CN116201101A - Construction method of ultra-long plain soil compaction pile in collapsible loess area with low water content - Google Patents

Construction method of ultra-long plain soil compaction pile in collapsible loess area with low water content Download PDF

Info

Publication number
CN116201101A
CN116201101A CN202310174277.5A CN202310174277A CN116201101A CN 116201101 A CN116201101 A CN 116201101A CN 202310174277 A CN202310174277 A CN 202310174277A CN 116201101 A CN116201101 A CN 116201101A
Authority
CN
China
Prior art keywords
pile
water injection
ultra
water content
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310174277.5A
Other languages
Chinese (zh)
Inventor
张智忠
钟晋
李林
徐大文
赵鹏飞
李秀虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202310174277.5A priority Critical patent/CN116201101A/en
Publication of CN116201101A publication Critical patent/CN116201101A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a construction method of an ultra-long soil compaction pile in a collapsible loess area with low water content, which comprises the steps of construction preparation, leveling of the field, measurement paying-off, equipment assembly in place, hole introduction of water injection holes, hole forming, sand filling, water injection, water content detection, compaction pile construction, detection and the like, wherein a short rod long spiral short rod hole introduction and motor driving are adopted, secondary hole forming is carried out by using a pile sinking pipe with a corresponding length, a diesel hammer is used for ramming and sinking, and the water injection pile sinking pipe extension is connected in an ultra-long pile sinking pipe extension mode; the method solves the problems of how to ensure the quality and the quality to moisten the foundation and the compaction pile construction under the condition of low water content of geology when the foundation treatment adopts a plain soil compaction pile scheme in construction in the ultra-thick collapsible loess area, and particularly solves the problem that the conventional equipment and technology can not treat.

Description

Construction method of ultra-long plain soil compaction pile in collapsible loess area with low water content
Technical Field
The invention relates to the technical field of house building foundation treatment, in particular to a construction method of a super-long plain soil compaction pile in a collapsible loess area with low water content.
Background
In order to effectively control the construction cost of low-rise and multi-storey building foundation engineering, in particular to avoid the design scheme of ultra-long pile foundation engineering, so as to control the investment ratio of the foundation and the main body, the foundation is selectively treated in the low-rise building design of collapsible loess areas in recent years, and in particular, a plain soil compaction pile treatment process is selected. However, the conventional compaction pile has a treatment depth of 15m or less, and construction equipment and technology for treating compaction piles with lengths of 25m or more in loess areas with super thickness are fewer in China.
Disclosure of Invention
The invention aims to provide a construction method of an ultra-long soil compaction pile in a collapsible loess area with low water content, which is used for solving the problems that when the construction is performed in the collapsible loess area with ultra-thick, the foundation is humidified and the compaction pile is constructed by maintaining the quality and guaranteeing the quality under the condition of low water content when the foundation treatment adopts an plain soil compaction pile scheme, and particularly solving the problem that conventional equipment and technology cannot be used for treatment.
In order to achieve the above purpose, the present invention provides the following technical solutions:
a construction method of a collapsible loess region ultra-long plain soil compaction pile with low water content comprises the following steps:
s1: and (3) preparation of construction: planning the planar arrangement of a construction site, including equipment assembly, material stacking, oil storage, earthwork storage, temporary line arrangement;
s2: leveling a field: leveling the site according to the elevation and the range of the designed pile top, and leveling all the areas with the height difference according to the highest elevation;
s3: and (3) measuring and paying off: setting one or more control points according to the range and the arrangement shape of the compaction piles, discharging pile positions through the control points, arranging according to isosceles triangles, and marking;
s4: the equipment is assembled in place: assembling a water injection and pipe sinking pile machine;
s5: leading and forming water injection holes: the arrangement position of the water injection holes is the same as the position of the compaction pile, and holes are continuously formed;
s6: sand filling and water injection: immediately pouring gravel with the particle size of 10-30 mm and the mud content of less than 5% into the hole when the hole forming is completed by 100 square meters; then, an artificial spade is utilized to scoop soil or a machine is used for piling up a soil ridge with the height of about 30 cm;
s7: and (3) water content detection: after 15 days of dissipation, the foundation soil water content after water injection is detected, compaction pile construction is carried out after the optimal water content is reached, and if not, water injection is continued;
s8: and (3) compaction pile construction: sequentially forming holes, tamping Kong Nasu soil, and surviving four times;
s9: and (3) detection: and detecting the compactness of piles and pile bodies, and judging whether the bearing capacity of the foundation meets the design requirement.
Furthermore, in the step S1, enough technical and quality post management staff are specifically provided according to engineering requirements, the design drawings are familiar, equipment and materials required by construction are prepared, on-site operators are provided according to progress requirements, and detailed technical engagement and training are performed.
Furthermore, in S2, leveling is performed according to the highest pile top elevation to prevent the high elevation site from cracking and sinking during the construction of the compaction pile at the bottom elevation, and the compaction pile at the height difference is poor in construction quality and difficult in pile foundation station.
And in the step S5, a short rod long spiral short rod guiding hole is adopted, the guiding hole depth is 12m, a motor is adopted to drive, a pile sinking pipe with a corresponding length is used for secondary hole forming, a diesel hammer is used for ramming and sinking, and the water injection pile sinking pipe extension is connected in an ultra-long pile sinking pipe extension mode.
Still further, the gravel should be filled to the ports and stacked in a cone at the water injection hole ports in S6.
Furthermore, the single-hole water injection quantity in S6 is calculated according to soil layer thickness, water injection area and optimal water content parameters, a water meter is arranged in the middle of a water injection pipeline before water injection, water injection time and water injection quantity of each unit cell are recorded, and 20cm water head flood irrigation type water immersion is maintained.
Furthermore, in S8, an ultra-long pile sinking pipe is adopted for section-by-section extension, so that the hole forming of the ultra-long compaction pile is realized, the filling is carried out when the filling in the hole reaches the optimal water content, and each filling amount, the number of times of tamping and the tamping lifting height are determined through experiments according to the weight of the tamping hammer.
Compared with the prior art, the invention has the beneficial effects that:
the invention provides a construction method of an ultra-long soil compaction pile in a collapsible loess area with low water content, which comprises the steps of construction preparation, leveling of a field, measurement paying-off, equipment assembly in place, hole introduction of water injection holes, hole forming, sand filling, water injection, water content detection, compaction pile construction, detection and the like, and solves the problems of how to guarantee the quality and guarantee the humidification of a foundation under the condition of low water content when the foundation treatment adopts an ultra-long soil compaction pile scheme in the collapsible loess area with the ultra-thick soil, and particularly solves the depth problem that conventional equipment and technology cannot handle.
Drawings
FIG. 1 is a flow chart of the construction process of the present invention;
FIG. 2 is a water injection hole forming sequence diagram of the present invention;
FIG. 3 is a pile forming sequence diagram of the compaction pile of the present invention;
fig. 4 is a water injection driving circuit diagram of the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1, the embodiment of the invention provides a construction method of an ultra-long plain soil compaction pile in a collapsible loess area with low water content, which comprises the following steps:
step one: and (3) preparation of construction: and (3) providing enough technical and quality post management staff according to engineering requirements, familiarizing design drawings, preparing equipment and materials required by construction and other works, providing on-site operators according to the requirements of progress and the like, planning and carrying out detailed technical engagement and training. The planning of the planar arrangement of the construction site comprises equipment assembly, material stacking, oil storage, earthwork storage, temporary line arrangement and the like.
Step two: leveling a field: the method comprises the steps of flattening the site according to the designed pile top elevation and the range, flattening all areas with height differences according to the highest elevation, and processing according to the highest pile top elevation.
Step three: and (3) measuring and paying off: and setting one or more control points according to the range and the arrangement shape of the compaction piles, discharging pile positions through the control points, arranging according to isosceles triangles, and marking.
Step four: the equipment is assembled in place: water injection (immersed tube, long spiral), immersed tube pile machine, etc.
Step five: leading and forming water injection holes: the water injection holes are arranged at the same compaction pile position, holes are continuously formed, the water injection holes are formed according to the sequence shown in the figure 2, the depth of the conventional foundation humidification water injection holes is less than or equal to 15m, the diameter of the water injection holes is 150-200 mm, the depth of the holes is 1m shorter than the length of the piles, the holes can be formed at one time, if the conventional construction process is adopted, pile sinking pipes are required to be welded and lengthened, so that the pile sinking pipes shake, bending deformation, frequent deviation of a hammer seat and the like are caused.
Step six: sand filling and water injection: when the pore-forming is completed by 100 square meters, gravel with the particle size of 10mm-30mm and the mud content of less than 5% is immediately poured into the pores, the gravel is filled into the pore openings and piled into a cone shape at the pore openings of the water injection pores, and then the artificial spade is utilized to shoveling soil or mechanically piling up soil ridges with the height of about 30cm, so that the water blocking effect is realized.
The single-hole water injection quantity is calculated according to parameters such as soil layer thickness, water injection area, optimal water content and the like. Before water injection, a water meter is arranged in the middle of a water injection pipeline, the water injection time and the water injection quantity of each unit cell are recorded, and a water head of 20cm is required to be maintained for flood irrigation type water immersion. The cofferdam ridge and water injection mode is carried out according to figure 4.
Step seven: and (3) water content detection: after 15 days of dissipation, the foundation soil water content after water injection is detected, compaction pile construction is carried out after the optimal water content is reached, and otherwise water injection is continued.
Step eight: and (3) compaction pile construction: and (3) sequentially forming holes according to the figure 3, tamping Kong Nasu soil, and surviving four times. When the depth of the pile hole of the compaction pile exceeds 25m, the pile sinking pipe is too long, and the conventional mechanical support frame is not enough in height, so that the ultra-long pile sinking pipe invented by the company is lengthened section by section, and the hole forming of the ultra-long compaction pile is realized. And (3) filling when the optimal water content of the filler in the hole is reached, and performing test determination on the filling quantity, the ramming times and the ramming lifting height of each time according to the weight of the rammer.
Step nine: and (3) detection: and detecting the compactness of piles and pile bodies, and judging whether the bearing capacity of the foundation meets the design requirement.
To sum up: the invention provides a construction method of an ultralong soil compaction pile in a collapsible loess area with low water content, which comprises the steps of construction preparation, leveling of the field, measurement paying-off, equipment assembly in place, hole introduction of water injection holes, hole forming, sand filling, water injection, water content detection, compaction pile construction, detection and the like, wherein short-rod long-spiral short-rod hole introduction is adopted, and a motor is adopted to drive the compaction pile, secondary hole forming is carried out by using a pile sinking pipe with corresponding length, the compaction is carried out by using a diesel hammer, and the extension of the water injection pile sinking pipe is connected in an ultralong pile sinking pipe extension mode; the method solves the problems of how to ensure the quality and the quality to moisten the foundation under the condition of low water content of geology and the construction of the compaction pile when the foundation treatment adopts a plain soil compaction pile scheme in the construction of the ultra-thick collapsible loess area, and particularly solves the depth problem that the conventional equipment and technology can not treat.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should be covered by the protection scope of the present invention by making equivalents and modifications to the technical solution and the inventive concept thereof.

Claims (7)

1. The construction method of the ultra-long plain soil compaction pile in the collapsible loess area with low water content is characterized by comprising the following steps:
s1: and (3) preparation of construction: planning the planar arrangement of a construction site, including equipment assembly, material stacking, oil storage, earthwork storage, temporary line arrangement;
s2: leveling a field: leveling the site according to the elevation and the range of the designed pile top, and leveling all the areas with the height difference according to the highest elevation;
s3: and (3) measuring and paying off: setting one or more control points according to the range and the arrangement shape of the compaction piles, discharging pile positions through the control points, arranging according to isosceles triangles, and marking;
s4: the equipment is assembled in place: assembling a water injection and pipe sinking pile machine;
s5: leading and forming water injection holes: the arrangement position of the water injection holes is the same as the position of the compaction pile, and holes are continuously formed;
s6: sand filling and water injection: immediately pouring gravel with the particle size of 10-30 mm and the mud content of less than 5% into the hole when the hole forming is completed by 100 square meters; then, an artificial spade is utilized to scoop soil or a machine is used for piling up a soil ridge with the height of about 30 cm;
s7: and (3) water content detection: after 15 days of dissipation, the foundation soil water content after water injection is detected, compaction pile construction is carried out after the optimal water content is reached, and if not, water injection is continued;
s8: and (3) compaction pile construction: sequentially forming holes, tamping Kong Nasu soil, and surviving four times;
s9: and (3) detection: and detecting the compactness of piles and pile bodies, and judging whether the bearing capacity of the foundation meets the design requirement.
2. The construction method of the ultra-long plain soil compaction pile in the collapsible loess area with low water content as set forth in claim 1, wherein the construction method comprises the following steps: and S1, specific staff for managing the technical and quality posts are equipped according to engineering requirements, familiarity is carried out on design drawings, equipment and materials required by construction are prepared, on-site operators are equipped according to progress requirements, and detailed technical engagement and training are carried out.
3. The construction method of the ultra-long plain soil compaction pile in the collapsible loess area with low water content as set forth in claim 1, wherein the construction method comprises the following steps: and S2, leveling according to the highest pile top elevation is used for preventing the site at the high elevation from cracking and sinking when the compaction pile at the bottom elevation is constructed, and the compaction pile at the high-low elevation has poor construction quality and difficult pile foundation station.
4. The construction method of the ultra-long plain soil compaction pile in the collapsible loess area with low water content as set forth in claim 1, wherein the construction method comprises the following steps: s5, adopting a short rod long spiral short rod hole, leading the hole to have a depth of 12m, adopting a motor to drive, then using a pile sinking pipe with a corresponding length to secondarily hole, using a diesel hammer to ram and sink, and connecting the water injection pile sinking pipe according to an ultra-long pile sinking pipe lengthening mode.
5. The construction method of ultra-long soil compaction pile for collapsible loess areas with low water content as set forth in claim 1, wherein the gravel is filled up to the hole and piled up in a cone shape in the water injection hole in S6.
6. The construction method of the ultra-long soil compaction pile in the collapsible loess area with low water content as set forth in claim 1, wherein the single-hole water injection quantity in the S6 is calculated according to soil layer thickness, water injection area and optimal water content parameters, a water meter is arranged in the middle of a water injection pipeline before water injection, water injection time and water injection quantity of each unit cell are recorded, and water head flood irrigation type immersion of 20cm is maintained.
7. The construction method of the ultra-long soil compaction pile in the collapsible loess area with low water content as set forth in claim 1, wherein in the step S8, an ultra-long pile sinking pipe is adopted for carrying out section-by-section extension, so that the hole forming of the ultra-long compaction pile is realized, the filling is carried out when the filling in the hole reaches the optimal water content, and each filling amount, the number of times of tamping and the tamping lifting height are determined according to the weight of the tamping.
CN202310174277.5A 2023-02-28 2023-02-28 Construction method of ultra-long plain soil compaction pile in collapsible loess area with low water content Pending CN116201101A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310174277.5A CN116201101A (en) 2023-02-28 2023-02-28 Construction method of ultra-long plain soil compaction pile in collapsible loess area with low water content

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310174277.5A CN116201101A (en) 2023-02-28 2023-02-28 Construction method of ultra-long plain soil compaction pile in collapsible loess area with low water content

Publications (1)

Publication Number Publication Date
CN116201101A true CN116201101A (en) 2023-06-02

Family

ID=86518831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310174277.5A Pending CN116201101A (en) 2023-02-28 2023-02-28 Construction method of ultra-long plain soil compaction pile in collapsible loess area with low water content

Country Status (1)

Country Link
CN (1) CN116201101A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117589632A (en) * 2024-01-18 2024-02-23 山西金宝岛基础工程有限公司 Method for testing water content in foundation water injection humidifying process through dynamic compaction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522191A (en) * 2016-10-28 2017-03-22 青海送变电工程公司 Transformer substation foundation treatment method and application thereof
CN107905212A (en) * 2017-09-27 2018-04-13 中铁三局集团有限公司 A kind of construction method of original position water filling element earth pile composite foundation
CN113832950A (en) * 2021-08-19 2021-12-24 中电建十一局工程有限公司 Construction method of plain soil compaction pile
CN217460530U (en) * 2022-04-12 2022-09-20 甘肃省建设监理有限责任公司 Pile forming guide pipe for lengthening assembled ultra-long compaction pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522191A (en) * 2016-10-28 2017-03-22 青海送变电工程公司 Transformer substation foundation treatment method and application thereof
CN107905212A (en) * 2017-09-27 2018-04-13 中铁三局集团有限公司 A kind of construction method of original position water filling element earth pile composite foundation
CN113832950A (en) * 2021-08-19 2021-12-24 中电建十一局工程有限公司 Construction method of plain soil compaction pile
CN217460530U (en) * 2022-04-12 2022-09-20 甘肃省建设监理有限责任公司 Pile forming guide pipe for lengthening assembled ultra-long compaction pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117589632A (en) * 2024-01-18 2024-02-23 山西金宝岛基础工程有限公司 Method for testing water content in foundation water injection humidifying process through dynamic compaction

Similar Documents

Publication Publication Date Title
CN102268871B (en) Construction method of turnover platform for underwater pile foundation of bridge
CN107724383B (en) Rotary digging cast-in-place pile construction method
CN109505297A (en) A kind of resistance to compression resistance to plucking variable diameters steel reinforcement cage club-footed pile
CN116201101A (en) Construction method of ultra-long plain soil compaction pile in collapsible loess area with low water content
CN111236215A (en) Rock-socketed construction process of large-diameter steel pipe inclined pile of offshore wind power high-rise pile cap foundation
CN106149751B (en) The method for reinforcing building construction ground using quick lime brick quarrel compaction pile
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN117107749A (en) Construction method of large-diameter punched bored pile under influence of sea water seepage in sea-filling land-building area
CN117071628A (en) Aquatic tower crane foundation and construction method thereof
CN117364553A (en) Karst cave piling method under complex geological conditions
CN106400781A (en) Prefabricated reinforced concrete pile provided with plastic bushing and prefabricating method of prefabricated reinforced concrete pile
CN110924401A (en) Construction foundation pit supporting mode for combined arching and bearing of mixing piles and cast-in-place piles
CN217517602U (en) Nearly river dike underground structure
CN216075211U (en) Combined pile system for treating deep collapsible loess foundation
CN214005719U (en) Cross pile foundation reinforcing apparatus
CN212248219U (en) Modular intelligent retaining wall filling pile
CN209741887U (en) Steel caisson pile body structure for bank abrupt slope
CN113931171A (en) Protection device for preventing tubular pile from being frozen and expanded and damaged
CN113006121A (en) Composite anchorage foundation suitable for large-span suspension bridge and construction method thereof
CN106120690A (en) A kind of inverter box flattens platform and preparation method thereof
CN202090357U (en) Pile cap for cluster type pile foundation and immersed tunnel pile foundation
CN106894386B (en) Construction system and construction method for reinforcing river revetment
CN220953500U (en) "Water tank" type gravity ground ox
CN221052632U (en) Slope protection structure of side slope
CN213926346U (en) Wind driven generator foundation structure for collapsible loess area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination