CN116128144A - Urban drainage pipe network partition linkage management method and system - Google Patents

Urban drainage pipe network partition linkage management method and system Download PDF

Info

Publication number
CN116128144A
CN116128144A CN202310158694.0A CN202310158694A CN116128144A CN 116128144 A CN116128144 A CN 116128144A CN 202310158694 A CN202310158694 A CN 202310158694A CN 116128144 A CN116128144 A CN 116128144A
Authority
CN
China
Prior art keywords
drainage
determining
node
information
real
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310158694.0A
Other languages
Chinese (zh)
Other versions
CN116128144B (en
Inventor
李磊
赵冬泉
李萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Qinghuan Wisdom Technology Co ltd
Beijing Thwater Technology Co ltd
Original Assignee
Zhejiang Qinghuan Wisdom Technology Co ltd
Beijing Thwater Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Qinghuan Wisdom Technology Co ltd, Beijing Thwater Technology Co ltd filed Critical Zhejiang Qinghuan Wisdom Technology Co ltd
Priority to CN202310158694.0A priority Critical patent/CN116128144B/en
Publication of CN116128144A publication Critical patent/CN116128144A/en
Application granted granted Critical
Publication of CN116128144B publication Critical patent/CN116128144B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F2201/00Details, devices or methods not otherwise provided for
    • E03F2201/20Measuring flow in sewer systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/152Water filtration

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Water Supply & Treatment (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Sewage (AREA)

Abstract

The embodiment of the application provides a regional linkage management method and system for an urban drainage pipe network, wherein the method comprises the following steps: performing drainage detection through a first detection device arranged at a primary drainage node, and determining primary drainage information; performing drainage detection through a second detection device arranged at a secondary drainage node, and determining secondary drainage information; detecting water discharge through a third detection device arranged at the three-stage water discharge node, and determining three-stage water discharge information; analyzing the three-level drainage information, determining a target drainage range corresponding to the drainage quantity of the three-level drainage nodes, and controlling the drainage from the three-level drainage nodes by a pump station control device according to the target drainage range; detecting water inflow through a fourth detection device arranged in a sewage treatment plant, determining water inflow information, and determining a current regulation event and a current regulation result; the current regulation event and the current regulation result are fed back to the pump station control device, and good regulation control can be performed by applying the method.

Description

Urban drainage pipe network partition linkage management method and system
Technical Field
The application relates to the technical field of drainage pipe networks, in particular to a regional linkage management method and system for an urban drainage pipe network.
Background
The water supply and drainage network is a necessary basic circulation system for each city, and plays a very important role in the good running of the city and the normal life of citizens. Reasonable management of the urban water supply and drainage network can effectively improve the rationality and economy of the drainage pipeline, and make the urban water system virtuous circle.
Under the actual scene, the water supply and drainage network has wide occupied area, the drainage source types related to the drainage network are various, the upstream and the downstream in the drainage process are mutually influenced, the reasonable regulation and storage control of a pump station is not facilitated, and the water supply and drainage effect of the water supply and drainage network is influenced.
Disclosure of Invention
The embodiment of the application provides a regional linkage management method and system for an urban drainage pipe network, which are used for at least solving the technical problems in the prior art.
According to a first aspect of an embodiment of the present application, there is provided a method for regional linkage management of an urban drainage network, the method including: performing drainage detection through a first detection device arranged on a primary drainage node, and determining primary drainage information, wherein the primary drainage node is a drainage source; performing drainage detection through a second detection device arranged on a secondary drainage node, and determining secondary drainage information, wherein the secondary drainage node comprises a plurality of drainage sources; carrying out drainage detection through a third detection device arranged on three-stage drainage nodes, and determining three-stage drainage information, wherein the three-stage drainage nodes are positioned at the connection points of a plurality of two-stage drainage nodes and a main pipeline; analyzing the three-level drainage information, determining a target drainage range corresponding to the drainage quantity of the three-level drainage node, and performing regulation and storage control on drainage from the three-level drainage node through a pump station control device according to the target drainage range; detecting water inflow through a fourth detection device arranged in a sewage treatment plant, determining water inflow information, analyzing based on the water inflow information, the primary drainage information, the secondary drainage information, the tertiary drainage information and the regulation control information, and determining a current regulation event and a current regulation result; and feeding back the current regulation event and the current regulation result to the pump station control device.
In one embodiment, the pump station control device is used for controlling the regulation of the drainage from the three-stage drainage node, and the pump station control device comprises: determining a regulation model based on the historical regulation event and the corresponding historical regulation result; and carrying out regulation control on the drainage from the three-stage drainage nodes based on the regulation model.
In an embodiment, the method further comprises: and optimizing the regulation model according to the current regulation event and the current regulation result to obtain an optimized regulation model.
In one embodiment, the drainage information includes at least one of the following: drainage liquid level, drainage flow, drainage water quality.
In an embodiment, the method further comprises: determining a first water quality detection value according to the primary drainage information, and when the first water quality detection value is characterized as abnormal drainage water quality, sending a first early warning notice to a second management end corresponding to a secondary drainage node so as to inform a manager corresponding to the second management end to perform evidence collection analysis on the drainage of the secondary drainage node, and determining a second water quality detection value; the second management end obtains a third water quality detection value of other primary drainage nodes in the same secondary drainage node; and determining a water quality detection result of the primary drainage node based on the first water quality detection value, the second water quality detection value and the third water quality detection value.
In an embodiment, the method further comprises: acquiring the real-time conductivity and the real-time flow of the drainage node; determining a conductivity coefficient of variation based on the real-time conductivity and the historical conductivity; determining a real-time effluent conductivity based on the real-time conductivity and the real-time flow; and determining a conductivity stability index corresponding to the drainage node according to the conductivity variation coefficient and the real-time effluent conductivity.
In an embodiment, the method further comprises: acquiring the real-time liquid level of the drainage node; when the real-time flow and the real-time liquid level are in an ascending trend and the real-time conductivity is in a descending trend, determining that the drainage node currently has a rainy day mixed flow characteristic; determining the real-time unit area infiltration amount of the drainage node based on the corresponding real-time flow and real-time liquid level; quantitatively analyzing the real-time infiltration amount and the precipitation amount in unit area, and determining a relation value between theoretical precipitation and infiltration and a corresponding fitting degree; and if the fitting degree meets the target fitting degree, determining the relation value of the theoretical precipitation and the infiltration as the relation value of the actual precipitation and the infiltration.
In an embodiment, the method further comprises: dividing the drainage households into sources according to drainage information of the drainage households, and determining a primary drainage node; partitioning the discharge source based on the flow direction information of the primary drainage node to determine a secondary drainage node; determining a third-level drainage node based on the connection information of the second-level drainage node and the main pipeline; determining corresponding pump station information and sewage treatment plants based on the flow direction information of the three-stage drainage nodes; and determining a drainage pipe network map based on the primary drainage nodes, the secondary drainage nodes, the tertiary drainage nodes, the pump station information and the sewage treatment plant.
According to a second aspect of embodiments of the present application, there is provided a municipal drainage network zoned linkage management system, the system comprising: the detection module is used for detecting water discharge through a first detection device arranged at a primary water discharge node, and determining primary water discharge information, wherein the primary water discharge node is a discharge source; the detection module is further used for detecting water discharge through a second detection device arranged at a secondary water discharge node, and determining secondary water discharge information, wherein the secondary water discharge node comprises a plurality of discharge sources; the detection module is further used for detecting water drainage through a third detection device arranged at a third-stage drainage node, determining third-stage drainage information, and the third-stage drainage node is located at the connection points of the plurality of second-stage drainage nodes and the main pipeline; the analysis module is used for analyzing the three-level drainage information, determining a target drainage range corresponding to the drainage quantity of the three-level drainage node, and controlling the drainage from the three-level drainage node by a pump station control device according to the target drainage range; the detection module is also used for detecting water inflow through a fourth detection device arranged in the sewage treatment plant, and determining water inflow information; the analysis module is used for analyzing based on the water inlet information, the primary drainage information, the secondary drainage information, the tertiary drainage information and the regulation control information and determining a current regulation event and a current regulation result; and the feedback module is used for feeding back the current regulation event and the current regulation result to the pump station control device.
In an embodiment, the system further comprises a control module for controlling the pump station control device to regulate and accumulate the drainage from the three-stage drainage node, the control module comprising: determining a regulation model based on the historical regulation event and the corresponding historical regulation result; and carrying out regulation control on the drainage from the three-stage drainage nodes based on the regulation model.
In one embodiment, the system further comprises: and the optimization module is used for optimizing the regulation model according to the current regulation event and the current regulation result to obtain an optimized regulation model.
In one embodiment, the system further comprises: the sending module is used for determining a first water quality detection value according to the primary drainage information, and sending a first early warning notice to a second management end corresponding to a secondary drainage node when the first water quality detection value is characterized as abnormal drainage water quality so as to inform a manager corresponding to the second management end to perform evidence collection analysis on the drainage of the secondary drainage node and determine a second water quality detection value; the second management end is used for acquiring a second water quality detection value of other first-level drainage nodes in the same second-level drainage node; and the determining module is used for determining the water quality detection result of the primary drainage node based on the first water quality detection value, the second water quality detection value and the third water quality detection value.
In an embodiment, the obtaining module is further configured to obtain a real-time conductivity and a real-time flow of the drainage node; the determination module is further configured to determine a conductivity variation coefficient based on the real-time conductivity and the historical conductivity; the determining module is further used for determining the real-time water outlet conductivity based on the real-time conductivity and the real-time flow; the determining module is further used for determining the conductivity stability of the corresponding drainage node according to the conductivity variation coefficient and the real-time effluent conductivity.
In an embodiment, the determining module is further configured to determine that the conductivity stability of the drainage node meets a stability criterion if the conductivity variation coefficient does not exceed a target coefficient threshold and the real-time effluent conductivity meets a target effluent conductivity range.
In an embodiment, the obtaining module is further configured to obtain a real-time liquid level of the drainage node; the determining module is further configured to determine that the drainage node currently has a rainy day mixed flow characteristic when the real-time flow and the real-time liquid level are in an ascending trend and the real-time conductivity is in a descending trend; the determining module is further used for determining the real-time unit area infiltration amount of the drainage node based on the corresponding real-time flow and the real-time liquid level; the analysis module is also used for quantitatively analyzing the real-time infiltration amount and the precipitation amount in unit area and determining the relation value of theoretical precipitation and infiltration and the corresponding fitting degree; and the determining module is further used for determining the relation value of the theoretical precipitation and the infiltration as the relation value of the actual precipitation and the infiltration if the fitting degree meets the target fitting degree.
In one embodiment, the system further comprises: the source dividing module is used for dividing the drainage households into sources according to the drainage information of the drainage households and determining a first-stage drainage node; the partition module is used for partitioning the discharge source based on the flow direction information of the primary drainage node to determine a secondary drainage node; the determining module is further used for determining a third-level drainage node based on the connection information of the second-level drainage node and the main pipeline; the determining module is further used for determining corresponding pump station information and sewage treatment plants based on the flow direction information of the three-level drainage nodes; the determining module is further used for determining a drainage pipe network map based on the primary drainage nodes, the secondary drainage nodes, the tertiary drainage nodes, pump station information and the sewage treatment plant.
According to the urban drainage pipe network partition linkage management method and system, early warning diagnosis and water quality evidence obtaining verification of water quality detection are achieved through the primary drainage nodes, the secondary drainage nodes and the tertiary drainage nodes, multi-party skin tearing is avoided, management is convenient, and data quality and operation effect are improved; the pump station control device can regulate and control the water discharge based on the water discharge amount of the three-level water discharge nodes, and ensures the stability of water discharge in the water discharge pipe network.
It should be understood that the description of this section is not intended to identify key or critical features of the embodiments of the application or to delineate the scope of the embodiments of the application. Other features of embodiments of the present application will become apparent from the description that follows.
Drawings
The foregoing and other objects, features and advantages of the exemplary embodiments of the present application will become apparent from the following detailed description read in conjunction with the accompanying drawings. Several implementations of the embodiments of the present application are illustrated by way of example, and not by way of limitation, in the figures of the accompanying drawings, in which:
in the drawings, the same or corresponding reference numerals indicate the same or corresponding parts.
Fig. 1 shows a schematic implementation flow diagram of a method for regional linkage management of an urban drainage pipe network according to an embodiment of the present application;
fig. 2 shows a schematic view of a drainage node scenario of a regional linkage management system of an urban drainage pipe network according to an embodiment of the application;
FIG. 3 shows a real-time conductivity schematic diagram of a method for regional linkage management of an urban drainage network according to an embodiment of the application;
fig. 4 is a schematic diagram of an implementation module of a regional linkage management system for an urban drainage network according to an embodiment of the present application;
Fig. 5 shows a schematic diagram of a composition structure of an electronic device according to an embodiment of the present application.
Detailed Description
In order to make the objects, features and advantages of the embodiments of the present application more obvious and understandable, the technical solutions of the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is apparent that the described embodiments are only some embodiments, but not all embodiments of the present application. All other embodiments, which can be made by those skilled in the art without the exercise of inventive faculty, are intended to be within the scope of the embodiments herein.
Fig. 1 shows a schematic implementation flow diagram of a regional linkage management method for an urban drainage pipe network according to an embodiment of the application.
Referring to fig. 1, according to a first aspect of an embodiment of the present application, there is provided a method for regional linkage management of an urban drainage network, where the method includes: operation 101, performing drainage detection through a first detection device arranged on a primary drainage node, and determining primary drainage information, wherein the primary drainage node is a drainage source; operation 102, performing drainage detection through a second detection device arranged at a secondary drainage node, and determining secondary drainage information, wherein the secondary drainage node comprises a plurality of drainage sources; operation 103, performing drainage detection through a third detection device arranged on three-stage drainage nodes, and determining three-stage drainage information, wherein the three-stage drainage nodes are positioned at the connection points of a plurality of two-stage drainage nodes and a main pipeline; 104, analyzing the three-level drainage information, determining a target drainage range corresponding to the drainage quantity of the three-level drainage node, and controlling the regulation and storage of drainage from the three-level drainage node through a pump station control device according to the target drainage range; operation 105, detecting water inflow through a fourth detection device arranged in the sewage treatment plant, determining water inflow information, analyzing based on the water inflow information, the primary water outflow information, the secondary water outflow information, the tertiary water outflow information and the regulation control information, and determining a current regulation event and a current regulation result; and 106, feeding back the current regulation event and the current regulation result to the pump station control device.
The following provides a concrete implementation scenario of the urban drainage pipe network partition linkage management method.
Fig. 2 shows a schematic view of drainage node scenario of a regional linkage management system of an urban drainage pipe network according to an embodiment of the application.
Referring to fig. 2, in this embodiment, the management method is applied to a regional linkage management system of a municipal drainage network, where the system includes a plurality of primary management ends, a plurality of secondary management ends, a plurality of pump station control devices, and a plurality of control devices of sewage treatment plants 205, which are disposed based on the municipal drainage network.
By analyzing the urban drainage network, the drainage conditions of all drainage households are studied in the field, and the important drainage households are determined as primary drainage nodes 201. Among the important drainage households include, but are not limited to: various factories, residential areas, commercial squares, school institutions, plantation and the like. Each primary drainage node 201 is provided with a corresponding detection device and a primary management end, and the primary management end is equipment with data processing capability, is in communication connection with the detection device arranged on the primary drainage node 201, and is used for acquiring detection data of the detection device of the primary drainage node 201. Wherein the detection means includes, but is not limited to: liquid level detection device, flow detection device, water quality detection device etc.. Correspondingly, liquid level detection data, flow detection data, water quality detection data and the like can be obtained.
Depending on the actual design of the urban drainage network, drainage households in the same area are usually drainage households of the same type, and based on this, a plurality of drainage households of the same type, which are located in the same geographical position or in close geographical positions and flow to the same branch pipeline, can be determined as the secondary drainage nodes 202. Such as: commercial, residential, industrial, livestock farm, agricultural planting areas, and the like. Each secondary drainage node 202 is provided with a corresponding detection device and a secondary management end, and the secondary management end is similar to equipment with data processing capability, is in communication connection with the detection device arranged on the secondary drainage node 202, and is used for acquiring detection data of the detection device of the secondary drainage node 202. Wherein the detection means includes, but is not limited to: liquid level detection device, flow detection device, water quality detection device etc.. Correspondingly, liquid level detection data, flow detection data, water quality detection data and the like can be obtained. The secondary management end is also in communication connection with the primary management end, so that the secondary management end can perform information interaction with the primary management end, and is used for receiving various detection data and detection results from the primary management end and sending corresponding verification results to the primary management end.
Correspondingly, in the practical design scheme of the urban drainage pipe network, drainage of the two-stage drainage nodes 202 can be collected into the same collection port of the main pipeline, each collection port is determined to be a three-stage drainage node 203, a corresponding detection device and a three-stage management end are arranged on each three-stage drainage node 203, and the three-stage management end is the same equipment with data processing capacity and is in communication connection with the detection device arranged on the three-stage drainage node 203 and used for acquiring detection data of the detection device of the three-stage drainage node 203. Wherein the detection means includes, but is not limited to: liquid level detection device, flow detection device, water quality detection device etc.. Correspondingly, liquid level detection data, flow detection data, water quality detection data and the like can be obtained. And the third-level management end is also in communication connection with the first-level management end and the second-level management end, so that the third-level management end can perform information interaction with the first-level management end and the second-level management end, and is used for receiving various detection data and detection results from the first-level management end and the second-level management end and sending corresponding verification results to the first-level management end and the second-level management end.
Wherein, the water quality testing device that sets up in one-level drainage node 201 can be automatic water quality testing device, thereby can obtain the real-time water quality testing result of one-level drainage node 201, the water quality testing device that sets up in second grade drainage node 202 and tertiary drainage node 203 can include automatic water quality testing device and automatic sampling device, when the water quality testing result of one-level drainage node is unusual, can trigger second grade drainage node 202 and carry out automatic sampling, obtain the sample of second grade drainage node 202, make the staff of second grade drainage node 202 can carry out the analysis to the sample, verify the real-time water quality testing result of one-level drainage node 201 and second grade drainage node 202, thereby improve the accuracy of testing result. Similarly, when the real-time water quality detection result of the secondary drainage node 202 is abnormal, the tertiary drainage node 203 can be triggered to automatically sample, a sampling sample of the tertiary drainage node 203 is obtained, a worker of the tertiary drainage node 203 can analyze the sampling sample, the real-time water quality detection results of the primary drainage node 201, the secondary drainage node 202 and the tertiary drainage node 203 are verified, the effect of verifying the upstream water quality problem is achieved, and therefore accuracy of the detection result is improved. By the mode, the drainage nodes causing water quality abnormality can be accurately determined, the phenomenon that multiple sides of drainage nodes of different grades are torn off is avoided, management is convenient, and data quality and operation effect are improved.
The pump station 204 on the main pipeline is used for carrying out regulation and storage control on drainage in a drainage pipe network, the control device of the pump station 204 is in communication connection with the three-level management end, three-level drainage information from the three-level management end is obtained in real time, regulation and storage control are carried out on the drainage based on the three-level drainage information, stability of the drainage is guaranteed, the three-level management end can send the three-level drainage information to the control device of the pump station 204, the control device of the pump station 204 stores a regulation and storage model, the regulation and storage model comprises a plurality of different target drainage ranges, and each target drainage range can be provided with a corresponding regulation and storage control scheme, so that the control device of the pump station 204 can carry out regulation and storage control on the drainage according to the regulation and storage control scheme conforming to the target drainage range, and stability of the drainage in the drainage pipe network is guaranteed.
The sewage treatment plant 205 behind the pump station 204 is used for carrying out sewage treatment on the drainage, the control device of the sewage treatment plant 205 is in communication connection with the control device of the pump station 204, the control device of the sewage treatment plant 205 can be in communication connection with the control device of the pump station 204, drainage information of each drainage node and the pump station 204 is obtained, further, the regulation control of the pump station 204 is evaluated according to the drainage information and the water inlet information of the sewage treatment plant 205, the current regulation result is obtained, the current regulation event and the current regulation result are fed back to the control device of the pump station 204, the regulation effect of the regulation control on the drainage can be determined according to the current regulation event and the current regulation result, and the regulation model is optimized, so that a regulation control scheme with better effect is obtained, and the control device of the pump station 204 is favorable for carrying out more reasonable and better regulation control on the subsequent drainage.
In sum, the partition linkage management system realizes early warning diagnosis and water quality evidence obtaining verification of water quality detection through the primary drainage node 201, the secondary drainage node 202 and the tertiary drainage node 203, avoids multi-party skin tearing, is convenient to manage, and improves data quality and operation effect; the pump station 204 control device can regulate and control the drainage based on the drainage amount of the three-stage drainage nodes 203, so that the stability of the drainage in a drainage pipe network is ensured; the control device of the sewage treatment plant 205 can evaluate the current regulation result by analyzing the water inflow and combining the drainage information of the primary drainage node 201, the secondary drainage node 202 and the tertiary drainage node 203, and optimize the regulation model by feeding back the current regulation event and the current regulation result to enable the pump station 204 control device so as to obtain a regulation control scheme with better effect, and perform more reasonable and better regulation control on the subsequent drainage.
Wherein, according to the analysis needs, the drainage information includes at least one of the following information: drainage liquid level, drainage flow, drainage water quality.
It is to be understood that, based on the complexity of the pipe network and the management complexity of the urban drainage pipe network, generally, the drainage pipe network of one city cannot be comprehensively managed by only one management object, and based on this, the objective condition of partition management of the drainage pipe network can be utilized by using the method, so as to achieve the purpose of finely managing the urban drainage pipe network.
In one embodiment, operation 104, the pump station control device regulates and controls drainage from the tertiary drainage node, comprising: firstly, determining a regulation model based on a history regulation event and a corresponding history regulation result; then, the drainage from the three-stage drainage nodes is subjected to regulation control based on the regulation model.
Specifically, the pump station control device of the embodiment of the application can analyze the historical regulation events and the corresponding historical regulation results to form a plurality of regulation control schemes, a regulation model is obtained, the historical regulation events can include the drainage amount, the regulation control parameters and the water inlet parameters of all levels of drainage nodes, the data can be used for evaluating whether the regulation control scheme of the pump station control device is excellent or not, and the excellent regulation control scheme can be selected as a reference, so that a manager of the pump station control device can control and regulate drainage from the three levels of drainage nodes according to the regulation control scheme. Wherein the regulation control parameters include, but are not limited to: dynamic liquid level height and change information of the three-level drainage node, liquid level parameters of the local station regulation and storage tank, regulation and storage flow and the like. For example: whether the water inlet gate of the regulating reservoir is opened or not can be judged through the dynamic liquid level height and change information of the three-stage drainage nodes so as to introduce partial drainage into the regulating reservoir. The residual space of the regulating reservoir can be calculated in real time through the regulating and storing Chi Jikeng liquid level meter, and whether the regulating reservoir needs to be closed to stop water inflow is judged. And whether the regulation reservoir can pump water out or not can be judged according to the dynamic liquid level height and change information of the three-stage drainage nodes, the water inlet information and the water storage information of a downstream pipe network of the regulation reservoir and a sewage treatment plant.
In an embodiment, the method further comprises: and optimizing the regulation model according to the current regulation event and the current regulation result to obtain an optimized regulation model.
Specifically, the current regulation result can be the evaluation of the current regulation event, the current regulation result can be determined based on the drainage information of the primary drainage node, the secondary drainage node and the tertiary drainage node, the regulation parameter of the regulation pool and the water inlet information of the sewage treatment plant, the evaluation result of the current regulation result can be set in a score manner, and the corresponding pump station control device can sort the regulation event based on the score of the regulation result and extract elements of the regulation event to form a regulation control scheme, so that the pump station management personnel can obtain the regulation control scheme with better regulation effect preferentially. Or, the pump station control device may sort the regulation events based on the scores of the regulation results, extract elements of the regulation events, form drainage characteristics, regulation pool characteristics and corresponding regulation control schemes, match the drainage characteristics and the regulation pool characteristics based on the three-level drainage information from the three-level drainage nodes and the current regulation pool detection data, sort the regulation events with the similarity meeting the matching conditions based on the scores of the regulation results, thereby determining the regulation control scheme corresponding to the regulation event with the highest score as a target regulation scheme, and then automatically regulate the drainage from the three-level drainage nodes based on the target regulation scheme.
In an embodiment, the method further comprises: firstly, determining a first water quality detection value according to primary drainage information, and when the first water quality detection value is characterized as abnormal drainage water quality, sending a first early warning notice to a second management end corresponding to a secondary drainage node so as to inform a manager corresponding to the second management end to perform evidence collection analysis on drainage of the secondary drainage node and determine the second water quality detection value; then, the second management end obtains a third water quality detection value of other first-level drainage nodes in the same second-level drainage node; and then, determining a water quality detection result of the primary drainage node based on the first water quality detection value, the second water quality detection value and the third water quality detection value.
The first management end compares the first water quality detection value with a preset water quality detection value, if the first water quality detection value exceeds the preset water quality detection value, a first early warning notice is sent to a second management end corresponding to the secondary drainage node, and when the second management end receives the first early warning notice, the automatic sampling device is triggered to collect water samples to obtain collected samples. And the second-level drainage node comprising the first-level drainage node is also provided with an automatic water quality detection device for detecting in real time to obtain a real-time water quality detection value corresponding to the second-level drainage node, a manager corresponding to the second management end can obtain an artificial water quality detection value by analyzing an acquired sample so as to carry out supplementary verification on the real-time water quality detection value, and further, the second management end can determine whether the first-level drainage node truly has a water quality abnormality or not by carrying out overall analysis on the first water quality detection value, the real-time water quality detection value, the artificial water quality detection value and the third water quality detection value of at least one other first-level drainage node by acquiring the third water quality detection value of the management end of other first-level drainage node which is in communication connection with the second management end and carrying out transverse comparison as a reference so as to assist in evaluating whether the first water quality detection value is normal or not through the variation difference degree of the third water quality detection value. It can be understood that the more the third water quality detection values of other first-level drainage nodes are obtained, the more difficult the overall analysis is, and the more accurate the analysis result is.
Fig. 3 shows a real-time conductivity schematic diagram of a regional linkage management method for an urban drainage network according to an embodiment of the application.
In one implementation scenario, the real-time conductivity schematic shown in fig. 3 is obtained by monitoring the drainage pipe network, where the ordinate is the conductivity unit, and the unit is: ms/cm, the abscissa is the time unit, the concrete unit is: and (3) days. As can be seen from fig. 3, if the conductivity mutation is detected at the node of the east branch pipe, the main pipe obtains the conductivity change condition of the west branch pipe which is synchronous with the east branch pipe and is positioned at the upstream of the east branch pipe, if the conductivity of the west branch pipe is normal, the conductivity of the main pipe suddenly changes, the conductivity peak trend of the main pipe is consistent with the conductivity peak trend of the east Lu Zhiguan, and the conductivity peak of the main pipe is lower than the conductivity peak of the east branch pipe, the problem of water pollution of the east branch pipe can be considered. By the method, the search range of the pollution discharge source can be greatly and accurately reduced, most of investigation workload is reduced, a water quantity and conductivity comprehensive index distributed monitoring network covering the whole process can be established aiming at important monitoring areas such as an industrial park, a pollution discharge event is sharply identified, and a discharge track is accurately identified.
In an embodiment, the method further comprises: firstly, acquiring the real-time conductivity and the real-time flow of a drainage node; then, determining a conductivity variation coefficient based on the real-time conductivity and the historical conductivity; then, determining the real-time water outlet conductivity based on the real-time conductivity and the real-time flow; and then, determining the conductivity stability index of the corresponding drainage node according to the conductivity variation coefficient and the real-time effluent conductivity.
Furthermore, according to the embodiment of the application, whether the corresponding drainage node has the rainy day mixed flow characteristic can be determined through the conductivity and the flow, and quantitative analysis is performed on the drainage node with the rainy day mixed flow characteristic. Based on the fact that the time of the drainage pipe network and actual weather does not completely correspond, for example, in the third day after rain, part of the drainage pipe network still has rainy day mixed flow characteristics, and the rainy day mixed flow characteristics can influence specific numerical values of various set reference values, for example, water quality detection values in dry days and waterlogging days are different, the corresponding various set reference values are determined through the rainy day mixed flow characteristics, and the determination of various set reference values can be more accurate instead of being determined directly through weather.
Specifically, the present application requires determining the conductivity stability of the drain node prior to determining whether the drain node currently has a rainy day mixed flow characteristic. The method comprises the steps of determining a conductivity variation coefficient and a water outlet conductivity by analyzing the real-time conductivity and the real-time flow of a drainage node, and determining a conductivity stability index of the drainage node when the conductivity variation coefficient does not exceed a target coefficient threshold and the real-time water outlet conductivity accords with a target water outlet conductivity range.
In another implementation scenario, the following approach may be employed: the inlet water concentration is lower in rainy days of a sewage plant at the downstream of a certain city, the inlet water quantity is increased rapidly, the inlet water quantity is quantitatively analyzed in rainy days of the sewage plant, engineering measures of diversion modification of a pipe network are guided, the aim of cleaning and diversion of the pipe network is achieved, and the sewage pipe network is monitored on line for 24 hours in flow-conductivity. And a plurality of monitoring points are distributed together to cover the main pipe nodes of the sewage pipe network, the municipal connection points of the communities and the urban water system, the conductivity variation coefficients among the detection points are determined by comparing the point conductivities of the monitoring points, and if the conductivity variation coefficients do not exceed a target coefficient threshold value and the real-time water outlet conductivities all meet the target water outlet conductivity range, the stability index corresponding to the conductivity stability of the water outlet nodes is determined.
Further, under the weather without precipitation, the conductivity data of the monitoring points are compared day by day to determine the continuity of the conductivity, and the liquid level and the flow data of the monitoring points are compared day by day to determine the continuity of the liquid level and the flow data. For example, the conductivity continuous float range is 10%, the liquid level continuous float range is 10%, and the continuous float range of the flow rate data is 10%. And determining a stability index corresponding to the conductivity based on the continuity and the stability. For example, in the implementation scenario, the stability index of the drainage node corresponding to the plurality of monitoring points is: the conductivity variation coefficient is smaller than 10%, the conductivity continuous floating range is 10%, the liquid level continuous floating range is 10%, the continuous floating range of flow data is 10%, and the conductivity of the community effluent is 1642 mu s/cm.
In an embodiment, the method further comprises: firstly, acquiring the real-time liquid level of a drainage node; then, under the condition that the real-time flow and the real-time liquid level are in an ascending trend and the real-time conductivity is in a descending trend, determining that the drainage node currently has a rainy day mixed flow characteristic; then, determining the real-time unit area infiltration amount of the drainage node based on the corresponding real-time flow and real-time liquid level; then, quantitatively analyzing the infiltration quantity and the precipitation quantity in real time in unit area, and determining the relation value of theoretical precipitation and infiltration and the corresponding fitting degree; and then, if the fitting degree meets the target fitting degree, determining the relation value of the theoretical precipitation and the infiltration as the relation value of the actual precipitation and the infiltration.
Specifically, based on the floating ranges of various stability indexes, the maximum predicted value and the minimum predicted value of the indexes, namely the corresponding conductivity range, flow range and liquid level range, can be determined, when the real-time flow is larger than the flow range by a specified proportion, for example, 10% beyond the flow range, the real-time flow can be determined to have an ascending trend, otherwise, when the real-time flow is smaller than the flow range by a specified proportion, for example, 10% beyond the flow range, the real-time flow can be determined to have a descending trend. The same is true for the liquid level range and the conductivity range, which are not illustrated below, wherein the specified ratios are not limiting and different types of specified ratios may be different.
When the real-time flow and the real-time liquid level are in an ascending trend and the real-time conductivity is in a descending trend, the fact that the corresponding drainage node has a rainy day mixed flow characteristic can be determined. And then calculating according to the real-time flow and the real-time liquid level according to a conventional method, determining the real-time unit area infiltration amount of the drainage node, drawing a chart to perform straight line fitting on the real-time unit area infiltration amount and the real-time precipitation amount by taking the real-time unit area infiltration amount as an ordinate and the real-time precipitation amount as an abscissa, and determining a theoretical precipitation-infiltration relation value corresponding to a fitting result as an actual precipitation-infiltration relation value if the fitting degree meets a target fitting degree.
For example: from the plotted graph, the equation y=155.52x+176.27, r can be found 2 =0.76. Wherein R is 2 The method is used for representing the fitting degree, the fitting degree meets the target fitting degree, namely, the real-time unit area infiltration amount and the real-time precipitation amount have higher correlation, at the moment, the theoretical precipitation and infiltration relation value corresponding to the equation can be determined as the actual precipitation and infiltration relation value, namely, each time 10mm rainfall is increased, the unit area infiltration amount is increased by 1555m 3
In an embodiment, the method further comprises: dividing sources of drainage households according to drainage information of the drainage households, and determining primary drainage nodes; partitioning the discharge source based on the flow direction information of the primary drainage nodes to determine the secondary drainage nodes; determining a third-level drainage node based on the connection information of the second-level drainage node and the main pipeline; determining corresponding pump station information and sewage treatment plants based on the flow direction information of the three-stage drainage nodes; and determining a drainage pipe network map based on the primary drainage node, the secondary drainage node, the tertiary drainage node, the pump station information and the sewage treatment plant. By the method, the drainage pipe network map can be obtained, and the various schemes are applied based on the drainage pipe network map.
Fig. 4 shows a schematic diagram of an implementation module of a regional linkage management system for an urban drainage network according to an embodiment of the application.
Referring to fig. 4, according to a second aspect of the embodiments of the present application, there is provided a district-linked management system for a municipal drainage network, the system comprising: the detection module 401 is configured to perform drainage detection through a first detection device disposed at a primary drainage node, determine primary drainage information, and the primary drainage node is a drainage source; the detection module 401 is further configured to perform drainage detection through a second detection device disposed at a secondary drainage node, and determine secondary drainage information, where the secondary drainage node includes a plurality of drainage sources; the detection module 401 is further configured to perform drainage detection through a third detection device disposed at a third drainage node, determine third drainage information, where the third drainage node is located at a connection point between the plurality of second drainage nodes and the main pipeline; the analysis module 402 is used for analyzing the three-level drainage information, determining a target drainage range corresponding to the drainage amount of the three-level drainage node, and performing regulation and control on drainage from the three-level drainage node through the pump station control device according to the target drainage range; the detection module 401 is further configured to perform water inflow detection through a fourth detection device disposed in the sewage treatment plant, and determine water inflow information; the analysis module 402 is configured to analyze based on the water inlet information, the primary drainage information, the secondary drainage information, the tertiary drainage information, and the regulation control information, and determine a current regulation event and a current regulation result; and the feedback module 403 is used for feeding back the current regulation event and the current regulation result to the pump station control device.
In one embodiment, the device further includes a control module 404, configured to regulate and control the water discharge from the three-stage water discharge node by the pump station control device, where the control module 404 includes: determining a regulation model based on the historical regulation event and the corresponding historical regulation result; and carrying out regulation control on the drainage from the three-stage drainage nodes based on the regulation model.
In an embodiment, the apparatus further comprises: and the optimizing module 405 is configured to optimize the storage model according to the current storage event and the current storage result, and obtain an optimized storage model.
In an embodiment, the apparatus further comprises: the sending module 406 is configured to determine a first water quality detection value according to the first-level drainage information, and send a first early warning notification to a second management end corresponding to the second-level drainage node when the first water quality detection value is characterized as abnormal drainage water quality, so as to notify a manager corresponding to the second management end to perform evidence collection analysis on drainage of the second-level drainage node, and determine the second water quality detection value; the obtaining module 407 is configured to obtain, by the second management end, a third water quality detection value of other primary drainage nodes in the same secondary drainage node; the determining module 408 is configured to determine a water quality detection result of the primary drainage node based on the first water quality detection value, the second water quality detection value, and the third water quality detection value.
In an embodiment, the obtaining module 407 is further configured to obtain the real-time conductivity and the real-time flow of the drainage node; a determination module 408 for determining a conductivity variation coefficient based on the real-time conductivity and the historical conductivity; a determining module 408, further configured to determine a real-time effluent conductivity based on the real-time conductivity and the real-time flow; the determining module 408 is further configured to determine the conductivity stability of the corresponding drainage node according to the conductivity variation coefficient and the real-time effluent conductivity.
In an embodiment, the determining module 408 is further configured to determine that the conductivity stability of the drainage node meets the stability criterion if the conductivity variation coefficient does not exceed the target coefficient threshold and the real-time water conductivity meets the target water conductivity range.
In an embodiment, the obtaining module 407 is further configured to obtain a real-time liquid level of the drainage node; the determining module 408 is further configured to determine that the drainage node currently has a rainy day mixed flow feature when the real-time flow and the real-time liquid level are in an ascending trend and the real-time conductivity is in a descending trend; a determining module 408, further configured to determine a real-time unit area infiltration amount of the drainage node based on the corresponding real-time flow rate and real-time liquid level; the analysis module 402 is further configured to quantitatively analyze the infiltration amount and the precipitation amount in real time in a unit area, and determine a relationship value between theoretical precipitation and infiltration and a corresponding fitness; the determining module 408 is further configured to determine the relationship value of the theoretical precipitation and the infiltration as the relationship value of the actual precipitation and the infiltration if the fitness meets the target fitness.
In an embodiment, the apparatus further comprises: the source dividing module 409 is configured to divide sources of drainage households according to drainage information of the drainage households, and determine a first-level drainage node; a partition module 410 for partitioning the discharge source based on the flow direction information of the primary drainage node to determine a secondary drainage node; a determining module 408, configured to determine a third-level drainage node based on connection information of the second-level drainage node and the main pipeline; the determining module 408 is further configured to determine corresponding pump station information and sewage treatment plant based on the flow direction information of the third-level drainage node; the determining module 408 is further configured to determine a drainage pipe network map based on the primary drainage node, the secondary drainage node, the tertiary drainage node, the pump station information, and the sewage treatment plant.
According to embodiments of the present application, an electronic device and a readable storage medium are also provided.
Fig. 5 shows a schematic block diagram of an example electronic device 500 that may be used to implement embodiments of the present application. Electronic devices are intended to represent various forms of digital computers, such as laptops, desktops, workstations, personal digital assistants, servers, blade servers, mainframes, and other appropriate computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular telephones, smartphones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions, are meant to be exemplary only, and are not meant to limit implementations of the embodiments of the present application described and/or claimed herein.
As shown in fig. 5, the apparatus 500 includes a computing unit 501 that can perform various suitable actions and processes according to a computer program stored in a Read Only Memory (ROM) 502 or a computer program loaded from a storage unit 508 into a Random Access Memory (RAM) 503. In the RAM 503, various programs and data required for the operation of the device 500 can also be stored. The computing unit 501, ROM 502, and RAM 503 are connected to each other by a bus 504. An input/output (I/O) interface 505 is also connected to bus 504.
Various components in the device 500 are connected to the I/O interface 505, including: an input unit 506 such as a keyboard, a mouse, etc.; an output unit 507 such as various types of displays, speakers, and the like; a storage unit 508 such as a magnetic disk, an optical disk, or the like; and a communication unit 509 such as a network card, modem, wireless communication transceiver, etc. The communication unit 509 allows the device 500 to exchange information/data with other devices via a computer network such as the internet and/or various telecommunication networks.
The computing unit 501 may be a variety of general and/or special purpose processing components having processing and computing capabilities. Some examples of computing unit 501 include, but are not limited to, a Central Processing Unit (CPU), a Graphics Processing Unit (GPU), various specialized Artificial Intelligence (AI) computing chips, various computing units running machine learning model algorithms, a Digital Signal Processor (DSP), and any suitable processor, controller, microcontroller, etc. The computing unit 501 performs the various methods and processes described above, such as a municipal drainage network zoned coordinated management method. For example, in some embodiments, a municipal drainage network zoned linkage management method may be implemented as a computer software program tangibly embodied on a machine-readable medium, such as storage unit 508. In some embodiments, part or all of the computer program may be loaded and/or installed onto the device 500 via the ROM 502 and/or the communication unit 509. When the computer program is loaded into RAM 503 and executed by computing unit 501, one or more steps of a municipal drainage network partition linkage management method described above may be performed. Alternatively, in other embodiments, the computing unit 501 may be configured to perform a municipal drainage network zoned coordinated management method in any other suitable manner (e.g., by means of firmware).
Various implementations of the systems and techniques described here above may be implemented in digital electronic circuitry, integrated circuit systems, field Programmable Gate Arrays (FPGAs), application Specific Integrated Circuits (ASICs), application Specific Standard Products (ASSPs), systems On Chip (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and/or combinations thereof. These various embodiments may include: implemented in one or more computer programs, the one or more computer programs may be executed and/or interpreted on a programmable system including at least one programmable processor, which may be a special purpose or general-purpose programmable processor, that may receive data and instructions from, and transmit data and instructions to, a storage system, at least one input device, and at least one output device.
Program code for carrying out methods of embodiments of the present application may be written in any combination of one or more programming languages. These program code may be provided to a processor or controller of a general purpose computer, special purpose computer, or other programmable data processing apparatus such that the program code, when executed by the processor or controller, causes the functions/operations specified in the flowchart and/or block diagram to be implemented. The program code may execute entirely on the machine, partly on the machine, as a stand-alone software package, partly on the machine and partly on a remote machine or entirely on the remote machine or server.
In the context of embodiments of the present application, a machine-readable medium may be a tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device. The machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. The machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any suitable combination of the foregoing. More specific examples of a machine-readable storage medium would include an electrical connection based on one or more wires, a portable computer diskette, a hard disk, a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
To provide for interaction with a user, the systems and techniques described here can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to a user; and a keyboard and pointing device (e.g., a mouse or trackball) by which a user can provide input to the computer. Other kinds of devices may also be used to provide for interaction with a user; for example, feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form, including acoustic input, speech input, or tactile input.
The systems and techniques described here can be implemented in a computing system that includes a background component (e.g., as a data server), or that includes a middleware component (e.g., an application server), or that includes a front-end component (e.g., a user computer having a graphical user interface or a web browser through which a user can interact with an implementation of the systems and techniques described here), or any combination of such background, middleware, or front-end components. The components of the system can be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: local Area Networks (LANs), wide Area Networks (WANs), and the internet.
The computer system may include a client and a server. The client and server are typically remote from each other and typically interact through a communication network. The relationship of client and server arises by virtue of computer programs running on the respective computers and having a client-server relationship to each other. The server may be a cloud server, a server of a distributed system, or a server incorporating a blockchain.
It should be appreciated that various forms of the flows shown above may be used to reorder, add, or delete steps. For example, the steps described in the present disclosure may be performed in parallel, sequentially, or in a different order, so long as the desired result of the technical solution disclosed in the embodiments of the present application can be achieved, which is not limited herein.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In the description of the embodiments of the present application, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
The foregoing is merely a specific implementation of the embodiments of the present application, but the protection scope of the embodiments of the present application is not limited thereto, and any person skilled in the art may easily think about changes or substitutions within the technical scope of the embodiments of the present application, and all changes and substitutions are included in the protection scope of the embodiments of the present application. Therefore, the protection scope of the embodiments of the present application shall be subject to the protection scope of the claims.

Claims (10)

1. The regional linkage management method for the urban drainage pipe network is characterized by comprising the following steps of:
performing drainage detection through a first detection device arranged on a primary drainage node, and determining primary drainage information, wherein the primary drainage node is a drainage source;
performing drainage detection through a second detection device arranged on a secondary drainage node, and determining secondary drainage information, wherein the secondary drainage node comprises a plurality of drainage sources;
carrying out drainage detection through a third detection device arranged on three-stage drainage nodes, and determining three-stage drainage information, wherein the three-stage drainage nodes are positioned at the connection points of a plurality of two-stage drainage nodes and a main pipeline;
analyzing the three-level drainage information, determining a target drainage range corresponding to the drainage quantity of the three-level drainage node, and performing regulation and storage control on drainage from the three-level drainage node through a pump station control device according to the target drainage range;
detecting water inflow through a fourth detection device arranged in a sewage treatment plant, determining water inflow information, analyzing based on the water inflow information, the primary drainage information, the secondary drainage information, the tertiary drainage information and the regulation control information, and determining a current regulation event and a current regulation result;
And feeding back the current regulation event and the current regulation result to the pump station control device.
2. The method of claim 1, wherein the regulating control of the drainage from the tertiary drainage node by a pump station control comprises:
determining a regulation model based on the historical regulation event and the corresponding historical regulation result;
and carrying out regulation control on the drainage from the three-stage drainage nodes based on the regulation model.
3. The method according to claim 2, wherein the method further comprises:
and optimizing the regulation model according to the current regulation event and the current regulation result to obtain an optimized regulation model.
4. The method of claim 1, wherein the drainage information comprises at least one of: drainage liquid level, drainage flow, drainage water quality.
5. The method according to claim 1, wherein the method further comprises:
determining a first water quality detection value according to the primary drainage information, and when the first water quality detection value is characterized as abnormal drainage water quality, sending a first early warning notice to a second management end corresponding to a secondary drainage node so as to inform a manager corresponding to the second management end to perform evidence collection analysis on drainage of the secondary drainage node, and determining a second water quality detection value;
The second management end obtains a third water quality detection value of other primary drainage nodes in the same secondary drainage node;
and determining a water quality detection result of the primary drainage node based on the first water quality detection value, the second water quality detection value and the third water quality detection value.
6. The method according to claim 1, wherein the method further comprises:
acquiring the real-time conductivity and the real-time flow of the drainage node;
determining a conductivity coefficient of variation based on the real-time conductivity and the historical conductivity;
determining a real-time effluent conductivity based on the real-time conductivity and the real-time flow;
and determining a conductivity stability index corresponding to the drainage node according to the conductivity variation coefficient and the real-time effluent conductivity.
7. The method of claim 6, wherein the method further comprises:
acquiring the real-time liquid level of the drainage node;
when the real-time flow and the real-time liquid level are in an ascending trend and the real-time conductivity is in a descending trend, determining that the drainage node currently has a rainy day mixed flow characteristic;
determining the real-time unit area infiltration amount of the drainage node based on the corresponding real-time flow and real-time liquid level;
Quantitatively analyzing the real-time infiltration amount and the precipitation amount in unit area, and determining a relation value between theoretical precipitation and infiltration and a corresponding fitting degree;
and if the fitting degree meets the target fitting degree, determining the relation value of the theoretical precipitation and the infiltration as the relation value of the actual precipitation and the infiltration.
8. The method according to claim 1, wherein the method further comprises:
dividing the drainage households into sources according to drainage information of the drainage households, and determining a primary drainage node;
partitioning the discharge source based on the flow direction information of the primary drainage node to determine a secondary drainage node;
determining a third-level drainage node based on the connection information of the second-level drainage node and the main pipeline;
determining corresponding pump station information and sewage treatment plants based on the flow direction information of the three-stage drainage nodes;
and determining a drainage pipe network map based on the primary drainage nodes, the secondary drainage nodes, the tertiary drainage nodes, the pump station information and the sewage treatment plant.
9. An urban drainage pipe network partition linkage management system, characterized in that the system comprises:
the detection module is used for detecting water discharge through a first detection device arranged at a primary water discharge node, and determining primary water discharge information, wherein the primary water discharge node is a discharge source;
The detection module is further used for detecting water discharge through a second detection device arranged at a secondary water discharge node, and determining secondary water discharge information, wherein the secondary water discharge node comprises a plurality of discharge sources;
the detection module is further used for detecting water drainage through a third detection device arranged at a third-stage drainage node, determining third-stage drainage information, and the third-stage drainage node is located at the connection points of the plurality of second-stage drainage nodes and the main pipeline;
the analysis module is used for analyzing the three-level drainage information, determining a target drainage range corresponding to the drainage quantity of the three-level drainage node, and controlling the drainage from the three-level drainage node by a pump station control device according to the target drainage range;
the detection module is also used for detecting water inflow through a fourth detection device arranged in the sewage treatment plant, and determining water inflow information;
the analysis module is used for analyzing based on the water inlet information, the primary drainage information, the secondary drainage information, the tertiary drainage information and the regulation control information and determining a current regulation event and a current regulation result;
and the feedback module is used for feeding back the current regulation event and the current regulation result to the pump station control device.
10. The system of claim 9, wherein the system further comprises:
the control module is used for controlling the pump station control device to regulate and store the drainage from the three-stage drainage nodes;
the control module comprises: determining a regulation model based on the historical regulation event and the corresponding historical regulation result; and carrying out regulation control on the drainage from the three-stage drainage nodes based on the regulation model.
CN202310158694.0A 2023-02-15 2023-02-15 Urban drainage pipe network partition linkage management method and system Active CN116128144B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310158694.0A CN116128144B (en) 2023-02-15 2023-02-15 Urban drainage pipe network partition linkage management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310158694.0A CN116128144B (en) 2023-02-15 2023-02-15 Urban drainage pipe network partition linkage management method and system

Publications (2)

Publication Number Publication Date
CN116128144A true CN116128144A (en) 2023-05-16
CN116128144B CN116128144B (en) 2024-02-13

Family

ID=86308144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310158694.0A Active CN116128144B (en) 2023-02-15 2023-02-15 Urban drainage pipe network partition linkage management method and system

Country Status (1)

Country Link
CN (1) CN116128144B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106412107A (en) * 2016-11-09 2017-02-15 重庆克那维环保科技有限公司 Regulation and storage system of city drainage pipe network
CN110159929A (en) * 2019-05-31 2019-08-23 万基泰科工集团西南科技有限公司 Subdrainage pipe network intelligently manages big data processing method
CN110673566A (en) * 2019-10-23 2020-01-10 上海交通大学 Multilayer intelligent supervision system and operation method of sewage mixing and collecting pipe network
CN113311799A (en) * 2021-06-09 2021-08-27 上海电器科学研究所(集团)有限公司 Urban drainage operation scheduling decision system and construction method
CN115545678A (en) * 2022-11-29 2022-12-30 浙江贵仁信息科技股份有限公司 Water quality monitoring method based on water environment portrait and pollutant traceability

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106412107A (en) * 2016-11-09 2017-02-15 重庆克那维环保科技有限公司 Regulation and storage system of city drainage pipe network
CN110159929A (en) * 2019-05-31 2019-08-23 万基泰科工集团西南科技有限公司 Subdrainage pipe network intelligently manages big data processing method
CN110673566A (en) * 2019-10-23 2020-01-10 上海交通大学 Multilayer intelligent supervision system and operation method of sewage mixing and collecting pipe network
CN113311799A (en) * 2021-06-09 2021-08-27 上海电器科学研究所(集团)有限公司 Urban drainage operation scheduling decision system and construction method
CN115545678A (en) * 2022-11-29 2022-12-30 浙江贵仁信息科技股份有限公司 Water quality monitoring method based on water environment portrait and pollutant traceability

Also Published As

Publication number Publication date
CN116128144B (en) 2024-02-13

Similar Documents

Publication Publication Date Title
CN105868886B (en) Rain and sewage storage tank operation efficiency evaluation method
CN104915562B (en) Build efficiency diagnostic method and system
CN115545678A (en) Water quality monitoring method based on water environment portrait and pollutant traceability
CN103810532B (en) The method of Optimizing City drainage system operation conditions
CN110033164B (en) Risk assessment and decision method for reservoir group combined flood control scheduling
Babaei et al. Risk assessment of agricultural water conveyance and delivery systems by fuzzy fault tree analysis method
CN113111478A (en) Method and equipment for evaluating mixed connection, inflow and infiltration degree of drainage system pipe network
CN115587667A (en) Pollution analysis management module and method for water environment management system of intelligent environment-friendly platform
CN111027730A (en) Water supply pipe network leakage efficient positioning method based on valve operation and online water consumption metering
CN112101519A (en) Converter valve cooling margin prediction operation and maintenance method and system based on LSTM
CN115774953A (en) Pollution space-time risk supervision and evaluation system and method based on data processing
CN115392617A (en) Reservoir tail river reach water environment safety assessment method based on environmental heterogeneity
Coombes et al. The relative efficiency of water supply catchments and rainwater tanks in cities subject to variable climate and the potential for climate change
CN116128144B (en) Urban drainage pipe network partition linkage management method and system
CN112330187A (en) Underground facility flood risk assessment method, system, terminal and storage medium
CN111080129B (en) Scoring method and device for drainage pipe network monitoring points and electronic equipment
CN117196120A (en) Water consumption behavior analysis algorithm for user
CN117191147A (en) Flood discharge dam water level monitoring and early warning method and system
CN115267950B (en) Initial rainwater quantification method and device, storage medium and electronic equipment
CN113792367B (en) PySWMM-based drainage system multi-source inflow infiltration and outflow dynamic estimation method
CN107977727B (en) Method for predicting blocking probability of optical cable network based on social development and climate factors
CN115358587A (en) Regional multi-department collaborative infrastructure planning method and system
CN114324800A (en) Drainage pipeline water inflow monitoring method and system and storage medium
CN113589404A (en) Method for predicting runoff of storm of field
CN111160608A (en) Application method and application system of extreme rainfall weather index, electronic device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant