CN115655806B - Sampling device for wastewater detection - Google Patents

Sampling device for wastewater detection Download PDF

Info

Publication number
CN115655806B
CN115655806B CN202211672010.0A CN202211672010A CN115655806B CN 115655806 B CN115655806 B CN 115655806B CN 202211672010 A CN202211672010 A CN 202211672010A CN 115655806 B CN115655806 B CN 115655806B
Authority
CN
China
Prior art keywords
sampling
flow
pipe
waste water
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211672010.0A
Other languages
Chinese (zh)
Other versions
CN115655806A (en
Inventor
徐栋
潘光耀
陈盛
丁文超
李欢
杨轩
肖耀军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yuncai Intelligent Environmental Technology Co ltd
Jiangsu Jinchuang Environment Group Co ltd
Original Assignee
Jiangsu Yuncai Intelligent Environmental Technology Co ltd
Jiangsu Jinchuang Environment Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yuncai Intelligent Environmental Technology Co ltd, Jiangsu Jinchuang Environment Group Co ltd filed Critical Jiangsu Yuncai Intelligent Environmental Technology Co ltd
Priority to CN202211672010.0A priority Critical patent/CN115655806B/en
Publication of CN115655806A publication Critical patent/CN115655806A/en
Application granted granted Critical
Publication of CN115655806B publication Critical patent/CN115655806B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment

Abstract

The application discloses sampling device for wastewater detection belongs to waste water sampling technical field. The device mainly comprises a shunt box, wherein a pre-flow pipe is connected to the pipeline of the shunt box, and a sampling pipe is higher than the pre-flow pipe, a pre-flow cylinder is connected to the bottom pipeline of the pre-flow pipe, a partition component for closing the pre-flow pipe is arranged in the pre-flow pipe, the sampling pipe is communicated with a sampling container, a valve is arranged in the sampling pipe, the waste water can flow into the shunt box in advance after being extracted, the initial section of waste water can flow into the pre-flow cylinder in advance because the orifice of the pre-flow pipe is lower than the orifice of the sampling pipe, the pre-flow pipe is blocked by the partition component after the initial section of waste water is extracted, the subsequent waste water can be accumulated in the shunt box until the waste water flows into the sampling pipe, the valve is in a closed state, and the waste water can be accumulated to fill the sampling pipe; and after the sampling tube is filled, stopping extracting the wastewater, opening the valve, and allowing the wastewater in the sampling tube to flow into the sampling container to finish sampling. The utility model provides an effect that waste water detects and reaches separation initial stage waste water with sampling device.

Description

Sampling device for wastewater detection
Technical Field
The application relates to the technical field of wastewater sampling, in particular to a sampling device for wastewater detection.
Background
When detecting waste water in an environment, the waste water needs to be sampled. In order to ensure the accuracy of detection, water bodies in different places and different depths need to be selected for sampling. Since the composition of wastewater varies with the depth of wastewater, shallow wastewater cannot be used as a sample for deep water detection.
In chinese patent publication No. CN108709773A, a portable wastewater sampling device is provided, which draws wastewater out through a water pump and a pipeline for sampling. However, the shallow waste water in the pipeline is firstly pumped out by the water pump when the pipeline is just put into the water. So, when sampling deep waste water, establish the waste water that the water pump just begins to pump as first section waste water, need abandonment with it, avoid sampling the waste water of shallow layer to avoid first section waste water and follow-up waste water to dissolve mutually, lead to the sample inaccurate.
Therefore, it is necessary to provide a sampling device for wastewater detection, which separates the initial stage wastewater to solve the above problems.
It should be noted that the above information disclosed in this background section is only for background purposes in understanding the inventive concept, and therefore, it may contain information that does not constitute prior art.
Disclosure of Invention
Based on the above problems in the prior art, the embodiments of the present application are directed to: the utility model provides a sampling device for waste water detection reaches the effect of separation initial stage waste water.
The technical scheme adopted by the application for solving the technical problem is as follows: the utility model provides a sampling device for waste water detection, includes the casing and is fixed in the reposition of redundant personnel case on the casing, the reposition of redundant personnel case is used for discharging into waste water, reposition of redundant personnel case pipe connection has preflow pipe and sampling tube, the mouth of pipe of connecting between reposition of redundant personnel case and the sampling tube is less than the mouth of pipe of connecting between reposition of redundant personnel case and the sampling tube, preflow pipe bottom pipe connection has preflow section of thick bamboo, preflow section of thick bamboo rotates with preflow pipe to be connected, preflow section of thick bamboo bottom rotates and is connected with the backup pad, sampling tube bottom rotates and is connected with the sampling sleeve pipe, sampling sleeve pipe bottom is provided with the swivelling joint pipe, sampling sleeve pipe circumference distributes and has a plurality of sample connection, the sample connection is fixed with the casing, the sample connection communicates a sample container respectively, be provided with the valve that is suitable for being controlled to open or close in the sampling tube, the transmission is connected between sampling sleeve pipe and the preflow section of thick bamboo to it is rotatory to drive preflow section of thick bamboo when sampling sleeve pipe is rotatory, be provided with in the preflow section of thick bamboo in advance when waste water rises, be provided with in the preflow section of thick bamboo in advance and be provided with the wall subassembly that is used for driving the rotatory drive assembly of sample sleeve pipe, be provided with the discharge port in the casing in advance, be suitable for the discharge port is in the waste water discharge port is suitable for the rotatory discharge port of preflow section of the rotatory waste water discharge tube of the rotatory in advance to be blocked in the casing in advance.
The waste water is extracted and then flows into the flow distribution box in advance, and a connecting pipe opening between the flow distribution box and the pre-flow pipe is lower than a connecting pipe opening between the flow distribution box and the sampling pipe, so that the primary waste water flows into the pre-flow cylinder firstly, after the primary waste water is extracted, the pre-flow pipe is blocked through the partition assembly, and then the subsequent waste water is accumulated in the flow distribution box until the liquid level is higher than the pipe opening of the sampling pipe and flows into the sampling pipe, and at the moment, the valve is in a closed state, and the waste water is accumulated and filled in the sampling pipe; when the sampling tube is filled, stopping extracting the wastewater, and opening the valve, so that the wastewater in the sampling tube flows into the sampling container through the sampling sleeve, the rotating tube and the sampling port; then the driving assembly drives the sampling sleeve to rotate, when the rotating pipe rotates to a position between the two sampling ports, the first discharge port is aligned with the second discharge port, the partition assembly is opened, and the residual wastewater in the pre-flow cylinder and the flow distribution box flows out through the first discharge port and the second discharge port; after the residual wastewater is discharged, the driving assembly drives the rotary pipe to rotate to the next sampling port, the first discharge port and the second discharge port are deviated, the first discharge port is blocked by the supporting plate, and the pre-flow cylinder recovers the sealing state, so that the next sampling is facilitated.
Further, cut off the subassembly including the activity set up in the floating plate in advance the flow tube, the floating plate edge is provided with the through-hole, the flow tube is in advance the upside of floating plate is fixed with the fender ring, the flow tube is in advance the downside of floating plate is fixed with the boss, the boss is used for avoiding the floating plate to fall out the flow tube in advance, the fender ring is used for plugging up the through-hole when the floating plate come-up to let fender ring and floating plate cooperation, cut off the waste water between a section of thick bamboo of flowing in advance and the flow distribution box.
Furthermore, a piston plate is arranged in the pre-flow cylinder, the pre-flow cylinder is connected with the piston plate in a sliding mode, the pre-flow pipe is inserted into the pre-flow cylinder and connected with the piston plate, a sealing space for containing waste water in the pre-flow cylinder is formed between the piston plate and the pre-flow cylinder, and a supporting assembly used for adjusting the height of the pre-flow cylinder is arranged on the lower side of the supporting plate, so that the volume of the sealing space is adjusted.
Further, the supporting component comprises a screw sleeve and a screw, the screw sleeve is rotatably connected with the shell, the screw is connected with the inside of the screw sleeve in a threaded mode, the top of the screw is fixed to the supporting plate, a clamping groove is formed in one side of the screw, a clamping block is arranged in the clamping groove and fixed to the shell, the clamping block is used for limiting rotation of the screw, the screw is driven to stretch through the rotating screw sleeve, and therefore the height of the pre-flow cylinder is adjusted.
Further, the supporting component further comprises a bolt and a supporting platform fixed on the screw sleeve, a plurality of first fixing holes are formed in the shell, a second fixing hole is formed in the supporting platform, the bolt is suitable for penetrating through the second fixing hole and is inserted into the first fixing hole to fix the screw sleeve, and therefore the height of the pre-flow cylinder is fixed.
Further, be provided with the pivot respectively between adjacent sample connection, the pivot rotates with the casing to be connected, the pivot lateral wall distributes and has a plurality of elastic components, pivot one side is fixed with the apron, sample sheathed tube bottom is fixed with the runner, is located the below of rotatory pipe the runner edge is provided with a plurality of fixed teeth, fixed tooth is suitable for and the elastic component meshing for when rotatory pipe is rotated to another sample connection department by a sample connection department, through fixed tooth meshing elastic component, rotate the pivot to the sample connection that the rotatory pipe position will be originally covered to the drive apron.
Furthermore, a traction wheel is fixed at the bottom of the sampling sleeve, a traction rope is wound on the screw rod sleeve, and two ends of the traction rope are respectively connected with the screw rod sleeve and the traction wheel and used for driving the preflow cylinder to change the height when the rotary tube switches the sampling port.
Furthermore, the traction wheels on the sampling sleeve are at least two, the diameters of the traction wheels are different, at least one threaded hole is formed in the edge of each traction wheel, one end, used for being connected with the traction wheel, of the traction rope is connected with a bolt, and one end of the traction rope is connected with the traction wheel by screwing the bolt into one threaded hole.
Furthermore, be provided with the overflow pipe on the reposition of redundant personnel case, the connecting pipe mouth between reposition of redundant personnel case and the sampling tube is less than the connecting pipe mouth between reposition of redundant personnel case and the overflow pipe for discharge unnecessary waste water.
The beneficial effect of this application is: according to the sampling device for wastewater detection, the initial-stage wastewater is separated through the pre-flowing cylinder and the partition assembly, so that the initial-stage wastewater can be prevented from being sampled, the initial-stage wastewater is prevented from being dissolved with the subsequent wastewater, and the accuracy of the subsequent detection is improved; through drive in advance a class section of thick bamboo and the remaining waste water of reposition of redundant personnel case discharge on the way at switching sample connection to carry out continuous sampling, reach the effect of facilitating the use.
In addition to the above-described objects, features and advantages, the present invention has other objects, features and advantages. The present invention will be described in further detail below with reference to the drawings.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate exemplary embodiments of the invention and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of a sampling device for wastewater detection according to the present application;
FIG. 2 is a schematic partial cross-sectional view of a sampling device for wastewater detection according to the present application;
FIG. 3 is an enlarged view of A in FIG. 2;
FIG. 4 is an enlarged view of B in FIG. 2;
FIG. 5 is an enlarged view of C in FIG. 2;
FIG. 6 is an enlarged schematic view of D in FIG. 2;
FIG. 7 is a schematic view of the interior of the preflow cartridge of FIG. 2;
FIG. 8 is a general schematic view of a sampling assembly of the present application;
wherein, in the figures, the various reference numbers:
1. a housing;
2. a water pump; 21. a suction pipe;
3. a shunt box; 31. a preflow tube; 311. a boss; 312. a baffle ring; 313. a floating plate; 314. a through hole; 315. a preflow sleeve; 316. a slider; 32. a sampling tube; 321. a valve; 322. a sampling cannula; 323. rotating the tube; 33. an overflow pipe; 34. a transmission gear;
4. a preflow assembly; 41. a preflow cartridge; 411. a chute; 42. a piston plate; 43. a seal ring; 44. a first discharge port; 45. a support plate; 46. a second discharge port; 47. a collection canister; 48. blocking the pipe; 49. a clamping block; 40. a waste pipe;
5. a sampling assembly; 51. a rotating wheel; 52. fixing teeth; 53. a sampling station; 54. a sampling port; 541. fixing the clamping plate; 542. a movable splint; 543. buckling; 544. a clamping block; 55. a rotating shaft; 551. an elastic member; 552. a cover plate; 56. a stop lever;
6. a support assembly; 61. a fixed table; 62. a first fixing hole; 63. a support table; 64. a second fixing hole; 65. a screw sleeve; 66. a screw; 67. a card slot; 68. a hauling rope; 69. a bolt;
7. a drive assembly; 71. a driver; 72. an output shaft; 73. a traction wheel; 74. a traction groove; 75. a threaded hole;
8. and (4) sampling the container.
Detailed Description
It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
In order to make the technical solutions of the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 8, the present application provides a sampling device for wastewater detection, which comprises a housing 1, a water pump 2 mounted on the housing 1, a flow dividing box 3 located at one side of the water pump 2, a pre-flow assembly 4 and a sampling assembly 5 located in the housing 1, and a support assembly located at the lower side of the pre-flow assembly 4 and a driving assembly 7 located at the lower side of the sampling assembly 5.
As shown in fig. 1 and 2, the water pump 2 is fixed on the upper side of the housing 1, an input port of the water pump 2 is connected with a water suction pipe 21 through a pipeline, the water suction pipe 21 is used for sucking waste water, and an output port of the water pump 2 is connected with an internal pipeline of the diversion box 3.
As shown in fig. 2, 3 side pipe connection in reposition of redundant personnel casees has preflow pipe 31, and 3 lateral walls in reposition of redundant personnel casees have sampling tube 32 and overflow pipe 33 respectively pipe connection, and among the reposition of redundant personnel casees 3, the mouth of pipe height of overflow pipe 33 is higher than the height of sampling tube 32, and the one end that reposition of redundant personnel case 3 was kept away from to preflow pipe 31 and sampling tube 32 all extends towards casing 1 is inside.
As shown in fig. 2 and 3, a partition assembly adapted to isolate the wastewater between the preflow cylinder 41 and the diversion box 3 when the wastewater in the preflow pipe 31 returns is disposed in the preflow pipe 31, the partition assembly includes a boss 311 disposed at a lower side of the interior of the preflow pipe 31, a baffle ring 312 fixed at an upper side of the interior of the preflow pipe 31, and a floating plate 313 disposed between the boss 311 and the baffle ring 312, a plurality of through holes 314 penetrating through the floating plate 313 are disposed at an edge of the floating plate 313, the through holes 314 communicate upper and lower sides of the floating plate 313, a floating space between the boss 311 and the baffle ring 312 is defined, when the floating plate 313 floats to be attached to the baffle ring 312 under the action of water, the through holes 314 on the floating plate 313 are blocked by the baffle ring 312, at this time, the water flow at this time is blocked, and when the floating plate 313 is attached to the boss 311, the through holes on the floating plate 313 are not blocked by the boss 311, a preflow pipe 315 is connected to the preflow pipe 31, the preflow pipe 31 is rotatably connected to the preflow pipe 315, and the preflow pipe 315 is connected to be in a movable sealing manner (a sealing connection (a non-flow sleeve 315), and the preflow pipe is provided with at least two sliders 316, and the pre-flow sleeve 316 is provided with a slide block 316.
As shown in fig. 2 and 4, a valve 321 is disposed on the lower side of the sampling tube 32, a sampling sleeve 322 is connected to a lower end pipeline of the sampling tube 32, the sampling tube 32 is rotatably connected to the sampling sleeve 322 and is connected to the sampling sleeve 322 in a dynamic sealing manner (not shown), teeth are disposed on the outer wall of the sampling sleeve 322, a rotating tube 323 is fixed to the side wall of the lower end of the sampling sleeve 322, and the rotating tube 323 is communicated with the lower end of the sampling sleeve 322.
In this embodiment, the dynamic seal connection may seal between two pipes that can rotate relatively, which is not described in this embodiment for the prior art.
As shown in fig. 1 and 2, a transmission gear 34 is engaged between teeth of the preflow sleeve 315 and the sampling sleeve 322, and the transmission gear 34 is rotatably mounted on the housing 1.
As shown in fig. 2, 5, and 7, the preflow assembly 4 includes a preflow cylinder 41 located inside the housing 1, the upper end of the preflow cylinder 41 is open, the lower end of the preflow sleeve 315 extends into the preflow cylinder 41 and is fixed with a piston plate 42, the edge of the piston plate 42 is fixed with a sealing ring 43, the sealing ring 43 is made of sealing material, in this embodiment, the sealing ring 43 may be made of rubber, the edge of the sealing ring 43 is attached to the inner wall of the preflow cylinder 41, the bottom inside the preflow cylinder 41 is provided with at least one first discharge port 44, the center of the outer bottom of the preflow cylinder 41 is rotatably connected with a support plate 45, the support plate 45 is provided with at least one second discharge port 46 corresponding to the first discharge port 44, the first discharge port 44 and the second discharge port 46 are both circumferentially distributed with the center of the bottom of the preflow cylinder 41 as a circle center, the first discharge port 44 and the second discharge port 46 communicate the bottom of the preflow cylinder 41 and the upper side and the support plate 45, in this embodiment, the first discharge port 44 is provided with one second discharge port 46, the upper side of the collection cylinder 47 is provided with a collection cylinder 47, the upper side of the collection cylinder 47, the inner wall of the collection cylinder is fixed with a block 48, and the inner wall of the bottom of the collection cylinder 48 is provided with a waste water collection block 48, and a waste water collection tube 48.
As shown in fig. 7, a slide slot 411 corresponding to the slide block 316 is provided at the top of the preflow cylinder 41.
As shown in fig. 2 and fig. 6, the supporting assembly 6 includes a fixing table 61 fixed at the bottom inside the housing 1, at least one first fixing hole 62 is uniformly distributed on the fixing table 61, a supporting table 63 is rotatably connected to the upper side of the fixing table 61, at least one second fixing hole 64 corresponding to the first fixing hole 62 is arranged on the supporting table 63, the first fixing hole 62 and the second fixing hole 64 are circumferentially distributed by taking the rotation center of the supporting table 63 as the center of circle, the second fixing hole 64 communicates the upper and lower sides of the supporting table 63, in this embodiment, sixteen first fixing holes 62 are arranged, four second fixing holes 64 are arranged, a screw sleeve 65 corresponding to the rotation center of the supporting table 63 is fixed on the upper side of the supporting table 63, a screw 66 is connected to the screw sleeve 65 through a thread, the screw 66 passes through the blocking pipe 48 and is fixed to the lower end of the supporting plate 45, a clamping groove 67 corresponding to the clamping block 49 is arranged on the side surface of the screw 66, a traction rope 68 is wound around the outer wall of the screw sleeve 65, one end of the traction rope 68 is fixed to the screw sleeve 65, a bolt 69 is fixed to the other end of the traction rope 68, a thread is fixed to the other end of the bolt 69, and a handle is fixed to the other end of the bolt 69.
As shown in fig. 8, the sampling assembly 5 includes a rotating wheel 51 fixed at the lower end of a sampling sleeve 322, a plurality of fixed teeth 52 are arranged at the edge of the rotating wheel 51, a sampling platform 53 is arranged at the lower side of the rotating wheel 51, the sampling platform 53 is fixed with the housing 1, a plurality of sampling ports 54 and rotating shafts 55 are uniformly distributed on the sampling platform 53 by taking the sampling sleeve 322 as the center, and a stop lever 56 is fixed at one side of each sampling port 54.
As shown in fig. 8, a fixed clamp 541 is fixed at the lower end of the sampling port 54, a movable clamp 542 is hinged to one side of the fixed clamp 541, a buckle 543 is disposed at the other side of the fixed clamp 541 and the movable clamp 542, a clamping block 544 is fixed to the opposite side (i.e. the inner side) of the fixed clamp 541 and the movable clamp 542, the clamping block 544 is made of an elastic material, in this embodiment, the clamping block 544 is made of rubber, and a sampling container 8 is clamped between the fixed clamp 541 and the movable clamp 542, in this embodiment, the sampling container 8 is a test tube.
As shown in fig. 8, the rotating shaft 55 is respectively located between the two sampling ports 54 and rotatably connected to the sampling platform 53, a plurality of elastic members 551 are fixed on an outer side wall of the rotating shaft 55, in this embodiment, the elastic members 551 are elastic pieces, and a cover plate 552 is further fixed on an outer side wall of the rotating shaft 55.
As shown in fig. 1, 2, and 8, the driving assembly 7 includes a driver 71 fixed at the bottom inside the housing 1, in this embodiment, the driver 71 may be a motor, an output shaft 72 is disposed at the top end of the driver 71, an axis of the output shaft 72 is collinear with an axis of the sampling sleeve 322, a top of the output shaft 72 is fixed with the rotating wheel 51, at least one traction wheel 73 is fixed on the output shaft 72, in this embodiment, three traction wheels 73 are disposed, radii between the traction wheels 73 are different, a traction groove 74 is disposed at an edge of the traction wheel 73, at least one threaded hole 75 is disposed in the traction groove 74, and in this embodiment, four threaded holes 75 are disposed in each traction groove 74.
It will be appreciated that the pump 2, valve 321 and actuator 71 are controlled by an external system, the end of the suction pipe 21 being placed in the waste water to facilitate the suction of the waste water, and the overflow pipe 33 and waste water pipe 40 being piped to a discharge pipe (not shown) for discharging excess waste water.
In this embodiment, the user is before sampling, the buckle 543 is relieved to the accessible, rotate movable clamp plate 542 again, make and separate between fixed clamp plate 541 and the movable clamp plate 542, thereby let the user can put the mouth of pipe of sample container 8 between fixed clamp plate 541 and the movable clamp plate 542, then reset movable clamp plate 542, make fixed clamp plate 541 and movable clamp plate 542 clip and fixed sample container 8, then buckle 543 is buckled, thereby fix sample container 8 at the lower extreme of the sample mouth 54 that corresponds respectively. In the above process, the elasticity of the clamping block 544 can prevent the sampling container 8 from being damaged by clamping, so as to achieve the effect of protecting the sampling container 8.
In the initial state, the first outlet 44 and the second outlet 46 are offset, the valve 321 is closed, and the outlet end of the rotating tube 323 is aligned with a sampling port 54.
During the sample, at first start water pump 2, let water pump 2 go into flow distribution box 3 with waste water pump through suction pipe 21, because in flow distribution box 3, the mouth of pipe of being connected between flow distribution box 3 and the preflow pipe 31 is less than the mouth of pipe of being connected between flow distribution box 3 and the sampling tube 32, waste water just can flow into preflow pipe 31 earlier through self gravity, because through-hole 314 can let floating plate 313 float, waste water just can pass through fender ring 312, through-hole 314 and boss 311 in proper order, flow through preflow pipe 31, get into preflow sleeve 315, flow into preflow sleeve 41 through preflow sleeve 315 at last.
The first discharge port 44 is blocked by the support plate 45 due to the deviation between the first discharge port 44 and the second discharge port 46, so that the waste water cannot flow out of the pre-flow cylinder 41, a sealed space is formed among the piston plate 42, the sealing ring 43 and the pre-flow cylinder 41 due to the edge of the sealing ring 43 being attached to the inner wall of the pre-flow cylinder 41, the waste water flowing out of the pre-flow sleeve 315 is continuously accumulated in the pre-flow cylinder 41, the pre-flow cylinder 41 is finally filled, and then the waste water is lifted into the pre-flow sleeve 315 and the pre-flow pipe 31.
The boss 311 is used for preventing the floating plate 313 from falling into the pre-flow sleeve 315, and as the wastewater in the pre-flow cylinder 41 rises into the pre-flow pipe 31, the floating plate 313 can rise together with the liquid level of the wastewater through the buoyancy of the floating plate 313 until the wastewater is blocked by the blocking ring 312, and the wastewater can continue to be accumulated above the floating plate 313. At this time, since the through hole 314 is blocked by the baffle ring 312, the floating plate 313 is attached to the lower side of the baffle ring 312 due to the buoyancy of the floating plate 313, so that the wastewater below the baffle ring 312 is isolated from the wastewater above the baffle ring 312, that is, during sampling, the initial stage wastewater which is sucked at the beginning is isolated in the pre-flow cylinder 41, so that the initial stage wastewater is separated from the subsequent wastewater and is prevented from being mixed with the subsequent wastewater.
Subsequent waste water is piled up in reposition of redundant personnel case 3, because the mouth of pipe height of overflow pipe 33 is greater than the height of sampling tube 32, when the mouth of pipe height of sampling tube 32 was piled up to waste water in the reposition of redundant personnel case 3, just can flow into in the sampling tube 32, because this moment valve 321 is closed state, waste water can't flow out the sampling tube 32, just can pile up in the sampling tube 32, and the waste water in sampling tube 32 and the reposition of redundant personnel case 3 is the waste water of sample this moment.
To sum up, realized the effect of isolation initial stage waste water when sampling at every turn, can keep apart remaining shallow layer waste water in the tub 21 that absorbs water in advance when sample waste water flows a section of thick bamboo 41, avoid it by the sample or mix with follow-up waste water, lead to the inaccurate phenomenon of detection after the sample, reach the effect that improves the sample degree of accuracy.
When the sampling tube 32 is filled, the waste water continues to accumulate in the diversion box 3, and finally flows out from the overflow tube 33 to discharge the excess waste water. At the moment, the starting time of the water pump 2 can be controlled by the system to ensure that sufficient waste water is sucked, and the water pump 2 is closed after the starting time is over; or when the operator observes the wastewater flowing out of overflow pipe 33, pump 2 is turned off.
After the water pump 2 is turned off, the system control valve 321 is opened, so that the wastewater sampled in the sampling pipe 32 flows into the sampling sleeve 322, and then falls into a sampling port 54 through the rotating pipe 323, so that the wastewater flows into a sampling container 8 through the sampling port 54 to complete one sampling.
After the system control valve 321 is opened for a period of time, the valve 321 is closed to ensure that the sampled wastewater can flow into a sampling container 8 completely. Then the system starts the driver 71, so that the system starts the driver 71 to drive the sampling sleeve 322 to rotate a certain angle through the output shaft 72, so that the outlet end of the rotating pipe 323 rotates to the position between the originally aligned sampling port 54 and the adjacent sampling port 54, and stays for a period of time.
When the sampling sleeve 322 rotates, the sampling sleeve 322 drives the pre-flow sleeve 315 to rotate together through the transmission gear 34, and the pre-flow sleeve 315 pushes the sliding slot 411 through the sliding block 316, so that the pre-flow cylinder 41 rotates together. Since the collecting cylinder 47 is fixed to the housing 1, the collecting cylinder 47 can clamp the screw 66 through the clamping block 49 and the clamping groove 67, so that the screw 66 is fixed to the support plate 45 and cannot rotate, and the pre-flow cylinder 41 and the support plate 45 rotate relatively.
When the rotary pipe 323 stays between the two sampling ports 54, the first discharge port 44 is aligned with a second discharge port 46, so that the waste water in the preflow cylinder 41 falls into the collecting cylinder 47 through the first discharge port 44 and the second discharge port 46 and is discharged through the waste water pipe 40. Because the waste water in the pre-flow cylinder 41 is reduced, the floating plate 313 descends along with the liquid level of the waste water, so that the waste water remained in the shunt box 3 and the pre-flow pipe 31 can flow into the pre-flow cylinder 41 and then flow into the collecting cylinder 47, and is discharged through the waste water pipe 40, and the effect that the pre-flow assembly 4 is driven to discharge the waste water remained in the pre-flow cylinder 41 and the shunt box 3 after the waste water sampling is completed is achieved, so as to prepare for the next sampling.
The rotary tube 323 stays between the two sampling ports 54 for a period of time to ensure that all the residual wastewater in the pre-flow cylinder 41 and the flow dividing box 3 is discharged, and then the system starts the driver 71 again to drive the sampling sleeve 322 to rotate until the rotary tube 323 moves to the position where the outlet end faces the sampling port 54 adjacent to the originally aligned sampling port 54 and stops. At this time, the rotary tube 323 is aligned with the sampling port 54 of another sampling container 8, and the first discharge port 44 and the second discharge port 46 are shifted again, so that the first discharge port 44 is blocked by the support plate 45 again, that is, the preflow assembly 4 and the sampling assembly 5 are restored to the initial state, and the next sampling can be performed.
Further, as shown in fig. 8, in the process of rotating the outlet end of the rotating pipe 323 from one sampling port 54 to the other sampling port 54 clockwise, the fixed teeth 52 engage the elastic member 551 between the two sampling ports 54, so that the fixed teeth 52 push the elastic member 551, and the rotating shaft 55 rotates until the cover 552 is stopped by the edge of the rotating wheel 51 and cannot rotate any further. At this time, on the one hand, the elastic member 551 can be disengaged from the fixed teeth 52 by the elastic deformation of the elastic member 551, thereby preventing the rotation wheel 51 from being caught; on the other hand, the cover 552 can block the sampling port 54 above the sampling container 8 after sampling is completed, and close the upper opening of the sampling container 8, so as to reduce the influence of the external environment on the sampled wastewater in the sampling container 8.
When the driver 71 rotates one turn, the sampling container 8 is completely sampled, and the system prompts the operator to take the sample.
After the worker takes the sample and replaces the sampling container 8, the driver 71 needs to rotate reversely for one circle, so that the fixed tooth 52 drives the rotating shaft 55 to rotate reversely until the stop lever 56 blocks the cover plate 552, and the cover plate 552 can open the sampling port 54; alternatively, the rotation shaft 55 is manually rotated to rotate the cover plate 552 into contact with the stopper 56, thereby opening the sampling port 54.
In this embodiment, the volume of the sampling tube 32 can be changed by changing the shape of the sampling tube 32 or by changing the thickness of the sampling tube 32, so that the amount of wastewater to be sampled can be changed. Accordingly, when the waste water is pumped in, the amount of the waste water flowing into the sampling pipe 32 is changed along with the change of the volume of the sampling pipe 32, so that the amount of the waste water flowing into the sampling container 8 is changed, and the effect of changing the amount of the waste water for sampling is achieved.
In addition, in this embodiment, the user can also change the amount of waste water that can be accumulated by changing the size of the space formed between the preflow cylinder 41 and the piston plate 42; the specific operation is as follows: through rotating the screw sleeve 65, because the collecting cylinder 47 blocks the screw 66 through the fixture block 49 and the fixture groove 67 and can not rotate, the screw sleeve 65 is in threaded connection with the screw 66, the screw 66 is driven to extend and contract in the screw sleeve 65, the screw 66 can drive the pre-flow cylinder 41 to move up and down through the support plate 45, because the position of the piston plate 42 is unchanged, the up and down movement of the pre-flow cylinder 41 can change the size of a space formed between the pre-flow cylinder 41 and the piston plate 42, and the amount of waste water which can be accumulated in the pre-flow cylinder 41 can be changed.
When deeper wastewater is sampled, the water inlet end of the water suction pipe 21 can extend into the deeper wastewater, and under the condition that more shallow wastewater exists in the water suction pipe 21, the pre-flow cylinder 41 can be moved downwards, the amount of wastewater which can be stored in the pre-flow cylinder 41 is increased, so that more initial wastewater can be stored, the initial wastewater can be completely stored in the pre-flow cylinder 41, and the accuracy of deep wastewater sampling is ensured; when the shallow waste water of sample, the end of intaking of pipe 21 that absorbs water can stretch into in the shallow waste water, can be with flowing a section of thick bamboo 41 upward movement in advance, and the waste water volume that can deposit in flowing a section of thick bamboo 41 in advance reduces, can deposit less initial stage waste water promptly, and after initial stage waste water all flowed into a section of thick bamboo 41 in advance, a section of thick bamboo 41 that flows in advance can be filled with the back fast, gets into the sample step more fast, promotes the sampling speed.
In conclusion, the effect of adapting to different depths of wastewater sampling by changing the capacity of the pre-flow cylinder 41 is achieved.
In this embodiment, when the screw sleeve 65 rotates clockwise, the preflow cylinder 41 moves upward, and the capacity of the preflow cylinder 41 is reduced; when the screw housing 65 rotates counterclockwise, the preflow cylinder 41 moves downward, increasing the capacity of the preflow cylinder 41.
When the height of the preflow cylinder 41 is adjusted to a proper level, the bolt 69 is inserted through a second fixing hole 64 and into the first fixing hole 62 aligned with the second fixing hole 64, and the bolt 69 fixes the screw housing 65, thereby fixing the height of the preflow cylinder 41.
In addition, in the present embodiment, the following operations are also possible: after the user wraps the pull cord 68 around the screw housing 65, the plug 69 is inserted into a threaded hole 75 in a pull wheel 73, and the plug 69 is threadedly secured in the threaded hole 75.
After once taking a sample and accomplishing, the rotatory in-process of output shaft 72 just can drive traction wheel 73 and tighten up haulage rope 68, and haulage rope 68 is tightened up the process of pull, just can drive screw rod cover 65 rotatory, makes screw rod cover 65 through the threaded connection with screw rod 66, drives screw rod 66 and stretches out and draws back in screw rod cover 65, adjusts the height of a class section of thick bamboo 41 in advance to the volume of adjustment initial segment waste water makes after taking a sample at every turn, and the volume of initial segment waste water all can change. And through changing the direction that the haulage rope 68 twines on screw rod cover 65, can change when haulage rope 68 is restrainted by traction wheel 73, drive the rotatory direction of screw rod cover 65, namely control after sampling each time, the volume of initial stage waste water increases gradually or dwindles.
If after sampling at every turn, need increase the degree of depth of waste water sampling, shallow layer waste water in the corresponding suction tube 21 can increase gradually, after the anticlockwise winding of haulage rope 68 on screw rod sleeve 65 this moment, fix bolt 69 on traction wheel 73 again, sample at this moment at every turn and accomplish the back, when traction wheel 73 is rotatory, just can be through binding up haulage rope 68, drive screw rod sleeve 65 anticlockwise rotation, thereby reduce and flow a 41 height in advance, reach the effect that increases the capacity of a 41 in advance gradually, thereby adapt to the volume of the shallow layer waste water that constantly increases.
If after sampling at every turn, can constantly reduce the degree of depth of waste water sampling, shallow layer waste water that corresponds in the pipe 21 that absorbs water can reduce gradually, after clockwise winding haulage rope 68 on screw sleeve 65 this moment, fix bolt 69 on traction wheel 73 again, the back is accomplished in every turn sampling this moment, when traction wheel 73 is rotatory, just can be through binding up haulage rope 68, drive screw sleeve 65 clockwise rotation, thereby increase and flow a section of thick bamboo 41 height in advance, reach the effect that reduces the capacity of a section of thick bamboo 41 in advance one by one, thereby the volume of the constantly reduced shallow layer waste water of adaptation.
In conclusion, the effect of adapting to continuous sampling of different depths of wastewater is achieved.
The speed of the drawstring 68 is also varied by the user securing the latch 69 to a different diameter of the drawstring wheel 73.
The larger the diameter of the traction wheel 73 is, the more the traction rope 68 is bundled after sampling each time, the more the rotation amount of the screw sleeve 65 is, and the more the variation amount of the height of the preflow cylinder 41 is, that is, after sampling each time, the larger the variation amplitude of the wastewater amount in the initial stage is, so that the sampling depth difference is adapted to the larger case;
the smaller the diameter of the traction wheel 73 is, the more the traction rope 68 is bound after sampling every time, the less the rotation amount of the screw sleeve 65 is, the smaller the variation of the height of the pre-flow cylinder 41 is, namely, after sampling every time, the smaller the variation amplitude of the initial-stage wastewater quantity is, and the smaller the depth difference of the sampling is adapted.
In conclusion, the condition of adapting to different sampling depth differences is achieved.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The utility model provides a sampling device for waste water detection which characterized in that: including casing (1) and be fixed in flow distribution box (3) on casing (1), flow distribution box (3) are used for discharging into waste water, flow distribution box (3) pipe connection has in advance flow tube (31) and sampling tube (32), flow distribution box (3) and the connecting pipe mouth between the flow tube (31) in advance are less than the connecting pipe mouth between flow distribution box (3) and sampling tube (32), flow tube (31) bottom pipe connection has in advance a class section of thick bamboo (41), flow tube (41) and flow tube (31) in advance rotate to be connected, flow tube (41) bottom in advance rotates to be connected with backup pad (45), sampling tube (32) bottom rotates to be connected with sampling sleeve pipe (322), sampling sleeve pipe (322) bottom is provided with rotatory pipe (323), sampling sleeve pipe (322) circumference distributes has a plurality of sample mouths (54), sample mouth (54) are fixed with casing (1), sample mouth (54) communicate a sampling container (8) respectively, be provided with in sampling tube (32) and be suitable for by the valve of being controlled to open or close, flow sleeve pipe (322) and transmission between the flow tube (41) in advance with the drive waste water flow tube (31) and flow tube (41) in advance when being suitable for rotatory flow distribution tube (31), be provided with waste water flow tube (31) in advance and flow tube (41) in advance The water-isolated partition assembly is characterized in that a driving assembly (7) for driving the sampling sleeve (322) to rotate is arranged in the shell (1), a first discharge port (44) is formed in the pre-flow cylinder (41), a plurality of second discharge ports (46) are formed in the supporting plate (45), and the first discharge port (44) is suitable for being blocked by the supporting plate (45) or communicated with the second discharge ports (46) in the rotating process of the pre-flow cylinder (41) to flow out of wastewater in the pre-flow cylinder (41).
2. The sampling device for wastewater testing according to claim 1, wherein: cut off the subassembly including the activity set up kickboard (313) in kickboard (31) in advance, kickboard (313) edge is provided with through-hole (314), kickboard (31) are in advance the upside of kickboard (313) is fixed with fender ring (312), in advance kickboard (31) be in the downside of kickboard (313) is fixed with boss (311), boss (311) are used for avoiding kickboard (313) to fall out kickboard (31) in advance, fender ring (312) are used for blockking up through-hole (314) when kickboard (313) come-up to let fender ring (312) and kickboard (313) cooperate, cut off the waste water between a class section of thick bamboo (41) and flow distribution box (3) in advance.
3. The sampling device for wastewater detection according to claim 1, wherein: the pre-flow cylinder (41) is internally provided with a piston plate (42), the pre-flow cylinder (41) is connected with the piston plate (42) in a sliding mode, the pre-flow pipe (31) is inserted into the pre-flow cylinder (41) and connected with the piston plate (42), a sealed space for containing waste water in the pre-flow cylinder (41) is formed between the piston plate (42) and the pre-flow cylinder (41), and a supporting assembly (6) for adjusting the height of the pre-flow cylinder (41) is arranged on the lower side of the supporting plate (45) so as to adjust the volume of the sealed space.
4. The sampling device for wastewater testing according to claim 3, wherein: support assembly (6) include screw rod cover (65) and threaded connection in screw rod cover (65) inside screw rod (66) of being connected with casing (1) rotation, screw rod (66) top is fixed with backup pad (45), the downside of backup pad (45) is provided with collection tube (47), collection tube (47) upside opening, and with casing (1) inside fixed, collection tube (47) bottom is provided with keeps off pipe (48), keep off pipe (48) intercommunication to collection tube (47) downside, screw rod (66) one side is provided with draw-in groove (67), be provided with fixture block (49) in draw-in groove (67), fixture block (49) and fender pipe (48) inner wall are fixed, fixture block (49) are used for restricting the rotation of screw rod (66), drive screw rod (66) through rotatory screw rod cover (65) and stretch out and draw back to adjustment preflow section of thick bamboo (41) height.
5. The sampling device for wastewater testing according to claim 4, wherein: the supporting component (6) further comprises a bolt (69) and a supporting platform (63) fixed on the screw sleeve (65), a plurality of first fixing holes (62) are formed in the shell (1), a second fixing hole (64) is formed in the supporting platform (63), the bolt (69) is suitable for penetrating through one second fixing hole (64), and is inserted into one first fixing hole (62) to fix the screw sleeve (65), so that the height of the pre-flow cylinder (41) is fixed.
6. The sampling device for wastewater testing according to claim 1, wherein: rotating shafts (55) are respectively arranged between adjacent sampling ports (54), the rotating shafts (55) are rotatably connected with the shell (1), a plurality of elastic members (551) are distributed on the side wall of each rotating shaft (55), a cover plate (552) is fixed on one side of each rotating shaft (55), a rotating wheel (51) is fixed at the bottom of each sampling sleeve (322), a plurality of fixed teeth (52) are arranged on the edge of the rotating wheel (51) below each rotating pipe (323), the fixed teeth (52) are suitable for being meshed with the elastic members (551), and when the rotating pipes (323) rotate from one sampling port (54) to the other sampling port (54), the rotating shafts (55) are rotated by the fact that the fixed teeth (52) are meshed with the elastic members (551), so that the cover plates (552) are driven to cover the sampling ports (54) where the rotating pipes (323) are located originally.
7. The sampling device for wastewater testing according to claim 4, wherein: sampling sleeve pipe (322) bottom is fixed with traction wheel (73), the winding has haulage rope (68) on screw rod cover (65), haulage rope (68) both ends are connected with screw rod cover (65) and traction wheel (73) respectively for when rotatory pipe (323) switches sample connection (54), drive and flow a section of thick bamboo (41) in advance and change the height.
8. The sampling device for wastewater testing according to claim 7, wherein: the sampling sleeve (322) is provided with at least two traction wheels (73), the diameters of the traction wheels (73) are different, the edge of each traction wheel (73) is provided with at least one threaded hole (75), one end, used for being connected with the traction wheel (73), of the traction rope (68) is connected with a bolt, and one end of the traction rope (68) is connected with the traction wheel (73) by screwing the bolt into one threaded hole (75).
9. The sampling device for wastewater detection according to claim 1, wherein: be provided with overflow pipe (33) on reposition of redundant personnel case (3), the connecting pipe mouth between reposition of redundant personnel case (3) and sampling tube (32) is less than the connecting pipe mouth between reposition of redundant personnel case (3) and overflow pipe (33) for discharge unnecessary waste water.
CN202211672010.0A 2022-12-26 2022-12-26 Sampling device for wastewater detection Active CN115655806B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211672010.0A CN115655806B (en) 2022-12-26 2022-12-26 Sampling device for wastewater detection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211672010.0A CN115655806B (en) 2022-12-26 2022-12-26 Sampling device for wastewater detection

Publications (2)

Publication Number Publication Date
CN115655806A CN115655806A (en) 2023-01-31
CN115655806B true CN115655806B (en) 2023-03-10

Family

ID=85023340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211672010.0A Active CN115655806B (en) 2022-12-26 2022-12-26 Sampling device for wastewater detection

Country Status (1)

Country Link
CN (1) CN115655806B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116286307B (en) * 2023-05-17 2023-08-11 深圳零一生命科技有限责任公司 Microorganism rapid sampling device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008008068A (en) * 2006-06-30 2008-01-17 Tsuneo Kondo Rainwater collecting device
CN106596879A (en) * 2016-11-02 2017-04-26 浙江水利水电学院 River section water quality monitoring system and method
CN110054235A (en) * 2019-05-16 2019-07-26 重庆市机电设计研究院 A kind of Sewage treatment reuse means
CN110074821A (en) * 2019-04-25 2019-08-02 重庆医科大学附属第三医院(捷尔医院) A kind of pregnant woman's physical examination urine sampling equipment
CN111947993A (en) * 2020-08-03 2020-11-17 六盘水市第二人民医院 Clinical laboratory adopts urine verifying attachment
CN114441239A (en) * 2022-01-20 2022-05-06 安徽尧舜建设有限公司 Multifunctional detection device and detection method for production wastewater of water conservancy and hydropower construction
CN114894550A (en) * 2022-07-12 2022-08-12 常州中能环境工程有限公司 Detection sampling device based on industrial wastewater treatment

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2079748U (en) * 1990-12-22 1991-06-26 玉环县楚门环保设备厂 Waste water sampler
FR2807520B1 (en) * 2000-04-06 2002-06-07 Cogema DEVICE FOR TAKING SAMPLES
JP3752630B1 (en) * 2004-09-17 2006-03-08 昌藏 吉田 Initial rainwater drainer
KR101051133B1 (en) * 2008-10-15 2011-07-22 한국지질자원연구원 Spill Rainwater Collector
CN209485773U (en) * 2019-01-03 2019-10-11 上海沁竺环境科技有限公司 Chemical plant wastewater detects auxiliary device
CN212180363U (en) * 2020-06-04 2020-12-18 茅台学院 Safe sampling mechanism of white spirit production wastewater tank
CN214804900U (en) * 2021-03-28 2021-11-23 上海市第六人民医院金山分院(上海市金山区中心医院、上海市金山区中医医院) Midstream urine collecting device
CN215767848U (en) * 2021-08-17 2022-02-08 薛雨 Catheterization chemical examination sampling device for nephrology department
CN215517105U (en) * 2021-09-30 2022-01-14 江苏今创环境集团有限公司 Sewage treatment equipment with novel dosing tank water charging system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008008068A (en) * 2006-06-30 2008-01-17 Tsuneo Kondo Rainwater collecting device
CN106596879A (en) * 2016-11-02 2017-04-26 浙江水利水电学院 River section water quality monitoring system and method
CN110074821A (en) * 2019-04-25 2019-08-02 重庆医科大学附属第三医院(捷尔医院) A kind of pregnant woman's physical examination urine sampling equipment
CN110054235A (en) * 2019-05-16 2019-07-26 重庆市机电设计研究院 A kind of Sewage treatment reuse means
CN111947993A (en) * 2020-08-03 2020-11-17 六盘水市第二人民医院 Clinical laboratory adopts urine verifying attachment
CN114441239A (en) * 2022-01-20 2022-05-06 安徽尧舜建设有限公司 Multifunctional detection device and detection method for production wastewater of water conservancy and hydropower construction
CN114894550A (en) * 2022-07-12 2022-08-12 常州中能环境工程有限公司 Detection sampling device based on industrial wastewater treatment

Also Published As

Publication number Publication date
CN115655806A (en) 2023-01-31

Similar Documents

Publication Publication Date Title
CN115655806B (en) Sampling device for wastewater detection
CN110284579B (en) A prevent stifled cistern for hydraulic engineering
CN210177656U (en) Water flow control system for urban drainage
CN110306509A (en) A kind of marine pollution cleaning device
CN110258762A (en) A kind of road sewer mouth preventing clogging up device
CN110902892A (en) Oral sewage treatment equipment
CN110127889A (en) A kind of unpowered processing unit of sanitary sewage
CN209752279U (en) Pressure reducing valve
CN215908394U (en) Full-automatic regulating valve for boiler feed water bypass
CN103866847A (en) Floating-ball flow intercepting device
CN115929923A (en) Butterfly valve that shock resistance is strong
CN213949463U (en) Liquid holding vessel is used in chemical products production
CN213668249U (en) Separation device for aquaculture sewage treatment
CN201943106U (en) Water distribution and discharge device and rain collecting pool with same
CN114618208A (en) Heating power pipeline filter equipment
CN112208959B (en) Solid-liquid different-opening discharge type storage tank
CN208414040U (en) A kind of unpowered processing unit of sanitary sewage
CN208457288U (en) Water-saving type irrigation rig
CN202545377U (en) Air-pressure water raiser
CN220531022U (en) Drainage mechanism of air filter
CN110103590A (en) A kind of detection device that can detect printed matter solvent residual amount automatically
CN213949462U (en) Liquid storage tank with solid and liquid discharged from different ports
CN220131952U (en) Slag-water separation device of cyclone slag remover
CN109603268A (en) A kind of sewage filter device
CN216616170U (en) Water remover for reservoir

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant