthy state in the aspect of the machine room environment, so that powerful guarantee can be better provided for reliable operation of equipment.
The existing network system is not enough in management and control during upgrading, so that the final network system is low in upgrading feasibility.
Disclosure of Invention
The application provides a feasibility assessment method and a feasibility assessment system for network system upgrading, which are used for solving the technical problem that the final network system upgrading is low in feasibility due to insufficient management and control of the network system during upgrading in the prior art.
In view of the above, the present application provides a method and a system for evaluating the feasibility of network system upgrade.
In a first aspect, the present application provides a method for evaluating feasibility of upgrading a network system, where the method includes: constructing a network system upgrading evaluation platform, wherein the network system upgrading evaluation platform comprises a system information acquisition module and a feasibility evaluation module; acquiring operation information of a target network system through the system information acquisition module to obtain operation upgrading information of the network system; performing attribute classification on the network system operation upgrading information to obtain system operation equipment information, system operation environment information and system data security information; transmitting the system operation equipment information, the system operation environment information and the system data security information to the feasibility evaluation module through data; based on the feasibility evaluation module, a system upgrading feasibility evaluation model is obtained; analyzing and evaluating the system operation equipment information, the system operation environment information and the system data safety information through the system upgrading feasibility evaluation model to obtain a system upgrading feasibility coefficient; and upgrading, reforming and controlling the target network system based on the system upgrading feasibility coefficient.
In a second aspect, the present application provides a feasibility assessment system for network system upgrades, the system comprising: the evaluation module is used for constructing a network system upgrading evaluation platform which comprises a system information acquisition module and a feasibility evaluation module; the operation upgrading module is used for acquiring operation information of the target network system through the system information acquisition module to obtain operation upgrading information of the network system; the information acquisition module is used for classifying the attributes of the network system operation upgrading information to acquire system operation equipment information, system operation environment information and system data security information; the feasibility evaluation module is used for transmitting the system operation equipment information, the system operation environment information and the system data safety information to the feasibility evaluation module through data; the model obtaining module is used for obtaining a system upgrading feasibility evaluation model based on the feasibility evaluation module; the coefficient obtaining module is used for analyzing and evaluating the system operation equipment information, the system operation environment information and the system data safety information through the system upgrading feasibility evaluation model to obtain a system upgrading feasibility coefficient; and the management and control module is used for carrying out upgrading and reconstruction management and control on the target network system based on the system upgrading feasibility coefficient.
One or more technical solutions provided in the present application have at least the following technical effects or advantages:
the feasibility assessment method for network system upgrading, which is provided by the application, relates to the technical field of network systems, solves the technical problems that the network system is not controlled enough in upgrading in the prior art, so that the feasibility of the final network system upgrading is low, realizes the improvement and upgrading of the network system operating environment, and carries out feasibility assessment on the upgrading result.
Drawings
Fig. 1 is a schematic flow chart of a method for evaluating the feasibility of upgrading a network system;
fig. 2 is a schematic structural diagram of a network system upgrade feasibility evaluation system according to the present application.
Reference numerals illustrate: the system comprises an evaluation module 1, an operation upgrading module 2, an information obtaining module 3, a feasibility evaluation module 4, a model obtaining module 5, a coefficient obtaining module 6 and a management and control module 7.
Detailed Description
The method for evaluating the feasibility of the network system upgrading is used for solving the technical problem that the network system is not enough to manage and control during upgrading in the prior art, so that the feasibility of the final network system upgrading is low.
Example 1
As shown in fig. 1, an embodiment of the present application provides a method for evaluating feasibility of upgrading a network system, where the method includes:
step S100: constructing a network system upgrading evaluation platform, wherein the network system upgrading evaluation platform comprises a system information acquisition module and a feasibility evaluation module;
specifically, firstly, a network system upgrading evaluation platform is constructed, the network system upgrading evaluation platform can examine the existing network infrastructure of an organization through evaluating network equipment, network performance and security threat, and evaluate an upgradeable network system in the existing network infrastructure, wherein the constructed network system evaluation platform comprises a system information acquisition module and a feasibility evaluation module, and is used as an important reference basis for realizing upgrading modification management and control of a target network system in the later period.
Step S200: acquiring operation information of a target network system through the system information acquisition module to obtain operation upgrading information of the network system;
specifically, on the basis of the system information acquisition module in the constructed network system upgrading and evaluating platform, the operation information of the target network system is acquired, wherein the target network system can be an electric power service system and the like, the operation information refers to the system information in the operation process of the network system, on the basis, the operation upgrading information of the network system is acquired, and further, the upgrading and reconstruction management and control of the target network system are guaranteed.
Step S300: performing attribute classification on the network system operation upgrading information to obtain system operation equipment information, system operation environment information and system data security information;
specifically, the obtained network system operation upgrading information is classified according to the attribute, the network system operation upgrading information is respectively divided into system operation equipment, a system operation environment and system data security, and an electric service system is taken as an example, wherein the system operation equipment can be equipment used on a main system for transmitting, transmitting and distributing power, and the like, the system operation environment can be obtained through an external sensor, a monitoring video and the like, the system data security information refers to data required for system security analysis and evaluation in the implementation process of a system security program plan, and further, the system operation equipment information, the system operation environment information and the system data security information are respectively obtained to be a tamper control basis for upgrading and reconstruction of a target network system.
Step S400: transmitting the system operation equipment information, the system operation environment information and the system data security information to the feasibility evaluation module through data;
specifically, based on the obtained system operation equipment information, the obtained system operation environment information and the obtained system data security information, the obtained system operation equipment information, the obtained system operation environment information and the obtained system data security information are input to a feasibility evaluation module in a constructed network system upgrading evaluation platform, and the obtained system operation equipment information, the obtained system operation environment information and the obtained system data security information are evaluated for system feasibility, so that the method has a pushing effect on upgrading, modifying and controlling the realization of a target network system.
Step S500: based on the feasibility evaluation module, a system upgrading feasibility evaluation model is obtained;
specifically, on the basis of the feasibility evaluation module in the constructed network system upgrading evaluation platform, a system upgrading feasibility evaluation model is constructed, wherein in the system upgrading feasibility evaluation model, the network system evaluates the feasibility of the system upgrading of the network system from three aspects of acquired system operation equipment information, acquired system operation environment information and acquired system data safety information, wherein the selection of a system upgrading scheme, a construction period plan and the evaluation of cost are required to be described so as to ensure the accuracy and the executable performance of output data of the system upgrading feasibility evaluation model and have profound influence on the upgrading and reconstruction management of a target network system realized later.
Step S600: analyzing and evaluating the system operation equipment information, the system operation environment information and the system data safety information through the system upgrading feasibility evaluation model to obtain a system upgrading feasibility coefficient;
specifically, the obtained system operation equipment information, the obtained system operation environment information and the obtained system data safety information are correspondingly analyzed and evaluated through the obtained system upgrade feasibility evaluation model, wherein the obtained system operation equipment information, the obtained system operation environment information and the obtained system data safety information are respectively input into the obtained system upgrade feasibility evaluation model for analysis, the corresponding system equipment operation evaluation coefficient, system operation environment evaluation coefficient and system data safety evaluation coefficient are obtained, and the system upgrade feasibility coefficient is determined based on the corresponding system equipment operation evaluation coefficient, the corresponding system operation environment evaluation coefficient and the corresponding system data safety evaluation coefficient, and the upgrade transformation management and control of the target network system are better realized according to the obtained system upgrade feasibility coefficient.
Step S700: and upgrading, reforming and controlling the target network system based on the system upgrading feasibility coefficient.
Specifically, on the basis of the obtained system upgrade feasibility coefficient, upgrade transformation management and control are performed on the target network system, wherein the upgrade transformation management and control are performed on the target network system by formulating an upgrade feasibility optimization scheme, so that the upgrade transformation optimization is performed on the target network system based on the formulated upgrade feasibility optimization scheme.
Further, the invention provides a feasibility evaluation method and a system for upgrading a network system, which relate to the technical field of network system upgrading, and the method comprises the following steps: the method comprises the steps of constructing a network system upgrading evaluation platform, acquiring operation information of a target network system through a system information acquisition module, acquiring operation upgrading information of the network system, classifying attributes, acquiring operation equipment information of the network system, operation environment information of the system and safety information of system data, transmitting the acquired three information to a feasibility evaluation module through data, acquiring a system upgrading feasibility evaluation model, analyzing and evaluating the acquired three information, acquiring a system upgrading feasibility coefficient, upgrading and controlling the target network system.
Further, step S200 of the present application further includes:
step S210: the system information acquisition module is in communication connection with the system operation equipment and the environment monitoring equipment;
step S220: acquiring system equipment operation environment information through the system operation equipment and the environment monitoring equipment;
step S230: performing information security test on the target network system to obtain a system information security test result;
step S240: and determining the network system operation upgrading information based on the system equipment operation environment information and the system information security test result.
Specifically, the system information acquisition module in the constructed network system upgrading and evaluating platform is respectively in communication connection with the obtained system operation equipment and the environment monitoring equipment, wherein the environment monitoring equipment can be an external sensor, a monitoring video and the like, the operation environment of the system equipment is detected and extracted on the basis of the obtained system operation equipment and the environment monitoring equipment, meanwhile, the operation environment information of the system equipment is obtained, further, after the information security test of the target network system is carried out, the system information security test result of the target network system is obtained, and therefore the network system operation upgrading information is determined on the basis of the obtained system operation environment information and the obtained system information security test result, and the technical effect of providing important basis for upgrading, modifying and optimizing the target network system is achieved.
Further, step S300 of the present application further includes:
step S310: extracting attributes of the running upgrading information of the network system to obtain data attribute information;
step S320: integrating the network system operation upgrading information based on the data attribute information to obtain network system data attribute information;
step S330: performing data processing on the network system data attribute information to obtain standard network system operation upgrading information;
step S340: classifying based on the standard network system operation upgrading information, and determining system operation equipment information, system operation environment information and system data security information.
Specifically, the operation information of the target network system is acquired through the acquired system information acquisition module, the acquired network system operation upgrading information is subjected to attribute extraction, meanwhile, data attribute information is acquired, the acquired data attribute information comprises a data format, a video picture format and the like, the network system operation upgrading information is integrated on the basis of the acquired data attribute information, the network system data attribute information is further acquired, the acquired network system data attribute information is subjected to data processing, the corresponding standard network system operation upgrading information is acquired, and the acquired standard network system operation upgrading information is classified, so that system operation equipment information, system operation environment information and system data safety information are determined, and the high efficiency of upgrading, reconstruction and optimization of the target network system is guaranteed.
Further, step S330 of the present application further includes:
step S331: when the network system data attribute information is an image, extracting image characteristics to obtain network system image characteristic information;
step S332: when the network system data attribute information is structured data, carrying out normalization processing to obtain network system data information;
step S333: and obtaining the standard network system operation upgrading information based on the network system image characteristic information and the network system data information.
Specifically, the obtained network system operation upgrading information is integrated based on the obtained data attribute information, the obtained network system data attribute information is analyzed, when the obtained network system data attribute information is an image, image feature extraction is carried out on the image, so that corresponding network system image feature information is obtained, when the obtained network system data attribute information is structured data, normalization processing is carried out on the structured data, so that corresponding network system data information is obtained, the normalization processing is a simplified calculation mode, a dimensionless expression is converted into a dimensionless expression, the dimensionless expression is converted into a scalar quantity, namely, the data is mapped into a range of 0-1 for processing, further, the obtained network system image feature information and the obtained network system data information are matched and integrated, further, standard network system operation upgrading information is obtained, and finally the technical effect of providing reference for upgrading, reconstruction and optimization of a target network system is achieved.
Further, step S600 of the present application further includes:
step S610: the system upgrade feasibility evaluation model comprises a system equipment operation evaluation model, a system operation environment evaluation model and a system data security evaluation model;
step S620: inputting the system operation equipment information, the system operation environment information and the system data security information into the system upgrading feasibility evaluation model respectively for analysis to obtain a system equipment operation evaluation coefficient, a system operation environment evaluation coefficient and a system data security evaluation coefficient;
step S630: and determining the system upgrading feasibility coefficient based on the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data safety evaluation coefficient.
Specifically, the obtained system operation equipment information, the obtained system operation environment information and the obtained system data safety information are transmitted to a feasibility evaluation module through data, and meanwhile, a system upgrading feasibility evaluation model is obtained based on the obtained feasibility evaluation module, wherein the system upgrading feasibility evaluation model comprises a system equipment operation evaluation model, a system operation environment evaluation model and a system data safety evaluation model, further, the obtained system operation equipment information, the obtained system operation environment information and the obtained system data safety information are respectively input into the obtained system upgrading feasibility evaluation model for corresponding analysis, so that a system equipment operation evaluation coefficient, a system operation environment evaluation coefficient and a system data safety evaluation coefficient corresponding to the obtained system operation equipment information, the obtained system operation environment information and the obtained system data safety information are obtained, and further, the system upgrading feasibility coefficient is determined according to the corresponding generated system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data safety evaluation coefficient, and finally, the technical effect of upgrading and modifying and optimizing the target network system is achieved.
Further, step S630 of the present application further includes:
step S631: performing weight distribution on the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data security evaluation coefficient to obtain coefficient weight distribution information;
step S632: determining a coefficient adjustment factor according to the coefficient weight allocation information;
step S633: and calculating the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data safety evaluation coefficient based on the coefficient adjustment factor to obtain the system upgrading feasibility coefficient.
Specifically, firstly, weight distribution is performed on the obtained system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data security evaluation coefficient, wherein the weight distribution refers to the relative importance degree of the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data security evaluation coefficient in the overall evaluation, and coefficient weight distribution information is obtained according to the distributed corresponding weights, further, according to the obtained coefficient weight distribution information, a coefficient adjustment factor is determined, meanwhile, based on the determined coefficient adjustment factor, weight calculation is performed on the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data security evaluation coefficient, the weight calculation is performed after the weight is accurately determined based on a large amount of data summary, and the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data security evaluation coefficient weight ratio can be a first influence coefficient by way of example: second influence coefficient: and the third influence coefficient is 2:3:4, wherein the influence parameters after the weighting calculation process are respectively the first influence parameter 0.2, the second influence parameter 0.3 and the third influence parameter 0.4, the final value of the matching result is obtained according to the weighting calculation result, and the important weight is regarded as high in importance degree, so that the system upgrading feasibility coefficient is obtained, and the maximum efficiency of upgrading and reconstruction optimization of the later-stage target network system is ensured.
Further, step S700 of the present application includes:
step S710: when the system upgrade feasibility coefficient does not reach a preset feasibility coefficient, obtaining an upgrade feasibility difference value;
step S720: according to the upgrade feasibility difference value, an upgrade feasibility optimization scheme is formulated;
step S730: and carrying out upgrading modification optimization on the target network system based on the upgrading feasibility optimization scheme.
Specifically, the system upgrade feasibility coefficient is compared with a preset feasibility coefficient, the system upgrade feasibility coefficient is judged, when the system upgrade feasibility coefficient does not reach the preset feasibility coefficient, an upgrade feasibility difference value is obtained, the obtained preset feasibility coefficient is preset by related technicians according to a large number of network system upgrade feasibility data, and finally the obtained feasibility difference value when the feasibility difference value is not met is used as output information to be correspondingly output, so that an upgrade feasibility optimization scheme is formulated, and further, the technical effect of upgrading, modifying and optimizing the obtained target network system is achieved based on the formulated upgrade feasibility optimization scheme.
Example two
Based on the same inventive concept as the feasibility assessment method for upgrading a network system in the foregoing embodiment, as shown in fig. 2, the present application provides a feasibility assessment system for upgrading a network system, where the system includes:
the evaluation module 1 is used for constructing a network system upgrading evaluation platform, and the network system upgrading evaluation platform comprises a system information acquisition module and a feasibility evaluation module;
the operation upgrading module 2 is used for acquiring operation information of the target network system through the system information acquisition module to obtain operation upgrading information of the network system;
the information obtaining module 3 is used for classifying the attribute of the network system operation upgrading information to obtain system operation equipment information, system operation environment information and system data security information;
the feasibility evaluation module 4 is used for transmitting the system operation equipment information, the system operation environment information and the system data safety information to the feasibility evaluation module through data;
the model obtaining module 5 is used for obtaining a system upgrade feasibility evaluation model based on the feasibility evaluation module;
the coefficient obtaining module 6 is used for analyzing and evaluating the system operation equipment information, the system operation environment information and the system data safety information through the system upgrading feasibility evaluation model to obtain a system upgrading feasibility coefficient;
and the management and control module 7 is used for performing upgrading and reconstruction management and control on the target network system based on the system upgrading feasibility coefficient.
Further, the system further comprises:
the connecting module is used for connecting the system information acquisition module with the system operation equipment and the environment monitoring equipment in a communication way;
the system equipment operation environment information acquisition module is used for acquiring system equipment operation environment information through the system operation equipment and the environment monitoring equipment;
the system information security test result obtaining module is used for carrying out information security test on the target network system to obtain a system information security test result
And the test module is used for determining the network system operation upgrading information based on the system equipment operation environment information and the system information security test result.
Further, the system further comprises:
the data attribute information module is used for extracting attributes of the network system operation upgrading information to obtain data attribute information;
the network system data attribute information module is used for integrating the network system operation upgrading information based on the data attribute information to obtain network system data attribute information;
the standard network system operation upgrade information acquisition module is used for carrying out data processing on the network system data attribute information to obtain standard network system operation upgrade information;
the classification module is used for classifying based on the standard network system operation upgrading information and determining system operation equipment information, system operation environment information and system data safety information.
Further, the system further comprises:
the image feature module is used for extracting image features when the network system data attribute information is an image, so as to obtain network system image feature information;
the normalization processing module is used for performing normalization processing to obtain network system data information when the network system data attribute information is structured data;
the standard network system operation upgrade information acquisition module is used for acquiring the standard network system operation upgrade information based on the network system image characteristic information and the network system data information.
Further, the system further comprises:
the system upgrading feasibility evaluation model module is used for the system upgrading feasibility evaluation model and comprises a system equipment operation evaluation model, a system operation environment evaluation model and a system data security evaluation model;
the input module is used for respectively inputting the system operation equipment information, the system operation environment information and the system data security information into the system upgrading feasibility evaluation model for analysis to obtain a system equipment operation evaluation coefficient, a system operation environment evaluation coefficient and a system data security evaluation coefficient;
the system upgrading feasibility coefficient determining module is used for determining the system upgrading feasibility coefficient based on the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data safety evaluation coefficient.
Further, the system further comprises:
the weight distribution information module is used for carrying out weight distribution on the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data safety evaluation coefficient to obtain coefficient weight distribution information
The coefficient adjustment factor module is used for determining a coefficient adjustment factor according to the coefficient weight distribution information;
and the system upgrading feasibility coefficient module is used for calculating the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data safety evaluation coefficient based on the coefficient adjustment factor to obtain the system upgrading feasibility coefficient.
Further, the system further comprises:
the difference value obtaining module is used for obtaining an upgrade feasibility difference value when the system upgrade feasibility coefficient does not reach a preset feasibility coefficient;
the scheme making module is used for making an upgrade feasibility optimizing scheme according to the upgrade feasibility difference value;
and the optimizing module is used for carrying out upgrading modification optimization on the target network system based on the upgrading feasibility optimizing scheme.
Through the foregoing detailed description of a method for evaluating the feasibility of a network system upgrade, those skilled in the art can clearly understand that the method and the system for evaluating the feasibility of a network system upgrade in this embodiment, for the device disclosed in the embodiment, since the device corresponds to the method disclosed in the embodiment, the description is relatively simple, and relevant places refer to the description of the method section.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (8)

1. A method for evaluating feasibility of a network system upgrade, the method comprising:
constructing a network system upgrading evaluation platform, wherein the network system upgrading evaluation platform comprises a system information acquisition module and a feasibility evaluation module;
acquiring operation information of a target network system through the system information acquisition module to obtain operation upgrading information of the network system;
performing attribute classification on the network system operation upgrading information to obtain system operation equipment information, system operation environment information and system data security information;
transmitting the system operation equipment information, the system operation environment information and the system data security information to the feasibility evaluation module through data;
based on the feasibility evaluation module, a system upgrading feasibility evaluation model is obtained;
analyzing and evaluating the system operation equipment information, the system operation environment information and the system data safety information through the system upgrading feasibility evaluation model to obtain a system upgrading feasibility coefficient;
and upgrading, reforming and controlling the target network system based on the system upgrading feasibility coefficient.
2. The method of claim 1, wherein the obtaining network system operation upgrade information comprises:
the system information acquisition module is in communication connection with the system operation equipment and the environment monitoring equipment;
acquiring system equipment operation environment information through the system operation equipment and the environment monitoring equipment;
performing information security test on the target network system to obtain a system information security test result;
and determining the network system operation upgrading information based on the system equipment operation environment information and the system information security test result.
3. The method of claim 1, wherein the obtaining system operating device information, system operating environment information, system data security information comprises:
extracting attributes of the running upgrading information of the network system to obtain data attribute information;
integrating the network system operation upgrading information based on the data attribute information to obtain network system data attribute information;
performing data processing on the network system data attribute information to obtain standard network system operation upgrading information;
classifying based on the standard network system operation upgrading information, and determining system operation equipment information, system operation environment information and system data security information.
4. The method of claim 3, wherein obtaining standard network system operational upgrade information comprises:
when the network system data attribute information is an image, extracting image characteristics to obtain network system image characteristic information;
when the network system data attribute information is structured data, carrying out normalization processing to obtain network system data information;
and obtaining the standard network system operation upgrading information based on the network system image characteristic information and the network system data information.
5. The method of claim 1, wherein the obtaining a system upgrade feasibility coefficient comprises:
the system upgrade feasibility evaluation model comprises a system equipment operation evaluation model, a system operation environment evaluation model and a system data security evaluation model;
inputting the system operation equipment information, the system operation environment information and the system data security information into the system upgrading feasibility evaluation model respectively for analysis to obtain a system equipment operation evaluation coefficient, a system operation environment evaluation coefficient and a system data security evaluation coefficient;
and determining the system upgrading feasibility coefficient based on the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data safety evaluation coefficient.
6. The method of claim 5, wherein the determining the system upgrade feasibility coefficient comprises:
performing weight distribution on the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data security evaluation coefficient to obtain coefficient weight distribution information;
determining a coefficient adjustment factor according to the coefficient weight allocation information;
and calculating the system equipment operation evaluation coefficient, the system operation environment evaluation coefficient and the system data safety evaluation coefficient based on the coefficient adjustment factor to obtain the system upgrading feasibility coefficient.
7. The method of claim 1, wherein the upgrade transformation management of the target network system based on the system upgrade feasibility coefficient comprises:
when the system upgrade feasibility coefficient does not reach a preset feasibility coefficient, obtaining an upgrade feasibility difference value;
according to the upgrade feasibility difference value, an upgrade feasibility optimization scheme is formulated;
and carrying out upgrading modification optimization on the target network system based on the upgrading feasibility optimization scheme.
8. A feasibility assessment system for a network system upgrade, the system comprising:
the evaluation module is used for constructing a network system upgrading evaluation platform which comprises a system information acquisition module and a feasibility evaluation module;
the operation upgrading module is used for acquiring operation information of the target network system through the system information acquisition module to obtain operation upgrading information of the network system;
the information acquisition module is used for classifying the attributes of the network system operation upgrading information to acquire system operation equipment information, system operation environment information and system data security information;
the feasibility evaluation module is used for transmitting the system operation equipment information, the system operation environment information and the system data safety information to the feasibility evaluation module through data;
the model obtaining module is used for obtaining a system upgrading feasibility evaluation model based on the feasibility evaluation module;
the coefficient obtaining module is used for analyzing and evaluating the system operation equipment information, the system operation environment information and the system data safety information through the system upgrading feasibility evaluation model to obtain a system upgrading feasibility coefficient;
and the management and control module is used for carrying out upgrading and reconstruction management and control on the target network system based on the system upgrading feasibility coefficient.
CN202310224214.6A 2023-03-09 2023-03-09 Feasibility assessment method and system for network system upgrade Pending CN116232916A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310224214.6A CN116232916A (en) 2023-03-09 2023-03-09 Feasibility assessment method and system for network system upgrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310224214.6A CN116232916A (en) 2023-03-09 2023-03-09 Feasibility assessment method and system for network system upgrade

Publications (1)

Publication Number Publication Date
CN116232916A true CN116232916A (en) 2023-06-06

Family

ID=86574807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310224214.6A Pending CN116232916A (en) 2023-03-09 2023-03-09 Feasibility assessment method and system for network system upgrade

Country Status (1)

Country Link
CN (1) CN116232916A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116414420A (en) * 2023-06-09 2023-07-11 山东华邦农牧机械股份有限公司 Automatic upgrading method of poultry breeding control system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116414420A (en) * 2023-06-09 2023-07-11 山东华邦农牧机械股份有限公司 Automatic upgrading method of poultry breeding control system
CN116414420B (en) * 2023-06-09 2023-10-13 山东华邦农牧机械股份有限公司 Automatic upgrading method of poultry breeding control system

Similar Documents

Publication Publication Date Title
CN116232916A (en) Feasibility assessment method and system for network system upgrade
CN112383891A (en) Equipment registration method and device based on object model automatic matching
KR20120101873A (en) Prediction apparatus and method for electromagnetic radiated emission of cable
CN115330887B (en) Automatic test system and test method for intelligent substation protection device
CN116467788B (en) Barrier-free environment construction management method and system
CN101142559B (en) Monitoring computer-controlled processes and systems
CN116204871A (en) Abnormal behavior recognition method and device, electronic equipment and storage medium
CN116546581B (en) Automatic cloud connection method based on network signal analysis
CN113010435A (en) Method and device for screening algorithm model and test platform
CN111313958A (en) Satellite data quality inspection report generation system
CN115775064A (en) Engineering decision calculation result evaluation method and cloud platform
CN116204428A (en) Test case generation method and device
CN114356712A (en) Data processing method, device, equipment, readable storage medium and program product
CN112801688A (en) Method and device for positioning reason of estimation failure
CN114968696A (en) Index monitoring method, electronic equipment and chip system
CN111258866A (en) Computer performance prediction method, device, equipment and readable storage medium
CN106294061B (en) Energy intensity Mutability analysis
CN115473343B (en) Intelligent gateway multi-master-station parallel access test method
CN116431378B (en) Product embedded system fault data analysis method
CN114721703B (en) Software maintenance method and system based on big data
CN114564853B (en) Evaluation report generation method based on FMEA data and electronic equipment
CN117807139A (en) Data acquisition method, system and electronic equipment
CN115982163A (en) Power system monitoring data analysis method and device, power system and storage medium
CN116455740A (en) Custom industrial protocol deep analysis method, system and electronic equipment
CN116595083A (en) Multi-source data conversion processing method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination