CN115506239A - Temporary connecting piece of initial stage quick location - Google Patents

Temporary connecting piece of initial stage quick location Download PDF

Info

Publication number
CN115506239A
CN115506239A CN202210097929.5A CN202210097929A CN115506239A CN 115506239 A CN115506239 A CN 115506239A CN 202210097929 A CN202210097929 A CN 202210097929A CN 115506239 A CN115506239 A CN 115506239A
Authority
CN
China
Prior art keywords
broach
hole
matched
fishback
comb
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210097929.5A
Other languages
Chinese (zh)
Inventor
王炎
朱子琪
陈浙江
王智航
胡光晓
张楠楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sci Tech University ZSTU
Original Assignee
Zhejiang Sci Tech University ZSTU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sci Tech University ZSTU filed Critical Zhejiang Sci Tech University ZSTU
Priority to CN202210097929.5A priority Critical patent/CN115506239A/en
Publication of CN115506239A publication Critical patent/CN115506239A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Abstract

The invention discloses a temporary connecting piece for initial quick positioning, which comprises a plurality of comb plates I, a plurality of comb plates II, a plurality of connecting mechanisms and an adjusting mechanism, wherein the adjusting mechanism is provided with the comb plates II, the comb plates II are fixedly connected with the comb plates I matched with the comb plates II through the connecting mechanisms, and the adjusting mechanism comprises a sliding mechanism and a movable connecting mechanism arranged on the sliding mechanism.

Description

Temporary connecting piece of initial stage quick location
[ technical field ] A method for producing a semiconductor device
The invention relates to the technical field of suspension bridge construction, in particular to the technical field of a temporary connecting piece capable of being quickly positioned at the initial stage.
[ background of the invention ]
In order to meet the line shape adjustment requirement of a suspension bridge during construction and after closure, a temporary connecting device is usually adopted between steel box girder sections, and when the temporary connecting device is not needed, the connecting device is detached.
The existing temporary connecting device is low in initial positioning speed and low in working efficiency.
[ summary of the invention ]
The invention aims to solve the problems in the prior art, and provides a temporary connecting piece capable of achieving initial quick positioning, which is high in initial positioning speed and capable of improving working efficiency.
In order to achieve the purpose, the invention provides a temporary connecting piece for initial quick positioning, which comprises a plurality of comb plates I, a plurality of comb plates II, a plurality of connecting mechanisms and an adjusting mechanism, wherein the adjusting mechanism is provided with the comb plates II, the comb plates II are fixedly connected with the comb plates I matched with the comb plates II through the connecting mechanisms, and the adjusting mechanism comprises a sliding mechanism and a movable connecting mechanism arranged on the sliding mechanism.
Preferably, the sliding mechanism comprises a fixed seat, a dovetail groove, a sliding body and two pushing mechanisms, the dovetail groove is arranged on the fixed seat, the sliding body matched with the dovetail groove is arranged in the dovetail groove, and the two ends of the fixed seat are respectively provided with the pushing mechanisms used for pushing the sliding body.
Preferably, the pushing mechanism comprises a fixed nut and a bolt matched with the fixed nut.
Preferably, the movable connecting mechanism comprises a plurality of ball joints and a mounting seat arranged on the ball joints.
Preferably, the comb teeth I of the comb plate I and the comb teeth II of the comb plate II are arranged in a staggered mode, through holes I are formed in the comb teeth I, the through holes I in the two adjacent comb teeth I are corresponding to each other, through holes II are formed in the comb teeth II, the through holes II in the two adjacent comb teeth II correspond to each other one by one, and connecting pieces are arranged in the through holes I and the through holes II in a penetrating mode.
Preferably, the connecting mechanism comprises a pin shaft body, threaded connecting portions are arranged at two ends of the pin shaft body, and nuts matched with the threaded connecting portions are arranged on the threaded connecting portions.
The invention has the beneficial effects that: according to the invention, the adjusting mechanism is provided with the comb plate II, the comb plate II is fixedly connected with the comb plate I matched with the adjusting mechanism through the connecting mechanism, the adjusting mechanism comprises the sliding mechanism and the movable connecting mechanism arranged on the sliding mechanism, the adjusting mechanism is used for adjusting the position of the comb plate II, when the initial beam section has position deviation, the comb plate I can be more quickly meshed with the corresponding comb plate II, and compared with the prior art, the initial positioning speed is high, and the working efficiency is improved.
The features and advantages of the present invention will be described in detail by embodiments in conjunction with the accompanying drawings.
[ description of the drawings ]
Fig. 1 is a schematic structural view of an initial quick-positioning temporary connection member according to the present invention.
In the figure: 1-comb plate I, 2-comb plate II, 3-connecting mechanism, 4-adjusting mechanism, 5-through hole II, 11-comb I, 21-comb II, 31-pin shaft body, 32-thread connecting part, 33-nut, 411-fixing seat, 412-dovetail groove, 413-sliding body, 414-pushing mechanism, 421-ball hinge joint, 422-mounting seat, 4141-fixing nut and 4142-bolt.
[ detailed description ] embodiments
Referring to fig. 1, the temporary connecting member for initial quick positioning of the present invention includes a plurality of comb plates I1, a plurality of comb plates II2, a plurality of connecting mechanisms 3 and an adjusting mechanism 4, the adjusting mechanism 4 is provided with a comb plate II2, the comb plate II2 is fixedly connected with the comb plate I1 matched therewith through the connecting mechanism 3, the adjusting mechanism 4 includes a sliding mechanism 41 and a movable connecting mechanism 42 arranged on the sliding mechanism 41, the sliding mechanism 41 includes a fixing seat 411, a dovetail groove 412, a sliding body and two pushing mechanisms 414, the fixing seat 411 is provided with a dovetail groove 412, the dovetail groove 412 is provided with a sliding body 413 matched therewith, both ends of the fixing seat 411 are provided with the pushing mechanisms 414 for pushing the sliding body 413, the pushing mechanism 414 comprises a fixing nut 4141 and a bolt 4142 matched with the fixing nut 4141, the movable connecting mechanism 42 comprises a plurality of ball hinges 421 and a mounting seat 422 arranged on the ball hinges 421, comb teeth I11 of the comb plate I1 and comb teeth II21 of the comb plate II2 are arranged in a staggered manner, through holes I4 are arranged on the comb teeth I11, the through holes I4 on two adjacent comb teeth I11 are corresponding, through holes II5 are arranged on the comb teeth II21, the through holes II5 on two adjacent comb teeth II21 are in one-to-one correspondence, connecting pieces 3 are arranged in the through holes I4 and the through holes II5 in a penetrating manner, the connecting mechanism 3 comprises a pin shaft body 31, threaded connecting portions 32 are arranged at two ends of the pin shaft body 31, and nuts 33 matched with the threaded connecting portions 32 are arranged on the threaded connecting portions 32.
The working process of the invention is as follows:
in the working process of the temporary connecting piece for initial quick positioning, the comb plate I1 and the adjusting mechanism 4 are respectively fixed on two adjacent beam sections 6, when the beam section 6 at the rear is deviated upwards, the comb plate II2 is pushed downwards to be adjusted to a proper position, then the comb plate II2 is pulled to rotate to be meshed and connected with the corresponding comb plate I1, then the pin shaft body 31 is arranged in the through hole I4 and the through hole II5 in a penetrating manner, then the nut 33 is screwed on the threaded connecting part 32, then the bolt 4142 at the lower part is screwed to adjust the beam section at the rear to be completely corresponding to the beam section at the front, and then the bolt 4142 at the upper part is screwed.
When the rear beam section deflects downwards, the comb plate II2 is pushed upwards to be adjusted to a proper position, then the comb plate II2 is pulled to rotate to enable the comb plate II to be meshed with the corresponding comb plate I1, then the pin shaft body 31 is arranged in the through hole I4 and the through hole II5 in a penetrating mode, then the nut 33 is screwed on the threaded connection portion 32, then the bolt 4142 above is screwed to adjust the rear beam section to be completely corresponding to the front beam section, and then the bolt 4142 below is screwed.
The above embodiments are illustrative of the present invention, and are not intended to limit the present invention, and any simple modifications of the present invention are within the scope of the present invention.

Claims (6)

1. The utility model provides a temporary connection spare of initial stage quick location which characterized in that: including a plurality of fishback I (1), a plurality of fishback II (2), a plurality of coupling mechanism (3) and adjustment mechanism (4), be equipped with fishback II (2) on adjustment mechanism (4), fishback II (2) passes through coupling mechanism (3) fixed connection rather than matched with fishback I (1), adjustment mechanism (4) include slide mechanism (41) and establish swing joint mechanism (42) on slide mechanism (41).
2. An initially quick-setting temporary connection according to claim 1, wherein: slide mechanism (41) are including fixing base (411), dovetail (412), sliding body (413) and two pushing mechanism (414), be equipped with dovetail (412) on fixing base (411), be equipped with in dovetail (412) rather than matched with sliding body (413), the both ends of fixing base (411) all are equipped with pushing mechanism (414) that are used for promoting sliding body (413).
3. An initially quick-setting temporary connection according to claim 2, wherein: the pushing mechanism (414) comprises a fixed nut (4141) and a bolt (4142) matched with the fixed nut (4141).
4. An initially quick-setting temporary connection according to claim 1, wherein: the movable connecting mechanism (42) comprises a plurality of ball joints (421) and mounting seats (422) arranged on the ball joints (421).
5. An initially quick-setting temporary connection according to claim 1, wherein: broach I (11) of broach I (1) and broach II (21) of broach II (2) crisscross the setting, all be equipped with through-hole I (4) on broach I (11), through-hole I (4) on two adjacent broach I (11) are corresponding, all be equipped with through-hole II (5) on broach II (21), through-hole II (5) one-to-one on two adjacent broach II (21), wear to be equipped with connecting piece (3) in through-hole I (4) and the through-hole II (5).
6. An initially quick-setting temporary connection according to any one of claims 1 to 5, wherein: the connecting mechanism (3) comprises a pin shaft body (31), wherein the two ends of the pin shaft body (31) are respectively provided with a threaded connecting part (32), and the threaded connecting parts (32) are respectively provided with a nut (33) matched with the threaded connecting parts.
CN202210097929.5A 2022-01-27 2022-01-27 Temporary connecting piece of initial stage quick location Pending CN115506239A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210097929.5A CN115506239A (en) 2022-01-27 2022-01-27 Temporary connecting piece of initial stage quick location

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210097929.5A CN115506239A (en) 2022-01-27 2022-01-27 Temporary connecting piece of initial stage quick location

Publications (1)

Publication Number Publication Date
CN115506239A true CN115506239A (en) 2022-12-23

Family

ID=84500886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210097929.5A Pending CN115506239A (en) 2022-01-27 2022-01-27 Temporary connecting piece of initial stage quick location

Country Status (1)

Country Link
CN (1) CN115506239A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004076443A (en) * 2002-08-20 2004-03-11 Kubota Corp Connecting structure and connecting method for segment
KR20070043755A (en) * 2007-04-05 2007-04-25 대봉비엠텍 주식회사 Flexible connecting device for bridge
KR20070000478U (en) * 2007-04-05 2007-04-25 대봉비엠텍 주식회사 Flexible connecting device for bridge
KR101745835B1 (en) * 2016-09-09 2017-06-20 오석환 Sturcutre and method of connecting steel girder
CN107724246A (en) * 2017-11-03 2018-02-23 天津市东泽天润建筑有限公司 The interim contraposition fixing device and its application method of a kind of steel box-girder segmented assembly
CN207244467U (en) * 2017-09-19 2018-04-17 中铁上海工程局集团有限公司 A kind of steel box arch rib assembly positioner
JP2018119287A (en) * 2017-01-24 2018-08-02 株式会社ビービーエム Omnidirectional expansion joint for bridge
CN209703328U (en) * 2019-03-26 2019-11-29 广东冠粤路桥有限公司 A kind of steel box girder assembling positioning device
JP6640945B1 (en) * 2018-09-11 2020-02-05 鹿島建設株式会社 Construction method of pier structure and pier structure
CN110847041A (en) * 2019-10-31 2020-02-28 上海市政工程设计研究总院(集团)有限公司 Temporary anchoring structure and anchoring method for segmental prefabricated assembled concrete box girder
DE202020102452U1 (en) * 2019-05-10 2020-06-02 China Railway Shanghai Engineering Bureau Group Co., Ltd. Centering and fine adjustment device for installing a pillar cap and a pillar body of large tonnage of a segmented prefabricated assembled bridge pillar
CN214695175U (en) * 2020-12-03 2021-11-12 中铁四局集团第五工程有限公司 Positioning device for prefabricated box girder

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004076443A (en) * 2002-08-20 2004-03-11 Kubota Corp Connecting structure and connecting method for segment
KR20070043755A (en) * 2007-04-05 2007-04-25 대봉비엠텍 주식회사 Flexible connecting device for bridge
KR20070000478U (en) * 2007-04-05 2007-04-25 대봉비엠텍 주식회사 Flexible connecting device for bridge
KR101745835B1 (en) * 2016-09-09 2017-06-20 오석환 Sturcutre and method of connecting steel girder
JP2018119287A (en) * 2017-01-24 2018-08-02 株式会社ビービーエム Omnidirectional expansion joint for bridge
CN207244467U (en) * 2017-09-19 2018-04-17 中铁上海工程局集团有限公司 A kind of steel box arch rib assembly positioner
CN107724246A (en) * 2017-11-03 2018-02-23 天津市东泽天润建筑有限公司 The interim contraposition fixing device and its application method of a kind of steel box-girder segmented assembly
JP6640945B1 (en) * 2018-09-11 2020-02-05 鹿島建設株式会社 Construction method of pier structure and pier structure
CN209703328U (en) * 2019-03-26 2019-11-29 广东冠粤路桥有限公司 A kind of steel box girder assembling positioning device
DE202020102452U1 (en) * 2019-05-10 2020-06-02 China Railway Shanghai Engineering Bureau Group Co., Ltd. Centering and fine adjustment device for installing a pillar cap and a pillar body of large tonnage of a segmented prefabricated assembled bridge pillar
CN110847041A (en) * 2019-10-31 2020-02-28 上海市政工程设计研究总院(集团)有限公司 Temporary anchoring structure and anchoring method for segmental prefabricated assembled concrete box girder
CN214695175U (en) * 2020-12-03 2021-11-12 中铁四局集团第五工程有限公司 Positioning device for prefabricated box girder

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周琦;: "混凝土箱梁节段预制拼装架设施工技术", 中国新技术新产品, no. 15, 10 August 2009 (2009-08-10) *

Similar Documents

Publication Publication Date Title
CN102865177A (en) Structure of combined impact type water turbine generator rotating wheel and manufacturing method
CN201618937U (en) Turnover fixture with adjustable gravity center position
CN115506239A (en) Temporary connecting piece of initial stage quick location
CN212682869U (en) New energy automobile frame tailor-welding device
CN212295106U (en) H-shaped steel connecting structure
CN210338265U (en) Sedan-chair formula wing body connection structure
CN112453803A (en) Assembly tool for parts of shock absorber bearing of bogie frame
CN115369764A (en) Multi-functional temporary connection spare
CN105984795B (en) A kind of moving sidewalk support body type face attachment means
CN215967101U (en) Assembly fixture of rectangular cross-section box body flange
CN115341469A (en) Adjustable temporary connection spare
CN213516597U (en) Device for simulating shot blasting intensity verification on part surface
CN201169639Y (en) Pneumatic power bus bar opening and closing device
CN213654640U (en) Large-scale door frame combination interfacing apparatus
CN208645125U (en) A kind of electric car rear suspension assembly tooling
CN208815361U (en) A kind of former rail mechanism changed in pillow vehicle applied to track
CN112122852A (en) Novel assembling tool and assembling method for flange of gantry crane
CN114030329B (en) Lower swing arm with adjustable ball head mounting position
CN220544931U (en) Photovoltaic panel support convenient to dismouting
CN219809386U (en) Middle support tube of rice transplanter
CN220807254U (en) Quick overhaul equipment for mechanical device for building
CN212666013U (en) General maintenance platform of mining engineering vehicle axle
CN101397682B (en) Pneumatic busbar switch device
CN216526897U (en) Photovoltaic tracking support connecting rod linkage device
CN220562843U (en) Mounting fixture for front and rear auxiliary suspensions of automobile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination