CN115870704A - A kind of internal expansion cold processing technology of equal-diameter tee - Google Patents

A kind of internal expansion cold processing technology of equal-diameter tee Download PDF

Info

Publication number
CN115870704A
CN115870704A CN202211608547.0A CN202211608547A CN115870704A CN 115870704 A CN115870704 A CN 115870704A CN 202211608547 A CN202211608547 A CN 202211608547A CN 115870704 A CN115870704 A CN 115870704A
Authority
CN
China
Prior art keywords
product
cutting
pipe
pressure
pipe fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211608547.0A
Other languages
Chinese (zh)
Inventor
张新宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhide Management Co ltd
Original Assignee
Jiangsu Zhide Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhide Management Co ltd filed Critical Jiangsu Zhide Management Co ltd
Priority to CN202211608547.0A priority Critical patent/CN115870704A/en
Publication of CN115870704A publication Critical patent/CN115870704A/en
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种管件等径三通的内膨胀冷加工工艺,属于金属加工工艺技术领域,步骤一:下料,根据需要生产的三通管件的成形尺寸来计算管胚的下料规格,来进行管胚的选择,在进行模具的选择,需提前对管胚的表面进行清理,并保持其表面干燥,在将管胚固定在三通水胀成型机中,在将模具固定好,须提前对其周边的环境进行清理,保持整体的清洁程度;本申请通过采用水胀成型机利于提供充足的压强,液体采用易流动性热量散快的白色乳化水,利于提高介质的传动效率,采用激光切割设备,来用于产品或管胚的切割,利于提高切割的效率,提高切割的质量,进一步的提高切割的精准程度,利于进一步的提高设备使用的美观程度。

Figure 202211608547

The invention discloses an internal expansion cold processing technology of equal-diameter tees of pipe fittings, which belongs to the technical field of metal processing technology. Step 1: blanking, calculating the blanking specifications of the pipe blank according to the forming size of the tee pipe fittings to be produced, and then For the selection of the tube embryo, the surface of the tube embryo must be cleaned in advance and kept dry before the mold is selected. After the tube embryo is fixed in the three-way water expansion molding machine, the mold must be fixed in advance. Clean up the surrounding environment to maintain the overall cleanliness; this application uses a water swelling molding machine to provide sufficient pressure, and the liquid uses white emulsified water that is easy to flow and dissipate heat quickly, which is beneficial to improve the transmission efficiency of the medium. Cutting equipment is used for cutting products or tube embryos, which is beneficial to improve the efficiency of cutting, improve the quality of cutting, further improve the accuracy of cutting, and further improve the aesthetics of equipment use.

Figure 202211608547

Description

一种管件等径三通的内膨胀冷加工工艺A kind of internal expansion cold processing technology of equal-diameter tee

技术领域technical field

本发明属于金属加工技术领域,具体为一种管件等径三通的内膨胀冷加工工艺。The invention belongs to the technical field of metal processing, and in particular relates to an internal expansion cold processing technology for equal-diameter tees of pipe fittings.

背景技术Background technique

三通管的生产工艺一般分为两种,一种为内膨胀冷加工工艺,也叫液压胀型工艺,一种为热压成形工艺,其中因液压胀型工艺适用的成形材料为冷作硬化倾向相对较低的低碳钢、低合金钢、不锈钢,包括一些有色金属材料,如铜、铝、钛等,这使得其得以广泛进行使用。The production process of the three-way pipe is generally divided into two types, one is the internal expansion cold processing process, also called the hydraulic expansion process, and the other is the hot pressing forming process, in which the forming material suitable for the hydraulic expansion process has a tendency of cold hardening Relatively low carbon steel, low alloy steel, stainless steel, including some non-ferrous metal materials, such as copper, aluminum, titanium, etc., which makes it widely used.

现有的管件等径三通的内膨胀冷加工工艺中,为了降低生产成本,一般在胀型的过程中采用液压胀型机,同时缩减工艺流程,但在实际的使用过程中,这种工艺流程的缩减及不合理的设备使用经常会导致产品在成型过程中出现压力不足导致三通经常出现产品有异常凹陷的情况,这种情况导致成品率相对较低,导致生产的成本相对较高,同时产品的表面也经常会出现存在裂缝的情况,为避免这种情况的出现,因此需要设计一种管件等径三通的内膨胀冷加工工艺。In the existing internal expansion cold processing technology of equal-diameter tees, in order to reduce production costs, hydraulic expansion machines are generally used in the expansion process, and the process flow is reduced at the same time. However, in the actual use process, this process flow The reduction and unreasonable use of equipment often lead to insufficient pressure in the forming process of the product, resulting in abnormal dents in the tee, which leads to a relatively low yield rate and relatively high production costs. At the same time There are often cracks on the surface of the product. In order to avoid this situation, it is necessary to design an internal expansion cold processing process for pipe fittings with equal diameters.

发明内容Contents of the invention

针对现有技术的不足,本发明提供了一种管件等径三通的内膨胀冷加工工艺,具有成品率相对较高的优点,本申请通过采用水胀成型机利于提供充足的压强,液体采用易流动性热量散快的白色乳化水,利于提高介质的传动效率,采用激光切割设备,来用于产品或管胚的切割,利于提高切割的效率,提高切割的质量,进一步的提高切割的精准程度,利于进一步的提高设备使用的美观程度。Aiming at the deficiencies of the prior art, the present invention provides an internal expansion cold processing process for equal-diameter tees, which has the advantage of a relatively high yield rate. This application uses a water expansion molding machine to provide sufficient pressure, and the liquid is easy to use. White emulsified water with fluidity and fast heat dissipation is conducive to improving the transmission efficiency of the medium. Using laser cutting equipment to cut products or tube embryos is beneficial to improve cutting efficiency, improve cutting quality, and further improve cutting accuracy. , which is conducive to further improving the aesthetics of the equipment.

为实现上述目的,本发明提供如下技术方案:一种管件等径三通的内膨胀冷加工工艺,其步骤如下:In order to achieve the above object, the present invention provides the following technical solution: a kind of internal expansion cold processing process of equal-diameter tee, the steps are as follows:

步骤一:下料,根据需要生产的三通管件的成形尺寸来计算管胚的下料规格,来进行管胚的选择,在进行模具的选择,需提前对管胚的表面进行清理,并保持其表面干燥,在将管胚固定在三通水胀成型机中,在将模具固定好,须提前对其周边的环境进行清理,保持整体的清洁程度。Step 1: blanking, calculate the blanking specification of the tube blank according to the forming size of the tee pipe fittings to be produced, and select the tube blank. When selecting the mold, the surface of the tube blank must be cleaned in advance and kept Its surface is dry. After fixing the tube embryo in the three-way water expansion molding machine and fixing the mold, the surrounding environment must be cleaned in advance to maintain the overall cleanliness.

步骤二:胀型,采用三通水胀成型机,在三通水胀成型机的使用前需开通冷却器的冷却水的开关,再通过三通水胀成型机两个水平柱塞向前运动,往模具内冲压液体,再通过三通水胀成型机的两个侧缸继续同步前进,并挤压管胚,增压器向模具内输入超高压液体,管坯受挤压后体积变小,管坯内的液体随管坯体积变小而压力升高,当达到三通支管胀出所需要的压力时,管坯在侧缸和模具内超高压液体的双重作用下沿模具内腔流动而胀出支管。Step 2: Expansion type, using a three-way water-expansion molding machine. Before using the three-way water-expansion molding machine, the switch of the cooling water of the cooler must be turned on, and then move forward through the two horizontal plungers of the three-way water-expansion molding machine , press the liquid into the mold, and then continue to advance synchronously through the two side cylinders of the three-way water expansion molding machine, and squeeze the tube blank. The supercharger inputs ultra-high pressure liquid into the mold, and the volume of the tube blank becomes smaller after extrusion , the pressure of the liquid in the tube blank increases as the volume of the tube blank decreases. When the pressure required for the expansion of the tee branch is reached, the tube blank flows along the inner cavity of the mold under the dual action of the side cylinder and the ultra-high pressure liquid in the mold. Expand the branch pipe.

步骤三:切割,将初步成型的产品进行等距切割,保证产品为等径三通,也需要将一些表面有异常凸起部分进行切除,同时,需要进行质量的检测,将表面有裂纹有异常凹陷的产品剔除,避免影响整体批次质量,Step 3: Cutting. Cutting the preliminarily formed product at equal distances to ensure that the product is a three-way tee. It is also necessary to remove some abnormal raised parts on the surface. At the same time, quality inspection is required to check the surface for cracks and abnormalities. Depressed products are rejected to avoid affecting the overall batch quality,

步骤四:清洗,将成型的产品置入超声波清洗池中进行清洗,超声波频率须控制在20-30KHZ之间,同时清洗温度,采用50-70℃的工作温度,在对其采用软质刷对其表面及内部进行清理,避免出现污渍粘连的情况出现,才对其进行烘干。Step 4: Cleaning, put the formed product into the ultrasonic cleaning tank for cleaning, the ultrasonic frequency must be controlled between 20-30KHZ, and the cleaning temperature should be 50-70 ° C, and then use a soft brush to clean it. Its surface and interior are cleaned to avoid the occurrence of stains and sticking, and then it is dried.

步骤五:修磨,先进行抛光粉的添加,在控制夹持组件进行复位,然后控制夹取组件将产品进行固定,需要保证夹具表面平整光滑,不漏气,避免夹具划伤三通管的情况出现,在对其采用打磨抛光机进行打磨抛光,同时需要对产品一些相对锋利的边角进行处理,需要保证产品边角的圆滑程度,在打磨抛光完成后,需要对产品进行二次清洗处理,并对产品表面涂上防腐漆。Step 5: Grinding, first add polishing powder, reset the control clamping component, and then control the clamping component to fix the product. It is necessary to ensure that the surface of the clamp is smooth and air-tight, so as to avoid scratching the tee pipe by the clamp When the situation arises, when the grinding and polishing machine is used for grinding and polishing, some relatively sharp corners of the product need to be processed at the same time. It is necessary to ensure the smoothness of the corners of the product. After the grinding and polishing is completed, the product needs to be cleaned twice , and apply anti-corrosion paint to the surface of the product.

优选的,下料过程中的选材若没有合适型号的物料需要采用激光切割刀来进行管胚的切割。Preferably, if there is no suitable type of material for material selection in the blanking process, a laser cutting knife is required to cut the tube embryo.

优选的,胀型中采用的三通水胀成型机在成型过程中压力超压则在一定时间内液压机会自动泄压,胀型中三通水胀成型机的泄压时间与产品成型时间一致,三通水胀成型机采用的液体为易流动性热量散快的白色乳化水。Preferably, when the pressure of the three-way water-expanding molding machine used in the expansion type is overpressured during the molding process, the hydraulic machine will automatically release the pressure within a certain period of time, and the pressure relief time of the three-way water-expansion molding machine in the expansion type is consistent with the product molding time , The liquid used in the three-way water swelling molding machine is white emulsified water with easy flow and fast heat dissipation.

优选的,产品的切割采用激光切割刀以保证切割的精准程度。Preferably, the cutting of the product adopts a laser cutting knife to ensure the accuracy of cutting.

优选的,修磨也可采用抛丸机进行处理,修磨采用的抛丸机需要降低钢丸的直径采用直径保持在0.2-0.5cm的钢丸。Preferably, the grinding can also be processed by a shot blasting machine. The shot blasting machine used in the grinding needs to reduce the diameter of the steel shot and use a steel shot with a diameter of 0.2-0.5 cm.

优选的,修磨完成后需要进行抽样检测,修磨后的抽样检测的检测内容一般为拉拔试验、压扁实验、气压试验、耐压试验、抗拉强度、耐腐蚀能力,拉拔试验需要产品的承插氩弧焊管件连接拉拔力为国家标准的3倍,压扁实验需要将管件压扁至外径的1/3但不会出现裂缝或者裂口,气压试验需要保证管件可以正常经过1.6Mpa气压测试而没有损坏,耐压试验需要管材与管件连接后在2.5Mpa及保压5min条件下连接处无泄露,抗拉强度需要对产品管件进行不小于520Mpa拉力保证其延伸率不小于35%,耐腐蚀能力需要保证产品的焊缝经盐雾试验后无锈蚀。Preferably, sampling inspection is required after the grinding is completed, and the detection content of the sampling inspection after the grinding is generally a pull-out test, a flattening test, an air pressure test, a pressure test, tensile strength, and corrosion resistance. The pull-out test requires The pulling force of the socket argon arc welding pipe fittings of the product is 3 times that of the national standard. The flattening test needs to flatten the pipe fittings to 1/3 of the outer diameter without cracks or cracks. The air pressure test needs to ensure that the pipe fittings can pass through normally. 1.6Mpa air pressure test without damage. The pressure test requires no leakage at the joint after the pipe and fitting are connected at 2.5Mpa and pressure for 5 minutes. The tensile strength needs to be not less than 520Mpa to ensure that the elongation of the product pipe fitting is not less than 35. %, corrosion resistance needs to ensure that the weld of the product has no corrosion after the salt spray test.

与现有技术相比,本发明的有益效果如下:Compared with the prior art, the beneficial effects of the present invention are as follows:

本申请通过采用水胀成型机利于提供充足的压强,利于在一定程度上改善金属的可塑性,液体采用易流动性热量散快的白色乳化水,利于提高介质的传动效率,同时水胀成型机在成型过程中压力超压则在一定时间内液压机会自动泄压可以起到一定的保护作用,避免压力过大到只剩一出现损坏的情况,利于更好的对设备起到一定的保护作用,同时,采用激光切割设备,来用于产品或管胚的切割,利于提高切割的效率,提高切割的质量,进一步的提高切割的精准程度,利于提高切割的灵活程度,提高提高切割的适配程度,降低产品边缘出现毛刺的情况出现,同时利于提高切割边缘的平滑程度,再通过采用超声波设备用作清洗设备,利于提高清洗的效果,提高清洗的质量,采用软毛刷在超声清洗后进行简单的清理,利于进一步的提高产品的整洁程度,降低污渍灰尘等污物粘连的概率,提高设备的美观程度,在对夹具的高要求利于降低设备在生产过程中的意外情况的出现,利于进一步的提高设备使用的美观程度。In this application, the water-swelling molding machine is used to provide sufficient pressure and improve the plasticity of the metal to a certain extent. The liquid adopts white emulsified water with easy flow and heat dissipation, which is good for improving the transmission efficiency of the medium. At the same time, the water-swelling molding machine is During the forming process, if the pressure is overpressure, the hydraulic machine will automatically release the pressure within a certain period of time, which can play a certain protective role, avoiding the situation where the pressure is too large and only one damage will occur, which will help better protect the equipment to a certain extent. At the same time, laser cutting equipment is used to cut products or tube embryos, which will help improve cutting efficiency, improve cutting quality, further improve cutting accuracy, improve cutting flexibility, and improve cutting adaptability , reduce the occurrence of burrs on the edge of the product, and at the same time help to improve the smoothness of the cutting edge, and then use ultrasonic equipment as cleaning equipment to improve the cleaning effect and quality of cleaning. Use a soft brush to perform simple cleaning after ultrasonic cleaning Cleaning will help to further improve the cleanliness of the product, reduce the probability of stains, dust and other dirt sticking together, and improve the aesthetics of the equipment. The high requirements for the fixture will help reduce the occurrence of accidents in the production process of the equipment, and will help further. Improve the aesthetics of equipment use.

附图说明Description of drawings

图1为本发明生产流程图。Fig. 1 is a production flow chart of the present invention.

具体实施方式Detailed ways

基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

本发明提供一种技术方案:一种管件等径三通的内膨胀冷加工工艺,其步骤如下:The present invention provides a technical solution: an internal expansion cold processing process for equal-diameter tees of pipe fittings, the steps of which are as follows:

步骤一:下料,根据需要生产的三通管件的成形尺寸来计算管胚的下料规格,来进行管胚的选择,在进行模具的选择,需提前对管胚的表面进行清理,并保持其表面干燥,在将管胚固定在三通水胀成型机中,在将模具固定好,须提前对其周边的环境进行清理,保持整体的清洁程度。Step 1: blanking, calculate the blanking specification of the tube blank according to the forming size of the tee pipe fittings to be produced, and select the tube blank. When selecting the mold, the surface of the tube blank must be cleaned in advance and kept Its surface is dry. After fixing the tube embryo in the three-way water expansion molding machine and fixing the mold, the surrounding environment must be cleaned in advance to maintain the overall cleanliness.

步骤二:胀型,采用三通水胀成型机,在三通水胀成型机的使用前需开通冷却器的冷却水的开关,再通过三通水胀成型机两个水平柱塞向前运动,往模具内冲压液体,再通过三通水胀成型机的两个侧缸继续同步前进,并挤压管胚,增压器向模具内输入超高压液体,管坯受挤压后体积变小,管坯内的液体随管坯体积变小而压力升高,当达到三通支管胀出所需要的压力时,管坯在侧缸和模具内超高压液体的双重作用下沿模具内腔流动而胀出支管。Step 2: Expansion type, using a three-way water-expansion molding machine. Before using the three-way water-expansion molding machine, the switch of the cooling water of the cooler must be turned on, and then move forward through the two horizontal plungers of the three-way water-expansion molding machine , press the liquid into the mold, and then continue to advance synchronously through the two side cylinders of the three-way water expansion molding machine, and squeeze the tube blank. The supercharger inputs ultra-high pressure liquid into the mold, and the volume of the tube blank becomes smaller after extrusion , the pressure of the liquid in the tube blank increases as the volume of the tube blank decreases. When the pressure required for the expansion of the tee branch is reached, the tube blank flows along the inner cavity of the mold under the dual action of the side cylinder and the ultra-high pressure liquid in the mold. Expand the branch pipe.

步骤三:切割,将初步成型的产品进行等距切割,保证产品为等径三通,也需要将一些表面有异常凸起部分进行切除,同时,需要进行质量的检测,将表面有裂纹有异常凹陷的产品剔除,避免影响整体批次质量,Step 3: Cutting. Cutting the preliminarily formed product at equal distances to ensure that the product is a three-way tee. It is also necessary to remove some abnormal raised parts on the surface. At the same time, quality inspection is required to check the surface for cracks and abnormalities. Depressed products are rejected to avoid affecting the overall batch quality,

步骤四:清洗,将成型的产品置入超声波清洗池中进行清洗,超声波频率须控制在20-30KHZ之间,同时清洗温度,采用50-70℃的工作温度,在对其采用软质刷对其表面及内部进行清理,避免出现污渍粘连的情况出现,才对其进行烘干。Step 4: Cleaning, put the formed product into the ultrasonic cleaning tank for cleaning, the ultrasonic frequency must be controlled between 20-30KHZ, and the cleaning temperature should be 50-70 ° C, and then use a soft brush to clean it. Its surface and interior are cleaned to avoid the occurrence of stains and sticking, and then it is dried.

步骤五:修磨,先进行抛光粉的添加,在控制夹持组件进行复位,然后控制夹取组件将产品进行固定,需要保证夹具表面平整光滑,不漏气,避免夹具划伤三通管的情况出现,在对其采用打磨抛光机进行打磨抛光,同时需要对产品一些相对锋利的边角进行处理,需要保证产品边角的圆滑程度,在打磨抛光完成后,需要对产品进行二次清洗处理,并对产品表面涂上防腐漆。Step 5: Grinding, first add polishing powder, reset the control clamping component, and then control the clamping component to fix the product. It is necessary to ensure that the surface of the clamp is smooth and air-tight, so as to avoid scratching the tee pipe by the clamp When the situation arises, when the grinding and polishing machine is used for grinding and polishing, some relatively sharp corners of the product need to be processed at the same time. It is necessary to ensure the smoothness of the corners of the product. After the grinding and polishing is completed, the product needs to be cleaned twice , and apply anti-corrosion paint to the surface of the product.

本发明提供一种技术方案:一种管件等径三通的内膨胀冷加工工艺,其中,下料过程中的选材若没有合适型号的物料需要采用激光切割刀来进行管胚的切割;一种管件等径三通的内膨胀冷加工工艺,其中,胀型中采用的三通水胀成型机在成型过程中压力超压则在一定时间内液压机会自动泄压,胀型中三通水胀成型机的泄压时间与产品成型时间一致,三通水胀成型机采用的液体为易流动性热量散快的白色乳化水,利于在一定程度上改善金属的可塑性,液体采用易流动性热量散快的白色乳化水,利于提高介质的传动效率,同时水胀成型机在成型过程中压力超压则在一定时间内液压机会自动泄压可以起到一定的保护作用,避免压力过大到只剩一出现损坏的情况,利于更好的对设备起到一定的保护作用。The invention provides a technical solution: an internal expansion cold processing process for pipe fittings with equal diameters, wherein, if there is no suitable type of material in the material selection process during the blanking process, a laser cutting knife must be used to cut the pipe embryo; a pipe fitting The internal expansion cold processing technology of the equal-diameter tee, in which, the pressure of the three-way water-inflatable molding machine used in the expansion type is overpressured during the forming process, and the hydraulic machine will automatically release the pressure within a certain period of time. The pressure relief time is consistent with the product molding time. The liquid used in the three-way water expansion molding machine is white emulsified water that is easy to flow and dissipate heat quickly, which is conducive to improving the plasticity of the metal to a certain extent. The liquid is easy to flow and dissipate heat quickly. White emulsified water is beneficial to improve the transmission efficiency of the medium. At the same time, when the water expansion molding machine is overpressured during the molding process, the hydraulic machine will automatically release the pressure within a certain period of time, which can play a certain protective role and prevent the pressure from being too large. In the case of damage, it is beneficial to better protect the equipment to a certain extent.

本发明提供一种技术方案:一种管件等径三通的内膨胀冷加工工艺,其中,产品的切割采用激光切割刀以保证切割的精准程度;修磨也可采用抛丸机进行处理,修磨采用的抛丸机需要降低钢丸的直径采用直径保持在0.2-0.5cm的钢丸,采用激光切割设备,来用于产品或管胚的切割,利于提高切割的效率,提高切割的质量,进一步的提高切割的精准程度,利于提高切割的灵活程度,提高提高切割的适配程度,降低产品边缘出现毛刺的情况出现,同时利于提高切割边缘的平滑程度,同时抛丸机的采用也可作为使用者的备用选项,采用抛丸机用作抛光打磨设备,利于提高产品的抗压能力,但整体的光洁程度相较于打磨设备而言会相对较低,同时,采用激光切割设备,来用于产品或管胚的切割,利于提高切割的效率,提高切割的质量,进一步的提高切割的精准程度,利于提高切割的灵活程度,提高提高切割的适配程度,降低产品边缘出现毛刺的情况出现,同时利于提高切割边缘的平滑程度,通过采用超声波设备用作清洗设备,利于提高清洗的效果,提高清洗的质量,采用软毛刷在超声清洗后进行简单的清理,利于进一步的提高产品的整洁程度,降低污渍灰尘等污物粘连的概率,提高设备的美观程度。The invention provides a technical solution: an internal expansion cold processing process for equal-diameter tees, wherein the cutting of the product adopts a laser cutting knife to ensure the accuracy of cutting; the grinding can also be processed by a shot blasting machine, and the grinding The shot blasting machine used needs to reduce the diameter of the steel shot. The steel shot with a diameter of 0.2-0.5cm is used, and the laser cutting equipment is used to cut the product or tube embryo, which is beneficial to improve the cutting efficiency and cutting quality, and further Improve the accuracy of cutting, improve the flexibility of cutting, improve the adaptability of cutting, reduce the occurrence of burrs on the edge of the product, and help improve the smoothness of the cutting edge. At the same time, the use of shot blasting machines can also be used as a The backup option for those who use shot blasting machines as polishing and grinding equipment is beneficial to improve the product’s resistance to pressure, but the overall smoothness will be relatively low compared with grinding equipment. At the same time, laser cutting equipment is used for The cutting of products or tube embryos is beneficial to improve the efficiency of cutting, improve the quality of cutting, further improve the accuracy of cutting, improve the flexibility of cutting, improve the degree of adaptation of cutting, and reduce the occurrence of burrs on the edge of products. At the same time, it is beneficial to improve the smoothness of the cutting edge. By using ultrasonic equipment as cleaning equipment, it is beneficial to improve the cleaning effect and quality of cleaning. Using a soft brush for simple cleaning after ultrasonic cleaning is conducive to further improving the cleanliness of the product. , reduce the probability of dirt adhesion such as stains and dust, and improve the aesthetics of the equipment.

本发明提供一种技术方案:一种管件等径三通的内膨胀冷加工工艺,其中,修磨完成后需要进行抽样检测,修磨后的抽样检测的检测内容一般为拉拔试验、压扁实验、气压试验、耐压试验、抗拉强度、耐腐蚀能力,拉拔试验需要产品的承插氩弧焊管件连接拉拔力为国家标准的3倍,压扁实验需要将管件压扁至外径的1/3但不会出现裂缝或者裂口,气压试验需要保证管件可以正常经过1.6Mpa气压测试而没有损坏,耐压试验需要管材与管件连接后在2.5Mpa及保压5min条件下连接处无泄露,抗拉强度需要对产品管件进行不小于520Mpa拉力保证其延伸率不小于35%,耐腐蚀能力需要保证产品的焊缝经盐雾试验后无锈蚀,通过对产品的高要求的检测,利于提高产品的质量,提高使用者在进行使用时的使用体验,利于变相的提高了成品质量的门槛。The invention provides a technical solution: an internal expansion cold processing process for equal diameter tees of pipe fittings, in which sampling inspection is required after the grinding is completed, and the detection content of the sampling inspection after grinding is generally a drawing test and a flattening test , air pressure test, pressure test, tensile strength, corrosion resistance, the pull-out test requires that the pull-out force of the socket argon arc welding pipe fittings of the product is 3 times that of the national standard, and the flattening test needs to flatten the pipe to the outer diameter The air pressure test needs to ensure that the pipe fittings can pass the 1.6Mpa air pressure test without damage. The pressure test requires that the pipe and pipe fittings are connected and there is no leakage at the joint under the condition of 2.5Mpa and holding pressure for 5 minutes. , the tensile strength needs to be not less than 520Mpa to ensure that the elongation of the product pipe fittings is not less than 35%, and the corrosion resistance needs to ensure that the weld seam of the product has no rust after the salt spray test. Through the detection of high requirements for the product, it is beneficial to improve The quality of the product improves the user experience when using it, which is conducive to raising the threshold of finished product quality in a disguised form.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes, modifications and substitutions can be made to these embodiments without departing from the principle and spirit of the present invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (6)

1. An internal expansion cold working process of a pipe fitting constant diameter tee joint is characterized by comprising the following steps:
the method comprises the following steps: blanking, namely calculating the blanking specification of a pipe blank according to the forming size of a three-way pipe fitting to be produced to select the pipe blank, wherein the surface of the pipe blank needs to be cleaned in advance and kept dry when a mould is selected, and the periphery of the pipe blank needs to be cleaned in advance when the mould is fixed in a three-way water expansion forming machine to keep the integral cleaning degree when the mould is fixed;
step two: expanding, namely adopting a three-way water-swelling forming machine, opening a switch of cooling water of a cooler before the three-way water-swelling forming machine is used, moving forwards through two horizontal plungers of the three-way water-swelling forming machine to punch liquid into a die, continuously and synchronously moving forwards through two side cylinders of the three-way water-swelling forming machine, extruding a pipe blank, inputting ultrahigh-pressure liquid into the die by a supercharger, reducing the volume of the pipe blank after extrusion, increasing the pressure of the liquid in the pipe blank along with the reduction of the volume of the pipe blank, and expanding the branch pipe by flowing along an inner cavity of the die under the double action of the ultrahigh-pressure liquid in the side cylinders and the die when the required pressure for expanding the three-way branch pipe is reached;
step three: cutting, namely, performing equidistant cutting on the preliminarily formed product to ensure that the product is an equal-diameter tee joint, cutting off parts with abnormal bulges on the surface, simultaneously, detecting the quality, removing the product with cracks and abnormal depressions on the surface to avoid influencing the quality of the whole batch,
step four: cleaning, namely putting the formed product into an ultrasonic cleaning pool for cleaning, controlling the ultrasonic frequency to be 20-30KHZ, simultaneously cleaning the surface and the interior of the product by adopting a soft brush at a working temperature of 50-70 ℃ to avoid the occurrence of stain adhesion, and drying the product;
step five: the polishing machine comprises a clamping assembly, a polishing mechanism, a clamp, a grinding and polishing machine and a control clamp, wherein the clamping assembly is used for clamping a product, the clamping assembly is used for clamping the product, the surface of the clamp is required to be smooth, air leakage is avoided, the clamp is prevented from scratching a three-way pipe, the grinding and polishing machine is used for grinding and polishing the three-way pipe, the corners of the product which are relatively sharp are required to be treated, the smoothness of the corners of the product is required to be ensured, after the grinding and polishing are finished, the product is required to be subjected to secondary cleaning treatment, and the surface of the product is coated with anticorrosive paint.
2. The internal expansion cold working process of the pipe fitting constant diameter tee joint as claimed in claim 1, wherein: if materials with proper types do not exist in the blanking process, a laser cutting knife needs to be adopted to cut the pipe blank.
3. The internal expansion cold working process of the pipe fitting constant diameter tee joint as claimed in claim 1, wherein the internal expansion cold working process comprises the following steps: the three-way water expansion forming machine adopted in the expansion type can automatically release pressure within a certain time when the pressure is over-pressure in the forming process, the pressure release time of the three-way water expansion forming machine in the expansion type is consistent with the product forming time, and the liquid adopted by the three-way water expansion forming machine is white emulsified water which is easy to flow and fast in heat dissipation.
4. The internal expansion cold working process of the pipe fitting constant diameter tee joint as claimed in claim 1, wherein: the cutting of product adopts laser cutting knife in order to guarantee the accurate degree of cutting.
5. The internal expansion cold working process of the pipe fitting constant diameter tee joint as claimed in claim 1, wherein: the grinding can also be carried out by adopting a shot blasting machine, and the shot blasting machine adopted by the grinding needs to reduce the diameter of the steel shot and adopts the steel shot with the diameter kept between 0.2 and 0.5 cm.
6. The internal expansion cold working process of the pipe fitting constant diameter tee joint as claimed in claim 1, wherein: the method is characterized in that sampling detection is needed after polishing is completed, the detection content of the sampling detection after polishing generally comprises a drawing test, a flattening test, an air pressure test, a pressure resistance test, tensile strength and corrosion resistance, the drawing test needs that the socket argon arc welding pipe fitting of a product is connected with the drawing force which is 3 times of the national standard, the flattening test needs that the pipe fitting is flattened to 1/3 of the outer diameter without cracks or splits, the air pressure test needs to ensure that the pipe fitting can normally pass the 1.6Mpa air pressure test without damage, the pressure resistance test needs that the joint of the pipe fitting and the pipe fitting is not leaked under the conditions of 2.5Mpa and 5min of pressure maintaining, the tensile strength needs to carry out not less than 520Mpa tensile force on the pipe fitting of the product to ensure that the elongation is not less than 35%, and the corrosion resistance needs to ensure that the welding line of the product is not rusted after the salt spray test.
CN202211608547.0A 2022-12-14 2022-12-14 A kind of internal expansion cold processing technology of equal-diameter tee Pending CN115870704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211608547.0A CN115870704A (en) 2022-12-14 2022-12-14 A kind of internal expansion cold processing technology of equal-diameter tee

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211608547.0A CN115870704A (en) 2022-12-14 2022-12-14 A kind of internal expansion cold processing technology of equal-diameter tee

Publications (1)

Publication Number Publication Date
CN115870704A true CN115870704A (en) 2023-03-31

Family

ID=85767522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211608547.0A Pending CN115870704A (en) 2022-12-14 2022-12-14 A kind of internal expansion cold processing technology of equal-diameter tee

Country Status (1)

Country Link
CN (1) CN115870704A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10137863A (en) * 1996-11-07 1998-05-26 Sumitomo Metal Ind Ltd Surface treated steel pipe for hydraulic bulging
CN102240690A (en) * 2011-04-21 2011-11-16 湖州机床厂有限公司 Three-way pipe extrusion molding device and extrusion molding technology thereof
CN206601716U (en) * 2017-01-05 2017-10-31 东莞市海亿机械设备有限公司 Smartphone fingerprint ring
CN108838270A (en) * 2018-08-27 2018-11-20 广东思豪内高压科技有限公司 A kind of water swelling moulding process of universal joint for automobile
CN110523802A (en) * 2019-08-15 2019-12-03 宁波金田铜管有限公司 A kind of processing technology of T-branch used in pipe-lines part
CN112917107A (en) * 2021-02-26 2021-06-08 卡狮管业(上海)有限公司 Production process of constant-diameter tee joint of stainless steel clamping and pressing type pipe fitting
CN217889202U (en) * 2022-08-24 2022-11-25 江苏志得管业有限公司 Pipeline bulging machine convenient to get material

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10137863A (en) * 1996-11-07 1998-05-26 Sumitomo Metal Ind Ltd Surface treated steel pipe for hydraulic bulging
CN102240690A (en) * 2011-04-21 2011-11-16 湖州机床厂有限公司 Three-way pipe extrusion molding device and extrusion molding technology thereof
CN206601716U (en) * 2017-01-05 2017-10-31 东莞市海亿机械设备有限公司 Smartphone fingerprint ring
CN108838270A (en) * 2018-08-27 2018-11-20 广东思豪内高压科技有限公司 A kind of water swelling moulding process of universal joint for automobile
CN110523802A (en) * 2019-08-15 2019-12-03 宁波金田铜管有限公司 A kind of processing technology of T-branch used in pipe-lines part
CN112917107A (en) * 2021-02-26 2021-06-08 卡狮管业(上海)有限公司 Production process of constant-diameter tee joint of stainless steel clamping and pressing type pipe fitting
CN217889202U (en) * 2022-08-24 2022-11-25 江苏志得管业有限公司 Pipeline bulging machine convenient to get material

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HONGYERUNQIANG: "等径三通的特点、工艺流程及用途", 《个人图书馆》 *

Similar Documents

Publication Publication Date Title
CN104001752B (en) A kind of steel pipe fittings production technology
CN106270095B (en) A kind of band reinforcing rib part superplastic forming & diffusion bonding integral forming mold and method
CN108889792B (en) Forming process of large-caliber super-wall-thickness seamless elbow pipe fitting
CN101234406A (en) Method for manufacturing multiunit tube
CN104786010A (en) Manufacturing method for nickel composite board end sockets
CN107159830A (en) Forging method
CN115870704A (en) A kind of internal expansion cold processing technology of equal-diameter tee
CN104786013A (en) Manufacturing method for nickel board end sockets
CN118218428A (en) Cold extrusion molding method of tee joint
CN112496247A (en) Hot forging forming method for titanium alloy aviation three-way elbow joint
CN105710155A (en) Pipe fitting processing technology
CN101020945A (en) Plastic deforming chamfer process to raise fatigue strength of hole and opening position
CN112122376B (en) Cold extrusion process for manufacturing seamless oblique steel tee
CN103453238B (en) A kind of plastic-lined composite pipe fitting and manufacture method thereof
CN109365598A (en) A kind of corronil flange flange forming method
CN110202019A (en) A kind of preparation method of bimetallic pipe billet and its prepare mold
CN213203139U (en) Semi-closed tubular aluminum profile heat treatment device with positioning structure
CN111360486A (en) Forming method of flat pipe fitting
CN214719422U (en) Novel clamping cooling device
CN108637609B (en) A kind of moulding process of engine hydraulic brake pipe
CN204602855U (en) A kind of pipe mould
CN113829005A (en) Processing technology of high-strength nickel-based alloy welded pipe
CN108380680A (en) A kind of cold drawing die having dust blowing function
CN210139049U (en) A circulating water-cooled low-pressure aluminum alloy wheel hub casting mold
CN104874987A (en) Machining technology for falling film evaporation heat exchange plate with turbulent flow channel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20230331