CN115538803A - Curtain wall positioning and mounting equipment - Google Patents

Curtain wall positioning and mounting equipment Download PDF

Info

Publication number
CN115538803A
CN115538803A CN202211451326.7A CN202211451326A CN115538803A CN 115538803 A CN115538803 A CN 115538803A CN 202211451326 A CN202211451326 A CN 202211451326A CN 115538803 A CN115538803 A CN 115538803A
Authority
CN
China
Prior art keywords
curtain wall
fixedly connected
block
sliding block
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211451326.7A
Other languages
Chinese (zh)
Inventor
郭桃会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202211451326.7A priority Critical patent/CN115538803A/en
Publication of CN115538803A publication Critical patent/CN115538803A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6813Compressable seals of hollow form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses curtain wall positioning and mounting equipment, which belongs to the technical field of buildings and comprises two upright posts, wherein a plurality of cross beams are arranged inside the two upright posts. According to the curtain wall, the cross beam is manually operated to be placed on the supporting limiting block, the curtain wall body is manually operated to enable the connecting rods at four corners to enter the second inner cavity formed in the cross beam, the connecting rods can drive the sliding blocks and the L-shaped sliding blocks to move when moving, the curtain wall body and the curtain wall outer frame are sealed, clamped and fixed, meanwhile, the spherical abutting blocks can be driven by the elastic action of the second springs to enter the arc-shaped clamping grooves formed in the cross beam, the using positions of the connecting rods are preliminarily fixed, the curtain wall body is quickly positioned and installed, the correcting and installing time of the curtain wall body is shortened, the use of bolts is reduced, the installing time is reduced, the bolts are prevented from being corroded after long-term use, the influence on later maintenance and disassembly work of the curtain wall body is avoided, and the construction period is effectively shortened.

Description

Curtain wall positioning and mounting equipment
Technical Field
The invention belongs to the technical field of buildings, and particularly relates to curtain wall positioning and mounting equipment.
Background
The curtain wall is composed of a supporting structure system and a panel, can have certain displacement capacity relative to a main structure, and does not bear the external protective structure or the decorative structure of a building acted on the main structure, the curtain wall usually has different types such as a glass curtain wall, a stone curtain wall, a metal plate curtain wall and the like, the fixed installation of the curtain wall needs to be connected with an installation device so as to be fixedly connected on the metal structure arranged on the surface of the building, the curtain wall is a light wall body with decorative effect commonly used by modern large-scale and high-rise buildings, the curtain wall is composed of a structural frame and an embedded plate, the building protective structure does not bear the load and the action of the main structure, the steel plate of the supporting structure is installed on the wall of the building structure, all the steel plates are ensured to be in the same vertical plane, and if the deviation occurs in the positioning process of installing the steel plates, the curtain wall can cause great influence on the subsequent installation of a keel frame.
When current curtain is installed, it is inconvenient to advance line location to it, needs two or more staff to rectify and install it, and then has increased the cost of labor, and installation operation is comparatively loaded down with trivial details, and construction cycle is longer, and when a curtain produced the damage because of receiving the exogenic action, inconvenient carries out quick replacement to it, has certain limitation, needs to carry out certain improvement.
Disclosure of Invention
The invention aims to: in order to solve the current curtain when the installation, inconvenient fix a position it fast, need two or more staff to rectify and install it, and then increased the cost of labor, the installation operation is comparatively loaded down with trivial details, construction cycle is longer, and when a curtain produced the damage because of receiving the exogenic action, inconvenient carry out quick replacement to it, has the problem of certain limitation, and a curtain location erection equipment who provides.
In order to achieve the purpose, the invention adopts the following technical scheme:
a curtain wall positioning and mounting device comprises two upright posts, wherein a plurality of cross beams are arranged inside the two upright posts, a first sealing assembly is arranged on one side of each cross beam, a curtain wall body is arranged on one side of each first sealing assembly, a curtain wall outer frame is sleeved on the outer side wall of each curtain wall body, a plurality of fixing assemblies are arranged on one side of each curtain wall outer frame, and fixing sealing assemblies are arranged on two sides of each curtain wall outer frame;
first seal assembly is including the installation piece, one side and the crossbeam fixed connection of installation piece, first inner chamber has been seted up to inside one side of installation piece, the inside one side fixedly connected with shrink gasbag of first inner chamber, one side intercommunication of shrink gasbag has defeated tuber pipe, the other end intercommunication of defeated tuber pipe has elastic airbag, elastic airbag is located the second inner chamber that the crossbeam was seted up, elastic airbag's opposite side fixedly connected with sliding block, sliding block sliding connection is in the inside of second inner chamber, the opposite side fixedly connected with L type slider of sliding block, inside one side of L type slider is provided with sealed the pad.
As a further description of the above technical solution:
the air bag contracting device is characterized in that a first conical sliding block is fixedly connected to the other side of the air bag contracting device, the first conical sliding block is connected to the inside of the first inner cavity in a sliding mode, second conical sliding blocks are arranged on the two sides of the first conical sliding block, a first guide rod is fixedly connected to the other side of the second conical sliding block, a first elastic sealing gasket is fixedly connected to the other end of the first guide rod, and the first elastic sealing gasket is arranged inside the first inner cavity in a sliding mode.
As a further description of the above technical solution:
the outer side wall of the first guide rod is sleeved with a first spring, and two sides of the first spring are fixedly connected with the first elastic sealing gasket and the inner side wall of the mounting block respectively.
As a further description of the above technical solution:
the fixed component comprises a connecting rod, one end of the connecting rod is fixedly connected with the connecting rod, the other end of the connecting rod is slidably connected with the second inner cavity, the mounting cavities are formed in two sides of the inside of the connecting rod, a plurality of second springs are fixedly connected with the inside of the mounting cavities, the spherical supporting block is fixedly connected with the other side of the second springs, the other side of the spherical supporting block is provided with an arc-shaped clamping groove, and the arc-shaped clamping groove is located in one side of the inside of the second inner cavity.
As a further description of the above technical solution:
the fixed seal assembly comprises a connecting block, one side of the connecting block is fixedly connected with the stand column, one side of the inner portion of the connecting block is rotatably connected with a screw rod, one end of the screw rod extends to the outer side of the connecting block and then is fixedly connected with a rotating handle, a third conical sliding block is connected to the screw rod in a threaded mode, and the third conical sliding block is arranged in a third inner cavity formed in the connecting block in a sliding mode.
As a further description of the above technical solution:
and the two sides of the third conical sliding block are respectively provided with a fourth conical sliding block, one side of the fourth conical sliding block, which is far away from the third conical sliding block, is fixedly connected with a second guide rod, the other end of the second guide rod is fixedly connected with a sliding plate, and the sliding plate is slidably connected in the third inner cavity.
As a further description of the above technical solution:
one side of the sliding plate is fixedly connected with a plurality of spherical rods, and the other side of each spherical rod is provided with an annular elastic part which is positioned in a clamping groove formed in the outer frame of the curtain wall.
As a further description of the above technical solution:
one side of the sliding plate is fixedly connected with a plurality of third guide rods, the other ends of the third guide rods are fixedly connected with second elastic sealing gaskets, and the second elastic sealing gaskets are arranged inside the connecting blocks in a sliding mode.
As a further description of the above technical solution:
and one side of the sliding plate, which is far away from the third guide rod, is fixedly connected with a sliding rod, the sliding rod is arranged in the third inner cavity in a sliding manner, third springs are sleeved on the sliding rod and the second guide rod, and two sides of each third spring are fixedly connected with the inner side walls of the sliding plate and the connecting block respectively.
As a further description of the above technical solution:
one side welded fastening of stand has a plurality of support stoppers, and the top of supporting the stopper contacts with the crossbeam, the crossbeam passes through L type piece and screw and stand fixed connection.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
1. according to the curtain wall body, the cross beams are manually operated to be placed on the supporting limiting blocks, the using positions of the cross beams are limited through the arranged supporting limiting blocks, so that the situation that deviation among the cross beams is large is prevented, the influence on the installation of a subsequent curtain wall body is caused, the correction time and the installation error of equipment in use are effectively reduced, the portability of the equipment in use is improved, the connecting rods at four corners of the curtain wall body are firstly arranged in the second inner cavities formed in the cross beams through manual operation, the sliding blocks and the L-shaped sliding blocks are driven to move towards the cross beams when the connecting rods move, the curtain wall body and the curtain wall outer frame are clamped and fixed in a sealing mode, meanwhile, the spherical abutting blocks are driven to enter the arc-shaped clamping grooves formed in the cross beams through the elastic action of the second springs, the using positions of the connecting rods are preliminarily fixed, the curtain wall body is rapidly positioned and installed, the correction and installation time of the curtain wall body is shortened, the use of bolts is reduced, the installation time is reduced, meanwhile, the bolts are prevented from being rusted after long-term use, the influence on the later maintenance and the disassembly work of the curtain wall body is reduced, the construction period, and the economic benefit of enterprises is improved.
2. According to the curtain wall outer frame, when the connecting rod moves, gas in the elastic air bag is conveyed to the interior of the contracted air bag, so that the connecting rod expands to drive the first conical sliding block to move, the first guide rod drives the first elastic sealing gasket to move towards the outer side of the cross beam, the joint of the L-shaped sliding block and the mounting block is sealed, an external water source is prevented from entering the outer side of the curtain wall outer frame, the service performance of the curtain wall outer frame is easily influenced due to corrosion for a long time, the subsequent overall sealing work is reduced, and the influence of the overall sealing work on the maintenance and disassembly work of a single curtain wall body is prevented, so that the limitation is caused on the installation and the use of equipment.
3. According to the invention, the screw rod is rotated by manually operating the rotating handle, the spherical rod is moved towards the interior of the curtain wall outer frame, the using position of the spherical rod is clamped and fixed through the arranged annular elastic piece, and then the using position between the curtain wall outer frame and the connecting block is fixed, so that the positioning and mounting effects of the equipment in use are further improved, the stability of the equipment in mounting is improved, the influence on the fixation of the equipment due to external action is prevented, and the potential safety hazard at high altitude is prevented.
Drawings
FIG. 1 is a schematic view of an overall three-dimensional structure of a curtain wall positioning and mounting device provided by the invention;
FIG. 2 is a schematic view of a part of an enlarged structure at A of FIG. 1 in the curtain wall positioning and mounting apparatus according to the present invention;
FIG. 3 is a schematic view of a part of an enlarged structure at the position B in FIG. 1 of the curtain wall positioning and mounting apparatus according to the present invention;
FIG. 4 is a schematic structural view of a support limiting block in the curtain wall positioning and mounting device according to the present invention;
FIG. 5 is a schematic view of an internal top view of a stationary seal assembly in a curtain wall positioning and mounting apparatus according to the present invention;
FIG. 6 is a schematic view of an internal structure of a cross beam in the curtain wall positioning and mounting device according to the present invention;
fig. 7 is a schematic view of a partial enlarged structure at the position C of fig. 6 in the curtain wall positioning and mounting device according to the present invention.
Illustration of the drawings:
1. a column; 2. a support limit block; 3. a cross beam; 4. a first seal assembly; 401. mounting blocks; 402. contracting the air bag; 403. a first tapered slider; 404. a second tapered slider; 405. a first guide bar; 406. a first spring; 407. a first resilient gasket; 408. a wind delivery pipe; 409. an elastic air bag; 410. a slider; 411. an L-shaped slider; 5. a fixing assembly; 501. a connecting rod; 502. a mounting cavity; 503. a second spring; 504. a spherical resisting block; 6. a curtain wall body; 7. fixing the sealing component; 701. connecting blocks; 702. a screw; 703. a handle is rotated; 704. a third tapered slider; 705. a fourth tapered slider; 706. a second guide bar; 707. a sliding plate; 708. a spherical rod; 709. a third spring; 710. a slide bar; 711. a third guide bar; 712. a second resilient gasket; 8. a curtain wall outer frame; 9. an annular elastic member.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution: a curtain wall positioning and mounting device comprises upright posts 1, wherein the upright posts 1 are provided with two, a plurality of cross beams 3 are arranged inside the two upright posts 1, one side of each cross beam 3 is provided with a first sealing assembly 4, one side of each first sealing assembly 4 is provided with a curtain wall body 6, the outer side wall of each curtain wall body 6 is sleeved with a curtain wall outer frame 8, one side of each curtain wall outer frame 8 is provided with a plurality of fixing assemblies 5, and the two sides of each curtain wall outer frame 8 are provided with fixing sealing assemblies 7;
the first sealing assembly 4 comprises an installation block 401, one side of the installation block 401 is fixedly connected with the cross beam 3, a first inner cavity is formed in one side of the interior of the installation block 401, a contraction air bag 402 is fixedly connected to one side of the interior of the first inner cavity, one side of the contraction air bag 402 is communicated with an air conveying pipe 408, the other end of the air conveying pipe 408 is communicated with an elastic air bag 409, the elastic air bag 409 is located in a second inner cavity formed in the cross beam 3, a sliding block 410 is fixedly connected to the other side of the elastic air bag 409, the sliding block 410 is slidably connected to the interior of the second inner cavity, an L-shaped sliding block 411 is fixedly connected to the other side of the sliding block 410, and a sealing pad is arranged on one side of the interior of the L-shaped sliding block 411.
The implementation mode is specifically as follows: fix stand 1 in suitable place through built-in fitting and bolt, manual operation crossbeam 3 made it place on support stopper 2 this moment, support stopper 2 through setting up prescribes a limit to the position of use of crossbeam 3, prevent that the staff from needing constantly to rectify when installing crossbeam 3, and then it is great in order to prevent the deviation between a plurality of crossbeams 3, thereby cause the influence to the installation of the curtain body 6 of epilogue, effectual correction time and the installation error of equipment when using have been reduced, the portability of equipment when using has been improved, manual operation curtain body 6 makes the connecting rod 501 in four corners enter into the second inner chamber that crossbeam 3 seted up earlier, manual at this moment presses curtain body 6, make connecting rod 501 carry out the rapid draing to the inside of second inner chamber, connecting rod 501 can push sliding block 410 when removing, utilize the linkage effect between sliding block 410 and the L type slider 411, make L type slider 411 move to the direction of crossbeam 3, seal clamping fixation to curtain body 6 and curtain 8, simultaneously the elasticity of second spring 503 can drive the block 504 and drive the linkage effect of arc shape slider 411, the bolt in the curtain body and the construction efficiency of fixing device and the use the reduction of the benefit of the installation of the curtain body after the construction of the corrosion of the installation of the curtain body 6, and the use the reduction of the construction of the curtain body, the long-term installation of the reduction of the curtain body, the use of the construction of the curtain body 6 and the reduction of the curtain body, the construction of the use of the curtain body is improved the use of the curtain body 6.
The other side of the contracting airbag 402 is fixedly connected with a first conical sliding block 403, the first conical sliding block 403 is slidably connected inside the first inner cavity, two conical sliding blocks 404 are arranged on two sides of the first conical sliding block 403, the other side of the second conical sliding block 404 is fixedly connected with a first guide rod 405, the other end of the first guide rod 405 is fixedly connected with a first elastic sealing gasket 407, the first elastic sealing gasket 407 is slidably arranged inside the first inner cavity, the outer side wall of the first guide rod 405 is sleeved with a first spring 406, two sides of the first spring 406 are respectively fixedly connected with the first elastic sealing gasket 407 and the inner side wall of the mounting block 401, the fixing component 5 comprises a connecting rod 501, one end of the connecting rod 501 is fixedly connected with the connecting rod 501, the other end of the connecting rod 501 is slidably connected with the second inner cavity, the mounting cavity 502 is arranged on two sides of the connecting rod 501, the plurality of second springs 503 are fixedly connected inside the mounting cavity 502, the other side of the second spring 503 is fixedly connected with a spherical supporting block 504, the other side of the spherical supporting block 504 is provided with an arc-shaped clamping groove, and the arc-shaped clamping groove is arranged on one side of the inside of the second inner cavity.
The implementation mode is specifically as follows: the connecting rod 501 can extrude the sliding block 410 while moving, and by utilizing the linkage effect between the sliding block 410 and the elastic air bag 409, the extrusion force can be applied to the elastic air bag 409, the gas in the elastic air bag 409 is conveyed to the interior of the contracted air bag 402 through the air conveying pipe 408, so that the gas is expanded, and further the gas drives the first conical sliding block 403 to move in the interior of the first inner cavity, the inclined surface of the first conical sliding block 403 can extrude the second conical sliding block 404 in the moving process, so that the first conical sliding block moves in the direction away from the first conical sliding block 403, at the moment, by utilizing the linkage effect between the second conical sliding block 404 and the first guide rod 405, the first guide rod 405 can drive the first elastic sealing gasket 407 to move towards the outer side of the cross beam 3, the joint of the L-shaped sliding block 411 and the mounting block 401 is sealed, the external water source is prevented from entering the outer side of the outer frame 8 of the curtain wall, and the service performance of the curtain wall is easily affected by corrosion for a long time.
The fixed sealing component 7 comprises a connecting block 701, one side of the connecting block 701 is fixedly connected with the upright post 1, one side inside the connecting block 701 is rotatably connected with a screw 702, one end of the screw 702 extends to the outer side of the connecting block 701 and is fixedly connected with a rotating handle 703, the screw 702 is in threaded connection with a third conical sliding block 704, the third conical sliding block 704 is slidably arranged in a third inner cavity formed in the connecting block 701, both sides of the third conical sliding block 704 are respectively provided with a fourth conical sliding block 705, one side of the fourth conical sliding block 705, which is far away from the third conical sliding block 704, is fixedly connected with a second guide rod 706, the other end of the second guide rod 706 is fixedly connected with a sliding plate 707, the sliding plate 707 is slidably connected in the third inner cavity, one side of the sliding plate 707 is fixedly connected with a plurality of spherical rods 708, and the other side of the spherical rods 708 is provided with an annular elastic component 9, annular elastic component 9 is located the draw-in groove that curtain frame 8 was seted up, a plurality of third guide arms 711 of one side fixedly connected with of sliding plate 707, the other end fixedly connected with second elastic sealing pad 712 of third guide arm 711, second elastic sealing pad 712 slides and sets up in the inside of connecting block 701, one side fixedly connected with slide bar 710 that sliding plate 707 deviates from third guide arm 711, slide bar 710 slides and sets up in the third inner chamber, it is equipped with third spring 709 all to overlap on slide bar 710 and the second guide arm 706, the both sides of third spring 709 respectively with the inside wall fixed connection of sliding plate 707 and connecting block 701, one side welded fastening of stand 1 has a plurality of support stopper 2, the top that supports stopper 2 contacts with crossbeam 3, crossbeam 3 passes through L type piece and screw and stand 1 fixed connection.
The implementation mode is specifically as follows: the handle 703 is manually operated to rotate the screw 702, and the power of the screw 702 is transmitted to the third conical slider 704 by using the linkage effect between the screw 702 and the third conical slider 704, so that the screw moves while rotating circumferentially, but under the limitation of a rectangular inner cavity formed in the connecting block 701, the third conical sliding block 704 can only move, at this time, the fourth conical sliding block 705 can move away from the third conical sliding block 704, the power is transmitted to the sliding plate 707 by using the linkage effect among the fourth conical sliding block 705, the second guide rod 706 and the sliding plate 707, so that the sliding plate 707 drives the spherical rod 708 to move towards the interior of the curtain wall outer frame 8, the using position of the ball-shaped rod 708 is clamped and fixed by the arranged annular elastic piece 9, further fixing the using position between the curtain wall outer frame 8 and the connecting block 701, further improving the positioning and mounting effect of the equipment when in use, thereby improving the stability of the equipment when in mounting, preventing the equipment from being affected by external action, the sliding plate 707 can move and drive the third guide rod 711 to move, the power is transmitted to the second elastic sealing gasket 712 by the linkage effect between the third guide rod 711 and the second elastic sealing gasket 712, so that the third guide rod 711 can move to the outside of the connecting block 701, and contacts with the outer side of the curtain wall outer frame 8 to seal, and the acting force of the third guide rod 711 can deform the second elastic sealing gasket 712, so that the sealing effect between the connecting block 701 and the curtain wall outer frame 8 is further improved, and the subsequent overall sealing work is reduced, meanwhile, the influence on the maintenance and disassembly work of the single curtain wall body 6 caused by the whole sealing work is prevented, and the limitation is further caused to the installation and the use of equipment.
The working principle is as follows: when the curtain wall is used, the upright posts 1 are fixed at proper positions through embedded parts and bolts, the cross beam 3 is manually operated to be placed on the supporting limiting blocks 2, the using position of the cross beam 3 is limited through the arranged supporting limiting blocks 2, the curtain wall body 6 is manually operated to enable the connecting rods 501 at four corners to enter the second inner cavities formed in the cross beam 3, the curtain wall body 6 is manually pressed to enable the connecting rods 501 to move rapidly towards the inner parts of the second inner cavities, the connecting rods 501 can extrude the sliding blocks 410 when moving, the L-shaped sliding blocks 411 move towards the cross beam 3 by utilizing the linkage effect between the sliding blocks 410 and the L-shaped sliding blocks 411 to seal, clamp and fix the curtain wall body 6 and the curtain wall outer frame 8, meanwhile, the elastic action of the second springs 503 can drive the spherical abutting blocks 504 to enter the arc-shaped clamping grooves formed in the cross beam 3 to preliminarily fix the using position of the connecting rods 501, further, the curtain wall body 6 is positioned and installed quickly, the connecting rod 501 extrudes the sliding block 410 while moving, the extrusion force is applied to the elastic air bag 409 by utilizing the linkage effect between the sliding block 410 and the elastic air bag 409, the air in the elastic air bag 409 is conveyed to the interior of the contracted air bag 402 through the air conveying pipe 408 to be expanded, and then the first tapered slider 403 is driven to move in the first inner cavity by the air conveying pipe, the inclined surface of the first tapered slider 403 extrudes the second tapered slider 404 in the moving process, so that the second tapered slider 404 moves in the direction away from the first tapered slider 403, at the moment, the first guide rod 405 drives the first elastic sealing gasket 407 to move towards the outer side of the cross beam 3 by utilizing the linkage effect between the second tapered slider 404 and the first guide rod 405, and the joint of the L-shaped slider 411 and the installation block 401 is sealed, the handle 703 is manually operated to rotate the screw 702, so that the third tapered slider 704 moves inside the third inner cavity by using the linkage effect between the screw 702 and the third tapered slider 704, at this time, the fourth tapered slider 705 moves away from the third tapered slider 704, the power is transmitted to the sliding plate 707 by using the linkage effect among the fourth tapered slider 705, the second guide rod 706 and the sliding plate 707, so that the sliding plate can drive the spherical rod 708 to move towards the inside of the curtain wall outer frame 8, the using position of the spherical rod 708 is clamped and fixed by the arranged annular elastic member 9, the sliding plate 707 moves while driving the third guide rod 711 to move, and the power is transmitted to the second elastic sealing gasket 712 by using the linkage effect between the third guide rod 711 and the second elastic sealing gasket 712, so that the spherical rod 708 moves towards the outside of the connecting block 701 and contacts with the outside of the curtain wall outer frame 8 to seal.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (10)

1. The curtain wall positioning and mounting equipment comprises two upright posts (1), and is characterized in that the upright posts (1) are arranged, a plurality of cross beams (3) are arranged inside the two upright posts (1), a first sealing assembly (4) is arranged on one side of each cross beam (3), a curtain wall body (6) is arranged on one side of each first sealing assembly (4), a curtain wall outer frame (8) is sleeved on the outer side wall of each curtain wall body (6), a plurality of fixing assemblies (5) are arranged on one side of each curtain wall outer frame (8), and fixing sealing assemblies (7) are arranged on two sides of each curtain wall outer frame (8);
first seal assembly (4) are including installation piece (401), one side and crossbeam (3) fixed connection of installation piece (401), first inner chamber has been seted up to inside one side of installation piece (401), inside one side fixedly connected with shrink gasbag (402) of first inner chamber, one side intercommunication of shrink gasbag (402) has defeated tuber pipe (408), the other end intercommunication elasticity gasbag (409) of defeated tuber pipe (408), elasticity gasbag (409) are located the second inner chamber that crossbeam (3) were seted up, the opposite side fixedly connected with sliding block (410) of elasticity gasbag (409), sliding block (410) sliding connection is in the inside of second inner chamber, the opposite side fixedly connected with L type slider (411) of sliding block (410).
2. The curtain wall positioning and mounting device according to claim 1, wherein a first conical sliding block (403) is fixedly connected to the other side of the contraction air bag (402), the first conical sliding block (403) is slidably connected to the inside of the first inner cavity, second conical sliding blocks (404) are arranged on two sides of the first conical sliding block (403), a first guide rod (405) is fixedly connected to the other side of the second conical sliding block (404), a first elastic sealing gasket (407) is fixedly connected to the other end of the first guide rod (405), and the first elastic sealing gasket (407) is slidably arranged inside the first inner cavity.
3. The curtain wall positioning and mounting device as claimed in claim 2, wherein a first spring (406) is sleeved on the outer side wall of the first guide rod (405), and two sides of the first spring (406) are fixedly connected with a first elastic sealing gasket (407) and the inner side wall of the mounting block (401) respectively.
4. The curtain wall positioning and mounting device according to claim 1, wherein the fixing assembly (5) comprises a connecting rod (501), one end of the connecting rod (501) is fixedly connected with the connecting rod (501), the other end of the connecting rod (501) is slidably connected with the second inner cavity, mounting cavities (502) are formed in two sides of the interior of the connecting rod (501), a plurality of second springs (503) are fixedly connected to the interior of the mounting cavities (502), a spherical abutting block (504) is fixedly connected to the other side of each second spring (503), an arc-shaped clamping groove is formed in the other side of each spherical abutting block (504), and the arc-shaped clamping groove is located in one side of the interior of the second inner cavity.
5. The curtain wall positioning and mounting device according to claim 1, wherein the fixed sealing assembly (7) comprises a connecting block (701), one side of the connecting block (701) is fixedly connected with the upright column (1), one side of the inside of the connecting block (701) is rotatably connected with a screw rod (702), one end of the screw rod (702) extends to the outer side of the connecting block (701) and then is fixedly connected with a rotating handle (703), a third conical sliding block (704) is connected to the screw rod (702) in a threaded manner, and the third conical sliding block (704) is slidably arranged in a third inner cavity formed in the connecting block (701).
6. The curtain wall positioning and mounting device as claimed in claim 5, wherein fourth conical sliding blocks (705) are arranged on two sides of the third conical sliding block (704), a second guide rod (706) is fixedly connected to one side, away from the third conical sliding block (704), of each fourth conical sliding block (705), a sliding plate (707) is fixedly connected to the other end of each second guide rod (706), and each sliding plate (707) is slidably connected to the inside of the third inner cavity.
7. The curtain wall positioning and mounting device as claimed in claim 6, wherein a plurality of spherical rods (708) are fixedly connected to one side of the sliding plate (707), an annular elastic member (9) is arranged on the other side of each spherical rod (708), and the annular elastic member (9) is positioned in a clamping groove formed in the outer frame (8) of the curtain wall.
8. The curtain wall positioning and mounting device as claimed in claim 7, wherein a plurality of third guide rods (711) are fixedly connected to one side of the sliding plate (707), a second elastic sealing gasket (712) is fixedly connected to the other end of each third guide rod (711), and the second elastic sealing gasket (712) is slidably arranged inside the connecting block (701).
9. The curtain wall positioning and mounting device as claimed in claim 8, wherein a sliding rod (710) is fixedly connected to one side of the sliding plate (707) away from the third guide rod (711), the sliding rod (710) is slidably disposed in the third inner cavity, a third spring (709) is sleeved on each of the sliding rod (710) and the second guide rod (706), and two sides of the third spring (709) are fixedly connected with inner side walls of the sliding plate (707) and the connecting block (701), respectively.
10. The curtain wall positioning and mounting device according to claim 1, wherein a plurality of supporting and limiting blocks (2) are welded and fixed on one side of the upright post (1), the upper parts of the supporting and limiting blocks (2) are in contact with the cross beam (3), and the cross beam (3) is fixedly connected with the upright post (1) through an L-shaped block and a screw.
CN202211451326.7A 2022-11-20 2022-11-20 Curtain wall positioning and mounting equipment Pending CN115538803A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211451326.7A CN115538803A (en) 2022-11-20 2022-11-20 Curtain wall positioning and mounting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211451326.7A CN115538803A (en) 2022-11-20 2022-11-20 Curtain wall positioning and mounting equipment

Publications (1)

Publication Number Publication Date
CN115538803A true CN115538803A (en) 2022-12-30

Family

ID=84721030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211451326.7A Pending CN115538803A (en) 2022-11-20 2022-11-20 Curtain wall positioning and mounting equipment

Country Status (1)

Country Link
CN (1) CN115538803A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116378284A (en) * 2023-04-13 2023-07-04 大成绿建科技(杭州)有限公司 Glass curtain wall mounting structure and glass curtain wall

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210343167U (en) * 2019-05-29 2020-04-17 张家港市富骏橡塑制品有限公司 Anti-seismic building curtain wall door and window sealing strip
CN210395766U (en) * 2019-07-02 2020-04-24 东莞市建安集团有限公司 Metal curtain wall
CN210562854U (en) * 2019-06-14 2020-05-19 李翠萍 Double-layer curtain wall
CN211007216U (en) * 2019-09-17 2020-07-14 张子磊 Assembled curtain fixed knot constructs
CN113445649A (en) * 2021-04-28 2021-09-28 王汉元 Stable form aluminum curtain wall
CN215563682U (en) * 2021-01-12 2022-01-18 东莞市金锋五金喷涂有限公司 Curtain wall plate mounting system
CN215716374U (en) * 2021-09-01 2022-02-01 广东凯宏建设工程有限公司 Glass curtain wall capable of moving and contracting
CN216042014U (en) * 2021-09-29 2022-03-15 蒋璐蔚 Novel building environmental protection curtain

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210343167U (en) * 2019-05-29 2020-04-17 张家港市富骏橡塑制品有限公司 Anti-seismic building curtain wall door and window sealing strip
CN210562854U (en) * 2019-06-14 2020-05-19 李翠萍 Double-layer curtain wall
CN210395766U (en) * 2019-07-02 2020-04-24 东莞市建安集团有限公司 Metal curtain wall
CN211007216U (en) * 2019-09-17 2020-07-14 张子磊 Assembled curtain fixed knot constructs
CN215563682U (en) * 2021-01-12 2022-01-18 东莞市金锋五金喷涂有限公司 Curtain wall plate mounting system
CN113445649A (en) * 2021-04-28 2021-09-28 王汉元 Stable form aluminum curtain wall
CN215716374U (en) * 2021-09-01 2022-02-01 广东凯宏建设工程有限公司 Glass curtain wall capable of moving and contracting
CN216042014U (en) * 2021-09-29 2022-03-15 蒋璐蔚 Novel building environmental protection curtain

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116378284A (en) * 2023-04-13 2023-07-04 大成绿建科技(杭州)有限公司 Glass curtain wall mounting structure and glass curtain wall
CN116378284B (en) * 2023-04-13 2023-09-05 大成绿建科技(杭州)有限公司 Glass curtain wall mounting structure and glass curtain wall

Similar Documents

Publication Publication Date Title
CN115538803A (en) Curtain wall positioning and mounting equipment
CN113339592B (en) Quick-mounting type pipeline anti-seismic support and mounting method
WO2022206075A1 (en) Reverse shipbuilding jig frame structure
CN109473927B (en) Special tool for mounting disc insulator and mounting method thereof
CN209568361U (en) A kind of supporting bracket of bridge construction
CN211489113U (en) Novel titanium-protecting alloy plate leveling machine
CN111395723B (en) Building construction safety protection device and use method thereof
CN212578521U (en) Quick mounting tool for fire-fighting spray header
CN211588845U (en) High-precision pneumatic material cutting system for flange production
CN220538888U (en) Steel column and column assembly type plug-in joint
CN214941037U (en) But reuse's housing construction steel constructs beam structure
CN220870245U (en) Pipeline installation regulator
CN219638190U (en) Building engineering external decoration curtain wall
CN221114312U (en) Triangular movable code clamping tool
CN221073014U (en) Assembled steel frame for building
CN220421273U (en) Portable line-crossing inspection device
CN216370825U (en) Support for welding steel structure
CN220945273U (en) Quick positioner is restoreed in municipal administration sewer line damage
CN217493220U (en) Flange and pipeline welding tool platform
CN214980726U (en) Flange part expander
CN217924806U (en) Building outer wall I-steel station rod positioning clamp
CN217951483U (en) Spray pipe mounting structure
CN220578716U (en) Special hoisting tool for ball valve sealing movable ring of large-scale unit
CN219324360U (en) Processing equipment of spraying subassembly and steel construction post
CN220725843U (en) U-shaped fixing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination