CN115649375A - Offshore platform system - Google Patents

Offshore platform system Download PDF

Info

Publication number
CN115649375A
CN115649375A CN202211379909.3A CN202211379909A CN115649375A CN 115649375 A CN115649375 A CN 115649375A CN 202211379909 A CN202211379909 A CN 202211379909A CN 115649375 A CN115649375 A CN 115649375A
Authority
CN
China
Prior art keywords
platform
seabed
buoyancy
maintenance
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211379909.3A
Other languages
Chinese (zh)
Inventor
朱晓东
朱俊
吴金峰
张锋
谢书鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Technology Marine Systems Co ltd
Original Assignee
Zhongtian Technology Marine Systems Co ltd
Jiangsu Zhongtian Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Technology Marine Systems Co ltd, Jiangsu Zhongtian Technology Co Ltd filed Critical Zhongtian Technology Marine Systems Co ltd
Priority to CN202211379909.3A priority Critical patent/CN115649375A/en
Publication of CN115649375A publication Critical patent/CN115649375A/en
Pending legal-status Critical Current

Links

Images

Abstract

The present invention provides an offshore platform system comprising: the system comprises a seabed platform, an operation and maintenance platform and mooring lines; the seabed platform is used for being fixed on the seabed and is connected with the operation and maintenance platform through a mooring cable, and the operation and maintenance platform can be suspended on the sea surface; the seabed platform comprises a bearing part and a buoyancy assembly, wherein one side of the bearing part can bear materials, and the buoyancy assembly is arranged on the other side of the bearing part; the buoyant assembly has a first state in which the subsea platform is capable of floating on the surface of the sea and a second state in which the subsea platform is capable of sinking on the sea. According to the offshore platform system, the bearing part can bear materials, the buoyancy of the buoyancy component enables the seabed platform to float on the sea surface, the transportation of the seabed platform is facilitated, the seabed platform can sink to the seabed by adjusting the buoyancy of the buoyancy component, the operation and maintenance platform is convenient for operators to perform regular maintenance, the construction cost is favorably reduced, and meanwhile, the convenience of operation and maintenance is favorably improved.

Description

Offshore platform system
Technical Field
The invention relates to the technical field of offshore platforms, in particular to an offshore platform system.
Background
The seabed observation system can realize long-term and real-time observation of marine environment, and has important effects on aspects of developing marine resources, early warning marine disasters, protecting marine environment and the like.
The conventional seabed observation system generally comprises a laying frame and a floating ball, wherein the floating ball floats on the sea surface, the laying frame is fixed on the seabed, the floating ball is connected with the laying frame through a rope, and the floating ball is positioned through an iron anchor. The structure mode needs to use a large engineering ship to lay the submarine cable during offshore construction, and the construction cost is high. In the operation and maintenance stage, because the floating ball target on the sea is small, the difficulty is brought to the positioning of the distribution frame, the operating personnel needs to submerge into the sea bottom to search for the distribution frame, then the distribution frame is salvaged by the engineering ship, the distribution frame is placed into the sea bottom after the maintenance is finished on the engineering ship, and the operation and maintenance operation is inconvenient.
Disclosure of Invention
The invention provides an offshore platform system, which is used for solving the problems of high construction cost and inconvenient operation and maintenance operation of the conventional seabed observation system.
The present invention provides an offshore platform system comprising: the system comprises a seabed platform, an operation and maintenance platform and mooring lines;
the seabed platform is used for being fixed on the seabed, the seabed platform is connected with the operation and maintenance platform through the mooring cable, and the operation and maintenance platform can be suspended on the sea surface;
the seabed platform comprises a bearing piece and a buoyancy assembly, wherein one side of the bearing piece can bear materials, and the buoyancy assembly is arranged on the other side of the bearing piece; the buoyant assembly has a first state in which the subsea platform is capable of floating on the sea surface and a second state in which the subsea platform is capable of sinking on the sea floor.
According to an offshore platform system provided by the invention, the buoyancy assembly comprises a buoy and a fastener;
the plurality of floating cylinders are arranged on the other side of the bearing piece and connected with the bearing piece through the fasteners; the flotation pontoon has the water intake pipe, be equipped with flow control valve on the water intake pipe under the condition that flow control valve opened, the fluid can flow in inside the flotation pontoon.
According to the offshore platform system provided by the invention, the offshore platform system further comprises a water depth sensor and a controller;
the water depth sensor and the flow control valve are both connected with the controller; the plurality of water depth sensors are arranged in the circumferential direction of the bearing piece and used for detecting the depth information of the seabed platform, and the controller adjusts the opening degree of the flow control valve according to the depth information.
According to the offshore platform system provided by the invention, the offshore platform further comprises a support, one end of the support is connected with the bearing part, and the other end of the support is used for anchoring to the seabed.
According to the offshore platform system provided by the invention, the bearing part comprises a first frame and a first buoyancy layer, and the first buoyancy layer is embedded in the first frame.
According to the offshore platform system provided by the invention, the operation and maintenance platform comprises a base and a lifting mechanism;
the lifting mechanism is arranged on one side of the base and is used for being connected with the distribution system, and the lifting mechanism can drive the distribution system to descend or ascend so that the distribution system sinks to the seabed or is lifted to the base.
According to the offshore platform system provided by the invention, the base comprises a second frame and a second buoyancy layer, and the second buoyancy layer is embedded in the second frame.
According to the offshore platform system provided by the invention, the lifting mechanism comprises a reel, a mooring rope and a driving piece;
the mooring rope is wound on the winding drum, the free end of the mooring rope is connected with the distributing system, and the driving piece is used for driving the winding drum to rotate so as to realize ascending or descending of the distributing system.
According to the offshore platform system provided by the invention, the base is provided with a first opening, the bearing piece is provided with a second opening, and the first opening and the second opening are arranged oppositely along the vertical direction; the tether can be threaded through the first opening and the second opening for guiding the raising and lowering of the deployment system.
According to the offshore platform system provided by the invention, the offshore platform further comprises a limiting piece, wherein the limiting piece is arranged in the circumferential direction of the second opening and is obliquely arranged on one side of the bearing piece.
According to the offshore platform system provided by the invention, the seabed platform comprises the bearing part and the buoyancy assembly, the bearing part can bear materials, the buoyancy of the buoyancy assembly enables the seabed platform to float on the sea surface, the transportation of the seabed platform is facilitated, the seabed platform can sink on the seabed by adjusting the buoyancy of the buoyancy assembly, the operation and maintenance platform is convenient for operators to regularly maintain the offshore platform system, and the offshore platform system is not only beneficial to reducing the construction cost, but also beneficial to improving the convenience of operation and maintenance.
Drawings
In order to more clearly illustrate the technical solutions of the present invention or the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic structural view of an offshore platform system provided by the present invention;
FIG. 2 is one of the schematic structural views of the subsea platform provided by the present invention;
FIG. 3 is a second schematic structural view of the subsea platform provided by the present invention;
FIG. 4 is a schematic structural diagram of an operation and maintenance platform provided by the present invention;
FIG. 5 is an assembled schematic view of a deployment system provided by the present invention;
FIG. 6 is a schematic illustration of the transport of a subsea platform provided by the present invention;
FIG. 7 is a schematic transportation diagram of the operation and maintenance platform provided by the present invention;
reference numerals: 1: an operation and maintenance platform; 101: a base; 102: a lifting mechanism; 1021: a reel; 1022: mooring a cable; 1023: a drive member; 103: a fence; 104: a balancing weight; 105: a warning light; 106: a beacon light; 2: a mooring line; 3: a subsea platform; 301: a carrier; 302: a buoyancy assembly; 3021: a float bowl; 3022: a U-shaped clamp; 303: a support member; 3031: a support leg; 3032: an anchor seat; 3033: a lifting eye screw; 304: a limiting member; 4: a laying system; 401: a docking box; 402: a camera assembly; 403: a sensor assembly; 404: a distribution frame; 5: a sea cable; 6: a tug; 7: a streamer.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
An offshore platform system according to an embodiment of the invention is described below with reference to fig. 1 to 7.
As shown in fig. 1, fig. 2 and fig. 5, an offshore platform system provided by an embodiment of the present invention includes: the system comprises a seabed platform 3, an operation and maintenance platform 1 and mooring lines 2; the seabed platform 3 is used for being fixed on the seabed, the seabed platform 3 is connected with the operation and maintenance platform 1 through a mooring cable 2, and the operation and maintenance platform 1 can be suspended on the sea surface; the seabed platform 3 comprises a bearing member 301 and a buoyancy assembly 302, wherein one side of the bearing member 301 can bear materials, and the buoyancy assembly 302 is arranged on the other side of the bearing member 301; the buoyancy assembly 302 has a first state in which the subsea platform 3 is able to float at the surface of the sea and a second state in which the subsea platform 3 is able to sink to the sea.
Specifically, the offshore platform system comprises a seabed platform 3, an operation and maintenance platform 1 and mooring cables 2, wherein the seabed platform 3 is fixed on the seabed, the operation and maintenance platform 1 is suspended on the sea surface, the operation and maintenance platform 1 is connected with the seabed platform 3 through the mooring cables 2, and the mooring cables 2 can be steel wire cables. The operation and maintenance platform 1 is used for providing a working platform for operators to check and maintain the laying system 4 sinking on the sea bottom. The operation and maintenance platform 1 can be connected with the distribution system 4 through a steel wire rope, the distribution system 4 comprises a distribution frame 404, a connection box 401, a camera module 402, a sensor module 403 and the like are fixedly installed on the distribution frame 404, and the camera module 402 and the sensor module 403 are used for collecting various parameters of the seabed. The submarine cable 5 is laid on the seabed, one end of the submarine cable 5 is connected with the connection box 401, and the other end of the submarine cable 5 is connected with a base station on the coast.
The seabed platform 3 includes and holds carrier 301 and buoyancy module 302, and the size that holds carrier 301 sets up according to actual demand, and it can be square to hold carrier 301, holds carrier 301 and has relative top surface and bottom surface, and the top surface that holds carrier 301 can place parts such as submarine cable 5 and construction tool that wait to lay, and buoyancy module 302 is fixed in the bottom surface of loading board. The buoyancy assembly 302 may be a buoy, buoyancy tank, or the like, the buoyancy assembly 302 having a first state and a second state. In the first state, the buoyancy of the buoyancy assembly 302 is constant, and the buoyancy of the buoyancy assembly 302 enables the subsea platform 3 to float on the sea surface; in the second state, the buoyancy of the buoyancy assembly 302 can be gradually reduced, and the seabed platform 3 gradually sinks along with the gradual reduction of the buoyancy until the seabed is sunk.
In the following, a process of constructing the offshore platform system is described, in which the submarine cable 5 to be laid, a construction tool and other components are placed on the carrier 301, and the buoyancy assembly 302 is in the first state, and the buoyancy of the buoyancy assembly 302 enables the seabed platform 3 to float on the sea surface. The components such as the seabed platform 3 and the submarine cable 5 to be laid and placed on the seabed platform 3 can be hauled to the construction position in the sea area through the small tug. The operation and maintenance platform 1 can also be hauled to a construction position in the sea area by a small tug. After the seabed platform 3 and the operation and maintenance platform 1 are hauled to the construction position, one end of each steel wire cable is tied to the seabed platform 3, the number of the steel wire cables is set according to actual requirements, for example, the number of the steel wire cables is four, and the four steel wire cables are respectively connected with the four end positions of the bearing piece 301. After one end of the steel cable is tied to the bearing member 301, the buoyancy assembly 302 is in the second state, and the seabed platform 3 begins to sink, and as the buoyancy of the buoyancy assembly 302 is gradually reduced, the seabed platform 3 gradually sinks until the seabed platform 3 sinks to the seabed, and after the seabed platform 3 sinks to the seabed, the seabed platform 3 can be fixed to the seabed through the anchoring members. After the seabed platform 3 is fixed on the seabed, the other end of the steel cable is tied to the operation and maintenance platform 1, one end of the steel cable is connected with the seabed platform 3, the other end of the steel cable is connected with the operation and maintenance platform 1, the steel cable is in a loose state at the moment, and the operation and maintenance platform 1 is guaranteed to be reliably suspended on the sea surface. The components such as the seabed platform 3, the operation and maintenance platform 1, the mooring cable 2, the submarine cable 5 to be laid and the like can be towed to the construction position of the sea area through the small-sized tugboat, and the construction cost of the offshore platform system is favorably reduced.
The seabed platform 3 is used as an anchoring part of the operation and maintenance platform 1, so that the operation and maintenance platform 1 can be suspended in a target area on the sea surface for a long time, when the offshore platform system is maintained regularly, an operator arrives at the operation and maintenance platform 1 to lift the deployment system 4 from the seabed onto the operation and maintenance platform 1, and the operator can maintain and maintain the observation system arranged on the deployment frame 404 on the operation and maintenance platform 1. For example, the operation and maintenance operations such as replacing a storage battery in the connection box 401 or replacing a damaged electrical component in the connection box 401 ensure the reliable operation of the offshore platform system.
In the embodiment of the invention, the seabed platform 3 comprises the bearing part 301 and the buoyancy component 302, the bearing part 301 can bear materials, the buoyancy of the buoyancy component 302 enables the seabed platform 3 to float on the sea surface, so that the seabed platform 3 is convenient to transport, the seabed platform 3 can sink on the seabed by adjusting the buoyancy of the buoyancy component 302, the operation and maintenance platform 1 is convenient for operators to regularly maintain the offshore platform system, and the offshore platform system is not only beneficial to reducing the construction cost, but also beneficial to improving the convenience of operation and maintenance.
As shown in FIG. 3, in an alternative embodiment, the buoyancy assembly 302 includes a buoy 3021 and a fastener; a plurality of pontoons 3021 are provided on the other side of carrier 301, pontoons 3021 being connected to carrier 301 by fasteners; buoy 3021 has a water inlet line with a flow control valve on it, and fluid can flow into buoy 3021 when the flow control valve is open.
Specifically, buoyancy module 302 includes a pontoon 3021 and a fastener, with pontoon 3021 being secured to the bottom surface of carrier 301 by the fastener. The number of buoys 3021 is set according to actual requirements, for example, the number of the buoys 3021 is four, and four buoys 3021 are distributed around the bottom surface of the carrier 301 at intervals; for example, six pontoons 3021 are provided, and six pontoons 3021 are spaced apart from each other on the bottom surface of the carrier 301. Pontoons 3021 are secured to the bottom surface of carrier 301 by fasteners, which may be U-shaped clips 3022, with each pontoon 3021 being secured to the bottom surface of carrier 301 by a plurality of U-shaped clips 3022.
The float 3021 has a water inlet line, and the water inlet line is provided with a flow control valve, and the water inlet line can be arranged on the end surface of the float 3021, and the flow control valve can be an electrically controlled valve, and the flow control valve is opened, so that seawater can enter the float 3021 along the water inlet line. When the seabed platform 3 reaches the construction position of the sea area and the seabed platform 3 needs to sink towards the seabed, the flow control valve is opened firstly, the seawater flows into the buoy 3021 through the water inlet pipeline, the buoyancy of the buoy 3021 is gradually reduced along with the gradual flow of the seawater into the buoy 3021, and the seabed platform 3 sinks towards the seabed along with the reduction of the buoyancy until the seabed platform 3 sinks to the seabed. After the seabed platform 3 is sunk to the seabed, the seabed platform 3 can be anchored at a target position on the seabed through the anchoring member.
When buoy 3021 is in the first, sealed state, buoy 3021 is able to provide the required buoyancy for towing subsea platform 3; when the seabed platform 3 reaches the construction position of the sea area, the valve of the flow control valve of the buoy 3021 is opened, the buoy 3021 is in the second state, seawater flows into the buoy 3021, the buoyancy of the buoy 3021 is gradually reduced, the gravity of the seabed platform 3 is gradually increased, the seabed platform 3 sinks into the seabed under the action of gravity, and other installation equipment is not needed, so that the construction cost is favorably reduced.
In the embodiment of the present invention, the buoy 3021 is fixed on the bottom surface of the carrier 301 by a fastener, so that the seabed platform 3 can float on the sea surface and can sink to the seabed under the condition of reduced buoyancy by virtue of the buoyancy change of the buoy 3021, thereby ensuring the transportation and sinking reliability of the seabed platform 3.
In an alternative embodiment, the offshore platform system further comprises a water depth sensor and a controller; the water depth sensor and the flow control valve are both connected with the controller; the water depth sensors are arranged in the circumferential direction of the bearing member 301 and used for detecting the depth information of the seabed platform 3, and the controller adjusts the opening degree of the flow control valve according to the depth information.
Specifically, the offshore platform system further comprises a water depth sensor and a controller, wherein the water depth sensor is mounted on the seabed platform 3, and the number of the water depth sensors is set according to actual requirements. For example, the number of the water depth sensors is four, the four water depth sensors are respectively installed at four corner positions of the carrier 301 along the circumferential direction of the carrier 301, and the water depth sensors are used for detecting the depth information of the seabed platform 3 relative to the sea level. The water depth sensor and the flow control valve on the buoy 3021 are both connected to the controller, and the controller adjusts the opening of the valve core of the flow control valve according to the depth information detected by the water depth sensor.
And in the process that the seabed platform 3 sinks towards the seabed, the water depth sensor detects the depth information of the seabed platform 3 in real time. For example, the bottom surface of the carrier 301 is divided into four areas, each area is provided with a buoy 3021, and the four areas are defined as a first area, a second area, a third area and a fourth area; the first area, the second area, the third area and the fourth area are respectively provided with a water depth sensor, and the four water depth sensors are used for simultaneously detecting the depth information of the four areas. For example, if it is detected that the depth information at the first area is smaller than the depth information at other positions, indicating that the first area of the subsea platform 3 has an upward inclination trend relative to the other areas, the controller increases the opening degree of the valve core of the flow control valve on the float 3021 at the first area, and increases the water inflow of the float 3021 at the first area, so that the first area is accelerated to sink until the four areas are in an equilibrium state.
In the sinking process of the seabed platform 3, the water depth sensor detects the depth information of a plurality of positions of the seabed platform 3 in real time, the controller controls the opening of a valve core of a flow control valve on the buoy 3021 according to water depth data, so as to adjust the inflow flow of the buoy 3021 corresponding to each position, thereby effectively avoiding the phenomena of rollover and the like of the seabed platform 3 due to uneven stress in the sinking process and ensuring that the seabed platform 3 sinks stably.
In the embodiment of the invention, in the sinking process of the seabed platform 3, the depth sensor detects the depth information of the seabed platform 3 in real time, and the controller adjusts the opening of the flow control valve on the buoy 3021 according to the depth information, so as to control the inflow of the buoy 3021 and ensure that the seabed platform 3 sinks stably.
As shown in fig. 2 and 3, in an alternative embodiment, the subsea platform 3 further comprises a support 303, one end of the support 303 being connected to the carrier 301, and the other end of the support 303 being adapted to be anchored to the seabed.
Specifically, support member 303 and carrier 301 are a certain inclination angle setting, and the quantity of support member 303 sets up according to actual demand, and for example the quantity of support member 303 is four, and four support member 303 are along the circumference equipartition that carries carrier 301, and support member 303 is favorable to increasing the support area of seabed platform 3, promotes the steadiness that seabed platform 3 is fixed in the seabed. The support member 303 comprises a leg 3031 and an anchor base 3032, one end of the leg 3031 being connected to an end of the carrier 301 and the other end of the leg 3031 being connected to the anchor base 3032, the anchor base 3032 being adapted for anchoring connection to the seabed.
Be provided with eyebolt 3033 on landing leg 3031, eyebolt 3033 locates landing leg 3031 and keeps away from the one end that holds carrier 301, and the one end of steel wire cable can be tie down on eyebolt 3033, and the other end tie of steel wire cable is on fortune dimension platform 1, is favorable to increasing the steel wire cable for the angle that opens of fortune dimension platform 1's central line, and then is favorable to guaranteeing the stability of fortune dimension platform 1 on the sea.
In the embodiment of the present invention, the plurality of supporting members 303 are obliquely arranged on the circumference of the supporting member 301, the seabed platform 3 is fixed on the seabed through the plurality of supporting members 303, so as to ensure the stability of the fixing of the seabed platform 3, one end of the mooring cable 2 is connected to one end of the supporting leg 3031 far away from the supporting member 301, and the other end of the mooring cable 2 is connected to the operation and maintenance platform 1, which is favorable for the stability of the operation and maintenance platform 1.
In an alternative embodiment, the carrier 301 comprises a first frame and a first buoyant layer embedded within the first frame.
In particular, the carrier 301 may be a square, the carrier 301 comprising a first frame and a first buoyancy layer. First frame can adopt shaped steel such as angle steel, channel-section steel or I-steel to splice and form frame construction, and first frame adopts many shaped steel to splice and forms frame construction, and frame construction is formed with a plurality of accommodation spaces. The first buoyancy layer comprises a plurality of buoyancy blocks, and the buoyancy blocks are made of buoyancy materials, for example, the buoyancy materials can be polyurethane foam materials, copolymer foam materials, composite foam materials, synthetic composite foam materials and the like. The size of buoyancy piece and accommodation space's size phase-match imbeds the buoyancy piece in the accommodation space, and the buoyancy piece can be connected with frame construction through the fastener, and the fastener can be the screw.
The first frame ensures that the bearing piece 301 has enough strength and can bear materials such as a submarine cable 5, a construction tool and the like; the first buoyancy layer provides the carrier 301 with a certain buoyancy, and the buoyancy provided by the buoy 3021 and the buoyancy provided by the first buoyancy layer ensure the reliability of the floating of the seabed platform 3 on the sea surface.
In the embodiment of the present invention, the bearing member 301 includes the first frame and the first buoyancy layer, which not only can ensure the structural strength of the subsea platform 3, but also can further enhance the buoyancy of the subsea platform 3, thereby ensuring the reliability of hauling the subsea platform 3.
As shown in fig. 4, in an alternative embodiment, the operation and maintenance platform 1 comprises a base 101 and a lifting mechanism 102; the lifting mechanism 102 is disposed on one side of the base 101, the lifting mechanism 102 is used for connecting with the deployment system 4, and the lifting mechanism 102 can drive the deployment system 4 to descend or ascend, so that the deployment system 4 sinks to the sea bottom or is lifted to the base 101.
Specifically, the operation and maintenance platform 1 comprises a base 101 and a lifting mechanism 102, wherein the lifting mechanism 102 is installed on the top surface of the base 101. The base 101 is provided with a working area, and the size of the base 101 is convenient for an operator to perform operation and maintenance on the operation and maintenance platform 1. Lifting mechanism 102 is capable of lowering deployment system 4 to the sea floor while lifting mechanism 102 is capable of lifting deployment system 4 to the sea surface.
In the prior art, the laying frame positioned at the seabed is connected with the floating ball positioned at the sea, the floating ball target is small, time is consumed for searching the target floating ball during operation and maintenance, the floating ball at the sea and the laying frame at the seabed are not in the same vertical position, and the positioning of the laying frame is difficult. When the platform is overhauled and maintained, an operator is conveyed to a floating ball position on the sea surface through the large ship, the operator submerges into the seabed position, the lifting rope hook is fixed on the lifting ring of the distribution frame, the distribution frame is salvaged from the seabed through the lifting equipment, the operator overhauls and maintains parts such as a connection box and the like arranged on the distribution frame on the large ship, and the operation and maintenance cost is high.
In the invention, when operation and maintenance operation needs to be performed on the deployment system 4, an operator can arrive at the operation and maintenance platform 1 by using a motor boat, the operator gets on the operation and maintenance platform 1, the deployment system 4 is lifted to the operation and maintenance platform 1 by using the lifting mechanism 102, the operator performs maintenance and repair on the operation and maintenance platform 1 on the components such as the docking box 401, and after the maintenance is completed, the deployment system 4 is sunk to the seabed by using the lifting mechanism 102.
In the embodiment of the present invention, the lifting mechanism 102 is installed on the top surface of the base 101, the seabed deployment system 4 can be lifted to the operation and maintenance platform 1 by the lifting mechanism 102, and the operation and maintenance work is performed on the operation and maintenance platform 1 by the operator, which is beneficial to reducing the operation and maintenance cost of the offshore platform system.
In an alternative embodiment, the base 101 comprises a second frame and a second buoyant layer embedded within the second frame.
Specifically, the base 101 may be a square body, and the base 101 includes a second frame and a second buoyant layer. The second frame can adopt shaped steel such as angle steel, channel-section steel or I-steel to splice and form frame construction, and the second frame adopts many shaped steel to splice and forms frame construction, and frame construction is formed with a plurality of accommodation spaces. The second buoyancy layer comprises a plurality of buoyancy blocks, and the buoyancy blocks are made of buoyancy materials, for example, the buoyancy materials can be polyurethane foam materials, copolymer foam materials, composite foam materials, synthetic composite foam materials and the like. The size of buoyancy piece and accommodation space's size phase-match imbeds the buoyancy piece in the accommodation space, and the buoyancy piece can be connected with frame construction through the fastener, and the fastener can be the screw. The second frame secures the base 101 with sufficient strength; the second buoyancy layer enables the base 101 to have certain buoyancy, and the operation and maintenance platform 1 can be suspended on the sea surface.
As shown in fig. 6 and 7, in the construction stage, the seabed platform 3 and the operation and maintenance platform 1 can be towed to the construction position of the sea area by a small towing vessel 6, and the towing vessel 6 is connected with the seabed platform 3 or the operation and maintenance platform 1 by a towing cable 7. The seabed platform 3 and the operation and maintenance platform 1 are hauled to the construction position of the sea area, one end of a mooring cable 2 is connected with a lifting bolt 3033 on a supporting leg 3031 of the seabed platform 3, a flow control valve of a buoy 3021 is opened, the opening degree of a valve core of the flow control valve is adjusted through a controller, so that the seabed platform 3 is stably sunk to the seabed, and the supporting leg 3031 is fixed at the seabed through an anchoring piece. The other end of the mooring cable 2 is connected with a hook on the operation and maintenance platform 1, and the tightness of the mooring cable 2 is adjusted, so that the mooring cable 2 is always in a loose state, and the operation and maintenance platform 1 is guaranteed to be reliably suspended in a target area of the sea surface above the seabed platform 3. One end of the submarine cable 5 is connected with the connection box 401, and the connection box 401 is fixed on the distribution frame 404. The deployment system 4 is lowered to the sea bottom by the lifting mechanism 102, and when maintenance is required, the deployment system 4 is lifted to the base 101 by the lifting mechanism 102.
Further, be provided with rail 103 along the circumference of base 101, rail 103 comprises many horizontal poles and montants concatenation, and when the operation personnel went on base 101 and maintain the operation, rail 103 was favorable to ensureing operation personnel's safety.
The bottom surface of base 101 sets up balancing weight 104, and the quantity of balancing weight 104 sets up according to actual demand, and every tip of base 101 all is provided with a balancing weight 104 for example, ensures the stationarity that fortune dimension platform 1 suspends in the sea.
The top surface of the fence 103 is provided with a warning light 105 and a navigation mark light 106, the number of the warning light 105 and the navigation mark light 106 is set according to actual requirements, for example, one end of the fence 103 is provided with one warning light 105 and two navigation mark lights 106, and the other end of the fence 103 is also provided with one warning light 105 and two navigation mark lights 106.
In the embodiment of the present invention, the base 101 includes the second frame and the second buoyancy layer, which can ensure the structural strength of the operation and maintenance platform 1 and ensure that the operation and maintenance platform 1 can reliably suspend on the sea surface.
As shown in fig. 4, in an alternative embodiment, the lifting mechanism 102 includes a drum 1021, a tether 1022, and a drive member 1023; the mooring cable 1022 is wound on the drum 1021, the free end of the mooring cable 1022 is connected with the deployment system 4, and the driving member 1023 is used for driving the drum 1021 to rotate so as to realize the ascending or descending of the deployment system 4.
Specifically, the lifting mechanism 102 includes a drum 1021, a tether 1022, a driving member 1023, and a frame, wherein the frame is fixed on the base 101, the drum 1021, the tether 1022, and the driving member 1023 are mounted on the frame, the tether 1022 is wound around the drum 1021, and a free end of the tether 1022 is connected to the deployment system 4. The driving member 1023 is used for driving the drum 1021 to rotate forwards or backwards so as to realize the cable winding operation or the cable unwinding operation of the mooring cable 1022, and the driving member 1023 can be a motor.
For example, the motor drives the drum 1021 to rotate clockwise, the laying system 4 is placed into the seabed through the cable laying operation, and after the laying system 4 is sunk into the seabed, the tightness of the mooring cable 1022 is adjusted, so that when the operation and maintenance platform 1 drifts in a local area on the sea surface, the mooring cable 1022 between the operation and maintenance platform 1 and the laying system 4 is always in a loose state, the laying system 4 is prevented from being pulled out of the seabed, and the reliable operation of the offshore platform system is guaranteed. The motor drives the drum 1021 to rotate in a counterclockwise direction, and the deployment system 4 is lifted to the operation and maintenance platform 1 through the cable retracting operation. The driving member 1023 can also be a handle, and the winding drum 1021 is driven to rotate in a clockwise direction or a counterclockwise direction by rotating the handle, so as to realize the cable winding operation or the cable unwinding operation of the mooring cable 1022.
In the embodiment of the present invention, the mooring line 1022 is wound on the drum 1021, the free end of the mooring line 1022 is connected to the deployment system 4, and the driving member 1023 drives the drum 1021 to rotate, so as to drive the deployment system 4 to descend or ascend, so that the deployment system 4 can be submerged into the sea bottom or lifted to the operation and maintenance platform 1, which is beneficial to reducing the cost of operation and maintenance work and improving the convenience of operation and maintenance work.
As shown in fig. 1 to 4, in an alternative embodiment, the base 101 is provided with a first opening, the carrier 301 is provided with a second opening, and the first opening and the second opening are arranged opposite to each other in a vertical direction; the mooring line 1022 can be threaded through a first opening and a second opening for guiding the raising and lowering of the deployment system 4.
Specifically, the base 101 is provided with a first opening, the carrier 301 is provided with a second opening, and an orthographic projection of the first opening is located in an area where the second opening is located. The first opening is located right below the reel 1021, and during sinking of the deployment system 4, the mooring line 1022 passes through the area of the first opening and further passes through the area of the second opening until the deployment system 4 sinks to the target position on the seabed. Due to the mobility of the seawater, when the mooring line 1022 moves in the vertical direction, the mooring line 1022 may drift, and the movement trajectory of the mooring line 1022 may be deviated from the target trajectory. In the process of sinking the deployment system 4 or lifting the deployment system 4, the first opening and the second opening can limit the floating range of the mooring line 1022, guide the mooring line 1022 to move in the vertical direction, ensure that the deployment system 4 is accurately placed at the target position of the sea bottom, or stably lift the deployment system 4 to the operation and maintenance platform 1, and facilitate the convenience of operation and maintenance.
The first opening and the second opening are arranged oppositely in the vertical direction, so that the mooring rope 1022 can ascend or descend in the vertical direction, and meanwhile, the lifting mechanism 102 does not need to be suspended outside the operation and maintenance platform 1, and the compactness of the platform structure is facilitated.
As shown in fig. 1, 2 and 3, in an alternative embodiment, the seabed platform 3 further comprises a limiting member 304, and the limiting member 304 is disposed in the circumferential direction of the second opening and is disposed in an inclined manner at one side of the carrier 301.
Specifically, the second opening is U-shaped or trapezoidal, for example, the second opening is U-shaped, the second opening has three connected segments, the limiting member 304 is disposed at the second opening, and the limiting member 304 includes three limiting plates connected in sequence. The three limiting plates are respectively connected with the three sections of the second opening, the limiting plates are obliquely arranged on the top surface of the bearing piece 301, the three limiting plates are sequentially connected, and the three limiting plates and the second opening form a channel in a horn mouth shape. The area enclosed by the second opening and the stopper 304 can further limit the floating range of the mooring line 1022, so that the mooring line 1022 can move in the vertical direction, and the deployment system 4 can be stably raised or lowered in the vertical direction.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. An offshore platform system, comprising: the system comprises a seabed platform, an operation and maintenance platform and mooring lines;
the seabed platform is used for being fixed on the seabed, the seabed platform is connected with the operation and maintenance platform through the mooring cable, and the operation and maintenance platform can be suspended on the sea surface;
the seabed platform comprises a bearing piece and a buoyancy assembly, wherein one side of the bearing piece can bear materials, and the buoyancy assembly is arranged on the other side of the bearing piece; the buoyant assembly has a first state in which the subsea platform is capable of floating on the surface of the sea and a second state in which the subsea platform is capable of sinking on the sea.
2. The offshore platform system of claim 1, wherein the buoyancy assembly comprises a buoy and a fastener;
the plurality of floating cylinders are arranged on the other side of the bearing piece and connected with the bearing piece through the fasteners; the flotation pontoon has the inlet channel, be equipped with flow control valve on the inlet channel under the condition that flow control valve is opened, fluid can flow in inside the flotation pontoon.
3. The offshore platform system of claim 2, further comprising a water depth sensor and a controller;
the water depth sensor and the flow control valve are both connected with the controller; the plurality of water depth sensors are arranged in the circumferential direction of the bearing piece and used for detecting the depth information of the seabed platform, and the controller adjusts the opening degree of the flow control valve according to the depth information.
4. The offshore platform system of claim 1, further comprising a support member having one end connected to the carrier member and another end for anchoring to the sea floor.
5. The offshore platform system of claim 1, wherein the carrier comprises a first frame and a first buoyant layer embedded within the first frame.
6. The offshore platform system of claim 1, wherein the operation and maintenance platform comprises a base and a lifting mechanism;
the lifting mechanism is arranged on one side of the base and is used for being connected with the distribution system, and the lifting mechanism can drive the distribution system to descend or ascend so that the distribution system sinks to the seabed or is lifted to the base.
7. The offshore platform system of claim 6, wherein the base comprises a second frame and a second buoyant layer embedded within the second frame.
8. The offshore platform system of claim 6, wherein the lift mechanism includes a drum, a tether, and a drive;
the mooring rope is wound on the winding drum, the free end of the mooring rope is connected with the distributing system, and the driving piece is used for driving the winding drum to rotate so as to realize ascending or descending of the distributing system.
9. The offshore platform system of claim 8, wherein the base defines a first opening and the carrier defines a second opening, the first opening being vertically aligned with the second opening; the tether can be threaded through the first opening and the second opening for guiding the raising and lowering of the deployment system.
10. The offshore platform system of claim 9, further comprising a stop member disposed circumferentially about the second opening and disposed angularly to one side of the carrier.
CN202211379909.3A 2022-11-04 2022-11-04 Offshore platform system Pending CN115649375A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211379909.3A CN115649375A (en) 2022-11-04 2022-11-04 Offshore platform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211379909.3A CN115649375A (en) 2022-11-04 2022-11-04 Offshore platform system

Publications (1)

Publication Number Publication Date
CN115649375A true CN115649375A (en) 2023-01-31

Family

ID=85015987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211379909.3A Pending CN115649375A (en) 2022-11-04 2022-11-04 Offshore platform system

Country Status (1)

Country Link
CN (1) CN115649375A (en)

Similar Documents

Publication Publication Date Title
CN106794887B (en) method for constructing offshore structure and offshore structure
US3540396A (en) Offshore well apparatus and system
CN101774422B (en) Novel offshore installation construction resource-combined type pontoon barge
EP3436335B1 (en) Method for installing a subsea structure
CN105366005A (en) Mooring anchor leg replacement method
CN106677258A (en) Installing process of offshore water taking head caisson of power plant
CA2916763A1 (en) Platform for tidal turbines
CN101927812B (en) Mating of buoyant hull structure with truss structure
US3677310A (en) Method for connection of an underwater riser to a floating facility
CN106628024B (en) Overwater piling operation platform
CN115649375A (en) Offshore platform system
CN115653002A (en) Long-distance underwater transportation method for immersed tube
US3690111A (en) Offshore pipeline installation method
JPH0656076A (en) Submarine cable laying construction method and laying work ship thereof
CN106335608A (en) Mounting method of seabed anchor
RU2714336C1 (en) Underwater positioning system of "dome" type device for liquidation of underwater oil spills
US20120082530A1 (en) System and method for submerging a hydraulic turbine engine
JP2020019440A (en) Floating body device
CN104805819B (en) The folding method of cantilever beam
KR20130003914A (en) Method for mounting azimuth thruster for ship on land
JPH0860645A (en) Construction method of underwater structure
CN218343688U (en) Spud pile structure of ship for water construction
JP2024034110A (en) Installation method of tension moored floating body and installation structure of tension moored floating body
CN115285653A (en) Ocean transportation device and method for large-segment steel box girder
KR101810237B1 (en) Installation of thruster underwater drill ship

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230410

Address after: 226010 No.3 Xinkai South Road, Nantong Economic and Technological Development Zone, Jiangsu Province

Applicant after: ZHONGTIAN TECHNOLOGY MARINE SYSTEMS Co.,Ltd.

Address before: 226407 Yangkou Port Business Building, Yangkou Port Economic Development Zone, Rudong County, Nantong City, Jiangsu Province

Applicant before: ZHONGTIAN TECHNOLOGY MARINE SYSTEMS Co.,Ltd.

Applicant before: JIANGSU ZHONGTIAN TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right