CN1158434C - Soft foundation composite ground base construction method for field pouring pipe pile with large diameter - Google Patents
Soft foundation composite ground base construction method for field pouring pipe pile with large diameter Download PDFInfo
- Publication number
- CN1158434C CN1158434C CNB021125384A CN02112538A CN1158434C CN 1158434 C CN1158434 C CN 1158434C CN B021125384 A CNB021125384 A CN B021125384A CN 02112538 A CN02112538 A CN 02112538A CN 1158434 C CN1158434 C CN 1158434C
- Authority
- CN
- China
- Prior art keywords
- internal
- pipe pile
- cavity structure
- external casing
- large diameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to a construction method of a composite foundation with a cast-in-place pipe pile on a soft soil foundation. The construction method comprises the steps that a hollow cavity structure of an inner casing tube and an outer casing tube is driven into the foundation, and a cast-in-place pipe pile driver with large diameter for the mold formation of the casing tubes is used and specially designed for the driving process; then, cast-in-place concrete is poured; consequently, a cast-in-place pipe pile with large diameter is formed between the soil body in a ring domain and the soil body outside the ring domain; moreover, a sandstone layer and an earth work grid are laid on the top of the cast-in-place pipe pile with large diameter. The construction method solves the problem that the past composite foundation has the defects of low strength of a pile body, difficult control of the quality, high detection expense and high cost. The present invention provides a pipe pile with a thin wall, belongs to rigid piles and has the advantages of high strength, deep processing position, simple technology, good operability, easy quality control and low cost.
Description
Technical field
The present invention relates on soft foundation, carry out the method for pouring pipe pile composite foundation construction.
Background technology
Before the present invention makes, in the work progress of high-grade highway, municipal administration and industry and civilian construction, must carry out consolidation process to soft foundation, increase the stability of ground and reduce sedimentation, above-mentioned building can be ensured the quality of products, safe handling.At present, what generally use is the composite foundation technology of performance pile soil common action, as methods such as granular material pile composite foundations such as rubble, cement mixing method composite foundation, rigidity precast concrete pile composite foundations.
Granular material pile composite foundation method costs such as rubble are low, but pile strength is low; Cement mixing method composite foundation construction quality is difficult to control, and testing cost height and reinforcement depth are limited; Rigidity precast concrete pile speed of application is fast, and concentration of treatment is big, suitable various geological conditionss, but precast concrete pile need be prefabricated in the factory, and want configuration reinforcement so that transport and the scene sets, make ground stabilization involve great expense.
Summary of the invention
Purpose of the present invention just is to overcome above-mentioned defective, designs a kind of pouring pipe pile with large diameter composite foundation construction method that soft foundation is punished.
Technical scheme of the present invention is: soft foundation composite ground base construction method for field pouring pipe pile with large diameter, and its major technique is characterised in that:
(1) sleeve pipe is become mould pouring pipe pile with large diameter machine be arranged in the ground place that to drive piles;
(2) the Vibration on Start-up head vibrates downwards, and it is downward to drive the internal and external casing cavity structure that is attached thereto;
(3) the internal and external casing cavity structure is squeezed in the ground under the protection of flap valve pile shoe structure closure;
(4) when the internal and external casing cavity structure sinks to predetermined projected depth, in the cavity of internal and external casing cavity structure, evenly inject concrete by the concrete current divider;
(5) the internal and external casing cavity structure is upwards extracted in the vibration head vibration, and flap valve pile shoe structure top separates automatically simultaneously;
(6) extract ground fully until the internal and external casing cavity structure, in ring domain, form concrete tubular pile between the soil body of the soil body and outside;
(7) treat in the pile tube after the concrete setting, lay sand stone layer on the stake top, and in sand stone layer, put into geo-grid, form the composite foundation mattress layer.
Advantage of the present invention and effect are thin-wall pipe pile, belong to rigid pile, pile strength is higher, reaches C20-C25, and the immersed tube mode of pressurization makes concentration of treatment greater than 25 meters while vibrating, construction technology is simple, workable, be convenient to quality control, supervision, cost is low, the bearing capacity height, the stability of ground is obviously strengthened.
Description of drawings
Fig. 1-sleeve pipe of the present invention becomes mould pouring pipe pile with large diameter machine face stereogram.
Fig. 2-sleeve pipe of the present invention becomes mould pouring pipe pile with large diameter pusher side face stereogram.
I-I sectional drawing among Fig. 3-Fig. 1.
Partial enlarged drawing among Fig. 4-Fig. 1.
Fig. 5-the present invention uses exemplary plot.
The specific embodiment
As Fig. 1, Fig. 2, Fig. 3, Fig. 4, sleeve pipe shown in Figure 5 becomes mould pouring pipe pile with large diameter machine, this machine is arranged on the ground (soft foundation) 12 that will drive piles, Equipment Foundations 1 are fixedlyed connected with the lower end, bottom of gantry support 2, connect vibration head 3 under in gantry support 2 tops, feed hopper 7 is arranged on internal and external casing cavity structure 4 upper outside, feed hopper 7 connects concrete current divider 8, concrete current divider 8 is corresponding to cutting up with a hay cutter top in internal and external casing cavity structure 4 cavitys, the upper end of the fixedly connected internal and external casing cavity structure 4 in vibration head 3 bottoms, this internal and external casing cavity structure 4 adopts steel material to make, has suitable hardness and intensity, and in internal and external casing cavity structure 4 lower ends, arranged outside becomes the lubricated slurry device 6 that causes of mould, in the formation, outer shroud connects flap valve pile shoe structure 5 on internal and external casing cavity structure 4 bottom outer tubes.
Vibration on Start-up 3 vibration downwards, make and be attached thereto the internal and external casing cavity structure that connects 4 and driven together vibration downwards, flap valve pile shoe structure 5 closures, taper off to a point, protecting and be beneficial to 4 vibrations of internal and external casing cavity structure squeezes in the ground 12, when internal and external casing cavity structure 4 sank to the concentration of design in advance, feed hopper 7 evenly injected concrete with concrete by the concrete current divider 8 that is attached thereto in the cavity of internal and external casing cavity structure 4, form pipe pile die in the ground 12; Vibration head 7 vibrations upwards drive internal and external casing cavity structure 4 and upwards extract, and flap valve pile shoe structure 5 tops separate automatically simultaneously, just form pouring pipe pile with large diameter 9 between the soil body and the outside soil body in ring domain; Squeeze into and vibrate in the process of extracting in internal and external casing cavity structure 4 vibration, molding slurry-making device 6 reduces the resistance of internal and external casing cavity structure 4 medial and lateral soil by being pressed into lubricated slurry to internal and external casing cavity structure 4 medial and lateral; Treat in the pile tube 9 after the concrete setting, lay certain thickness sand stone layer 10 on pile tube 9 tops, about about 50 centimetres, in sand stone layer 10, put into geo-grid 11 again, form the composite foundation mattress layer.
Principle of the present invention can be widely used in other various soft soil foundations.
Claims (2)
1. soft foundation composite ground base construction method for field pouring pipe pile with large diameter is characterized in that:
(1) sleeve pipe is become mould pouring pipe pile with large diameter machine be arranged in the ground place that to drive piles;
(2) the Vibration on Start-up head vibrates downwards, and it is downward to drive the internal and external casing cavity structure that is attached thereto;
(3) the internal and external casing cavity structure is squeezed in the ground under the protection of flap valve pile shoe structure closure;
(4) when the internal and external casing cavity structure sinks to predetermined projected depth, in the cavity of internal and external casing cavity structure, evenly inject concrete by the concrete current divider;
(5) the internal and external casing cavity structure is upwards extracted in the vibration head vibration, and flap valve pile shoe structure top separates automatically simultaneously;
(6) extract ground fully until the internal and external casing cavity structure, in ring domain, form concrete tubular pile between the soil body of the soil body and outside;
(7) treat in the pile tube after the concrete setting, lay sand stone layer on the stake top, and in sand stone layer, put into geo-grid, form the composite foundation mattress layer.
2. soft foundation composite ground base construction method for field pouring pipe pile with large diameter according to claim 1 is characterized in that squeezing into and extracting in the ground process at the internal and external casing cavity structure, and lubricated slurry is gone in molding slurry-making device side pressure inside and outside the internal and external casing cavity structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB021125384A CN1158434C (en) | 2002-01-14 | 2002-01-14 | Soft foundation composite ground base construction method for field pouring pipe pile with large diameter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB021125384A CN1158434C (en) | 2002-01-14 | 2002-01-14 | Soft foundation composite ground base construction method for field pouring pipe pile with large diameter |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1367296A CN1367296A (en) | 2002-09-04 |
CN1158434C true CN1158434C (en) | 2004-07-21 |
Family
ID=4742087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB021125384A Expired - Lifetime CN1158434C (en) | 2002-01-14 | 2002-01-14 | Soft foundation composite ground base construction method for field pouring pipe pile with large diameter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1158434C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100355991C (en) * | 2005-04-18 | 2007-12-19 | 河海大学 | Method for constructing composite foundation of piles and ground interactive slurry bonded dispersed body material |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100387787C (en) * | 2005-02-16 | 2008-05-14 | 周兆弟 | Apparatus and method for constructing shape-variable pile in situ by static pressure and drawing |
CN100387788C (en) * | 2005-02-17 | 2008-05-14 | 周兆弟 | Apparatus and method for constructing strength-variable pile in situ by static pressure and drawing |
CN100371537C (en) * | 2006-01-05 | 2008-02-27 | 江苏南水土建工程公司 | Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method |
CN101691753B (en) * | 2009-09-14 | 2011-01-19 | 河海大学 | Pile mould for PCC pile and construction method for overlong PCC pile |
CN102296598B (en) * | 2011-06-20 | 2013-05-15 | 河海大学 | Construction method of PCC (cast-in-place concrete large-diameter pipe) pile |
CN102296632B (en) * | 2011-06-20 | 2013-03-06 | 河海大学 | Manufacturing method of PCC (Cast-in-Place Concrete Large-Diameter Pipe Pile) underground storage well in soft soil region |
CN105274987B (en) * | 2015-09-15 | 2017-05-31 | 河海大学 | A kind of cast-in-situ major diameter pipe pile sleeve pipe and construction method |
CN109577307A (en) * | 2019-01-10 | 2019-04-05 | 上海市市政规划设计研究院有限公司 | Combination of rigidity and flexibility stake and its construction method |
-
2002
- 2002-01-14 CN CNB021125384A patent/CN1158434C/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100355991C (en) * | 2005-04-18 | 2007-12-19 | 河海大学 | Method for constructing composite foundation of piles and ground interactive slurry bonded dispersed body material |
Also Published As
Publication number | Publication date |
---|---|
CN1367296A (en) | 2002-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102011399B (en) | PHC pile-based multiple high jet pedestal pile construction method | |
EP1337717A4 (en) | Lateral displacement pier and method of installing the same | |
CN203924036U (en) | A kind of pile for prestressed pipe of outsourcing active material pile body | |
CN1158434C (en) | Soft foundation composite ground base construction method for field pouring pipe pile with large diameter | |
CN206784372U (en) | Injection forming club-footed pile | |
CN102418337B (en) | New grouting method | |
CN102345287B (en) | Construction method of large-diameter cast-in-situ thin-wall concrete composite pile forming device | |
CN106836201B (en) | Pipe sinking molding drainage cast-in-situ reinforced concrete pile machine and soft soil foundation reinforcing method | |
CN112359815A (en) | Dry-type vibroflotation gravel pile for soft foundation treatment and construction method thereof | |
CN1944808A (en) | Construction method for single wall screw plastic casing on-site concrete pile | |
CN2753797Y (en) | Long-spiral pressure-poured concrete core-inserting combined pile | |
CN205999887U (en) | Boring steel reinforcement cage hoop slip casting broken stone pile | |
CN205776209U (en) | The construction equipment of concrete-pile | |
CN2515246Y (en) | Double pipe mould forming large diameter field pouring tubular pile machine used for soft ground | |
CN115110515A (en) | Foundation reinforcing method for super-hard upper shell layer and deep and soft lower soil layer | |
CN213805319U (en) | Large-thickness virtual filling collapsible loess foundation treatment structure | |
CN108487226A (en) | Multisection type composite bushing punching press sandy pile construction engineering method | |
CN1632238A (en) | Long spiral press pouring concrete lock pin combination pile and construction method thereof | |
CN206706747U (en) | Vibration sinking tube is into mould extrusion drainage cast-in-situ steel reinforced concrete stake machine | |
CN210086237U (en) | Rotating steel pipe pile suitable for coral island reef geology | |
CN112144522A (en) | Construction method of prestressed pipe pile and special prestressed pipe pile thereof | |
CN2532120Y (en) | Multi-function in site pouring pile and wall machine for reinforcing foundation | |
CN205530235U (en) | One -tenth stake device of cast -in -place major diameter combination thin wall screw tubular pile | |
CN2869128Y (en) | Spiral perforated large-diameter cast-in-place concrete thin-wall tubularpile machine | |
CN201027308Y (en) | Cast-in-situ X shaped pile mould sinking device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20040721 |
|
CX01 | Expiry of patent term |