CN115971767A - Round tube inner partition plate assembling and welding tool - Google Patents

Round tube inner partition plate assembling and welding tool Download PDF

Info

Publication number
CN115971767A
CN115971767A CN202310008804.5A CN202310008804A CN115971767A CN 115971767 A CN115971767 A CN 115971767A CN 202310008804 A CN202310008804 A CN 202310008804A CN 115971767 A CN115971767 A CN 115971767A
Authority
CN
China
Prior art keywords
welding
frame
partition plate
pipe
circular tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310008804.5A
Other languages
Chinese (zh)
Inventor
李之硕
马骏达
项旭
周岳峰
王志刚
侍继飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Southeast Lvjian Integrated Technology Co ltd
Original Assignee
Zhejiang Southeast Lvjian Integrated Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Southeast Lvjian Integrated Technology Co ltd filed Critical Zhejiang Southeast Lvjian Integrated Technology Co ltd
Priority to CN202310008804.5A priority Critical patent/CN115971767A/en
Publication of CN115971767A publication Critical patent/CN115971767A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Abstract

The invention relates to the technical field of steel structure processing, in particular to a round tube inner partition plate assembling and welding tool which comprises a movable trolley, an inner partition plate and a round tube, wherein a vertical frame is arranged in the movable trolley, a cross frame connected with the vertical frame is arranged in the vertical frame, a joint connected with the cross frame is arranged at the end part of the cross frame, at least one roller frame used for supporting the round tube is arranged below the round tube, a plurality of sliding frames which move transversely along the roller frame are arranged on the roller frame, and a guide supporting assembly used for supporting the round tube is arranged in each sliding frame. Compared with the prior art, the assembling and welding tool for the inner partition plate of the circular tube realizes the assembling and welding integration of the inner partition plate, saves labor, improves the production efficiency and ensures the welding quality.

Description

Round tube inner partition plate assembling and welding tool
Technical Field
The invention relates to the technical field of steel structure processing, in particular to a tool for assembling and welding a partition plate in a circular tube.
Background
The steel structure component is convenient for make in the mill, the building site is assembled, and it has component finished product precision height, production efficiency is high, the building site is assembled fastly, characteristics such as time limit for a project short, and the steel structure is the highest structure of industrialization degree, and it accords with the industrial policy of country very much. Therefore, the steel structure is widely applied to the fields of large-scale factory buildings, bridges, venues, super high-rise buildings and the like.
Chinese patent publication is CN 209035666U's utility model name is a round tube internal baffle automatic welder, include base, support frame, horizontal stand, welder micromatic setting and be used for placing the gyro wheel frame mechanism of pipe, the fixed support frame that is equipped with on the base, fixed frame is established to the support frame pot head, be equipped with the gyro wheel around the fixed frame curb plate respectively, set up the horizontal stand in the gyro wheel, both sides are equipped with the guide rail with gyro wheel matched with about the horizontal stand for adjust horizontal stand X axle direction position, be located the below of horizontal stand is equipped with hydraulic pressure adjusting device, hydraulic pressure adjusting device fixes on base and fixed frame, is used for adjusting horizontal stand Y axle direction position, the other end fixed connection welder micromatic setting of horizontal stand, gyro wheel frame mechanism is located welder micromatic setting's front end. In the above scheme, although the automatic welding of the partition board in the circular tube can be realized, when the inner partition board is placed in the circular tube, other devices are required to be placed, so that the working efficiency is reduced to a certain extent, the placing position is easily influenced due to the limitation of the working space, and the product quality is further influenced.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a tool for assembling and welding a partition plate in a circular tube, which solves the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a baffle equipment welding frock in pipe, includes portable shallow, inner baffle and pipe, be equipped with the crossbearer that links to each other with the grudging post in being equipped with grudging post and the grudging post in the portable shallow, the tip of crossbearer is equipped with the joint that links to each other with the crossbearer, the below of pipe is equipped with at least one and is used for carrying out the gyro wheel frame that supports to the pipe, be equipped with a plurality of slide frame that carry out lateral shifting along the gyro wheel frame just be equipped with in the slide frame and be used for carrying out the direction supporting component that supports to the pipe.
Optionally, the joint includes an assembly joint and a welding joint, an inner partition baffle plate for limiting the inner partition plate is arranged in the assembly joint, and a welding gun for connecting the inner partition plate with the circular tube is arranged in the welding joint.
Optionally, the inner baffle is arranged at the outer end of the assembly joint, a gap between the inner baffle and the assembly joint corresponds to the inner baffle, a welding hoop a connected with the welding joint is arranged in the welding joint, a welding hoop B connected with the welding hoop a is arranged outside the welding hoop a, a welding vertical shaft connected with the welding hoop B is arranged below the welding hoop B, the lowest end of the welding vertical shaft is connected with the welding gun through the welding hoop, and a gas-shielded welding machine connected with the welding gun can be arranged in the movable cart.
Optionally, the grudging post includes vertical square pipe A, vertical square pipe B that the upper end of vertical square pipe A was equipped with and carries out reciprocating with vertical square pipe A and along vertical square pipe A's inside, vertical square pipe B's top is equipped with and carries out reciprocating vertical promotion staple bolt that links to each other with vertical square pipe B and along vertical square pipe B's outside, vertical square pipe A, vertical square pipe B and vertical the regulation of reciprocating between the promotion staple bolt carry on spacingly through the bolt.
Optionally, the cross frame and the vertical frame have the same structure but different sizes.
Optionally, the direction supporting component includes the arc frame, the arc frame is connected with the looks bearing type of frame that slides, the both ends of arc frame are equipped with the ball ring that is used for supporting the pipe respectively.
Optionally, the below of pipe is equipped with two gyro wheel framves that are used for supporting the pipe, the frame that slides is the symmetry formula and sets up in the both ends of gyro wheel frame, can be provided with on the gyro wheel frame and be used for carrying out spacing locating part to the removal of frame that slides.
Optionally, weights are further arranged in the movable cart.
Optionally, a roller frame motor for driving the circular tube to rotate slowly is arranged in the roller frame.
The operation method of the assembling and welding tool for the partition board in the circular tube is characterized in that: the method comprises the following steps:
the method comprises the following steps: the sliding frame can be adjusted according to the specification of the round pipe, after the adjustment is finished, the round pipe is fixed through the limiting piece, so that the round pipe is conveniently supported, and then the round pipe is transversely placed on the roller frame;
step two: after the tool is changed into an assembly state, proper weights are placed, the vertical frame and the transverse frame are adjusted to proper positions, after the adjustment is finished, the vertical frame and the transverse frame are fixed through the bolts, and then the inner partition plate is placed in a gap between the inner partition plate baffle and the assembly joint;
step three: marking the position, needing to be arranged inside the circular tube, of the inner baffle plate, after marking is finished, pushing the movable trolley to move, after the inner baffle plate is pushed into the circular tube, detaching the inner baffle plate, and withdrawing the movable trolley;
step four: then replacing the assembly joint with a welding joint, fixing the assembly joint by using a bolt or an M20 screw, adjusting the height of the opposite frame and the length of the transverse frame to enable the welding gun to be in a proper position, and fixing a welding machine wire by using the bolt;
step five: and then pushing the movable trolley to move so that the welding gun enters the circular tube and is positioned at a gap between the inner partition plate and the circular tube, then synchronously starting the roller frame motor and the gas shielded welding machine so that the circular tube can be welded with the gap between the circular tube and the inner partition plate through the welding gun in the process of slowly rotating, and pushing the movable trolley out after the welding is finished.
Tool specification:
1. the longitudinal square tube A and the cart are fixed by welding.
2. The longitudinal lifting hoops are fixed by welding through transverse strips.
3. The trolley rollers adopt universal wheels with brakes.
4. A sleeve is arranged between the transverse frames, and the extension length is adjusted through a bolt.
5. A sleeve is arranged between the longitudinal square tube A and the longitudinal square tube B, and the height is adjusted through a bolt.
6. The bolt can be replaced by an M20 or M22 bolt.
Compared with the prior art, the assembling and welding tool for the inner partition plate of the circular tube has the advantages that the assembling and welding integration of the inner partition plate are realized, the labor is saved, the production efficiency is improved, and the welding quality is ensured.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of a first configuration of the mobile cart according to the present invention;
fig. 3 is a schematic structural view of a second mobile cart according to the present invention.
In the figure: 1. an inner baffle plate; 2. assembling a joint; 4. a longitudinal square tube B; 5. a longitudinal square tube A; 6. a mobile cart; 8. longitudinally lifting the anchor ear; 11. a bolt; 12. welding a joint; 13. welding the anchor ear A; 14. welding the anchor ear B; 15. welding a vertical shaft; 16. welding the anchor ear; 17. a welding gun; 18. a gas shielded welding machine; 19. a roller frame; 20. a circular tube; 21. an inner partition plate; 22. erecting a frame; 23. a transverse frame; 24. a sliding frame; 25. a joint; 26. a guide support assembly; 27. an arc-shaped frame; 28. a ball ring; 29. a roller frame motor.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a welding tool for assembling and welding a circular tube inner partition plate comprises a movable trolley 6, an inner partition plate 21 and a circular tube 20, wherein weights are further arranged in the movable trolley 6, a vertical frame 22 is arranged in the movable trolley 6, a transverse frame 23 connected with the vertical frame 22 is arranged in the vertical frame 22, a connector 25 connected with the transverse frame 23 is arranged at the end part of the transverse frame 23, the connector 25 comprises an assembling connector 2 and a welding connector 12, an inner partition plate baffle 1 used for limiting the inner partition plate 21 is arranged in the assembling connector 2, a welding gun 17 used for connecting the inner partition plate 21 with the circular tube 20 is arranged in the welding connector 12, the inner partition plate baffle 1 is arranged at the outer end part of the assembling connector 2, a gap between the inner partition plate baffle 1 and the assembling connector 2 corresponds to the inner partition plate 21, a welding connector 12 is internally provided with a welding anchor A13, a welding anchor B14 connected with the welding anchor A13 is arranged outside the welding anchor A13, a square tube 5 connected with the welding anchor B14 below the welding anchor B14 through a welding anchor B16, a square tube 5 connected with a square tube 5 capable of vertically moving anchor B and a square tube 5 capable of vertically moving along the longitudinal anchor B4 is arranged below the vertical tube 5, a vertical tube 5 is arranged below the anchor B4, a square tube 5 capable of vertically moving anchor B5 capable of vertically, the roller frame 19 is provided with a plurality of sliding frames 24 which move transversely along the roller frame 19, and the sliding frames 24 are provided with guide supporting components 26 for supporting the circular tube 20, each guide supporting component 26 comprises an arc frame 27, the arc frames 27 are in bearing connection with the sliding frames 24, two ends of each arc frame 27 are respectively provided with a ball ring 28 for supporting the circular tube 20, two roller frames 19 for supporting the circular tube 20 are arranged below the circular tube 20, the sliding frames 24 are symmetrically arranged at two ends of each roller frame 19, a roller frame motor 29 for driving the circular tube 20 to rotate slowly is arranged in each roller frame 19, and each roller frame 19 can be provided with a limiting part for limiting the movement of the sliding frame 24.
The operation method of the assembling and welding tool for the inner partition plate of the circular tube is characterized in that: the method comprises the following steps:
the method comprises the following steps: the sliding frame 24 can be adjusted according to the specification of the circular tube 20, after the adjustment is finished, the circular tube 20 is fixed through the limiting piece, so that the circular tube 20 is conveniently supported, and then the circular tube 20 is transversely placed on the roller frame 19;
step two: after the tool is changed into an assembly state, a proper weight is placed, the vertical frame 22 and the transverse frame 23 are adjusted to proper positions, after the adjustment is finished, the inner partition plate 21 is fixed through the bolt 11, and then the inner partition plate 21 is placed in a gap between the inner partition plate baffle 1 and the assembly joint 2;
step three: marking the position, needing to install the inner baffle 21 in the circular tube 20, of the inner baffle, pushing the movable cart 6 to move after marking is finished, detaching the inner baffle 1 after the inner baffle 21 is pushed into the circular tube 20, and withdrawing the movable cart 6;
step four: then replacing the assembly joint 2 with the welding joint 12 and fixing by using a bolt or an M20 screw, then adjusting the height of the opposite frame 22 and the length of the cross frame 23 to enable the welding gun 17 to be in a proper position, and fixing a welding machine line by using the bolt;
step five: then the movable cart 6 is pushed to move, so that the welding gun 17 enters the circular tube 20 and is positioned at a gap between the inner partition plate 21 and the circular tube 20, then the roller frame motor 29 and the gas shielded welding machine 18 are synchronously started, so that the circular tube 20 can be welded with the gap between the circular tube 20 and the inner partition plate 21 through the welding gun 17 in the slow rotation process, and after the welding is finished, the movable cart 6 is pushed out.
The electrical components presented in the document are all connected with an external master controller and 380V commercial electricity, and the master controller can be a conventional known device controlled by a computer and the like.
In the description of the present specification, the terms "connect", "mount", "fix", "set", and the like are used in a broad sense, for example, the "connect" may be a fixed connection or an indirect connection through intermediate components without affecting the relationship and technical effects of the components, or may be an integral connection or a partial connection, and as such, for a person skilled in the art, the specific meaning of the above terms in the present invention or the invention can be understood according to specific situations.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (10)

1. The utility model provides a baffle equipment welding frock in pipe which characterized in that: including portable shallow (6), interior baffle (21) and pipe (20), be equipped with grudging post (22) in portable shallow (6) and be equipped with crossbearer (23) that link to each other with grudging post (22) in grudging post (22), the tip of crossbearer (23) is equipped with joint (25) that link to each other with crossbearer (23), the below of pipe (20) is equipped with at least and is equipped with one and is used for carrying out the gyro wheel frame (19) that support to pipe (20), be equipped with a plurality of slide frame (24) that carry out lateral shifting along gyro wheel frame (19) on gyro wheel frame (19) just be equipped with direction supporting component (26) that are used for carrying out the support to pipe (20) in slide frame (24).
2. The tooling for assembling and welding the inner clapboard of the round tube according to claim 1, is characterized in that: the connector (25) comprises an assembly connector (2) and a welding connector (12), an inner partition plate baffle (1) used for limiting the inner partition plate (21) is arranged in the assembly connector (2), and a welding gun (17) used for connecting the inner partition plate (21) with the circular tube (20) is arranged in the welding connector (12).
3. The tooling for assembling and welding the inner partition plate of the circular tube according to claim 2, is characterized in that: the welding device is characterized in that the inner baffle (1) is arranged at the outer end part of the assembly connector (2), a gap between the inner baffle (1) and the assembly connector (2) corresponds to the inner baffle (21), a welding hoop A (13) connected with the welding connector (12) is arranged in the welding connector (12), a welding hoop B (14) connected with the welding hoop A (13) is arranged outside the welding hoop A (13), a welding vertical shaft (15) connected with the welding hoop B (14) is arranged below the welding hoop B (14), the lowest end of the welding vertical shaft (15) is connected with a welding gun (17) through a welding hoop (16), and a gas shielded welding machine (18) connected with the welding gun (17) can be arranged in the movable cart (6).
4. The tooling of claim 3 for assembling and welding the inner clapboard of the round tube, which is characterized in that: the grudging post (22) is including vertical square pipe A (5), the upper end of vertical square pipe A (5) is equipped with and vertical square pipe A (5) link to each other and carry out vertical square pipe B (4) that reciprocate along the inside of vertical square pipe A (5), the top of vertical square pipe B (4) is equipped with and vertical square pipe B (4) link to each other and carry out vertical promotion staple bolt (8) that reciprocate along the outside of vertical square pipe B (4), vertical square pipe A (5), vertical square pipe B (4) and vertical the regulation of reciprocating between promotion staple bolt (8) carry on spacingly through bolt (11).
5. The tooling for assembling and welding the inner partition plate of the circular tube according to claim 4, wherein: the transverse frame (23) and the vertical frame (22) have the same structure but different sizes.
6. The tooling for assembling and welding the inner clapboard of the round tube according to claim 1, is characterized in that: the direction supporting component (26) includes arc frame (27), arc frame (27) are connected with the frame (24) looks bearing type that slides, the both ends of arc frame (27) are equipped with ball ring (28) that are used for supporting pipe (20) respectively.
7. The tooling for assembling and welding the partition board in the circular tube according to claim 6, characterized in that: the below of pipe (20) is equipped with two gyro wheel framves (19) that are used for carrying out the support to pipe (20), slip frame (24) are the symmetrical formula and set up in the both ends of gyro wheel frame (19), can be provided with on gyro wheel frame (19) and be used for carrying out spacing locating part to the removal of slip frame (24).
8. The tooling for assembling and welding the partition board in the circular tube according to claim 1, characterized in that: weights are further arranged in the movable trolley (6).
9. The tooling for assembling and welding the inner clapboard of the round tube according to claim 1, is characterized in that: and a roller frame motor (29) for driving the circular tube (20) to rotate slowly is arranged in the roller frame (19).
10. The operation method of the assembling and welding tool for the partition board in the circular tube is characterized in that: the method comprises the following steps:
the method comprises the following steps: the sliding frame (24) can be adjusted according to the specification of the round pipe (20), after the adjustment is finished, the round pipe (20) is fixed through the limiting piece, so that the round pipe (20) is conveniently supported, and then the round pipe (20) is placed on the roller frame (19) transversely;
step two: after the tool is changed into an assembly state, proper weights are placed, the vertical frame (22) and the transverse frame (23) are adjusted to proper positions, after the adjustment is finished, the vertical frame and the transverse frame are fixed through the bolts (11), and then the inner partition plate (21) is placed in a gap between the inner partition plate baffle (1) and the assembly joint (2);
step three: marking the position, needing to install the inner baffle (21) in the circular tube (20), of the inner baffle, pushing the movable trolley (6) to move after marking is finished, detaching the inner baffle (1) after the inner baffle (21) is pushed into the circular tube (20), and withdrawing the movable trolley (6);
step four: then the assembly joint (2) is replaced by a welding joint (12) and is fixed by a bolt or an M20 screw, and then the height of the opposite frame (22) and the length of the transverse frame (23) are adjusted to enable the welding gun (17) to be in a proper position and fix a welding machine line by the bolt;
step five: then the movable trolley (6) is pushed to move, the welding gun (17) enters the circular tube (20) and is positioned in a gap between the inner partition plate (21) and the circular tube (20), then the roller frame motor (29) and the gas shield welding machine (18) are synchronously started, so that the gap between the circular tube (20) and the inner partition plate (21) can be welded through the welding gun (17) in the process that the circular tube (20) slowly rotates, and after the welding is finished, the movable trolley (6) is pushed out.
CN202310008804.5A 2023-01-04 2023-01-04 Round tube inner partition plate assembling and welding tool Pending CN115971767A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310008804.5A CN115971767A (en) 2023-01-04 2023-01-04 Round tube inner partition plate assembling and welding tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310008804.5A CN115971767A (en) 2023-01-04 2023-01-04 Round tube inner partition plate assembling and welding tool

Publications (1)

Publication Number Publication Date
CN115971767A true CN115971767A (en) 2023-04-18

Family

ID=85959427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310008804.5A Pending CN115971767A (en) 2023-01-04 2023-01-04 Round tube inner partition plate assembling and welding tool

Country Status (1)

Country Link
CN (1) CN115971767A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117583826A (en) * 2024-01-19 2024-02-23 陕西建工泾渭钢结构有限公司 Intelligent welding device for inner partition plate and application method of intelligent welding device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117583826A (en) * 2024-01-19 2024-02-23 陕西建工泾渭钢结构有限公司 Intelligent welding device for inner partition plate and application method of intelligent welding device
CN117583826B (en) * 2024-01-19 2024-04-05 陕西建工泾渭钢结构有限公司 Intelligent welding device for inner partition plate and application method of intelligent welding device

Similar Documents

Publication Publication Date Title
CN102011907A (en) Automatic assembly machine for straight pipe flange
CN112935697B (en) Straight seam welding and team forming welding equipment for large-diameter cylinder
CN215617641U (en) Wheel rim steel wire positioning machine capable of achieving quick positioning
CN115971767A (en) Round tube inner partition plate assembling and welding tool
CN211804541U (en) H-shaped beam welding device for special component of super-huge boiler steel frame
CN219787237U (en) Automatic roller welding device
CN110482438B (en) Tool for installing and adjusting bottom electrode of direct current arc furnace and bottom electrode installing method
CN217776814U (en) Rapid tube core assembling tool for tube type heat exchanger
CN214602729U (en) Quick assembly welding device for stiffening ring of large-sized pressure steel pipe
CN215091756U (en) Steel tie rod processing platform
CN212191829U (en) Steel pipe circumferential weld welding frock bed-jig
CN113231495B (en) Oval orthotic devices of cast iron pipe straight tube section
CN113042950B (en) Welding machine for machining elevator hand wheel
CN211248720U (en) Angle steel edge cutting machine
CN211135343U (en) Integral reinforcement cage welding machine
CN203484786U (en) Automatic welding device for large motor shaft core
CN113814646A (en) Steel pipe stiffening ring assembling device and assembling method thereof
CN217965224U (en) ESP production line hot roll way collector pipe welding system
CN212793794U (en) Modular assembly welding device for horizontal container production
CN214769900U (en) Welding tool for air conditioner body and steel pipe
CN105268869A (en) 1500T expanding machine
CN214921880U (en) Truss welded joint connector
CN218016318U (en) Auxiliary tool for preventing circular tube welding deformation
CN218193569U (en) Box adjusting mechanism and box cantilever crane equipment
CN216227724U (en) Tool for flexible assembly of barrels

Legal Events