CN115800270B - Power distribution network power and communication coordination recovery method and device - Google Patents

Power distribution network power and communication coordination recovery method and device Download PDF

Info

Publication number
CN115800270B
CN115800270B CN202310043251.7A CN202310043251A CN115800270B CN 115800270 B CN115800270 B CN 115800270B CN 202310043251 A CN202310043251 A CN 202310043251A CN 115800270 B CN115800270 B CN 115800270B
Authority
CN
China
Prior art keywords
base station
area
communication
restored
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310043251.7A
Other languages
Chinese (zh)
Other versions
CN115800270A (en
Inventor
张磐
郑悦
徐科
魏然
陈沼宇
霍现旭
刘明祥
王录泽
张腾飞
周霞
孙建东
蔡月明
邹花蕾
吴巨爱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd
Nanjing University of Posts and Telecommunications
NARI Nanjing Control System Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd
Nanjing University of Posts and Telecommunications
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd, Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd, Nanjing University of Posts and Telecommunications, NARI Nanjing Control System Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202310043251.7A priority Critical patent/CN115800270B/en
Publication of CN115800270A publication Critical patent/CN115800270A/en
Application granted granted Critical
Publication of CN115800270B publication Critical patent/CN115800270B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a method and a device for coordinating and recovering power and communication of a power distribution network, wherein the method comprises the following steps: dividing the area to be restored into a plurality of first-stage areas to be restored and second-stage areas to be restored; taking a first-level to-be-recovered area where a fault base station is located as an emergency communication recovery area, and determining all emergency communication recovery areas where the fault base station is located; according to the electric power parameters of the secondary areas to be recovered and the communication parameters of the emergency communication recovery areas, calculating recovery returns of fault base stations in each emergency communication recovery area, and recovering communication faults of the emergency communication recovery areas according to the order of the recovery returns from large to small; taking the power supply of the important load level area recovered quickly as a total target, and constructing a power communication double-layer optimization model of the area to be recovered; and solving the power communication double-layer optimization model by utilizing a depth-first traversal path search algorithm, and determining a final repair scheme. By adopting the embodiment of the invention, the rush-repair time of the distribution network after disaster can be greatly shortened, and the power failure loss of the distribution network can be reduced.

Description

Power distribution network power and communication coordination recovery method and device
Technical Field
The invention relates to the technical field of power distribution network fault recovery, in particular to a power distribution network power and communication coordination recovery method and device.
Background
In recent years, extreme natural disasters frequently happen, large-scale external damage causes successive disconnection of power transmission and distribution lines and communication lines, power and communication networks are damaged to a large extent, large-scale power failure and communication interruption of disaster areas are caused, and finally, the production and life of people are influenced, so that the repair and recovery work of a power distribution network is required to be quickened.
However, the existing repair recovery research on the power distribution network does not consider the influence of the communication network, in fact, the fault recovery of the power distribution network depends on the positioning and isolation of the communication network to the power faults, when the communication is interrupted, the dispatching automation breaks down, and a command center cannot acquire the fault information of the power distribution network in time, so that the fault repair recovery work of the power distribution network, which is not very serious in the original power faults, is seriously lagged.
Disclosure of Invention
The invention provides a power distribution network power and communication coordination recovery method and device, which can coordinate and consider the fault recovery of a power side and a communication side, greatly shorten the rush-repair time of a power distribution network after disaster and reduce the power failure loss of the power distribution network.
In order to achieve the above object, an embodiment of the present invention provides a method for coordinating and recovering power and communication in a power distribution network, including:
dividing the to-be-restored area into a plurality of primary to-be-restored areas and secondary to-be-restored areas according to the distribution conditions of the base stations and the power distribution terminals in the to-be-restored area; each first-level area to be restored comprises a plurality of second-level areas to be restored;
Taking a first-level to-be-recovered area where a fault base station is located as an emergency communication recovery area, and determining all emergency communication recovery areas where the fault base station is located; wherein, the fault base station is a base station with communication fault;
according to the electric power parameters of the secondary areas to be recovered and the communication parameters of the emergency communication recovery areas, calculating recovery returns of fault base stations in each emergency communication recovery area, and recovering communication faults of the emergency communication recovery areas according to the sequence of the recovery returns from high to low so as to enable part of areas of the emergency communication recovery areas to be subjected to fault recovery through a power distribution network self-recovery method;
taking the power supply of the important load level area recovered quickly as a total target, and constructing a power communication double-layer optimization model of the area to be recovered;
and solving the power communication double-layer optimization model by utilizing a depth-first traversal path search algorithm, and determining a final restoration scheme so as to restore the communication faults and the power faults of the primary to-be-restored area and the secondary to-be-restored area one by one according to the restoration scheme.
As an improvement of the above solution, dividing the to-be-restored area into a plurality of primary to-be-restored areas and secondary to-be-restored areas according to distribution conditions of the base stations and the power distribution terminals in the to-be-restored area, including:
Dividing the area to be restored into a plurality of primary areas to be restored according to the distribution condition of the base stations in the area to be restored;
and dividing each first-stage to-be-restored area into a plurality of second-stage to-be-restored areas according to the distribution condition of the power distribution terminals in the first-stage to-be-restored areas.
As an improvement of the above solution, the calculating a recovery report of the faulty base station in each emergency communication recovery area according to the power parameter of the secondary to-be-recovered area and the communication parameter of the emergency communication recovery area includes:
calculating the sub-load loss rate of each secondary to-be-recovered area according to the load quantity before and after the power failure of each secondary to-be-recovered area in the emergency communication recovery area:
adding the sub-load loss rates to obtain a total load loss rate in the emergency communication recovery area;
calculating the sub-load priority of each secondary area to be restored according to the sub-load priority index of each secondary area to be restored in the emergency communication restoration area;
taking the largest sub-load priority as the total load priority in the emergency communication recovery area;
acquiring an initial radiation radius of a fault base station in the emergency communication recovery area before communication faults occur;
And adding the total load loss rate, the total load priority and the initial radiation radius according to weights to obtain recovery returns of the fault base stations in the emergency communication recovery area.
As an improvement of the above solution, the calculating the sub-load priority of each secondary to-be-restored area according to the sub-load priority index of each secondary to-be-restored area in the emergency communication restoration area includes:
acquiring a sub-load priority index of each secondary to-be-restored area in the emergency communication restoration area; wherein the sub-load priority index comprises: the power consumption demand, the power consumption priority, the power quality requirement, the population number and the power supply recovery success rate;
carrying out standardization processing on each sub-load priority index to obtain a standard value of each sub-load priority index;
and adding all the standard values according to the weight, and calculating the sub-load priority of the secondary area to be restored.
As an improvement of the above solution, the recovering the communication failure of the emergency communication recovery area in order of the recovery rewards from large to small includes:
determining all normal base stations; wherein, the normal base station is a base station for normal communication;
According to the distance between the fault base station and each normal base station, determining the normal base station closest to the fault base station, and taking the normal base station as a first normal base station;
according to the distance between the first normal base station and each normal base station, determining the normal base station closest to the first normal base station, and taking the normal base station as a second normal base station;
calculating the radiation radius required by the first normal base station according to the distance between the first normal base station and the fault base station and the second normal base station respectively;
and lifting the transmitting power of the first normal base station corresponding to the fault base station according to the order of the recovery return from large to small, so that the radiation radius of the first normal base station after the lifting of the transmitting power is enlarged to the required radiation radius.
As an improvement of the above solution, the calculating the radiation radius required by the first normal base station according to the distances between the first normal base station and the faulty base station and the second normal base station, respectively, includes:
the distance between the first normal base station and the fault base station is recorded as a first distance, and the distance between the first normal base station and the second normal base station is recorded as a second distance;
Adding the first distance to the initial radiation radius before the communication failure of the failed base station to obtain a third distance;
when the third distance is smaller than the second distance, the radiation radius required by the first normal base station is the average value of the third distance and the second distance;
and when the third distance is greater than or equal to the second distance, the radiation radius required by the first normal base station is the third distance.
As an improvement of the scheme, the power supply of the important load level area is quickly restored as a total target, and a power communication double-layer optimization model of the area to be restored is constructed:
communication side recovery takes maximum communication force of all fault base stations as objective functionF 1
Wherein, the communication forces of all the faulty base stations are calculated by the following steps:
base station with fault
Figure SMS_1
Total number of radiated distribution terminals +.>
Figure SMS_2
Dividing by the total number of distribution terminals of the area to be restored>
Figure SMS_3
Multiplying the obtained quotient by a preset first weight coefficient to obtain a faulty base station +.>
Figure SMS_4
Is a first communication force of (a);
base station with fault
Figure SMS_5
Initial radiation radius before communication failure>
Figure SMS_6
Multiplying the base station with a preset second weight coefficient to obtain the fault base station +.>
Figure SMS_7
Is a second communication force of (a);
Adding the first communication force and the second communication force to obtain a fault base station
Figure SMS_8
Is a communication force of (a);
each faulty base station
Figure SMS_9
The communication forces of all the fault base stations are obtained by adding the communication forces of all the fault base stations;
wherein the first weight coefficient and the second weight coefficient have the following constraint:
the first weight coefficient is greater than or equal to 0 and less than or equal to the second weight coefficient;
the second weight coefficient is smaller than or equal to 1;
the first weight coefficient and the second weight coefficient are added to be equal to 1.
As an improvement of the above solution, the constructing the power communication double-layer optimization model of the to-be-restored area with the power supply of the fast-restoration important load level area as a total target further includes:
power side recovery is based on the minimum influence of failure loss of all secondary areas to be recoveredF 2
The second-level to-be-restored area which is not fully recovered is the second-level to-be-restored area which is still unable to be fully recovered after the communication of the emergency communication restoration area is temporarily restored;
and calculating the fault loss of all the two-stage areas to be recovered which are not recovered by the following steps:
prioritizing the sub-load of the incompletely restored second-level region to be restored
Figure SMS_10
Sub-load deficit rate with the incompletely restored secondary region ≡>
Figure SMS_11
Multiplying to obtain the fault loss of the secondary to-be-recovered area which is not completely recovered;
calculating the total power failure time of the secondary to-be-restored area which is not fully restored
Figure SMS_12
Integration of the failure deficit of the second-level to-be-restored region in the non-restored region;
adding the integral of each fault loss to obtain the fault loss of all the two-stage areas to be recovered which are not fully recovered;
wherein each of the two-stage to-be-restored areas which are not fully restored has the following constraint:
Figure SMS_13
in the method, in the process of the invention,
Figure SMS_14
representing a continuous logical OR operation, ">
Figure SMS_15
Indicating whether or not incompletely restored secondary areas are allocated to a maintenance teampIf yes, then->
Figure SMS_16
Otherwise->
Figure SMS_17
,/>
Figure SMS_18
The total number of the secondary areas to be restored which are not fully restored;
communication side recovery with minimum maintenance cost of all faulty base stations as objective functionF 3
The maintenance cost of all the fault base stations is calculated through the following steps:
base station to be maintained for faults
Figure SMS_19
Time spent->
Figure SMS_20
And malfunction base station->
Figure SMS_21
Is damaged by disaster>
Figure SMS_22
Multiplying to obtain fault base station->
Figure SMS_23
Is a maintenance cost of the (a);
each faulty base station
Figure SMS_24
Adding the maintenance costs of all the fault base stations to obtain the maintenance costs of all the fault base stations;
The recovery of the power side and the communication side takes the maintenance speed of the power distribution network fault as the fastest objective functionF 4
Figure SMS_25
Wherein maxV p For maintenance teamspThe fastest rate at which the maintenance tasks are completed,Min order to maintain the total number of teams,V p for maintenance teamspThe speed at which maintenance tasks are completed;
wherein the maintenance team is calculated by the steps ofpSpeed of completion of maintenance tasksV p
Will repair the grouppCompletion of incompletely restored second in maintenance task volumeTime required for power restoration of a stage to-be-restored areat ep Maintenance teampTime required for completing maintenance of faulty base station of primary to-be-recovered area in maintenance task amountt cp And maintenance teampReaching the primary to-be-restored area, the incompletely restored secondary to-be-restored area, and the time taken to move within the incompletely restored secondary to-be-restored areat dp Adding to obtain maintenance teampTotal time to complete maintenance tasks;
will be assigned to maintenance teamspIs to be maintainedA p Divided by maintenance teampObtaining maintenance teams for total time within the completion of maintenance taskspSpeed of completion of maintenance tasksV p
Wherein, the maintenance teampThe time required for completing the power restoration of the secondary to-be-restored area which is not fully restored has the following constraint:
maintenance team pThe total time required for completing the power restoration of all the secondary areas to be restored, which are not fully restored, is greater than or equal to 0 and less than or equal to the maintenance teampTime required for completing power restoration of secondary to-be-restored area which is not fully restored in maintenance task amountt ep
Maintenance teampThe total time spent for completing the repair of the faulty base station of all the primary areas to be restored is greater than or equal to 0 and less than or equal to the repair teampTime required for completing maintenance of faulty base station of primary to-be-recovered area in maintenance task amountt cp
As an improvement of the above solution, the solving the power communication double-layer optimization model by using a path search algorithm of depth-first traversal, and determining a final repair solution, so as to recover the communication faults and the power faults of the primary to-be-recovered area and the secondary to-be-recovered area one by one according to the repair solution, including:
solving the communication force of all fault base stations in each repairing scheme, the fault loss of all secondary areas to be recovered which are not completely recovered, the maintenance cost of all fault base stations and the maintenance speed of the power distribution network faults;
finding an objective function with a depth-first traversal search algorithmF 1 Maximum scheme sum and objective function F 1 Schemes with differences of maximum values within a preset first range form a scheme setA
Finding an objective function with a depth-first traversal search algorithmF 2 Minimum scheme and objective functionF 2 Schemes with the minimum value difference value within a preset second range form a scheme setB
Finding an objective function with a depth-first traversal search algorithmF 3 Maximum scheme sum and objective functionF 3 Schemes with maximum difference value within a preset third range form a scheme setC
Finding an objective function with a depth-first traversal search algorithmF 4 Minimum scheme sum and objective functionF 4 Schemes with the minimum value difference value within a preset fourth range form a scheme setD
Selection scheme set
Figure SMS_26
Target function of (b)F 4 And the maximum value scheme is used as a final repair scheme to recover the communication faults and the power faults of the primary to-be-recovered area and the secondary to-be-recovered area one by one according to the repair scheme.
To achieve the above object, an embodiment of the present invention further provides a power distribution network power and communication coordination recovery device, including:
the regional division module is used for dividing the region to be restored into a plurality of primary regions to be restored and secondary regions to be restored according to the distribution conditions of the base stations and the power distribution terminals in the region to be restored; each first-level area to be restored comprises a plurality of second-level areas to be restored;
The fault base station determining module is used for taking a primary to-be-recovered area where the fault base station is located as an emergency communication recovery area and determining all emergency communication recovery areas where the fault base station is located; wherein, the fault base station is a base station with communication fault;
the emergency communication recovery module is used for calculating recovery returns of fault base stations in each emergency communication recovery area according to the electric power parameters of the secondary areas to be recovered and the communication parameters of the emergency communication recovery areas, and recovering communication faults of the emergency communication recovery areas according to the order of the recovery returns from large to small so as to enable part of areas of the emergency communication recovery areas to be subjected to fault recovery through a power distribution network self-recovery method;
the model construction module is used for constructing a power communication double-layer optimization model of the region to be recovered by taking the power supply of the region with the important load level recovered quickly as a total target;
and the restoration scheme determining module is used for solving the electric power communication double-layer optimization model by utilizing a depth-first traversal path searching algorithm, and determining a final restoration scheme so as to restore the communication faults and the electric power faults of the primary area to be restored and the secondary area to be restored one by one according to the restoration scheme.
Compared with the prior art, the power and communication coordination recovery method and device for the power distribution network provided by the embodiment of the invention sequentially recover the important first-stage communication faults of the area to be recovered according to the order of the recovery return, so that the power supply of the partial area is recovered through the self-recovery of the power distribution network, the time and the cost required by the whole power supply recovery are saved, further, the fault recovery of the power side and the communication side is coordinated and considered by constructing the power communication double-layer optimization model of the area to be recovered, the fault recovery is carried out according to the final recovery scheme obtained by solving the power communication double-layer optimization model, the power distribution network fault can be recovered timely and effectively, the rush-repair time of the power distribution network after disaster is greatly shortened, and the power failure loss of the power distribution network is reduced.
Drawings
Fig. 1 is a flowchart of a method for coordinating and recovering power and communication of a power distribution network according to an embodiment of the present invention;
fig. 2 is a block diagram of a power distribution network power and communication coordination recovery device according to an embodiment of the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1, fig. 1 is a flowchart of a power distribution network power and communication coordination recovery method provided by an embodiment of the present invention, where the power distribution network power and communication coordination recovery method includes:
s1, dividing a to-be-restored area into a plurality of first-stage to-be-restored areas and second-stage to-be-restored areas according to distribution conditions of base stations and power distribution terminals in the to-be-restored areas; each first-level area to be restored comprises a plurality of second-level areas to be restored;
s2, taking a first-level to-be-recovered area where a fault base station is located as an emergency communication recovery area, and determining all emergency communication recovery areas where the fault base station is located; wherein, the fault base station is a base station with communication fault;
s3, calculating recovery returns of fault base stations in each emergency communication recovery area according to the electric power parameters of the secondary areas to be recovered and the communication parameters of the emergency communication recovery areas, and recovering communication faults of the emergency communication recovery areas according to the order of the recovery returns from large to small so that part of areas of the emergency communication recovery areas are subjected to fault recovery through a power distribution network self-recovery method;
s4, constructing a power communication double-layer optimization model of the region to be restored by taking the power supply of the region with the important load level of quick restoration as a total target;
And S5, solving the electric power communication double-layer optimization model by utilizing a depth-first traversal path search algorithm, and determining a final restoration scheme so as to restore the communication faults and the electric power faults of the primary to-be-restored area and the secondary to-be-restored area one by one according to the restoration scheme.
In an optional embodiment, in step S1, according to the distribution situation of the base station and the power distribution terminal in the to-be-restored area, the to-be-restored area is divided into a plurality of primary to-be-restored areas and secondary to-be-restored areas, including:
dividing the area to be restored into a plurality of primary areas to be restored according to the distribution condition of the base stations in the area to be restored;
and dividing each first-stage to-be-restored area into a plurality of second-stage to-be-restored areas according to the distribution condition of the power distribution terminals in the first-stage to-be-restored areas.
The coordinates are constructed by taking the central processing unit as the center, the primary to-be-recovered areas are divided by the distribution condition of the base stations, and the primary to-be-recovered areas are divided by taking the radiation radius of the base stations as the boundary
Figure SMS_27
Wherein->
Figure SMS_28
For the number of the base station>
Figure SMS_29
For base station->
Figure SMS_30
The geographic coordinates of each base station are realized by a GPS (global positioning system) locator arranged on the base station, and the base station in the embodiment of the invention can be a 5G base station; a base station corresponds to a plurality of power distribution terminals (STUs), a secondary area to be recovered is divided according to distribution conditions of the power distribution terminals which can be radiated by the base station in the primary area to be recovered on the basis of the primary area to be recovered, specifically, a physical switch node under the power distribution terminals is taken as a boundary, and the secondary area to be recovered is selected on the basis of equally dividing the number of switches under each power distribution terminal >
Figure SMS_31
Boundary switch of (1), wherein->
Figure SMS_32
For base station->
Figure SMS_33
Is a number of the distribution terminal within the signal radiation range.
It can be understood that in step S2, the base station monitoring data is reported by the base station fault monitoring unit, the base station fault monitoring unit determines whether the base station has a communication fault by monitoring whether the primary to-be-recovered area has communication signal coverage, and further, the central processing unit determines the primary to-be-recovered area set a=where all the faulty base stations are located through the fault information reported by the base station fault monitoring unit
Figure SMS_34
First-order region set to be restored b= for normal communication>
Figure SMS_35
Then fail base station->
Figure SMS_36
The first-level to-be-recovered area is the emergency communication recovery area>
Figure SMS_37
Normal base station->
Figure SMS_38
The primary area to be restored is->
Figure SMS_39
In an optional embodiment, step S3 of calculating a recovery report of the faulty base station in each emergency communication recovery area according to the power parameter of the secondary to-be-recovered area and the communication parameter of the emergency communication recovery area includes:
calculating the sub-load loss rate of each secondary to-be-recovered area according to the load quantity before and after the power failure of each secondary to-be-recovered area in the emergency communication recovery area:
Adding the sub-load loss rates to obtain a total load loss rate in the emergency communication recovery area;
calculating the sub-load priority of each secondary area to be restored according to the sub-load priority index of each secondary area to be restored in the emergency communication restoration area;
taking the largest sub-load priority as the total load priority in the emergency communication recovery area;
acquiring an initial radiation radius of a fault base station in the emergency communication recovery area before communication faults occur;
and adding the total load loss rate, the total load priority and the initial radiation radius according to weights to obtain recovery returns of the fault base stations in the emergency communication recovery area.
It will be appreciated that the sub-load priority represents the load level of the secondary zone to be restored, and the total load priority represents the load level of the emergency communication restoration zone, the greater the value, the higher the load level, the more important the zone. According to the embodiment of the invention, the recovery returns of the fault base stations are more objectively evaluated according to the power factors and the communication factors of the emergency communication recovery areas, comprehensive factors consider the recovery returns of the fault base stations, and the communication of the emergency communication recovery areas is temporarily recovered one by one according to the descending order of the recovery returns, so that part of the areas of the emergency communication recovery areas can be recovered by a power distribution network self-recovery method.
In an optional embodiment, the calculating the sub-load loss rate of each secondary to-be-restored area according to the load amount before and after the power failure of each secondary to-be-restored area in the emergency communication restoration area includes:
for each secondary to-be-restored area within the emergency communication restoration area:
load quantity before failure of the secondary area to be recovered
Figure SMS_40
Subtracting the load before the failure of the secondary recovery area +.>
Figure SMS_41
Dividing the result of the second level zone to be restored by the load before the failure>
Figure SMS_42
Multiplying by 100% to obtain the subload loss rate of the secondary recovery area->
Figure SMS_43
In an optional embodiment, the calculating the sub-load priority of each secondary to-be-restored area according to the sub-load priority index of each secondary to-be-restored area in the emergency communication restoration area includes:
acquiring a sub-load priority index of each secondary to-be-restored area in the emergency communication restoration area; wherein the sub-load priority index comprises: the power consumption demand, the power consumption priority, the power quality requirement, the population number and the power supply recovery success rate;
carrying out standardization processing on each sub-load priority index to obtain a standard value of each sub-load priority index;
And adding all the standard values according to the weight, and calculating the sub-load priority of the secondary area to be restored.
Illustratively, for each of the secondary to-be-restored areas within the emergency communication restoration area: firstly, acquiring electricity consumption demand, electricity utilization priority, electric energy quality requirement, resident number and power supply recovery success rate; wherein, a preset third weight coefficient is used for
Figure SMS_44
A result of multiplying the historical failure rate of the secondary area to be recovered and a preset fourth weight coefficient +.>
Figure SMS_45
Adding the result of multiplying the loss degree caused by the failure of the secondary area to be recovered to obtain the reciprocal of the power supply recovery success rate, and then according to the power supplyThe reciprocal of the electricity recovery success rate is calculated to obtain the electricity recovery success rate; then, the electricity consumption demand, the electricity priority, the electricity quality requirement, the resident number and the power supply recovery success rate are respectively subjected to standardized processing to obtain a standard value of the electricity consumption demand, a standard value of the electricity priority, a standard value of the electricity quality requirement, a standard value of the resident number and a standard value of the power supply recovery success rate; and finally, adding the standard value of the electricity consumption, the standard value of the electricity priority, the standard value of the electric energy quality requirement, the standard value of the resident number and the standard value of the power supply recovery success rate according to weights respectively to obtain the sub-load priority of the secondary area to be recovered.
In an optional embodiment, the adding the total load loss rate, the total load priority and the initial radius of radiation according to weights to obtain recovery returns of the faulty base stations in the emergency communication recovery area includes:
will preset the fifth weight coefficient
Figure SMS_46
A result of multiplication with said total load deficit rate, a preset sixth weight coefficient +.>
Figure SMS_47
A result of multiplication with the total load priority and a preset seventh weight coefficient +.>
Figure SMS_48
Adding the result of the addition of the initial radiation radius to obtain recovery returns of the fault base stations in the emergency communication recovery area; wherein, the liquid crystal display device comprises a liquid crystal display device,
Figure SMS_49
,/>
Figure SMS_50
in an optional embodiment, the recovering the communication failure of the emergency communication recovery area in the order of from the big to the small in the recovery report in step S3 includes:
determining all normal base stations; wherein, the normal base station is a base station for normal communication;
according to the distance between the fault base station and each normal base station, determining the normal base station closest to the fault base station, and taking the normal base station as a first normal base station;
according to the distance between the first normal base station and each normal base station, determining the normal base station closest to the first normal base station, and taking the normal base station as a second normal base station;
Calculating the radiation radius required by the first normal base station according to the distance between the first normal base station and the fault base station and the second normal base station respectively;
and lifting the transmitting power of the first normal base station corresponding to the fault base station according to the order of the recovery return from large to small, so that the radiation radius of the first normal base station after the lifting of the transmitting power is enlarged to the required radiation radius.
In the embodiment of the invention, the fault base station with the largest recovery return is sequentially lifted according to the descending order of the recovery returns
Figure SMS_51
Nearest first normal base station->
Figure SMS_55
To extend its own radiation radius, enabling to temporarily recover the faulty base station +.>
Figure SMS_58
Emergency communication recovery area>
Figure SMS_53
Is a communication of (a). Finally, the maintenance team maintains all the faulty base stations according to the final repair scheme, so that the faulty base stations are +.>
Figure SMS_54
Resetting the faulty base station after resuming normal communication>
Figure SMS_57
Is the initial radiation radius before failure +.>
Figure SMS_59
Reset the first normal base station->
Figure SMS_52
Is the initial radiation radius +.>
Figure SMS_56
In an alternative embodiment, the calculating the radiation radius required by the first normal base station according to the distance between the first normal base station and the fault base station and the second normal base station respectively includes:
The distance between the first normal base station and the fault base station is recorded as a first distance, and the distance between the first normal base station and the second normal base station is recorded as a second distance;
adding the first distance to the initial radiation radius before the communication failure of the failed base station to obtain a third distance;
when the third distance is smaller than the second distance, the radiation radius required by the first normal base station is the average value of the third distance and the second distance;
and when the third distance is greater than or equal to the second distance, the radiation radius required by the first normal base station is the third distance.
In one embodiment, the distance between the first normal base station and the failed base station is recorded as a first distance
Figure SMS_60
The distance between the first normal base station and the second normal base station is recorded as a second distance
Figure SMS_61
The first distance +.>
Figure SMS_62
And the institute are connected withInitial radiation radius before communication failure of failure base station
Figure SMS_63
Adding to obtain a third distance->
Figure SMS_64
It will be appreciated that since the normal base station extends to cover the original radiation range of the failed base station, the radiation radius required by the normal base station is required
Figure SMS_65
Greater than or equal to the first distance- >
Figure SMS_66
Initial radiation radius before failure of failed base station +.>
Figure SMS_67
And (3) summing. But in order to avoid the waste of energy caused by the overlarge radiation radius +.>
Figure SMS_68
The specific value method of (2) is as follows: />
At a third distance
Figure SMS_69
Less than the second distance->
Figure SMS_70
When the base station is normal, the required radiation radius is +.>
Figure SMS_71
For said third distance->
Figure SMS_72
And said second distance->
Figure SMS_73
Average value of (2);
at a third distance
Figure SMS_74
Greater than or equal to the second distance->
Figure SMS_75
When the base station is normal, the required radiation radius is +.>
Figure SMS_76
For said third distance->
Figure SMS_77
In an alternative embodiment, in step S4, the power supply of the important load level area is quickly recovered as a total target, and a power communication double-layer optimization model of the area to be recovered is constructed:
communication side recovery takes maximum communication force of all fault base stations as objective functionF 1
Wherein, the communication forces of all the faulty base stations are calculated by the following steps:
base station with fault
Figure SMS_78
Total number of radiated distribution terminals +.>
Figure SMS_79
Dividing by the total number of distribution terminals of the area to be restored>
Figure SMS_80
Multiplying the obtained quotient by a preset first weight coefficient to obtain a faulty base station +.>
Figure SMS_81
Is a first communication force of (a);
base station with fault
Figure SMS_82
Initial radiation radius before communication failure>
Figure SMS_83
Multiplying the base station with a preset second weight coefficient to obtain the fault base station +.>
Figure SMS_84
Is a second communication force of (a);
Adding the first communication force and the second communication force to obtain a fault base station
Figure SMS_85
Is a communication force of (a);
each faulty base station
Figure SMS_86
The communication forces of all the fault base stations are obtained by adding the communication forces of all the fault base stations;
wherein the first weight coefficient and the second weight coefficient have the following constraint:
the first weight coefficient is greater than or equal to 0 and less than or equal to the second weight coefficient;
the second weight coefficient is smaller than or equal to 1;
the first weight coefficient and the second weight coefficient are added to be equal to 1.
In an optional embodiment, in step S4, the power supply of the area with the important load level of quick recovery is taken as a total target, and the power communication double-layer optimization model of the area to be recovered is constructed, which further includes:
power side recovery is based on the minimum influence of failure loss of all secondary areas to be recoveredF 2
The second-level to-be-restored area which is not fully recovered is the second-level to-be-restored area which is still unable to be fully recovered after the communication of the emergency communication restoration area is temporarily restored;
and calculating the fault loss of all the two-stage areas to be recovered which are not recovered by the following steps:
prioritizing the sub-load of the incompletely restored second-level region to be restored
Figure SMS_87
Sub-load deficit rate with the incompletely restored secondary region ≡>
Figure SMS_88
Multiplying to obtain the fault loss of the secondary to-be-recovered area which is not completely recovered;
calculating the total power failure time of the secondary to-be-restored area which is not fully restored
Figure SMS_89
Integration of the failure deficit of the second-level to-be-restored region in the non-restored region;
adding the integral of each fault loss to obtain the fault loss of all the two-stage areas to be recovered which are not fully recovered;
wherein each of the two-stage to-be-restored areas which are not fully restored has the following constraint:
Figure SMS_90
in the method, in the process of the invention,
Figure SMS_91
representing a continuous logical OR operation, ">
Figure SMS_92
Indicating whether or not incompletely restored secondary areas are allocated to a maintenance teampIf yes, then->
Figure SMS_93
Otherwise->
Figure SMS_94
,/>
Figure SMS_95
The total number of the secondary areas to be restored which are not fully restored;
communication side recovery with minimum maintenance cost of all faulty base stations as objective functionF 3
The maintenance cost of all the fault base stations is calculated through the following steps:
base station to be maintained for faults
Figure SMS_96
Time spent->
Figure SMS_97
And malfunction base station->
Figure SMS_98
Is damaged by disaster>
Figure SMS_99
Multiplying to obtain fault base station->
Figure SMS_100
Is a maintenance cost of the (a);
each faulty base station
Figure SMS_101
Adding the maintenance costs of all the fault base stations to obtain the maintenance costs of all the fault base stations;
The recovery of the power side and the communication side takes the maintenance speed of the power distribution network fault as the fastest objective functionF 4
Figure SMS_102
Wherein maxV p For maintenance teamspThe fastest rate at which the maintenance tasks are completed,Min order to maintain the total number of teams,V p for maintenance teamspThe speed at which maintenance tasks are completed;
wherein the maintenance team is calculated by the steps ofpSpeed of completion of maintenance tasksV p
Will repair the grouppTime required for completing power restoration of secondary to-be-restored area which is not fully restored in maintenance task amountt ep Maintenance teampTime required for completing maintenance of faulty base station of primary to-be-recovered area in maintenance task amountt cp And maintenance teampReaching the first-stage to-be-restored area and the second-stage to-be-restored area which is not fully restoredThe time it takes to move within the incompletely restored secondary to-be-restored areat dp Adding to obtain maintenance teampTotal time to complete maintenance tasks;
will be assigned to maintenance teamspIs to be maintainedA p Divided by maintenance teampObtaining maintenance teams for total time within the completion of maintenance taskspSpeed of completion of maintenance tasksV p
Wherein, the maintenance teampThe time required for completing the power restoration of the secondary to-be-restored area which is not fully restored has the following constraint:
maintenance team pThe total time required for completing the power restoration of all the secondary areas to be restored, which are not fully restored, is greater than or equal to 0 and less than or equal to the maintenance teampTime required for completing power restoration of secondary to-be-restored area which is not fully restored in maintenance task amountt ep
Maintenance teampThe total time spent for completing the repair of the faulty base station of all the primary areas to be restored is greater than or equal to 0 and less than or equal to the repair teampTime required for completing maintenance of faulty base station of primary to-be-recovered area in maintenance task amountt cp
According to the embodiment of the invention, the power supply of the important load level area is quickly recovered as a total target, the power communication double-layer optimization model of the area to be recovered is constructed, and the power supply of the important load level area can be quickly recovered by a final repair scheme obtained by solving the power communication double-layer optimization model.
In an optional embodiment, the solving the power communication dual-layer optimization model by using the path search algorithm of depth-first traversal in step S5 determines a final repair scheme, so as to recover the communication faults and the power faults of the primary to-be-recovered area and the secondary to-be-recovered area one by one according to the repair scheme, including:
Solving the communication force of all fault base stations in each repairing scheme, the fault loss of all secondary areas to be recovered which are not completely recovered, the maintenance cost of all fault base stations and the maintenance speed of the power distribution network faults;
finding an objective function with a depth-first traversal search algorithmF 1 Maximum scheme sum and objective functionF 1 Schemes with differences of maximum values within a preset first range form a scheme setA
Finding an objective function with a depth-first traversal search algorithmF 2 Minimum scheme and objective functionF 2 Schemes with the minimum value difference value within a preset second range form a scheme setB
Finding an objective function with a depth-first traversal search algorithmF 3 Maximum scheme sum and objective functionF 3 Schemes with maximum difference value within a preset third range form a scheme setC
Finding an objective function with a depth-first traversal search algorithmF 4 Minimum scheme sum and objective functionF 4 Schemes with the minimum value difference value within a preset fourth range form a scheme setD
Selection scheme set
Figure SMS_103
Target function of (b)F 4 And the maximum value scheme is used as a final repair scheme to recover the communication faults and the power faults of the primary to-be-recovered area and the secondary to-be-recovered area one by one according to the repair scheme.
It can be appreciated that with the objective functionF 1 The difference between the maximum values is within a preset first range and is an objective functionF 1 Maximum approach scheme, and objective functionF 2 The minimum difference value is within a preset second range and is set as an objective functionF 2 Approach of minimum value approach to objective functionF 3 The difference between the maximum values is within a preset third range and is an objective functionF 3 Maximum approach scheme, and objective functionF 4 The difference of the minimum value is at a preset fourthWithin the range, the scheme is a function of the targetF 4 A minimum approach;
according to the embodiment of the invention, the objective function is solved in sequence through a depth-first traversal search algorithmF 1 Structured set of schemesAObjective functionF 2 Structured set of schemesBObjective functionF 3 Structured set of schemesCObjective functionF 4 Structured set of schemesDThen the schemes are assembled
Figure SMS_104
Target function of (b)F 4 The maximum scheme is used as a final repair scheme, so that a maintenance worker can perform fault maintenance according to the final repair scheme, and power supply of an important load level area can be quickly recovered.
According to the power distribution network power and communication coordination recovery method provided by the embodiment of the invention, the important first-stage communication faults of the area to be recovered are recovered sequentially from large to small according to the recovery return, so that the power supply of the partial area is recovered through the power distribution network self-recovery, the time and the cost required by the whole power supply recovery are saved, furthermore, the fault recovery of the power side and the communication side is coordinated and considered by constructing the power communication double-layer optimization model of the area to be recovered, the fault recovery is carried out according to the final recovery scheme obtained by solving the power communication double-layer optimization model, the power distribution network fault can be recovered timely and effectively, the rush-repair time of the power distribution network after the disaster is shortened greatly, and the power failure loss of the power distribution network is reduced.
Referring to fig. 2, fig. 2 is a block diagram of a coordination and restoration device 10 for power distribution network according to an embodiment of the present invention, where the coordination and restoration device 10 for power distribution network includes:
the zone dividing module 11 is used for dividing the zone to be restored into a plurality of primary zones to be restored and secondary zones to be restored according to the distribution conditions of the base stations and the power distribution terminals in the zone to be restored; each first-level area to be restored comprises a plurality of second-level areas to be restored;
the fault base station determining module 12 is configured to determine all emergency communication recovery areas where the fault base station is located, by using a primary to-be-recovered area where the fault base station is located as an emergency communication recovery area; wherein, the fault base station is a base station with communication fault;
the emergency communication recovery module 13 is configured to calculate recovery returns of the fault base stations in each emergency communication recovery area according to the electric power parameters of the secondary to-be-recovered area and the communication parameters of the emergency communication recovery areas, and recover communication faults of the emergency communication recovery areas according to the order of the recovery returns from high to low, so that a part of areas of the emergency communication recovery areas are subjected to fault recovery through a power distribution network self-recovery method;
The model construction module 14 is used for constructing a power communication double-layer optimization model of the region to be recovered by taking the power supply of the region with the important load level of rapid recovery as a total target;
and the repair scheme determining module 15 is configured to solve the power communication double-layer optimization model by using a path search algorithm traversed by depth priority, and determine a final repair scheme, so as to recover the communication faults and the power faults of the primary to-be-recovered area and the secondary to-be-recovered area one by one according to the repair scheme.
Preferably, the dividing the to-be-restored area into a plurality of primary to-be-restored areas and secondary to-be-restored areas according to the distribution situation of the base station and the power distribution terminal in the to-be-restored area includes:
dividing the area to be restored into a plurality of primary areas to be restored according to the distribution condition of the base stations in the area to be restored;
and dividing each first-stage to-be-restored area into a plurality of second-stage to-be-restored areas according to the distribution condition of the power distribution terminals in the first-stage to-be-restored areas.
Preferably, the calculating a recovery report of the faulty base station in each emergency communication recovery area according to the power parameter of the secondary to-be-recovered area and the communication parameter of the emergency communication recovery area includes:
Calculating the sub-load loss rate of each secondary to-be-recovered area according to the load quantity before and after the power failure of each secondary to-be-recovered area in the emergency communication recovery area:
adding the sub-load loss rates to obtain a total load loss rate in the emergency communication recovery area;
calculating the sub-load priority of each secondary area to be restored according to the sub-load priority index of each secondary area to be restored in the emergency communication restoration area;
taking the largest sub-load priority as the total load priority in the emergency communication recovery area;
acquiring an initial radiation radius of a fault base station in the emergency communication recovery area before communication faults occur;
and adding the total load loss rate, the total load priority and the initial radiation radius according to weights to obtain recovery returns of the fault base stations in the emergency communication recovery area.
Preferably, the calculating the sub-load priority of each secondary area to be restored according to the sub-load priority index of each secondary area to be restored in the emergency communication restoration area includes:
acquiring a sub-load priority index of each secondary to-be-restored area in the emergency communication restoration area; wherein the sub-load priority index comprises: the power consumption demand, the power consumption priority, the power quality requirement, the population number and the power supply recovery success rate;
Carrying out standardization processing on each sub-load priority index to obtain a standard value of each sub-load priority index;
and adding all the standard values according to the weight, and calculating the sub-load priority of the secondary area to be restored.
Preferably, the recovering the communication failure of the emergency communication recovery area in order of the recovery rewards from the big to the small includes:
determining all normal base stations; wherein, the normal base station is a base station for normal communication;
according to the distance between the fault base station and each normal base station, determining the normal base station closest to the fault base station, and taking the normal base station as a first normal base station;
according to the distance between the first normal base station and each normal base station, determining the normal base station closest to the first normal base station, and taking the normal base station as a second normal base station;
calculating the radiation radius required by the first normal base station according to the distance between the first normal base station and the fault base station and the second normal base station respectively;
and lifting the transmitting power of the first normal base station corresponding to the fault base station according to the order of the recovery return from large to small, so that the radiation radius of the first normal base station after the lifting of the transmitting power is enlarged to the required radiation radius.
Preferably, the calculating the radiation radius required by the first normal base station according to the distances between the first normal base station and the faulty base station and the second normal base station respectively includes:
the distance between the first normal base station and the fault base station is recorded as a first distance, and the distance between the first normal base station and the second normal base station is recorded as a second distance;
adding the first distance to the initial radiation radius before the communication failure of the failed base station to obtain a third distance;
when the third distance is smaller than the second distance, the radiation radius required by the first normal base station is the average value of the third distance and the second distance;
and when the third distance is greater than or equal to the second distance, the radiation radius required by the first normal base station is the third distance.
Preferably, the power supply of the important load level area is quickly restored as a total target, and a power communication double-layer optimization model of the area to be restored is constructed:
communication side recovery takes maximum communication force of all fault base stations as objective functionF 1
Wherein, the communication forces of all the faulty base stations are calculated by the following steps:
Base station with fault
Figure SMS_105
Total number of radiated distribution terminals +.>
Figure SMS_106
Dividing by the total number of distribution terminals of the area to be restored>
Figure SMS_107
Multiplying the obtained quotient by a preset first weight coefficient to obtain a faulty base station +.>
Figure SMS_108
Is a first communication force of (a);
base station with fault
Figure SMS_109
Initial radiation radius before communication failure>
Figure SMS_110
Multiplying the base station with a preset second weight coefficient to obtain the fault base station +.>
Figure SMS_111
Is a second communication force of (a);
adding the first communication force and the second communication force to obtain a fault base station
Figure SMS_112
Is a communication force of (a);
each faulty base station
Figure SMS_113
The communication forces of all the fault base stations are obtained by adding the communication forces of all the fault base stations;
wherein the first weight coefficient and the second weight coefficient have the following constraint:
the first weight coefficient is greater than or equal to 0 and less than or equal to the second weight coefficient;
the second weight coefficient is smaller than or equal to 1;
the first weight coefficient and the second weight coefficient are added to be equal to 1.
Preferably, the constructing the power communication double-layer optimization model of the area to be restored with the power supply of the area with the important load level of quick restoration as a total target further includes:
power side recovery is based on the minimum influence of failure loss of all secondary areas to be recovered F 2
The second-level to-be-restored area which is not fully recovered is the second-level to-be-restored area which is still unable to be fully recovered after the communication of the emergency communication restoration area is temporarily restored;
and calculating the fault loss of all the two-stage areas to be recovered which are not recovered by the following steps:
prioritizing the sub-load of the incompletely restored second-level region to be restored
Figure SMS_114
Sub-load deficit rate with the incompletely restored secondary region ≡>
Figure SMS_115
Multiplying to obtain the fault loss of the secondary to-be-recovered area which is not completely recovered;
calculating the total power failure time of the secondary to-be-restored area which is not fully restored
Figure SMS_116
Integration of the failure deficit of the second-level to-be-restored region in the non-restored region;
adding the integral of each fault loss to obtain the fault loss of all the two-stage areas to be recovered which are not fully recovered;
wherein each of the two-stage to-be-restored areas which are not fully restored has the following constraint:
Figure SMS_117
in the method, in the process of the invention,
Figure SMS_118
representing a continuous logical OR operation, ">
Figure SMS_119
Indicating whether or not incompletely restored secondary areas are allocated to a maintenance teampIf yes, then->
Figure SMS_120
Otherwise->
Figure SMS_121
,/>
Figure SMS_122
The total number of the secondary areas to be restored which are not fully restored;
Communication side recovery with minimum maintenance cost of all faulty base stations as objective functionF 3
The maintenance cost of all the fault base stations is calculated through the following steps:
base station to be maintained for faults
Figure SMS_123
Time spent->
Figure SMS_124
And malfunction base station->
Figure SMS_125
Is damaged by disaster>
Figure SMS_126
Multiplying to obtain fault base station->
Figure SMS_127
Is a maintenance cost of the (a);
each faulty base station
Figure SMS_128
Adding the maintenance costs of all the fault base stations to obtain the maintenance costs of all the fault base stations;
the recovery of the power side and the communication side takes the maintenance speed of the power distribution network fault as the fastest objective functionF 4
Figure SMS_129
Wherein maxV p For maintenance teamspThe fastest rate at which the maintenance tasks are completed,Min order to maintain the total number of teams,V p for maintenance teamspThe speed at which maintenance tasks are completed;
wherein the maintenance team is calculated by the steps ofpSpeed of completion of maintenance tasksV p
Will repair the grouppTime required for completing power restoration of secondary to-be-restored area which is not fully restored in maintenance task amountt ep Maintenance teampTime required for completing maintenance of faulty base station of primary to-be-recovered area in maintenance task amountt cp And maintenance teampReaching the primary to-be-restored area, the incompletely restored secondary to-be-restored area, and the time taken to move within the incompletely restored secondary to-be-restored area t dp Adding to obtain maintenance teampTotal time to complete maintenance tasks;
will be assigned to maintenance teamspIs to be maintainedA p Divided by maintenance teampObtaining maintenance teams for total time within the completion of maintenance taskspSpeed of completion of maintenance tasksV p
Wherein, the maintenance teampThe time required for completing the power restoration of the secondary to-be-restored area which is not fully restored has the following constraint:
maintenance teampThe total time required for completing the power restoration of all the secondary areas to be restored, which are not fully restored, is greater than or equal to 0 and less than or equal to the maintenance teampCompletion of maintenance tasksTime required for power restoration of the secondary to-be-restored area which is not fully restored in the systemt ep
Maintenance teampThe total time spent for completing the repair of the faulty base station of all the primary areas to be restored is greater than or equal to 0 and less than or equal to the repair teampTime required for completing maintenance of faulty base station of primary to-be-recovered area in maintenance task amountt cp
Preferably, the solving the power communication double-layer optimization model by using a path search algorithm of depth-first traversal, determining a final repair scheme, so as to recover the communication faults and the power faults of the primary to-be-recovered area and the secondary to-be-recovered area one by one according to the repair scheme, including:
Solving the communication force of all fault base stations in each repairing scheme, the fault loss of all secondary areas to be recovered which are not completely recovered, the maintenance cost of all fault base stations and the maintenance speed of the power distribution network faults;
finding an objective function with a depth-first traversal search algorithmF 1 Maximum scheme sum and objective functionF 1 Schemes with differences of maximum values within a preset first range form a scheme setA
Finding an objective function with a depth-first traversal search algorithmF 2 Minimum scheme and objective functionF 2 Schemes with the minimum value difference value within a preset second range form a scheme setB
Finding an objective function with a depth-first traversal search algorithmF 3 Maximum scheme sum and objective functionF 3 Schemes with maximum difference value within a preset third range form a scheme setC
Finding an objective function with a depth-first traversal search algorithmF 4 Minimum scheme sum and objective functionF 4 Schemes with the minimum value difference value within a preset fourth range form a scheme setD
Selection scheme set
Figure SMS_130
Target function of (b)F 4 And the maximum value scheme is used as a final repair scheme to recover the communication faults and the power faults of the primary to-be-recovered area and the secondary to-be-recovered area one by one according to the repair scheme.
It should be noted that, the working process of each module in the power distribution network power and communication coordination recovery device 10 according to the embodiment of the present invention may refer to the working process of the power distribution network power and communication coordination recovery method according to the above embodiment, which is not described herein.
According to the power distribution network power and communication coordination recovery device 10 provided by the embodiment of the invention, the important first-stage communication faults of the area to be recovered are recovered sequentially from large to small according to the recovery return, so that the power supply of the partial area is recovered through the power distribution network self-recovery, the time and the cost required by the whole power supply recovery are saved, furthermore, the fault recovery of the power side and the communication side is coordinated and considered by constructing the power communication double-layer optimization model of the area to be recovered, the fault recovery is carried out according to the final recovery scheme obtained by solving the power communication double-layer optimization model, the power distribution network fault can be recovered timely and effectively, the rush-repair time of the power distribution network after the disaster is shortened greatly, and the power failure loss of the power distribution network is reduced.
While the foregoing is directed to the preferred embodiments of the present invention, it will be appreciated by those skilled in the art that changes and modifications may be made without departing from the principles of the invention, such changes and modifications are also intended to be within the scope of the invention.

Claims (9)

1. The power distribution network power and communication coordination recovery method is characterized by comprising the following steps of:
dividing the to-be-restored area into a plurality of primary to-be-restored areas and secondary to-be-restored areas according to the distribution conditions of the base stations and the power distribution terminals in the to-be-restored area; each first-level area to be restored comprises a plurality of second-level areas to be restored;
taking a first-level to-be-recovered area where a fault base station is located as an emergency communication recovery area, and determining all emergency communication recovery areas where the fault base station is located; wherein, the fault base station is a base station with communication fault;
according to the electric power parameters of the secondary areas to be recovered and the communication parameters of the emergency communication recovery areas, calculating recovery returns of fault base stations in each emergency communication recovery area, and recovering communication faults of the emergency communication recovery areas according to the sequence of the recovery returns from high to low so as to enable part of areas of the emergency communication recovery areas to be subjected to fault recovery through a power distribution network self-recovery method;
taking the power supply of the important load level area recovered quickly as a total target, and constructing a power communication double-layer optimization model of the area to be recovered;
solving the power communication double-layer optimization model by utilizing a depth-first traversal path search algorithm, and determining a final restoration scheme so as to restore communication faults and power faults of the primary to-be-restored area and the secondary to-be-restored area one by one according to the restoration scheme;
The power supply of the important load level area is quickly recovered as a total target, and the power communication double-layer optimization model of the area to be recovered is constructed, which comprises the following steps:
communication side recovery takes maximum communication force of all fault base stations as objective functionF 1
Wherein, the communication forces of all the faulty base stations are calculated by the following steps:
base station with fault
Figure QLYQS_1
Total number of radiated distribution terminals +.>
Figure QLYQS_2
Dividing by the total number of distribution terminals of the area to be restored>
Figure QLYQS_3
Multiplying the obtained quotient by a preset first weight coefficient to obtain a faulty base station +.>
Figure QLYQS_4
Is a first communication force of (a);
base station with fault
Figure QLYQS_5
Initial radiation radius before communication failure>
Figure QLYQS_6
Multiplying the base station with a preset second weight coefficient to obtain the fault base station +.>
Figure QLYQS_7
Is a second communication force of (a);
adding the first communication force and the second communication force to obtain a fault base station
Figure QLYQS_8
Is a communication force of (a);
each faulty base station
Figure QLYQS_9
The communication forces of all the fault base stations are obtained by adding the communication forces of all the fault base stations;
wherein the first weight coefficient and the second weight coefficient have the following constraint:
the first weight coefficient is greater than or equal to 0 and less than or equal to the second weight coefficient;
the second weight coefficient is smaller than or equal to 1;
the first weight coefficient and the second weight coefficient are added to be equal to 1.
2. The coordinated power and communication recovery method of a power distribution network according to claim 1, wherein the dividing the area to be recovered into a plurality of primary areas to be recovered and secondary areas to be recovered according to distribution conditions of base stations and power distribution terminals in the area to be recovered comprises:
dividing the area to be restored into a plurality of primary areas to be restored according to the distribution condition of the base stations in the area to be restored;
and dividing each first-stage to-be-restored area into a plurality of second-stage to-be-restored areas according to the distribution condition of the power distribution terminals in the first-stage to-be-restored areas.
3. The coordinated power distribution network power and communication recovery method according to claim 1, wherein the calculating a recovery report of the faulty base station in each emergency communication recovery area according to the power parameter of the secondary to-be-recovered area and the communication parameter of the emergency communication recovery area comprises:
calculating the sub-load loss rate of each secondary to-be-recovered area according to the load quantity before and after the power failure of each secondary to-be-recovered area in the emergency communication recovery area:
adding the sub-load loss rates to obtain a total load loss rate in the emergency communication recovery area;
Calculating the sub-load priority of each secondary area to be restored according to the sub-load priority index of each secondary area to be restored in the emergency communication restoration area;
taking the largest sub-load priority as the total load priority in the emergency communication recovery area;
acquiring an initial radiation radius of a fault base station in the emergency communication recovery area before communication faults occur;
and adding the total load loss rate, the total load priority and the initial radiation radius according to weights to obtain recovery returns of the fault base stations in the emergency communication recovery area.
4. A method for coordinated recovery of power and communication over a power distribution network according to claim 3, wherein said calculating the sub-load priority of each of said secondary areas to be recovered based on the sub-load priority index of each of said secondary areas to be recovered in said emergency communication recovery area comprises:
acquiring a sub-load priority index of each secondary to-be-restored area in the emergency communication restoration area; wherein the sub-load priority index comprises: the power consumption demand, the power consumption priority, the power quality requirement, the population number and the power supply recovery success rate;
Carrying out standardization processing on each sub-load priority index to obtain a standard value of each sub-load priority index;
and adding all the standard values according to the weight, and calculating the sub-load priority of the secondary area to be restored.
5. The coordinated power distribution network power and communication restoration method according to claim 1, wherein the restoration of the communication failure of the emergency communication restoration area in order of the restoration returns from the large to the small includes:
determining all normal base stations; wherein, the normal base station is a base station for normal communication;
according to the distance between the fault base station and each normal base station, determining the normal base station closest to the fault base station, and taking the normal base station as a first normal base station;
according to the distance between the first normal base station and each normal base station, determining the normal base station closest to the first normal base station, and taking the normal base station as a second normal base station;
calculating the radiation radius required by the first normal base station according to the distance between the first normal base station and the fault base station and the second normal base station respectively;
and lifting the transmitting power of the first normal base station corresponding to the fault base station according to the order of the recovery return from large to small, so that the radiation radius of the first normal base station after the lifting of the transmitting power is enlarged to the required radiation radius.
6. The coordinated power and communication restoration method of a power distribution network according to claim 5, wherein the calculating the radiation radius required by the first normal base station according to the distances between the first normal base station and the faulty base station and the second normal base station, respectively, comprises:
the distance between the first normal base station and the fault base station is recorded as a first distance, and the distance between the first normal base station and the second normal base station is recorded as a second distance;
adding the first distance to the initial radiation radius before the communication failure of the failed base station to obtain a third distance;
when the third distance is smaller than the second distance, the radiation radius required by the first normal base station is the average value of the third distance and the second distance;
and when the third distance is greater than or equal to the second distance, the radiation radius required by the first normal base station is the third distance.
7. The coordinated power and communication recovery method of a power distribution network according to claim 1, wherein the constructing a power communication double-layer optimization model of the area to be recovered with the power supply of the area with the important load level of fast recovery as a total target further comprises:
Power side recovery is based on the minimum influence of failure loss of all secondary areas to be recoveredF 2
The second-level to-be-restored area which is not fully recovered is the second-level to-be-restored area which is still unable to be fully recovered after the communication of the emergency communication restoration area is temporarily restored;
and calculating the fault loss of all the two-stage areas to be recovered which are not recovered by the following steps:
prioritizing the sub-load of the incompletely restored second-level region to be restored
Figure QLYQS_10
Sub-load deficit rate with the incompletely restored secondary region ≡>
Figure QLYQS_11
Multiplying to obtain the incomplete productFailure loss of the fully recovered secondary to-be-recovered area;
calculating the total power failure time of the secondary to-be-restored area which is not fully restored
Figure QLYQS_12
Integration of the failure deficit of the second-level to-be-restored region in the non-restored region;
adding the integral of each fault loss to obtain the fault loss of all the two-stage areas to be recovered which are not fully recovered;
wherein each of the two-stage to-be-restored areas which are not fully restored has the following constraint:
Figure QLYQS_13
in the method, in the process of the invention,
Figure QLYQS_14
representing a continuous logical OR operation, ">
Figure QLYQS_15
Indicating whether or not incompletely restored secondary areas are allocated to a maintenance team pIf yes, then->
Figure QLYQS_16
Otherwise->
Figure QLYQS_17
,/>
Figure QLYQS_18
The total number of the secondary areas to be restored which are not fully restored;
communication side recovery with minimum maintenance cost of all faulty base stations as objective functionF 3
The maintenance cost of all the fault base stations is calculated through the following steps:
base station to be maintained for faults
Figure QLYQS_19
Time spent->
Figure QLYQS_20
And malfunction base station->
Figure QLYQS_21
Is damaged by disaster>
Figure QLYQS_22
Multiplying to obtain fault base station->
Figure QLYQS_23
Is a maintenance cost of the (a); />
Each faulty base station
Figure QLYQS_24
Adding the maintenance costs of all the fault base stations to obtain the maintenance costs of all the fault base stations;
the recovery of the power side and the communication side takes the maintenance speed of the power distribution network fault as the fastest objective functionF 4
Figure QLYQS_25
Wherein maxV p For maintenance teamspThe fastest rate at which the maintenance tasks are completed,Min order to maintain the total number of teams,V p for maintenance teamspThe speed at which maintenance tasks are completed;
wherein the maintenance team is calculated by the steps ofpSpeed of completion of maintenance tasksV p
Will repair the grouppTime required for completing power restoration of secondary to-be-restored area which is not fully restored in maintenance task amountt ep Maintenance teampTime required for completing maintenance of faulty base station of primary to-be-recovered area in maintenance task amountt cp And maintenanceGroup ofpReaching the primary to-be-restored area, the incompletely restored secondary to-be-restored area, and the time taken to move within the incompletely restored secondary to-be-restored area t dp Adding to obtain maintenance teampTotal time to complete maintenance tasks;
will be assigned to maintenance teamspIs to be maintainedA p Divided by maintenance teampObtaining maintenance teams for total time within the completion of maintenance taskspSpeed of completion of maintenance tasksV p
Wherein, the maintenance teampThe time required for completing the power restoration of the secondary to-be-restored area which is not fully restored has the following constraint:
maintenance teampThe total time required for completing the power restoration of all the secondary areas to be restored, which are not fully restored, is greater than or equal to 0 and less than or equal to the maintenance teampTime required for completing power restoration of secondary to-be-restored area which is not fully restored in maintenance task amountt ep
Maintenance teampThe total time spent for completing the repair of the faulty base station of all the primary areas to be restored is greater than or equal to 0 and less than or equal to the repair teampTime required for completing maintenance of faulty base station of primary to-be-recovered area in maintenance task amountt cp
8. The coordinated power and communication restoration method of a power distribution network according to claim 7, wherein the solving the power communication double-layer optimization model by using a path search algorithm of depth-first traversal, determining a final restoration scheme to restore the communication faults and the power faults of the primary area to be restored and the secondary area to be restored one by one according to the restoration scheme, comprises:
Solving the communication force of all fault base stations in each repairing scheme, the fault loss of all secondary areas to be recovered which are not completely recovered, the maintenance cost of all fault base stations and the maintenance speed of the power distribution network faults;
finding an objective function with a depth-first traversal search algorithmF 1 Maximum scheme sum and objective functionF 1 Schemes with differences of maximum values within a preset first range form a scheme setA
Finding an objective function with a depth-first traversal search algorithmF 2 Minimum scheme and objective functionF 2 Schemes with the minimum value difference value within a preset second range form a scheme setB
Finding an objective function with a depth-first traversal search algorithmF 3 Maximum scheme sum and objective functionF 3 Schemes with maximum difference value within a preset third range form a scheme setC
Finding an objective function with a depth-first traversal search algorithmF 4 Minimum scheme sum and objective functionF 4 Schemes with the minimum value difference value within a preset fourth range form a scheme setD
Selection scheme set
Figure QLYQS_26
Target function of (b)F 4 And the maximum value scheme is used as a final repair scheme to recover the communication faults and the power faults of the primary to-be-recovered area and the secondary to-be-recovered area one by one according to the repair scheme. / >
9. A power distribution network power and communication coordination recovery device, comprising:
the regional division module is used for dividing the region to be restored into a plurality of primary regions to be restored and secondary regions to be restored according to the distribution conditions of the base stations and the power distribution terminals in the region to be restored; each first-level area to be restored comprises a plurality of second-level areas to be restored;
the fault base station determining module is used for taking a primary to-be-recovered area where the fault base station is located as an emergency communication recovery area and determining all emergency communication recovery areas where the fault base station is located; wherein, the fault base station is a base station with communication fault;
the emergency communication recovery module is used for calculating recovery returns of fault base stations in each emergency communication recovery area according to the electric power parameters of the secondary areas to be recovered and the communication parameters of the emergency communication recovery areas, and recovering communication faults of the emergency communication recovery areas according to the order of the recovery returns from large to small so as to enable part of areas of the emergency communication recovery areas to be subjected to fault recovery through a power distribution network self-recovery method;
the model construction module is used for constructing a power communication double-layer optimization model of the region to be recovered by taking the power supply of the region with the important load level recovered quickly as a total target;
The restoration scheme determining module is used for solving the electric power communication double-layer optimization model by utilizing a path search algorithm traversed by depth priority, and determining a final restoration scheme so as to restore communication faults and electric power faults of the primary area to be restored and the secondary area to be restored one by one according to the restoration scheme;
the power supply of the important load level area is quickly recovered as a total target, and the power communication double-layer optimization model of the area to be recovered is constructed, which comprises the following steps:
communication side recovery takes maximum communication force of all fault base stations as objective functionF 1
Wherein, the communication forces of all the faulty base stations are calculated by the following steps:
base station with fault
Figure QLYQS_27
Total number of radiated distribution terminals +.>
Figure QLYQS_28
Dividing by the total number of distribution terminals of the area to be restored>
Figure QLYQS_29
Multiplying the obtained quotient by a preset first weight coefficient to obtain a faulty base station +.>
Figure QLYQS_30
Is a first communication force of (a);
base station with fault
Figure QLYQS_31
Initial radiation radius before communication failure>
Figure QLYQS_32
Multiplying the base station with a preset second weight coefficient to obtain the fault base station +.>
Figure QLYQS_33
Is a second communication force of (a);
adding the first communication force and the second communication force to obtain a fault base station
Figure QLYQS_34
Is a communication force of (a);
each faulty base station
Figure QLYQS_35
The communication forces of all the fault base stations are obtained by adding the communication forces of all the fault base stations;
wherein the first weight coefficient and the second weight coefficient have the following constraint:
the first weight coefficient is greater than or equal to 0 and less than or equal to the second weight coefficient;
the second weight coefficient is smaller than or equal to 1;
the first weight coefficient and the second weight coefficient are added to be equal to 1.
CN202310043251.7A 2023-01-29 2023-01-29 Power distribution network power and communication coordination recovery method and device Active CN115800270B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310043251.7A CN115800270B (en) 2023-01-29 2023-01-29 Power distribution network power and communication coordination recovery method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310043251.7A CN115800270B (en) 2023-01-29 2023-01-29 Power distribution network power and communication coordination recovery method and device

Publications (2)

Publication Number Publication Date
CN115800270A CN115800270A (en) 2023-03-14
CN115800270B true CN115800270B (en) 2023-05-23

Family

ID=85429053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310043251.7A Active CN115800270B (en) 2023-01-29 2023-01-29 Power distribution network power and communication coordination recovery method and device

Country Status (1)

Country Link
CN (1) CN115800270B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116896063B (en) * 2023-05-29 2024-05-17 杭州鸿晟电力设计咨询有限公司 Intelligent control method and system for power transformation and distribution
CN117974115A (en) * 2024-03-28 2024-05-03 国网山东省电力公司梁山县供电公司 Power distribution network maintenance scheduling method, system, storage medium and equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111799785B (en) * 2020-07-03 2023-11-28 国网新疆电力有限公司电力科学研究院 Method and system for coordinated recovery of power and communication of power distribution network after extreme disasters

Also Published As

Publication number Publication date
CN115800270A (en) 2023-03-14

Similar Documents

Publication Publication Date Title
CN115800270B (en) Power distribution network power and communication coordination recovery method and device
WO2019184286A1 (en) Online dynamic decision-making method and system for unit restoration
CN101236575B (en) Black start assistant decision making support/training system and its method
CN103986237B (en) A kind of prevention and control of power distribution network and fault processing system
CN101710400A (en) Method and device for evaluating risk of nuclear power station
CN113555872B (en) Emergency operation and maintenance method for energy storage system in bottom-protection power grid based on disaster full period
CN113159598A (en) Method and device for rush repair and scheduling of transformer area faults and terminal equipment
CN111799785A (en) Power and communication coordination recovery method and system for power distribution network after extreme disasters
CN112070243A (en) Multi-channel automatic pushing method for power grid fault information
CN105552899A (en) Method for calculating recovery capability of power grid after blackout
CN110689178A (en) Method and system for analyzing forest fire cascading failure risk of power transmission line of power grid
CN113659570A (en) Power distribution network power-communication fault cooperative repair method oriented to elastic improvement
CN113132166A (en) Communication network fault scheduling method and system
CN113055231A (en) Service reliability assessment method and device for N-X maintenance state of power communication network
CN108536980B (en) Gas detector discrete site selection optimization method considering reliability factor
CN104281878A (en) Electric power system black start on-line navigation type decision recovery method
CN114221901A (en) Energy Internet CPS toughness scheduling method, system and storage medium thereof
CN111353682A (en) Multi-power-supply power grid reliability evaluation method
Lai et al. Smart Grids to Revolutionize Chinese Cities: Challenges and Opportunities
CN112165118A (en) Multi-fault power supply recovery method for power distribution network
CN112365087A (en) Method for predicting annual uninterrupted power operation demand
CN112132354A (en) Urban power grid load advanced transfer method considering network toughness and system thereof
CN111146798A (en) Reliability modeling method for multi-terminal direct-current power transmission system
CN111208386A (en) Power distribution network fault rapid positioning method adaptive to topology change and information error
CN115396294B (en) Multi-stage information physical cooperative recovery method for distribution network information physical composite fault

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant