CN115434287A CN202211212614.7A CN202211212614A CN115434287A CN 115434287 A CN115434287 A CN 115434287A CN 202211212614 A CN202211212614 A CN 202211212614A CN 115434287 A CN115434287 A CN 115434287A
Authority
CN
China
Prior art keywords
pile
wood
thick bamboo
section
activity groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211212614.7A
Other languages
Chinese (zh)
Other versions
CN115434287B (en
Inventor
黄坡
李国华
纪洪鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202211212614.7A priority Critical patent/CN115434287B/en
Publication of CN115434287A publication Critical patent/CN115434287A/en
Application granted granted Critical
Publication of CN115434287B publication Critical patent/CN115434287B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/14Components for drivers inasmuch as not specially for a specific driver construction

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention relates to the field of river bank protection, in particular to an auxiliary pile cap for piling of wood pile revetment protection and a construction method. It is radial vertical a plurality of fixed plate that is provided with all around at lower listrium top center, the bottom surface middle part of lower listrium is fixed with protects a section of thick bamboo, protect and seted up the vertical activity groove of a plurality of on the section of thick bamboo, it is fixed with a set of splint to protect a section of thick bamboo surface and be located the both sides of activity groove lower part, it has the gag lever post to articulate between every group splint, it is provided with the connecting seat to protect a section of thick bamboo surface and be located the activity groove top, the gag lever post is kept away from and is provided with the spring between splint's the one end and the connecting seat, one side integrated into one piece of gag lever post has the fan-shaped cardboard that runs through the activity groove, be provided with the latch of tilt up on the outer peripheral face of fan-shaped cardboard, it is equipped with a set of and protects a high holding opening such as a section of thick bamboo to protect and be located relatively opening between the activity groove to protect on protecting a section of thick bamboo. Greatly reduces the labor consumption, improves the construction efficiency, reduces the construction cost and has very high economic and social benefits.

Description

Auxiliary pile cap for piling wood pile revetment and construction method
Technical Field
The invention relates to the field of river bank protection, in particular to an auxiliary pile cap for piling a wood pile revetment and a construction method.
Background
With the steady advance of the national village revivification strategy, the natural and living environment of cities and towns and rural areas is obviously improved. Once the foul water ditch and the garbage dump are designed and optimized, the rocking becomes a visiting scenic spot representing the local folk characteristics and cultural connotation. River course stake revetment bank protection technique is suitable for transport, and as the thing of giving birth to, the slope protection stake construction does not have fashioned equipment and device auxiliary construction, and traditional construction methods need several people to transport the stake from the bank limit to the river course in, and traditional slope protection stake construction method is for pressing into soil layer preset position and elevation through the excavator scraper bowl. The perpendicularity of the slope protection timber pile can not be guaranteed by the method, the deviation of adjacent elevations is large, manpower is consumed, and the work efficiency is poor.
Disclosure of Invention
The invention aims to solve the problems, and provides an auxiliary pile cap and a construction method for piling the wood pile revetment, which can accelerate the efficiency and save the manpower.
The invention solves the problems and adopts the technical scheme that:
the utility model provides an auxiliary pile cap of stake revetment pile driving, including the lower flange plate, be radial vertical a plurality of fixed plate that is provided with around the center of lower flange plate top, the bottom surface middle part of lower flange plate is fixed with protects a section of thick bamboo, protect and seted up the vertical activity groove of a plurality of on the section of thick bamboo, it is fixed with a set of splint to protect a section of thick bamboo surface and be located the both sides of activity groove lower part, it has the gag lever post to articulate between the splint of every group, it is provided with the connecting seat just to be located activity groove top to protect a section of thick bamboo surface, the gag lever post is kept away from and is provided with the spring between the one end of splint and the connecting seat, one side integrated into one piece of gag lever post has the fan-shaped cardboard that runs through the activity groove, be provided with the latch of tilt up on the outer peripheral face of fan-shaped cardboard, it is equipped with a set of and protects a high accommodate port such as a set of a section of thick bamboo just to be located to run out mutually between the activity groove on protecting a section of thick bamboo.
A piling construction method for a wood pile revetment comprises the following steps:
the method comprises the following steps: a breaking hammer of the excavator is inserted into a space defined by the fixing plates and is welded and fixed;
step two: placing a plurality of wood pile piles at intervals on one side of a river channel, placing the top ends of adjacent wood piles in each wood pile in a staggered mode from front to back, adjusting a breaking hammer to enable an auxiliary pile cap to be opposite to a wood pile head, continuously moving the breaking hammer to enable the auxiliary pile cap to be in butt joint with the wood pile head, and clamping the wood piles by the clamping teeth inclined upwards in the butt joint process to realize locking between the wood piles and the auxiliary pile caps;
step three: controlling an excavator to transport the timber pile to a piling site;
step four: starting the breaking hammer, and controlling the levelness of an excavator operating disc to ensure the verticality of the wooden pile;
step five: driving the timber pile into a preset elevation and then stopping hammering;
step six: a worker separates one end of the spring from the limiting rod, the top end of the timber pile is separated from the latch of the fan-shaped clamping plate in the auxiliary pile cap, and the excavator is controlled to carry out construction operation on the next group of timber piles;
step seven: and repeating the operation to enable the accommodating opening to be opposite to the previous timber pile, wherein one side of the pile body of the previous timber pile is positioned in the accommodating opening in the piling process to enable the two timber piles to be tightly abutted, and the hammer is stopped when the bottom surface of the lower edge plate is contacted with the top surface of the previous timber pile in the piling process.
Compared with the prior art, the invention adopting the technical scheme has the outstanding characteristics that:
the construction method that needs several people with traditional construction mode and transports the stake from the bank to the river course in, the construction method that the stake is impressed to rethread excavator scraper bowl changes into the semi-mechanized line production that only 1 commander of workman cooperation 1 excavator carried out the pile, the ingenious latch structure that utilizes fan-shaped cardboard, combine the automatic locking of spring realization stake, realize automatic pile feeding, then commander workman manually takes off the stake, the artifical consumption has been reduced greatly, the efficiency of construction is improved, construction cost is reduced, very high economic benefits and social.
Preferably, the further technical scheme of the invention is as follows:
an upper edge plate is arranged between the lower edge plate and the fixed plate.
Drawings
Fig. 1 is a schematic structural view of an auxiliary pile cap for piling a wood pile revetment according to an embodiment of the present invention;
fig. 2 is a schematic front view of a pile casing in an auxiliary pile cap for piling a wood pile revetment according to an embodiment of the present invention;
fig. 3 is a schematic front view of an upper edge plate, a lower edge plate and a fixing plate in an auxiliary pile cap for piling a wood pile revetment according to an embodiment of the present invention;
fig. 4 is a schematic front view of a clamp plate, a limiting rod connecting seat and a spring in an auxiliary pile cap for piling a wood pile revetment according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of an automatic pile feeding method in a piling construction method for a wood pile revetment according to an embodiment of the present invention;
fig. 6 is a schematic structural diagram of a pile transporting process in a pile driving construction method for a wood pile revetment according to an embodiment of the present invention;
fig. 7 is a schematic structural diagram of a manual pile removal process after a timber pile is driven to a predetermined elevation in the piling construction method for the timber pile revetment according to the embodiment of the present invention;
fig. 8 is a schematic structural diagram after pile removal in the pile driving construction method for the wood pile revetment according to the embodiment of the present invention;
labeled as: the device comprises a lower edge plate 1, a fixing plate 2, a protective cylinder 3, a movable groove 4, a clamping plate 5, a limiting rod 6, a connecting seat 7, a spring 8, a fan-shaped clamping plate 9, a clamping tooth 10, an accommodating opening 11, an upper edge plate 12 and a breaking hammer 13.
Detailed Description
The invention will be further illustrated by the following examples, which are intended only for a better understanding of the present invention and therefore do not limit the scope of the invention.
The utility model provides an auxiliary pile cap that stake revetment pile was piled to revetment, including lower flange plate 1, lower flange plate 1 is discoid, be radial vertical a plurality of fixed plate 2 that is provided with around 1 top center of lower flange plate, fixed plate 2 is right trapezoid, the centre of a circle of flange plate 1 is kept away from to the hypotenuse of fixed plate 2, the bottom surface middle part of lower flange plate 1 is fixed with protects a section of thick bamboo 3, protect and set up the vertical activity groove 4 of a plurality of on 3, it is fixed with a set of splint 5 just to be located the both sides of activity groove 4 lower part to protect 3 surfaces of a section of thick bamboo, it has gag lever post 6 to articulate between every group splint 5, it is provided with connecting seat 7 just to be located activity groove 4 top to protect 3 surfaces of a section of thick bamboo 3, gag lever post 6 is kept away from and is provided with spring 8 between splint 5's one end and connecting seat 7, one side integrated into one piece of gag lever post 6 has the fan-shaped cardboard 9 that runs through activity groove 4, be provided with tilt up's latch 10 on the outer peripheral face of fan-shaped cardboard 9, it is equipped with a set of holding opening relatively to protect 3 and protects a set of 3 equal height to be located between activity groove 4 to protect.
A piling construction method for a wood pile revetment comprises the following steps:
the method comprises the following steps: a breaking hammer 13 of the excavator is inserted into a space surrounded by the fixing plates 2 and is welded and fixed.
Step two: the method comprises the steps that a plurality of timber piles are placed on one side of a river channel at intervals, timber piles required by every 10m are stacked into a pile, the top ends of adjacent timber piles in each timber pile are placed in a front-back staggered mode, the top ends can be operated conveniently in a front-back staggered mode, a breaking hammer 13 is adjusted to enable an auxiliary pile cap to be opposite to a timber pile head, the breaking hammer 13 is moved continuously to enable the auxiliary pile cap to be in butt joint with the timber pile head, the timber pile is clamped by a clamping tooth 10 inclined upwards in the butt joint process, locking between the timber pile and the auxiliary pile cap is achieved, the timber pile is placed in a tilted mode to enable an excavator body to be free of moving, alignment of the auxiliary pile cap and the timber pile can be achieved by operating a rotary platform, a driver operates the excavator to rotate around the rotary platform, a large arm and a small arm hydraulic pump are controlled to the corresponding degree, the auxiliary pile cap is enabled to be in a horizontal state integrally, a pile protection barrel 3 of the auxiliary pile cap is enabled to be aligned to the timber pile head, and the rotary platform is enabled to be matched with the large arm and the small arm to enable the pile head to enter a feeding barrel 3 of the auxiliary pile protection barrel.
Step three: and controlling a large arm and a small arm of the excavator to convey the wooden piles to a piling site.
Step four: and starting the breaking hammer 13, and controlling the levelness of the operation disc of the excavator to ensure the verticality of the wooden pile.
Step five: and stopping the hammer after the timber pile is driven into the preset elevation, fixing the horizontal rotary table by an excavator driver after the timber pile is aligned, starting the breaking hammer 13, controlling the small arm of the excavator to vertically downwards, and slowly driving the timber pile into the pile position and the preset elevation under the action of the exciting force of the breaking hammer 13.
Step six: a worker separates one end of the spring 8 from the limiting rod 6, the top end of the timber pile is separated from the latch 10 of the fan-shaped clamping plate 9 in the auxiliary pile cap, and the excavator is controlled to carry out construction operation on the next group of timber piles.
Step seven: repeated operation makes the holding opening 11 of the pile casing 3 opposite to the previous timber pile, one side of the pile body of the previous timber pile is positioned in the holding opening in the piling process, so that the two timber piles are tightly abutted, the hammer is stopped when the bottom surface of the lower flange plate 1 is contacted with the top surface of the previous timber pile in the piling process, manual elevation measurement is not needed, and the timber pile is the preset elevation at the moment.
Be provided with between lower flange plate 1 and fixed plate 2 upper flange plate 12, upper flange plate 12 is discoid, and the diameter of upper flange plate 12 is less than the diameter of lower flange plate 1, and the exciting force that quartering hammer 13 provided is too big, and upper flange plate 12 can provide the buffering between lower flange plate 1 and quartering hammer 13, prevents that lower flange plate 1 is broken.
The construction method that needs several people with traditional construction mode and transports the stake from the bank to the river course in, the construction method that the stake is impressed to rethread excavator scraper bowl changes into the semi-mechanized line production that only 1 commander of workman cooperation 1 excavator carried out the pile, the ingenious latch structure that utilizes fan-shaped cardboard, combine the automatic locking of spring realization stake, realize automatic pile feeding, then commander workman manually takes off the stake, the artifical consumption has been reduced greatly, the efficiency of construction is improved, construction cost is reduced, very high economic benefits and social.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention, which is defined by the appended claims and their equivalents.

Claims (3)

1. The utility model provides an auxiliary pile cap of stake revetment pile driving which characterized in that: including the lower flange plate, be radial vertical a plurality of fixed plate that is provided with around the center of lower flange plate top, the bottom surface middle part of lower flange plate is fixed with protects a section of thick bamboo, protect and seted up the vertical activity groove of a plurality of on the section of thick bamboo, it is fixed with a set of splint just to be located the both sides of activity groove lower part to protect a section of thick bamboo surface, it has the gag lever post to articulate between every group splint, it is provided with the connecting seat to protect a section of thick bamboo surface and be located the activity groove top, the gag lever post is kept away from between the one end and the connecting seat of splint and is provided with the spring, one side integrated into one piece of gag lever post has the fan-shaped cardboard that runs through the activity groove, be provided with the latch of tilt up on the outer peripheral face of fan-shaped cardboard, it is equipped with a set of and protects a high accommodate port such as a section of thick bamboo just to be located to run out mutually between the activity groove on protecting a section of thick bamboo.
2. The auxiliary pile cap for piling on the wood pile revetment according to claim 1, wherein: an upper edge plate is arranged between the lower edge plate and the fixing plate.
3. The piling construction method for the protection slope of the wood pile revetment according to any of claims 1-2, comprising the steps of:
the method comprises the following steps: a breaking hammer of the excavator is inserted into a space defined by the fixing plates and is welded and fixed;
step two: placing a plurality of wood pile piles at one side of a river at intervals, placing the top ends of adjacent wood piles in each wood pile in a staggered manner from front to back, adjusting a breaking hammer to enable an auxiliary pile cap to be opposite to a wood pile head, continuously moving the breaking hammer to enable the auxiliary pile cap to be in butt joint with the wood pile head, and clamping the wood piles by an upwardly inclined clamping tooth in the butt joint process to realize locking between the wood piles and the auxiliary pile cap;
step three: controlling an excavator to convey the timber pile to a piling site;
step four: starting the breaking hammer, and controlling the levelness of an excavator operating panel to ensure the verticality of the timber pile;
step five: driving the timber pile into a preset elevation and stopping hammering;
step six: a worker separates one end of the spring from the limiting rod, the top end of the timber pile is separated from the latch of the fan-shaped clamping plate in the auxiliary pile cap, and the excavator is controlled to carry out construction operation on the next group of timber piles;
step seven: and repeating the operation to enable the accommodating opening to be opposite to the previous wood pile, wherein one side of the pile body of the previous wood pile is positioned in the accommodating opening in the piling process to enable the two wood piles to be tightly abutted, and the hammer is stopped when the bottom surface of the lower edge plate is contacted with the top surface of the previous wood pile in the piling process.
CN202211212614.7A 2022-09-30 2022-09-30 Auxiliary pile cap for revetment piling of wood pile revetment and construction method Active CN115434287B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211212614.7A CN115434287B (en) 2022-09-30 2022-09-30 Auxiliary pile cap for revetment piling of wood pile revetment and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211212614.7A CN115434287B (en) 2022-09-30 2022-09-30 Auxiliary pile cap for revetment piling of wood pile revetment and construction method

Publications (2)

Publication Number Publication Date
CN115434287A true CN115434287A (en) 2022-12-06
CN115434287B CN115434287B (en) 2024-09-24

Family

ID=84251812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211212614.7A Active CN115434287B (en) 2022-09-30 2022-09-30 Auxiliary pile cap for revetment piling of wood pile revetment and construction method

Country Status (1)

Country Link
CN (1) CN115434287B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116607516A (en) * 2023-07-21 2023-08-18 济南临港建设集团有限公司 Ground tamping equipment for building engineering

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006307613A (en) * 2005-05-02 2006-11-09 Chowa Kogyo Kk Chuck control method for pile and this device
CN201738300U (en) * 2010-08-19 2011-02-09 中冶天工集团有限公司 Profiled bar support pile piling cap
RU2494195C1 (en) * 2012-03-27 2013-09-27 Иван Николаевич Яковлев Vibratory pile driver of directed action for submersion and withdrawal of piles, rabbet and other pile elements
CN105780774A (en) * 2015-06-23 2016-07-20 台州建筑安装工程公司 Excavator piling device and policy for loosening timber piles by using excavator piling device
CN207760852U (en) * 2017-12-12 2018-08-24 江苏优埃唯智能科技有限公司 A kind of piling structure of electric automatization
CN109403323A (en) * 2018-10-30 2019-03-01 余辉青 A kind of herding pile driving equipment of the internal buckle clamping of anti-hand fiber crops
CN210658346U (en) * 2019-07-23 2020-06-02 中国建筑土木建设有限公司 Steel-pipe pile auxiliary device
CN211036965U (en) * 2019-11-18 2020-07-17 曹顺良 Combined supporting pile for civil engineering

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006307613A (en) * 2005-05-02 2006-11-09 Chowa Kogyo Kk Chuck control method for pile and this device
CN201738300U (en) * 2010-08-19 2011-02-09 中冶天工集团有限公司 Profiled bar support pile piling cap
RU2494195C1 (en) * 2012-03-27 2013-09-27 Иван Николаевич Яковлев Vibratory pile driver of directed action for submersion and withdrawal of piles, rabbet and other pile elements
CN105780774A (en) * 2015-06-23 2016-07-20 台州建筑安装工程公司 Excavator piling device and policy for loosening timber piles by using excavator piling device
CN207760852U (en) * 2017-12-12 2018-08-24 江苏优埃唯智能科技有限公司 A kind of piling structure of electric automatization
CN109403323A (en) * 2018-10-30 2019-03-01 余辉青 A kind of herding pile driving equipment of the internal buckle clamping of anti-hand fiber crops
CN210658346U (en) * 2019-07-23 2020-06-02 中国建筑土木建设有限公司 Steel-pipe pile auxiliary device
CN211036965U (en) * 2019-11-18 2020-07-17 曹顺良 Combined supporting pile for civil engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116607516A (en) * 2023-07-21 2023-08-18 济南临港建设集团有限公司 Ground tamping equipment for building engineering
CN116607516B (en) * 2023-07-21 2023-10-20 济南临港建设集团有限公司 Ground tamping equipment for building engineering

Also Published As

Publication number Publication date
CN115434287B (en) 2024-09-24

Similar Documents

Publication Publication Date Title
CN108103939B (en) Combined reinforcement mode and construction process for construction of oblique-section steel trestle
CN115434287A (en) Auxiliary pile cap for piling of wood pile revetment and construction method
CN210368986U (en) Foundation pit supporting pile supporting structure
CN214459689U (en) Cast-in-place box girder support of weak soil foundation
CN208039252U (en) A kind of crawler type pile-grafting machine
CN117569307A (en) Highway bridge pile foundation reinforced structure
CN204510221U (en) Rotary marine piling saddle
CN108342984A (en) A kind of beach soft foundation trestle and its installation sedimentation method
CN115976955A (en) Method for synchronously constructing distribution beam and steel pipe pile of trestle in shallow water area
CN206667253U (en) Pile No. piling machine
CN215948197U (en) Strutting arrangement is used in pile foundation construction
CN109610406A (en) A kind of inland river Processing tecchnics
CN212026110U (en) Novel subside board-like pier and connect bank structure
CN214741382U (en) Tunnel preliminary bracing well pilot tunnel bow member grudging post device
CN210368964U (en) Precast pile positioning aid
CN211446904U (en) Prestressed pipe pile foundation structure containing deep boulder
CN114438904B (en) Large-span downward-bearing type continuous steel truss girder pushing process
CN220927876U (en) Foundation pit supporting structure in special-shaped arch support construction
CN217840126U (en) Anti-deflection device for compression static load test of engineering foundation pile
CN221823737U (en) Construction equipment for building foundation piles
CN110056314A (en) It is a kind of for the supplementary base of raked pile construction equipment angular adjustment to be perfused
CN221095120U (en) Novel pile driver
CN115258056B (en) Integrated transportation overturning process for offshore steel pipe pile
CN221778269U (en) Offshore construction platform using steel pipe pile sinking anchoring barge
CN217781787U (en) Device is demolishd to bridge flotation tank steel construction support on water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant