CN116071018A - Electric power industry installation and connection management system - Google Patents

Electric power industry installation and connection management system Download PDF

Info

Publication number
CN116071018A
CN116071018A CN202310105642.7A CN202310105642A CN116071018A CN 116071018 A CN116071018 A CN 116071018A CN 202310105642 A CN202310105642 A CN 202310105642A CN 116071018 A CN116071018 A CN 116071018A
Authority
CN
China
Prior art keywords
module
link
power
execution
execution data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310105642.7A
Other languages
Chinese (zh)
Inventor
田锦华
王永利
刘雁行
张月圆
乔如妤
段泽晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Marketing Services And Operation Management Branch Of Inner Mongolia Power Group Co ltd
Original Assignee
Electric Power Marketing Services And Operation Management Branch Of Inner Mongolia Power Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Marketing Services And Operation Management Branch Of Inner Mongolia Power Group Co ltd filed Critical Electric Power Marketing Services And Operation Management Branch Of Inner Mongolia Power Group Co ltd
Priority to CN202310105642.7A priority Critical patent/CN116071018A/en
Publication of CN116071018A publication Critical patent/CN116071018A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a power industry report connection management system, which comprises an execution terminal, a cloud server and a management terminal, wherein the execution terminal is connected with the cloud server; the execution terminal is used for uploading execution data of the link where the execution terminal is located to the cloud server by staff in each link of the newspaper installation and connection; the cloud server is used for storing execution data; the management terminal is used for managing the whole flow of the newspaper power on the basis of the execution data by a manager. The invention sets the execution terminal for each link of the newspaper-mounted electricity, so that the staff of each link can upload the execution data. And the manager can inquire the execution data stored in the cloud server through the management terminal, so that the progress and execution conditions of each link of the newspaper installation and connection can be conveniently carried out.

Description

Electric power industry installation and connection management system
Technical Field
The invention relates to the field of management, in particular to a power industry newspaper-mounted electricity management system.
Background
The electricity report and connection comprises the steps of accepting a customer electricity application, formulating a safe, economic and reasonable power supply scheme according to the electricity demand of the customer and combining the condition of a power supply network, determining the investment of a power supply project, organizing the design and implementation of the power supply project, organizing and coordinating and checking the design and implementation of the internal project of the electricity customer, signing a power supply contract, installing a meter and connecting electricity and the like. In the prior art, a system for carrying out full-flow management on the power supply of the power industry is lacking, and data of all links of the power supply are scattered into different departments, so that a manager cannot conveniently know the progress of the power supply and the execution condition of all links.
Disclosure of Invention
The invention aims to disclose a power industry installation and power supply management system, which solves the problem that in the prior art, a system for carrying out full-flow management on the power industry installation and power supply is lacked, so that a manager cannot conveniently know the progress of the installation and power supply and the execution condition of each link.
In order to achieve the above purpose, the invention adopts the following technical scheme:
a power industry report and connection management system comprises an execution terminal, a cloud server and a management terminal;
the execution terminal is used for uploading execution data of the link where the execution terminal is located to the cloud server by staff in each link of the newspaper installation and connection;
the cloud server is used for storing execution data;
the management terminal is used for managing the whole flow of the newspaper power on the basis of the execution data by a manager.
Optionally, the link of reporting and receiving electricity comprises an application acceptance link, a scheme design link, a scheme approval link, a construction link, an acceptance link, a signing link and an electricity receiving link.
Optionally, the execution terminal includes an identity recognition module, a first display module, a data entry module and a first network module;
the identity recognition module is used for recognizing the identity of a worker using the execution terminal;
the first display module is used for displaying an operation interface corresponding to the identity of the staff;
the data input module is used for inputting execution data in the operation interface by a worker;
the first network module is used for transmitting the execution data to the cloud server.
Optionally, the cloud server comprises an interface storage module, an execution data storage module and a communication module;
the interface storage module is used for storing operation interfaces of all links of the newspaper installation and connection;
the execution data storage module is used for storing the execution data of each link of the newspaper power;
the communication module is used for being respectively in communication connection with the first network module and the management terminal.
Optionally, the first network module is further configured to transmit an identity of the worker to the communication module;
the communication module is used for transmitting the identity of the staff to the interface storage module;
the interface storage module is used for acquiring a corresponding operation interface according to the identity of the staff and transmitting the operation interface to the communication module;
the communication module is used for transmitting the operation interface to the first network module;
the first network module is used for transmitting the received operation interface to the first display module.
Optionally, the management terminal includes a query module, a second display module and a second network module;
the second display module is used for displaying a full-flow management interface for reporting the power connection to a manager;
the inquiry module is used for inputting the name of the link to be inquired by the manager;
the second network module is used for sending the name of the link to be queried to the communication module.
Optionally, the communication module is used for transmitting the received name of the link to be queried to the execution data storage module;
the execution data storage module is used for acquiring the execution data of the corresponding link according to the name;
the communication module is used for transmitting the execution data to the second network module.
Optionally, the second network module is configured to transmit the received execution data to the second display module;
the second display module is used for displaying the execution data transmitted by the second network module in the whole-flow management interface.
Optionally, the cloud server further comprises a deadline storage module and a progress monitoring module;
the term storage module is used for storing the working term of each link of the newspaper installation and connection;
the progress monitoring module is used for judging whether links with execution time exceeding the corresponding working period exist in all links of the power-on and power-off, and if yes, a warning prompt is generated.
The communication module is also used for sending the warning prompt to the first network module and the second network module respectively.
Optionally, the first network module is configured to transmit the received warning prompt to the first display module;
the first display module is used for displaying a warning prompt in the operation interface;
the second network module is used for transmitting the received warning prompt to the second display module;
the second display module is used for displaying warning prompts in the whole-flow management interface.
The invention sets the execution terminal for each link of the newspaper-mounted electricity, so that the staff of each link can upload the execution data. And the manager can inquire the execution data stored in the cloud server through the management terminal, so that the progress and execution conditions of each link of the newspaper installation and connection can be conveniently carried out.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and together with the description, serve to explain the principles of the invention.
Fig. 1 is a schematic diagram of a power industry installation management system according to the present invention.
Fig. 2 is a schematic diagram of the present invention for identifying the identity of a worker using an execution terminal.
Detailed Description
Reference will now be made in detail to exemplary embodiments, examples of which are illustrated in the accompanying drawings. When the following description refers to the accompanying drawings, the same numbers in different drawings refer to the same or similar elements, unless otherwise indicated. The implementations described in the following exemplary examples do not represent all implementations consistent with the invention. Rather, they are merely examples of apparatus and methods consistent with aspects of the invention as detailed in the accompanying claims.
The invention provides an electric power industry report and connection management system, as shown in an embodiment of fig. 1, which comprises an execution terminal 301, a cloud server 302 and a management terminal 303;
the execution terminal 301 is used for uploading execution data of the link where the execution terminal is located to the cloud server 302 by staff in each link of the newspaper installation and connection;
the cloud server 302 is used for storing execution data;
the management terminal 303 is used for managing personnel to perform full-process management on the power report based on the execution data.
The invention sets the execution terminal 301 for each link of the newspaper-mounted electricity, so that the staff of each link can upload the execution data. And the manager can query the execution data stored in the cloud server 302 through the management terminal 303, so that the progress and execution condition of each link of the power connection and the report can be conveniently checked.
Optionally, the link of reporting and receiving electricity comprises an application acceptance link, a scheme design link, a scheme approval link, a construction link, an acceptance link, a signing link and an electricity receiving link.
Specifically, the application acceptance link is a link for reporting by a reporting staff, and the execution data in this stage includes a power-on application form, identity data of the reporting staff, land evidence data, reporting application processing process data and the like.
The information such as the position, contact person, electricity demand and the like of the house needing to be connected with electricity needs to be filled in the electricity connection application form.
The identity information of the newspaper-loading personnel can comprise an identity card or an account book, and if the newspaper-loading personnel transacts instead, the newspaper-loading personnel also needs to provide an order book.
The proving data of the land can be a property certificate, a lease contract and the like.
The data of the application acceptance link can comprise the time of receiving the electric application form, the name of a worker for checking various data provided by the reporting personnel, the checking time, the circulation completion time of the link and the like.
Specifically, the scheme design link is a link for designing a scheme of a power supply party after a worker of the power supply department goes to a place where the power is actually used for checking.
In the scheme design link, the execution data includes names of workers who view on site, on-site images, on-site view time, names of workers responsible for design, and the like.
Specifically, the scheme approval link is a link of the power supply department for approving the power supply scheme. In this link, the execution data includes the name of the approver, the approval time, the approval result, and the like.
Specifically, the construction link is a link for installing a power supply line to a building needing power connection. In this link, the execution data includes the installation time, the name of the worker responsible for the installation, the installation result, and the like.
Specifically, the acceptance link is a link for safety acceptance of a worker responsible for acceptance to a building on which a power supply line is installed. In this link, the execution data includes the acceptance time, the name of the acceptance person, the acceptance result of each item of acceptance, and the like.
Specifically, the signing link is a link in which the newspaper-loading personnel and the power supply department sign a power supply contract. In this link, the execution data includes a power supply contract, a contract signing time, and the like.
Specifically, after signing, the electricity connection link is a link for connecting an ammeter to a building with a power supply line, and after the link is finished, the flow of reporting and connecting electricity is finished. In the present invention, the execution database may include an installation time, an electricity meter number, an installer name, and the like.
Optionally, the execution terminal 301 includes an identity recognition module, a first display module, a data entry module, and a first network module;
the identity recognition module is used for recognizing the identity of a worker using the execution terminal 301;
the first display module is used for displaying an operation interface corresponding to the identity of the staff;
the data input module is used for inputting execution data in the operation interface by a worker;
the first network module is used to transmit the execution data to the cloud server 302.
Specifically, as shown in fig. 2, identifying the identity of the worker using the execution terminal 301 includes:
s101, acquiring an identification image of a worker using the execution terminal 301;
s102, acquiring image features of an identity recognition image;
s103, acquiring the identity of the staff based on the image characteristics.
In the invention, the identity is determined based on the image recognition mode, so that the safety of data input can be improved.
Specifically, acquiring an identification image of a worker using the execution terminal 301 includes:
s201, acquiring a face image of a worker using the execution terminal 301;
s202, carrying out quick recognition on the facial image to obtain a recognition result;
s203, it is determined whether or not the face image of the worker using the execution terminal 301 needs to be acquired again based on the recognition result, if yes, the process proceeds to S201, and if no, the face image is used as an identification image, and the process proceeds to S102.
In the invention, the obtained facial image is rapidly identified, and the image which does not meet the requirements, such as the too small difference between pixel values, can be deleted and re-acquired, thereby improving the quality of the obtained image features.
Specifically, the method for quickly identifying the facial image to obtain an identification result comprises the following steps:
carrying out median processing on the face image to obtain a median image;
calculating a quick recognition coefficient of the median image;
if the quick identification coefficient is larger than the coefficient threshold value, the identification result is that the identification is passed; if the quick recognition coefficient is smaller than or equal to the coefficient threshold value, the recognition result is that the recognition is not passed.
In the invention, in order to avoid consuming more time in the rapid recognition stage, the electric median image is acquired based on the face image, and the actual area of the pixels in the median image is enlarged, so that the number of pixels in the process of calculating the parameter rapid recognition coefficient is effectively reduced, thereby improving the rapid recognition efficiency.
Specifically, median processing is performed on the facial image to obtain a median image, which includes:
sliding is performed in the face image using a D x D sliding window, the pixel interval of each sliding is D,
the following processing is performed on the pixel points in the sliding window:
gry w =mid(nei w )
therein, nei w Representing a set of pixel points in the sliding window w, mid represents the acquisition nei w Intermediate values of pixel values of all pixel points in (a);
forming window pixel points by all pixel points in the sliding window w;
setting the pixel value of the window pixel point as gry w And obtaining a median image.
In the median image, the window pixel points are composed of a plurality of normal pixel points, so that the number of the pixel points in the median image is reduced. Moreover, in the quick recognition stage, the main purpose is to acquire a satisfactory image, and therefore, even if the number of pixels in the image is reduced, for the judgment of whether or not the image is satisfactory, since the satisfactory judgment process does not perform calculation of an image requiring high definition such as feature extraction, a desired judgment result can also be obtained.
Moreover, the intermediate value is obtained only by the sequencing algorithm, and compared with the time consumed by directly calculating the quick identification coefficient of the corresponding real pixel point in the window pixel point, the time consumed by the sequencing algorithm is obviously far less than the time consumed by directly calculating the real pixel point, so that the accuracy of a judgment result is ensured, and meanwhile, the judgment time is effectively shortened.
Specifically, calculating the fast recognition coefficient of the median image includes:
the quick recognition coefficients are calculated using the following functions:
Figure BDA0004074734110000051
wherein qwki represents the quick recognition coefficient; delta, phi and gamma respectively represent a first proportion value, a second proportion value and a third proportion value which are set; the sum of the first proportion value, the second proportion value and the third proportion value is 1; n (N) abv Representing the number of window pixel points in the median image with luminance values greater than the set luminance threshold, N all Representing the total number of window pixels contained in the median image, qwk representing the set of window pixels, floor s Representing the absolute value of the luminance difference between window pixel s and the window pixel with the largest luminance in its 8 neighbors, abs representing the absolute value variance reference constant set, locl (qwk) representing the area parameter;
Figure BDA0004074734110000061
wherein S represents the area of the median image, x ma And x mi Respectively representing the maximum value and the minimum value of the abscissa of the window pixel points meeting the screening requirement, y ma And y mi Respectively show that meets the screening requirementsMaximum and minimum values of the ordinate of the window pixel points.
The quick recognition coefficient consists of three parts, wherein the first part is the number of window pixels meeting the brightness requirement, the second part is the maximum difference between the window pixels, and the third part is the area estimation of the area of the pixels meeting the screening requirement.
The first part can exclude images with too low a brightness, the second part can exclude images with unclear boundaries, and the third part can exclude images with too small an effective calculation area.
The larger the numerical value of each part in the three parts is, the larger the probability that the face image meets the requirements is, so that the judgment of the requirements can be made.
Specifically, the process of judging whether the window pixel points meet the screening requirements comprises the following steps:
acquiring a red image component R, a green image component G and a red image component B of a window pixel point winpix in an RGB space;
if Rmin is less than or equal to R winpix Rmax is less than or equal to Rmin and Gmin is less than or equal to G winpix Gmax is less than or equal to 2 and Bmin is less than or equal to B winpix If Bmax is less than or equal to, window pixel points winpix meet the screening requirements, otherwise, window pixel points winpix do not meet the screening requirements;
rmin and Rmax represent the lower and upper screening values of the red image component R, gmin and Gmax represent the lower and upper screening values of the green image component G, bmin and Bmax represent the lower and upper screening values of the blue image component R,
R winpix 、G winpix 、B winpix the pixel value of window pixel point winpix in R, G, B is represented.
By performing the calculation in the RGB space, the pixels having the capability of effective calculation can be screened out, for example, the pixels of the five sense organs region of the staff are screened out.
Specifically, determining whether or not a face image of a worker using the execution terminal 301 needs to be acquired again based on the recognition result includes:
if the recognition result is that the recognition is passed, it is not necessary to acquire the face image of the worker using the execution terminal 301 again; if the recognition result is that the recognition is not passed, the face image of the worker using the execution terminal 301 needs to be acquired again.
Specifically, acquiring the image features of the identification image includes:
s301, filtering the identity identification image to obtain a filtered image;
s302, calculating a filtered image by using an adaptive segmentation algorithm to obtain a calculated image;
s303, acquiring image characteristics of the calculated image.
Specifically, the adaptive segmentation algorithm includes:
using wimg to represent the image to be segmented;
image segmentation is carried out on the image wimg by using an Ojin method, a first segmentation threshold value is obtained, and pixel points in the image wimg are divided into a set U1 of pixel points larger than the first segmentation threshold value and a set U2 of pixel points smaller than the segmentation threshold value;
image segmentation is carried out on the pixel points in the set U1 by using an Ojin method, a second segmentation threshold value is obtained, and the pixel points in the set U1 are divided into a set U11 of pixel points larger than the second segmentation threshold value and a set U12 of pixel points smaller than the second segmentation threshold value;
image segmentation is carried out on the pixel points in the set U2 by using an Ojin method, a third segmentation threshold value is obtained, and the pixel points in the set U2 are divided into a set U21 of pixel points larger than the third segmentation threshold value and a set U22 of pixel points smaller than the third segmentation threshold value;
calculating a set coefficient nuix:
Figure BDA0004074734110000071
wherein vstr U11 、vstr U12 、vstr U21 、vstr U22 Dividing coefficients of pixel points in the set U11, the set U12, the set U21 and the set U22 are respectively represented; stu (Stu) 11 、stu 12 、stu 21 、stu 22 Respectively represent the set vstr U11 、vstr U12 、vstr U21 、vstr U22 Is a division coefficient comparison value of (a);
if the set coefficient is greater than the set coefficient threshold, a fourth segmentation threshold is calculated using the following function:
cthr 4 =cthr 1 +uin;
if the set coefficient is equal to or smaller than the set coefficient threshold, a fourth segmentation threshold is calculated using the following function:
cthr 4 =cthr 1 -uin;
uin represents the set unit change amount, cthr 4 And cthr 1 Respectively representing a fourth segmentation threshold and a first segmentation threshold;
and performing image segmentation on the image wimg by using a fourth segmentation threshold value, and forming a calculated image by pixel points larger than the fourth segmentation threshold value.
Compared with the existing segmentation algorithm, the method and the device have the advantages that after the segmentation result is obtained by using the first segmentation threshold, the first segmentation threshold is adjusted by calculating the set coefficient, so that a more accurate segmentation result is obtained. The larger the set coefficient is, the larger the difference between the pixels segmented in the second segmentation threshold and the third segmentation threshold is still, and in the invention, the face region is expected to be segmented, therefore, the larger the set coefficient is, the larger the probability that a plurality of pixels not belonging to the face region are segmented into the pixels of the face region is, therefore, the invention removes the part of the pixels by adjusting the first segmentation threshold, otherwise, the first segmentation algorithm is adjusted to be low, and a more accurate segmentation result is obtained.
In particular, the partition coefficient may be a variance of a gradient of pixel points in the set or a variance of pixel values.
Specifically, acquiring the identity of the staff based on the image features includes:
the image feature obtained by the execution terminal 301 is noted as a first feature, and the image feature of the previously stored identification image of the worker is noted as a second feature;
comparing the first characteristic with the second characteristic to obtain a correlation coefficient between the first characteristic and the second characteristic;
and acquiring the identity corresponding to the maximum correlation coefficient.
Specifically, a table of the relationship between the image features and the identities of the staff members may be pre-stored, and the second feature most relevant to the first feature is determined according to the correlation coefficient, so that the identities of the staff members using the execution terminal 301 can be obtained based on the second feature.
Specifically, the identity includes a department name, a post name, and the like.
Optionally, the cloud server 302 includes an interface storage module, an execution data storage module, and a communication module;
the interface storage module is used for storing operation interfaces of all links of the newspaper installation and connection;
the execution data storage module is used for storing the execution data of each link of the newspaper power;
the communication modules are used for communication connection with the first network module and the management terminal 303, respectively.
Specifically, different links correspond to different departments in different power stations, so that the operation interfaces between the links are not necessarily the same.
Optionally, the first network module is further configured to transmit an identity of the worker to the communication module;
the communication module is used for transmitting the identity of the staff to the interface storage module;
the interface storage module is used for acquiring a corresponding operation interface according to the identity of the staff and transmitting the operation interface to the communication module;
the communication module is used for transmitting the operation interface to the first network module;
the first network module is used for transmitting the received operation interface to the first display module.
Specifically, after the identity of the staff is identified, the link of the staff in the whole newspaper-mounted electricity full flow can be known, so that a corresponding operation interface is adaptively displayed for the staff.
Optionally, the management terminal 303 includes a query module, a second display module, and a second network module;
the second display module is used for displaying a full-flow management interface for reporting the power connection to a manager;
the inquiry module is used for inputting the name of the link to be inquired by the manager;
the second network module is used for sending the name of the link to be queried to the communication module.
Specifically, the whole process management interface can display the flow chart of each link of the whole installation and connection process and the data of the responsible person of each link, etc. of the link which the whole installation and connection process passes through at present.
Optionally, the communication module is used for transmitting the received name of the link to be queried to the execution data storage module;
the execution data storage module is used for acquiring the execution data of the corresponding link according to the name;
the communication module is used for transmitting the execution data to the second network module.
Specifically, the query module may also be used for a manager to input the name of a detailed item to be queried, for example, the name of a worker responsible for construction, etc.
Optionally, the second network module is configured to transmit the received execution data to the second display module;
the second display module is used for displaying the execution data transmitted by the second network module in the whole-flow management interface.
Optionally, the cloud server 302 further includes a deadline storage module and a progress monitoring module;
the term storage module is used for storing the working term of each link of the newspaper installation and connection;
the progress monitoring module is used for judging whether links with execution time exceeding the corresponding working period exist in all links of the power-on and power-off, and if yes, a warning prompt is generated.
The communication module is also used for sending the warning prompt to the first network module and the second network module respectively.
Specifically, when the flow of the reporting node reaches a certain link, the progress monitoring module counts down the remaining completion time of the link according to the corresponding working period of the link, and when the count down is finished, the link does not reach the next link yet, then a warning prompt is generated.
Specifically, the warning prompt includes the name of the link exceeding the working period, the working period of the link, the processing rule exceeding the working period, and the like.
Optionally, the first network module is configured to transmit the received warning prompt to the first display module;
the first display module is used for displaying a warning prompt in the operation interface;
the second network module is used for transmitting the received warning prompt to the second display module;
the second display module is used for displaying warning prompts in the whole-flow management interface.
The foregoing is only a specific embodiment of the invention to enable those skilled in the art to understand or practice the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The power industry report and connection management system is characterized by comprising an execution terminal, a cloud server and a management terminal;
the execution terminal is used for uploading execution data of the link where the execution terminal is located to the cloud server by staff in each link of the newspaper installation and connection;
the cloud server is used for storing execution data;
the management terminal is used for managing the whole flow of the newspaper power on the basis of the execution data by a manager.
2. The power industry power extension management system of claim 1, wherein the power extension links include an application acceptance link, a scheme design link, a scheme approval link, a construction link, an acceptance link, a subscription link, and a power extension link.
3. The power industry connection management system of claim 1, wherein the execution terminal comprises an identity recognition module, a first display module, a data entry module and a first network module;
the identity recognition module is used for recognizing the identity of a worker using the execution terminal;
the first display module is used for displaying an operation interface corresponding to the identity of the staff;
the data input module is used for inputting execution data in the operation interface by a worker;
the first network module is used for transmitting the execution data to the cloud server.
4. The power industry power-on and off management system according to claim 3, wherein the cloud server comprises an interface storage module, an execution data storage module and a communication module;
the interface storage module is used for storing operation interfaces of all links of the newspaper installation and connection;
the execution data storage module is used for storing the execution data of each link of the newspaper power;
the communication module is used for being respectively in communication connection with the first network module and the management terminal.
5. The power industry tie-in management system of claim 4, wherein the first network module is further configured to transmit the identity of the worker to the communication module;
the communication module is used for transmitting the identity of the staff to the interface storage module;
the interface storage module is used for acquiring a corresponding operation interface according to the identity of the staff and transmitting the operation interface to the communication module;
the communication module is used for transmitting the operation interface to the first network module;
the first network module is used for transmitting the received operation interface to the first display module.
6. The power industry power on and off management system of claim 4, wherein the management terminal comprises a query module, a second display module and a second network module;
the second display module is used for displaying a full-flow management interface for reporting the power connection to a manager;
the inquiry module is used for inputting the name of the link to be inquired by the manager;
the second network module is used for sending the name of the link to be queried to the communication module.
7. The power industry report and connection management system according to claim 6, wherein the communication module is used for transmitting the received name of the link to be queried to the execution data storage module;
the execution data storage module is used for acquiring the execution data of the corresponding link according to the name;
the communication module is used for transmitting the execution data to the second network module.
8. The power industry tie-in power management system of claim 7, wherein the second network module is configured to transmit the received execution data to the second display module;
the second display module is used for displaying the execution data transmitted by the second network module in the whole-flow management interface.
9. The power industry connection management system of claim 6, wherein the cloud server further comprises a deadline storage module and a progress monitoring module;
the term storage module is used for storing the working term of each link of the newspaper installation and connection;
the progress monitoring module is used for judging whether links with execution time exceeding the corresponding working period exist in all links of the power-on and power-off, and if yes, a warning prompt is generated.
The communication module is also used for sending the warning prompt to the first network module and the second network module respectively.
10. The power industry tie-in power management system of claim 9, wherein the first network module is configured to transmit the received warning prompt to the first display module;
the first display module is used for displaying a warning prompt in the operation interface;
the second network module is used for transmitting the received warning prompt to the second display module;
the second display module is used for displaying warning prompts in the whole-flow management interface.
CN202310105642.7A 2023-02-01 2023-02-01 Electric power industry installation and connection management system Pending CN116071018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310105642.7A CN116071018A (en) 2023-02-01 2023-02-01 Electric power industry installation and connection management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310105642.7A CN116071018A (en) 2023-02-01 2023-02-01 Electric power industry installation and connection management system

Publications (1)

Publication Number Publication Date
CN116071018A true CN116071018A (en) 2023-05-05

Family

ID=86181771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310105642.7A Pending CN116071018A (en) 2023-02-01 2023-02-01 Electric power industry installation and connection management system

Country Status (1)

Country Link
CN (1) CN116071018A (en)

Similar Documents

Publication Publication Date Title
CN111355941B (en) Image color real-time correction method, device and system
JP4185699B2 (en) Form reading system, form reading method and program therefor
CN116633816A (en) Media display terminal safety supervision early warning system based on enterprise digitization
CN110766558A (en) Method, device and equipment for processing data of underwriting and computer readable storage medium
CN111199018A (en) Abnormal data detection method and device, storage medium and electronic equipment
CN110855012A (en) Real-time line loss intelligent analysis system for transformer area
CN109635265A (en) A kind of test report generation system based on image recognition
CN105574666A (en) Method and device for evaluating credit level of enterprise based on key data modeling
CN115187927A (en) Remote monitoring management method and system for viewing seat
CN115545058A (en) Water meter data analysis method and system and readable storage medium
CN111461487B (en) Indoor decoration engineering wisdom management system based on BIM
CN110765289A (en) Method for rapidly acquiring building crack opening degree at low cost
CN117093822B (en) Industrial brain data analysis platform based on industrial knowledge graph
CN116344378B (en) Intelligent detection system for photovoltaic panel production and detection method thereof
CN116071018A (en) Electric power industry installation and connection management system
CN107871344B (en) Anti-substitute-printing attendance checking method for intelligent monitoring management
CN116894639B (en) Multi-information fusion plan management system and method for Internet of things
CN108921433B (en) Risk quantitative analysis system based on business continuity
CN115098919B (en) BIM-based digital engineering construction project comprehensive management system and method
CN113052417A (en) Resource allocation method and device
CN114943465A (en) Enterprise management consultation service system based on data analysis
CN106850291B (en) Network monitoring management system and method
KR20200013136A (en) Watt-Hour Meter Measurement Character Learning Method using Vision IoT
CN117312583B (en) House user data auxiliary management method and system
CN117172729B (en) Labor affair subcontracting personnel management system based on big data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination