CN115583591B - A pipeline erection equipment for building site is fire control temporarily - Google Patents

A pipeline erection equipment for building site is fire control temporarily Download PDF

Info

Publication number
CN115583591B
CN115583591B CN202211570343.2A CN202211570343A CN115583591B CN 115583591 B CN115583591 B CN 115583591B CN 202211570343 A CN202211570343 A CN 202211570343A CN 115583591 B CN115583591 B CN 115583591B
Authority
CN
China
Prior art keywords
pipeline
arc
storage bin
plate
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211570343.2A
Other languages
Chinese (zh)
Other versions
CN115583591A (en
Inventor
孟令鸿
马桂宁
张云鹏
汪洋
刘端亮
王同刚
刘健
张汝超
崔竞伟
刘杉
吕经帅
张凯
李贵喜
刘志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202211570343.2A priority Critical patent/CN115583591B/en
Publication of CN115583591A publication Critical patent/CN115583591A/en
Application granted granted Critical
Publication of CN115583591B publication Critical patent/CN115583591B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/30Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
    • B65G65/34Emptying devices
    • B65G65/40Devices for emptying otherwise than from the top
    • B65G65/48Devices for emptying otherwise than from the top using other rotating means, e.g. rotating pressure sluices in pneumatic systems
    • B65G65/4881Devices for emptying otherwise than from the top using other rotating means, e.g. rotating pressure sluices in pneumatic systems rotating about a substantially horizontal axis
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • B66F11/042Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations actuated by lazy-tongs mechanisms or articulated levers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F13/00Common constructional features or accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides pipeline installation equipment for temporary fire protection at a construction site, and belongs to the field of pipeline installation equipment. The technical proposal is as follows: including cutting fork lift, the removal curb plate of setting on cutting fork lift side, be provided with storage mechanism on the removal curb plate, still including setting up the hoist mechanism on cutting fork lift, cut fork lift top and be provided with the rail guard, the rail guard side is provided with hoist mechanism, hoist mechanism is including setting up a pair of electric block on the rail guard, electric block's cable free end is provided with equipment hanger, storage mechanism includes the arc storage silo that sets up on removing the curb plate through a plurality of risers, arc storage silo top is sealed, arc storage silo bottom is opened, the open one end of arc storage is close to the recess setting, be provided with on the open one end lateral wall of arc storage silo and stir the subassembly, arc storage silo top is provided with down the subassembly. The beneficial effects of the invention are as follows: simple structure, convenient to use, transportation that can be efficient, installation pipeline.

Description

A pipeline erection equipment for building site is fire control temporarily
Technical Field
The invention relates to the field of pipeline installation equipment, in particular to pipeline installation equipment for temporary fire protection at a construction site.
Background
At present, the installation path of the fire-fighting pipeline inside the building is required to be provided with a pipe from the top of the floor, the fire-fighting pipeline can be placed on the hanging frame before being installed, then butt joint is completed, the fire-fighting pipeline to be installed is required to be manually lifted to the hanging frame, the existing supporting hanging frame has some problems, the installation clamping pipeline is single in function, and the difficulty is high in installation because the fire-fighting pipeline is long and heavy, so that workers consume a large amount of physical power during installation, the working efficiency is influenced, and the manpower resources are wasted.
Disclosure of Invention
The invention aims to provide the pipeline installation equipment for temporarily fire fighting at a construction site, which has the advantages of simple structure and convenient use, and can efficiently transport and install pipelines.
The invention is realized by the following measures:
the pipeline installation device for temporary fire protection of the construction site is characterized by comprising a scissor fork type lifter, a movable side plate arranged on the side surface of the scissor fork type lifter, a storage mechanism arranged on the movable side plate, and a hoisting mechanism arranged on the scissor fork type lifter;
the top of the scissor type lifter is provided with a guard rail, the side face of the guard rail is provided with a hoisting mechanism, the hoisting mechanism comprises a pair of electric hoists arranged on the guard rail, the free end of a cable of each electric hoist is provided with an assembly hoisting piece, and one side of the movable side plate, which is close to the scissor type lifter, is provided with a groove in a concave manner corresponding to the position of the assembly hoisting piece;
the storage mechanism comprises an arc storage bin arranged on the movable side plate through a plurality of vertical plates, the top of the arc storage bin is closed, the bottom of the arc storage bin is open, and one open end of the arc storage bin is close to the groove;
the arc storage silo is characterized in that a stirring assembly is arranged on the side wall of the open end of the arc storage silo, and a pressing assembly is arranged at the top of the arc storage silo.
The invention has the specific characteristics that:
the electric hoist is characterized in that a pair of vertical rods are arranged on one side face of the protective guard, the pair of vertical rods are arranged in parallel, a top plate is arranged at the end of each vertical rod, a pair of electric hoists are arranged at the bottom of the top plate, a hook is arranged at the free end of a cable of each electric hoist, and an assembly hanging piece is arranged on the hook.
The equipment hanging piece is including setting up in both sides link on the couple all be provided with semi-circular punch holder on the link, both sides semi-circular punch holder bottom is provided with semi-circular lower plate, semi-circular punch holder bilateral symmetry is provided with a plurality of installation sleeves, a plurality of are corresponding to the tip of semi-circular lower plate both sides installation sleeve position has seted up the jack, the jack bottom is provided with the installation screw hole, the installation sleeve the jack with be provided with the mounting bolt in the installation screw hole.
A pair of fastening threaded holes are formed in the semicircular upper clamping plate, and fastening bolts are arranged in the fastening threaded holes.
The stirring assembly comprises a pair of fixing seats arranged on the side wall of the arc-shaped storage bin, a rotating shaft is arranged between the pair of fixing seats, a plurality of stirring rods are arranged on the rotating shaft in a cross shape, a penetrating groove is formed in the side wall of the arc-shaped storage bin, the position of the stirring rod corresponds to the stirring rod, and the end part of the stirring rod penetrates through the penetrating groove and is arranged inside the arc-shaped storage bin;
one side of the fixed seat is provided with a driving motor, and one end part of the rotating shaft is arranged on a motor shaft of the driving motor.
The pushing component comprises a pressing plate arranged inside the arc-shaped storage bin, a through hole penetrating through the top of the arc-shaped storage bin is formed in the top of the pressing plate, a pull rope is arranged at the top of the pressing plate, and the end part of the pull rope penetrates out of the through hole to be arranged outside the arc-shaped storage bin and provided with a pull handle.
The side of the scissor lift is provided with a rectangular slot, the side of the movable side plate is provided with a plugboard, the plugboard is inserted into the rectangular slot, the plugboard and the side wall of the rectangular slot are correspondingly provided with a through limiting jack, and the limiting jack is provided with a limiting pin.
The movable side plate is far away from the bottom of one side of the scissor fork type lifter and provided with a plurality of universal wheels.
When carrying the pipelines, orderly placing the pipelines to be installed on the arc-shaped storage bin, enabling the pipeline at the bottommost part to be propped against a poking rod positioned in the arc-shaped storage bin, and pulling the pull handle in the placing process, so that the pressing plate is pressed on the pipeline at the topmost part;
after the pipeline is placed, controlling the scissor type lifter to walk to a designated position, controlling the driving motor to drive the rotating shaft to rotate for a quarter circle, enabling the bottom-most pipeline to fall into the semicircular lower clamping plate by the poking rod (in an initial state, the semicircular lower clamping plate is placed in the groove), then controlling the electric hoist to descend the semicircular upper clamping plate, inserting the mounting sleeve of the semicircular upper clamping plate into the corresponding jack on the semicircular lower clamping plate, inserting the mounting bolt into the mounting sleeve and screwing the mounting bolt into the mounting threaded hole, connecting the semicircular lower clamping plate and the semicircular upper clamping plates on two sides into a whole through the mounting bolt, and then screwing the fastening bolt to further limit the pipeline;
when the pipeline lifting device is installed, the electric hoist is controlled to lift the pipeline, the general position of the electric hoist is adjusted, the pipeline is lapped on a pipeline hanging bracket (the whole length of the semicircular lower clamping plate is smaller than the interval between adjacent hanging brackets), then the pipeline end is connected by adjusting the pipeline position left and right, the pipeline is fixedly installed on the pipeline hanging bracket, after the installation is completed, the semicircular lower clamping plate is taken down by loosening the fastening bolt and the installation bolt, the installed pipeline is separated from the position of the movable scissor lifting device, the installation is completed, and finally the semicircular lower clamping plate is placed in the groove to continuously hoist the next pipeline;
after the pipeline is installed, the monitoring cameras can be installed at the top of the pipeline or a factory building at the same time;
the monitoring cameras are used for an intelligent platform fire protection system in a building factory building, a plurality of monitoring cameras are installed in the building factory building to realize regional real-time monitoring, sensing data and states reported by fire protection equipment are monitored in real time through a monitoring television wall, regional division is carried out according to a construction site, after a fire disaster occurs, the monitoring cameras recognize position information of a marked region through a fire disaster source, instantly send information to management personnel, track a fire disaster expansion range in real time, and secondly, the monitoring cameras can intuitively know the detailed conditions of all regions of the construction site, discover potential safety hazards in advance and feed back in time, so that the occurrence of the safety accident is avoided;
further, the monitoring camera can be combined with the firefighting APP, so that a user can check unit videos at the first time of fire hazard occurrence through the mobile phone to acquire on-site real-time conditions.
The beneficial effects of the invention are as follows: simple structure, convenient to use can the efficient transportation, install the pipeline, conveniently adjusts the position of pipeline simultaneously.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is a schematic structural diagram of an embodiment of the present invention.
Fig. 3 is a schematic structural diagram of an embodiment of the present invention.
Fig. 4 is a schematic structural diagram of an embodiment of the present invention.
Fig. 5 is a partial enlarged view of a portion a in fig. 4.
Fig. 6 is a schematic structural diagram of an embodiment of the present invention.
Fig. 7 is a schematic structural view of an assembled crane according to an embodiment of the invention.
Fig. 8 is a partial enlarged view of the portion B in fig. 7.
Wherein, the reference numerals are as follows: 1. a scissor lift; 101. 2, moving a side plate; 201. a groove; 202. inserting plate; 203. a limiting pin; 3. a storage mechanism; 4. a hoisting mechanism; 5. a riser; 6. an arc-shaped storage bin; 601. a through groove; 7. the assembly is stirred; 701. a fixing seat; 702. a driving motor; 703. a rotating shaft; 704. a toggle rod; 8. a pressing plate; 9. a pull rope; 10. a pipe; 11. a hoisting mechanism; 1101. hanging rings; 1102. a semicircular upper clamping plate; 1103. a semicircular lower clamping plate; 1104. installing a bolt; 1105. a mounting sleeve; 1106. a jack; 1107. installing a threaded hole; 12. a vertical rod; 13. a top plate; 14. an electric hoist; 15. a cable; 16. a hook; 17. a pull handle.
Detailed Description
In order to clearly illustrate the technical characteristics of the scheme, the scheme is explained below through a specific embodiment.
Referring to fig. 1 to 8, a pipeline installation device for temporary fire protection at a construction site comprises a scissor lift 1, a movable side plate 2 arranged on the side surface of the scissor lift 1, a storage mechanism 3 arranged on the movable side plate 2, and a hoisting mechanism 11 arranged on the scissor lift 1;
the top of the scissor lift 1 is provided with a guard rail, the side surface of the guard rail is provided with a hoisting mechanism 11, the hoisting mechanism 11 comprises a pair of electric hoists 14 arranged on the guard rail, the free end of a cable 15 of each electric hoist 14 is provided with an assembly hoisting piece, and a groove 201 is concavely formed in the position, corresponding to the assembly hoisting piece, of one side of the movable side plate 2, close to the scissor lift 1;
the storage mechanism 3 comprises an arc storage bin 6 arranged on the movable side plate 2 through a plurality of vertical plates 5, the top of the arc storage bin 6 is closed, the bottom of the arc storage bin 6 is open, and one open end of the arc storage bin is arranged close to the groove 201;
the side wall of the open end of the arc storage bin 6 is provided with a poking component 7, and the top of the arc storage bin 6 is provided with a pressing component.
The side of rail guard one side is provided with a pair of montant 12, and a pair of montant 12 parallel arrangement, and a pair of montant 12 tip is provided with roof 13, and roof 13 bottom is provided with a pair of electric block 14, and cable 15 free end of electric block 14 is provided with couple 16, is provided with the equipment hanger on the couple 16.
The assembly hanging piece comprises hanging rings 1101 arranged on hooks 16 on two sides, semicircular upper clamping plates 1102 are arranged on the hanging rings 1101 on two sides, semicircular lower clamping plates 1103 are arranged at the bottoms of the semicircular upper clamping plates 1102 on two sides, a plurality of mounting sleeves 1105 are symmetrically arranged on two sides of the semicircular upper clamping plates 1102, insertion holes 1106 are formed in the end portions on two sides of the semicircular lower clamping plates 1103 corresponding to the positions of the mounting sleeves 1105, mounting threaded holes 1107 are formed in the bottoms of the insertion holes 1106, and mounting bolts 1104 are arranged in the mounting sleeves 1105, the insertion holes 1106 and the mounting threaded holes 1107.
The semicircular upper clamping plate 1102 is provided with a pair of fastening threaded holes, and fastening bolts are arranged in the fastening threaded holes.
The poking assembly 7 comprises a pair of fixed seats 701 arranged on the side wall of the arc-shaped storage bin 6, a rotating shaft 703 is arranged between the fixed seats 701, a plurality of poking rods 704 are arranged on the rotating shaft 703 in a cross shape, through grooves 601 penetrating through the side wall of the arc-shaped storage bin 6 corresponding to the poking rods 704 are formed in the positions of the poking rods 704, and the end parts of the poking rods 704 penetrate through the through grooves 601 and are arranged inside the arc-shaped storage bin 6;
a driving motor 702 is arranged on the side face of the one-side fixing seat 701, and one end part of the rotating shaft 703 is arranged on a motor shaft of the driving motor 702.
The pushing-down assembly comprises a pressing plate 8 arranged inside the arc-shaped storage bin 6, a through hole penetrating through the top of the arc-shaped storage bin 6 is formed in the top of the pressing plate 8, a pull rope 9 is arranged at the top of the pressing plate, and the end part of the pull rope 9 penetrates out of the through hole to be arranged outside the arc-shaped storage bin 6 and is provided with a pull handle 17.
The side of the scissor lift 1 is provided with a rectangular slot 101, the side of the movable side plate 2 is provided with a plugboard 202, the plugboard 202 is inserted into the rectangular slot 101, the plugboard 202 and the side wall of the rectangular slot 101 are correspondingly provided with a penetrated limit jack 1106, and the limit jack 1106 is provided with a limit pin 203.
The bottom of one side of the movable side plate 2 far away from the scissor fork type lifter 1 is provided with a plurality of universal wheels.
When carrying the pipelines 10, arranging the pipelines 10 to be installed on the arc-shaped storage bin 6 in order, enabling the pipeline 10 at the bottommost part to be propped against the poking rod 704 positioned in the arc-shaped storage bin 6, and pulling the pull handle 17 in the arranging process, so that the pressing plate 8 is pressed on the pipeline 10 at the topmost part;
after the placement of the pipeline 10 is completed, controlling the scissor lift 1 to walk to a designated position, controlling the driving motor 702 to drive the rotating shaft 703 to rotate by a quarter circle, poking the bottommost pipeline 10 by the poking rod 704 to fall into the semicircular lower clamping plate 1103 (in an initial state, the semicircular lower clamping plate 1103 is placed in the groove 201), then controlling the electric hoist 14 to descend the semicircular upper clamping plate 1102, inserting the mounting sleeve 1105 of the semicircular upper clamping plate 1102 into the corresponding jack 1106 on the semicircular lower clamping plate 1103, inserting the mounting bolt 1104 into the mounting sleeve 1105 and screwing the mounting bolt 1104 into the mounting threaded hole 1107, connecting the semicircular lower clamping plate 1103 and the semicircular upper clamping plates 1102 on two sides into a whole through the mounting bolt 1104, and screwing the fastening bolt to further limit the pipeline 10;
when the pipeline 10 is installed, the scissor type lifter 1 is lifted, the electric hoist 14 is controlled to lift the pipeline 10, the general position of the scissor type lifter 1 is adjusted, the pipeline 10 is lapped on a pipeline hanger (the whole length of the semicircular lower clamping plate 1103 is smaller than the interval between adjacent hangers), then the position of the pipeline 10 is adjusted left and right to connect the end part of the pipeline 10 and fixedly install the pipeline 10 on the pipeline 10 hanger, after the installation is completed, the semicircular lower clamping plate 1103 is taken down by loosening the fastening bolts and the installing bolts 1104, the position of the scissor type lifter 1 is moved to be separated from the installed pipeline 10, the installation is completed, and finally the semicircular lower clamping plate 1103 is placed into the groove 201 to continuously hoist the next pipeline 10;
after the pipeline 10 is installed, the monitoring cameras can be installed at the top of the pipeline 10 or a factory building at the same time;
the monitoring cameras are used for an intelligent platform fire protection system in a building factory building, a plurality of monitoring cameras are installed in the building factory building to realize regional real-time monitoring, sensing data and states reported by fire protection equipment are monitored in real time through a monitoring television wall, regional division is carried out according to a construction site, after a fire disaster occurs, the monitoring cameras recognize position information of a marked region through a fire disaster source, immediately send information to management personnel, track a fire disaster expansion range in real time, and secondly, the monitoring cameras can intuitively know the detailed condition of each region of the construction site, discover potential safety hazards in advance and feed back in time, so that the occurrence of the safety accident is avoided;
further, the monitoring camera can be combined with the firefighting APP, so that a user can check unit videos at the first time of fire hazard occurrence through the mobile phone to acquire on-site real-time conditions.
The technical features of the present invention that are not described in the present invention may be implemented by or using the prior art, and are not described in detail herein, but the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, but is also intended to be within the scope of the present invention by those skilled in the art.

Claims (1)

1. The pipeline installation device for temporary fire protection of the construction site is characterized by comprising a scissor fork type lifter, a movable side plate arranged on the side surface of the scissor fork type lifter, a storage mechanism arranged on the movable side plate, and a hoisting mechanism arranged on the scissor fork type lifter;
the top of the scissor type lifter is provided with a guard rail, the side face of the guard rail is provided with a hoisting mechanism, the hoisting mechanism comprises a pair of electric hoists arranged on the guard rail, the free end of a cable of each electric hoist is provided with an assembly hoisting piece, and one side of the movable side plate, which is close to the scissor type lifter, is provided with a groove in a concave manner corresponding to the position of the assembly hoisting piece;
the storage mechanism comprises an arc storage bin arranged on the movable side plate through a plurality of vertical plates, the top of the arc storage bin is closed, the bottom of the arc storage bin is open, and one open end of the arc storage bin is close to the groove;
a poking component is arranged on the side wall of the open end of the arc storage bin, and a pressing component is arranged at the top of the arc storage bin;
the side face of one side of the protective guard is provided with a pair of vertical rods, the pair of vertical rods are arranged in parallel, the end parts of the pair of vertical rods are provided with a top plate, the bottom of the top plate is provided with a pair of electric hoists, the free end of a cable of each electric hoist is provided with a hook, and the hook is provided with an assembly hanging piece;
the assembly hanging piece comprises hanging rings arranged on the hooks at two sides, semicircular upper clamping plates are arranged on the hanging rings at two sides, semicircular lower clamping plates are arranged at the bottoms of the semicircular upper clamping plates at two sides, a plurality of mounting sleeves are symmetrically arranged at two sides of the semicircular upper clamping plates, insertion holes are formed in the end parts of two sides of the semicircular lower clamping plates, corresponding to the mounting sleeves, at the positions of the mounting sleeves, mounting threaded holes are formed in the bottoms of the insertion holes, and mounting bolts are arranged in the mounting sleeves, the insertion holes and the mounting threaded holes;
a pair of fastening threaded holes are formed in the semicircular upper clamping plate, and fastening bolts are arranged in the fastening threaded holes;
the stirring assembly comprises a pair of fixing seats arranged on the side wall of the arc-shaped storage bin, a rotating shaft is arranged between the pair of fixing seats, a plurality of stirring rods are arranged on the rotating shaft in a cross shape, a penetrating groove is formed in the side wall of the arc-shaped storage bin, the position of the stirring rod corresponds to the stirring rod, and the end part of the stirring rod penetrates through the penetrating groove and is arranged inside the arc-shaped storage bin;
one side of the fixed seat is provided with a driving motor, and one end part of the rotating shaft is arranged on a motor shaft of the driving motor;
the pressing assembly comprises a pressing plate arranged inside the arc-shaped storage bin, a through hole penetrating through the top of the arc-shaped storage bin is formed in the top of the pressing plate, a pull rope is arranged at the top of the pressing plate, and the end part of the pull rope penetrates out of the through hole to be arranged outside the arc-shaped storage bin and is provided with a pull handle;
the side face of the scissor type lifter is provided with a rectangular slot, the side face of the movable side plate is provided with a plugboard, the plugboard is inserted into the rectangular slot, the plugboard and the side wall of the rectangular slot are correspondingly provided with a through limiting jack, and the limiting jack is provided with a limiting pin;
the bottom of one side of the movable side plate, which is far away from the scissor fork type lifter, is provided with a plurality of universal wheels;
when carrying the pipelines, orderly placing the pipelines to be installed on the arc-shaped storage bin, enabling the pipeline at the bottommost part to be propped against a poking rod positioned in the arc-shaped storage bin, and pulling the pull handle in the placing process, so that the pressing plate is pressed on the pipeline at the topmost part;
after the pipeline is placed, controlling the scissor type lifter to walk to a designated position, controlling the driving motor to drive the rotating shaft to rotate for a quarter circle, enabling the bottom-most pipeline to fall into the semicircular lower clamping plate by the poking rod, then controlling the electric hoist to descend the semicircular upper clamping plate, inserting the mounting sleeve of the semicircular upper clamping plate into the corresponding jack on the semicircular lower clamping plate, inserting the mounting bolt into the mounting sleeve and screwing the mounting sleeve into the mounting threaded hole, connecting the semicircular lower clamping plate and the semicircular upper clamping plates on two sides into a whole through the mounting bolt, and then screwing the fastening bolt to further limit the pipeline;
during installation, the electric hoist is controlled to lift the pipeline, the general position of the electric hoist is adjusted to enable the pipeline to be mounted on the pipeline hanging frame, then the pipeline end is connected by adjusting the pipeline position left and right and is fixedly mounted on the pipeline hanging frame, after installation is completed, the fastening bolt and the mounting bolt are loosened to enable the semicircular lower clamping plate to be taken down, the pipeline with the installation completed is removed from the position of the electric hoist, the installation is completed, and finally the semicircular lower clamping plate is placed into the groove to continue to hoist the next pipeline.
CN202211570343.2A 2022-12-08 2022-12-08 A pipeline erection equipment for building site is fire control temporarily Active CN115583591B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211570343.2A CN115583591B (en) 2022-12-08 2022-12-08 A pipeline erection equipment for building site is fire control temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211570343.2A CN115583591B (en) 2022-12-08 2022-12-08 A pipeline erection equipment for building site is fire control temporarily

Publications (2)

Publication Number Publication Date
CN115583591A CN115583591A (en) 2023-01-10
CN115583591B true CN115583591B (en) 2023-08-11

Family

ID=84783060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211570343.2A Active CN115583591B (en) 2022-12-08 2022-12-08 A pipeline erection equipment for building site is fire control temporarily

Country Status (1)

Country Link
CN (1) CN115583591B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160004142A (en) * 2014-07-02 2016-01-12 이영주 a pipe hanger of pipe arrangement
CN207608207U (en) * 2017-08-03 2018-07-13 上海二十冶建设有限公司 A kind of lifting device of waste heat boiler rise and fall pipe
CN210457199U (en) * 2019-08-22 2020-05-05 长沙中联恒通机械有限公司 Hoisting apparatus, fire fighting apparatus and mechanical equipment thereof
CN210655932U (en) * 2019-09-06 2020-06-02 中建八局第一建设有限公司 Novel pipeline hoist and mount device
CN112093652A (en) * 2020-09-16 2020-12-18 浙江巨龙管业科技有限公司 Concrete pipe lifting appliance and lifting method thereof
CN112811346A (en) * 2020-07-03 2021-05-18 天工俐德科技发展有限公司 Totally closed installation device for sound barrier
CN213332803U (en) * 2020-10-18 2021-06-01 天津科安佳消防工程有限公司 Fire-fighting pipeline fixing device
CN214398802U (en) * 2020-11-20 2021-10-15 郝永蕾 Civil engineering pipe fitting placing and bearing structure
CN216038524U (en) * 2021-09-17 2022-03-15 江苏佳锦建设工程有限公司 Safety protection aerial work platform
CN217972497U (en) * 2022-06-22 2022-12-06 湖南源杰安全系统工程有限公司 Special lift of fire-fighting pipeline installation

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160004142A (en) * 2014-07-02 2016-01-12 이영주 a pipe hanger of pipe arrangement
CN207608207U (en) * 2017-08-03 2018-07-13 上海二十冶建设有限公司 A kind of lifting device of waste heat boiler rise and fall pipe
CN210457199U (en) * 2019-08-22 2020-05-05 长沙中联恒通机械有限公司 Hoisting apparatus, fire fighting apparatus and mechanical equipment thereof
CN210655932U (en) * 2019-09-06 2020-06-02 中建八局第一建设有限公司 Novel pipeline hoist and mount device
CN112811346A (en) * 2020-07-03 2021-05-18 天工俐德科技发展有限公司 Totally closed installation device for sound barrier
CN112093652A (en) * 2020-09-16 2020-12-18 浙江巨龙管业科技有限公司 Concrete pipe lifting appliance and lifting method thereof
CN213332803U (en) * 2020-10-18 2021-06-01 天津科安佳消防工程有限公司 Fire-fighting pipeline fixing device
CN214398802U (en) * 2020-11-20 2021-10-15 郝永蕾 Civil engineering pipe fitting placing and bearing structure
CN216038524U (en) * 2021-09-17 2022-03-15 江苏佳锦建设工程有限公司 Safety protection aerial work platform
CN217972497U (en) * 2022-06-22 2022-12-06 湖南源杰安全系统工程有限公司 Special lift of fire-fighting pipeline installation

Also Published As

Publication number Publication date
CN115583591A (en) 2023-01-10

Similar Documents

Publication Publication Date Title
CN110137852B (en) Single-piece replacement method for tension insulator of ultra-high voltage transmission line
CN107069562A (en) Replacing insulator under electrified method and load transfer device
CN212671608U (en) Wellhead oil pipe moving device
CN115583591B (en) A pipeline erection equipment for building site is fire control temporarily
WO2024066821A1 (en) Climbing system for tower crane, and tower crane
CN109205481A (en) The outer lifting device of transformer of household portable
CN202023508U (en) Connecting and fixing device for moving top drive of drilling machine and derrick rapidly
CN213276887U (en) Intelligent electric fire monitoring device
CN212369445U (en) Underground lifesaving equipment
CN211037773U (en) Hanging basket suspension device
CN211444835U (en) Tower body tile holding mounting and dismounting device of tower crane
CN210692985U (en) Grounding wire assembling and disassembling device
CN115182704A (en) Emergency rescue device for blowout of oil and gas well and use method
CN204456690U (en) Multi-functional installation colored steel mobile roof support
CN204125116U (en) Wellhead blowout preventor checking maintenance platform
CN208964367U (en) A kind of safe and simple vertical support hanging apparatus
CN103326264B (en) Single-column vertical-telescopic-type outdoor high-voltage alternating replacing options
CN109038365B (en) Load hoisting system for live replacement of 500kV linear insulator string
CN218145361U (en) Gallows structure is used in building engineering construction
CN113738293A (en) Wellhead oil pipe moving device
CN215828206U (en) Heavy built-in fitting hoist device
CN215768799U (en) Live-wire work device
CN218371306U (en) Mine hydraulic support dismouting mechanism
CN204689391U (en) The high-altitude safe suspension hook of terrestrial operation
CN218060411U (en) Comprehensive pipe gallery modeling device based on BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant