CN115417231A - Cable pay-off rack convenient to fast assembly - Google Patents

Cable pay-off rack convenient to fast assembly Download PDF

Info

Publication number
CN115417231A
CN115417231A CN202211059892.3A CN202211059892A CN115417231A CN 115417231 A CN115417231 A CN 115417231A CN 202211059892 A CN202211059892 A CN 202211059892A CN 115417231 A CN115417231 A CN 115417231A
Authority
CN
China
Prior art keywords
supporting
plate
rod
mounting
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211059892.3A
Other languages
Chinese (zh)
Inventor
李宇涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing State Grid Huashang Power Engineering Co ltd
Original Assignee
Beijing State Grid Huashang Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing State Grid Huashang Power Engineering Co ltd filed Critical Beijing State Grid Huashang Power Engineering Co ltd
Priority to CN202211059892.3A priority Critical patent/CN115417231A/en
Publication of CN115417231A publication Critical patent/CN115417231A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/34Arrangements for effecting positive rotation of packages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/30Swifts or skein holders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/40Arrangements for rotating packages
    • B65H54/44Arrangements for rotating packages in which the package, core, or former is engaged with, or secured to, a driven member rotatable about the axis of the package
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
    • B65H75/34Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
    • B65H75/38Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
    • B65H75/44Constructional details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The invention relates to the technical field of intelligent power distribution engineering, and discloses a cable pay-off rack convenient for quick assembly, which comprises two supporting seats, wherein two supporting rods are symmetrically and movably embedded in the two supporting seats, supporting plates are respectively arranged on the left side and the right side between the two supporting rods, supporting frames are arranged on the upper surfaces of the supporting plates, a winding component is arranged outside the supporting frames, and an adjusting component is arranged inside the supporting seats.

Description

Cable pay-off rack convenient to fast assembly
Technical Field
The invention relates to the technical field of intelligent power distribution engineering, in particular to a cable pay-off stand convenient for quick assembly.
Background
The intelligent power transmission and distribution system and the control equipment comprise alternating current and direct current transmission equipment more than 500 kilovolts, cross-linked polyethylene (XLPE) insulated power cables, cable accessories and the like, a reliable power distribution network and a power supply and supply system can be formed by the equipment and accessories, when intelligent power distribution engineering construction is carried out, a large number of cables need to be used, and the cables need to be drawn out through a cable pay-off rack for use.
The Chinese patent discloses a cable pay-off rack (No. CN 207713130U) and a cable pay-off rack (No. CN 211920454U), and the two patent technologies can respectively rotate a pay-off rod through a U-shaped support and an adjusting device, so as to drive a cable drum outside the pay-off rod to rotate and pay out a cable; but when operating them, if the cable of putting out too much just need the rolling, at this moment either need make a round trip to run alone and rotate the cable drum and carry out the rolling, or need two people alone directly to operate, like this either improved staff's working strength, or need two people just can operate, improved the cost of labor, these two kinds of problems can't be avoided simultaneously. Accordingly, those skilled in the art have provided a cable reel that facilitates quick assembly to solve the problems set forth in the background art described above.
Disclosure of Invention
The invention aims to provide a cable pay-off rack convenient to assemble quickly, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a cable pay-off rack convenient for quick assembly comprises two supporting seats, wherein two supporting rods are symmetrically and movably embedded in the two supporting seats together, one end of each supporting rod is in threaded connection with a first supporting bolt, ramps are arranged on the left side and the right side of the front side of each supporting rod, supporting plates are arranged on the left side and the right side between the two supporting rods, supporting blocks are arranged on the surfaces of the front side and the rear side of each supporting plate respectively, one end of each supporting block penetrates through and is in threaded connection with a second supporting bolt, a supporting frame is arranged on the upper surface of each supporting plate, a first electric push rod is arranged in each supporting frame, two rollers are symmetrically and rotatably connected to the upper end of each first electric push rod, inserting rods are arranged above the two supporting frames together, and cable drums for an intelligent power distribution network are movably arranged outside the inserting rods;
a winding component is arranged outside the support frame;
the inside of supporting seat is provided with adjusting part.
As a still further scheme of the invention: the winding assembly comprises a mounting seat, a mounting plate is mounted below the mounting seat, mounting rods are mounted at four corners of the upper surface of the mounting plate, a mounting sleeve is mounted on one side surface of the mounting plate, two winding drums are symmetrically mounted above the mounting seat, connecting rods are mounted at the left end and the right end of each winding drum, one end of each connecting rod is rotatably connected with a connecting plate, a first synchronizing wheel is mounted at the outer part of the left side of each connecting rod, a first synchronizing belt is mounted at the outer part of each first synchronizing wheel, a lifting plate is slidably connected inside the mounting seat, sliding rods are movably connected at the four corners of each lifting plate in a penetrating manner, and connecting blocks are mounted at the front side and the rear side of the upper surface of each lifting plate, the upper end of connecting block is rotated and is connected with the dwang, the externally mounted of dwang has second synchronizing wheel, rear side the outside of dwang is located one side of second synchronizing wheel and installs third synchronizing wheel, front side the outside of dwang is located one side of second synchronizing wheel and installs the fourth synchronizing wheel, the upper surface intermediate position department of lifter plate installs the speed reducer, double synchronizing wheel is installed to the one end of speed reducer, the externally mounted of double synchronizing wheel has two second hold-in ranges, the inside below that is located the lifter plate of mount pad installs the fixed plate, the last surface mounting of fixed plate has pressure sensor, and the lower surface four corners of fixed plate all installs second electric putter.
As a still further scheme of the invention: the adjusting part comprises an adjusting plate, the four corners of the adjusting plate are movably connected with limiting rods in a penetrating mode, the limiting plate is installed at the lower end of the limiting rods, two universal wheels are installed on the lower surface of the adjusting plate in a symmetrical mode, two first magnetic blocks are installed on the upper surface of the adjusting plate in a symmetrical mode, the second magnetic blocks are attracted to the upper ends of the first magnetic blocks, an adjusting box is installed above the adjusting plate, an electromagnet is installed on the upper surface of the adjusting box in the inner portion, an iron block is slidably connected to the position, located inside the adjusting box, below the electromagnet, of the adjusting box in the sliding mode, the lower surface of the iron block is provided with an adjusting rope, and the limiting blocks are movably installed outside the adjusting rope.
As a still further scheme of the invention: the first supporting bolt is movably attached to one side surface of the supporting seat, the supporting rod penetrates through the supporting block in a movable mode, one end of the second supporting bolt is attached to one side surface of the supporting rod, and the inserting rod is movably installed between the rollers on the left side and the right side.
As a still further scheme of the invention: the upper end of the mounting rod is mounted on the lower surface of the mounting seat, the mounting sleeve is mounted outside the supporting frame, and the connecting plate and the first synchronous belt movably penetrate through the upper surface of the mounting seat.
As a still further scheme of the invention: the slide bar is installed on the surface of the upper side and the lower side of the interior of the mounting seat, the lower end of the first synchronous belt is installed on the outer portion of the second synchronous wheel, and the two second synchronous belts are installed on the outer portions of the third synchronous wheel and the fourth synchronous wheel respectively.
As a still further scheme of the invention: the lifter plate is installed in pressure sensor's upper end, the lower extreme of second electric putter is installed on the inside lower surface of mount pad, speed reducer, pressure sensor and second electric putter all with external control ware electric connection.
As a still further scheme of the invention: the upper end of the limiting rod is installed on the inner upper surface of the supporting seat, the limiting plate is installed on the surface of one side of the inner portion of the supporting seat, and the upper end of the second magnetic block is installed on the inner upper surface of the supporting seat.
As a still further scheme of the invention: the electro-magnet and external control ware electric connection, adjust the lower surface and the regulating plate that the rope activity runs through the regulating box, and the one end of adjusting the rope is installed on the lower surface of regulating plate, the stopper is installed on the inside side surface of supporting seat.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, by arranging the winding component, a worker can conveniently complete the assembly of the pay-off rack by screwing the first supporting bolt and the second supporting bolt, the pay-off rack can be disassembled when not in use, the large size and space occupation of the pay-off rack are avoided, when the worker carries out pay-off, when more cables need to be wound, the worker can open the second electric push rod through the handheld remote controller to drive the lifting plate to ascend, the cable winding drum for the intelligent power distribution network is jacked up by the winding drum, and the speed reducer drives the winding drum to rotate, so that the cable winding drum for the intelligent power distribution network rotates in the opposite direction of paying-off to wind the cables, the assembly can be completed by one person without two-person operation, the operation is not required to be carried out by one person, the labor intensity is reduced, and the labor cost is also saved.
2. According to the invention, the adjusting component is arranged, the electromagnet in the adjusting component is started through the handheld remote controller to attract the iron block, the adjusting rope can pull the adjusting plate downwards, so that the universal wheel is in contact with the ground and jacks up the pay-off stand, and the pay-off stand can be conveniently moved by a worker at any time on a working site.
Drawings
FIG. 1 is a schematic structural view of a cable payoff stand that facilitates quick assembly;
FIG. 2 is a partial front cross-sectional view of a support base in a cable pay-off stand that facilitates quick assembly;
FIG. 3 is a partial schematic view of a cable payoff stand that facilitates quick assembly;
FIG. 4 is a partial left side view of a support base in a cable pay-off stand for easy quick assembly;
FIG. 5 is a schematic view of a take-up assembly in a cable pay-off stand that facilitates quick assembly;
FIG. 6 is an enlarged view of A in FIG. 5;
FIG. 7 is a cross-sectional view of a mounting block in a cable pay-off stand that facilitates quick assembly;
FIG. 8 is a schematic view of a rotating rod in a cable drum for easy rapid assembly;
fig. 9 is a schematic structural view of an adjusting assembly in a cable drum for facilitating quick assembly.
In the figure: 1. a supporting seat; 2. a support bar; 3. a first support pin; 4. a ramp; 5. a support plate; 6. a supporting block; 7. a second supporting pin; 8. a support frame; 9. a first electric push rod; 10. a drum; 11. inserting a rod; 12. cable drums for smart distribution networks; 13. a winding component; 14. an adjustment assembly; 15. a mounting seat; 16. mounting a plate; 17. mounting a rod; 18. installing a sleeve; 19. winding the roll; 20. a connecting rod; 21. a connecting plate; 22. a first synchronizing wheel; 23. a first synchronization belt; 24. a lifting plate; 25. a slide bar; 26. connecting blocks; 27. rotating the rod; 28. a second synchronizing wheel; 29. a third synchronizing wheel; 30. a fourth synchronizing wheel; 31. a speed reducer; 32. double-row synchronizing wheels; 33. a second synchronous belt; 34. a fixing plate; 35. a pressure sensor; 36. a second electric push rod; 37. an adjusting plate; 38. a limiting rod; 39. a limiting plate; 40. a universal wheel; 41. a first magnetic block; 42. a second magnetic block; 43. an adjustment box; 44. an electromagnet; 45. an iron block; 46. adjusting the rope; 47. and a limiting block.
Detailed Description
Referring to fig. 1 to 9, in the embodiment of the present invention, a cable pay-off rack convenient for fast assembly includes two support bases 1, two support rods 2 are symmetrically and movably embedded in the two support bases 1, a first support bolt 3 is screwed to one end of each support rod 2, the first support bolt 3 is movably attached to one side surface of each support base 1, ramps 4 are disposed on the left and right sides of the front side of each support rod 2, support plates 5 are disposed on the left and right sides between the two support rods 2, support blocks 6 are disposed on the front and rear sides of each support plate 5, each support rod 2 movably penetrates through each support block 6, one end of each support block 6 penetrates through and is screwed to a second support bolt 7, one end of each second support bolt 7 is attached to one side surface of each support rod 2, a support frame 8 is disposed on the upper surface of each support plate 5, and a first electric push rod 9 is disposed in each support frame 8, the upper end of a first electric push rod 9 is symmetrically and rotatably connected with two rollers 10, an insert rod 11 is jointly installed above two support frames 8, the insert rod 11 is movably installed between the left and right rollers 10, cable winding drums 12 for an intelligent power distribution network are movably installed outside the insert rod 11, a winding assembly 13 is arranged outside the support frames 8, the winding assembly 13 comprises an installation seat 15, an installation plate 16 is installed below the installation seat 15, installation rods 17 are installed at four corners of the upper surface of the installation plate 16, the upper end of the installation rod 17 is installed on the lower surface of the installation seat 15, an installation sleeve 18 is installed on one side surface of the installation plate 16, the installation sleeve 18 is installed outside the support frames 8, two winding drums 19 are symmetrically installed above the installation seat 15, connecting rods 20 are installed at the left and right ends of the winding drums 19, one end of each connecting rod 20 is rotatably connected with a connecting plate 21, and a first synchronous wheel 22 is installed outside the left connecting rod 20, a first synchronous belt 23 is installed outside the first synchronous wheel 22, the connecting plate 21 and the first synchronous belt 23 both movably penetrate through the upper surface of the installation seat 15, a lifting plate 24 is slidably connected inside the installation seat 15, four corners of the lifting plate 24 are both movably connected with sliding rods 25, the sliding rods 25 are installed on the upper and lower side surfaces inside the installation seat 15, connecting blocks 26 are installed on the front and rear sides of the upper surface of the lifting plate 24, the upper end of each connecting block 26 is rotatably connected with a rotating rod 27, a second synchronous wheel 28 is installed outside the rotating rod 27, the lower end of the first synchronous belt 23 is installed outside the second synchronous wheel 28, a third synchronous wheel 29 is installed on one side of the second synchronous wheel 28 outside the rear rotating rod 27, a fourth synchronous wheel 30 is installed on one side of the second synchronous wheel 28 outside the front rotating rod 27, a speed reducer 31 is installed at the middle position of the upper surface of the lifting plate 24, one end of the speed reducer 31 is installed with a synchronous wheel 32, two second synchronous wheels 33 are installed outside the double-row synchronous wheels 32, two second synchronous belts 33 are respectively installed on the third synchronous wheel 29 and the fourth synchronous wheel 30, a lower surface of the installation seat 15, two electric pressure sensors are installed on the lower surface of the lifting plate 34, the lower surface of the lifting plate 15, the internal lifting plate 34, the lifting plate 34 and the lower surface of the electric pressure sensor are installed on the electric pressure sensor mounting plate 35, the lower surface of the lifting plate 34, the electric pressure sensor mounting plate 35 of the lifting plate 34, the electric pressure sensor mounting plate 35;
when a worker pulls a cable on the cable drum 12 for the intelligent power distribution network, the insertion rod 11 rotates in the two rollers 10 on the left side and the right side, so that the cable drum 12 for the intelligent power distribution network can rotate, the cable can be continuously pulled out, and the paying-off is convenient; external control ware can be the handheld remote controller who conveniently carries, the staff is in the unwrapping wire, because inertia is too big, have unnecessary cable to be put out easily, the staff can start second electric putter 36 with handheld remote controller and drive lifter plate 24 and rise, make two receipts reel 19 jack-up inserted bar 11, will be through handheld remote controller automatic stop second electric putter 36 when pressure sensor 35 senses the pressure value of settlement, speed reducer 31 drives four receipts reel 19 altogether and rotates, make cable reel 12 reversal come to come the cable rolling of putting out more for the intelligent power distribution network.
In fig. 1 and 9: an adjusting component 14 is arranged inside the supporting seat 1, the adjusting component 14 comprises an adjusting plate 37, four corners of the adjusting plate 37 are movably connected with limiting rods 38 in a penetrating manner, the upper ends of the limiting rods 38 are installed on the upper surface inside the supporting seat 1, the lower end of the limiting rods 38 is provided with a limiting plate 39, the limiting plate 39 is installed on the surface of one side inside the supporting seat 1, the lower surface of the adjusting plate 37 is symmetrically provided with two universal wheels 40, two first magnetic blocks 41 are symmetrically installed on the upper surface of the adjusting plate 37, the upper ends of the first magnetic blocks 41 attract and are provided with second magnetic blocks 42, the upper ends of the second magnetic blocks 42 are installed on the upper surface inside the supporting seat 1, an adjusting box 43 is installed above the adjusting plate 37, the upper surface inside of the adjusting box 43 is provided with an electromagnet 44, the electromagnet 44 is electrically connected with an external controller, the inside of the adjusting box 43 is located below the electromagnet 44 and is slidably connected with an iron block 45, the lower surface of the iron block 45 is provided with an adjusting rope 46, the adjusting rope 46 movably penetrates through the lower surface of the adjusting box 43 and the adjusting plate 37, one end of the adjusting rope 46 is installed on the surface of one side inside the adjusting plate 37, a limiting block 47 is movably installed outside the limiting block 47;
when the pay-off stand needs to be moved on a working site, a worker can start the electromagnet 44 through a handheld remote controller to suck the iron block 45, so that the universal wheel 40 is pulled downwards to contact the ground through the adjusting rope 46, and the pay-off stand is convenient for the worker to move.
The working principle of the invention is as follows: firstly, assembling is carried out, a worker sleeves two support frames 8 outside support rods 2 through support blocks 6, screws a second support bolt 7, inserts the two support rods 2 into two support seats 1, and locks the support rods 2 through a first support bolt 3 to complete the whole pay-off rack assembling, the assembling is very simple and convenient, the worker puts two ramps 4 well, rolls a cable reel 12 for the intelligent power distribution network between the two support rods 2 through the ramps 4, then inserts a plug rod 11 into a cable reel 12 for the intelligent power distribution network, so that two ends of the plug rod 11 are positioned between the left and right two groups of drums 10, opens a first electric push rod 9 to drive the drums 10 to ascend, so that the cable reel 12 for the intelligent power distribution network is lifted, when the worker pulls the cable to pay-off, if the pulled-out cable is too much, the worker needs to recover, at this time, the worker does not need to return to the position of the pay-off rack, directly opens a second electric push rod 36 to drive a lifting plate 24 to ascend through a handheld remote controller, a winding drum 19 touches the plug rod 11 and drives the intelligent cable reel 12 to rotate towards a second electric push rod 36, when the cable reel 31 is pulled, the worker drives the second electric push rod to rotate to drive a second electric push rod to rotate to drive a second electric power distribution network to move, and a second electric power distribution network to move to a synchronous belt speed reducer 31, and a remote controller to drive the two synchronous belt to drive the synchronous belt to move along with the synchronous belt, and a synchronous belt speed reducer 31, and a synchronous belt speed reducer, so that the synchronous belt of the intelligent power distribution network 12, the synchronous belt reducer 31; when the pay-off stand needs to be moved, a worker can start the electromagnet 44 through a hand-held remote controller to suck the iron block 45, the adjusting rope 46 can pull the adjusting plate 37 downwards, the universal wheel 40 is made to contact the ground and jack up the pay-off stand, and the pay-off stand is convenient to move.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention are equivalent to or changed within the technical scope of the present invention.

Claims (9)

1. A cable pay-off rack convenient for rapid assembly comprises two supporting seats (1), wherein two supporting rods (2) are symmetrically and movably embedded in the two supporting seats (1) together, a first supporting bolt (3) is connected to one end of each supporting rod (2) through threads, ramps (4) are placed on the front left side and the front right side of each supporting rod (2), a supporting plate (5) is installed on the left side and the right side between the two supporting rods (2), supporting blocks (6) are installed on the surfaces of the front side and the rear side of each supporting plate (5), one end of each supporting block (6) penetrates through and is connected with a second supporting bolt (7) through threads, a supporting frame (8) is installed on the upper surface of each supporting plate (5), a first electric push rod (9) is installed in each supporting frame (8), two rollers (10) are symmetrically and rotatably connected to the upper end of each first electric push rod (9), an inserting rod (11) is installed above the two supporting frames (8) together, and an intelligent cable reel (12) for a power distribution network is movably installed outside the inserting rod (11);
a winding component (13) is arranged outside the support frame (8);
the inside of supporting seat (1) is provided with adjusting part (14).
2. The cable pay-off stand convenient to fast assembly of claim 1, characterized in that, rolling subassembly (13) includes mount pad (15), mounting panel (16) is installed to the below of mount pad (15), installation pole (17) are all installed to the upper surface four corners of mounting panel (16), and one side surface mounting of mounting panel (16) has installation cover (18), two receipts reel (19) are installed to the top symmetry of mount pad (15), connecting rod (20) are all installed at both ends about receipts reel (19), the one end of connecting rod (20) is rotated and is connected with connecting plate (21), the left side the externally mounted of connecting rod (20) has first synchronizing wheel (22), the externally mounted of first synchronizing wheel (22) has first synchronous belt (23), the inside sliding connection of mount pad (15) has lifter plate (24), the dwang of lifter plate (24) all activity run-through is connected with slide bar (25), and both sides all install connecting block (26) in the front of the upper surface of lifter plate (24) back, the upper end rotation of connecting block (26) is connected with lifter plate (27), the outside of second synchronizing wheel (28) is located one side of second synchronizing wheel (28), front side fourth synchronizing wheel (30) are installed to one side that the outside of dwang (27) is located second synchronizing wheel (28), upper surface intermediate position department of lifter plate (24) installs speed reducer (31), double synchronizing wheel (32) are installed to the one end of speed reducer (31), the externally mounted of double synchronizing wheel (32) has two second hold-in ranges (33), fixed plate (34) are installed to the below that the inside of mount pad (15) is located lifter plate (24), the last surface mounting of fixed plate (34) has pressure sensor (35), and second electric putter (36) are all installed in the lower surface four corners of fixed plate (34).
3. The cable pay-off rack convenient to fast assembly of claim 1, characterized in that, adjusting part (14) includes regulating plate (37), the equal activity through connection in four corners of regulating plate (37) has gag lever post (38), limiting plate (39) are installed to the lower extreme of gag lever post (38), two universal wheels (40) are installed to the lower surface symmetry of regulating plate (37), and the upper surface symmetry of regulating plate (37) installs two first magnetic blocks (41), the upper end actuation of first magnetic block (41) has second magnetic block (42), adjust box (43) is installed to the top of regulating plate (37), the inside upper surface mounting who adjusts box (43) has electro-magnet (44), and the inside below sliding connection who is located electro-magnet (44) that adjusts box (43) has iron block (45), the lower surface mounting of iron block (45) has regulation rope (46), the outside movable mounting who adjusts rope (46) has stopper (47).
4. The cable pay-off rack convenient for quick assembly according to claim 1, wherein the first support bolt (3) is movably attached to one side surface of the support base (1), the support bar (2) movably penetrates through the support block (6), one end of the second support bolt (7) is attached to one side surface of the support bar (2), and the insert rod (11) is movably mounted between the left and right rollers (10).
5. The cable pay-off stand convenient for quick assembly as claimed in claim 2, wherein the upper end of the mounting rod (17) is mounted on the lower surface of the mounting seat (15), the mounting sleeve (18) is mounted on the outside of the supporting frame (8), and the connecting plate (21) and the first synchronous belt (23) both movably penetrate through the upper surface of the mounting seat (15).
6. The cable reel for cable pay-off convenient to assemble rapidly as claimed in claim 2, wherein the slide bar (25) is installed on the inner upper and lower side surfaces of the installation seat (15), the lower end of the first timing belt (23) is installed on the outer portion of the second timing wheel (28), and the two second timing belts (33) are installed on the outer portions of the third timing wheel (29) and the fourth timing wheel (30), respectively.
7. The cable pay-off stand convenient for quick assembly as claimed in claim 2, wherein the lifting plate (24) is installed at the upper end of the pressure sensor (35), the lower end of the second electric push rod (36) is installed on the inner lower surface of the installation seat (15), and the speed reducer (31), the pressure sensor (35) and the second electric push rod (36) are all electrically connected with an external controller.
8. The cable pay-off stand convenient for quick assembly as claimed in claim 3, wherein the upper end of the limiting rod (38) is mounted on the inner upper surface of the supporting seat (1), the limiting plate (39) is mounted on one side surface of the inner part of the supporting seat (1), and the upper end of the second magnetic block (42) is mounted on the inner upper surface of the supporting seat (1).
9. The cable pay-off stand convenient for rapid assembly as claimed in claim 3, wherein the electromagnet (44) is electrically connected with an external controller, the adjusting rope (46) movably penetrates through the lower surface of the adjusting box (43) and the adjusting plate (37), one end of the adjusting rope (46) is installed on the lower surface of the adjusting plate (37), and the limiting block (47) is installed on one side surface of the inside of the supporting seat (1).
CN202211059892.3A 2022-09-01 2022-09-01 Cable pay-off rack convenient to fast assembly Pending CN115417231A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211059892.3A CN115417231A (en) 2022-09-01 2022-09-01 Cable pay-off rack convenient to fast assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211059892.3A CN115417231A (en) 2022-09-01 2022-09-01 Cable pay-off rack convenient to fast assembly

Publications (1)

Publication Number Publication Date
CN115417231A true CN115417231A (en) 2022-12-02

Family

ID=84200994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211059892.3A Pending CN115417231A (en) 2022-09-01 2022-09-01 Cable pay-off rack convenient to fast assembly

Country Status (1)

Country Link
CN (1) CN115417231A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116730112A (en) * 2023-08-15 2023-09-12 国网山东省电力公司单县供电公司 Auxiliary stand for cable threading and laying

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB907838A (en) * 1959-06-02 1962-10-10 Delore Sa Geoffroy Improvements in or relating to apparatus for continuously winding or unwinding filaments
CN204205431U (en) * 2013-11-21 2015-03-11 国网河南省电力公司驻马店供电公司 A kind of infra-red remote control hydraulic pressure landing electric cable actinobacillus device
CN209685040U (en) * 2019-03-12 2019-11-26 金华市新宏远线缆有限公司 A kind of cable reel jacking transferring device
CN210260637U (en) * 2019-06-29 2020-04-07 徐州天虹银联纺织有限公司 Spinning tube matched with rotor spinning machine
CN111003592A (en) * 2019-12-16 2020-04-14 南通倍佳机械科技有限公司 Winding device for super-length soft rubber hose
CN210798203U (en) * 2019-06-13 2020-06-19 张韫 Multi-use architecture energy-conserving paint spraying apparatus
CN211521244U (en) * 2019-12-18 2020-09-18 湖北中南电缆研究所有限公司 Winding frame device convenient to lift and adjust for cable production
CN211920401U (en) * 2020-03-24 2020-11-13 中核四达建设监理有限公司 Pay-off rack
CN213770860U (en) * 2020-09-29 2021-07-23 四川中联锦创科技有限公司 5G communication optical cable coiling mechanism
CN214652623U (en) * 2021-04-19 2021-11-09 杭州九鼎纸管有限公司 Adjusting type friction rolling device based on broken-wire-preventing and broken-wire-preventing chemical fiber paper tube
CN214779825U (en) * 2021-04-01 2021-11-19 湖北弘源鼎盛电力工程有限公司 High-strength cable pay-off rack convenient for rapid assembly
CN214828076U (en) * 2021-06-22 2021-11-23 苏州耀玛精密五金有限公司 Auxiliary carrier convenient for heat conduction for mobile phone antenna printing
CN214934782U (en) * 2021-01-25 2021-11-30 山西世纪新盛电力有限公司 Over-and-under type portable cable pay off rack

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB907838A (en) * 1959-06-02 1962-10-10 Delore Sa Geoffroy Improvements in or relating to apparatus for continuously winding or unwinding filaments
CN204205431U (en) * 2013-11-21 2015-03-11 国网河南省电力公司驻马店供电公司 A kind of infra-red remote control hydraulic pressure landing electric cable actinobacillus device
CN209685040U (en) * 2019-03-12 2019-11-26 金华市新宏远线缆有限公司 A kind of cable reel jacking transferring device
CN210798203U (en) * 2019-06-13 2020-06-19 张韫 Multi-use architecture energy-conserving paint spraying apparatus
CN210260637U (en) * 2019-06-29 2020-04-07 徐州天虹银联纺织有限公司 Spinning tube matched with rotor spinning machine
CN111003592A (en) * 2019-12-16 2020-04-14 南通倍佳机械科技有限公司 Winding device for super-length soft rubber hose
CN211521244U (en) * 2019-12-18 2020-09-18 湖北中南电缆研究所有限公司 Winding frame device convenient to lift and adjust for cable production
CN211920401U (en) * 2020-03-24 2020-11-13 中核四达建设监理有限公司 Pay-off rack
CN213770860U (en) * 2020-09-29 2021-07-23 四川中联锦创科技有限公司 5G communication optical cable coiling mechanism
CN214934782U (en) * 2021-01-25 2021-11-30 山西世纪新盛电力有限公司 Over-and-under type portable cable pay off rack
CN214779825U (en) * 2021-04-01 2021-11-19 湖北弘源鼎盛电力工程有限公司 High-strength cable pay-off rack convenient for rapid assembly
CN214652623U (en) * 2021-04-19 2021-11-09 杭州九鼎纸管有限公司 Adjusting type friction rolling device based on broken-wire-preventing and broken-wire-preventing chemical fiber paper tube
CN214828076U (en) * 2021-06-22 2021-11-23 苏州耀玛精密五金有限公司 Auxiliary carrier convenient for heat conduction for mobile phone antenna printing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116730112A (en) * 2023-08-15 2023-09-12 国网山东省电力公司单县供电公司 Auxiliary stand for cable threading and laying

Similar Documents

Publication Publication Date Title
KR102042783B1 (en) apparatus for drawing out charging cable of electric vehicles
CN115417231A (en) Cable pay-off rack convenient to fast assembly
CN112141917A (en) Smart power grids transformer system transformer installation auxiliary device
CN109179058A (en) A kind of actinobacillus device for disk dress high voltage cable
CN114334368A (en) Transformer capable of being rapidly installed and installation process thereof
CN210176240U (en) Floor control device of integrated elevator
CN218231302U (en) High-performance cable processing winding device
CN113772579B (en) Transformer substation construction transformer installation and fixation auxiliary device and installation method
CN214739786U (en) Reinforced concrete vestibule construction bearing structure
CN114715717A (en) Electric power engineering construction cable laying equipment and method
CN215905622U (en) Cable pay-off
CN214879161U (en) Cable coiling device for cable production
CN210682728U (en) Pay-off rack for electric power construction
CN210271914U (en) Heating device for cable manufacture
CN219443243U (en) Insulating fireproof cable device that straightens
CN115140144B (en) A handling device for stone material short distance transportation
CN215797906U (en) Hanging device of transformer
CN219040190U (en) Auxiliary installation device for transformer for power engineering
CN217996613U (en) Detachable hoist engine erection equipment
CN215854326U (en) Distribution lines lays device
CN220098087U (en) Mechanical lifting type cable paying-off device
CN214624661U (en) Transformer erection equipment for electric power construction
CN217282136U (en) Rolling chain type cable buried laying device
CN219203865U (en) Mutual inductance auxiliary lifting device of centrally installed switchgear
CN221275053U (en) Portal frame for installing electromechanical equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination