CN115595886A CN202211295885.3A CN202211295885A CN115595886A CN 115595886 A CN115595886 A CN 115595886A CN 202211295885 A CN202211295885 A CN 202211295885A CN 115595886 A CN115595886 A CN 115595886A
Authority
CN
China
Prior art keywords
steel
slideway
steel pipe
slide
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211295885.3A
Other languages
Chinese (zh)
Inventor
樊志飞
陈开桥
拓守俭
王敏
刘立云
文杰
李勇波
刘晓斌
程建华
胡嘉宾
谭健
丁超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
7th Engineering Co Ltd of MBEC
Original Assignee
7th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 7th Engineering Co Ltd of MBEC filed Critical 7th Engineering Co Ltd of MBEC
Priority to CN202211295885.3A priority Critical patent/CN115595886A/en
Publication of CN115595886A publication Critical patent/CN115595886A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A steel beam sliding trestle and a construction method relate to the technical field of bridge construction and comprise two first slideway beams and two second slideway beams. The two first slideway beams are arranged on the shore along the transverse bridge direction, and an expanding foundation for supporting is arranged below the two first slideway beams; two second slide girders are arranged on the water along the transverse bridge direction, the second slide girders are in one-to-one correspondence with the first slide girders, a fracture is reserved between each second slide girder and the corresponding first slide girder, and a steel pipe pile foundation for supporting is arranged below the two second slide girders. The fracture is reserved between the first slide roof beam and the second slide roof beam in this application embodiment, the below of first slide roof beam is for enlarging the basis, and the below of second slide roof beam is the steel pipe pile foundation, and when the girder steel trestle that slides on water and the atress on the bank is different, first slide roof beam bears the load with the second slide roof beam separately, is located the part on water and is located the deformation separately of on-bank part, has guaranteed the overall structure stability of girder steel trestle that slides.

Description

Steel beam sliding trestle and construction method
Technical Field
The application relates to the technical field of bridge construction, in particular to a steel beam sliding trestle and a construction method.
Background
The main bridge steel beam of the suspension bridge and the arch bridge is usually constructed by vertically hoisting the steel beam sections by a cable crane, especially for the bridge across the great river due to the complicated topography and the influence of the bank slope of the river, the river channel and the flood wall, the steel beam sliding trestle is often erected firstly, the steel beam sections are slid to the hoisting position by the steel beam sliding trestle, and then the cable crane is adopted to vertically hoist the steel beam sections at the hoisting position. However, the steel beam sliding trestle has different stresses on water and on the bank, so that the deformation of the part of the steel beam sliding trestle on the water and the deformation of the part of the steel beam sliding trestle on the bank are inconsistent, and the stability of the whole structure of the steel beam sliding trestle is reduced.
Disclosure of Invention
The embodiment of the application provides a steel beam sliding trestle and a construction method, and aims to solve the problems that the part of the steel beam sliding trestle on water and the deformation of the steel beam sliding trestle on the bank are not coordinated, and the stability of the whole structure of the steel beam sliding trestle is reduced.
The utility model provides a girder steel landing stage that slides which characterized in that includes:
the two first slideway beams are arranged on the shore along the transverse bridge direction, each first slideway beam extends along the longitudinal bridge direction, and an expanded foundation for supporting is arranged below the two first slideway beams;
two second slide roof beams are arranged on water along the cross bridge direction, every the second slide roof beam is arranged along the longitudinal bridge direction to extend, and second slide roof beam and first slide roof beam one-to-one, every it is equipped with the fracture to leave between second slide roof beam and a first slide roof beam that corresponds, two the below of second slide roof beam is provided with the steel-pipe pile basis that is used for supporting.
Furthermore, the girder sliding trestle further comprises cast-in-situ bored piles, the cast-in-situ bored piles are inserted on the bank, and one ends of the first slide beams, which are close to the fracture, and one ends of the second slide beams, which are close to the fracture, are supported on the tops of the cast-in-situ bored piles.
Further, enlarge the basis and include rubble bed course, bar basis and be used for smooth backing plate, the rubble bed course lays on the bank, the bar basis set up in the top of rubble bed course, the backing plate lays in the top of bar basis, two first slide roof beams set up in the top of backing plate.
Furthermore, the steel pipe pile foundation comprises a plurality of steel pipe piles and a plurality of connecting systems, each steel pipe pile is vertically inserted into water, the plurality of steel pipe piles below each second slideway beam are symmetrical with respect to the axial line of the second slideway beam in the longitudinal bridge direction, and the connecting systems are arranged between every two adjacent steel pipe piles.
Further, the top surfaces of the first slideway beam and the second slideway beam are provided with steel plates for reducing friction.
Further, the girder steel trestle that slides still includes the operation platform that is used for personnel to walk, operation platform set up in the bottom of second slide roof beam, and along the horizontal bridge to the relative both sides that extend second slide roof beam.
The construction method of the steel beam sliding trestle comprises the following steps:
constructing an enlarged foundation on the bank, and constructing a steel pipe pile foundation in water;
two first slideway beams are arranged on the top surface of the enlarged foundation along the transverse bridge direction, and each first slideway beam extends along the longitudinal bridge direction;
and two second slideway beams are arranged at the top of the steel pipe pile foundation, each second slideway beam extends along the longitudinal bridge direction, the second slideway beams correspond to the first slideway beams one to one, and a fracture is reserved between each second slideway beam and the corresponding first slideway beam.
Further, enlarge the basis and include bar basis, rubble bed course and backing plate, it includes to be under construction on the bank and enlarge the basis:
paving a broken stone cushion layer on the bank;
constructing a strip foundation on the top of the gravel cushion layer;
and laying a base plate on the top of the strip foundation, and flattening the top surface of the base plate.
Further, the construction on bank enlarges the basis, and the construction steel pipe pile foundation in water still includes:
and inserting the cast-in-situ bored pile on the bank, wherein the cast-in-situ bored pile is positioned between the enlarged foundation and the steel pipe column foundation.
Further, the steel-pipe pile foundation includes steel-pipe pile and connected system, the steel-pipe pile foundation of being under construction in aqueous includes:
inserting a plurality of steel pipe piles into water at intervals;
and a connecting system is arranged between every two adjacent steel pipe piles.
The technical scheme who provides this application brings beneficial effect includes:
the embodiment of the application provides a girder steel trestle that slides and construction method, it includes two first slide roof beams and two second slide roof beams, wherein, first slide roof beam is located the bank, the second slide roof beam is located overwater, it is equipped with the fracture to reserve between first slide roof beam and the second slide roof beam, when the girder steel trestle that slides overwater and on-bank atress is different, first slide roof beam bears the load with the second slide roof beam separately, the girder steel trestle that slides is located overwater part and the part that is located the bank warp separately, can not produce the influence mutually, thereby the overall structure stability of girder steel trestle that slides has been guaranteed. And the lower part of the first slide way beam is an enlarged foundation, the lower part of the second slide way beam is a steel pipe pile foundation, and different slide way beams bear loads through different foundations without mutual interference, so that the stability of the whole structure of the steel beam sliding trestle is further ensured.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic overall structure diagram of an embodiment of the present application;
FIG. 2 is a schematic view of a 1/2 top view of the cast-in-situ bored pile, the steel pipe pile, and the connection system of FIG. 1;
FIG. 3 is a schematic view of the connection of the first skid beam of FIG. 1 to an enlarged base;
FIG. 4 is a cross-sectional structural view of the first skid beam of FIG. 1 coupled to an enlarged base;
FIG. 5 is a schematic view of the structure at the fracture in FIG. 1;
FIG. 6 is a schematic structural view of the first skid beam of FIG. 1;
FIG. 7 is a cross-sectional structural schematic view of the first skid beam of FIG. 1;
FIG. 8 is a schematic view of the second ramp beam of FIG. 1;
FIG. 9 is a schematic cross-sectional view of the second skid beam of FIG. 1 coupled to a distributor beam;
FIG. 10 is a schematic structural view of the distributor beam of FIG. 1;
FIG. 11 is a schematic view of the structure of the connection between the distributor beam and the pile cap of FIG. 1;
fig. 12 is a schematic structural view of a connection system between the steel pipe piles in fig. 1;
fig. 13 is a schematic structural view of a connection system between the steel pipe pile and the crash pile in fig. 1;
FIG. 14 is a cross-sectional view of a rod in the linkage of FIG. 1;
fig. 15 is a schematic overall structure diagram of the operation platform in the embodiment of the present application.
Reference numerals:
1. a first slideway beam; 2. a second slideway beam; 3. a strip foundation; 4. a gravel cushion layer; 5. a base plate; 6. drilling a cast-in-place pile; 7. a cap beam; 8. steel pipe piles; 9. pile caps; 10. a distribution beam; 11. a connecting system; 111. a rod member; 112. a gusset plate; 12. a stiffening plate; 13. anti-collision piles; 14. a means for docking on a boat; 15. embedding parts; 16. a steel plate; 17. an operating platform; 171. a support beam; 172. a base plate; 173. a railing; 18. and (4) breaking.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The embodiment of the application provides a steel beam sliding trestle and a construction method, and the problems that the part of the steel beam sliding trestle on water and the deformation of the steel beam sliding trestle on the bank are not coordinated, and the stability of the whole structure of the steel beam sliding trestle is reduced can be solved.
As shown in fig. 1, a steel beam sliding trestle comprises two first slideway beams 1 and two second slideway beams 2.
Wherein, two first slide roof beams 1 are arranged on the bank along the horizontal direction of the bridge, every first slide roof beam 1 extends along the vertical direction of the bridge and sets up, and the below of two first slide roof beams 1 is provided with the expansion basis that is used for supporting.
Two second slide roof beams 2 are arranged on water along the cross bridge direction, every second slide roof beam 2 is arranged along the longitudinal bridge direction, and second slide roof beam 2 and first slide roof beam 1 one-to-one correspond, and a fracture 18 is reserved between every second slide roof beam 2 and the first slide roof beam 1 that corresponds, and the below of two second slide roof beams 2 is provided with the steel-pipe pile foundation that is used for supporting.
Specifically, the first slideway beam 1 and the second slideway beam 2 are located on the same straight line to form a slideway, and a fracture 18 is reserved between the first slideway beam 1 and the second slideway beam 2. The other first slideway beam 1 and the other second slideway beam 2 are positioned on the same straight line to form another slideway, a fracture 18 is reserved between the first slideway beam 1 and the second slideway beam 2, and the two slideways have the same length. Preferably, the top surface parallel and level of every first slide roof beam 1 of complaining and a second slide roof beam 2 that corresponds to when the girder steel subsection slips the landing stage through the girder steel and slides, block in 18 departments of fracture, can't slide smoothly, influence the efficiency of construction.
Specifically, as shown in fig. 6 to 8, the first slideway beam 1 includes three H-shaped steels and a plurality of stiffening plates 12, the three H-shaped steels and the plurality of stiffening plates 12 are welded together, the stiffening plates 12 are uniformly arranged on the outward sides of the webs of the two H-shaped steels on the outermost sides, and each stiffening plate 12 is welded together with the upper flange plate, the lower flange plate and the web of the H-shaped steel. The structural form of the second slideway beam 2 is the same as that of the first slideway beam 1, and the second slideway beam is also formed by welding three pieces of H-shaped steel and a plurality of stiffening plates 12. The number and the pitch of the H-sections and the stiffener plates 12 may be determined according to actual circumstances.
Further, as shown in fig. 1, fig. 2 and fig. 5, the steel beam sliding trestle of the embodiment of the present application further includes a cast-in-situ bored pile 6, the cast-in-situ bored pile 6 is inserted on the bank, and both the end of the first slide rail beam 1 close to the fracture 18 and the end of the second slide rail beam 2 close to the fracture 18 are supported at the top of the cast-in-situ bored pile 6.
Specifically, in the present embodiment, the number of the cast-in-situ bored piles 6 is two, and two cast-in-situ bored piles 6 are respectively located at two fractures 18. The end portion of each first slide beam 1 close to the fracture 18 is located on the bank, the first cast-in-place pile 6 is inserted on the bank, one end of the first slide beam 1 close to the fracture 18 and one end of the second slide beam 2 close to the fracture 18 are both supported at the top of the cast-in-place pile 6, the loads borne by the end portions of the first slide beam 1 and the second slide beam 2 are large, the cast-in-place pile 6 has strong bearing capacity, and therefore the stability of the overall structure of the steel beam sliding trestle is guaranteed.
Specifically, the depth of the bored pile 6 can be calculated according to the load borne by the bored pile. In the present embodiment, a cap beam 7 is further provided on the top of each bored pile 6, and the cap beam 7 can support the first and second chute beams 1 and 2 above and transmit the entire load to the bored pile 6 below. Still be provided with built-in fitting 15 between cap roof beam 7 and the top of the bored concrete pile 6 that corresponds, cap roof beam 7 passes through built-in fitting 15 with bored concrete pile 6 and is connected, has guaranteed the fastening nature of connection, and this built-in fitting 15 can be pre-buried when construction bored concrete pile 6.
Further, as shown in fig. 3 and 4, the enlarged foundation comprises a gravel cushion layer 4, a strip-shaped foundation 3 and a backing plate 5 for leveling, the gravel cushion layer 4 is laid on the shore, the strip-shaped foundation 3 is arranged at the top of the gravel cushion layer 4, the backing plate 5 is laid at the top of the strip-shaped foundation 3, and the two first slide beams 1 are arranged at the top of the backing plate 5.
Specifically, above-mentioned rubble bed course 4 can strengthen the basic structure intensity on the bank, and bar basis 3 mainly used bears the load, lays backing plate 5 at bar basis 3's top surface, can guarantee the stationarity of first slide roof beam 1. In other embodiments, other types of bases may be used instead of the bar base 3. The bar foundation is made of 3-position reinforced concrete. In addition, in this embodiment of the application, an embedded part 15 is further disposed between the strip foundation 3 and the backing plate 5, the strip foundation 3 and the backing plate 5 are connected through the embedded part 15, the fastening performance of the connection is ensured, and the embedded part 15 can be embedded while the cast-in-situ bored pile 6 is constructed. In specific construction, a backing plate 5 can be welded and installed on the top surface of the embedded part 15 for leveling, and then the first slideway beam 1 is installed on the top surface of the backing plate 5, so that the first slideway beam 1 is ensured to be horizontal.
Further, as shown in fig. 2, 12 and 14, the steel pipe pile foundation includes a plurality of steel pipe piles 8 and a plurality of connecting systems 11, each steel pipe pile 8 is vertically inserted into the water, the plurality of steel pipe piles 8 below each second slideway beam 2 are symmetrical with respect to the longitudinal axis of the second slideway beam 2, and the connecting system 11 is provided between every two adjacent steel pipe piles 8.
Specifically, a plurality of steel pipe piles 8 are arranged below each second slideway beam 2, and a distance is reserved between every two adjacent steel pipe piles 8. In this application embodiment, the steel-pipe pile 8 of the below of every second slide roof beam 2 has the multiunit, multiunit steel-pipe pile 8 will indulge the bridge to arranging, the quantity of the steel-pipe pile 8 of every group can be two, also can be four, when the quantity of the steel-pipe pile 8 of every group is two, this two steel-pipe piles 8 are symmetrical about the axis that this second slide roof beam 2 indulges the bridge to, when the quantity of the steel-pipe pile 8 of every group is four, four steel-pipe piles 8 are arranged for the matrix, form two rows and two, this four steel-pipe piles 8 are symmetrical about the axis that this second slide roof beam 2 indulges the bridge to. In other embodiments, the number of groups of steel pipe piles 8 below each second slideway beam 2 may be determined according to actual conditions, and the number of steel pipe piles 8 in each group may also be determined according to actual conditions, preferably, the number of steel pipe piles 8 in each group near the shore may be smaller, and the number of steel pipe piles 8 in each group in the water may be larger, and is preferably an even number.
Specifically, in this application embodiment, all be provided with between the many steel-pipe piles 8 of every group and be connected 11, can strengthen the overall structure stability of steel-pipe pile basis to can improve the bearing capacity of steel-pipe pile basis. The connection system 11 includes a rod 111 and a gusset 112 welded together, and the rod 111 is formed by welding two channel bars facing each other, that is, the opening directions of the two channel bars are opposite to each other. The rod 111 is connected and fixed to the steel pipe pile 8 by the gusset plate 112. The rods 111 have horizontal, vertical and diagonal directions, and are connected and fixed by the gusset plate 112 at the intersection of the rods 111.
Specifically, the number of the connection systems 11 between every two adjacent steel pipe piles 8 may be increased at a deep water depth, in the embodiment of the present application, one connection system 11 may be provided between every two adjacent steel pipe piles 8 near the shore, or the connection system 11 may not be provided, and at a deep water depth, two connection systems 11 may be provided between every two adjacent steel pipe piles 8. It is understood that, in other embodiments, the number of the connecting systems 11 between every two adjacent steel pipe piles 8 may be set according to actual conditions, and the arrangement of the connecting systems 11 between different groups of steel pipe piles 8 may also be determined according to actual conditions.
Specifically, the degree of depth of burying of every steel-pipe pile 8 can be calculated according to the atress and obtain, and in this application embodiment, the top of every steel-pipe pile 8 still is provided with pile cap 9, can avoid steel-pipe pile 8 to suffer destruction at the in-process of construction.
Further, as shown in fig. 9 to 11, the steel pipe pile foundation further includes a plurality of distribution beams 10, the plurality of distribution beams 10 are arranged along the longitudinal bridge direction and erected at the top ends of the steel pipe piles 8, each distribution beam 10 extends along the transverse bridge direction, at least two steel pipe piles 8 are arranged below each distribution beam 10, and the second chute beam 2 is located at the top end of the distribution beam 10.
Specifically, the distribution beam 10 can distribute the load transmission in a certain proportion and transmit the load transmission to the component below, so that the component below can be prevented from bearing too much and being damaged. In the present embodiment, since two steel pipe piles 8 are provided below each of the distributor beams 10 and the two steel pipe piles 8 are symmetrically arranged, the distributor beam 10 divides the load into two parts and transmits the two parts to the two steel pipe piles 8 below the two parts. When the top of the steel pipe pile 8 is provided with the pile cap 9, the distribution beam 10 and the pile cap 9 can be fixed by welding. In the embodiment of the present application, the distribution beam 10 and the second chute beam 2 may be fixed by bolts.
Specifically, each distribution beam 10 comprises 2 pieces of H-shaped steel and a plurality of stiffening plates 12, the two pieces of H-shaped steel are welded to the plurality of stiffening plates 12, the stiffening plates 12 are uniformly arranged on the outward side of the web of the two pieces of H-shaped steel located on the outermost side, and each stiffening plate 12 is welded to the upper flange plate, the lower flange plate and the web of the H-shaped steel at the same time. At the position of the pile cap 9, the number of the stiffening plates 12 may be increased, and the stiffening plates 12 may extend to be connected with the pile cap 9, to play a role of further reinforcement, ensuring the structural stability and rigidity of the distribution beam 10 at the pile cap 9.
Specifically, at the position where the distribution beam 10 is disposed, the number of the stiffening plates 12 of the second chute beam 2 may be increased, so as to further reinforce the distribution beam 10, and ensure the overall structural stability and rigidity of the second chute beam 2 at the distribution beam 10.
Further, as shown in fig. 5 to 8, the top surfaces of the first and second skid beams 1 and 2 are each provided with a steel plate 16 for reducing friction.
Specifically, when the girder steel segment section slided through the girder steel trestle that slides, still can set up the support of sliding in the top of first slide roof beam 1 or second slide roof beam 2, above-mentioned steel sheet 16 can reduce the frictional resistance that slides between support and first slide roof beam 1 or second slide roof beam 2, improves the efficiency of construction.
Further, as shown in fig. 15, the steel beam sliding trestle according to the embodiment of the present application further includes an operating platform 17 for personnel to walk, and the operating platform 17 is disposed at the bottom of the second slideway beam 2 and extends out of two opposite sides of the second slideway beam 2 along the transverse bridge direction.
Specifically, the operation platform 17 can ensure the construction safety and the personnel safety in the steel beam sliding construction process so as to avoid unsafe accidents.
Further, the above-mentioned operation platform 17 includes that a plurality of supporting beams 171, bottom plate 172 and railing 173 constitute, and a plurality of supporting beams 171 are along indulging the bridge to setting up in the below of second slide roof beam 2, and every supporting beam 171 is along indulging the bridge to extending, and bottom plate 172 is laid in the top surface of a plurality of supporting beams 171, and pastes the bottom surface of second slide roof beam 2, and bottom plate 172 is along the relative both sides that the bridge extended second slide roof beam 2 to, and railing 173 encloses and locates bottom plate 172.
Specifically, in this application embodiment, the distance between every two adjacent supporting beams 171 can be 1m, the supporting beams 171 can be channel steel, and the bottom plate 172 can be made of a patterned steel plate, so as to increase the friction resistance when the person walks. In addition, in the embodiment of the present application, the supporting beam 171 extends out of two opposite sides of the bottom plate 172 along the transverse bridge direction, the balustrade 173 is disposed on the portion of the supporting beam 171 extending out of the bottom plate 172, and the bottom plate 172 has a horizontal section laid on the supporting beam 171 and a vertical section attached to the balustrade 173, so that the occurrence of safety accidents caused by falling from high altitude can be effectively avoided. In other embodiments, the spacing of support beams 171 may be determined based on the actual situation. In a preferred embodiment of the method of the invention,
specifically, the balustrade 173 includes a vertical column and a cross bar, two ends of each support beam 171 are respectively provided with a vertical column, and the vertical columns on the same side of the bottom plate 172 are connected by the cross bar to form the balustrade 173. The number of the cross bars on each side can be one or more than one. The upright posts and the cross bars can be steel pipes with the diameter of 48mm and the thickness of 3 mm. In other embodiments, the size of the columns and rails may be determined based on the circumstances.
Further, as shown in fig. 13, the steel beam sliding trestle of the embodiment of the present application further includes a crash pile 13 and a berthing device 14, the crash pile 13 and the berthing device 14 are inserted into water, and are adjacent to the end of the second slideway beam 2, and the end is the end of the second slideway beam 2 far away from the first slideway beam 1.
Specifically, in the present embodiment, the number of the crash piles 13 is two, the number of the boat-holding devices 14 is also two, and one boat-holding device 14 is adjacent to or attached to one crash pile 13. Preferably, sand is poured inside each of the piles 13. The docking device 14 may be made of elastic material such as rubber, which can reduce the acting force generated during docking and thus play a role in buffering and protecting the ship.
Further, the ship-berthing device 14 is attached to the impact pile 13, the impact pile 13 is adjacent to the second slideway beam 2, and a connecting system 11 is arranged between the impact pile 13 and the adjacent steel pipe pile 8.
Specifically, the connection system 11 includes a rod 111 and a gusset 112 welded together, and the rod 111 is formed by welding two channel bars together, that is, the opening directions of the two channel bars are opposite to each other. The rod 111 is connected and fixed to the steel pipe pile 8 and the impact pile 13 by the gusset plate 112. The rods 111 have horizontal, vertical and diagonal directions, and are connected and fixed by the gusset plates 112 at the junctions of the rods 111.
All relevant components in the embodiment of the application can be processed and manufactured in factories, the site construction time is greatly shortened, and the construction cost is saved.
The embodiment of the application also provides a construction method of the steel beam sliding trestle, which comprises the following steps:
step 1: and (3) constructing and enlarging a foundation on the bank, and constructing a steel pipe pile foundation in water.
Step 2: two first slideway beams 1 are arranged on the top surface of the enlarged foundation along the transverse bridge direction, and each first slideway beam 1 extends along the longitudinal bridge direction.
And 3, step 3: two second slideway beams 2 are arranged at the top of the steel pipe pile foundation, each second slideway beam 2 extends along the longitudinal bridge direction, the second slideway beams 2 correspond to the first slideway beams 1 one by one, and a fracture 18 is reserved between each second slideway beam 2 and the corresponding first slideway beam 1.
Specifically, in step 2 and step 3, one first slideway beam 1 and one second slideway beam 2 are located on the same straight line to form one slideway, and a fracture 18 is left between the first slideway beam 1 and the second slideway beam 2. The other first slideway beam 1 and the other second slideway beam 2 are positioned on the same straight line to form another slideway, a fracture 18 is reserved between the first slideway beam 1 and the second slideway beam 2, and the two slideways are the same in length. Preferably, the every first slide roof beam 1 of complaining and the top surface parallel and level of a second slide roof beam 2 that corresponds to when the girder steel segment passes through the girder steel trestle that slides, block in fracture 18 department, can't slide smoothly, influence the efficiency of construction.
Specifically, in the above steps 2 and 3, the first slideway beam 1 includes three pieces of H-shaped steel and a plurality of stiffening plates 12. The method further comprises the step of welding the three pieces of H-shaped steel, specifically, welding the upper flange plates of the three pieces of H-shaped steel, welding the lower flange plates of the three pieces of H-shaped steel, and welding the stiffening plate 12 on the outward side of the two pieces of H-shaped steel positioned on the outermost side, so that the stiffening plate 12 is simultaneously connected to the web plate, the upper flange plate and the lower flange plate of the H-shaped steel. The structural form of the second slideway beam 2 is the same as that of the first slideway beam 1, and the second slideway beam is also formed by welding three pieces of H-shaped steel and a plurality of stiffening plates 12. The number and the pitch of the H-section steel and the stiffener plates 12 may be determined according to actual circumstances.
Further, enlarge the basis and include bar basis 3, rubble bed course 4 and backing plate 5, the bank construction that is in above-mentioned step 1 enlarges the basis and includes: a gravel cushion 4 is laid on the shore. And constructing a strip foundation 3 on the top of the gravel cushion layer 4. And laying a backing plate 5 on the top of the strip foundation 3, and flattening the top surface of the backing plate 5.
Specifically, the broken stone cushion layer 4 in the steps can enhance the strength of the foundation structure on the shore, the strip foundation 3 is mainly used for bearing load, and the base plate 5 is laid on the top surface of the strip foundation 3, so that the stability of the first slideway beam 1 can be guaranteed. In the embodiment of the application, the embedded part 15 is further arranged between the strip foundation 3 and the base plate 5, so that the connection tightness is ensured, and the embedded part 15 can be embedded when the cast-in-situ bored pile 6 is constructed.
Specifically, the steps may be: constructing a gravel cushion layer 4 on a bank, installing a template on the top surface of the gravel cushion layer 4, pouring a strip foundation 3, and installing an embedded part 15. And welding a mounting base plate 5 on the top surface of the embedded part 15 for leveling.
Further, the step 1 further includes: on shore a cast-in-place bored pile 6 is inserted, which positions the cast-in-place bored pile 6 between the enlarged foundation and the steel pipe column foundation.
Specifically, in the above steps, the cast-in-situ bored pile 6 can be constructed in synchronization with the enlarged foundation, thereby improving the construction efficiency.
Specifically, in the above step, the number of cast-in-situ bored piles 6 is two, and the insertion depth of the cast-in-situ bored pile 6 can be calculated from the load applied thereto. In the embodiment of the application, the top of each cast-in-situ bored pile 6 is further provided with a cap beam 7, and an embedded part 15 is further arranged between the cap beam 7 and the top end of the corresponding cast-in-situ bored pile 6, so that the connection tightness is ensured, and the embedded part 15 can be embedded in advance while the cast-in-situ bored pile 6 is constructed. When the first slide way beam 1 and the second slide way beam 2 are constructed to the cast-in-situ bored pile 6, the first slide way beam 1 and the second slide way beam 2 are both supported at the top end of the cast-in-situ bored pile 6.
Further, the steel pipe pile foundation includes a steel pipe pile 8 and a connection system 11, and the underwater steel pipe pile foundation of step 2 includes: a plurality of steel pipe piles 8 are inserted into the water at intervals. And a connecting system 11 is arranged between every two adjacent steel pipe piles 8.
Specifically, in the above steps, a plurality of steel pipe piles 8 are arranged below each second slideway beam 2, and a distance is provided between every two adjacent steel pipe piles 8. In this application embodiment, the steel-pipe pile 8 of the below of every second slide roof beam 2 has the multiunit, multiunit steel-pipe pile 8 will indulge the bridge to arranging, the quantity of the steel-pipe pile 8 of every group can be two, also can be four, when the quantity of the steel-pipe pile 8 of every group is two, this two steel-pipe piles 8 are symmetrical about the axis that this second slide roof beam 2 indulges the bridge to, when the quantity of the steel-pipe pile 8 of every group is four, four steel-pipe piles 8 are arranged for the matrix, form two rows and two, this four steel-pipe piles 8 are symmetrical about the axis that this second slide roof beam 2 indulges the bridge to. In other embodiments, the number of groups of steel pipe piles 8 below each second slipway beam 2 may be determined according to actual conditions, and the number of steel pipe piles 8 in each group may also be determined according to actual conditions, preferably, the number of steel pipe piles 8 in each group near the shore may be smaller, the number of steel pipe piles 8 in each group in the water may be larger, and the number of steel pipe piles 8 in each group is preferably an even number.
Specifically, in this application embodiment, all be provided with between many steel-pipe piles 8 of every group and be connected system 11, can strengthen the overall structure stability of steel-pipe pile basis to can improve the bearing capacity of steel-pipe pile basis. The connecting system 11 comprises a rod piece 111 and node plates 112, and the steps further comprise welding the node plates 112 on the side walls of the steel pipe piles 8, and welding the connecting rod piece 111 between the node plates 112 of every two adjacent steel pipe piles 8, so that the rod piece 111 is in a horizontal direction, a vertical direction and an oblique direction. At the intersection of the rods 111, gusset plates 112 are provided. The bar 111 is formed by welding two channel steels oppositely.
Specifically, in the above steps, the number of the connection systems 11 between every two adjacent steel pipe piles 8 may be increased at a deep water depth, in the embodiment of the present application, one connection system 11 between every two adjacent steel pipe piles 8 near the shore may be provided, or the connection system 11 may not be provided, and at a deep water depth, two connection systems 11 between every two adjacent steel pipe piles 8 may be provided. It is understood that, in other embodiments, the number of the connecting systems 11 between every two adjacent steel pipe piles 8 may be set according to actual conditions, and the arrangement of the connecting systems 11 between different groups of steel pipe piles 8 may also be determined according to actual conditions.
Specifically, in the above steps, the penetration depth of each steel pipe pile 8 may be calculated according to the stress. In an embodiment of the present application, the foregoing steps further include: the top of each steel pipe pile 8 is also provided with a pile cap 9, so that the steel pipe piles 8 can be prevented from being damaged in the construction process.
Further, after the construction of the steel pipe pile 8, the method further includes: a distribution beam 10 is erected at the top end of the steel pipe pile 8, a plurality of distribution beams 10 are arranged in the longitudinal bridge direction, and each distribution beam 10 extends in the transverse bridge direction. After the second slideway beams 2 are laid, each distributing beam 10 is connected with the second slideway beams 2 through bolts.
Specifically, in the above steps, when the pile cap 9 is provided on the top of the steel pipe pile 8, the distribution beam 10 and the pile cap 9 may be fixed by welding. The distribution beam 10 and the second skid beam 2 may be fixed using bolts. In the present embodiment, two steel pipe piles 8 are provided below each distribution beam 10, and the two steel pipe piles 8 are symmetrically arranged.
Specifically, in the above steps, each distribution beam 10 includes 2H-shaped steels and a plurality of stiffening plates 12, and the two H-shaped steels are welded together, specifically, the upper flange plates of the two H-shaped steels are welded together, and the lower flange plates of the two H-shaped steels are welded together. And welding a plurality of stiffening plates 12 on the outward sides of the webs of the two pieces of H-shaped steel, so that the stiffening plates 12 are simultaneously connected to the webs, the upper flange plates and the lower flange plates of the H-shaped steel. At the location of the pile cap 9, the number of stiffening plates 12 may be increased, which may act as further reinforcement, ensuring the structural stability and rigidity of the distribution beam 10 at the pile cap 9.
Specifically, in the above step, at the position where the distribution beam 10 is disposed, the number of the stiffening plates 12 of the second chute beam 2 may be increased, so as to play a role of further reinforcing, and ensure the overall structural stability and rigidity of the second chute beam 2 at the position of the distribution beam 10.
Further, the construction method of the embodiment of the application further comprises the following steps: after the first slideway beam 1 and the second slideway beam 2 are uniformly distributed, steel plates 16 for reducing friction are arranged on the top surfaces of the first slideway beam 1 and the second slideway beam 2.
Specifically, in the above steps, when the steel beam segment slides through the steel beam sliding trestle, a sliding support is further arranged above the first slide rail beam 1 or the second slide rail beam 2, and the steel plate 16 can reduce the frictional resistance between the sliding support and the first slide rail beam 1 or the second slide rail beam 2, thereby improving the construction efficiency.
Further, the construction method of the embodiment of the application further comprises the following steps: an operating platform 17 for the person to walk is provided at the second ramp beam 2. The operation platform 17 can ensure the construction safety and the personnel safety in the steel beam sliding construction process so as to avoid unsafe accidents.
Specifically, the operation platform 17 includes a plurality of support beams 171, a bottom plate 172, and a rail 173. After the second slideway beam 2 is laid, the method further comprises the following steps: a plurality of support beams 171 are arranged below the second chute beam 2 in the longitudinal bridge direction, and the support beams 171 are bolted to the second chute beam 2. The bottom plates 172 are laid on the top surfaces of the support beams 171, the bottom plates 172 are attached to the bottom surface of the second chute beam 2, and the bottom plates 172 extend out of the opposite sides of the second chute beam 2 in the lateral bridge direction. A rail 173 is provided around the bottom plate 172 such that the rail 173 surrounds the bottom plate 172.
The distance between every two adjacent supporting beams 171 can be 1m, the supporting beams 171 can be channel steel, and the bottom plate 172 can be made of a pattern steel plate, so that the friction resistance of people during walking is increased. In the embodiment of the present application, the supporting beam 171 extends out of two opposite sides of the bottom plate 172 along the transverse bridge direction, the balustrade 173 is disposed on the portion of the supporting beam 171 extending out of the bottom plate 172, and the bottom plate 172 has a horizontal section laid on the supporting beam 171 and a vertical section attached to the balustrade 173, so as to effectively avoid the occurrence of safety accidents caused by falling from high altitude. In other embodiments, the spacing of support beams 171 may be determined as is practical.
Further, before the step 1, the method further comprises: the impact piles 13 and the boat-alongside device 14 are inserted in the water so that the impact piles 13 and the boat-alongside device 14 are adjacent to the end of the second slideway beam 2 which is the end of the second slideway beam 2 remote from the first slideway beam 1.
Specifically, in the above steps, the number of the crash piles 13 is two, and two crash piles 13 are arranged along the transverse bridge direction and are respectively adjacent to two second slide rails 2. The number of the berthing apparatuses 14 is also two, and one berthing apparatus 14 is adjacent to or attached to one crash pile 13. The steps further include sand filling inside each of the crash piles 13.
Specifically, the above steps further include: the mooring device 14 is attached to the impact pile 13, the impact pile 13 is adjacent to the second chute beam 2, and the connection system 11 is provided between the impact pile 13 and the adjacent steel pipe pile 8.
Specifically, in the above steps, the connection system 11 includes the rod members 111 and the gusset plates 112, and specifically, the gusset plates 112 are welded to the side walls of the crash pile 13 and the adjacent steel pipe pile 8, and the connection rod members 111 are welded between the gusset plates 112, so that the rod members 111 are horizontal, vertical and oblique. And, at the intersection of the rod pieces 111, the gusset plates 112 are welded, so that the rod pieces 111 are intersected on the gusset plates 112.
Further, before the step 1, the method further comprises: according to a design drawing, components such as a first slide rail beam 1, a second slide rail beam 2, a base plate 5, a pile cap 9, a distribution beam 10, a connecting system 11, an embedded part 15, a supporting beam 171 and the like are welded and processed in a factory in sequence. And, holes are drilled in the distributor beam 10 and the second runner beam 2, respectively, for later bolting. And, holes are drilled in the support beam 171 and the second chute beam 2, respectively, for later bolting.
In the description of the present application, it should be noted that the terms "upper", "lower", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are merely for convenience of describing the present application and simplifying the description, but do not indicate or imply that the referred device or element must have a specific orientation, be configured and operated in a specific orientation, and thus, should not be construed as limiting the present application. Unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are intended to be inclusive and mean, for example, that they may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as the case may be.
It is noted that, in the present application, relational terms such as "first" and "second", and the like, are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising a," "8230," "8230," or "comprising" does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.
The previous description is only an example of the present application, and is provided to enable any person skilled in the art to understand or implement the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The utility model provides a girder steel landing stage that slides which characterized in that includes:
the two first slideway beams (1) are arranged on the shore along the transverse bridge direction, each first slideway beam (1) extends along the longitudinal bridge direction, and an expanded foundation for supporting is arranged below the two first slideway beams (1);
two second slide roof beams (2) are arranged on water along the transverse bridge direction, and are every second slide roof beam (2) are arranged along the longitudinal bridge direction and are set up to extending, and second slide roof beam (2) and first slide roof beam (1) one-to-one, and every second slide roof beam (2) and a first slide roof beam (1) that corresponds between leave and be equipped with fracture (18), two the below of second slide roof beam (2) is provided with the steel-pipe pile basis that is used for supporting.
2. The steel beam sliding trestle of claim 1, wherein: the steel beam sliding trestle further comprises cast-in-situ bored piles (6), the cast-in-situ bored piles (6) are inserted on the bank, and one ends, close to fractures (18), of the first slide rail beams (1) and one ends, close to the fractures (18), of the second slide rail beams (2) are supported on the tops of the cast-in-situ bored piles (6).
3. The steel beam sliding trestle of claim 1, wherein: enlarge the basis and include rubble bed course (4), bar basis (3) and be used for smooth backing plate (5), rubble bed course (4) are laid on the bank, bar basis (3) set up in the top of rubble bed course (4), lay in backing plate (5) the top of bar basis (3), two first slide roof beams (1) set up in the top of backing plate (5).
4. The steel beam sliding trestle of claim 1, wherein: the steel pipe pile foundation comprises a plurality of steel pipe piles (8) and a plurality of connecting systems (11), each steel pipe pile (8) is vertically inserted into water, the steel pipe piles (8) below each second slideway beam (2) are symmetrical about the longitudinal axis of the second slideway beam (2), and the connecting systems (11) are arranged between every two adjacent steel pipe piles (8).
5. The steel beam sliding trestle of claim 1, wherein: the top surfaces of the first slideway beam (1) and the second slideway beam (2) are both provided with steel plates (16) for reducing friction.
6. The steel beam sliding trestle of claim 1, wherein: the steel beam sliding trestle further comprises an operating platform (17) for personnel to walk, wherein the operating platform (17) is arranged at the bottom of the second slide way beam (2) and extends out of two opposite sides of the second slide way beam (2) along the transverse bridge direction.
7. A construction method of a steel beam sliding trestle is characterized by comprising the following steps:
constructing an enlarged foundation on the bank, and constructing a steel pipe pile foundation in water;
two first slideway beams (1) are arranged on the top surface of the enlarged foundation along the transverse bridge direction, and each first slideway beam (1) extends along the longitudinal bridge direction;
two second slideway beams (2) are arranged at the top of the steel pipe pile foundation, each second slideway beam (2) extends along the longitudinal bridge direction, the second slideway beams (2) correspond to the first slideway beams (1) one by one, and a fracture (18) is reserved between each second slideway beam (2) and the corresponding first slideway beam (1).
8. The construction method of the steel girder sliding trestle according to claim 7, wherein the enlarged foundation comprises a bar-shaped foundation (3), a gravel bed (4) and a base plate (5), and the onshore construction of the enlarged foundation comprises:
paving a gravel cushion (4) on the shore;
constructing a strip foundation (3) on the top of the gravel cushion layer (4);
and (4) paving a backing plate (5) on the top of the strip-shaped foundation (3), and leveling the top surface of the backing plate (5).
9. The method of constructing a steel girder sliding trestle according to claim 8, wherein the step of constructing the enlarged foundation on the shore, and the step of constructing the steel pipe pile foundation in the water further comprises the steps of:
and inserting the cast-in-situ bored pile (6) on the bank, wherein the cast-in-situ bored pile (6) is positioned between the enlarged foundation and the steel pipe column foundation.
10. The construction method of a steel girder sliding trestle according to claim 8, wherein the steel pipe pile foundation comprises a steel pipe pile (8) and a connection system (11), and the construction of the steel pipe pile foundation in water comprises:
a plurality of steel pipe piles (8) are inserted into water at intervals;
a connecting system (11) is arranged between every two adjacent steel pipe piles (8).
CN202211295885.3A 2022-10-21 2022-10-21 Steel beam sliding trestle and construction method Pending CN115595886A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211295885.3A CN115595886A (en) 2022-10-21 2022-10-21 Steel beam sliding trestle and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211295885.3A CN115595886A (en) 2022-10-21 2022-10-21 Steel beam sliding trestle and construction method

Publications (1)

Publication Number Publication Date
CN115595886A true CN115595886A (en) 2023-01-13

Family

ID=84849199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211295885.3A Pending CN115595886A (en) 2022-10-21 2022-10-21 Steel beam sliding trestle and construction method

Country Status (1)

Country Link
CN (1) CN115595886A (en)

Similar Documents

Publication Publication Date Title
CN108678751B (en) Assembly type construction method of shield cutter head manhole by jacking and excavating firstly
CN106087746A (en) A kind of cast-in-situ box girder falsework construction method and bridge
CN112726411A (en) Integral dragging construction method for single-hole large cantilever steel truss girder
CN210049103U (en) High-grade high-speed highway bracket spanned by large-span cast-in-place box girder
CN109056710B (en) Hard stratum steel pipe pile and construction method thereof
CN108797323B (en) Steel trestle suitable for hard stratum
CN114000459B (en) Method for erecting platform for high-pile wharf cast-in-place pile construction
CN211922133U (en) Large cantilever structure suitable for widening old road of cliff road section
CN110820519A (en) Tunnel arch bridge convenient for rapid construction and construction method thereof
CN217078829U (en) Position structure of bridge pile foundation and subway tunnel
CN218712227U (en) Girder steel landing stage that slides
CN207277211U (en) Large steel pipe truss for bent cap cast-in-place construction
CN113622956B (en) Construction method for high-speed railway double-track tunnel to penetrate through vertical mud gushing karst cave
CN214573260U (en) Interim river steel landing stage of striding of construction
CN115387207A (en) Shallow covering layer steel-concrete composite pile pier structure and construction method
CN115595886A (en) Steel beam sliding trestle and construction method
CN112813852B (en) Repairing and reinforcing method for bridge deck subsidence of in-service bridge
CN112049011B (en) Reverse construction method for large-span prestressed cast-in-place bridge
CN211872669U (en) Uneven jacking system of current bridge superstructure
CN218809982U (en) Gantry crane
CN113047587B (en) Liftable operation platform for soft soil foundation construction and building method
CN214737080U (en) Reinforced structure of long side road bed is connected to railway bridge and culvert
CN211171563U (en) Tunnel arch bridge convenient to quick construction
CN115929399B (en) Construction protection device and construction protection method for electric power tunnel
CN114645514B (en) Bridge construction equipment assembly construction method for beam transportation channel under narrow topography condition of mountain area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination