CN115600426A - Intelligent building construction simulation analysis system - Google Patents

Intelligent building construction simulation analysis system Download PDF

Info

Publication number
CN115600426A
CN115600426A CN202211387843.2A CN202211387843A CN115600426A CN 115600426 A CN115600426 A CN 115600426A CN 202211387843 A CN202211387843 A CN 202211387843A CN 115600426 A CN115600426 A CN 115600426A
Authority
CN
China
Prior art keywords
module
construction
simulation
data
analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211387843.2A
Other languages
Chinese (zh)
Inventor
楼矗云
任兵
李诚鄀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN202211387843.2A priority Critical patent/CN115600426A/en
Publication of CN115600426A publication Critical patent/CN115600426A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/252Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/20Configuration CAD, e.g. designing by assembling or positioning modules selected from libraries of predesigned modules
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14Force analysis or force optimisation, e.g. static or dynamic forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Geometry (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Computer Hardware Design (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Evolutionary Computation (AREA)
  • Data Mining & Analysis (AREA)
  • Pure & Applied Mathematics (AREA)
  • Mathematical Optimization (AREA)
  • Development Economics (AREA)
  • Mathematical Analysis (AREA)
  • Educational Administration (AREA)
  • Computational Mathematics (AREA)
  • Game Theory and Decision Science (AREA)
  • Structural Engineering (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a simulation analysis system for intelligent construction, which comprises: the system comprises a central architecture, a database system and a functional system, wherein the central architecture comprises a BIM modeling simulation module, an environmental data analysis module and a summary evaluation report module, and the environmental data analysis module and the summary evaluation report module are connected to the BIM modeling simulation module; the database system is connected with the BIM modeling simulation module and comprises a virtual building construction module and a data retrieval module; the function system comprises a data acquisition module, a cloud storage module and a big data search module, the cloud storage module is connected to the data acquisition module and the big data search module, and the cloud storage module is further connected to the central architecture and the database system. The intelligent building construction simulation analysis system can plan the worker construction process and the optimal construction time period of the construction area, improves the construction progress of the project, reduces the construction error rate, reduces the resource waste and realizes harmonious sustainable development.

Description

Intelligent building construction simulation analysis system
Technical Field
The invention relates to the technical field of intelligent construction, in particular to an intelligent construction simulation analysis system.
Background
Wisdom building has two layers of implications: the harmonious development of the industry, harmonious and sustainable development with the nature, fine management and reduction of consumption and emission; and secondly, the industry is armed with an advanced digital nervous system, and the management of both the industry and the enterprise and the project is supported by an advanced informatization technology system, so that the management environment is fair and transparent, and the project management of the enterprise is efficient and fine. If the concept of 'intelligent construction' can go deep into the construction industry, the resource consumption and the carbon emission can be saved by at least more than 20%, the current situation of uneconomic scale at present is changed, the market concentration is improved, intensive operation is realized, and the laggard capacity is rapidly eliminated.
The patent number is "system for wisdom construction" of CN202210225406.4, this system passes through detection module with data transfer to exclusive server and analyzes, and the analysis result is shown in real time to the terminal, in time monitors place equipment to the record, improves the real-time, accuracy and the authenticity of data, and has improved the management and control level and the intelligent level of project backstage. However, the patent does not provide a reasonable and effective construction scheme, the construction error occurrence probability and the worker error occurrence rate are not reduced, the coordination relationship among the construction environment, the building and the worker construction can not be reasonably planned, the construction efficiency can not be improved, and the resources are wasted.
Disclosure of Invention
The invention aims to provide a simulation analysis system for intelligent construction, which can plan the construction flow of workers and the optimal construction time period of a construction area according to the environment, the construction and the construction conditions of the workers. The construction method has the advantages that people are oriented, the construction efficiency can be improved, the construction comfort of workers can be increased, the construction progress of engineering is improved, the construction error rate is reduced, the resource waste is reduced, and harmonious sustainable development is realized.
In order to solve the technical problem, the invention adopts the following technical scheme: the intelligent building construction simulation analysis system comprises the following contents:
the system comprises a central architecture, a data analysis module and a summary evaluation report module, wherein the central architecture comprises a BIM modeling simulation module, an environmental data analysis module and a summary evaluation report module, and the environmental data analysis module and the summary evaluation report module are connected to the BIM modeling simulation module;
the database system is connected with the BIM modeling simulation module and comprises a virtual building construction module and a data retrieval module;
the functional system comprises a data acquisition module, a cloud storage module and a big data search module, wherein the cloud storage module is connected to the data acquisition module and the big data search module, and the cloud storage module is further connected to the central architecture and the database system.
The data support is provided for the generation model through the database system, the generated model is adjusted in real time according to actual conditions through the functional system, all data of all parts in the system are stored, the data can be conveniently checked and corrected, a reasonable worker construction scheme can be generated, the construction comfort is optimized, and the construction efficiency is improved.
In the simulation analysis system for intelligent construction, the BIM modeling simulation module comprises a modeling module and a simulation module, and the simulation module is connected to the modeling module; the simulation module utilizes each construction node to separate the integral model and simulate a specific construction process; the modeling module generates different types of models according to the construction scheme. The BIM modeling simulation module is used for simulating the construction process and scheme, and then different types of purchased models are generated, so that the operation is intuitive for users, the construction error rate is reduced, and the resources are saved.
The intelligent building construction simulation analysis system comprises an environment data analysis module, a wind speed analysis module, a lighting analysis module, a humidity analysis module, a regional temperature difference analysis module and a time period summarization module, wherein the environment data analysis module is connected to a data acquisition module in a functional system, and each part of the environment data analysis module is also connected to a modeling module. The data acquisition module generates a scientific and reasonable construction scheme with high temperature timeliness according to factors such as wind speed, lighting, humidity, time period and temperature difference, and is more convenient to execute.
The intelligent building construction simulation analysis system comprises a humidity analysis module, a regional temperature difference analysis module, a simulation module and a temperature sensor, wherein the humidity analysis module and the regional temperature difference analysis module collect data information, generate a statistical chart and transmit the statistical chart to the simulation module. The statistical chart is generated according to the data information collected by the humidity analysis module and the regional temperature difference analysis module, so that the generated construction scheme is scientific and efficient, and the implementability is stronger.
The intelligent building construction simulation analysis system comprises a time period summarizing module, a humidity analysis module, an area temperature difference analysis module and a time period measuring module, wherein the time period summarizing module collects the surface pressure and the illumination incidence range of building stress in a time period and the variation range values of the humidity analysis module and the area temperature difference analysis module, and evaluates the appropriate time period in an area. The time period which is more reasonable and convenient for construction is analyzed, so that the collected data can better meet the actual construction requirements.
The intelligent building construction simulation analysis system comprises a worker timeliness evaluation module, a building regulation evaluation module and a summary report output module, wherein the worker timeliness evaluation module and the building regulation evaluation module are connected to the summary report output module; and all parts of the summary evaluation reporting module are connected with the simulation module. The method has the advantages that the evaluation is carried out according to actual construction, environment and worker construction conditions, so that the accuracy of worker construction is higher, construction errors are avoided, and the accuracy of an evaluation report is guaranteed according to scientific and effective specific data.
According to the intelligent building construction simulation analysis system, the worker aging evaluation module collects worker work efficiency data and influence efficiency data, and plans a construction flow and an optimal construction time period. Therefore, the actual data of the worker construction and the data influencing the worker construction are collected, and the comfort of the worker construction is ensured.
In the intelligent building construction simulation analysis system, the building regulation and evaluation module collects environmental data and transmits the environmental data to the simulation module; and the summary report output module outputs the evaluation result and lists the alternative schemes. Through the data acquisition and analysis, more schemes are output while the evaluation result is output, so that a user can conveniently select the schemes.
The intelligent building construction simulation analysis system is characterized in that the database system is connected to the modeling module, the virtual building construction module provides construction drawings and schemes for the modeling module, and the data retrieval module provides data material support for the modeling module. The construction scheme is more scientific through the data support of the database system, and the rationality of the specific construction scheme can be further improved through the data retrieval module.
The intelligent construction simulation analysis system comprises a data acquisition module, a remote sensing global image acquisition module, a space-time data acquisition module and a ground source data acquisition module, wherein all the modules in the data acquisition module are connected to a modeling module. The data acquisition module acquires real data such as environment and building, so that the effectiveness of the construction scheme is improved, the reference efficiency is high, the cost is saved, and the use experience of a user is optimized.
Compared with the prior art, the invention has the beneficial effects that:
1. the invention utilizes the BIM modeling simulation module to simulate construction, adds the timeliness simulation to the construction efficiency of workers, and evaluates the most suitable regional time period by analyzing the surrounding environment data; the influence of the environment on the construction timeliness of workers is evaluated, and the time period which is the most suitable for the environment of each area of the building is matched, so that the construction process of the workers and the optimal construction time period of the construction area are planned, the construction efficiency can be improved, and the construction comfort of the workers can be improved.
2. The building model is built by the modeling module, the simulation module is used for simulating the specific construction process of each node of the building, the faults, the omissions and the omissions are found, the key construction nodes are evaluated, the feasibility is judged, the intelligent integration simulation analysis is facilitated, the control on the construction safety is improved, the errors of manual judgment are reduced, and the execution efficiency of intelligent construction is improved.
3. The invention analyzes the influence of environmental factors on the building structure and materials through the environmental data analysis module, thereby adjusting building components and construction nodes, evaluating building materials adapting to the environment, having diversified functions, more perfect analysis on building construction and further improving the building quality.
4. The invention utilizes the BIM database to store BIM virtual building components of various types and specifications, and can utilize various components to carry out simulation construction during building evaluation, thereby providing convenience for construction engineering, reducing construction error rate, saving resources and realizing intelligent sustainable development.
Drawings
FIG. 1 is a schematic diagram of the system architecture of the present invention.
The invention is further described with reference to the following figures and detailed description.
Detailed Description
Example 1 of the invention: a simulation analysis system for intelligent construction comprises the following contents:
the system comprises a central architecture, a data analysis module and a summary evaluation report module, wherein the central architecture comprises a BIM modeling simulation module, an environmental data analysis module and a summary evaluation report module, and the environmental data analysis module and the summary evaluation report module are connected to the BIM modeling simulation module;
the database system is connected with the BIM modeling simulation module and comprises a virtual building construction module and a data retrieval module;
the cloud storage module is connected to the data acquisition module and the big data search module, and the cloud storage module is further connected to the central framework and the database system.
The intelligent construction can save resource consumption and carbon emission, change the current situation of current scale being uneconomical, promote the improvement of market concentration and realize intensive operation. Therefore, the simulation analysis system for intelligent building construction in the embodiment, as shown in fig. 1, not only can save resources and realize sustainable development, but also can reduce errors of manual judgment, reduce the influence of the judgment errors on building construction, improve the accuracy of decision judgment, and know the specific construction efficiency of workers. The specific construction efficiency of workers is influenced by the environment, so that the simulation analysis system for intelligent construction plans the factors of the workers, the buildings and the environment, and simultaneously generates a reasonable construction scheme, thereby being people-oriented and improving the construction comfort of the workers. In this embodiment, the simulation analysis system for intelligent construction includes a central architecture, a functional system and a database system. The functional system, the database system and the central architecture are operated based on a computer.
Specifically, the central architecture comprises a BIM modeling simulation module, an environmental data analysis module and a summary evaluation report module, wherein the BIM modeling simulation module is used for simulating construction by adopting building virtual components in a BIM database according to a construction scheme, judging construction flow and feasibility, adding the construction efficiency of workers to simulate timeliness, evaluating factors such as an optimal construction time period in a construction planning area, generating a specific construction scheme, and listing alternative schemes for a user to refer. And analyzing the environmental condition in the current area through an environmental data analysis module, and transmitting the actual data to a BIM modeling simulation module, so that the generated model and the construction scheme more meet the requirements of the current construction environment. And the BIM modeling simulation module is also connected with the summary evaluation report module, and the summary evaluation report module outputs the comprehensive analysis result to the BIM modeling simulation module connected with the summary evaluation report module, so that the model and the scheme of the BIM modeling simulation module are generated not only based on actual data, but also are scientifically and effectively analyzed to generate a model and a scheme which are more in line with the actual requirements of a building area, and are more real and effective. In the embodiment, the database system provides data support, so that the generated model and scheme are more scientific and rigorous, and the database system also provides data retrieval, thereby further enriching the data support condition of the model and scheme. And set up the high in the clouds storage module and save the data in this system, the high in the clouds storage module is based on the high in the clouds server, provides the data storage function to data mark time stamp, be used for data retrieval, big data search module connects Bima search engine, provides the function of searching according to building type and component keyword, and provides the download channel. The method is convenient for searching more building types and components and perfecting the reserves of the BIM database system. The user can check and proofread the building model and scheme in the later period. Therefore, the intelligent construction system can plan the optimal construction time period of the worker construction process and the construction area according to the environment, the building and the worker construction condition, reduces the construction error rate and improves the construction efficiency.
According to the simulation analysis system for intelligent construction, as shown in fig. 1, the BIM modeling simulation module includes a modeling module and a simulation module, and the simulation module is connected to the modeling module; the simulation module utilizes each construction node to separate the integral model and simulate a specific construction process; the modeling module generates different types of models according to the scheme of the construction drawing machine. As shown in fig. 1, in this embodiment, the BIM modeling simulation module is connected to the database system, and may stretch and stereoscopically build parameters of a virtual building component by using Revit software according to a construction drawing and a scheme, and then build a three-dimensional image model by using ContextCapture based on a BIM three-dimensional integration technology to obtain a building model, and separately model each stage in the overall model by using one or more of Revit, PKPM, and 3DsMax, and then arrange an overall model of each construction node. And the simulation module utilizes each construction node to separate the whole model, then according to the construction flow, simulates the concrete flow of construction of each node of the building, inspects the building components of each construction node, finds out the missing and missing vacancy, selects an alternative scheme, synchronously evaluates the key construction node, and compared with the traditional assembly node, the simulation module has higher feasibility. Therefore, the building components and construction nodes are adjusted, building materials adapting to the environment are evaluated, the functions are diversified, the analysis of building construction is more perfect, and the building quality is further improved. Therefore, in this embodiment, the simulation module is used to simulate the specific construction process of each node of the building, find out the faults, omissions and defects, evaluate key construction nodes, judge feasibility, facilitate intelligent integrated simulation analysis, evaluate construction process and construction feasibility, make construction management intelligent, improve control over construction safety, reduce errors of manual judgment, and improve execution efficiency of intelligent construction.
Example 2 of the invention: in the simulation analysis system for intelligent construction, as shown in fig. 1, an environmental data analysis module is connected to a data acquisition module in a functional system, the environmental data analysis module includes a wind speed analysis module, a lighting analysis module, a humidity analysis module, a regional temperature difference analysis module and a time period summarization module, and each part of the environmental data analysis module is further connected to a modeling module. In this embodiment, the environmental data analysis module performs further analysis operations on the collected data based on the data standby module. Specifically, the environment data analysis module comprises a wind speed analysis module, a lighting analysis module, a humidity analysis module, a regional temperature difference analysis module and a time period summarization module, wherein the wind speed analysis module constructs a wind speed vector analysis diagram according to air convection layer data by utilizing a two-three-dimensional integration technology, the wind speed vector analysis diagram is led into an integral model to obtain a surface pressure analysis diagram of a building subjected to wind power, and simulation change is carried out according to time, the lighting analysis module leads illumination into the integral model to carry out three-dimensional simulation according to change of topographic and topographic data and illumination data, and measures the angles and the illumination time of different regions of the building as lighting coefficients, so that a spectrogram is prepared, the spectrogram is input into an ENVI IDL, a second derivative formula is input to carry out calculation of a second derivative of the spectrum, the spectral characteristic value is enhanced, so that an illumination incidence range characteristic value is obtained, and simulation change is carried out according to the time. The overall model is closer to the actual environment condition, and the feasibility is higher.
According to the intelligent construction simulation analysis system, as shown in fig. 1, the humidity analysis module and the area temperature difference analysis module collect data information, generate a statistical chart, and transmit the statistical chart to the simulation module. In this embodiment, the humidity analysis module and the area temperature difference analysis module obtain a humidity change range and an area temperature difference change range of a building area according to a landform, a climate condition, a thermal imaging image and lighting data, input the humidity change range and the area temperature difference change range into the integral model, list a statistical chart, and change the model according to time. The whole model is more scientific and rigorous, the use efficiency is high, the construction error rate is reduced, and the reliability is high.
Example 3 of the invention: in the simulation analysis system for intelligent construction, as shown in fig. 1, a time period summarizing module collects the surface pressure and the illumination incidence range of construction stress in a time period, and the variation range values of a humidity analysis module and a regional temperature difference analysis module, and evaluates the appropriate time period in a region. In the embodiment, the time period summarizing module is used for summarizing the surface pressure of the building, the light incidence range, the humidity change range and the area temperature difference change range of the building under the wind force in the time period, so that the time period which is most suitable for the environment of each area of the building is evaluated. Through environmental data analysis module analysis all ring edge border data, judge that the building receives surface pressure, illumination incidence range, humidity variation range and the regional difference in temperature variation range of wind-force, each regional optimum regional time quantum of aassessment building, the workman can be under construction to corresponding region according to the optimum time quantum, both can improve the efficiency of construction, can increase workman construction comfort level again, comprehensive planning, the wisdom construction.
According to the intelligent simulation analysis system for construction, as shown in fig. 1, the summary evaluation report module comprises a worker aging evaluation module, a building adjustment evaluation module and a summary report output module, and the worker aging evaluation module and the building adjustment evaluation module are connected to the summary report output module; and all parts of the summary evaluation reporting module are connected with the simulation module. In this embodiment, the summary evaluation reporting module may perform objective analysis and evaluation on data generated according to the environment, the building and the worker construction conditions, simulate the construction process, judge the timeliness, and import the environment data analyzed by the environment data analysis module into the simulation module. Various factors influencing the construction of workers are analyzed, the optimal construction environment time is matched, and the construction efficiency can be improved. The influence of the environment on the construction timeliness of workers is evaluated by the summarizing and evaluating report module, and the time period which is the most suitable for the environment of each area of the building is matched, so that the construction process of the workers and the optimal construction time period of the construction area are planned, the time period which is the optimal construction environment is matched, the construction efficiency can be improved, and the construction comfort of the workers can be increased.
Example 4 of the invention: as shown in fig. 1, a worker aging evaluation module collects worker work efficiency data and influence efficiency data, and plans a construction process and an optimal construction time period. In this embodiment, the worker aging evaluation module is based on the simulation module to the normal work efficiency of the worker, simulate the construction process, judge the timeliness, and import the environmental data analyzed by the environmental data analysis module into the simulation, analyze the influence of wind power, illumination, humidity and regional temperature difference on the worker construction, and then match the most suitable time period of each regional environment of the building. Specifically, the environmental data analyzed by the environmental data analysis module is imported into simulation, the construction process is simulated by combining the normal working efficiency of workers in the environment, the timeliness in different environments is judged, the environmental parameter data with the highest timeliness are screened out by taking the timeliness as comparison, the optimal values of wind power, illumination, humidity and area temperature difference are analyzed by comprehensive judgment, the optimal values of the environment are matched with the time periods of all areas of the building, the time periods with the optimal environmental values are screened out, and therefore the construction process of workers and the optimal construction time periods of construction areas are planned. Controllable and intelligent construction is realized, resources are saved, and execution efficiency of intelligent construction is improved.
According to the intelligent construction simulation analysis system, as shown in fig. 1, the building regulation and evaluation module collects environmental data and transmits the environmental data to the simulation module; and the summary report output module outputs the evaluation result and lists the alternative schemes. In this embodiment, the building regulation evaluation module is connected to the simulation module, and can import the environmental data analyzed by the environmental data analysis module into the simulation, analyze the influence of wind power, illumination, humidity and regional temperature difference on building structures and materials, thereby adjust building components and construction nodes, and evaluate building materials adapted to the environment, and the summary report output module is used for outputting the summary evaluation schemes of the worker aging evaluation module and the building regulation evaluation module, and enumerates alternative schemes. The influence of wind power, illumination, humidity and regional temperature difference on building structures and materials is analyzed through the environmental data analysis module, so that building components and construction nodes are adjusted, building materials adaptive to the environment are evaluated, the functions are diversified, the building construction analysis is more perfect, and the building quality is further improved.
Example 5 of the invention: as shown in FIG. 1, the intelligent building construction simulation analysis system is characterized in that a database system is connected to a modeling module, a virtual building construction module provides construction drawings and schemes for the modeling module, and a data retrieval module provides data material support for the modeling module. In this embodiment, the BIM database is used to store various types and specifications of BIM virtual building components, the BIM virtual building components all correspond to actual building components in reality, and simultaneously provide a combination scheme of various BIM virtual building components, and the BIM database provides a component retrieval function, specifically: and searching according to the application scene of the component and the keywords of the building effect. The BIM database is used for storing BIM virtual building components of various types and specifications, and during building evaluation, various components can be used for simulation construction, so that convenience is brought to building engineering.
According to the intelligent construction simulation analysis system, as shown in fig. 1, the data acquisition module comprises a remote sensing global image acquisition module, a space-time data acquisition module and a ground source data acquisition module, and all the modules in the data acquisition module are connected to the modeling module. In this embodiment, the data acquisition module is used to collect the change range of the landform, climate condition, cloud coverage, thermal imaging image, air troposphere distribution and illumination data around the building in cooperation with the remote sensing hardware. The collected data are diversified, and the surface pressure, the illumination incidence range, the humidity change range and the area temperature difference change range of the building under wind power can be comprehensively evaluated conveniently. Actual data which are more real, reliable, scientific and rigorous are obtained, the reality of a model and a scheme of the whole system is improved, and the use experience of a user is optimized.
The principle of the intelligent construction simulation analysis system is as follows, referring to fig. 1, the intelligent construction simulation analysis system is used for simulating construction by adopting building virtual components in a BIM database according to a construction scheme through a BIM modeling simulation module, judging construction flow and feasibility, and adding the efficiency of worker construction to carry out timeliness simulation. The data acquisition module is used for acquiring construction surrounding environment data, the environment data analysis module is used for analyzing the surrounding environment data, the human body suitability degree and the most suitable area time period are evaluated, the evaluation report module is used for judging the influence of the environmental factors on the construction efficiency of workers, the optimal construction time period of the area is planned, the construction flow scheme and the worker construction time efficiency scheme are summarized, and alternative schemes are listed in parallel. And the cloud storage module is used for storing all data generated by the central architecture, the BIM database and the functional system. The intelligent building construction simulation analysis system utilizes the BIM modeling simulation module to simulate construction, judges construction flow and feasibility, adds efficiency of worker construction to simulate timeliness, analyzes surrounding environment data through the environment data analysis module, evaluates the optimum regional time period, evaluates the influence of environment on worker construction timeliness through the summary evaluation report module, matches the optimum time period of each regional environment of a building, and accordingly plans the worker construction flow and the optimum construction time period of the construction region, is man-oriented, matches the optimum construction environment time, can improve construction efficiency, can increase the construction comfort of workers, is comprehensively planned and is in intelligent construction.

Claims (10)

1. A simulation analysis system for intelligent construction, comprising:
the system comprises a central architecture, a data analysis module and a summary evaluation report module, wherein the central architecture comprises a BIM modeling simulation module, an environmental data analysis module and a summary evaluation report module, and the environmental data analysis module and the summary evaluation report module are connected to the BIM modeling simulation module;
the database system is connected with the BIM modeling simulation module and comprises a virtual building construction module and a data retrieval module;
the functional system comprises a data acquisition module, a cloud storage module and a big data search module, wherein the cloud storage module is connected to the data acquisition module and the big data search module, and the cloud storage module is further connected to the central architecture and the database system.
2. The simulation analysis system for smart construction according to claim 1, wherein the BIM modeling simulation module includes a modeling module and a simulation module, the simulation module being connected to the modeling module; the simulation module utilizes each construction node to separate the integral model and simulate a specific construction process; the modeling module generates different types of models according to the construction scheme.
3. The intelligent construction simulation analysis system according to claim 2, wherein the environmental data analysis module is connected to the data collection module in the functional system, the environmental data analysis module comprises a wind speed analysis module, a lighting analysis module, a humidity analysis module, a regional temperature difference analysis module and a time period summarization module, and each part of the environmental data analysis module is further connected to the modeling module.
4. The intelligent building construction simulation analysis system according to claim 3, wherein the humidity analysis module and the regional temperature difference analysis module collect data information, generate statistical maps, and transmit the statistical maps to the simulation module.
5. The simulation analysis system for intelligent construction according to claim 4, wherein the time period summarizing module collects the surface pressure of the building stress in the time period, the light incidence range, and the variation range values of the humidity analysis module and the regional temperature difference analysis module to evaluate the suitable time period in the region.
6. The simulation analysis system for smart construction according to claim 5, wherein the summary evaluation reporting module comprises a worker aging evaluation module, a building adjustment evaluation module, and a summary reporting output module, the worker aging evaluation module and the building adjustment evaluation module being connected to the summary reporting output module; and all parts of the summary evaluation reporting module are connected with the simulation module.
7. The simulation analysis system for intelligent construction according to claim 6, wherein the worker aging evaluation module collects worker work efficiency data and influence efficiency data, and plans a construction flow and an optimal construction period.
8. The simulation analysis system for intelligent construction according to claim 7, wherein the building regulation and evaluation module collects environmental data and transmits the environmental data to the simulation module; and the summary report output module outputs the evaluation result and lists the alternative schemes.
9. The intelligent construction simulation analysis system of claim 2, wherein the database system is connected to a modeling module, the virtual building construction module provides construction drawings and plans to the modeling module, and the data retrieval module provides data material support to the modeling module.
10. The intelligent construction simulation analysis system according to claim 1, wherein the data acquisition module comprises a remote sensing global image acquisition module, a space-time data acquisition module and a ground source data acquisition module, and all the modules in the data acquisition module are connected to the modeling module.
CN202211387843.2A 2022-11-07 2022-11-07 Intelligent building construction simulation analysis system Pending CN115600426A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211387843.2A CN115600426A (en) 2022-11-07 2022-11-07 Intelligent building construction simulation analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211387843.2A CN115600426A (en) 2022-11-07 2022-11-07 Intelligent building construction simulation analysis system

Publications (1)

Publication Number Publication Date
CN115600426A true CN115600426A (en) 2023-01-13

Family

ID=84852708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211387843.2A Pending CN115600426A (en) 2022-11-07 2022-11-07 Intelligent building construction simulation analysis system

Country Status (1)

Country Link
CN (1) CN115600426A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116304225A (en) * 2023-03-22 2023-06-23 联洋国融(上海)科技有限公司 Component retrieval and evaluation method based on MAS system
CN116307537A (en) * 2023-02-24 2023-06-23 河南创优科学技术研究院有限公司 Construction scheduling method and system based on building engineering model

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116307537A (en) * 2023-02-24 2023-06-23 河南创优科学技术研究院有限公司 Construction scheduling method and system based on building engineering model
CN116304225A (en) * 2023-03-22 2023-06-23 联洋国融(上海)科技有限公司 Component retrieval and evaluation method based on MAS system
CN116304225B (en) * 2023-03-22 2024-05-17 联洋国融(上海)科技有限公司 Component retrieval and evaluation method based on MAS system

Similar Documents

Publication Publication Date Title
CN115600426A (en) Intelligent building construction simulation analysis system
CN107844424B (en) Model-based testing system and method
CN110647131B (en) Five-character integration analysis method based on model
CN113688558B (en) Automobile driving condition construction method and system based on large database sample
CN111967721A (en) Comprehensive energy system greening level evaluation method and system
CN103177404A (en) Energy-using data analysis system based on data mining
CN112633632A (en) Integrated short-term wind power cluster power prediction method based on signal decomposition technology
CN115965102A (en) Method and system for positioning and calculating carbon emission space-time big data
CN113295826B (en) Motor vehicle exhaust emission test management system and intelligent diagnosis method based on Internet of vehicles
CN110232130A (en) Metadata management pedigree generation method, device, computer equipment and storage medium
CN106447207A (en) Green building pre-evaluation system based on large data analysis
CN111930818A (en) RDE data post-processing method, device, equipment and storage medium
CN117114176A (en) Land utilization change prediction method and system based on data analysis and machine learning
CN115221796A (en) Cloud manufacturing mode-oriented process flow simulation method and system
CN115080386A (en) Scene effectiveness analysis method and device based on automatic driving function requirement
CN104807492B (en) Method for actually measuring and evaluating large region ground surface coverage precision by using high-precision instrument
CN111881030A (en) Intelligent traffic data test sample generation method based on understandable characteristic variation
Du et al. Mining multicity urban data for sustainable population relocation
CN117892212B (en) Distributed heterogeneous energy station situation awareness monitoring method
CN117114254B (en) Power grid new energy abnormal data monitoring method and system
CN116126852B (en) BIM-based intelligent management data storage method for fabricated building
CN111400335B (en) Analysis method and system for cloud environment operation data
CN116341047A (en) Simulation system for bridge planning design
CN118171556A (en) Antenna test-oriented data analysis flow modeling system and method
Yang Evaluating Software Metrics for Sorting Software Modules in Order of Defect Count.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination