CN116222323A - A timing signal self-test system on launch vehicle - Google Patents
A timing signal self-test system on launch vehicle Download PDFInfo
- Publication number
- CN116222323A CN116222323A CN202211643604.9A CN202211643604A CN116222323A CN 116222323 A CN116222323 A CN 116222323A CN 202211643604 A CN202211643604 A CN 202211643604A CN 116222323 A CN116222323 A CN 116222323A
- Authority
- CN
- China
- Prior art keywords
- time sequence
- test
- test state
- module
- rocket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 123
- 230000007246 mechanism Effects 0.000 claims abstract description 44
- 238000000034 method Methods 0.000 claims abstract description 20
- 230000008569 process Effects 0.000 claims abstract description 10
- 238000004891 communication Methods 0.000 claims description 36
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 239000002360 explosive Substances 0.000 claims description 5
- 238000002955 isolation Methods 0.000 claims description 5
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 230000001105 regulatory effect Effects 0.000 claims description 3
- 230000000977 initiatory effect Effects 0.000 claims 3
- 230000003287 optical effect Effects 0.000 claims 1
- 238000000926 separation method Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 5
- 230000009471 action Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 235000015842 Hesperis Nutrition 0.000 description 1
- 235000012633 Iberis amara Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005474 detonation Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008844 regulatory mechanism Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42B—EXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
- F42B35/00—Testing or checking of ammunition
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Testing Of Engines (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
本发明涉及一种运载火箭箭上时序信号自测试系统,包括:包括包括电源模块、控制器,还包括改进管制机构以及时序测试仪;改进管制机构包括多路管制通道,每一路管制通道可以在测试状态或者非测试状态之间切换,使得所述改进管制机构对应测试状态或者非测试状态;所述时序测试仪在所述改进管制机构对应测试状态时对箭上时序进行自测试。本发明的运载火箭箭上时序信号自测试系统及方法,将时序测试仪集成在运载火箭内部,减少地面测试设备和工艺电缆,简化测试流程,实现时序信号箭上自测试,提高自动化水平。通过改进管制机构,集成火工品短路保护功能和测试仪测试选通功能,在保证安全性、不增加其它箭上设备的情况下满足了箭上自测试的需求。
The invention relates to a timing signal self-test system on a carrier rocket, comprising: a power supply module, a controller, an improved control mechanism and a timing tester; the improved control mechanism includes multiple control channels, and each control channel can The test state or the non-test state is switched, so that the improved control mechanism corresponds to the test state or the non-test state; the timing tester performs self-test on the arrow sequence when the improved control mechanism corresponds to the test state. The system and method for self-testing the timing signal on the carrier rocket of the present invention integrates the timing tester inside the carrier rocket, reduces ground testing equipment and process cables, simplifies the test process, realizes the self-testing of the timing signal on the arrow, and improves the automation level. By improving the control mechanism, integrating the short-circuit protection function of pyrotechnics and the test gating function of the tester, it meets the needs of self-testing on the arrow without adding other equipment on the arrow.
Description
技术领域technical field
本发明属于运载火箭测试技术领域,具体涉及一种运载火箭箭上时序信号自测试系统。The invention belongs to the technical field of carrier rocket testing, and in particular relates to a self-testing system for timing signals on a carrier rocket.
背景技术Background technique
运载火箭从正式发射前至飞行结束,会发出大量的火工品信号、电磁阀动作信号。火工品信号包括点火信号和分离信号,按照时间顺序具体为一级点火、一级分离,二级点火、二级分离,三级点火、三级分离等信号;电磁阀动作即开闭信号为一个持续一定时间长度的信号,可以重复发出。运载火箭在正式发射之前的各阶段测试中,一般要对上述时序信号进行检查,检测其是否符合设计要求,重点检测参数为信号发出时刻和信号持续时间。常用方法是在箭体上设置舱盖、或者在火箭舱段分离状态下,断开箭上控制器和火工品或者电磁阀的连接,一般是测试时火工品或电磁阀需短路,使用转接电缆将箭上接口和地面设备(如时序等效器)进行测试连接,然后使用时序测试仪对箭上时序信号进行测试,准备步骤较多,流程繁琐,已经不符合运载火箭快速测试发射的自动化需求。From before the official launch to the end of the flight, the launch vehicle will send out a large number of pyrotechnics signals and solenoid valve action signals. The pyrotechnic signal includes the ignition signal and the separation signal. According to the time sequence, it is specifically the first-level ignition, the first-level separation, the second-level ignition, the second-level separation, the third-level ignition, and the third-level separation. The solenoid valve action is the opening and closing signal. A signal that lasts for a certain length of time and can be sent repeatedly. In the various stages of testing of the launch vehicle before the official launch, the above-mentioned timing signals are generally checked to check whether they meet the design requirements. The key testing parameters are the signal sending time and signal duration. The common method is to set a hatch on the rocket body, or disconnect the controller on the rocket from the pyrotechnic device or solenoid valve when the rocket cabin is separated. Generally, the pyrotechnic device or solenoid valve needs to be short-circuited during the test. Use The adapter cable connects the interface on the arrow to the ground equipment (such as a timing equivalent device), and then uses a timing tester to test the timing signal on the arrow. There are many preparation steps and the process is cumbersome, which is no longer suitable for the rapid test launch of the launch vehicle. automation needs.
发明内容Contents of the invention
针对现有技术的不足,为简化地面设备、满足运载火箭时序信号(如火工品信号、电磁阀动作信号等)快速测试需要,本发明提出了一种运载火箭箭上时序信号自测试系统。Aiming at the deficiencies of the prior art, in order to simplify the ground equipment and meet the needs of rapid testing of the launch vehicle timing signals (such as pyrotechnics signals, solenoid valve action signals, etc.), the present invention proposes a self-testing system for the launch vehicle timing signals.
为实现上述目的,本发明提供的技术方案如下:In order to achieve the above object, the technical scheme provided by the invention is as follows:
一种运载火箭箭上时序信号自测试系统,所述系统集成于火箭箭体上,包括电源模块、控制器,还包括改进管制机构以及时序测试仪;A timing signal self-test system on a carrier rocket, said system is integrated on the rocket body, including a power supply module, a controller, an improved control mechanism and a timing tester;
所述电源模块为所述箭上时序自测试系统的其它设备供电;The power supply module supplies power to other devices of the Arrow Sequence Self-Test System;
所述控制器,包括第一通讯模块、第一主控模块、和时序信号输出模块,所述第一通讯模块接收火箭通信总线传送来的命令后发送给所述第一主控模块,所述第一主控模块将接收的命令进行解析,并控制时序信号输出模块输出时序信号;The controller includes a first communication module, a first main control module, and a timing signal output module, and the first communication module sends the command transmitted from the rocket communication bus to the first main control module. The first main control module parses the received command, and controls the timing signal output module to output the timing signal;
所述改进管制机构包括多路管制通道,所述每一路管制通道可以在测试状态或者非测试状态之间切换,使得所述改进管制机构对应测试状态或者非测试状态;The improved control mechanism includes multiple control channels, and each control channel can be switched between a test state or a non-test state, so that the improved control mechanism corresponds to a test state or a non-test state;
所述时序测试仪在所述改进管制机构对应测试状态时对箭上时序进行自测试。The timing tester performs a self-test on the timing on the arrow when the improved control mechanism corresponds to the testing state.
进一步地,所述每一路管制通道在测试状态或者非测试状态之间切换,具体包括Further, each control channel is switched between a test state or a non-test state, specifically including
所述每一路管制通道包括有至少一组接通通道和至少一组短路保护通道,根据对测试状态或者非测试状态的需求,对所述一组接通通道和一组短路保护通道进行切换,从而使得所述改进管制机构对应测试状态或者非测试状态。Each of the control channels includes at least one group of connected channels and at least one group of short-circuit protection channels, and the group of connected channels and one group of short-circuit protection channels are switched according to the requirements of the test state or the non-test state, Thus, the improved regulatory mechanism corresponds to a testing state or a non-testing state.
进一步地,所述一组接通通道和一组短路保护通道进行切换具体包括Further, switching between the group of on-channels and a group of short-circuit protection channels specifically includes
所述每一路管制通道设置有两对(组)可往复运动的插头,所述插头往复运动使其与对应的电路板插座插合或断开,从而实现所述改进管制机构对应测试状态或者非测试状态的切换。Each control channel is provided with two pairs (groups) of reciprocating plugs, and the reciprocating motion of the plugs causes it to be mated or disconnected from the corresponding circuit board socket, so as to realize the corresponding test state or non-contact state of the improved control mechanism. Test state toggle.
进一步地,还包括尾段控制器,所述尾段控制器发出测试(进入测试状态)命令或者非测试(进入非测试状态)命令输入到所述改进管制机构,使得所述改进管制机构对应切换至测试状态或者非测试状态。Further, it also includes a tail section controller, which sends a test (entering the test state) command or a non-test (entering the non-test state) command to the improved control mechanism, so that the improved control mechanism switches correspondingly to test state or non-test state.
进一步地,所述时序测试仪包括隔离电源模块、时序信号输入模块、第二主控模块、和通信模块;Further, the timing tester includes an isolated power supply module, a timing signal input module, a second main control module, and a communication module;
所述隔离电源模块为其它模块提供合适电源;The isolated power module provides suitable power for other modules;
所述第二主控模块包括主控芯片及存储电路等外围电路,所述第二主控模块通过所述通信模块从箭通信总线接收信息,开始采集时序信号或停止采集时序信号;当有时序信号输入时,对输入时序信号进行测量、计算,按照设定参数(包括所检测时序信号的发出时刻和持续时间长度,以及偏差阈值)进行初步判读,将时序信息参数和判读结果按照通信协议编码,通过通信模块发送到火箭通信总线上,最后传回地面;The second main control module includes peripheral circuits such as a main control chip and a storage circuit, and the second main control module receives information from the arrow communication bus through the communication module, and starts to collect timing signals or stops collecting timing signals; when timing When the signal is input, the input timing signal is measured and calculated, and the preliminary interpretation is performed according to the set parameters (including the timing and duration of the detected timing signal, as well as the deviation threshold), and the timing information parameters and interpretation results are coded according to the communication protocol. , sent to the rocket communication bus through the communication module, and finally sent back to the ground;
时序信号输入模块包括光耦,所述光耦起隔离作用,把28V的电压时序信号电压整形变成(3.3V)适合的电压信号,输入至主控芯片;The timing signal input module includes an optocoupler, and the optocoupler plays an isolation role, and the voltage of the 28V voltage timing signal is shaped into a (3.3V) suitable voltage signal, which is input to the main control chip;
所述通信模块受第二主控模块驱动与火箭通信总线通信。The communication module is driven by the second main control module to communicate with the rocket communication bus.
进一步地,所述隔离电源模块包括一路隔离DC/DC电路和多个电压转换电路;输入,隔离DC/DC电路适应9~36V输入,输出的12V电压,可以通过多个电压转换电路转换为其它模块的输入电源,包括主控模块的1.8V、2.5V、3.3V供电及通讯电路的隔离供电。Further, the isolated power supply module includes an isolated DC/DC circuit and multiple voltage conversion circuits; the input, isolated DC/DC circuit is suitable for 9-36V input, and the output voltage of 12V can be converted to other voltages by multiple voltage conversion circuits. The input power supply of the module includes the 1.8V, 2.5V, 3.3V power supply of the main control module and the isolated power supply of the communication circuit.
进一步地,在主控模块上运行的测试仪软件中添加判断逻辑,当所检测参数与设定(计)参数差超过阈值时,会输出警告信息。Further, judgment logic is added to the tester software running on the main control module, and when the difference between the detected parameter and the set (measured) parameter exceeds a threshold, a warning message will be output.
另一方面,本发明提供一种运载火箭箭上时序信号自测试方法,其特征在于利用根据权利要求1-6所述的运载火箭箭上时序信号自测试系统,包括如下步骤:On the other hand, the present invention provides a method for self-testing timing signals on a carrier rocket, which is characterized in that the self-testing system for timing signals on a carrier rocket according to claims 1-6 comprises the following steps:
当火箭进入箭上时序自测试状态流程时,尾段控制器发出时序自测试指令,改进管制机构对火工品电阻回路进行短路保护,将控制器输出和时序测试仪导通,使得时序测试仪可以检测控制器输出,记录时序状态;When the rocket enters the timing self-test state process on the arrow, the tail section controller issues a timing self-test command, and the improved control mechanism performs short-circuit protection on the resistance circuit of the pyrotechnics, and conducts the output of the controller with the timing tester, so that the timing tester It can detect the controller output and record the timing status;
当火箭进入火箭正式发射流程时,尾段控制器发出正式发射即“进入非测试状态”指令,改进管制机构将时序测试仪短路,将控制器输出与火工品或电磁阀接通,此时火工品可以正常发火起爆、电磁阀可以正常打开。When the rocket enters the official launch process of the rocket, the tail section controller sends out the command of "entering the non-test state" for the official launch, and the improved control agency short-circuits the timing tester, and connects the output of the controller to the pyrotechnic device or solenoid valve. At this time The pyrotechnic device can ignite and detonate normally, and the solenoid valve can be opened normally.
本发明所构思的以上技术方案与现有技术相比,能够取得下列有益效果:Compared with the prior art, the above technical solutions conceived by the present invention can achieve the following beneficial effects:
本发明的运载火箭箭上时序信号自测试系统及方法,将时序测试仪集成在运载火箭内部,减少地面测试设备和工艺电缆,简化测试流程,实现时序信号箭上自测试,提高自动化水平。通过改进管制机构,集成火工品短路保护功能和测试仪测试选通功能,在保证安全性、不增加其它箭上设备的情况下满足了箭上自测试的需求;The system and method for self-testing the timing signal on the carrier rocket of the present invention integrates the timing tester inside the carrier rocket, reduces ground testing equipment and process cables, simplifies the test process, realizes the self-testing of the timing signal on the arrow, and improves the automation level. By improving the control mechanism, integrating the short-circuit protection function of pyrotechnics and the test gating function of the tester, it meets the needs of self-testing on the arrow without adding other equipment on the arrow;
时序测试仪的输入采取光耦多通道同步并行输入设计,数量丰富,兼容性、通用性好,同步性高,能同步采集多路信号(例如星箭分离时可以同步采集多路分离信号等),可以作为模块化设备,满足不同型号火箭需求,缩短研制时间和成本。The input of the timing tester adopts the design of optocoupler multi-channel synchronous parallel input, which is rich in quantity, good in compatibility and versatility, and high in synchronization, and can synchronously collect multi-channel signals (for example, when the satellite and arrow are separated, multi-channel separated signals can be collected synchronously, etc.) , can be used as a modular device to meet the needs of different types of rockets and shorten the development time and cost.
附图说明Description of drawings
图1为本发明的系统示意图;Fig. 1 is a schematic diagram of the system of the present invention;
图2为改进管制机构测试状态和正式发射状态示意图;Figure 2 is a schematic diagram of the test status and official launch status of the improved regulatory agency;
图3为每一路管制通道在测试状态或者非测试状态之间切换即设置有两组插合或者断开接通通道结构示意图;Fig. 3 is a schematic diagram of the structure of each control channel switching between the test state or the non-test state, that is, two sets of plug-in or disconnection channels are provided;
图4为时序测试仪结构示意图;FIG. 4 is a schematic structural diagram of a timing tester;
图5为光耦输入检测电路示意图。FIG. 5 is a schematic diagram of an optocoupler input detection circuit.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,均属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
如图1所示,本发明的实施例提供一种运载火箭箭上时序信号自测试系统,系统集成于火箭箭体上,包括电源模块、至少一个控制器,还包括至少一个改进管制机构以及时序测试仪;本实例中火箭包括一级、二级、三级和末级,对应地每一级设置有一个控制器和一个改进管制机构;还包括一级、二级、三级和末级相应的火工品或电磁阀;对时序信号进行测试时,需要对火工品或电磁阀短路,让时序信号经过改进管制机构到达时序测试仪里进行测试;As shown in Figure 1, an embodiment of the present invention provides a self-test system for timing signals on a carrier rocket. The system is integrated on the rocket body, including a power supply module, at least one controller, and at least one improved control mechanism and timing The tester; the rocket in this example includes the first stage, the second stage, the third stage and the last stage, and each stage is equipped with a controller and an improved control mechanism correspondingly; it also includes the first, second stage, third stage and the last stage corresponding pyrotechnics or solenoid valves; when testing timing signals, it is necessary to short-circuit the pyrotechnics or solenoid valves, so that the timing signals can be tested in the timing tester after the improved control mechanism;
电源模块为所述箭上时序自测试系统的其它设备供电;The power supply module supplies power to other devices of the on-arrow timing self-test system;
所述电源模块利用火箭原有的电源系统,本就可以为电气设备和火工品提供能源,只是增加箭上时序自测试系统中新增设备供电功能,例如时序测试仪、改进管制机构等。The power supply module uses the original power supply system of the rocket, which can provide energy for electrical equipment and pyrotechnics. It only adds power supply functions for new equipment in the timing self-test system on the rocket, such as timing testers and improved control agencies.
控制器,包括第一通讯模块、第一主控模块、和时序信号输出模块,所述第一通讯模块接收火箭通信总线传送来的信息后发送给所述第一主控模块,所述第一主控模块将接收的信息编译成时序信号,并控制时序信号输出模块输出时序信号。在测试状态下,该输出时序信号通过改进管制机构或者进入到时序测试仪,完成时序信号的测试;在非测试状态下,该输出时序信号通过改进管制机构或者进入到火工品使火工品点火、或者进入到电磁阀使电磁阀动作;控制器在箭上有多个,一般采用就近控制的原则设置在各个级的舱段里;控制器的时序信号输出模块,它就会在设定的时间点,发出点火信号、电磁阀作动信号,或者分离信号。The controller includes a first communication module, a first main control module, and a timing signal output module. The first communication module sends the information transmitted from the rocket communication bus to the first main control module. The first The main control module compiles the received information into a timing signal, and controls the timing signal output module to output the timing signal. In the test state, the output timing signal passes through the improved control mechanism or enters the timing tester to complete the test of the timing signal; in the non-test state, the output timing signal passes through the improved control mechanism or enters the explosive device to make the explosive Ignite, or enter the solenoid valve to make the solenoid valve act; there are multiple controllers on the arrow, and generally adopt the principle of nearby control to be set in the compartments of each level; the timing signal output module of the controller, it will be in the setting At the time point, the ignition signal, the solenoid valve actuation signal, or the separation signal are sent.
改进管制机构设置在控制器和火工品之间,时序信号沿着控制器、改进管制机构和火工品的顺序传递。如图2所示,改进管制机构包括多路管制通道,所述每一路管制通道可以在测试状态或者非测试状态之间切换,使得所述改进管制机构对应测试状态或者非测试状态;本实例中非测试状态是指火箭正式发射状态;有多个改进管制机构,如图1所示有四个改进管制机构;改进管制机构里面通道有多个,因此多个电磁阀或者火工品时序可以使用同一个改进管制机构,改进管制机构在火箭上的布置以尽可能避免或减轻对时序信号电缆的影响为原则,要求时序信号全部经过改进管制机构,一般情况下改进管制机构布置在原有时序信号电缆的路径上即可。本实例中的改进管制机构是在专利CN201010231660基础上改进而来,该专利的火工品管制装置包括盒体、电机组件、电路板组件、导向杆和外部连接器,所述电机组件、电路板组件和导向杆容置于所述盒体中,所述电机组件包括电机减速机构、固定夹、插头固定板和两个插头,所述固定夹将电机减速机构固定在插头固定板上,两个插头对称于固定夹安装在插头固定板上;所述电路板组件包括电路板、微动开关和两个插座,所述电路板固定在盒体底面,两个插座对称于所述固定夹分别焊接在电路板两侧上,各自与同侧的插头对应;所述外部连接器通过电路板与两个插座电连接;工作时,电机减速机构带动整个电机组件在导向杆的导向下往复运动,使所述两个插头分别与各自对应的插座插合,从而使火工品控制线路的状态在接通和断开之间变化,实现对火工品控制线路中信号的管制;为方便描述,称该专利中每一路管制通道实现两个插头分别与各自对应的插座插合或者断开的结构为一组插合或者断开接通通道结构。本实例的改进管制机构的每一路管制通道在测试状态或者非测试状态之间切换,即设置有两组插合或者断开接通通道结构,其中一组使火工品控制线路的状态在接通和断开之间变化,另一组使时序测试仪控制线路的状态在接通和断开之间变化;具体实现方法包括:每一路管制通道包括有至少一组接通通道和至少一组短路保护通道,根据对测试状态或者非测试状态的需求,对一组接通通道和一组短路保护通道进行切换,从而使得所述改进管制机构对应测试状态或者非测试状态(即火箭正式发射状态)。一组接通通道和一组短路保护通道进行切换具体实现方法包括:每一路管制通道设置有两组可往复运动的插头,所述插头往复运动使其与对应的电路板插座插合或断开,从而实现所述改进管制机构对应测试状态或者非测试状态的切换,如图3所示,图中圆圈代表插针,半圆弧代表插座,两者合在一起(同圆心状态-虚线框里的状态)即为接通状态,否则为断开状态。切换到测试状态后,火工品短路,时序测试仪接通接通通道,使时序测试仪可以检测控制器输出的时序信号,并记录时序信号,完成时序信号自动测试。切换到正式发射状态后,时序测试仪短路,使火工品或电磁阀可以接收控制器输出的发射信号,完成火工品点火或者电磁阀开闭动作。相应地电机组件、电路板组件、导向杆等结构也要跟两组可往复运动的插头以及两组插座匹配,是现有技术,在此不再赘述。The improved control mechanism is arranged between the controller and the pyrotechnics, and the timing signal is transmitted along the order of the controller, the improved control mechanism and the pyrotechnics. As shown in Figure 2, the improved control mechanism includes multiple control channels, and each control channel can be switched between a test state or a non-test state, so that the improved control mechanism corresponds to a test state or a non-test state; in this example The non-test state refers to the official launch state of the rocket; there are multiple improved control agencies, as shown in Figure 1, there are four improved control agencies; there are multiple channels in the improved control agency, so multiple solenoid valves or pyrotechnic timing can be used The same improved control mechanism, the principle of improving the arrangement of the control mechanism on the rocket is to avoid or reduce the impact on the timing signal cable as much as possible. It is required that all the timing signals pass through the improved control mechanism. Generally, the improved control mechanism is arranged on the original timing signal cable. on the path. The improved control mechanism in this example is improved on the basis of patent CN201010231660. The pyrotechnics control device of this patent includes a box body, a motor assembly, a circuit board assembly, a guide rod and an external connector. The motor assembly, circuit board Components and guide rods are accommodated in the box, the motor assembly includes a motor reduction mechanism, a fixing clip, a plug fixing plate and two plugs, the fixing clip fixes the motor reducing mechanism on the plug fixing plate, and the two The plug is installed on the plug fixing plate symmetrically to the fixing clip; the circuit board assembly includes a circuit board, a micro switch and two sockets, the circuit board is fixed on the bottom surface of the box body, and the two sockets are respectively welded symmetrically to the fixing clip On both sides of the circuit board, each corresponds to the plug on the same side; the external connector is electrically connected to the two sockets through the circuit board; when working, the motor reduction mechanism drives the entire motor assembly to reciprocate under the guidance of the guide rod, so that The two plugs are respectively mated with their corresponding sockets, so that the state of the pyrotechnic control circuit is changed between on and off, and the control of the signal in the pyrotechnic control circuit is realized; for the convenience of description, it is called In this patent, each control channel realizes that two plugs are respectively mated or disconnected with their corresponding sockets, which is a group of mated or disconnected channel structures. Each control channel of the improved control mechanism of this example is switched between the test state or the non-test state, that is, there are two sets of plug-in or disconnection channel structures, one of which makes the state of the pyrotechnics control circuit in the connection state. The other group makes the state of the sequence tester control line change between on and off; the specific implementation method includes: each control channel includes at least one group of on-channels and at least one group of The short-circuit protection channel, according to the requirements of the test state or the non-test state, switches a group of connection channels and a group of short-circuit protection channels, so that the improved control mechanism corresponds to the test state or the non-test state (that is, the official launch state of the rocket) ). The specific implementation method for switching between a group of connection channels and a group of short-circuit protection channels includes: each control channel is provided with two sets of reciprocating plugs, and the reciprocating motion of the plugs makes it mated with or disconnected from the corresponding circuit board socket , so as to realize the switching of the corresponding test state or non-test state of the improved control mechanism, as shown in Figure 3, the circle in the figure represents the pin, and the semi-circular arc represents the socket, and the two are combined (same center state-in the dotted line frame state) is the on state, otherwise it is the off state. After switching to the test state, the pyrotechnic product is short-circuited, and the timing tester is connected to the channel, so that the timing tester can detect the timing signal output by the controller and record the timing signal to complete the automatic test of the timing signal. After switching to the official launch state, the timing tester is short-circuited, so that the pyrotechnic device or solenoid valve can receive the launch signal output by the controller, and complete the ignition of the pyrotechnic device or the opening and closing of the solenoid valve. Correspondingly, structures such as motor components, circuit board components, and guide rods also need to be matched with two sets of reciprocating plugs and two sets of sockets, which are prior art and will not be repeated here.
时序测试仪在改进管制机构对应测试状态时,接收控制器发送过来的时序信号,对箭上时序信号进行自测试。The timing tester receives the timing signal sent by the controller and self-tests the timing signal on the arrow when improving the corresponding test state of the control agency.
如图4所示,时序测试仪作为一种模块化的通用设备,包括隔离电源模块、时序信号输入模块、第二主控模块、和通信模块;隔离电源模块包括一路隔离DC/DC电路和多个电压转换电路,其中隔离DC/DC电路适应9~36V输入(为外部供电),输出12V;输出的12V电源通过多个电压转换电路为其它模块供电,例如为主控模块提供1.8V、2.5V、3.3V供电及通讯电路的隔离供电。第二主控模块包括主控芯片及存储电路等外围电路,第二主控模块通过通信模块从箭通信总线接收命令,按照设定逻辑,例如时序:一级点火、一级分离,二级点火、二级分离,三级点火、三级分离,末级点火、末级分离等,开始或停止采集时序信号;当时序信号输入时,对采集到的时序信号进行测量、计算,与设定的时序时刻和持续时间长度进行比较,初步判断误差是否超过设定阈值,将时序参数信息和判读结果按照通信协议编码,通过通信模块发送到火箭通信总线上,传回地面控制系统。时序信号输入模块包括光耦,所述光耦起隔离作用,把28V的电压时序信号电压整形变成适合的电压信号给到主控芯片,视主控芯片参数而定,本实例中为3.3V;如图5所示,为光耦输入检测电路。光耦本身具有隔离功能,无需隔离电源供电,可以大幅简化电子元器件数量和种类;光耦输出信号只取决于前置电路是否有电流流过,在输入端悬空时不会产生不确定信号,可以有效适应输入端悬空或者输入端电平差为低电平的情况、适应信号输出电路正端控制、负端控制和两端控制等情况;光耦间输入端可以相互隔离,能够有效适应输入信号共正极或者输入信号共负极的情况。As shown in Figure 4, the timing tester is a modular general-purpose device, including an isolated power supply module, a timing signal input module, a second main control module, and a communication module; the isolated power supply module includes an isolated DC/DC circuit and multiple A voltage conversion circuit, in which the isolated DC/DC circuit adapts to 9~36V input (for external power supply), and outputs 12V; the output 12V power supplies power to other modules through multiple voltage conversion circuits, for example, the main control module provides 1.8V, 2.5 V, 3.3V power supply and isolated power supply for communication circuits. The second main control module includes peripheral circuits such as the main control chip and storage circuit. The second main control module receives commands from the Arrow communication bus through the communication module, according to the set logic, such as timing: primary ignition, primary separation, secondary ignition , two-stage separation, three-stage ignition, three-stage separation, final stage ignition, final stage separation, etc., start or stop collecting timing signals; when timing signals are input, measure and calculate the collected timing signals, and The timing moment is compared with the duration length to preliminarily judge whether the error exceeds the set threshold, and the timing parameter information and interpretation results are encoded according to the communication protocol, sent to the rocket communication bus through the communication module, and then transmitted back to the ground control system. The timing signal input module includes an optocoupler. The optocoupler plays an isolation role and transforms the voltage of the 28V timing signal into a suitable voltage signal and sends it to the main control chip. It depends on the parameters of the main control chip. In this example, it is 3.3V. ; As shown in Figure 5, it is an optocoupler input detection circuit. The optocoupler itself has an isolation function and does not need an isolated power supply, which can greatly simplify the number and types of electronic components; the output signal of the optocoupler only depends on whether there is current flowing through the pre-circuit, and no uncertain signal will be generated when the input terminal is suspended. It can effectively adapt to the situation where the input terminal is suspended or the level difference of the input terminal is low level, and it can adapt to the situation of positive terminal control, negative terminal control and two-terminal control of the signal output circuit; the input terminals between optocouplers can be isolated from each other, which can effectively adapt to the input The signal common positive or the input signal common negative.
通信模块受第二主控模块驱动与火箭通信总线通信。The communication module is driven by the second main control module to communicate with the rocket communication bus.
例如当时序的实际发出时刻与预设的发出时刻时间差超过阈值1s,或者当时序实际保持时间长度的与预设保持时间长度相差超过阈值1s时,判定时序出错,输出报警信息;原地面测试方案没有装订此判断逻辑,只能进行人工判读。For example, when the time difference between the actual sending time of the time sequence and the preset sending time exceeds the threshold 1s, or when the difference between the actual holding time of the time sequence and the preset holding time exceeds the threshold 1s, it is judged that the time sequence is wrong and an alarm message is output; the original ground test scheme Without binding this judgment logic, only manual interpretation can be performed.
作为一个实例,本发明的系统还包括尾段控制器,尾段控制器发出测试信号或者非测试信号给到所述改进管制机构,使得所述改进管制机构对应测试状态或者非测试状态。实例中非测试信号为火箭正式发射信号。As an example, the system of the present invention further includes a tail section controller, which sends a test signal or a non-test signal to the improved control mechanism, so that the improved control mechanism corresponds to the test state or the non-test state. In the example, the non-test signal is the official launch signal of the rocket.
另一方面,本发明提供一种运载火箭箭上时序信号自测试方法,利用根据前述的运载火箭箭上时序信号自测试系统,包括如下步骤:On the other hand, the present invention provides a method for self-testing timing signals on a carrier rocket, using the aforementioned self-testing system for timing signals on a carrier rocket, comprising the following steps:
当火箭进入箭上时序自测试流程时,尾段控制器发出时序自测试指令,对火工品电阻回路进行短路保护,将控制器输出和时序测试仪导通,使得时序测试仪可以检测控制器输出,记录时序状态;When the rocket enters the timing self-test process on the rocket, the tail section controller issues a timing self-test command to short-circuit the resistance circuit of the pyrotechnics, and conducts the controller output with the timing tester, so that the timing tester can test the controller Output, record timing status;
当火箭进入火箭正式发射流程时,尾段控制器发出正式发射即非测试信号指令,将时序测试仪短路,将控制器输出与火工品或电磁阀接通,此时火工品可以正常发火起爆、电磁阀可以正常打开。When the rocket enters the official launch process of the rocket, the tail section controller sends out a formal launch, that is, a non-test signal command, short-circuits the timing tester, and connects the output of the controller to the pyrotechnic device or solenoid valve. At this time, the pyrotechnic device can ignite normally. Detonation, solenoid valve can be opened normally.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211643604.9A CN116222323B (en) | 2022-12-20 | 2022-12-20 | A timing signal self-test system on a launch vehicle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211643604.9A CN116222323B (en) | 2022-12-20 | 2022-12-20 | A timing signal self-test system on a launch vehicle |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116222323A true CN116222323A (en) | 2023-06-06 |
CN116222323B CN116222323B (en) | 2025-02-11 |
Family
ID=86583308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211643604.9A Active CN116222323B (en) | 2022-12-20 | 2022-12-20 | A timing signal self-test system on a launch vehicle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116222323B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116608741A (en) * | 2023-07-20 | 2023-08-18 | 东方空间技术(山东)有限公司 | Initiating explosive device time sequence testing system, method and equipment of rocket |
CN116989621A (en) * | 2023-08-01 | 2023-11-03 | 东方空间技术(山东)有限公司 | Carrier rocket separation test system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5872460A (en) * | 1996-10-04 | 1999-02-16 | Delco Electronics Corp. | Fast acting FET test circuit with current detection for SIR diagnostics |
CN207096392U (en) * | 2017-07-28 | 2018-03-13 | 湖北三江航天红峰控制有限公司 | Unit ignition circuit test circuit on a kind of bullet |
CN110618393A (en) * | 2019-09-21 | 2019-12-27 | 西安航天动力测控技术研究所 | Special tester for high-voltage ignition power supply of solid rocket engine |
JP2022100453A (en) * | 2020-12-24 | 2022-07-06 | 株式会社不二越 | Backup device and control system |
-
2022
- 2022-12-20 CN CN202211643604.9A patent/CN116222323B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5872460A (en) * | 1996-10-04 | 1999-02-16 | Delco Electronics Corp. | Fast acting FET test circuit with current detection for SIR diagnostics |
CN207096392U (en) * | 2017-07-28 | 2018-03-13 | 湖北三江航天红峰控制有限公司 | Unit ignition circuit test circuit on a kind of bullet |
CN110618393A (en) * | 2019-09-21 | 2019-12-27 | 西安航天动力测控技术研究所 | Special tester for high-voltage ignition power supply of solid rocket engine |
JP2022100453A (en) * | 2020-12-24 | 2022-07-06 | 株式会社不二越 | Backup device and control system |
Non-Patent Citations (1)
Title |
---|
朱轶龙;孙浩;白蕾;王艳艳;吕倩;: "火箭橇试验地面点火控制系统", 兵工自动化, no. 09, 9 September 2020 (2020-09-09) * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116608741A (en) * | 2023-07-20 | 2023-08-18 | 东方空间技术(山东)有限公司 | Initiating explosive device time sequence testing system, method and equipment of rocket |
CN116608741B (en) * | 2023-07-20 | 2023-10-03 | 东方空间技术(山东)有限公司 | Initiating explosive device time sequence testing system, method and equipment of rocket |
CN116989621A (en) * | 2023-08-01 | 2023-11-03 | 东方空间技术(山东)有限公司 | Carrier rocket separation test system and method |
CN116989621B (en) * | 2023-08-01 | 2024-05-07 | 东方空间技术(山东)有限公司 | A launch vehicle separation test system and method |
Also Published As
Publication number | Publication date |
---|---|
CN116222323B (en) | 2025-02-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN116222323A (en) | A timing signal self-test system on launch vehicle | |
CN104184193B (en) | Charging pile control guide and plug detection logic circuit and test device thereof | |
CN103217920B (en) | Initiating explosive device short-circuit protection circuit for measure-control device | |
CN111392071B (en) | Initiating explosive device detonation control system and testing method thereof | |
CN201584821U (en) | Controlled circuit of negative bus of power supply of priming system | |
CN106291427A (en) | Battery management system BMS fault self-diagnosis function test platform and method of testing | |
CN112165141B (en) | Carrier rocket digital power supply and distribution control system and test method thereof | |
WO2020181656A1 (en) | Building-block type electric automobile direct-current charging facility detection device | |
Rumale et al. | Design and implementation of an on-board vehicle CHAdeMO interface for Vehicle-to-Grid applications | |
CN115200424B (en) | Ground equivalent separation testing device and testing method for carrier rocket | |
CN112803509A (en) | Battery monomer management controller and battery management system | |
CN105471083A (en) | Safety switching device and method of power battery and battery simulator | |
CN115930695A (en) | Carrier rocket integrated controller | |
CN203881894U (en) | Elevator traveling electric cable detection apparatus | |
CN102610133B (en) | Training system and control method for operating skills in debugging of pantograph of high-speed motor train unit | |
CN112327085A (en) | Method for verifying initiating explosive device access | |
CN111964542A (en) | Initiating explosive device detonation circuit, stratospheric airship and nondestructive testing method | |
CN110988620A (en) | Line calibration and insulation and voltage resistance test integrated device | |
CN110077271A (en) | Communication unit for vehicle | |
CN113341301B (en) | Single board signal change timing detection device and method | |
CN212458149U (en) | Initiating explosive device detonation circuit and stratospheric airship | |
CN212722990U (en) | Detection switching device for power distribution terminal | |
CN110971109B (en) | Drive control module, circuit detection and control method | |
CN111751716B (en) | Circuit breaker test equipment | |
CN109578147B (en) | Ignition device capable of automatically repairing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |