CN115717827A - Method for realizing quick furnace opening of side-blown molten pool smelting furnace - Google Patents

Method for realizing quick furnace opening of side-blown molten pool smelting furnace Download PDF

Info

Publication number
CN115717827A
CN115717827A CN202211508221.0A CN202211508221A CN115717827A CN 115717827 A CN115717827 A CN 115717827A CN 202211508221 A CN202211508221 A CN 202211508221A CN 115717827 A CN115717827 A CN 115717827A
Authority
CN
China
Prior art keywords
furnace
spray gun
molten pool
smelting furnace
blown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211508221.0A
Other languages
Chinese (zh)
Inventor
姚明安
李智
孙武
张开庆
梁浩强
张曦文
吕海波
魏志萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Nickel Cobalt Co ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN202211508221.0A priority Critical patent/CN115717827A/en
Publication of CN115717827A publication Critical patent/CN115717827A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The invention discloses a method for realizing quick furnace opening of a side-blown molten pool smelting furnace, which comprises the following steps: paving materials at the bottom of a smelting furnace in advance, adding inflammable matters to ignite to generate open fire, inserting a furnace drying spray gun into the smelting furnace from a furnace drying spray gun hole of the smelting furnace, arranging a plurality of side gun air ports at the lower part of the smelting furnace, inserting the side blowing spray gun into the smelting furnace before a melt liquid level rises to be close to the side gun air ports, and feeding fuel and combustion-supporting gas; and when the melt submerges the side-blown spray gun, the molten pool is successfully formed, the molten pool is continuously formed to expand the liquid level through the stirring of the side-blown spray gun, the furnace-baking spray gun is disassembled, the molten pool forming procedure is completed, and the production stage is started. The invention solves the problems of high furnace opening difficulty and difficult molten pool manufacturing of the side-blown molten pool smelting furnace, simplifies the molten pool manufacturing process, reduces the labor intensity, eliminates the possible factors of furnace opening failure and realizes a rapid and stable furnace opening mode.

Description

Method for realizing quick furnace opening of side-blown molten pool smelting furnace
Technical Field
The invention relates to the field of metal smelting, in particular to a method for realizing quick furnace opening of a side-blown molten pool smelting furnace.
Background
A side-blown molten pool smelting furnace is an advanced nonferrous metallurgy furnace, when the side-blown molten pool smelting furnace is opened to build a molten pool, the traditional mode is that firstly, wood splitting is added into the furnace and the wood splitting is ignited, then coke is added quickly to fill gaps of the wood splitting, then materials are added to form a material seal at the top, oxygen-enriched air or air is blown from spray gun holes at two sides synchronously to support wood splitting and coke combustion, the top materials are gradually melted to build the molten pool in the combustion process, the side-blown smelting conditions are met after the spray gun is immersed in the molten pool, production can be started, the whole molten pool building process is nervous in organization, the workload of feeding personnel is large, the wood splitting and coke consumption is large, the combustion speed is difficult to control, the molten pool building failure is easily caused, and the furnace cannot be opened.
Disclosure of Invention
The invention aims to solve the technical problem of providing a method for realizing quick furnace opening of a side-blown molten pool smelting furnace aiming at the defects and shortcomings of the prior art. The current situations that the side-blown molten pool smelting furnace is difficult to open and the molten pool is difficult to manufacture are solved.
In order to achieve the aim, the invention provides a method for realizing quick furnace opening of a side-blown molten pool smelting furnace, which is characterized by comprising the following steps: the method comprises the following steps: paving materials at the bottom of a smelting furnace in advance, adding inflammable substances to ignite to generate open fire, arranging a plurality of baking furnace spray gun holes in the upper circumferential direction of the smelting furnace, inserting baking furnace spray guns into the smelting furnace from the baking furnace spray gun holes of the smelting furnace, feeding fuel and oxygen-enriched air to ignite, melting the materials through the high temperature of the burning of the baking furnace spray guns to form a molten pool, and continuously adding the materials to expand the liquid level of the melt; the lower part of the smelting furnace is provided with a plurality of side gun air ports, the side gun air ports are dredged before the melt liquid level rises to be close to the side gun air ports, side blowing spray guns are inserted and fuel and combustion-supporting gas are fed, the air ports are prevented from being immersed by the liquid level, heat is provided at the same time, and the material melting speed is accelerated; when the side-blown spray gun is immersed in the melt, the molten pool is successfully manufactured, the side-blown spray gun is stirred to continue to manufacture the liquid level of the molten pool, the furnace-baking spray gun is removed, the molten pool manufacturing procedure is completed, and the production stage is started; and when the slag surface rises to a height close to the side-blowing spray gun, starting to add a concentrate matte surface, wherein the bottom of the smelting furnace is provided with a hearth, and the height of the matte surface cannot exceed the hearth.
In the technical scheme of the method for realizing the quick furnace opening of the side-blown molten pool smelting furnace, the further preferable technical scheme is characterized in that:
1. the fuel is gas fuel or powder fuel;
2. the gas fuel is natural gas, and the powder fuel is pulverized coal;
3. the side lance tuyere is provided with a plurality of smelting furnaces which are arranged between the hearth and the lance holes of the oven side by side, and the side lance tuyere is arranged at one side close to the hearth;
4. the drying furnace spray gun is an arc spray gun, a fuel inlet and an oxygen-enriched air inlet are arranged at the inlet end of the arc spray gun, and a fuel outlet and an oxygen-enriched air outlet are arranged at the outlet end of the arc spray gun;
5. an inner bushing arranged along the length direction of the arc-shaped spray gun is arranged inside the arc-shaped spray gun, an inner channel is arranged inside the inner bushing, one end of the inner channel is connected with an oxygen-enriched air inlet, and the other end of the inner channel is connected with an oxygen-enriched air outlet;
6. an outer channel is arranged between the outer wall of the inner lining and the inner wall of the arc-shaped spray gun, one end of the outer channel is connected with the fuel inlet, and the other end of the outer channel is connected with the fuel outlet.
Compared with the prior art, the method solves the problems of high furnace opening difficulty and difficult molten pool manufacturing of the side-blown molten pool smelting furnace, simplifies the molten pool manufacturing process, reduces the labor intensity, eliminates possible factors of furnace opening failure, and realizes a rapid and stable furnace opening mode.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required in the description of the embodiments or the prior art will be briefly introduced below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view of the construction of a melting furnace according to the present invention;
FIG. 2 is a schematic view of the construction of a lance of the oven.
Detailed Description
The technical solutions in the embodiments will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Embodiment 1, as shown in fig. 1 and 2, a method for realizing the quick furnace opening of a side-blown molten pool smelting furnace comprises the following steps: the method comprises the following steps: laying materials at the bottom of a smelting furnace 2 in advance, adding inflammable matters to ignite to generate open fire, arranging a plurality of baking furnace spray gun holes in the upper circumferential direction of the smelting furnace, inserting baking furnace spray guns into the smelting furnace from the baking furnace spray gun holes of the smelting furnace 2, feeding fuel and oxygen-enriched air to ignite, melting the materials at high temperature by the baking furnace spray guns to form a molten pool, and continuously adding the materials to expand the liquid level of the melt; the lower part of the smelting furnace is provided with a plurality of side gun tuyeres 3, before the liquid level of the melt rises and is close to the side gun tuyeres 3, the side gun tuyeres 3 are dredged, a side blowing spray gun is inserted and fuel and combustion-supporting gas are fed, the liquid level is prevented from submerging the tuyeres, heat is provided, and the material melting speed is accelerated; when the side-blown spray gun is immersed in the melt, the molten pool is successfully formed, the side-blown spray gun is stirred to continue to form the liquid level of the molten pool, the furnace-baking spray gun is disassembled, the molten pool forming procedure is completed, and the production stage is started; and when the slag surface 7 rises to a height close to the side-blowing lance, starting to add a concentrate matte surface 6, wherein the bottom of the smelting furnace is provided with a hearth 4, and the height of the matte surface 5 cannot exceed the hearth 4. The smelting furnace 2 is also provided with an end wall slag hole 6, and a furnace drying spray gun can enter from the end wall slag hole 6. The baking furnace spray gun holes are symmetrically provided with 2 baking furnace spray gun holes 1. Before a molten pool is manufactured, the side-blowing spray gun is taken out and the air port of the side gun is blocked, so that the side gun channel is prevented from being blocked by splashed objects; before the melt liquid level rises and is close to the side gun air inlet, the side gun air inlet is dredged, the side gun is inserted into the side gun and fuel and combustion-supporting gas are fed in, the situation that the liquid level submerges the air inlet and cannot follow the side gun is prevented, meanwhile, a part of heat is provided, and the material melting speed is accelerated; after a certain amount of melt is produced, the drying furnace spray gun can be inserted into the melt, the mass transfer effect, the heat transfer effect and the heat utilization rate are improved by stirring the air flow of the spray gun, the melting of materials is accelerated, and more melt is quickly generated. The invention is also provided with a spray gun replacing device, which can directly replace the spray gun when the melt is higher than the spray gun, namely the spray gun is immersed in the melt, without lowering the liquid level and lowering the spray gun to expose, the spray gun of the baking furnace is inserted into the furnace from the sealing device to continuously supply fuel and oxygen-enriched air to the furnace; at the moment, the sealing ball body is at the upper top position, and the spare air inlet valve is in a closed state.
Embodiment 2, in the method for realizing the quick furnace opening of the side-blown molten pool smelting furnace according to embodiment 1, the fuel is gas fuel or powder fuel.
Embodiment 3, in the method for realizing the quick furnace opening of the side-blown molten pool smelting furnace according to embodiment 1 or 2, the gas fuel is natural gas, and the pulverized fuel is pulverized coal. When the gas fuel is used, the powder is directly fed into the drying furnace spray gun under pressure and sprayed out, and when the powder fuel is used, the powder is required to be brought into the drying furnace spray gun through compressed air and sprayed out.
Embodiment 4, the method for realizing the quick furnace opening of the side-blown molten pool smelting furnace according to any one of the embodiments 1 to 3, wherein the side tuyere is arranged on the smelting furnace between the hearth and the lance hole of the baking furnace in a plurality of numbers and is arranged side by side, and the side tuyere is arranged at one side close to the hearth. .
Embodiment 5, the method for realizing the fast furnace opening of the side-blown molten pool smelting furnace according to any one of embodiments 1 to 4, wherein the furnace drying spray gun is an arc-shaped spray gun, the inlet end of the arc-shaped spray gun is provided with a fuel inlet and an oxygen-enriched air inlet, and the outlet end of the arc-shaped spray gun is provided with a fuel outlet and an oxygen-enriched air outlet. The baking furnace spray gun is designed to have a certain curvature, can be inserted into a side-blown furnace through a baking furnace spray gun hole and a slag hole, and directly faces materials to be melted at high temperature.
Example 6. In the method for realizing the rapid furnace opening of the side-blown molten pool smelting furnace according to any one of examples 1 to 5, an inner bushing is arranged inside the arc-shaped lance along the length direction of the arc-shaped lance, an inner passage 9 is arranged inside the inner bushing, one end of the inner passage is connected with an oxygen-enriched air inlet 11, and the other end of the inner passage is connected with an oxygen-enriched air outlet.
Example 7. In a method for performing a rapid tap-in of a side-blown molten bath smelting furnace according to any one of examples 1 to 6, an outer passage 10 is provided between an outer wall of the inner bushing and an inner wall of the arc lance, one end of the outer passage is connected to a fuel inlet 12, and the other end of the outer passage is connected to a fuel outlet.
Embodiment 8, according to any one of embodiments 1 to 7, in the method for realizing the rapid furnace opening of the side-blown molten pool smelting furnace, the airflow acceleration devices 8 are arranged in the inner and outer channels at the front end of the lance of the furnace, and the principle is that the cross section area of the channels is reduced to improve the airflow velocity, further improve the kinetic conditions, increase the flame jet distance, improve the stirring of the melt, and increase the mass and heat transfer effects.
The above description is only for the preferred embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can substitute or change the technical solution of the present invention and the inventive concept thereof within the scope of the present invention.

Claims (7)

1. A method for realizing quick furnace opening of a side-blown molten pool smelting furnace is characterized by comprising the following steps: laying materials at the bottom of a smelting furnace in advance, adding inflammable matters to ignite to generate open fire, arranging a plurality of baking furnace spray gun holes in the upper circumferential direction of the smelting furnace, inserting baking furnace spray guns into the smelting furnace from the baking furnace spray gun holes of the smelting furnace, feeding fuel and oxygen-enriched air to ignite, melting the materials through the high temperature of the burning of the baking furnace spray guns to form a molten pool, and continuously adding the materials to expand the liquid level of the molten body; the lower part of the smelting furnace is provided with a plurality of side gun air ports, the side gun air ports are dredged before the melt liquid level rises to be close to the side gun air ports, a side blowing spray gun is inserted and fuel and combustion-supporting gas are fed, the liquid level is prevented from submerging the air ports, heat is provided at the same time, and the material melting speed is accelerated; when the side-blown spray gun is immersed in the melt, the molten pool is successfully formed, the side-blown spray gun is stirred to continue to form the liquid level of the molten pool, the furnace-baking spray gun is disassembled, the molten pool forming procedure is completed, and the production stage is started; and when the slag surface rises to a height close to the side-blowing spray gun, adding concentrate for making a matte surface, wherein a hearth is arranged at the bottom of the smelting furnace, and the height of the matte surface cannot exceed the hearth.
2. The method for realizing the quick furnace opening of the side-blown molten pool smelting furnace according to the claim 1, which is characterized in that: the fuel is gas fuel or powder fuel.
3. The method for realizing the quick furnace opening of the side-blown molten pool smelting furnace according to the claim 2, characterized in that: the gas fuel is natural gas, and the powder fuel is pulverized coal.
4. The method for realizing the quick furnace opening of the side-blown molten pool smelting furnace according to the claim 1, which is characterized in that: the side lance tuyere is provided with a plurality of smelting furnaces which are arranged between the hearth and the lance holes of the oven side by side, and the side lance tuyere is arranged at one side close to the hearth.
5. The method for realizing the quick furnace opening of the side-blown molten pool smelting furnace according to the claim 1, which is characterized in that: the drying furnace spray gun is an arc-shaped spray gun, a fuel inlet and an oxygen-enriched air inlet are arranged at the inlet end of the arc-shaped spray gun, and a fuel outlet and an oxygen-enriched air outlet are arranged at the outlet end of the arc-shaped spray gun.
6. The method for realizing the quick furnace opening of the side-blown molten pool smelting furnace according to the claim 5, characterized in that: an inner bushing arranged along the length direction of the arc-shaped spray gun is arranged in the arc-shaped spray gun, an inner channel is arranged in the inner bushing, one end of the inner channel is connected with an oxygen-enriched air inlet, and the other end of the inner channel is connected with an oxygen-enriched air outlet.
7. The method for realizing the quick furnace opening of the side-blown molten pool smelting furnace according to the claim 5, characterized in that: an outer channel is arranged between the outer wall of the inner lining and the inner wall of the arc-shaped spray gun, one end of the outer channel is connected with the fuel inlet, and the other end of the outer channel is connected with the fuel outlet.
CN202211508221.0A 2022-11-29 2022-11-29 Method for realizing quick furnace opening of side-blown molten pool smelting furnace Pending CN115717827A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211508221.0A CN115717827A (en) 2022-11-29 2022-11-29 Method for realizing quick furnace opening of side-blown molten pool smelting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211508221.0A CN115717827A (en) 2022-11-29 2022-11-29 Method for realizing quick furnace opening of side-blown molten pool smelting furnace

Publications (1)

Publication Number Publication Date
CN115717827A true CN115717827A (en) 2023-02-28

Family

ID=85256827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211508221.0A Pending CN115717827A (en) 2022-11-29 2022-11-29 Method for realizing quick furnace opening of side-blown molten pool smelting furnace

Country Status (1)

Country Link
CN (1) CN115717827A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116926337A (en) * 2023-09-15 2023-10-24 内蒙古兴安银铅冶炼有限公司 Cold material input process of side-blowing reduction furnace

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116926337A (en) * 2023-09-15 2023-10-24 内蒙古兴安银铅冶炼有限公司 Cold material input process of side-blowing reduction furnace
CN116926337B (en) * 2023-09-15 2023-11-24 内蒙古兴安银铅冶炼有限公司 Cold material input process of side-blowing reduction furnace

Similar Documents

Publication Publication Date Title
US5599375A (en) Method for electric steelmaking
RU2258743C2 (en) Method of direct melting for production of molten cast iron and/or ferroalloys
MXPA01002930A (en) Glass melting process and furnace therefor with oxy-fuel combustion over melting zone and air-fuel combustion over fining zone.
CN115717827A (en) Method for realizing quick furnace opening of side-blown molten pool smelting furnace
CN105441694A (en) Method for treating copper concentrate through improved side blowing molten pool melting furnace
CN104073655A (en) Tin smelting technique by continuous side blowing
CN105256107A (en) Ring groove coherent jet nozzle structure
CN104152713A (en) Side-blowing lead melting reduction device
CN101144121A (en) Solid blowing in method for fused bath smelting
CN104073653A (en) Continuous lateral blowing tin smelting device
CN101410539A (en) Method and equipment for treating process gas
KR20090099538A (en) Process for making pig iron in a blast furnace
JPH0611262A (en) Operation of vertical type kiln
CN205090798U (en) Improved generation side -blown molten bath smelting furnace
CN111378809A (en) Equipment and method for electric arc furnace steelmaking by using oxygen combustion lance
CN104152712A (en) A side-blown lead melting reduction process
CN204138734U (en) Blow side plumbous melting reduction device
RU2576281C2 (en) Method and system for furnace skull removal
KR100866850B1 (en) Modular apparatus for the production of molten metal
KR930004473B1 (en) Process for making iron in the blast furnace
CN206974192U (en) A kind of furnace wall is the ellipsoid side-blown converter of refractory brick
JP2008007802A (en) Concentrate burner, and method for operating flash smelting furnace using it
CN219415670U (en) Scrap copper refining device
CN104073654A (en) Side-blowing tin smelting technique
CN212339244U (en) Scrap steel preheating spray gun

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20240415

Address after: 737104 No. 2 Lanzhou Road, Beijing Road Street, Jinchuan District, Jinchang City, Gansu Province

Applicant after: Jinchuan Group Nickel Cobalt Co.,Ltd.

Country or region after: China

Address before: 737100 Beijing Road, Jinchang City, Gansu Province

Applicant before: JINCHUAN GROUP Co.,Ltd.

Country or region before: China