CN115564243A - Production control method and device based on routing inspection list, electronic equipment and system - Google Patents

Production control method and device based on routing inspection list, electronic equipment and system Download PDF

Info

Publication number
CN115564243A
CN115564243A CN202211234315.3A CN202211234315A CN115564243A CN 115564243 A CN115564243 A CN 115564243A CN 202211234315 A CN202211234315 A CN 202211234315A CN 115564243 A CN115564243 A CN 115564243A
Authority
CN
China
Prior art keywords
inspection
list
time length
alarm
unqualified
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211234315.3A
Other languages
Chinese (zh)
Inventor
袁海波
孙小春
张燕妮
徐庭锐
左红
黄蓉
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Qiruike Technology Co Ltd
Original Assignee
Sichuan Qiruike Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Qiruike Technology Co Ltd filed Critical Sichuan Qiruike Technology Co Ltd
Priority to CN202211234315.3A priority Critical patent/CN115564243A/en
Publication of CN115564243A publication Critical patent/CN115564243A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing

Abstract

The invention provides a production control method and device based on a routing inspection list and electronic equipment, which are applied to a manufacturing execution system and comprise the following steps: selecting a command list and a working center at a client for computer production; generating a command list and a routing inspection list corresponding to a work center, and setting the inspection state of the routing inspection list as to-be-inspected; determining whether the inspection state of the inspection list is inspection completion; if the inspection state of the inspection list is inspection completion, judging whether the inspection result of the inspection list is unqualified; and if the inspection result of the inspection list is unqualified, forcibly unloading the client corresponding to the work center corresponding to the order list, and forbidding the work center corresponding to the order list to continue to operate on the computer for production. The quality problems in the production and manufacturing process are timely checked and found through automatically or manually generating the inspection list. And if the check result of the inspection list is unqualified, automatically forcing the work center corresponding to the order list to be offline, and preventing the quality problem from being further diffused.

Description

Production control method and device based on routing inspection list, electronic equipment and system
Technical Field
The invention relates to the technical field of intelligent manufacturing, in particular to a production control method and device based on a routing inspection list, electronic equipment and a system.
Background
In the manufacturing industry, quality control needs to be performed on factory or workshop production nodes, and quality management needs to be performed on workshop-level processes or products. The method has the advantages that the manufacturing site information is collected in real time, the quality of the processing or assembling process is tracked, analyzed and controlled, the quality management of the production process from raw materials entering a factory to finished products leaving the factory is realized, and the product quality is ensured.
In the production and manufacturing process, product quality inspection is an important link for ensuring the product quality. The traditional quality inspection mode is that a system generates an inspection list, and an inspector stores an offline inspection result in the system. The inspector informs the first-line production staff to stop continuing the production according to the inspection result (unqualified inspection) and cleans up the product which may have quality problems. Conventional such schemes do not manage the production process in a timely manner and prevent further propagation of possible quality problems.
In the manufacturing process of the product, how to find the quality problem in time, how to define the range of the product with the possible quality problem, and how to take the treatment measures in time to prevent the further diffusion of the quality problem are the problems which are urgently needed to be solved by the manufacturing.
Disclosure of Invention
In order to achieve the purpose, the invention adopts the technical scheme that: according to a first aspect of the embodiments of the present invention, a production control method based on a routing inspection list is provided, where the method includes:
an operator selects a command list and a working center to carry out machine production at a client;
automatically or manually generating the order sheet and the routing inspection sheet corresponding to the work center, and setting the inspection state of the routing inspection sheet as to-be-inspected;
determining whether the inspection state of the inspection list is inspection completion;
if the inspection state of the inspection ticket is that the inspection is finished, judging whether the inspection result of the inspection ticket is unqualified;
and if the inspection result of the inspection list is unqualified, forcibly unloading the client corresponding to the work center corresponding to the order list, and forbidding the work center corresponding to the order list to continue to operate on the computer for production.
Preferably, after determining whether the inspection state of the inspection ticket is that the inspection is completed, the method further includes:
and if the inspection state of the inspection list is not the inspection completion, judging whether the generation time length of the inspection list reaches the preset time length. And the generation duration is the difference between the current time and the creation time of the inspection list.
And if the generation time of the routing inspection list reaches the preset time, forcibly offline the client corresponding to the order list and the work center, and forbidding the work center corresponding to the order list to continue to operate on the computer for production.
Preferably, the method further comprises:
if the generation time length of the routing inspection list does not reach the preset time length, whether the difference value between the generation time length and the preset time length of the routing inspection list is larger than a first alarm time length and smaller than a second alarm time length or not is judged.
And if the difference value between the generated time length and the preset time length of the routing inspection list is judged to be greater than a first alarm time length and smaller than a second alarm time length, an alarm prompt is pushed to a first responsible person and/or a first responsible department.
Preferably, the method further comprises:
if the generation time length of the inspection list does not reach the preset time length, whether the difference value between the generation time length and the preset time length of the inspection list is smaller than a first alarm time length or not is judged.
And if the difference value between the generated time length and the preset time length of the routing inspection list is smaller than the first alarm time length, pushing an alarm prompt to a second responsible person and/or a second responsible department.
Preferably, after the forcibly downloading the client corresponding to the work center corresponding to the order form and prohibiting the work center corresponding to the order form from continuing to operate the computer for production, the method further includes:
and pushing an alarm prompt to the third responsible person and/or the third responsible department.
Preferably, the preset time period is 4 hours; the first alarm time is 0.5 hours; the second alarm period is 1 hour.
According to a second aspect of the embodiments of the present invention, there is provided a production control method based on a routing inspection list, the method including:
determining whether the inspection result of the order sheet and the inspection sheet corresponding to the work center is unqualified;
if the inspection result of the inspection sheet is unqualified, setting the unqualified processing state of the inspection sheet as to-be-processed;
and judging whether the unqualified processing state corresponding to the inspection list is processed.
And if the unqualified processing state corresponding to the inspection sheet is processed, allowing the work center corresponding to the order sheet to continue to be operated on the computer for production.
Preferably, the method further comprises: and judging whether the existence time of the routing inspection list is longer than a third alarm time and shorter than a fourth alarm time. And the existing duration is the difference value of the current time minus the time when the inspection sheet is judged to be unqualified.
And if the existence time length of the inspection list is longer than the third alarm time length and shorter than the fourth alarm time length, pushing an alarm prompt to the first responsible person and/or the first responsible department.
Preferably, the method further comprises:
and judging whether the existence time of the routing inspection list is longer than a fourth alarm time.
And if the existence duration of the routing inspection list is judged to be greater than the fourth alarm duration, an alarm prompt is pushed to a second responsible person and/or a second responsible department.
Preferably, the third alarm duration is 2 hours; the fourth alarm time is 4 hours;
according to a third aspect of the embodiments of the present invention, there is provided a production control device based on a routing inspection list, the device including:
the computer-on module is used for an operator to select a command list at the client and to perform computer production in a work center;
the inspection list generating module is used for automatically or manually generating the order list and the inspection list corresponding to the work center and setting the inspection state of the inspection list as to-be-inspected;
and the determining module is used for determining whether the inspection state of the inspection list is the inspection completion.
And the judging module is used for judging whether the inspection result of the inspection list is unqualified or not if the inspection state of the inspection list is inspection completion.
And the control module is used for forcibly disconnecting the client corresponding to the working center corresponding to the order sheet and forbidding the working center corresponding to the order sheet to continue operating the computer for production if the inspection result of the inspection sheet is unqualified.
Preferably, after determining whether the inspection state of the inspection ticket is that the inspection is completed, the method further includes:
and the judging module is also used for judging whether the generation time length of the routing inspection list reaches the preset time length if the inspection state of the routing inspection list is not the inspection completion. And the generation duration is the difference value between the current time and the creation time of the routing inspection list.
And the control module is also used for forcibly offline the order sheet and the client corresponding to the work center if the generation time of the inspection sheet reaches a preset time, and forbidding the work center corresponding to the order sheet to continue to operate on the computer for production.
Preferably, the apparatus further comprises:
the judging module is also used for judging whether the difference value between the generated time length of the inspection list and the preset time length is greater than the first alarm time length and less than the second alarm time length if the generated time length of the inspection list does not reach the preset time length.
And the alarm module is used for pushing an alarm prompt to the first responsible person and/or the first responsible department if the difference between the generated time length and the preset time length of the routing inspection list is judged to be greater than the first alarm time length and less than the second alarm time length.
Preferably, the apparatus further comprises:
the judging module is also used for judging whether the difference value between the generation time length of the inspection list and the preset time length is less than first alarm time length if the generation time length of the inspection list does not reach the preset time length.
And the alarm module is used for pushing an alarm prompt to a second responsible person and/or a second responsible department if the difference value between the generated time length and the preset time length of the routing inspection list is judged to be smaller than the first alarm time length.
According to a fourth aspect of the embodiments of the present invention, there is provided a production control device based on a routing inspection list, including:
the determining module is used for determining whether the inspection result of the order sheet and the inspection sheet corresponding to the work center is unqualified;
the setting module is used for setting the unqualified processing state of the inspection list as to-be-processed if the inspection result of the inspection list is unqualified;
and the judging module is used for judging whether the unqualified processing state corresponding to the inspection list is processed.
And the control module is used for allowing the work center corresponding to the order sheet to continue to be operated for production if the unqualified processing state corresponding to the inspection sheet is processed.
Preferably, the apparatus further comprises:
and the judging module is used for judging whether the existence time length of the routing inspection list is greater than the third alarm time length and less than the fourth alarm time length. And the existing duration is the difference value of the current time minus the time when the inspection sheet is judged to be unqualified.
And the alarm module is used for pushing an alarm prompt to the first responsible person and/or the first responsible department if the existence duration of the routing inspection list is longer than the third alarm duration and shorter than the fourth alarm duration.
Preferably, the apparatus further comprises:
and the judging module is used for judging whether the existing time length of the routing inspection list is greater than the fourth alarm time length.
And the alarm module is used for pushing an alarm prompt to a second responsible person and/or a second responsible department if the existence duration of the routing inspection list is judged to be greater than the fourth alarm duration.
According to a fifth aspect of embodiments of the present invention, there is provided an electronic apparatus, including: a processor; a memory for storing a processor executable computer program; wherein the processor implements the method as described above by running the executable computer program.
According to a sixth aspect of embodiments of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements the steps of the method as described above.
The invention has the beneficial effects that: the quality problems in the production and manufacturing process are timely checked and found through automatically or manually generating the inspection list. And if the checking result of the inspection sheet is unqualified, automatically forcing the work center corresponding to the order sheet to be offline, and preventing the quality problem from further spreading. Meanwhile, quality personnel can timely process the inspection list by limiting the processing time of the inspection list so as to reduce the influence range of potential quality problems; and limiting the processing time of the routing inspection list, and providing timely processing for quality personnel to reduce the unplanned downtime of the work center.
Drawings
Fig. 1 is a flow chart of a production control method based on a routing inspection list in the embodiment of the invention;
FIG. 2 is a flow chart of a production control method based on a routing inspection list according to an embodiment of the present invention;
FIG. 3 is a flow chart in an embodiment of the invention;
fig. 4 is a block diagram of the structure in the embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
On the contrary, this application is intended to cover any alternatives, modifications, equivalents, and alternatives that may be included within the spirit and scope of the application as defined by the appended claims. Furthermore, in the following detailed description of the present application, certain specific details are set forth in order to provide a better understanding of the present application. It will be apparent to one skilled in the art that the present application may be practiced without these specific details.
A method, an apparatus and an electronic device for managing and controlling production based on a routing inspection list according to embodiments of the present application will be described in detail below with reference to fig. 1 to 4. It is to be noted that the following examples are only for explaining the present application and do not constitute a limitation to the present application.
The manufacturing execution system is a management information system facing the vehicle interlayer and positioned between the upper-layer plan management system and the bottom-layer industrial control, and can help enterprises to realize production plan management and scheduling, production process monitoring, product quality monitoring and the technology of combining industrial Internet of things, so that the production and manufacturing process is more intelligent.
The manufacturing execution system is also referred to as an MES for short. A manufacturing execution system generally includes a server and a client. The server provides planning and management functions of the production and manufacturing process, and is generally used by management personnel of a factory; the client provides the execution functions of the manufacturing process, typically used by an operator of a manufacturing plant or line.
In the production and manufacturing process, the quality of materials, products and finished products required by production needs to be checked so as to ensure the quality of the products. The quality inspection is divided into the processes of incoming inspection IQC, processing inspection IPQC and outgoing inspection OQC according to the production process. Process check IPQC is a quality control of a product from the input of raw materials to the final packaging of the product, and is a check for periodic or random flowability during the manufacturing process of the product. The process inspection IPQC inspects products produced by the process or the work center, records an inspection conclusion according to an inspection result, and sends out alarm information if finding unqualified products.
Fig. 1 is a flowchart of a production control method based on a routing inspection list according to an exemplary embodiment. As shown in fig. 1, a production control method based on a routing inspection list is provided, the method includes:
step S102: an operator selects a command list and a working center to carry out machine production at a client;
in one embodiment, the client is a collection end or an employee operation end or an employee workbench of the manufacturing execution system. A work center may be a logical unit, such as representing a process of a process flow; the work center may also be a logic unit, such as representing a station of a production line; or represent a piece of equipment. The order sheet is a production order sheet or a production task sheet issued by the manufacturing execution system; the order sheet can also be a production order sheet or a production task sheet which is sent to the work center by the manufacturing execution system; an operator refers to any operator of a plant or production line, or any person having the authority to operate a work center. And the operator selects the order sheets required to be produced and the corresponding work center at the client and then machines the order sheets for production.
Step S104: automatically or manually generating the order sheet and the routing inspection sheet corresponding to the work center, and setting the inspection state of the routing inspection sheet as to-be-inspected;
in one embodiment, after the operator performs the production on the computer, the production execution system may automatically generate the order sheet and the routing inspection sheet corresponding to the work center according to a preset rule. The preset rules include: and the work center works for every H hours and produces N products. The quality inspection personnel can also manually create the order and the routing inspection list corresponding to the work center. When the order sheet and the routing inspection sheet corresponding to the work center are created, the manufacturing execution system sets the inspection state of the routing inspection sheet to be inspected;
step S106: determining whether the inspection state of the inspection ticket is the inspection completion;
in one embodiment, the quality inspection personnel are responsible for inspecting products produced by the work center corresponding to the inspection list. After the inspection is completed, the quality inspection personnel give inspection results to the inspection list, and the inspection results comprise: and (4) passing and failing. And the qualification shows that the product produced by the work center corresponding to the inspection sheet meets the quality requirement. And the unqualified inspection sheet indicates that the product produced by the work center corresponding to the inspection sheet possibly does not meet the quality requirement, and the work center corresponding to the inspection sheet or the product produced by the work center needs to be further processed.
After the quality testing personnel give a testing result to the inspection form, the manufacturing execution system sets the testing state of the inspection form as the completion of the testing;
step S108: if the inspection state of the inspection list is inspection completion, judging whether the inspection result of the inspection list is unqualified;
step S110: and if the inspection result of the inspection list is unqualified, forcibly unloading the client corresponding to the work center corresponding to the order list, and forbidding the work center corresponding to the order list to continue to operate on the computer for production.
In one embodiment, if the inspection sheet is unqualified in the verification result, the work center corresponding to the order sheet is automatically forced to be offline, so that the quality problem is prevented from being further diffused.
In one embodiment, after determining whether the inspection state of the inspection ticket is the inspection completion, if it is determined that the inspection state of the inspection ticket is not the inspection completion, determining whether the generation time length of the inspection ticket reaches a preset time length. And the generation duration is the difference value between the current time and the creation time of the routing inspection list.
And if the generation time of the routing inspection list reaches the preset time, forcibly offline the client corresponding to the order list and the work center, and forbidding the work center corresponding to the order list to continue to operate on the computer for production.
In one embodiment, if the generation time length of the routing inspection list does not reach a preset time length, whether the difference value between the generation time length of the routing inspection list and the preset time length is larger than a first alarm time length and smaller than a second alarm time length is judged.
And if the difference value between the generated time length and the preset time length of the inspection list is judged to be greater than a first alarm time length and less than a second alarm time length, an alarm prompt is pushed to a first responsible person and/or a first responsible department.
In one embodiment, if the generation time length of the routing inspection list does not reach the preset time length, whether the difference value between the generation time length of the routing inspection list and the preset time length is smaller than a first alarm time length is judged.
And if the difference value between the generated time length and the preset time length of the routing inspection list is smaller than the first alarm time length, pushing an alarm prompt to a second responsible person and/or a second responsible department.
In a certain embodiment, the client corresponding to the work center corresponding to the order sheet is forced to be offline, and after the work center corresponding to the order sheet is prohibited from continuously operating on the computer for production, an alarm prompt is pushed to a third responsible person and/or a third responsible department.
In one embodiment, the preset time period is 4 hours; the first alarm time is 0.5 hours; the second alarm period is 1 hour.
Fig. 2 is a flowchart of a production control method based on a routing inspection list according to an exemplary embodiment. As shown in fig. 2, a production control method based on a routing inspection list is provided, the method includes:
step S202: determining whether the inspection results of the order sheet and the inspection sheet corresponding to the work center are unqualified;
step S204: if the inspection result of the inspection list is unqualified, setting the unqualified processing state of the inspection list as to-be-processed;
step S206: and judging whether the unqualified processing state corresponding to the inspection list is processed.
Step S208: and if the unqualified processing state corresponding to the inspection sheet is processed, allowing the work center corresponding to the order sheet to continue to be operated on the computer for production.
In one embodiment, whether the existence time of the routing inspection list is longer than a third alarm time and shorter than a fourth alarm time is judged. And the existing duration is the difference between the current time and the time when the inspection sheet is judged to be unqualified.
And if the existence time of the routing inspection list is longer than the third alarm time and shorter than the fourth alarm time, pushing an alarm prompt to the first responsible person and/or the first responsible department.
In one embodiment, whether the existence time of the routing inspection list is longer than a fourth alarm time is judged. And if the existence duration of the routing inspection list is judged to be greater than the fourth alarm duration, an alarm prompt is pushed to a second responsible person and/or a second responsible department.
In one embodiment, the third alarm period is 2 hours; the fourth alarm time is 4 hours;
fig. 3 is a block diagram of a production control device based on a routing inspection list according to an exemplary embodiment. As shown in fig. 3, a production control device 30 based on a routing inspection list is provided, where the device 30 includes:
an on-machine module 302, configured to select a command list and an on-machine production in a work center at a client by an operator;
the inspection sheet generation module 304 is used for automatically or manually generating the order sheet and the inspection sheet corresponding to the work center and setting the inspection state of the inspection sheet to be inspected;
a determining module 306, configured to determine whether the inspection status of the routing inspection ticket is inspection completion.
The judging module 308 judges whether the inspection result of the inspection ticket is unqualified if the inspection state of the inspection ticket is inspection completion.
And the control module 310 is configured to, if the inspection result of the routing inspection ticket is unqualified, force to offline the client corresponding to the work center corresponding to the order ticket, and prohibit the work center corresponding to the order ticket from continuing to operate the computer for production.
In one embodiment, determining whether the inspection status of the routing inspection ticket is after the inspection is completed further includes: the determining module 308 is further configured to determine whether the generation time of the routing inspection list reaches a preset time if it is determined that the inspection state of the routing inspection list is not the inspection completion. And the generation duration is the difference value between the current time and the creation time of the routing inspection list.
The control module 310 is further configured to, if the generation duration of the routing inspection ticket reaches a preset duration, force the client corresponding to the order ticket and the work center to go offline, and prohibit the work center corresponding to the order ticket from continuing to operate the computer for production.
In one embodiment, the apparatus 30 further comprises: the determining module 308 is further configured to determine whether a difference between the generated duration of the routing inspection ticket and the preset duration is greater than a first alarm duration and less than a second alarm duration if the generated duration of the routing inspection ticket does not reach the preset duration.
And the alarm module 312 is configured to push an alarm prompt to the first responsible person and/or the first responsible department if it is determined that the difference between the generated time length of the routing inspection ticket and the preset time length is greater than a first alarm time length and less than a second alarm time length.
In a certain embodiment, the apparatus further comprises: the determining module 308 is further configured to determine whether a difference between the generated duration of the routing inspection ticket and the preset duration is less than a first alarm duration if the generated duration of the routing inspection ticket does not reach the preset duration.
And the alarm module 312 is configured to push an alarm prompt to a second responsible person and/or a second responsible department if it is determined that the difference between the generated time length of the routing inspection list and the preset time length is smaller than a first alarm time length.
Fig. 4 is a block diagram of a production control device based on a routing inspection list according to an exemplary embodiment. As shown in fig. 4, a production management and control device 40 based on a patrol ticket is provided, where the device 40 includes:
a determining module 402, configured to determine whether the inspection result of the order sheet and the routing inspection sheet corresponding to the work center is unqualified;
a setting module 404, configured to set an unqualified processing state of the routing inspection list as to-be-processed if the inspection result of the routing inspection list is unqualified;
and the judging module 406 is configured to judge whether the unqualified processing state corresponding to the inspection ticket is processed.
And the control module 408 is configured to allow the work center corresponding to the order sheet to continue to operate the computer for production if the unqualified processing state corresponding to the inspection sheet is processed.
In one embodiment, the apparatus 40 further comprises: and the judging module 406 is configured to judge whether the existence duration of the routing inspection list is greater than a third alarm duration and less than a fourth alarm duration. And the existing duration is the difference value of the current time minus the time when the inspection sheet is judged to be unqualified.
And the alarm module 410 is used for pushing an alarm prompt to the first responsible person and/or the first responsible department if the existence duration of the routing inspection list is longer than the third alarm duration and shorter than the fourth alarm duration.
In one embodiment, the apparatus 40 further comprises: and the judging module 406 is configured to judge whether the existence duration of the routing inspection list is greater than a fourth alarm duration.
And the alarm module 410 is configured to push an alarm prompt to a second responsible person and/or a second responsible department if it is determined that the existence duration of the routing inspection list is greater than a fourth alarm duration.
The embodiment of the production control device provided in the present specification can be applied to electronic devices. The device embodiments may be implemented by software, or by hardware, or by a combination of hardware and software. Taking a software implementation as an example, as a logical device, the device is formed by reading, by a processor of the electronic device where the device is located, a corresponding computer program instruction in the nonvolatile memory into the memory for operation.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (16)

1. The utility model provides a production management and control method based on patrol and examine list, is applied to manufacturing execution system, its characterized in that includes:
selecting a command list and a working center at a client for computer production;
generating the order sheet and a routing inspection sheet corresponding to the work center, and setting the inspection state of the routing inspection sheet as to-be-inspected;
determining whether the inspection state of the inspection ticket is the inspection completion;
if the inspection state of the inspection list is inspection completion, judging whether the inspection result of the inspection list is unqualified;
and if the inspection result of the inspection list is unqualified, forcibly unloading the client corresponding to the work center corresponding to the order list, and forbidding the work center corresponding to the order list to continue to operate on the computer for production.
2. The method according to the claim 1, characterized in that, after determining whether the inspection state of the inspection ticket is that the inspection is completed, the method further comprises:
if the inspection state of the inspection list is not the inspection completion, judging whether the generation time length of the inspection list reaches the preset time length; the generation duration is the difference value between the current time and the creation time of the inspection list;
and if the generation time of the routing inspection list reaches the preset time, forcibly offline the order list and the client corresponding to the work center, and forbidding the work center corresponding to the order list to continue to operate on the computer for production.
3. The method of claim 2, further comprising:
if the generation time length of the routing inspection list does not reach the preset time length, judging whether the difference value between the generation time length of the routing inspection list and the preset time length is greater than a first alarm time length and smaller than a second alarm time length;
and if the difference value between the generated time length and the preset time length of the routing inspection list is judged to be greater than a first alarm time length and smaller than a second alarm time length, an alarm prompt is pushed to a first responsible person and/or a first responsible department.
4. The method of claim 2, further comprising:
if the generation time length of the routing inspection list does not reach the preset time length, judging whether the difference value between the generation time length of the routing inspection list and the preset time length is smaller than a first alarm time length;
and if the difference value between the generated time length and the preset time length of the routing inspection list is smaller than a first alarm time length, pushing an alarm prompt to a second responsible person and/or a second responsible department.
5. The utility model provides a production management and control method based on patrol and examine list, is applied to manufacturing execution system, its characterized in that includes:
determining whether the inspection results of the order sheet and the inspection sheet corresponding to the work center are unqualified;
if the inspection result of the inspection sheet is unqualified, setting the unqualified processing state of the inspection sheet as to-be-processed;
judging whether the unqualified processing state corresponding to the inspection sheet is processed or not;
and if the unqualified processing state corresponding to the inspection sheet is processed, allowing the work center corresponding to the order sheet to continue to be operated on the computer for production.
6. The method according to the claim 5, wherein if the inspection result of the inspection ticket is unqualified, the method sets the unqualified processing state of the inspection ticket as the state after the inspection ticket is to be processed, and the method further comprises the following steps:
judging whether the existence time of the routing inspection list is longer than a third alarm time and shorter than a fourth alarm time; the existing duration is the difference value of the current time minus the time when the inspection sheet is judged to be unqualified;
and if the existence time of the routing inspection list is longer than the third alarm time and shorter than the fourth alarm time, pushing an alarm prompt to the first responsible person and/or the first responsible department.
7. The method of claim 5, further comprising:
judging whether the existing time length of the routing inspection list is greater than a fourth alarm time length or not; the existing duration is the difference value of the current time minus the time when the inspection sheet is judged to be unqualified;
and if the existence time length of the inspection list is judged to be greater than the fourth alarm time length, an alarm prompt is pushed to a second responsible person and/or a second responsible department.
8. The utility model provides a production management and control device based on it is single to patrol and examine, its characterized in that includes:
the computer-on module is used for an operator to select a command list at the client and to perform computer production in a work center;
the inspection list generating module is used for automatically or manually generating the order list and the inspection list corresponding to the work center and setting the inspection state of the inspection list as to-be-inspected;
the determining module is used for determining whether the inspection state of the inspection ticket is the inspection completion;
the judging module is used for judging whether the inspection result of the inspection list is unqualified or not if the inspection state of the inspection list is inspection completion;
and the control module is used for forcibly disconnecting the client corresponding to the working center corresponding to the order sheet and forbidding the working center corresponding to the order sheet to continue operating the computer for production if the inspection result of the inspection sheet is unqualified.
9. The apparatus for managing and controlling production according to claim 8, wherein the determining whether the inspection status of the inspection ticket is after the inspection is completed further comprises:
the judging module is further used for judging whether the generation time length of the routing inspection list reaches a preset time length or not if the inspection state of the routing inspection list is determined not to be the inspection completion; the generation duration is the difference value between the current time and the creation time of the inspection list;
and the control module is further used for forcibly offline the order sheet and the client corresponding to the work center if the generation time of the routing inspection sheet reaches a preset time, and forbidding the work center corresponding to the order sheet to continue to operate on the computer for production.
10. The production management and control device according to claim 9, further comprising:
the judging module is further used for judging whether the difference value between the generated time length of the routing inspection list and the preset time length is larger than a first alarm time length and smaller than a second alarm time length or not if the generated time length of the routing inspection list does not reach the preset time length;
and the alarm module is used for pushing an alarm prompt to the first responsible person and/or the first responsible department if the difference between the generated time length and the preset time length of the routing inspection list is judged to be greater than the first alarm time length and less than the second alarm time length.
11. The production management and control device according to claim 9, further comprising:
the judging module is further used for judging whether the difference value between the generated time length of the routing inspection list and the preset time length is smaller than a first alarm time length or not if the generated time length of the routing inspection list does not reach the preset time length;
and the alarm module is used for pushing an alarm prompt to a second responsible person and/or a second responsible department if the difference value between the generated time length and the preset time length of the routing inspection list is judged to be smaller than the first alarm time length.
12. The utility model provides a production management and control device based on it is single to patrol and examine, its characterized in that includes:
the determining module is used for determining whether the inspection results of the order sheet and the routing inspection sheet corresponding to the work center are unqualified;
the setting module is used for setting the unqualified processing state of the inspection list as to-be-processed if the inspection result of the inspection list is unqualified;
the judging module is used for judging whether the unqualified processing state corresponding to the inspection sheet is processed or not;
and the control module is used for allowing the work center corresponding to the order sheet to continue to be operated for production if the unqualified processing state corresponding to the inspection sheet is processed.
13. The apparatus of claim 11, further comprising:
the judging module is used for judging whether the existing time length of the routing inspection list is greater than a third alarm time length and less than a fourth alarm time length; the existing duration is the difference between the current time and the time when the inspection sheet is judged to be unqualified;
and the alarm module is used for pushing an alarm prompt to the first responsible person and/or the first responsible department if the existence duration of the routing inspection list is longer than the third alarm duration and shorter than the fourth alarm duration.
14. The apparatus of claim 11, further comprising:
the judging module is used for judging whether the existing time length of the routing inspection list is greater than a fourth alarm time length or not;
and the alarm module is used for pushing an alarm prompt to a second responsible person and/or a second responsible department if the existence duration of the routing inspection list is judged to be greater than the fourth alarm duration.
15. An electronic device, comprising: a processor; a memory for storing a processor executable computer program; wherein the processor implements the method of any one of claims 1-7 by running the executable computer program.
16. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method according to any one of claims 1 to 7.
CN202211234315.3A 2022-10-10 2022-10-10 Production control method and device based on routing inspection list, electronic equipment and system Pending CN115564243A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211234315.3A CN115564243A (en) 2022-10-10 2022-10-10 Production control method and device based on routing inspection list, electronic equipment and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211234315.3A CN115564243A (en) 2022-10-10 2022-10-10 Production control method and device based on routing inspection list, electronic equipment and system

Publications (1)

Publication Number Publication Date
CN115564243A true CN115564243A (en) 2023-01-03

Family

ID=84745546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211234315.3A Pending CN115564243A (en) 2022-10-10 2022-10-10 Production control method and device based on routing inspection list, electronic equipment and system

Country Status (1)

Country Link
CN (1) CN115564243A (en)

Similar Documents

Publication Publication Date Title
JP2011081795A (en) Method and apparatus for managing data uploading in process control environment
WO2015139867A1 (en) Supporting failure mode and effects analysis
CN113642912A (en) Method, system, equipment and storage medium for reporting labor and preventing mistake
CN112036708A (en) Comprehensive pipe gallery inspection and maintenance method, platform and computer storage medium
Zhang et al. An early fault elimination method of computerized numerical control machine tools
CN113554324B (en) Production process withdrawal method, system, equipment and storage medium
CN113191738B (en) Multi-template management and control method for test equipment and related equipment
Ingemansson et al. Reducing bottle‐necks in a manufacturing system with automatic data collection and discrete‐event simulation
CN111260286B (en) Nuclear power station material classification acceptance method and system and storage medium
CN115564243A (en) Production control method and device based on routing inspection list, electronic equipment and system
Rozen et al. Using simulation to improve semiconductor factory cycle time by segregation of preventive maintenance activities
Nijhawan et al. On development of change point based generalized SRGM for software with multiple releases
Lundgren et al. Human-centered model-driven process and quality planning
Al-Shayea et al. New integrated model for maintenance planning and quality control policy for multi-component system using an EWMA chart
CN109976269B (en) Method for monitoring manufacturing execution process information of rolling and packing workshop
CN113886262A (en) Software automation test method and device, computer equipment and storage medium
EP2960837A1 (en) System and method for supporting global effect analysis
Léger et al. A safety barriers-based approach for the risk analysis of socio-technical systems
Šolc et al. Improving the quality of production by the eight disciplines problem solving method
Basse et al. A decision model for cost-optimized inspection planning
Araujo The Importance of Engineering Technical Reviews to Improve the Product Reliability
Lyberger Towards Zero Defect Manufacturing in Multi-Stage Production Systems
Goerges et al. System theoretic approach for determining causal factors of quality loss in complex system design
Widya et al. Dies Process Performance Improvement Maintenance With e-DMIS Based on Iot Technology
Suarez-Cabal et al. Improvement of test data by measuring SQL statement coverage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination