CN115922896A - Intelligent beam yard of light-duty T roof beam prefabricated component - Google Patents

Intelligent beam yard of light-duty T roof beam prefabricated component Download PDF

Info

Publication number
CN115922896A
CN115922896A CN202211491814.0A CN202211491814A CN115922896A CN 115922896 A CN115922896 A CN 115922896A CN 202211491814 A CN202211491814 A CN 202211491814A CN 115922896 A CN115922896 A CN 115922896A
Authority
CN
China
Prior art keywords
yard
light
intelligent
ground surface
fixed mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211491814.0A
Other languages
Chinese (zh)
Inventor
朱其宇
石贤孝
杨兵
张琪
�田�浩
许家生
杨超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Traffic Control Engineering Group Co ltd
Anhui Traffic Control Industrial Construction Co ltd
Anhui Transportation Holding Group Co Ltd
Original Assignee
Anhui Traffic Control Engineering Group Co ltd
Anhui Traffic Control Industrial Construction Co ltd
Anhui Transportation Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Traffic Control Engineering Group Co ltd, Anhui Traffic Control Industrial Construction Co ltd, Anhui Transportation Holding Group Co Ltd filed Critical Anhui Traffic Control Engineering Group Co ltd
Priority to CN202211491814.0A priority Critical patent/CN115922896A/en
Publication of CN115922896A publication Critical patent/CN115922896A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The application relates to the technical field of beam yards and discloses an intelligent beam yard of light T-beam prefabricated parts, which comprises a beam yard body, wherein three flushing tables are fixedly arranged on the west side of the ground surface of the beam yard body; the small concrete is used for pretreating the raw material by arranging the conveying belt, and the pretreated raw material enters the large concrete through the conveying belt for retreatment, so that the concrete raw material can be conveniently used in the follow-up process; by arranging the fan blades, the fluidity of air in the rest room can be improved when the fan blades rotate, so that the comfort of workers in the rest room is improved; through setting up the hanging wheel group, the T roof beam handling to the storage area of transporting on the dumper can be organized to the hanging wheel, also is convenient for the operation workman to the utilization of stacking the regional space simultaneously more.

Description

Intelligent beam yard of light-duty T roof beam prefabricated component
Technical Field
The application relates to a roof beam field technical field especially relates to an intelligent roof beam field of light-duty T roof beam prefabricated component.
Background
The beam yard is the place of production bridge precast concrete simple beam, but most of present beam yards are in the in-process of building, and in the overall arrangement planning of the operating unit that needs in each T roof beam manufacturing, the moving path design of T roof beam is too far (even there is the region that needs the turn), thereby can be unreasonable a little, lead to can cause the waste in time in the in-process of in-service use, and then can influence the production efficiency to the T roof beam, lead to the manufacturing cost of T roof beam to improve.
Disclosure of Invention
In order to solve the problem proposed above, the present application provides an intelligent beam yard of light-duty T roof beam prefabricated component.
The application provides a light-duty T roof beam prefabricated component's intelligent beam yard adopts following technical scheme:
the utility model provides an intelligent beam yard of light-duty T roof beam prefabricated component, includes the beam yard body, the west fixed mounting of beam yard body ground surface has three platform of washing, the west fixed mounting of beam yard body ground surface has two digital signs, a plurality of parking stalls have been seted up to beam yard body ground surface, and is three the east side of platform of washing all installs the platform of weighing, the construction of beam yard body ground surface has the processing plant district, the north side and the south equal fixed mounting of side have the mix station body in processing plant district, placing two rest rooms of beam yard body ground surface, the ground rail of having seted up of beam yard body ground surface, the top side sliding connection of ground rail is by the dumper, the fixed mounting of beam yard body ground surface has six laser scanners, six laser scanner three is a set of two sets of and is located the both sides of dumper respectively, the fixed mounting of beam yard body ground surface has all slidable mounting on two sets of slide rails and has the portal body, two the middle zone of stacking is regional to set up to be regional, the fixed mounting of portal body has a plurality of ground shower nozzles all be linked together with a plurality of shower nozzles and a plurality of shower nozzles all external shower nozzles are linked together in a plurality of beam yard body ground area below the shower nozzle and a plurality of shower nozzle all external water pipe are linked together.
Preferably, the washing table comprises a washing frame, a plurality of washing heads are fixedly mounted on the inner wall of the washing frame, and the washing heads are communicated with an external water pipe.
Through adopting above-mentioned technical scheme, through setting up the flushing head, after the freight train got into this internal unloading of roof beam yard material, through the wash platform, the flushing head can wash the freight train this moment to avoid the freight train to drive out the back and cause the pollution to municipal road surface.
Preferably, the digital sign includes two stands, two the outside fixed mounting of stand has same electron tablet.
Through adopting above-mentioned technical scheme, through setting up the electron tablet, the electron tablet can demonstrate the surplus quantity on parking stall to be convenient for instruct entering this internal vehicle in roof beam field.
Preferably, the mixing station body comprises a small concrete and a large concrete, and a transmission belt is fixedly installed between the small concrete and the large concrete.
Through adopting above-mentioned technical scheme, through setting up the transmission band, little concrete carries out the preliminary treatment to the raw materials, and the raw materials of preliminary treatment pass through the transmission band and get into and carry out the retreatment in the big concrete to in subsequent use to the concrete raw materials.
Preferably, two the rest room all includes bellows, two the equal fixedly connected with fixed plate of inner wall of bellows, two the equal fixedly connected with motor in right side of fixed plate, two the equal fixedly connected with bull stick of output shaft of motor, two the equal fixedly connected with fan blade in the outside of bull stick.
By adopting the technical scheme, the fan blade is arranged, so that the flowability of air in the rest room can be improved when the fan blade rotates, and the comfort of workers in the rest room is improved.
Preferably, six laser scanner all includes the bottom plate, six the equal fixedly connected with support in top side of bottom plate, six the equal fixed mounting in top side of support has the scanner body.
By adopting the technical scheme, the quality of the manufactured T beam can be detected by the scanner body through the arrangement of the scanner body, so that the qualification of the manufacturing quality is ensured.
Preferably, the two gantry crane bodies comprise moving frames, and each moving frame is fixedly provided with a hoisting wheel set.
Through adopting above-mentioned technical scheme, through setting up the hanging wheel group, hanging wheel group can be with the T roof beam handling of transporting on the dumper to depositing the region, also is convenient for more simultaneously the operation workman to the utilization of depositing regional space.
Preferably, the plurality of spray heads comprise bottom frames, and liquid heads are fixedly communicated with the top sides of the bottom frames.
Through adopting above-mentioned technical scheme, through setting up the liquid head, the liquid head can carry out water spray work to the T roof beam of stacking the region to can reach the health preserving work to the T roof beam.
Preferably, it is a plurality of the cistern all includes the water tank, and is a plurality of the inner wall fixedly connected with filter plate of water tank, a plurality of holes that leak have all been seted up on the top ground of a plurality of water tanks.
Through adopting above-mentioned technical scheme, through setting up the water tank, the shower nozzle is spraying the during operation, and unnecessary water can leak into the water tank from the hole that leaks to carry out reuse to the water of collecting.
To sum up, the application comprises the following beneficial technical effects:
1. through the arrangement of the flushing head, after the truck enters the beam field body and is unloaded, the truck can be cleaned by the flushing head through the flushing platform, so that the pollution to the municipal road surface after the truck is driven out is avoided;
2. the small concrete is used for pretreating the raw material by arranging the conveying belt, and the pretreated raw material enters the large concrete through the conveying belt for retreatment, so that the concrete raw material can be used subsequently;
3. by arranging the fan blades, the fluidity of air in the rest room can be improved when the fan blades rotate, so that the comfort of workers in the rest room is improved;
4. through setting up the hanging wheel group, the T roof beam handling to the storage area of transporting on the dumper is organized to the hanging wheel, also is convenient for the operation workman to the utilization of stacking the regional space simultaneously more.
Drawings
Fig. 1 is a schematic structural view of a beam field aerial view according to an embodiment of the present application.
Fig. 2 is a three-dimensional structure diagram of the appearance of the rinsing table in the application embodiment.
Fig. 3 is a structural diagram of a digital signboard appearance solid according to an embodiment of the application.
FIG. 4 is a structural diagram of the blending station body of the embodiment of the application in a three-dimensional appearance.
Fig. 5 is a sectional structural schematic view of the rest room of the application embodiment.
Fig. 6 is a schematic structural view of an appearance solid of the laser scanner according to the embodiment of the application.
Fig. 7 is a schematic structural diagram of a main view of a gantry crane body according to an embodiment of the present application.
Fig. 8 is a schematic structural view of a sprayer according to an embodiment of the present application.
Fig. 9 is a structural schematic diagram of an external appearance of the water reservoir in the embodiment of the application.
Description of reference numerals: 1. a beam field body; 2. a washing table; 3. a digital sign; 4. a parking space; 5. a weighing platform; 6. processing a factory area; 7. a mixing station body; 8. a rest room; 9. a ground rail; 10. a material transporting vehicle; 11. a laser scanner; 12. a slide rail; 13. a gantry crane body; 14. a spray head; 15. a reservoir; 21. a washing rack; 22. a rinsing head; 31. a column; 32. an electronic card; 71. small concrete; 72. large concrete; 73. a conveyor belt; 81. an air box; 82. a fixing plate; 83. a motor; 84. a rotating rod; 85. a fan blade; 111. a base plate; 112. a support; 113. a scanner body; 131. a movable frame; 132. a hoisting wheel set; 141. a chassis; 142. a liquid head; 151. a water tank; 152. and (4) water leakage holes.
Detailed Description
The present application is described in further detail below with reference to figures 1-9.
The embodiment of the application discloses intelligent beam yard of light-duty T roof beam prefabricated component. Referring to fig. 1-9, an intelligent beam yard of light-duty T roof beam prefabricated component, including beam yard body 1, the west fixed mounting of beam yard body 1 ground surface has three wash platform 2, the west fixed mounting of beam yard body 1 ground surface has two digital signs 3, a plurality of parking stalls 4 have been seted up of beam yard body 1 ground surface, weighing platform 5 is all installed to the east of three wash platform 2, the construction of beam yard body 1 ground surface has processing factory district 6, the north side and the south side of processing factory district 6 all fixed mounting have mix station body 7, two rest rooms 8 of placing of beam yard body 1 ground surface, ground rail 9 has been seted up of beam yard body 1 ground surface, the top side sliding connection of ground rail 9 is by dumper 10, the fixed mounting of beam yard body 1 ground surface has six laser scanners 11, six laser scanners 11 three are a set of three and are located dumper 10 both sides respectively, the fixed mounting of beam yard body ground rail 12 and two sets up all sliding mounting and hang body 13 on two sets of gantry body, the regional storage of two sets up into the regional storage of a plurality of ground rail 14 that the regional storage cistern is all linked together with a plurality of ground shower nozzles 14 external shower nozzles of the fixed mounting of multiple beam yard 1 ground rail 14, the storage of the regional storage of the fixed mounting of beam yard body is all linked together with a plurality of ground rail 14.
In this application, wash platform 2 is including washing frame 21, and the inner wall fixed mounting that washes frame 21 has a plurality of washing heads 22, and a plurality of washing heads 22 all are linked together with external water pipe, through setting up washing head 22, after the freight train got into roof beam yard body 1 and has unloaded the material, through wash platform 2, washing head 22 can wash the freight train this moment to avoid the freight train to open the back and cause the pollution to the municipal road surface.
In this application, digital sign 3 includes two stands 31, and the outside fixed mounting of two stands 31 has same electron tablet 32, and through setting up electron tablet 32, electron tablet 32 can demonstrate the remaining quantity in parking stall 4 to be convenient for instruct the vehicle that gets into in the beam yard body 1.
In this application, mixing station body 7 includes little concrete 71 and big concrete 72, and fixed mounting has transmission band 73 between little concrete 71 and the big concrete 72, and through setting up transmission band 73, little concrete 71 carries out the preliminary treatment to the raw materials, and the raw materials of preliminary treatment passes through transmission band 73 and gets into and reprocess in the big concrete 72 to in order to follow-up use to the concrete raw materials.
In this application, two rest rooms 8 all include bellows 81, the equal fixedly connected with fixed plate 82 of the inner wall of two bellows 81, the equal fixedly connected with motor 83 in right side of two fixed plate 82, the equal fixedly connected with bull stick 84 of output shaft of two motors 83, the equal fixedly connected with fan blade 85 in the outside of two bull sticks 84, through setting up fan blade 85, can improve the mobility of air in rest room 8 when fan blade 85 rotates, thereby improve the travelling comfort of workman when the rest in rest room 8.
In this application, six laser scanner 11 all include bottom plate 111, and six bottom plate 111's the equal fixedly connected with support 112 in the top side, six support 112's the equal fixed mounting in top side has scanner body 113, and through setting up scanner body 113, scanner body 113 can carry out the quality inspection to the T roof beam of making the completion to ensure the qualification of making the quality.
In this application, two portal crane bodies 13 all include the removal frame 131, and equal fixed mounting has the hanging wheel group 132 on two removal frames 131, and through setting up hanging wheel group 132, hanging wheel group 132 can be with the T roof beam handling of transporting on the dumper 10 to depositing area, also is convenient for simultaneously more the operation workman to the utilization of stacking area space.
In this application, a plurality of shower nozzles 14 all include chassis 141, and a plurality of chassis 141's top side all is fixed the intercommunication and has liquid head 142, and through setting up liquid head 142, liquid head 142 can carry out water spray work to the T roof beam of stacking the region to can reach the health preserving work to the T roof beam.
In this application, a plurality of cisterns 15 all include water tank 151, and a plurality of holes 152 that leak have all been seted up on the inner wall fixedly connected with filter plate of a plurality of water tanks 151, the top ground of a plurality of water tanks 151, and through setting up water tank 151, shower nozzle 14 is spraying the during operation, and unnecessary water can leak into water tank 151 from the hole 152 that leaks to in being convenient for carry out reuse to the water of collecting.
The implementation principle of the intelligent beam field of the light T-beam prefabricated part in the embodiment of the application is as follows: the weighing platform 5 can record the load of the truck, after the truck enters the beam yard body 1 and is unloaded, the truck passes through the flushing platform 2, at the moment, the flushing head 22 can clean the truck, so that the pollution to municipal road surfaces after the truck is driven out is avoided, the electronic tag 32 can display the residual quantity of the parking spaces 4, so that the indication of the vehicles entering the beam yard body 1 is facilitated, the unloaded raw materials are pretreated by the small concrete 71, the pretreated raw materials enter the large concrete 72 through the conveying belt 73 to be reprocessed, so that the subsequent use of the concrete raw materials is facilitated, the fluidity of air in the rest room 8 can be improved when the output shaft of the motor 83 drives the fan blades 85 to rotate, so that the comfort of workers in the rest room 8 is improved, the scanner body 113 can carry out quality detection on the manufactured T-beam, so that the qualification of the manufacturing quality is ensured, after the T-beam is manufactured in the processing plant area 6, the T-beam can be placed on the material transporting vehicle 10, the material transporting vehicle 10 moves to the east side of the processing plant area 6 on the ground rail 9, the lifting wheel set 132 can be used for lifting the T-beam transported on the material transporting vehicle 10 to a storage area, meanwhile, the utilization of the space of the storage area by an operator is facilitated, an external water source is injected into the liquid head 142 through high pressure, the T-beam stacked in the storage area can be sprayed, the health maintenance work of the T-beam can be achieved, the spray head 14 can spray the water in the process, redundant water can leak into the water tank 151 from the water leakage hole 152, the collected water can be recycled, the collected water can reenter the washing head 22, the small concrete 71 and the large concrete 72, the effect of maximum recycling is achieved, and the sliding rail 12 can facilitate the position movement of the gantry crane body 13.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides an intelligent beam yard of light-duty T roof beam prefabricated component, includes beam yard body (1), its characterized in that: the system is characterized in that the west side of the ground surface of the beam field body (1) is fixedly provided with three flushing tables (2), the west side of the ground surface of the beam field body (1) is fixedly provided with two digital indicating plates (3), the ground surface of the beam field body (1) is provided with a plurality of parking spaces (4), the east side of the three flushing tables (2) is provided with a weighing table (5), the ground surface of the beam field body (1) is built with a processing plant area (6), the north side and the south side of the processing plant area (6) are fixedly provided with mixing station bodies (7), the ground surface of the beam field body (1) is provided with two rest rooms (8), and the ground surface of the beam field body (1) is provided with a ground rail (9), the top side sliding connection of ground rail (9) is by dumper (10), the fixed mounting of beam field body (1) ground surface has six laser scanners (11), six the both sides that laser scanner (11) three are a set of dumper (10) that are located respectively, the fixed mounting of beam field body (1) ground surface has equal slidable mounting on two sets of slide rails (12) and two sets of slide rails (12) to have portal crane body (13), two the middle zone of portal crane body (13) sets up to stack the region, the fixed mounting of beam field body (1) ground surface has a plurality of shower nozzles (14), and is a plurality of equal fixed mounting in stack the region of shower nozzle (14) and a plurality of shower nozzle (14) All be linked together with external water pipe, a plurality of cistern (15) have been seted up to beam yard body (1) below ground, and are a plurality of cistern (15) all are located the region of stacking below ground.
2. The intelligent beam yard of light-weight T-beam prefabricated parts of claim 1, characterized in that: the washing table (2) comprises a washing frame (21), a plurality of washing heads (22) are fixedly mounted on the inner wall of the washing frame (21), and the washing heads (22) are communicated with an external water pipe.
3. The intelligent beam yard of light-weight T-beam prefabricated parts of claim 1, characterized in that: digital sign (3) include two stand (31), two the outside fixed mounting of stand (31) has same electron tablet (32).
4. The intelligent beam yard of light T-beam prefabricated parts of claim 1, characterized in that: the mixing station body (7) comprises a small concrete (71) and a large concrete (72), and a transmission belt (73) is fixedly installed between the small concrete (71) and the large concrete (72).
5. The intelligent beam yard of light T-beam prefabricated parts of claim 1, characterized in that: two rest room (8) all include bellows (81), two the equal fixedly connected with fixed plate (82) of inner wall of bellows (81), two the equal fixedly connected with motor (83) of right side of fixed plate (82), two the equal fixedly connected with bull stick (84), two of output shaft of motor (83) the equal fixedly connected with fan blade (85) in the outside of bull stick (84).
6. The intelligent beam yard of light T-beam prefabricated parts of claim 1, characterized in that: six laser scanner (11) all include bottom plate (111), six the equal fixedly connected with support (112) in top side of bottom plate (111), six the equal fixed mounting in top side of support (112) has scanner body (113).
7. The intelligent beam yard of light T-beam prefabricated parts of claim 1, characterized in that: two gantry crane body (13) all include removal frame (131), two all fixed mounting has hanging wheel group (132) on removal frame (131).
8. The intelligent beam yard of light T-beam prefabricated parts of claim 1, characterized in that: the plurality of spray heads (14) comprise bottom frames (141), and liquid heads (142) are fixedly communicated with the top sides of the bottom frames (141).
9. The intelligent beam yard of light T-beam prefabricated parts of claim 1, characterized in that: it is a plurality of cistern (15) all include water tank (151), and is a plurality of the inner wall fixedly connected with filter plate of water tank (151), a plurality of holes of leaking (152) have all been seted up on the top ground of a plurality of water tanks (151).
CN202211491814.0A 2022-11-25 2022-11-25 Intelligent beam yard of light-duty T roof beam prefabricated component Pending CN115922896A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211491814.0A CN115922896A (en) 2022-11-25 2022-11-25 Intelligent beam yard of light-duty T roof beam prefabricated component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211491814.0A CN115922896A (en) 2022-11-25 2022-11-25 Intelligent beam yard of light-duty T roof beam prefabricated component

Publications (1)

Publication Number Publication Date
CN115922896A true CN115922896A (en) 2023-04-07

Family

ID=86556783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211491814.0A Pending CN115922896A (en) 2022-11-25 2022-11-25 Intelligent beam yard of light-duty T roof beam prefabricated component

Country Status (1)

Country Link
CN (1) CN115922896A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208137446U (en) * 2018-03-16 2018-11-23 中建八局第一建设有限公司 A kind of comprehensive station of building
CN112692980A (en) * 2020-12-31 2021-04-23 中铁二十三局集团第一工程有限公司 Prefabricated T-beam assembly line and using method thereof
CN112763700A (en) * 2021-02-18 2021-05-07 同济大学 Concrete precast beam finished product quality detection and digital entity model construction system and method
CN217168990U (en) * 2022-02-25 2022-08-12 中铁十四局集团青岛工程有限公司 Beam slab spraying and scouring device for beam yard
CN115214005A (en) * 2022-06-23 2022-10-21 中国建筑第八工程局有限公司 Circulating beam manufacturing system of precast beam field and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208137446U (en) * 2018-03-16 2018-11-23 中建八局第一建设有限公司 A kind of comprehensive station of building
CN112692980A (en) * 2020-12-31 2021-04-23 中铁二十三局集团第一工程有限公司 Prefabricated T-beam assembly line and using method thereof
CN112763700A (en) * 2021-02-18 2021-05-07 同济大学 Concrete precast beam finished product quality detection and digital entity model construction system and method
CN217168990U (en) * 2022-02-25 2022-08-12 中铁十四局集团青岛工程有限公司 Beam slab spraying and scouring device for beam yard
CN115214005A (en) * 2022-06-23 2022-10-21 中国建筑第八工程局有限公司 Circulating beam manufacturing system of precast beam field and construction method thereof

Similar Documents

Publication Publication Date Title
CN108890850B (en) Intelligent production line and production process capable of producing various standard PC components
CN203876032U (en) Automatic prefabricated part production system
CN103029212A (en) Production process of automatic assembly line in factory for pre-fabricating and assembling wall panel of integral shear wall structure
CN109773952B (en) Short line matching segment beam circulating flow production line and production method thereof
CN105921471B (en) Cigarette automatic double surface gluer cleaning device
CN107282507A (en) A kind of circulating cleaning platform of movement suitable for railcar parts
CN111941630A (en) Automatic production system of PC component
CN207138376U (en) A kind of circulating cleaning platform of movement suitable for railcar parts
CN113733318B (en) Integrated equipment for cleaning and spraying release agent on precast concrete member platform
CN115922896A (en) Intelligent beam yard of light-duty T roof beam prefabricated component
CN104526862A (en) Integrated prefabricated part demolding machine
CN206474316U (en) Can automated cleaning hanger the synchronous double mode flush coater of 4 axles
CN112123554A (en) PC component automation line
CN108748643B (en) Novel intelligent production line of assembled building material
CN215094490U (en) Flexible production line of PC concrete member
CN107030866B (en) Numerical control PC production line
CN212707351U (en) Automatic production system of PC component
CN211370423U (en) Large-scale wet blasting of efficient loading attachment for manipulator
CN209853370U (en) Two-position single-line container dumping system
CN205604802U (en) Ferry vehicle and parking system
CN110014009B (en) Intelligent cleaning process for household garbage container
CN112281664A (en) Slip form construction method for cast-in-situ of large-span simply supported beam
CN112140324A (en) Detachable movable assembly line factory
CN112549277A (en) Automatic change distributing device
CN204367155U (en) A kind of integrated form prefabricated component ingot stripper

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination