CN115984480A - 一种基于bim与mr的地下管线巡检方法 - Google Patents
一种基于bim与mr的地下管线巡检方法 Download PDFInfo
- Publication number
- CN115984480A CN115984480A CN202310045585.8A CN202310045585A CN115984480A CN 115984480 A CN115984480 A CN 115984480A CN 202310045585 A CN202310045585 A CN 202310045585A CN 115984480 A CN115984480 A CN 115984480A
- Authority
- CN
- China
- Prior art keywords
- inspection
- pipeline
- model
- bim
- personnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310045585.8A CN115984480A (zh) | 2023-01-30 | 2023-01-30 | 一种基于bim与mr的地下管线巡检方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310045585.8A CN115984480A (zh) | 2023-01-30 | 2023-01-30 | 一种基于bim与mr的地下管线巡检方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115984480A true CN115984480A (zh) | 2023-04-18 |
Family
ID=85974050
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310045585.8A Pending CN115984480A (zh) | 2023-01-30 | 2023-01-30 | 一种基于bim与mr的地下管线巡检方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115984480A (zh) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108038917A (zh) * | 2017-12-27 | 2018-05-15 | 上海市地下空间设计研究总院有限公司 | 基于mr或ar技术的目标观察方法及巡检系统 |
CN115130979A (zh) * | 2022-05-17 | 2022-09-30 | 杭州书微信息科技有限公司 | 一种基于mr的烟机辅助巡检装置及方法 |
-
2023
- 2023-01-30 CN CN202310045585.8A patent/CN115984480A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108038917A (zh) * | 2017-12-27 | 2018-05-15 | 上海市地下空间设计研究总院有限公司 | 基于mr或ar技术的目标观察方法及巡检系统 |
CN115130979A (zh) * | 2022-05-17 | 2022-09-30 | 杭州书微信息科技有限公司 | 一种基于mr的烟机辅助巡检装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chen et al. | A BIM-based construction quality management model and its applications | |
CN105191262B (zh) | 用于无损测试系统中的协作的系统和方法 | |
US20180267500A1 (en) | Method and system for integrated manufacturing production quality inspections | |
Kim et al. | Improvement of realism of 4D objects using augmented reality objects and actual images of a construction site | |
CN108508850A (zh) | 制造过程数据收集和分析 | |
CN110325850A (zh) | 预测性完整性分析 | |
Garza et al. | Augmented reality application for the maintenance of a flapper valve of a fuller-kynion type m pump | |
CN108985471B (zh) | 基于3d轻量化模型的航空器管理系统 | |
KR102649171B1 (ko) | 물체에 대한 결함 데이터를 시각화하기 위한 증강 현실 시스템 | |
Rehbein et al. | 3D-visualization of ultrasonic NDT data using mixed reality | |
Forcina et al. | Exploring Industry 4.0 technologies to improve manufacturing enterprise safety management: A TOPSIS-based decision support system and real case study | |
KR20010101333A (ko) | 건설 작업의 검사를 돕는 방법 및 장치 | |
Ensafi et al. | Field testing of mixed reality (MR) technologies for quality control of as-built models at project handover: a case study | |
Halder et al. | Real-time construction inspection in an immersive environment with an inspector assistant robot | |
CN115984480A (zh) | 一种基于bim与mr的地下管线巡检方法 | |
Jacobs et al. | Potential Augmented Reality Applications in the Mining Industry | |
Hou et al. | An integration framework of advanced technologies for productivity improvement for LNG mega-projects | |
Naticchia et al. | Mixed reality approach for the management of building maintenance and operation | |
Iglesias et al. | An enhanced photorealistic immersive system using augmented situated visualization within virtual reality | |
JPH07244686A (ja) | プラント統合caeシステム | |
Hegenberg et al. | Task-and user-centered design of a human-robot system for gas leak detection: From requirements analysis to prototypical realization | |
Oliveira et al. | Augmented reality system for maintenance of high-voltage systems | |
US20160239583A1 (en) | Method and system for component design and validation | |
Le et al. | Schedule-driven bim model breakdown framework for construction monitoring with augmented reality | |
Kwon et al. | Development and Evaluation of Augmented Reality Learning Content for Pneumatic Flow: Case Study on Brake Operating Unit of Railway Vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhao Xuefeng Inventor after: Tao Yibing Inventor after: Li Wangbing Inventor after: Fan Xiongtao Inventor after: Sun Zhe Inventor after: Peng Yunfei Inventor after: Liu Siyu Inventor after: Yang Qiantai Inventor before: Zhao Xuefeng Inventor before: Tao Yibing Inventor before: Li Wangbing Inventor before: Fan Xiongtao Inventor before: Sun Zhe Inventor before: Peng Yunfei Inventor before: Liu Siyu Inventor before: Yang Qiantai |