CN1160503C - 一次成墙多头深层搅拌桩机及其施工方法 - Google Patents

一次成墙多头深层搅拌桩机及其施工方法 Download PDF

Info

Publication number
CN1160503C
CN1160503C CNB001093851A CN00109385A CN1160503C CN 1160503 C CN1160503 C CN 1160503C CN B001093851 A CNB001093851 A CN B001093851A CN 00109385 A CN00109385 A CN 00109385A CN 1160503 C CN1160503 C CN 1160503C
Authority
CN
China
Prior art keywords
wall
deep
pile machine
once
mixed pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNB001093851A
Other languages
English (en)
Other versions
CN1326034A (zh
Inventor
伟 韦
韦伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENCHONG ENGINEERING Co LTD BEIJING
Original Assignee
ZHENCHONG ENGINEERING Co LTD BEIJING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENCHONG ENGINEERING Co LTD BEIJING filed Critical ZHENCHONG ENGINEERING Co LTD BEIJING
Priority to CNB001093851A priority Critical patent/CN1160503C/zh
Publication of CN1326034A publication Critical patent/CN1326034A/zh
Application granted granted Critical
Publication of CN1160503C publication Critical patent/CN1160503C/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

一次成墙多头深层搅拌桩机及其施工方法。是由动力箱通过驱动机构连接若干根中空钻杆,每根钻杆按一字形排列,每根钻杆上分别滑动配合一滑套,每个滑套共固接在一固定约束装置上,且每根相邻钻杆的钻头在纵向上相互错位。施工中一次可形成一个单元墙,并按单元墙之间的尾首桩套接或搭接依次施工,工效提高一倍以上,单元墙内的桩之间不开叉,深度达30m,并保证最小墙厚。

Description

一次成墙多头深层搅拌桩机及其施工方法
技术领域
本发明涉及一种一次成墙多头深层搅拌桩机及其施工方法。
背景技术
水泥土防渗墙是由深层搅拌工法来实现,深层搅拌法是早起源于美国,二战后引入日本并由日本发展应用于工业与民用建筑工程、港口、公路铁路路基加固。70年代后期引入中国,也主要应用于上述领域,到了90年代,在淮河流域,我国首次把普通深层搅拌工法应用到了水库坝基防渗成功。由于普通深层搅拌工法是采用单钻头,施工工效低,而且直径大造价高,每平方米成墙造价达200元,每台班仅能成墙30m2。后来在我国又发明了“多头小直径深层搅拌桩截渗墙技术”,其成墙造价只有80元/m2左右,工效提高了四倍。实践证明截渗效果良好,尤其98年大洪水管涌成群的九江赤心堤用该技术加固后,99年(洪水位比98年低0.34m,高水位持续时间同98年)未发现一处管涌,目前该技术已申请专利,申请号为98110514.9,名为:一种堤坝截渗墙及其施工方法。该技术已广泛应用于长江、黄河、淮河、海河、松花江、太湖等流域干堤加固工程,应用防渗墙面积已超过100万m2,为国家节省资金超过亿元人民币。
多头小直径深层搅拌桩截渗墙技术是利用普通深层搅拌桩固化机理,在原来成桩工艺的基础上发展研制而成,技术方法是,用水泥浆作固化剂,通过多头小直径深层搅拌桩机(专利号为98235301.4)将水泥浆喷入土层,同时钻头搅拌,利用固化剂、土体和水之间产生的一系列物理化学反应,使水泥土硬结成具有良好整体性、稳定性、不透水性,并具有一定强度的水泥土防渗墙。主要工艺流程有:
(1)主机就位并调试,安装水泥浆液制备系统;
(2)主机调平,制浆系统搅拌制浆
(3)启动主机;使多钻头同时转动并向下钻进,与此同时多管浆泵开始输浆,在钻头喷浆搅拌钻进的同时达设计深度;
(4)提升钻头喷浆搅拌至地面,完成第1序号桩施工;如图1所示,第1序号桩为3个,即图1中序号为1的3个桩;
(5)主机上机架第一次纵移至第2序号桩位,两序号桩搭接尺寸按设计要求;
(6)重复(2)、(3)、(4)项完成第2序桩;如图1所示,第2序号桩为3个,即图1中序号为2的3个桩,序号为2的3个桩分别与序号1的3个桩搭接;
(7)主机上机架第二次纵移至第3桩位,两序号桩搭接尺寸按设计要求;
(8)重复(2)、(3)、(4)项步骤完成第3序号桩,如图1所示,第3号桩为3个,即图1中序号为3的3个桩,序号为3的3个桩分别与序号1的3个桩、序号2的3个桩分别搭接,形成9个桩相互搭接,至此完成一个单元墙施工;
(9)主机整机沿先标定的方向移动,第二单元第1序号桩就位,两单元起迄桩搭接尺寸仍按设计要求,重复(2)-(8)项步骤,如此连续作业,最终成墙。
多头小直径深层搅拌截渗技术存在的主要问题是:
(1)三次搭接才能做成一个单元墙,成墙工效仍较低,约13m2/小时,若改成3-6个头实现一次成墙可使工效提高一倍以上。
(2)该技术所用原设备的多头之间无固定约束,随着钻进深度的增加有可能出现钻头较大漂移,造成墙体开叉现象,多钻头之间若有约束则可避免这一现象。
(3)正是多钻头之间无约束,施工深度受至限制,原设备的施工深度超不过15m,
(4)正是由于三次才能搭接成一个单元墙,才使得钻头之间的约束难以实现。
发明内容
本发明的目的是提供一种一次成墙深层搅拌桩机及其施工方法、该多桩机和施工方法可保证一次成墙,不存在单元墙内桩之间的开叉现象,最大施工深度可达30m,工效提高一倍以上,成墙造价比原来可降低20%左右。
为实现上述目的,本发明采取以下设计方案:一种一次成墙多头深层搅拌桩机,是由动力箱通过驱动机构连接若干根中空钻杆,所述的每根钻杆按一字形排列,每根钻杆上分别滑动配合一滑套,每个滑套共固接在一固定约束装置上,且每根相邻钻杆的钻头在纵向上相互错位。由于采用固定约束装置及钻头的错位的结构,可以保证相邻钻头的中心距达到搭接长度的要求,一次施工可形成一个单元墙,钻进深度可达30m。
在本发明的设备中,钻头可以为多种方式,如螺旋钻头,十字形叶片钻头等。采用十字形叶片钻头,其错位方式是,相邻钻杆的前后向叶片与左右向叶片排列顺序相反,并且相互错开。
在本发明设备中,所述的相邻钻杆间的固定约束装置的两侧分别设有一滚压轮。采用滚压轮以保证最小墙厚。
本发明设备中,也可以采取另一种方式保证最小墙厚,所述的相邻钻杆间的固定约束装置的两侧分别设有一切削边刀,并由所对应的相邻的钻杆分别通过传动机构与切削边刀连接。
在本发明设备中,所述的钻杆为3-6根。
在本发明设备中,所述的每根钻杆的钻头的直径为250-400mm,相邻钻头的中心距为200-350mm。钻机通过加长可完成30米深桩。
采用本发明设备的施工方法包括下述步骤:
(1)采用泥浆泵向一次成墙多头深层搅拌桩机输浆;
(2)采用一次成墙多头深层搅拌桩机进行第一单元墙的施工;
(3)采用一次成墙多头深层搅拌桩机进行第二单元墙的的施工,并使第二单元的最前一根桩与第一单元的最后一根桩套接;
依次进行以后单元墙并重复上述单元墙之间套接施工过程,直至全部桩连成所需的水泥防渗墙。
两个单元墙之间也可以采用尾、首桩相割搭接的方式。该施工方法包括下述步骤:
(1)采用泥浆泵向一次成墙多头深层搅拌桩机输浆;
(2)采用一次成墙多头深层搅拌桩机进行第一单元墙的施工;
(3)采用一次成墙多头深层搅拌桩机进行第二单元墙的的施工,并使第二单元的最前一根桩与第一单元的最后一根桩相割搭接;
依次进行以后单元墙并重复上述单元墙之间搭接施工过程,直至全部桩连成所需的水泥防渗墙。
下面结合附图对本发明作进一步说明。
附图说明
图1为原多头小直径搅拌桩机施工顺序图
图2为采用本发明的一次成墙多头深层搅拌桩机施工顺序图
图3为钻杆与固定约束装置的结构图
图4为图3的侧视图
图5为图3的A-A剖视图
图6为一次成墙多头搅拌桩机的示意图
图7为钻头示意图
图8为图7的B-B示意图
图9为切削边刀安装示意图
具体实施方式
本发明的一次成墙多头深层搅拌桩机采用常规的动力箱和驱动机构,如图6所示,是由动力箱9通过驱动机构10连接6根中空钻杆11,钻杆的中心空芯可以输水泥浆或气体。如图3、图4、图5所示,每根钻杆11按一字形排列,每根钻杆11上分别滑动配合一滑套12,滑套12套卡在钻杆11外径的凹进处,不会从钻杆11上脱落,每个滑套12共固接在一固定约束装置14上,如图4所示,滑套12是通过凸块与凹槽的方式固接在固定约束装置14上,使每根钻杆11之间的中心距保持固定,在成桩时避免单元墙内的桩之间的开叉现象发生,保证了施工质量。如图3、图4、图5所示,固定约束装置14上装设固定板16,滚压轮15安装在与两固定板转动连接的滚压轮轴17上,采用滚压轮15可以保证最小墙厚。如图7、图8所示,钻头18为十字形叶片,相邻钻杆11的前后向叶片19与左右向叶片20排列顺序相反,并且相互错开。该设备的钻头直径为250mm-400mm,相邻钻头的中心距为200mm-350mm,钻机通过加长可完成30米深桩。这样可以保证打出的桩之间的搭接长度不小于50mm。采用本发明的设备进行施工,最大钻进深度可达30m,单钻杆输出扭距为2-10KN·m。
如图9所示,在相邻钻杆间的固定约束装置14的两侧分别设有一切削边刀8,并由所对应的相邻钻杆分别通过传动机构7与切削边刀8连接。钻杆通过传动机构7驱动切削边刀8旋转,也可以保证最小墙厚。
实施例
采用本发明的设备进行施工,与普通深层搅拌施工法一样,也是使用水泥浆作为固化剂,使用水泥浆和土搅拌形成水泥土墙。
采用本发明的设备施工的工艺过程为:
拉线放样,用标尺定出桩位;搅拌制水泥浆;主机就位、调平主机;操作输浆泵向主机钻杆输浆;启动主机,使钻头旋钻入土并喷射水泥浆,钻进到设计深度后,提升钻杆的同时钻头仍然搅拌喷浆至施工地面,完成一个单元墙的施工,然后按设计要求的搭接尺寸向前移动,搭接施工重复前述过程,其主要特点不需象普通多头小直径深层搅拌桩机采用三次搭接完成一单元墙。而采用本发明的设备是一次即可成单元墙。
如图2所示,采用本发明的设备进行施工,每根钻头的直径为300mm,相邻两钻头的中心距为200mm,采用六钻头的桩机,一次施工形成一个单元墙,即6个第1’序号桩的长度为150mm+200mm×5+150mm=1300mm,再使第二单元的最前一根桩与第一单元的最后一根桩套接,两个单元墙即6个第1’序号桩和5个第2’序号桩(还有1个第2’序号桩与第1’序号桩重合)的长度为150mm+200mm×10+150mm=2300mm。
如图1所示,采用普通多头小直径深层搅拌桩机进行施工,每根钻头的直径也为300mm,要进行三次搭接才能完成一单元墙,在每个桩的中心距为200mm时,该单元墙即3个第1序号的桩、3个第2序号桩和3个第3序号桩的长度为150mm+200mm×8+150mm=1900mm。与采用本发明的设备施工相比,普通技术三次搭接成一单元墙长度不如本发明的二次搭接的两单元墙的长度,并且,由于本发明采用了滚压轮,使两桩搭接处21的厚度增加,保证最小墙厚。采用本发明的设备的施工方法的工效确实提高很多。
采用本发明的设备的施工法具有以下优点:
1、一次施工形成一个单元墙,不需要三次搭接,一次可成墙0.7-1.8m,工效可提高一倍以上。
2、在多钻杆之间增加了固定约束装置,避免了单元墙内的桩之间的开叉现象发生,而且固定约束装置上设有滚压轮可保证最小墙厚。保证了施工质量。
3、成墙深度可达30m,比原有技术的适用范围扩大了很多,具有更加广阔的市场前景。

Claims (9)

1、一种一次成墙多头深层搅拌桩机,是由动力箱通过驱动机构连接若干根中空钻杆,其特征在于:所述的每根钻杆按一字形排列,每根钻杆上分别滑动配合一滑套,每个滑套共固接在一固定约束装置上,且每根相邻钻杆的钻头在纵向上相互错位。
2、根据权利要求1所述的一次成墙多头深层搅拌桩机,其特征在于:所述的钻头为十字形叶片,其错位方式是,相邻钻杆的前后向叶片与左右向叶片排列顺序相反,并且相互错开。
3、根据权利要求1所述的一次成墙多头深层搅拌桩机,其特征在于:所述的钻头为螺旋钻头。
4、根据权利要求2或3所述的一次成墙多头深层搅拌桩机,其特征在于:所述的相邻钻杆间的固定约束装置的两侧分别设有一滚压轮。
5、根据权利要求2或3所述的一次成墙多头深层搅拌桩机,其特征在于:所述的相邻钻杆间的固定约束装置的两侧分别设有一切削边刀,并由所对应的相邻的钻杆分别通过传动机构与切削边刀连接。
6、根据权利要求4所述的一次成墙多头深层搅拌桩机,其特征在于:所述的钻杆为3-6根。
7、根据权利要求6所述的一次成墙多头深层搅拌桩机,其特征在于:所述的每根钻杆的钻头的直径为250-400mm,相邻钻头的中心距为200-350mm。
8、采用权利要求1所述的一次成墙多头深层搅拌桩机的施工方法,其特征在于:该方法包括下述步骤:
(1)采用泥浆泵向一次成墙多头深层搅拌桩机输浆;
(2)采用一次成墙多头深层搅拌桩机进行第一单元墙的施工;
(3)采用一次成墙多头深层搅拌桩机进行第二单元墙的施工,并使第二单元的最前一根桩与第一单元的最后一根桩套接;
依次进行以后单元墙并重复上述单元墙之间套接的施工过程,直至全部桩连成所需的水泥防渗墙。
9、采用权利要求1所述的一次成墙多头深层搅拌桩机的施工方法,其特征在于:该方法包括下述步骤:
(1)采用泥浆泵向一次成墙多头深层搅拌桩机输浆;
(2)采用一次成墙多头深层搅拌桩机进行第一单元墙的施工;
(3)采用一次成墙多头深层搅拌桩机进行第二单元墙的施工,并使第二单元的最前一根桩与第一单元的最后一根桩相割搭接;
依次进行以后单元墙并重复上述单元墙之间搭接的施工过程,直至全部桩连成所需的水泥防渗墙。
CNB001093851A 2000-05-31 2000-05-31 一次成墙多头深层搅拌桩机及其施工方法 Expired - Lifetime CN1160503C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB001093851A CN1160503C (zh) 2000-05-31 2000-05-31 一次成墙多头深层搅拌桩机及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB001093851A CN1160503C (zh) 2000-05-31 2000-05-31 一次成墙多头深层搅拌桩机及其施工方法

Publications (2)

Publication Number Publication Date
CN1326034A CN1326034A (zh) 2001-12-12
CN1160503C true CN1160503C (zh) 2004-08-04

Family

ID=4579605

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB001093851A Expired - Lifetime CN1160503C (zh) 2000-05-31 2000-05-31 一次成墙多头深层搅拌桩机及其施工方法

Country Status (1)

Country Link
CN (1) CN1160503C (zh)

Families Citing this family (57)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100465383C (zh) * 2006-06-26 2009-03-04 河海大学 多头小直径长螺旋钻进成墙机的成墙方法
CN102383432A (zh) * 2011-02-23 2012-03-21 上海城地建设发展有限公司 三轴(二轴)水泥土搅拌桩中插h型钢筋砼板桩围护方法
CN104612178B (zh) * 2014-12-31 2016-04-20 卢兴耐 水泥土搅拌成墙机
CN104612132B (zh) * 2015-02-28 2016-05-18 宗超 挡板搅拌桩墙机
CN104863135A (zh) * 2015-06-05 2015-08-26 刘玉秋 H型水泥土桩机
CN104988908A (zh) * 2015-06-05 2015-10-21 刘玉秋 正方形搅拌钻机
CN104831713A (zh) * 2015-06-05 2015-08-12 刘玉燕 一种腰圆成桩机的实施方法
CN104831711A (zh) * 2015-06-05 2015-08-12 赵子健 六棱柱复合水泥土桩机
CN104831710A (zh) * 2015-06-05 2015-08-12 刘玉燕 楔形锁口桩成型装置
CN104831715A (zh) * 2015-06-05 2015-08-12 刘玉秋 H型水泥土桩机
CN104831709A (zh) * 2015-06-05 2015-08-12 张璐 一种三角形搅拌钻机的实施方法
CN104912059B (zh) * 2015-06-30 2016-12-14 重庆环德科技有限公司 搅拌成墙机的一种用法
CN105133593A (zh) * 2015-08-09 2015-12-09 刘玉秋 拱门形桩制作设备的一种用法
CN105133591A (zh) * 2015-08-09 2015-12-09 刘玉秋 双v端头桩制作设备
CN105133594A (zh) * 2015-08-09 2015-12-09 刘玉秋 拱门形桩制作设备
CN105178297B (zh) * 2015-08-09 2016-11-30 重庆晨宇机床制造有限公司 八边形搅拌桩墙机的一种用法
CN105178303B (zh) * 2015-08-09 2016-12-14 重庆科燃科技有限公司 双v端头桩制作设备的一种用法
CN105421350A (zh) * 2015-12-31 2016-03-23 卢兴耐 矩形组合钻搅机
CN105442577A (zh) * 2015-12-31 2016-03-30 卢兴耐 矩形插口x形桩成桩机
CN105421355A (zh) * 2015-12-31 2016-03-23 卢兴耐 楔形接头桩钻搅机
CN105464084A (zh) * 2015-12-31 2016-04-06 吕文娥 半圆插口π桩搅拌钻机
CN105649020A (zh) * 2015-12-31 2016-06-08 卢兴耐 V形接头桩搅拌钻机
CN105649018A (zh) * 2015-12-31 2016-06-08 卢兴耐 半圆插口桩搅拌钻机
CN105442576A (zh) * 2015-12-31 2016-03-30 朱艳菊 圆角六边形钻搅机
CN105442551A (zh) * 2015-12-31 2016-03-30 宋姝娴 L桩与矩形桩半圆锁扣设备
CN105649021A (zh) * 2015-12-31 2016-06-08 卢兴耐 方圆组合桩搅拌钻机
CN105421368A (zh) * 2015-12-31 2016-03-23 卢兴耐 矩形桩与h桩梯形插扣设备
CN105421404A (zh) * 2015-12-31 2016-03-23 叶连国 十字桩与矩形桩圆弧锁扣设备
CN105421344A (zh) * 2015-12-31 2016-03-23 卢兴耐 V形插头x桩成桩机
CN105464088A (zh) * 2015-12-31 2016-04-06 宗超 矩形插口x形桩成桩机
CN105442584A (zh) * 2015-12-31 2016-03-30 卢兴耐 π桩与矩形桩矩形插扣设备
CN105714775A (zh) * 2016-02-18 2016-06-29 韩希鹏 T桩与矩形桩圆弧咬合设备
CN105586898A (zh) * 2016-02-18 2016-05-18 吕文娥 X桩与矩形桩圆弧咬合设备
CN105586901A (zh) * 2016-02-18 2016-05-18 吕文娥 Y桩与矩形桩v形插合设备
CN105586900A (zh) * 2016-02-18 2016-05-18 吕文娥 Y桩与矩形桩梯形插合设备
CN105714782A (zh) * 2016-02-18 2016-06-29 吕文娥 X桩与矩形桩梯形扣合设备
CN105586899A (zh) * 2016-02-18 2016-05-18 吕文娥 Y桩与矩形桩矩形接合设备
CN105714777A (zh) * 2016-02-18 2016-06-29 韩希鹏 Y桩与矩形桩圆弧扣合设备
CN105586895A (zh) * 2016-02-18 2016-05-18 吕文娥 T桩与矩形桩弧形插接设备
CN105714783A (zh) * 2016-02-18 2016-06-29 吕文娥 Y桩与矩形桩圆弧插合设备
CN105714781A (zh) * 2016-02-18 2016-06-29 吕文娥 T桩与矩形桩梯形锁扣设备
CN105672276A (zh) * 2016-02-18 2016-06-15 吕文娥 Y桩与矩形桩v形接合设备
CN105714776A (zh) * 2016-02-18 2016-06-29 韩希鹏 Y桩与矩形桩矩形插合设备
CN105586897A (zh) * 2016-02-18 2016-05-18 吕文娥 X桩与矩形桩v形接合设备
CN105586896A (zh) * 2016-02-18 2016-05-18 吕文娥 圆弧插扣十字桩制造设备
CN105586902A (zh) * 2016-02-18 2016-05-18 吕文娥 Y桩与矩形桩矩形插接设备
CN105625396A (zh) * 2016-02-18 2016-06-01 吕文娥 T桩与矩形桩梯形插接设备
CN105735261A (zh) * 2016-03-04 2016-07-06 韩希鹏 正六边形桩与h桩插扣设备
CN105735262A (zh) * 2016-03-04 2016-07-06 韩希鹏 正六边形桩与t桩插扣装置
CN105735272A (zh) * 2016-03-13 2016-07-06 陈兆英 三角形桩与矩形桩锁扣设备
CN105586959A (zh) * 2016-03-13 2016-05-18 陈兆英 三角形桩与t桩锁扣设备
CN105735274A (zh) * 2016-03-14 2016-07-06 陈兆英 三角形桩与十字桩插扣桩墙制造装置
CN105756039A (zh) * 2016-03-14 2016-07-13 陈兆英 三角形桩与t桩插扣桩墙制造装置
CN105735273A (zh) * 2016-03-14 2016-07-06 陈兆英 三角形桩与十字桩插接桩墙制造装置
CN105735276A (zh) * 2016-03-22 2016-07-06 陈兆英 梅花桩制造设备
CN113700935B (zh) * 2021-09-09 2022-12-30 安徽省新路建设工程集团有限责任公司 软土地区开槽埋管结构及施工方法
GB2625172A (en) * 2023-06-15 2024-06-12 Sheet Piling Uk Ltd Method for sheet pile installation

Also Published As

Publication number Publication date
CN1326034A (zh) 2001-12-12

Similar Documents

Publication Publication Date Title
CN1160503C (zh) 一次成墙多头深层搅拌桩机及其施工方法
CN2429566Y (zh) 一次成墙多头深层搅拌桩机
CN1071392C (zh) 用以构筑地下连续壁体的挖掘机及采用这种挖掘机的构筑方法
CN1926287A (zh) 头部延伸桩及其施工方法
CN102776884A (zh) 中搅旋转预应力离心管桩沉桩装置及其沉桩方法
CN100336980C (zh) 防砂塌陷支撑物
CN112854239B (zh) 一种超深淤泥质土层三轴搅拌桩加固施工方法
CN1517495A (zh) 地下工程、隧道及坑道的连续实现方法,一般包括通过引导冲孔而获得的加固工程、密封工程以及排水工程
CN105714832B (zh) 一种深基坑大尺寸预制围护结构及施工方法
CN105672329B (zh) 深基坑大尺寸预制围护结构及施工方法
CN218934444U (zh) 冻土地区高压水平旋喷桩隧道加固结构
CN106049487A (zh) V形钻搅机
CN1504613A (zh) 防水桩挡墙的成型方法及其使用的螺旋钻机
CN106193024A (zh) 凹凸接合钻机
CN106193021A (zh) 凹凸锁接钻机
CN106049486A (zh) 接合v形钻搅机
CN106193023A (zh) 接合y形钻机
CN2429565Y (zh) 多头深层搅拌桩机的联锁器
CN1148492C (zh) 水泥土防渗墙及其施工方法
JP3426556B2 (ja) 地盤改良装置及び地盤改良工法
KR102122698B1 (ko) 대심도 및 도심지 수직굴착시 지반변위 최소화를 위한 흙막이 벽체 시공공법
JP5200584B2 (ja) 充填材、充填材の作製方法及び地山の安定化方法
CN1804230A (zh) 利用螺纹搅拌轴降低周围地基变形的施工方法
CN1279247C (zh) 多层组合钢管嵌岩桩施工方法
CN220202350U (zh) 一种公路路基沉降加固结构

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20011212

Assignee: Beijing Geotechnical Engineering Association

Assignor: Zhenchong Engineering Co., Ltd, Beijing

Contract record no.: 2015990000871

Denomination of invention: Piling machine with multiple heads and deep stiring for one-pass wall construction and its operating method

Granted publication date: 20040804

License type: Exclusive License

Record date: 20151021

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CX01 Expiry of patent term

Granted publication date: 20040804

CX01 Expiry of patent term