CN115897659A - Retaining wall structure and construction method - Google Patents

Retaining wall structure and construction method Download PDF

Info

Publication number
CN115897659A
CN115897659A CN202211473529.6A CN202211473529A CN115897659A CN 115897659 A CN115897659 A CN 115897659A CN 202211473529 A CN202211473529 A CN 202211473529A CN 115897659 A CN115897659 A CN 115897659A
Authority
CN
China
Prior art keywords
longitudinal
bottom plate
column
fixedly connected
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211473529.6A
Other languages
Chinese (zh)
Other versions
CN115897659B (en
Inventor
赵文辉
张珂
马殷军
吴术高
张亮
余仕江
雷丽
王江东
黄星
杨有海
党凯堂
吴小敏
许锦江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Jiaotong University
China Railway Lanzhou Group Co Ltd
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Original Assignee
Lanzhou Jiaotong University
China Railway Lanzhou Group Co Ltd
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Jiaotong University, China Railway Lanzhou Group Co Ltd, Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd filed Critical Lanzhou Jiaotong University
Priority to CN202211473529.6A priority Critical patent/CN115897659B/en
Publication of CN115897659A publication Critical patent/CN115897659A/en
Application granted granted Critical
Publication of CN115897659B publication Critical patent/CN115897659B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明提供一种挡土墙结构及施工方法,涉及路基帮宽填筑支护技术领域,内杆的外侧拧接有限位螺母,纵向底板以及横向底板的内侧均呈直线阵列固定连接有两处导轨,导轨的内部滑动连接有调节块,解决了支护结构在进行使用时,由于其施工量大、工期长且对周围环境的影响过大,以及在进行施工时缺乏对支护结构的有效牵引支撑结构,使得支护结构在压实或使用过程中很容易因受压而导致出现形变,进而会影响后续的支护效果的问题,通过内杆带动着滚轮B的转动以实现对纵向底板的收紧工作,然后再通过将限位螺母进行拧紧以对内杆进行快速的摩擦限位工作即可,进而达到与滚轮A形成配合以对装置进行加固的目的。

Figure 202211473529

The invention provides a retaining wall structure and construction method, and relates to the technical field of subgrade side width filling and support. The outer side of the inner rod is screwed with a limit nut, and the inner side of the longitudinal bottom plate and the transverse bottom plate are fixedly connected in two places in a linear array. The guide rail, the internal sliding connection of the guide rail has an adjustment block, which solves the problem of the large amount of construction, long construction period and excessive impact on the surrounding environment when the support structure is in use, and the lack of effective support for the support structure during construction. The traction support structure makes the support structure easy to deform due to compression during compaction or use, which will affect the subsequent support effect. The inner rod drives the rotation of the roller B to realize the longitudinal bottom plate. The tightening work, and then tighten the limit nut to perform fast friction limit work on the inner rod, and then achieve the purpose of forming cooperation with the roller A to reinforce the device.

Figure 202211473529

Description

一种挡土墙结构及施工方法A kind of retaining wall structure and construction method

技术领域technical field

本发明涉及路基帮宽填筑支护技术领域,特别涉及一种挡土墙结构及施工方法。The invention relates to the technical field of roadbed side width filling and support, in particular to a retaining wall structure and a construction method.

背景技术Background technique

随着交通网密度的增加,在铁路进站前或公路段会出现路基帮宽工程,常规帮宽路基结构存在占地面积大、对既有路基影响大、工期长等问题,而常规挡土墙支护结构也存在需现场浇筑、圬工量大、质量控制困难、工期长等缺点。With the increase of the traffic network density, there will be roadbed side width projects before the railway enters the station or on the highway section. The conventional side width roadbed structure has problems such as large area occupation, great impact on the existing roadbed, and long construction period, while the conventional retaining soil The wall support structure also has disadvantages such as the need for on-site pouring, large amount of masonry, difficult quality control, and long construction period.

而支护结构在进行使用时,由于其施工量大、工期长且对周围环境的影响过大,以及在进行施工时缺乏对支护结构的有效牵引支撑结构,使得支护结构在压实或使用过程中很容易因受压而导致出现形变,进而会影响后续的支护效果。However, when the support structure is in use, due to its large construction volume, long construction period and excessive impact on the surrounding environment, and the lack of effective traction support structure for the support structure during construction, the support structure is under compaction or It is easy to deform due to compression during use, which will affect the subsequent support effect.

发明内容Contents of the invention

本发明提供了一种挡土墙结构及施工方法的目的与功效,具体包括:纵向底板和横向底板以及套筒,所述横向底板与立柱的栓接位置长度为二分之一的立柱宽度,其纵向长度要求大于等于2m,厚*高为5mm*25cm,纵向底板的纵向长度为2.2m,其与横向底板栓接位置长度为10cm,纵向底板以及横向底板的内部开设有安装孔A,安装孔A用于安装M10螺栓,且该螺栓孔外缘不低于5cm,所述套筒的内部转动连接有内杆,内杆的长度大于套筒,内杆的外侧固定连接有滚轮B,内杆的顶端固定连接有调节板,且内杆的外侧拧接有限位螺母,纵向底板以及横向底板的内侧均呈直线阵列固定连接有两处导轨,导轨的内部滑动连接有调节块。The present invention provides the purpose and effect of a retaining wall structure and construction method, specifically comprising: a longitudinal base plate, a transverse base plate and a sleeve, the length of the bolted position between the transverse base plate and the column is 1/2 the width of the column, The longitudinal length is required to be greater than or equal to 2m, the thickness*height is 5mm*25cm, the longitudinal length of the longitudinal bottom plate is 2.2m, and the length of the bolted position with the horizontal bottom plate is 10cm, and there are installation holes A inside the longitudinal bottom plate and the horizontal bottom plate. Hole A is used to install M10 bolts, and the outer edge of the bolt hole is not less than 5cm. The inner part of the sleeve is connected with an inner rod which is longer than the sleeve. The outer side of the inner rod is fixedly connected with a roller B. The top of the rod is fixedly connected with an adjustment plate, and the outer side of the inner rod is screwed with a limit nut. The inner sides of the longitudinal base plate and the transverse base plate are fixedly connected with two guide rails in a linear array, and the inside of the guide rail is slidingly connected with an adjustment block.

进一步的,所述立柱为类工字钢结构,尺寸为150*170*7mm,且立柱的一侧设置有弯角,该弯角长度为20mm,安装倾斜比为1:20,且立柱的内侧以及外侧均开设有安装孔B,安装孔B用于安装M10螺栓,且安装孔B的外缘不低于2cm,立柱的外侧固定连接有悬挂环,该悬挂环的尺寸为内径2cm,其安装位置为立柱外侧的外侧中上(距顶部1/5高度)、中部和中下(距底部1/5高度)。Further, the column is an I-shaped steel structure with a size of 150*170*7mm, and a corner is provided on one side of the column, the length of the corner is 20mm, and the installation inclination ratio is 1:20, and the inside of the column And the outer side is provided with installation hole B, the installation hole B is used to install M10 bolts, and the outer edge of the installation hole B is not less than 2cm, the outer side of the column is fixedly connected with a suspension ring, the size of the suspension ring is 2cm in inner diameter, its installation The positions are the upper middle (1/5 height from the top), the middle and the lower middle (1/5 height from the bottom) on the outer side of the column.

进一步的,所述纵向波纹钢的一侧固定连接有滤网,且纵向底板以及横向底板的内部填充有开级配碎石、土工织物和路基常规填料,且开级配碎石的底端铺设有透水织物,其中滤网用于封堵排水孔,且滤网的尺寸15cm*15cm,网格尺寸1cm*1cm,填筑开级配碎石的纵向填筑形状为正梯形,透水织物用于全包裹开级配碎石,后续分层填筑和压实路基常规填料。Further, one side of the longitudinal corrugated steel is fixedly connected with a filter screen, and the interior of the longitudinal floor and the transverse floor is filled with open-graded crushed stones, geotextiles and conventional roadbed fillers, and the bottom end of the open-graded crushed stones is laid There are permeable fabrics, in which the filter screen is used to block the drainage holes, and the size of the filter screen is 15cm*15cm, and the grid size is 1cm*1cm. Fully wrapped open-graded crushed stone, followed by layered filling and compacted roadbed conventional filler.

进一步的,所述立柱的内部通过螺栓安装有纵向波纹钢,纵向波纹钢的竖向总高度为25cm,其中H1、H2、H3、H4、H5分别为5cm、2.5cm、10cm、2.5cm和10cm,B为150cm,且纵向波纹钢的纵向长度2.15m,纵向波纹钢的内部开设有排水孔,排水孔的尺寸为直径为3cm,底项点位于距离底面线1cm。Further, the inside of the column is installed with longitudinal corrugated steel through bolts, the total vertical height of the longitudinal corrugated steel is 25cm, wherein H1, H2, H3, H4, H5 are 5cm, 2.5cm, 10cm, 2.5cm and 10cm respectively , B is 150cm, and the longitudinal length of the longitudinal corrugated steel is 2.15m. There are drainage holes inside the longitudinal corrugated steel.

进一步的,所述调节块的一侧固定连接有挂钩,且调节块的一端固定连接有限位杆,限位杆为丝杆结构,且限位杆的外侧通过拧接螺母限位,挂钩与滚轮A以及滚轮B之间通过牵引绳连接,牵引绳为钢丝绳。Further, one side of the adjustment block is fixedly connected with a hook, and one end of the adjustment block is fixedly connected with a limit rod, the limit rod is a screw structure, and the outside of the limit rod is limited by screwing a nut, the hook and the roller A and roller B are connected by a traction rope, and the traction rope is a steel wire rope.

进一步的,所述纵向底板的内部固定连接有导架,导架的内部插接有延伸架,延伸架通过固定栓限位,延伸架的顶端固定连接有台座,台座的内部呈环形阵列开设有限位孔,且台座的内部转动连接有套筒,套筒的外侧安装有滚轮A,且套筒的外侧固定连接有限位板,限位板的内部开设有通孔,该通孔与台座中所开设的限位孔相匹配。Further, the inside of the longitudinal bottom plate is fixedly connected with a guide frame, and an extension frame is plugged into the inside of the guide frame, the extension frame is limited by a fixing bolt, and the top of the extension frame is fixedly connected with a pedestal, and the inside of the pedestal is arranged in a circular array with limited space. position hole, and the inside of the pedestal is connected with a sleeve, the outer side of the sleeve is installed with a roller A, and the outer side of the sleeve is fixedly connected with a limit plate, and the inside of the limit plate is provided with a through hole. Match the opening limit hole.

进一步的,所述立柱的顶端安装有盖板,盖板的纵向长度2.2m,宽度177mm,厚度5mm,与立柱采用M10螺栓连接,且盖板的顶端面上呈直线阵列固定连接有两处安装架,安装架用于安装栅栏,且纵向底板、横向底板、立柱、纵向波纹钢、固定结构和盖板的钢构件均采用镀锌防腐处理。Further, a cover plate is installed on the top of the column. The longitudinal length of the cover plate is 2.2m, the width is 177mm, and the thickness is 5mm. The mounting frame is used to install the fence, and the steel components of the longitudinal base plate, transverse base plate, column, longitudinal corrugated steel, fixed structure and cover plate are all galvanized and anti-corrosion treated.

本发明公开了一种挡土墙结构的施工方法,包括以下步骤:The invention discloses a construction method of a retaining wall structure, comprising the following steps:

1)、准备工作:主要分为钢构件准备、帮宽地基平整或复合地基施工、既有路基开挖阶段,钢构件需结合设计资料,确定纵向底板和横向底板以及立柱的高度,结合工程量,确定钢构件配件量,帮宽地基平整或复合地基施工阶段需结合设计图纸,在该结构施工前完成帮宽地基平整或复合地基施工,保证上部呈4%外倾式斜坡,既有路基开挖阶段,结合既有路基边坡,分别开挖高度为0.25m和0.5m台阶,保证新建帮宽路基与既有路基衔接;1) Preparatory work: It is mainly divided into steel member preparation, foundation leveling or composite foundation construction, and existing roadbed excavation stage. Steel members need to be combined with design data to determine the height of the longitudinal bottom plate, transverse bottom plate and columns, combined with the engineering quantity , to determine the amount of steel component parts, and the design drawings should be combined with the construction stage of the side-wide foundation leveling or composite foundation. In the excavation stage, combined with the existing subgrade slope, the excavation heights are 0.25m and 0.5m steps respectively, so as to ensure the connection between the new side-width subgrade and the existing subgrade;

2)、纵向底板和横向底板组装:根据定位确定不同的横向底板以及纵向底板的长度以及位置,结合编号进行横向底板和纵向底板螺栓的连接,而后进行立柱主体和第一层纵向波纹钢的连接,结构连接后可保证立柱的稳定性;2) Assembling the longitudinal base plate and the transverse base plate: determine the length and position of different transverse base plates and longitudinal base plates according to the positioning, connect the horizontal base plate and the longitudinal base plate bolts according to the number, and then connect the column main body and the first layer of longitudinal corrugated steel , the stability of the column can be guaranteed after the structure is connected;

3)、然后在当需要对横向底板进行拉紧时,可以通过工具插入到限位板中的通孔内部对套筒进行转动驱动,直至使得滚轮A的转动来利用牵引绳来将横向底板进行同步的拉紧操作,通过对设置在纵向底板前后两侧横向底板的同步拉扯聚拢操作,可以实现对横向底板的加强并确保后续填料工作不会造成横向底板发生形变;3) Then, when the transverse base plate needs to be tightened, the sleeve can be rotated and driven by inserting a tool into the through hole in the limit plate until the rotation of the roller A is used to pull the transverse base plate Synchronous tensioning operation, through the synchronous pulling and gathering operation of the horizontal bottom plates arranged on the front and rear sides of the longitudinal bottom plate, can realize the reinforcement of the horizontal bottom plate and ensure that the subsequent filling work will not cause deformation of the horizontal bottom plate;

4)、在当套筒转动到合适位置后,可以通过将螺栓穿过限位板以及台座中所开设的通孔来对限位板进行限位,并同步的对套筒进行限位,而在当需要对纵向底板进行拉紧时,则可以通过将工具插入到调节板中所开设的通孔内部带动着内杆进行转动,并通过内杆带动着滚轮B的转动以实现对纵向底板的收紧工作,然后再通过将限位螺母进行拧紧以对内杆进行快速的摩擦限位工作即可;4) After the sleeve is rotated to a suitable position, the limit plate can be limited by passing the bolt through the through hole in the limit plate and the pedestal, and the sleeve can be limited synchronously, while When it is necessary to tighten the longitudinal bottom plate, the inner rod can be driven to rotate by inserting the tool into the through hole provided in the adjustment plate, and the inner rod can drive the rotation of the roller B to realize the tension on the longitudinal bottom plate Tighten the work, and then tighten the limit nut to perform fast friction limit work on the inner rod;

5)、纵向底板和横向底板内填筑:先进行滤网放置,而后依次填筑开级配碎石,放置一层透水织物,且透水织物需全包裹开级配碎石,而后在外侧向内侧倾倒路基常规填料,人工先进行铲平,而后采用机械进行压实,并保证压实度满足设计要求;5) Filling in the longitudinal bottom plate and the horizontal bottom plate: first place the filter screen, then fill in the graded gravel in turn, place a layer of permeable fabric, and the permeable fabric must fully wrap the graded gravel, and then in the outer direction Dump the conventional subgrade filler on the inside, level it manually, and then compact it mechanically, and ensure that the degree of compaction meets the design requirements;

6)、路基填料、纵向波纹钢和加筋体交替分层设置:结合设计图,每层按照0.5m厚度进行路基填料、纵向波纹钢和加筋体交替分层设置,其中纵向波纹钢至少高于填筑位置一层,直至顶部,每层填筑高度顶面基本位于加筋体的结构位置,在进行压实填筑压实时,由立柱位置依次向内压实,且各项工作交替、分区进行,节约工期和实现机械、人工利用最大化;6) Subgrade filler, longitudinal corrugated steel and reinforced body alternately layered: combined with the design drawing, each layer is arranged in alternate layers of subgrade filler, longitudinal corrugated steel and reinforced body according to the thickness of 0.5m, in which the longitudinal corrugated steel is at least as high as From the first floor of the filling position to the top, the top surface of each layer of filling height is basically located at the structural position of the reinforced body. When performing compaction and compaction, the position of the column is compacted inwards sequentially, and various tasks are alternated. Partitioning, saving construction time and maximizing the use of machinery and labor;

7)、顶部盖板安装:当即将填筑至立柱的顶面时,进行对盖板的安装,同时该位置上固定连接有供栅栏安装的安装架;7) Installation of the top cover plate: when the top surface of the column is about to be filled, the cover plate is installed, and at the same time, a mounting frame for fence installation is fixedly connected to this position;

8)、外侧宣传画幅安装:当帮宽工程交付运营单位前或交付运营单位,施工单位或运营单位可结合外侧预留的悬挂环定做宣传画幅,采用扣环或钢丝悬挂等方法固定。8) Installation of external promotional posters: Before the widening project is handed over to the operating unit or delivered to the operating unit, the construction unit or operating unit can combine the hanging rings reserved on the outer side to customize the publicity posters, and use buckles or steel wires to hang and other methods to fix them.

与现有技术相比,本发明具有如下有益效果:Compared with the prior art, the present invention has the following beneficial effects:

1、本发明中,通过结合设计图,每层按照0.5m厚度进行路基填料、纵向波纹钢和层状加筋结构交替分层设置,其中纵向波纹钢至少高于填筑位置一层,直至顶部,每层填筑高度顶面基本位于层状加筋结构位置,在进行压实填筑压实时,由竖向立柱位置依次向内压实,且各项工作交替、分区进行,节约工期和实现机械、人工利用最大化。1. In the present invention, by combining the design drawings, each layer is alternately layered with subgrade filler, longitudinal corrugated steel and layered reinforcement structure according to the thickness of 0.5m, wherein the longitudinal corrugated steel is at least one layer higher than the filling position until the top , the top surface of the filling height of each layer is basically located at the position of the layered reinforced structure. When compacting and compacting, the position of the vertical column is compacted inward in turn, and the work is carried out alternately and in different areas, saving the construction period and realizing Maximize the utilization of machinery and labor.

2、本发明中,在当帮宽工程交付运营单位前或交付运营单位,施工单位或运营单位可结合外侧预留的悬挂环定做宣传画幅,采用扣环或钢丝悬挂等方法固定,进行单位宣传或出租,增加资源利用和经济效益等。2. In the present invention, before the project is delivered to the operation unit or to the operation unit, the construction unit or the operation unit can combine the hanging ring reserved on the outside to customize the poster, and fix it by buckle ring or steel wire suspension for unit publicity Or lease, increase resource utilization and economic benefits, etc.

3、本发明中,在当套筒转动到合适位置后,可以通过将螺栓穿过限位板以及台座中所开设的通孔来对限位板进行限位,并同步的对套筒进行限位,而在当需要对纵向底板进行拉紧时,则可以通过将工具插入到调节板中所开设的通孔内部带动着内杆进行转动,并通过内杆带动着滚轮B的转动以实现对纵向底板的收紧工作,然后再通过将限位螺母进行拧紧以对内杆进行快速的摩擦限位工作即可,进而达到与滚轮A形成配合以对装置进行加固的目的。3. In the present invention, after the sleeve is rotated to a proper position, the limit plate can be limited by passing the bolt through the through hole set in the limit plate and the pedestal, and the sleeve can be simultaneously limited. position, and when the longitudinal bottom plate needs to be tightened, the inner rod can be driven to rotate by inserting the tool into the through hole opened in the adjustment plate, and the inner rod can drive the rotation of the roller B to achieve alignment. The tightening of the longitudinal bottom plate can be done by tightening the limit nut to quickly friction limit the inner rod, and then achieve the purpose of forming cooperation with the roller A to strengthen the device.

附图说明Description of drawings

为了更清楚地说明本发明的实施例的技术方案,下面将对实施例的附图作简单地介绍。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the accompanying drawings of the embodiments will be briefly introduced below.

下面描述中的附图仅仅涉及本发明的一些实施例,而非对本发明的限制。The drawings in the following description only relate to some embodiments of the present invention, but do not limit the present invention.

在附图中:In the attached picture:

图1示出了根据本发明实施例挡土墙结构的部分结构剖切状态下的前侧视结构示意图;Fig. 1 shows a schematic diagram of a front side view structure of a partial structural section of a retaining wall structure according to an embodiment of the present invention;

图2示出了根据本发明实施例挡土墙结构的部分结构剖切状态下的仰侧视结构示意图;Fig. 2 shows a schematic diagram of the structure of the retaining wall structure according to an embodiment of the present invention, in a cut-away state of a part of the structure;

图3示出了根据本发明实施例挡土墙结构的装配结构示意图;Fig. 3 shows a schematic diagram of an assembly structure of a retaining wall structure according to an embodiment of the present invention;

图4示出了根据本发明实施例挡土墙结构的前视结构示意图;Fig. 4 shows a front view structural diagram of a retaining wall structure according to an embodiment of the present invention;

图5示出了根据本发明实施例挡土墙结构的导架至滚轮B展示结构示意图;Fig. 5 shows a schematic diagram of the display structure from the guide frame to the roller B of the retaining wall structure according to the embodiment of the present invention;

图6示出了根据本发明实施例挡土墙结构的纵向波纹钢结构示意图;Fig. 6 shows a schematic diagram of a longitudinal corrugated steel structure of a retaining wall structure according to an embodiment of the present invention;

图7示出了根据本发明实施例挡土墙结构的滤网结构示意图;Fig. 7 shows a schematic diagram of a screen structure of a retaining wall structure according to an embodiment of the present invention;

图8示出了根据本发明实施例挡土墙结构的图2中A处放大结构示意图。Fig. 8 shows an enlarged schematic diagram of the structure at A in Fig. 2 of the retaining wall structure according to an embodiment of the present invention.

图9示出了根据本发明实施例挡土墙结构的图2中B处放大结构示意图。Fig. 9 shows an enlarged schematic diagram of the structure at B in Fig. 2 of the retaining wall structure according to an embodiment of the present invention.

附图标记列表List of reference signs

1、纵向底板;2、横向底板;3、安装孔A;4、立柱;5、安装孔B;6、悬挂环;7、纵向波纹钢;8、排水孔;9、固定结构;10、加筋体;11、滤网;12、开级配碎石;13、土工织物;14、路基常规填料;15、透水织物;16、盖板;17、安装架;18、导架;19、固定栓;20、延伸架;21、台座;22、套筒;23、滚轮A;24、限位板;25、内杆;26、滚轮B;27、调节板;28、限位螺母;29、导轨;30、调节块;31、挂钩;32、限位杆;33、牵引绳。1. Longitudinal bottom plate; 2. Transverse bottom plate; 3. Mounting hole A; 4. Column; 5. Mounting hole B; 6. Suspension ring; 7. Longitudinal corrugated steel; Rib body; 11. Filter screen; 12. Open graded crushed stone; 13. Geotextile; 14. Conventional subgrade filler; 15. Permeable fabric; 16. Cover plate; 17. Mounting frame; 18. Guide frame; 19. Fixing Bolt; 20, extension frame; 21, pedestal; 22, sleeve; 23, roller A; 24, limit plate; 25, inner rod; 26, roller B; 27, adjustment plate; 28, limit nut; 29, Guide rail; 30, adjusting block; 31, hook; 32, limit rod; 33, traction rope.

下面结合附图和实施例对本发明的实施方式作进一步详细描述。Embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings and examples.

具体实施方式Detailed ways

实施例:Example:

如附图1至附图9所示:As shown in accompanying drawing 1 to accompanying drawing 9:

本发明提供一种挡土墙结构及施工方法,包括有:纵向底板1和横向底板2以及套筒22,横向底板2与立柱4的栓接位置长度为二分之一的立柱4宽度,其纵向长度要求大于等于2m,厚*高为5mm*25cm,纵向底板1的纵向长度为2.2m,其与横向底板2栓接位置长度为10cm,纵向底板1以及横向底板2的内部开设有安装孔A3,安装孔A3用于安装M10螺栓,且该螺栓孔外缘不低于5cm,套筒22的内部转动连接有内杆25,内杆25的长度大于套筒22,内杆25的外侧固定连接有滚轮B26,内杆25的顶端固定连接有调节板27,且内杆25的外侧拧接有限位螺母28,纵向底板1以及横向底板2的内侧均呈直线阵列固定连接有两处导轨29,导轨29的内部滑动连接有调节块30,调节块30的一侧固定连接有挂钩31,且调节块30的一端固定连接有限位杆32,限位杆32为丝杆结构,且限位杆32的外侧通过拧接螺母限位,挂钩31与滚轮A23以及滚轮B26之间通过牵引绳33连接,牵引绳33为钢丝绳,在当帮宽工程交付运营单位前或交付运营单位,施工单位或运营单位可结合外侧预留的悬挂环6定做宣传画幅,采用扣环或钢丝悬挂等方法固定,进行单位宣传或出租,增加资源利用和经济效益等。The present invention provides a retaining wall structure and construction method, comprising: a longitudinal base plate 1, a transverse base plate 2 and a sleeve 22, the length of the bolted position between the transverse base plate 2 and the column 4 is half the width of the column 4, and The longitudinal length is required to be greater than or equal to 2m, the thickness*height is 5mm*25cm, the longitudinal length of the longitudinal bottom plate 1 is 2.2m, and the length of the bolted position with the horizontal bottom plate 2 is 10cm, and there are installation holes inside the longitudinal bottom plate 1 and the horizontal bottom plate 2 A3, the installation hole A3 is used to install M10 bolts, and the outer edge of the bolt hole is not less than 5cm, the inner rod 25 is connected to the inner rotation of the sleeve 22, the length of the inner rod 25 is longer than the sleeve 22, and the outer side of the inner rod 25 is fixed The roller B26 is connected, the top of the inner rod 25 is fixedly connected with the adjustment plate 27, and the outer side of the inner rod 25 is screwed with the limit nut 28, and the inner side of the longitudinal base plate 1 and the transverse base plate 2 are in a linear array and fixedly connected with two guide rails 29 , the inside of the guide rail 29 is slidingly connected with an adjustment block 30, one side of the adjustment block 30 is fixedly connected with a hook 31, and one end of the adjustment block 30 is fixedly connected with a limit rod 32, the limit rod 32 is a screw structure, and the limit rod The outer side of 32 is limited by screwing the nut, and the hook 31 is connected with the roller A23 and the roller B26 through the traction rope 33. The traction rope 33 is a steel wire rope. The unit can combine the hanging ring 6 reserved on the outside to make a promotional poster, and fix it by means of buckle or steel wire suspension, so as to promote or rent out the unit, so as to increase resource utilization and economic benefits.

其中,立柱4为类工字钢结构,尺寸为150*170*7mm,且立柱4的一侧设置有弯角,该弯角长度为20mm,安装倾斜比为1:20,且立柱4的内侧以及外侧均开设有安装孔B5,安装孔B5用于安装M10螺栓,且安装孔B5的外缘不低于2cm,立柱4的外侧固定连接有悬挂环6,该悬挂环6的尺寸为内径2cm,其安装位置为立柱4外侧的外侧中上距顶部1/5高度、中部和中下距底部1/5高度,立柱4的内部通过螺栓安装有纵向波纹钢7,纵向波纹钢7的竖向总高度为25cm,其中H1、H2、H3、H4、H5分别为5cm、2.5cm、10cm、2.5cm和10cm,B为150cm,且纵向波纹钢7的纵向长度2.15m,纵向波纹钢7的内部开设有排水孔8,排水孔8的尺寸为直径为3cm,底项点位于距离底面线1cm。Among them, the column 4 is a similar I-shaped steel structure with a size of 150*170*7mm, and one side of the column 4 is provided with a bend, the length of which is 20mm, and the installation inclination ratio is 1:20, and the inside of the column 4 and the outside are provided with installation holes B5, the installation holes B5 are used to install M10 bolts, and the outer edge of the installation holes B5 is not less than 2cm, the outside of the column 4 is fixedly connected with a suspension ring 6, and the size of the suspension ring 6 is 2cm in inner diameter , the installation position is 1/5 of the height from the top to the top of the outside of the column 4, and 1/5 of the height from the middle and bottom to the bottom. The inside of the column 4 is equipped with longitudinal corrugated steel 7 through bolts, and the vertical corrugated steel 7 is vertically The total height is 25cm, of which H1, H2, H3, H4, H5 are 5cm, 2.5cm, 10cm, 2.5cm and 10cm respectively, B is 150cm, and the longitudinal length of the longitudinal corrugated steel 7 is 2.15m, the interior of the longitudinal corrugated steel 7 A drain hole 8 is provided, and the size of the drain hole 8 is 3 cm in diameter, and the top point of the bottom is positioned at 1 cm away from the bottom surface line.

其中,纵向波纹钢7的一侧固定连接有滤网11,且纵向底板1以及横向底板2的内部填充有开级配碎石12、土工织物13和路基常规填料14,且开级配碎石12的底端铺设有透水织物15,其中滤网11用于封堵排水孔8,且滤网11的尺寸15cm*15cm,网格尺寸1cm*1cm,填筑开级配碎石12的纵向填筑形状为正梯形,透水织物15用于全包裹开级配碎石12,后续分层填筑和压实路基常规填料14,立柱4的外侧安装有固定结构9,固定结构9的外侧固定连接有加筋体10,其中固定结构9采用M10螺栓与立柱4连接,固定结构9的长*高*宽为2.2m*10cm*5mm,加筋体10为双向土工格栅,土工格栅单幅宽度为2.0m,下层长度与横向底板2的横向长度相同,上层返包长度不少于1.0m,土工格栅强度参数不低于40kN/m,断裂伸长率≤3%,网格尺寸不大于5cm*5cm,在当套筒22转动到合适位置后,可以通过将螺栓穿过限位板24以及台座21中所开设的通孔来对限位板24进行限位,并同步的对套筒22进行限位,而在当需要对纵向底板1进行拉紧时,则可以通过将工具插入到调节板27中所开设的通孔内部带动着内杆25进行转动,并通过内杆25带动着滚轮B26的转动以实现对纵向底板1的收紧工作,然后再通过将限位螺母28进行拧紧以对内杆25进行快速的摩擦限位工作即可,进而达到与滚轮A23形成配合以对装置进行加固的目的。Among them, one side of the longitudinal corrugated steel 7 is fixedly connected with a filter screen 11, and the interior of the longitudinal bottom plate 1 and the transverse bottom plate 2 is filled with open-graded gravel 12, geotextile 13 and roadbed conventional filler 14, and the open-graded gravel The bottom end of 12 is laid with water-permeable fabric 15, wherein filter screen 11 is used for plugging drainage hole 8, and the size of filter screen 11 is 15cm*15cm, and grid size is 1cm*1cm, and the longitudinal filling of graded crushed stone 12 is filled. The shape of the building is trapezoidal. The permeable fabric 15 is used to fully wrap the graded crushed stone 12, and the subsequent layered filling and compaction of the subgrade conventional filler 14. The outer side of the column 4 is installed with a fixed structure 9, and the outer side of the fixed structure 9 is fixedly connected. There is a reinforced body 10, wherein the fixed structure 9 is connected to the column 4 by M10 bolts, the length*height*width of the fixed structure 9 is 2.2m*10cm*5mm, the reinforced body 10 is a bidirectional geogrid, and the geogrid is single-width The width is 2.0m, the length of the lower layer is the same as the lateral length of the horizontal bottom plate 2, the length of the upper layer is not less than 1.0m, the strength parameter of the geogrid is not less than 40kN/m, the elongation at break is ≤3%, and the grid size is not less than 1.0m. greater than 5cm*5cm, when the sleeve 22 is rotated to a suitable position, the limit plate 24 can be limited by passing the bolt through the through hole in the limit plate 24 and the pedestal 21, and the sleeve can be synchronized The cylinder 22 is used to limit the position, and when the longitudinal bottom plate 1 needs to be tightened, the inner rod 25 can be driven to rotate by inserting the tool into the through hole opened in the adjustment plate 27, and the inner rod 25 can drive the inner rod 25 to rotate. Rotate the roller B26 to realize the tightening work on the longitudinal bottom plate 1, and then tighten the limit nut 28 to quickly frictionally limit the inner rod 25, and then achieve cooperation with the roller A23 to The purpose of strengthening the device.

其中,立柱4的顶端安装有盖板16,盖板16的纵向长度2.2m,宽度177mm,厚度5mm,与立柱4采用M10螺栓连接,且盖板16的顶端面上呈直线阵列固定连接有两处安装架17,安装架17用于安装栅栏,且纵向底板1、横向底板2、立柱4、纵向波纹钢7、固定结构9和盖板16的钢构件均采用镀锌防腐处理,纵向底板1的内部固定连接有导架18,导架18的内部插接有延伸架20,延伸架20通过固定栓19限位,延伸架20的顶端固定连接有台座21,台座21的内部呈环形阵列开设有限位孔,且台座21的内部转动连接有套筒22,套筒22的外侧安装有滚轮A23,且套筒22的外侧固定连接有限位板24,限位板24的内部开设有通孔,该通孔与台座21中所开设的限位孔相匹配,本发明中,通过结合设计图,每层按照0.5m厚度进行路基填料、纵向波纹钢和层状加筋结构交替分层设置,其中纵向波纹钢至少高于填筑位置一层,直至顶部;每层填筑高度顶面基本位于层状加筋结构位置;在进行压实填筑压实时,由立柱4位置依次向内压实,且各项工作交替、分区进行,节约工期和实现机械、人工利用最大化。Wherein, a cover plate 16 is installed on the top of the column 4, the longitudinal length of the cover plate 16 is 2.2m, the width is 177mm, and the thickness is 5mm. Mounting frame 17, the mounting frame 17 is used to install the fence, and the longitudinal bottom plate 1, the horizontal bottom plate 2, the column 4, the longitudinal corrugated steel 7, the fixed structure 9 and the steel components of the cover plate 16 are all galvanized and anti-corrosion treated, and the longitudinal bottom plate 1 The inside of the guide frame 18 is fixedly connected with a guide frame 18, and the inside of the guide frame 18 is plugged with an extension frame 20. The extension frame 20 is limited by the fixing bolt 19, and the top of the extension frame 20 is fixedly connected with a pedestal 21, and the interior of the pedestal 21 is arranged in a circular array. There are limited holes, and the inside of the pedestal 21 is rotatably connected with a sleeve 22, the outside of the sleeve 22 is equipped with a roller A23, and the outside of the sleeve 22 is fixedly connected with a limit plate 24, and the inside of the limit plate 24 is provided with a through hole. The through hole matches the limit hole provided in the pedestal 21. In the present invention, by combining the design drawing, each layer is alternately layered with subgrade filler, longitudinal corrugated steel and layered reinforcement structure according to the thickness of 0.5m. The longitudinal corrugated steel is at least one layer higher than the filling position, to the top; the top surface of each layer of filling height is basically located at the position of the layered reinforcement structure; when performing compaction and compaction, it is compacted inward from the position of the column 4, And each work is carried out alternately and dividedly, saving the construction period and maximizing the utilization of machinery and labor.

本发明公开了一种挡土墙结构的施工方法,包括以下步骤:The invention discloses a construction method of a retaining wall structure, comprising the following steps:

1)、准备工作:主要分为钢构件准备、帮宽地基平整或复合地基施工、既有路基开挖阶段,钢构件需结合设计资料,确定纵向底板1和横向底板2以及立柱4的高度,结合工程量,确定钢构件配件量,帮宽地基平整或复合地基施工阶段需结合设计图纸,在该结构施工前完成帮宽地基平整或复合地基施工,保证上部呈4%外倾式斜坡,既有路基开挖阶段,结合既有路基边坡,分别开挖高度为0.25m和0.5m台阶,保证新建帮宽路基与既有路基衔接;1) Preparatory work: It is mainly divided into steel member preparation, side width foundation leveling or composite foundation construction, and existing roadbed excavation stage. Steel members need to combine design data to determine the height of longitudinal floor 1, transverse floor 2 and column 4. Combined with the project quantity, determine the quantity of steel component parts. The construction stage of the side-wide foundation leveling or composite foundation needs to be combined with the design drawings. In the subgrade excavation stage, combined with the existing subgrade slope, the excavation heights are 0.25m and 0.5m steps respectively, so as to ensure the connection between the new side-width subgrade and the existing subgrade;

2)、纵向底板1和横向底板2组装:根据定位确定不同的横向底板2以及纵向底板1的长度以及位置,结合编号进行横向底板2和纵向底板1螺栓的连接,而后进行立柱4主体和第一层纵向波纹钢7的连接,结构连接后可保证立柱4的稳定性;2) Assembly of the longitudinal base plate 1 and the transverse base plate 2: determine the length and position of the different transverse base plates 2 and the longitudinal base plate 1 according to the positioning, and connect the bolts of the horizontal base plate 2 and the longitudinal base plate 1 according to the numbering, and then carry out the column 4 main body and the second The connection of a layer of longitudinal corrugated steel 7 can ensure the stability of the column 4 after the structure is connected;

3)、然后在当需要对横向底板2进行拉紧时,可以通过工具插入到限位板24中的通孔内部对套筒22进行转动驱动,直至使得滚轮A23的转动来利用牵引绳33来将横向底板2进行同步的拉紧操作,通过对设置在纵向底板1前后两侧横向底板2的同步拉扯聚拢操作,可以实现对横向底板2的加强并确保后续填料工作不会造成横向底板2发生形变;3) Then, when the transverse bottom plate 2 needs to be tightened, the sleeve 22 can be rotated and driven by inserting a tool into the through hole in the limit plate 24 until the rotation of the roller A23 is achieved by the traction rope 33. The horizontal floor 2 is tightened synchronously, and the horizontal floor 2 can be strengthened by synchronous pulling and gathering operation of the horizontal floor 2 arranged on the front and rear sides of the longitudinal floor 1 and ensures that the subsequent filling work will not cause the horizontal floor 2 to occur. deformation;

4)、在当套筒22转动到合适位置后,可以通过将螺栓穿过限位板24以及台座21中所开设的通孔来对限位板24进行限位,并同步的对套筒22进行限位,而在当需要对纵向底板1进行拉紧时,则可以通过将工具插入到调节板27中所开设的通孔内部带动着内杆25进行转动,并通过内杆25带动着滚轮B26的转动以实现对纵向底板1的收紧工作,然后再通过将限位螺母28进行拧紧以对内杆25进行快速的摩擦限位工作即可;4) After the sleeve 22 is rotated to a proper position, the limit plate 24 can be limited by passing the bolt through the through hole in the limit plate 24 and the pedestal 21, and the sleeve 22 can be synchronized. position, and when the longitudinal bottom plate 1 needs to be tightened, the inner rod 25 can be driven to rotate by inserting the tool into the through hole provided in the adjustment plate 27, and the inner rod 25 can drive the roller The rotation of B26 is to realize the tightening work on the longitudinal bottom plate 1, and then tighten the stop nut 28 to perform fast friction limit work on the inner rod 25;

5)、纵向底板1和横向底板2内填筑:先进行滤网11放置,而后依次填筑开级配碎石12,放置一层透水织物15,且透水织物15需全包裹开级配碎石12,而后在外侧向内侧倾倒路基常规填料14,人工先进行铲平,而后采用机械进行压实,并保证压实度满足设计要求;5) Filling in the longitudinal bottom plate 1 and the horizontal bottom plate 2: first place the filter screen 11, then fill in the graded gravel 12 in turn, and place a layer of permeable fabric 15, and the permeable fabric 15 needs to be fully wrapped in the graded gravel Stone 12, and then dump the subgrade conventional filler 14 from the outside to the inside, manually level it first, and then use machinery to compact it, and ensure that the degree of compaction meets the design requirements;

6)、路基填料、纵向波纹钢7和加筋体10交替分层设置:结合设计图,每层按照0.5m厚度进行路基填料、纵向波纹钢7和加筋体10交替分层设置,其中纵向波纹钢7至少高于填筑位置一层,直至顶部,每层填筑高度顶面基本位于加筋体10的结构位置,在进行压实填筑压实时,由立柱4位置依次向内压实,且各项工作交替、分区进行,节约工期和实现机械、人工利用最大化;6) Subgrade filler, longitudinal corrugated steel 7 and reinforced body 10 are arranged alternately in layers: according to the design drawing, each layer is arranged in alternate layers of roadbed filler, longitudinal corrugated steel 7 and reinforced body 10 according to the thickness of 0.5m, wherein the longitudinal The corrugated steel 7 is at least one layer higher than the filling position until the top, and the top surface of each layer of filling height is basically located at the structural position of the reinforced body 10. When performing compaction and compaction, the position of the column 4 is compacted inwards sequentially , and each work is carried out alternately and dividedly, saving the construction period and maximizing the utilization of machinery and labor;

7)、顶部盖板16安装:当即将填筑至立柱4的顶面时,进行对盖板16的安装,同时该位置上固定连接有供栅栏安装的安装架17;7), top cover plate 16 installation: when about to be filled to the top surface of column 4, carry out the installation to cover plate 16, simultaneously this position is fixedly connected with the installation frame 17 that is installed for fence;

8)、外侧宣传画幅安装:当帮宽工程交付运营单位前或交付运营单位,施工单位或运营单位可结合外侧预留的悬挂环6定做宣传画幅,采用扣环或钢丝悬挂等方法固定。8) Installation of external promotional posters: Before the widening project is delivered to the operating unit or to the operating unit, the construction unit or operating unit can combine the suspension ring 6 reserved on the outer side to customize the promotional posters, and fix them by buckle or steel wire suspension.

使用时:首先对合适规格的钢构件进行准备,并帮宽地基平整或复合地基施工、既有路基开挖阶段,钢构件需结合设计资料,确定纵向底板1和横向底板2以及立柱4的高度,结合工程量,确定钢构件配件量,帮宽地基平整或复合地基施工阶段需结合设计图纸,在该结构施工前完成帮宽地基平整或复合地基施工,保证上部呈4%外倾式斜坡,既有路基开挖阶段,结合既有路基边坡,分别开挖高度为0.25m和0.5m台阶,保证新建帮宽路基与既有路基衔接;When in use: firstly prepare the steel members of appropriate specifications, and help the wide foundation leveling or composite foundation construction, the excavation stage of the existing roadbed, the steel members need to combine the design data to determine the height of the longitudinal bottom plate 1, the transverse bottom plate 2 and the column 4 , combined with the engineering quantity, determine the quantity of steel component parts, and the design drawings should be combined with the construction stage of the side-wide foundation leveling or composite foundation. In the excavation stage of the existing subgrade, combined with the side slope of the existing subgrade, the excavation heights are 0.25m and 0.5m steps respectively, so as to ensure the connection between the new side-width subgrade and the existing subgrade;

然后再通过根据定位确定不同的横向底板2以及纵向底板1的长度以及位置,结合编号进行横向底板2和纵向底板1螺栓的连接,而后进行立柱4主体和第一层纵向波纹钢7的连接,结构连接后可保证立柱4的稳定性;Then determine the lengths and positions of different transverse base plates 2 and longitudinal base plates 1 according to the positioning, connect the horizontal base plate 2 and the longitudinal base plate 1 bolts in combination with the numbers, and then carry out the connection between the main body of the column 4 and the first layer of longitudinal corrugated steel 7, After the structure is connected, the stability of the column 4 can be guaranteed;

然后再通过将牵引绳33的一端与设置在调节块30一端的挂钩31进行连接,并同步的将两处牵引绳33的另一端分别与设置在套筒22和内杆25外侧的滚轮A23和滚轮B26外侧进行安装,并且在当填料时,可以根据填料高度的不同,来手动调节插接在导架18中延伸架20的高度,在当延伸架20的高度调整完成后,再通过将固定栓19拧接到导架18的外侧来对延伸架20进行限位操作即可;Then by connecting one end of the traction rope 33 with the hook 31 that is arranged on one end of the adjustment block 30, and synchronously connecting the other end of the two traction ropes 33 with the roller A23 and the roller A23 that are arranged on the outside of the sleeve 22 and the inner rod 25 respectively. The outer side of the roller B26 is installed, and when filling, the height of the extension frame 20 plugged into the guide frame 18 can be manually adjusted according to the height of the filler, and after the height adjustment of the extension frame 20 is completed, the fixed The bolt 19 is screwed to the outside of the guide frame 18 to limit the extension frame 20;

然后在当需要对横向底板2进行拉紧时,可以通过工具插入到限位板24中的通孔内部对套筒22进行转动驱动,直至使得滚轮A23的转动来利用牵引绳33来将横向底板2进行同步的拉紧操作,通过对设置在纵向底板1前后两侧横向底板2的同步拉扯聚拢操作,可以实现对横向底板2的加强并确保后续填料工作不会造成横向底板2发生形变,进而达到加固的目的;Then when the transverse base plate 2 needs to be tensioned, the sleeve 22 can be rotated and driven through the tool inserted into the through hole in the limit plate 24, until the rotation of the roller A23 is used to pull the transverse base plate 33 2. Perform synchronous tensioning operations. By synchronous pulling and gathering operations on the transverse base plates 2 arranged on the front and rear sides of the longitudinal base plate 1, the reinforcement of the transverse base plate 2 can be realized and the subsequent filling work will not cause deformation of the transverse base plate 2, and then achieve the purpose of reinforcement;

且在当套筒22转动到合适位置后,可以通过将螺栓穿过限位板24以及台座21中所开设的通孔来对限位板24进行限位,并同步的对套筒22进行限位,而在当需要对纵向底板1进行拉紧时,则可以通过将工具插入到调节板27中所开设的通孔内部带动着内杆25进行转动,并通过内杆25带动着滚轮B26的转动以实现对纵向底板1的收紧工作,然后再通过将限位螺母28进行拧紧以对内杆25进行快速的摩擦限位工作即可,进而达到与滚轮A23形成配合以对装置进行加固的目的;And when the sleeve 22 is rotated to a suitable position, the limit plate 24 can be limited by passing the bolt through the through hole provided in the limit plate 24 and the pedestal 21, and the sleeve 22 can be limited synchronously. position, and when the longitudinal bottom plate 1 needs to be tightened, the inner rod 25 can be driven to rotate by inserting the tool into the through hole provided in the adjustment plate 27, and the inner rod 25 can drive the roller B26 Rotate to realize the tightening work on the longitudinal bottom plate 1, and then tighten the limit nut 28 to perform fast friction limit work on the inner rod 25, and then achieve the cooperation with the roller A23 to strengthen the device Purpose;

然后,将滤网11与纵向波纹钢7中所开设的排水孔8进行安装,而后依次填筑开级配碎石12,再放置一层透水织物15,且透水织物15需全包裹开级配碎石12,而后在外侧向内侧倾倒路基常规填料14,填充完成后再通过人工先进行铲平,而后采用机械进行压实,并保证压实度满足设计要求;Then, install the filter screen 11 and the drainage hole 8 provided in the longitudinal corrugated steel 7, then fill in the graded gravel 12 in sequence, and then place a layer of permeable fabric 15, and the permeable fabric 15 needs to be fully wrapped and graded Gravel 12, and then dump the subgrade conventional filler 14 from the outside to the inside, after the filling is completed, it will be leveled manually, and then compacted by machinery to ensure that the compactness meets the design requirements;

然后再通过结合设计图,每层按照0.5m厚度进行路基填料、纵向波纹钢7和加筋体10交替分层设置,其中纵向波纹钢7至少高于填筑位置一层,直至顶部,每层填筑高度顶面基本位于加筋体10的结构位置,在进行压实填筑压实时,由立柱4位置依次向内压实,且各项工作交替、分区进行,节约工期和实现机械、人工利用最大化;Then, by combining the design drawings, each layer is alternately layered with subgrade filler, longitudinal corrugated steel 7 and reinforced body 10 according to the thickness of 0.5m, wherein the longitudinal corrugated steel 7 is at least one layer higher than the filling position until the top. The top surface of the filling height is basically located at the structural position of the reinforced body 10. During the compaction and compaction, the positions of the columns 4 are compacted inwards sequentially, and various tasks are carried out alternately and in different areas, saving the construction period and realizing mechanical and manual construction. maximize utilization;

在当即将填筑至立柱4的顶面时,进行对盖板16的安装,同时该位置上固定连接有供栅栏安装的安装架17,进一步的加强了装置整体的覆盖范围;When it is about to be filled to the top surface of the column 4, the installation of the cover plate 16 is carried out, and the installation frame 17 for the installation of the fence is fixedly connected at this position, which further strengthens the overall coverage of the device;

且在当帮宽工程交付运营单位前或交付运营单位,施工单位或运营单位可结合外侧预留的悬挂环6定做宣传画幅,采用扣环或钢丝悬挂等方法固定,进行单位宣传或出租,增加资源利用和经济效益等。And before the delivery of the widening project to the operating unit or before the delivery of the operating unit, the construction unit or the operating unit can combine the hanging ring 6 reserved on the outside to customize a poster, and use buckles or steel wires to hang and fix it for unit publicity or rental, increasing Resource utilization and economic benefits, etc.

Claims (9)

1.一种挡土墙结构,其特征在于,包括:纵向底板(1)和横向底板(2)以及套筒(22),所述横向底板(2)与立柱(4)的栓接位置长度为二分之一的立柱(4)宽度,纵向底板(1)以及横向底板(2)的内部开设有安装孔A(3),安装孔A(3)用于安装M10螺栓,所述套筒(22)的内部转动连接有内杆(25),内杆(25)的长度大于套筒(22),内杆(25)的外侧固定连接有滚轮B(26),内杆(25)的顶端固定连接有调节板(27),且内杆(25)的外侧拧接有限位螺母(28),纵向底板(1)以及横向底板(2)的内侧均呈直线阵列固定连接有两处导轨(29),导轨(29)的内部滑动连接有调节块(30)。1. A retaining wall structure, characterized in that it comprises: a longitudinal base plate (1) and a transverse base plate (2) and a sleeve (22), the bolted position length of the transverse base plate (2) and the column (4) One-half the width of the column (4), the inside of the longitudinal bottom plate (1) and the transverse bottom plate (2) is provided with a mounting hole A (3), the mounting hole A (3) is used to install M10 bolts, the sleeve The inside of (22) is rotationally connected with inner rod (25), and the length of inner rod (25) is greater than sleeve (22), and the outside of inner rod (25) is fixedly connected with roller B (26), and the inner rod (25) The top end is fixedly connected with an adjustment plate (27), and the outer side of the inner rod (25) is screwed with a limit nut (28), and the inner sides of the longitudinal bottom plate (1) and the transverse bottom plate (2) are in a linear array and fixedly connected with two guide rails (29), the inside of guide rail (29) is slidably connected with adjusting block (30). 2.如权利要求1所述一种挡土墙结构,其特征在于:所述立柱(4)为类工字钢结构,且立柱(4)的一侧设置有弯角,立柱(4)的内侧以及外侧均开设有安装孔B(5),安装孔B(5)用于安装M10螺栓,立柱(4)的外侧固定连接有悬挂环(6)。2. A kind of retaining wall structure as claimed in claim 1, characterized in that: the column (4) is a similar I-shaped steel structure, and one side of the column (4) is provided with a bend, and the column (4) Both the inside and the outside are provided with installation holes B (5), and the installation holes B (5) are used for installing M10 bolts, and the outside of the column (4) is fixedly connected with a suspension ring (6). 3.如权利要求1所述一种挡土墙结构,其特征在于:所述立柱(4)的内部通过螺栓安装有纵向波纹钢(7),纵向波纹钢(7)的内部开设有排水孔(8)。3. A retaining wall structure as claimed in claim 1, characterized in that: the inside of the column (4) is equipped with longitudinal corrugated steel (7) through bolts, and the interior of the longitudinal corrugated steel (7) is provided with drainage holes (8). 4.如权利要求1所述一种挡土墙结构,其特征在于:所述立柱(4)的外侧安装有固定结构(9),固定结构(9)的外侧固定连接有加筋体(10),其中固定结构(9)采用M10螺栓与立柱(4)连接,加筋体(10)为双向土工格栅。4. A kind of retaining wall structure as claimed in claim 1, is characterized in that: the outer side of described column (4) is equipped with fixed structure (9), and the outer side of fixed structure (9) is fixedly connected with reinforcing body (10 ), wherein the fixed structure (9) is connected with the column (4) by M10 bolts, and the reinforced body (10) is a two-way geogrid. 5.如权利要求3所述一种挡土墙结构,其特征在于:所述纵向波纹钢(7)的一侧固定连接有滤网(11),且纵向底板(1)以及横向底板(2)的内部填充有开级配碎石(12)、土工织物(13)和路基常规填料(14),且开级配碎石(12)的底端铺设有透水织物(15),其中滤网(11)用于封堵排水孔(8)。5. A retaining wall structure as claimed in claim 3, characterized in that: one side of the longitudinal corrugated steel (7) is fixedly connected with a filter screen (11), and the longitudinal bottom plate (1) and the transverse bottom plate (2 ) is filled with open graded crushed stone (12), geotextile (13) and roadbed conventional filler (14), and the bottom end of open graded crushed stone (12) is laid with permeable fabric (15), wherein the filter screen (11) is used for plugging drain hole (8). 6.如权利要求1所述一种挡土墙结构,其特征在于:所述立柱(4)的顶端安装有盖板(16),与立柱(4)采用M10螺栓连接,且盖板(16)的顶端面上呈直线阵列固定连接有两处安装架(17),安装架(17)用于安装栅栏。6. A kind of retaining wall structure as claimed in claim 1, characterized in that: a cover plate (16) is installed on the top of the column (4), connected with the column (4) by M10 bolts, and the cover plate (16) ) is fixedly connected with two mounting brackets (17) in a linear array on the top surface, and the mounting bracket (17) is used to install the fence. 7.如权利要求1所述一种挡土墙结构,其特征在于:所述纵向底板(1)的内部固定连接有导架(18),导架(18)的内部插接有延伸架(20),延伸架(20)通过固定栓(19)限位,延伸架(20)的顶端固定连接有台座(21),台座(21)的内部呈环形阵列开设有限位孔,且台座(21)的内部转动连接有套筒(22),套筒(22)的外侧安装有滚轮A(23),且套筒(22)的外侧固定连接有限位板(24),限位板(24)的内部开设有通孔,该通孔与台座(21)中所开设的限位孔相匹配。7. A kind of retaining wall structure as claimed in claim 1, is characterized in that: the inside of described longitudinal base plate (1) is fixedly connected with guide frame (18), and the inside of guide frame (18) is plugged with extension frame ( 20), the extension frame (20) is limited by the fixing bolt (19), the top of the extension frame (20) is fixedly connected with a pedestal (21), and the inside of the pedestal (21) is provided with a limit hole in a circular array, and the pedestal (21 ) is connected with a sleeve (22) for rotation, the outer side of the sleeve (22) is equipped with a roller A (23), and the outer side of the sleeve (22) is fixedly connected with a limiting plate (24), and the limiting plate (24) The inside of the pedestal is provided with a through hole, which matches with the limit hole provided in the pedestal (21). 8.如权利要求1所述一种挡土墙结构,其特征在于:所述调节块(30)的一侧固定连接有挂钩(31),且调节块(30)的一端固定连接有限位杆(32),限位杆(32)为丝杆结构,且限位杆(32)的外侧通过拧接螺母限位,挂钩(31)与滚轮A(23)以及滚轮B(26)之间通过牵引绳(33)连接,牵引绳(33)为钢丝绳。8. A retaining wall structure according to claim 1, characterized in that: one side of the adjustment block (30) is fixedly connected with a hook (31), and one end of the adjustment block (30) is fixedly connected with a limit rod (32), the limit rod (32) is a screw structure, and the outside of the limit rod (32) is limited by screwing the nut, and the hook (31) passes between the roller A (23) and the roller B (26). Traction rope (33) connects, and traction rope (33) is steel wire rope. 9.如权利要求1-8所述一种挡土墙结构的施工方法,其特征在于,包括以下步骤:9. The construction method of a retaining wall structure as claimed in claim 1-8, characterized in that, comprising the following steps: 1)、准备工作:主要分为钢构件准备、帮宽地基平整或复合地基施工、既有路基开挖阶段,钢构件需结合设计资料,确定纵向底板(1)和横向底板(2)以及立柱(4)的高度,结合工程量,确定钢构件配件量,帮宽地基平整或复合地基施工阶段需结合设计图纸,在该结构施工前完成帮宽地基平整或复合地基施工,保证上部呈4%外倾式斜坡,既有路基开挖阶段,结合既有路基边坡,分别开挖高度为0.25m和0.5m台阶,保证新建帮宽路基与既有路基衔接;1) Preparatory work: It is mainly divided into steel member preparation, side width foundation leveling or composite foundation construction, and existing roadbed excavation stage. Steel members need to be combined with design data to determine the longitudinal floor (1) and transverse floor (2) and columns (4) The height, combined with the engineering quantity, determines the amount of steel component parts. The construction stage of the side-wide foundation leveling or composite foundation needs to be combined with the design drawings. Before the construction of the structure, the side-width foundation leveling or composite foundation construction should be completed to ensure that the upper part is 4% Outward-inclining slopes, in the excavation stage of the existing subgrade, combined with the side slope of the existing subgrade, the excavation heights are 0.25m and 0.5m steps, respectively, to ensure the connection between the new side-width subgrade and the existing subgrade; 2)、纵向底板(1)和横向底板(2)组装:根据定位确定不同的横向底板(2)以及纵向底板(1)的长度以及位置,结合编号进行横向底板(2)和纵向底板(1)螺栓的连接,而后进行立柱(4)主体和第一层纵向波纹钢(7)的连接,结构连接后可保证立柱(4)的稳定性;2) Assembling the longitudinal base plate (1) and the transverse base plate (2): determine the length and position of the different transverse base plates (2) and longitudinal base plates (1) according to the positioning, and combine the numbers to carry out the horizontal base plate (2) and the longitudinal base plate (1) ) bolts, and then carry out the connection of the column (4) main body and the first layer of longitudinal corrugated steel (7), the stability of the column (4) can be guaranteed after the structural connection; 3)、然后在当需要对横向底板(2)进行拉紧时,可以通过工具插入到限位板(24)中的通孔内部对套筒(22)进行转动驱动,直至使得滚轮A(23)的转动来利用牵引绳(33)来将横向底板(2)进行同步的拉紧操作,通过对设置在纵向底板(1)前后两侧横向底板(2)的同步拉扯聚拢操作,可以实现对横向底板(2)的加强并确保后续填料工作不会造成横向底板(2)发生形变;3), then when the transverse base plate (2) needs to be tensioned, the sleeve (22) can be rotated and driven through the tool inserted into the through hole in the limit plate (24) until the roller A (23 ) is rotated to use the traction rope (33) to perform a synchronous tensioning operation on the horizontal bottom plate (2), and through the synchronous pulling and gathering operation of the horizontal bottom plate (2) arranged on the front and rear sides of the longitudinal bottom plate (1), it can be realized. Reinforcement of the transverse bottom plate (2) and ensuring that subsequent filling work will not cause deformation of the transverse bottom plate (2); 4)、在当套筒(22)转动到合适位置后,可以通过将螺栓穿过限位板(24)以及台座(21)中所开设的通孔来对限位板(24)进行限位,并同步的对套筒(22)进行限位,而在当需要对纵向底板(1)进行拉紧时,则可以通过将工具插入到调节板(27)中所开设的通孔内部带动着内杆(25)进行转动,并通过内杆(25)带动着滚轮B(26)的转动以实现对纵向底板(1)的收紧工作,然后再通过将限位螺母(28)进行拧紧以对内杆(25)进行快速的摩擦限位工作即可;4) After the sleeve (22) is rotated to a proper position, the limit plate (24) can be limited by passing the bolt through the through hole set in the limit plate (24) and the pedestal (21) , and synchronously limit the sleeve (22), and when the longitudinal bottom plate (1) needs to be tightened, it can be driven by inserting the tool into the through hole opened in the adjustment plate (27). The inner rod (25) rotates, and the rotation of the roller B (26) is driven by the inner rod (25) to realize the tightening of the longitudinal bottom plate (1), and then the stop nut (28) is tightened to Carry out fast friction limit work to inner rod (25); 5)、纵向底板(1)和横向底板(2)内填筑:先进行滤网(11)放置,而后依次填筑开级配碎石(12),放置一层透水织物(15),且透水织物(15)需全包裹开级配碎石(12),而后在外侧向内侧倾倒路基常规填料(14),人工先进行铲平,而后采用机械进行压实,并保证压实度满足设计要求;5), filling in the longitudinal bottom plate (1) and the horizontal bottom plate (2): first place the filter screen (11), then fill in the graded crushed stones (12) sequentially, place a layer of permeable fabric (15), and The water-permeable fabric (15) needs to fully wrap the graded gravel (12), and then dump the conventional subgrade filler (14) from the outside to the inside, level it manually, and then compact it mechanically to ensure that the degree of compaction meets the design requirements. Require; 6)、路基填料、纵向波纹钢(7)和加筋体(10)交替分层设置:结合设计图,每层按照0.5m厚度进行路基填料、纵向波纹钢(7)和加筋体(10)交替分层设置,其中纵向波纹钢(7)至少高于填筑位置一层,直至顶部,每层填筑高度顶面基本位于加筋体(10)的结构位置,在进行压实填筑压实时,由立柱(4)位置依次向内压实,且各项工作交替、分区进行,节约工期和实现机械、人工利用最大化;6), roadbed filler, longitudinal corrugated steel (7) and reinforced body (10) are alternately layered: according to the design drawing, each layer is carried out with a thickness of 0.5m for roadbed filler, longitudinal corrugated steel (7) and reinforced body (10 ) are alternately arranged in layers, wherein the longitudinal corrugated steel (7) is at least one layer higher than the filling position to the top, and the top surface of each layer of filling height is basically located at the structural position of the reinforced body (10). During compaction, the position of the column (4) is compacted inward sequentially, and various tasks are carried out alternately and in different areas, saving the construction period and maximizing the use of machinery and labor; 7)、顶部盖板(16)安装:当即将填筑至立柱(4)的顶面时,进行对盖板(16)的安装,同时该位置上固定连接有供栅栏安装的安装架(17);7), top cover (16) installation: when the top surface of the column (4) is about to be filled, the installation of the cover (16) is carried out, and the installation frame (17) for fence installation is fixedly connected at this position ); 8)、外侧宣传画幅安装:当帮宽工程交付运营单位前或交付运营单位,施工单位或运营单位可结合外侧预留的悬挂环(6)定做宣传画幅,采用扣环或钢丝悬挂等方法固定。8) Installation of external promotional posters: Before the widening project is delivered to the operating unit or delivered to the operating unit, the construction unit or operating unit can combine the hanging ring (6) reserved on the outer side to customize the promotional posters, and use buckles or steel wires to hang and other methods to fix them .
CN202211473529.6A 2022-11-22 2022-11-22 Retaining wall structure and construction method Active CN115897659B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211473529.6A CN115897659B (en) 2022-11-22 2022-11-22 Retaining wall structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211473529.6A CN115897659B (en) 2022-11-22 2022-11-22 Retaining wall structure and construction method

Publications (2)

Publication Number Publication Date
CN115897659A true CN115897659A (en) 2023-04-04
CN115897659B CN115897659B (en) 2024-07-09

Family

ID=86478334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211473529.6A Active CN115897659B (en) 2022-11-22 2022-11-22 Retaining wall structure and construction method

Country Status (1)

Country Link
CN (1) CN115897659B (en)

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2008564A1 (en) * 1989-01-25 1990-07-25 Felix P. Jaecklin Wall with gravity support structure, building element and method for construction thereof
JP2005042320A (en) * 2003-07-23 2005-02-17 Kaneka Corp Widened embankment structure
WO2010013210A2 (en) * 2008-07-29 2010-02-04 Betonform S.R.L. Earth retaining and stabilizing device
CN103352477A (en) * 2013-07-12 2013-10-16 青岛理工大学 Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof
CN110144767A (en) * 2019-04-03 2019-08-20 中铁第四勘察设计院集团有限公司 Help broad way based structures and construction method
CN210117730U (en) * 2019-03-06 2020-02-28 王燏斌 Sinking construction device for basement
CN210507478U (en) * 2019-07-02 2020-05-12 武汉立诚岩土工程有限公司 High steep soil body deformation slope supporting construction
CN210917406U (en) * 2019-09-30 2020-07-03 安徽永昊建设工程有限公司 Prestressing force soil nail assembled supporting construction
CN211522703U (en) * 2019-12-31 2020-09-18 石家庄冀星路桥工程设计有限公司 Wide structure is pieced together to road bed
CN111827034A (en) * 2020-07-28 2020-10-27 中铁二院工程集团有限责任公司 Wide integrative structure of consolidating of existing highway transformation engineering group
CN212270829U (en) * 2020-04-16 2021-01-01 江西信恒建设工程有限公司 Side slope support device suitable for water conservancy building
CN212388574U (en) * 2020-06-30 2021-01-22 贵州建工集团第一建筑工程有限责任公司 Road side slope supporting construction
US20210046377A1 (en) * 2019-08-16 2021-02-18 Dylan Gastel Support member for elevating a retaining wall panel
CN212772409U (en) * 2020-07-03 2021-03-23 郑州大学 Permanent supporting construction of existing side slope
CN113463682A (en) * 2021-05-27 2021-10-01 中铁十九局集团第三工程有限公司 Corrugated plate retaining wall structure and construction method thereof
CN216688857U (en) * 2021-11-18 2022-06-07 中铁第四勘察设计院集团有限公司 Side width structure of existing line embankment
CN114922200A (en) * 2022-01-17 2022-08-19 兰州交通大学 Existing-new combined retaining structure for wide embankment and construction method
CN115059112A (en) * 2022-07-22 2022-09-16 兰州交通大学 Assembled retaining wall structure for existing roadbed slope width and construction method thereof
US20220298740A1 (en) * 2021-03-17 2022-09-22 Pacific Prebenched Ltd. Retaining wall systems

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2008564A1 (en) * 1989-01-25 1990-07-25 Felix P. Jaecklin Wall with gravity support structure, building element and method for construction thereof
EP0385067A2 (en) * 1989-01-25 1990-09-05 Felix Paul Dr. Jaecklin Wall with gravity support structure, building element and method for construction thereof
JP2005042320A (en) * 2003-07-23 2005-02-17 Kaneka Corp Widened embankment structure
WO2010013210A2 (en) * 2008-07-29 2010-02-04 Betonform S.R.L. Earth retaining and stabilizing device
CN103352477A (en) * 2013-07-12 2013-10-16 青岛理工大学 Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof
CN210117730U (en) * 2019-03-06 2020-02-28 王燏斌 Sinking construction device for basement
CN110144767A (en) * 2019-04-03 2019-08-20 中铁第四勘察设计院集团有限公司 Help broad way based structures and construction method
CN210507478U (en) * 2019-07-02 2020-05-12 武汉立诚岩土工程有限公司 High steep soil body deformation slope supporting construction
US20210046377A1 (en) * 2019-08-16 2021-02-18 Dylan Gastel Support member for elevating a retaining wall panel
CN210917406U (en) * 2019-09-30 2020-07-03 安徽永昊建设工程有限公司 Prestressing force soil nail assembled supporting construction
CN211522703U (en) * 2019-12-31 2020-09-18 石家庄冀星路桥工程设计有限公司 Wide structure is pieced together to road bed
CN212270829U (en) * 2020-04-16 2021-01-01 江西信恒建设工程有限公司 Side slope support device suitable for water conservancy building
CN212388574U (en) * 2020-06-30 2021-01-22 贵州建工集团第一建筑工程有限责任公司 Road side slope supporting construction
CN212772409U (en) * 2020-07-03 2021-03-23 郑州大学 Permanent supporting construction of existing side slope
CN111827034A (en) * 2020-07-28 2020-10-27 中铁二院工程集团有限责任公司 Wide integrative structure of consolidating of existing highway transformation engineering group
US20220298740A1 (en) * 2021-03-17 2022-09-22 Pacific Prebenched Ltd. Retaining wall systems
CN113463682A (en) * 2021-05-27 2021-10-01 中铁十九局集团第三工程有限公司 Corrugated plate retaining wall structure and construction method thereof
CN216688857U (en) * 2021-11-18 2022-06-07 中铁第四勘察设计院集团有限公司 Side width structure of existing line embankment
CN114922200A (en) * 2022-01-17 2022-08-19 兰州交通大学 Existing-new combined retaining structure for wide embankment and construction method
CN115059112A (en) * 2022-07-22 2022-09-16 兰州交通大学 Assembled retaining wall structure for existing roadbed slope width and construction method thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
GAN LEI: "Analyses of stability and deformation of tank type planting concrete retaining wall", 《JOURNAL OF CHINA THREE GORGES UNIVERSITY (NATURAL SCIENCES)》, vol. 41, 9 July 2019 (2019-07-09), pages 42 - 45 *
学军, 张文学, 杨有海: "铁路路基膨胀土填料改良试验研究", 《交通标准化》, no. 20, 23 October 2011 (2011-10-23), pages 125 - 129 *
张亮: "黄土地区高速铁路路基帮填施工关键技术", 《铁路技术创新》, no. 05, 30 October 2022 (2022-10-30), pages 75 - 79 *
王军龙主编;杨琳,魏连峰副主编;刘兴文主审: "《铁路工程施工组织与概 预算》", 31 March 2012, 西南交通大学出版社 , pages: 52 - 60 *

Also Published As

Publication number Publication date
CN115897659B (en) 2024-07-09

Similar Documents

Publication Publication Date Title
WO2023015984A1 (en) Concrete pouring construction method for edge portion of road base layer
CN110158641B (en) Anchor rod reinforced composite retaining wall and construction method
KR100904857B1 (en) Underground structure construction method using steel pipe and segment
CN104480963A (en) Construction method of retaining wall by a prefabricated module panel geogrid reinforcement tailing sand
CN114775352A (en) A kind of widening structure and construction method of existing roadbed and embankment section near the river
CN113403903B (en) Roadbed reinforcing structure for highway construction and construction process thereof
CN108797636A (en) A kind of upper font retaining wall structure and its construction method
CN108755284A (en) Reduce the railway bed structure of subgrade settlement deformation to lacing wire material U-type groove
CN112832079A (en) Construction method of foamed light soil spliced wide-height highway embankment
CN204982673U (en) Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash
CN1167857C (en) Foundation pit side-wall flexible support method
EP3049571B1 (en) System for and method of stabilizing rail track structures using a load transfer apparatus
JP4715571B2 (en) Construction method inside tunnel
CN113697640B (en) Finished well for integrally assembled elevator of existing multi-storey building and construction method
CN110924251A (en) Road structure with pipe gallery arranged at bottom
CN115897659A (en) Retaining wall structure and construction method
CN108951642A (en) The ruggedized construction and construction method of anti-pit accident on a kind of across existing tunnel
CN114482607B (en) Construction method for additionally installing steel plate layer on inner wall of reinforced concrete silo
CN118257285A (en) Assembled ecological retaining wall construction structure and construction method
CN106245546A (en) A kind of corrugated steel Pipe rack
CN115324093B (en) Foam light soil shallow foundation structure and construction method thereof
CN113585317B (en) Construction method for mucky soil support beam cushion layer
CN112359845B (en) Construction method of power grid
CN209568461U (en) Prefabricated assembled bar shaped composite foundation mounting structure for soft soil foundation
KR100749930B1 (en) Restoration method of decay slope using soil filling rod and rebar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant