CN115409259A - 一种电力负荷概率预测方法 - Google Patents

一种电力负荷概率预测方法 Download PDF

Info

Publication number
CN115409259A
CN115409259A CN202211045551.0A CN202211045551A CN115409259A CN 115409259 A CN115409259 A CN 115409259A CN 202211045551 A CN202211045551 A CN 202211045551A CN 115409259 A CN115409259 A CN 115409259A
Authority
CN
China
Prior art keywords
variable
value
power load
variables
sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211045551.0A
Other languages
English (en)
Inventor
黄新力
金俊涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Normal University
Original Assignee
East China Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Normal University filed Critical East China Normal University
Priority to CN202211045551.0A priority Critical patent/CN115409259A/zh
Publication of CN115409259A publication Critical patent/CN115409259A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/02Neural networks
    • G06N3/08Learning methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Health & Medical Sciences (AREA)
  • Software Systems (AREA)
  • Primary Health Care (AREA)
  • Mathematical Physics (AREA)
  • Computing Systems (AREA)
  • Molecular Biology (AREA)
  • Evolutionary Computation (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Computational Linguistics (AREA)
  • Biophysics (AREA)
  • General Engineering & Computer Science (AREA)
  • Biomedical Technology (AREA)
  • Artificial Intelligence (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种电力负荷概率预测方法,涉及电力负荷预测技术领域。其中方法步骤包括:将电力负荷值、影响负荷值的历史变量和影响负荷值的未来已知变量构成数据集,进行数据预处理,并划分成训练集和测试集;将训练集的变量输入到电力负荷预测模型中,利用训练集对电力负荷预测模型进行第一训练;将测试集的电力负荷时间序列输入到训练好的电力负荷预测模型中进行电力负荷概率预测,得到电力负荷概率预测值。本发明改进了电力负荷概率预测模型,融合了电力负荷序列分解方法和多变量电力负荷预测方法,综合考虑了电力负荷序列隐藏的时间序列信息与多变量对负荷值的影响因子,提高了预测精准度,解决了现有电力负荷预测方法预测角度单一的问题。

Description

一种电力负荷概率预测方法
技术领域
本发明涉及时间序列预测领域,涉及时间序列预测在电力负荷预测的应用,尤其是一种电力负荷概率预测方法。
背景技术
随着社会的快速发展,各行各业对于电能的需求不断提高,电能已经成为人类发展过程中不可或缺的重要能源。为了保证稳定的电力供应以及供电质量,对电网的安全高效运行提出了更高的要求。由于电能本身很难实现大量存储,所以最好的办法就是保持发电量和用电量处于一个动态平衡的状态,否则将导致发电量和用电量供需失衡,非常容易引发安全事故,给电力系统和用户造成极大的经济损失。
目前,解决这一问题最有效的方法就是做好电力负荷的预测,使得发电量和用电量达到一定的动态平衡,还可以帮助电力部门及时做出科学决策,降低成本,保证电网长期安全稳定运行。现有的技术主要有两类:一是基于传统的时间序列预测法,在历史的数据上进行统计和分析,构建未来数据和历史数据之间存在的映射关系,但对于非线性数据处理能力较弱,并且当电力负荷受到不确定因素影响时,往往预测效果欠佳。二是基于机器学习的预测方法,它解决了传统时间序列预测方法对非线性数据处理弱的问题,具有强大的非线性数据处理能力。近年来,随着数据量的增加,数据维度的增多,深度学习在电力负荷预测问题上有了更好的应用,深度学习通过对底层特征组合形成更加高层抽象的特征,更加具有优势。但是,基于机器学习的预测方法,着重学习数据特征(包括预测目标历史数据)和预测目标值之间的非线性关系,忽略了预测目标序列所隐藏的丰富信息,导致了预测效果无法进一步提升。因此,基于机器学习的预测方法预测效果不佳是一个亟待解决的问题。
发明内容
本发明的目的是提供一种电力负荷概率预测方法,该方法通过一个由两个编码器组成的神经网络,目标序列编码器通过分解数据集的目标序列历史数据,分解它的趋势性和周期性,进而得到目标序列编码器的预测值。协变量编码器提取特征信息中的时间信息,学习到协变量对预测值的误差影响。再对目标序列编码器的预测值进行修正,进行分位数预测,实现了更加精确的电力负荷预测值。
实现本发明目的的具体技术方案是:
一种电力负荷概率预测方法,其特征在于,包括:
将电力负荷值、影响负荷值的历史变量和影响负荷值的未来已知变量构成数据集,进行数据预处理,并划分成训练集和测试集;
将训练集的变量输入到由目标序列编码器、协变量编码器和分位数输出层构成的电力负荷预测模型中,具体包括:
将训练集中的电力负荷序列值输入到目标序列编码器,分解目标序列的趋势性和周期性,得到第一隐藏变量;
将训练集中的影响负荷值的历史变量和影响负荷值的未来已知变量输入到协变量编码器,学习协变量对于预测值的误差影响因子,得到第二隐藏变量;
将第一隐藏变量和第二隐藏变量输入到分位数输出层,融合第一隐藏变量和第二隐藏变量,进行线性层输出,线性层函数为:
Figure BDA0003822259800000021
其中,W为权重参数,b为偏置参数;
Figure BDA0003822259800000022
为预测电力负荷值,u为第一隐藏变量和第二隐藏变量之和;
利用训练集对电力负荷预测模型进行第一训练,训练电力负荷预测模型使用的第一损失函数为:
Figure BDA0003822259800000023
Figure BDA0003822259800000024
其中,QL(·)为分位数损失函数,Ω为训练集,ω为电力负荷预测模型权重参数,
Figure BDA0003822259800000025
是分位数集合,q是
Figure BDA0003822259800000026
里的元素,
Figure BDA0003822259800000027
为预测电力负荷序列值,y为实际电力负荷序列值,H为预测长度,M是Ω的样本数量;t为当前时刻;
将测试集的变量输入到训练好的电力负荷预测模型中进行电力负荷概率预测,得到电力负荷概率预测值。
可选地,所述目标序列编码器由数个趋势性堆和数个周期性堆组成,趋势性堆和周期性堆又由对应的数个块组成;目标序列编码器的输入序列值为目标序列值,第一隐藏变量为所有堆的输出和:
Figure BDA0003822259800000028
每个堆的输入序列值为:
Figure BDA0003822259800000031
其中,xs-1为第s-1个堆的输入序列值,
Figure BDA0003822259800000032
为上一个堆的输出的过去序列值,S为堆的数量,x1为目标序列编码器的输入序列值;
每个堆的输出序列值为组成该堆的所有块的输出和:
Figure BDA0003822259800000033
每个块的输入值为:
Figure BDA0003822259800000034
其中,xs,l-1为第s个堆的第l-1个块的输入序列值,
Figure BDA0003822259800000035
为第s个堆的第l-1个块的过去序列值,L为第s个堆里块的数量,xs,1为第s个堆的输入序列值;
每个块对输入序列值xs,l进行4层全连接层处理:
hs,l,1=FCs,l,1(xs,l),hs,l,2=FCs,l,2(hs,l,1),hs,l,3=FCs,l,3(hs,l,2),hs,l,4=FCs,l,4(hs,l,3) (8)
FC(x)=RELU(Wx+b) (9)
其中,s为第s个堆,l为第l个块,hs,l,i为第s个堆的第l个块的第i个中间变量,RELU(·)为RELU激活函数,FC(·)为全连接层函数;
分别对hs,l,4进行线性层的处理,确定过去和未来的扩展系数
Figure BDA0003822259800000036
Figure BDA0003822259800000037
Figure BDA0003822259800000038
对扩展系数进行基础函数的计算,得到未来和过去的序列值;趋势性基础函数为:
Figure BDA0003822259800000039
其中,v=[0,1,2,…,H-2,H-1]T/H,H为预测步长,p为多项式最高次数幂;
周期性基础函数为:
Figure BDA00038222598000000310
Figure BDA0003822259800000041
可选地,所述协变量编码器由静态变量选择器、数个历史变量选择器、数个未来已知变量选择器、数个静态变量编码器和基于GRU的编码器-解码器组成,将影响负荷值的历史变量和影响负荷值的未来已知变量输入到所述协变量编码器中:
将影响负荷值的历史静态变量输入到静态变量选择器,得到静态变量编码值;
将静态变量编码值分别输入到2个静态变量编码器,对静态变量编码值进行编码,得到2个不同的上下文向量,作为历史变量选择器与未来已知变量选择器和基于GRU的编码器-解码器的可选上下文向量输入值。
可选地,所述静态变量选择器、数个历史变量选择器、数个未来已知变量选择器均由数个GRN组件构成:
Figure BDA0003822259800000042
Figure BDA0003822259800000043
其中,Ξt为各变量组成的矩阵,cs为可选的上下文向量,
Figure BDA0003822259800000046
为变量个数,
Figure BDA0003822259800000044
为第j个变量,
Figure BDA0003822259800000045
为权重。
可选地,所述GRN组件处理影响负荷值的历史变量与影响负荷值的未来已知变量和负荷值之间的非线性关系,结构如下:
GRNω(x,c)=LayerNorm(x,GLUω1)) (16)
η1=Ψ1,ωη2+e1,ω (17)
η2=ELU(Ψ2,ωx+Ψ3,ωc+e2,ω) (18)
GLUω(η)=σ(Ψ4,ωη+e4,ω)⊙(Ψ5,ωη+e5,ω) (19)
其中,Ψi,ω为各层权重参数,ei,ω为各层偏置参数,⊙为哈达玛积,σ为sigmoid激活函数,LayerNorm为标准化函数。
本发明的有益效果包括:
1)与单变量时间序列预测方法相比,本发明在整个训练过程中考虑了协变量对目标预测值的影响,并对不同类型的变量采取了适合的特征工程提取信息的方式,使得本发明的预测准确性更高。
2)与多变量时间序列预测方法相比,本发明充分利用了目标序列自身所包含的时间序列信息,通过分解其趋势性、周期性,得到了预测序列值,再考虑到外部因素对预测的影响,使得本发明的预测更加精准。
附图说明
图1为本发明的一种电力负荷概率预测方法流程示意图;
图2为本发明的目标序列编码器框架示意图;
图3为本发明的协变量编码器框架示意图;
图4为本发明的变量选择器框架示意图;
图5为本发明的GRN组件框架示意图。
具体实施方式
结合以下具体实施例和附图,对本发明作进一步的详细说明。实施本发明的过程、条件、实验方法等,除以下专门提及的内容之外,均为本领域的普遍知识和公知常识,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图,并获得其他的实施方式。
参阅图1,为本发明具体实施方式提供的一种电力负荷概率预测方法流程示意图。该方法具体包括:
步骤101:将电力负荷值、影响负荷值的历史变量和影响负荷值的未来已知变量构成数据集,进行数据预处理,并划分成训练集和测试集;
步骤102:将训练集中的电力负荷序列输入到目标序列编码器,分解目标序列的趋势性和周期性,得到第一隐藏变量;
将训练集中的影响负荷值的历史变量和影响负荷值的未来已知变量输入到协变量编码器,学习协变量对于预测值的误差影响因子,得到第二隐藏变量;
将第一隐藏变量和第二隐藏变量输入到分位数输出层,融合第一隐藏变量和第二隐藏变量,进行线性层输出,线性层函数为:
Figure BDA0003822259800000051
其中,W为权重参数,b为偏置参数;
Figure BDA0003822259800000052
为预测电力负荷值,u为第一隐藏变量和第二隐藏变量之和;
利用训练集对电力负荷预测模型进行第一训练,训练电力负荷预测模型使用的第一损失函数为:
Figure BDA0003822259800000061
Figure BDA0003822259800000062
其中,QL(·)为分位数损失函数,Ω为训练集,ω为电力负荷预测模型权重参数,
Figure BDA0003822259800000063
是分位数集合,q是
Figure BDA0003822259800000064
里的元素,
Figure BDA0003822259800000065
为预测电力负荷序列值,y为实际电力负荷序列值,H为预测长度,M是Ω的样本数量;t为当前时刻;
步骤103:将测试集的电力负荷时间序列输入到训练好的电力负荷预测模型中进行电力负荷概率预测,得到电力负荷概率预测值。
为了更清楚地介绍上述目标序列编码器,下面结合图2,对本发明实施例中所涉及到的目标序列编码器网络架构进行整体性说明。如图2所示,目标序列编码器网络架构可以包括:
目标序列编码器由数个趋势性堆和数个周期性堆组成,趋势性堆和周期性堆又由对应的数个块组成;目标序列编码器的输入序列值为目标序列值,第一隐藏变量为所有堆的输出和:
Figure BDA0003822259800000066
每个堆的输入序列值为:
Figure BDA0003822259800000067
其中,xs-1为第s-1个堆的输入序列值,
Figure BDA0003822259800000068
为上一个堆的输出的过去序列值,S为堆的数量,x1为目标序列编码器的输入序列值;
每个堆的输出序列值为组成该堆的所有块的输出和:
Figure BDA0003822259800000069
每个块的输入值为:
Figure BDA00038222598000000610
其中,xs,l-1为第s个堆的第l-1个块的输入序列值,
Figure BDA00038222598000000611
为第s个堆的第l-1个块的过去序列值,L为第s个堆里块的数量,xs,1为第s个堆的输入序列值;
每个块对输入序列值xs,l进行4层全连接层处理:
hs,l,1=FCs,l,1(xs,l),hs,l,2=FCs,l,2(hs,l,1),hs,l,3=FCs,l,3(hs,l,2),hs,l,4=FCs,l,4(hs,l,3) (8)
FC(x)=RELU(Wx+b) (9)
其中,s为第s个堆,l为第l个块,hs,l,i为第s个堆的第l个块的第i个中间变量,RELU(·)为RELU激活函数,FC(·)为全连接层函数;
分别对hs,l,4进行线性层的处理,确定过去和未来的扩展系数
Figure BDA0003822259800000071
Figure BDA0003822259800000072
Figure BDA0003822259800000073
对扩展系数进行基础函数的计算,得到未来和过去的序列值;趋势性基础函数为:
Figure BDA0003822259800000074
其中,v=[0,1,2,…,H-2,H-1]T/H,H为预测步长,p为多项式最高次数幂;
周期性基础函数为:
Figure BDA0003822259800000075
Figure BDA0003822259800000076
为了更清楚地介绍上述协变量编码器,下面结合图3,对本发明实施例中所涉及到的协变量编码器网络架构进行整体性说明。如图3所示,协变量编码器网络架构可以包括:
假设
Figure BDA0003822259800000077
是静态变量,例如城市、地区、位置等信息,
Figure BDA0003822259800000078
是历史协变量,例如历史的气候、时间等数据,
Figure BDA0003822259800000079
Figure BDA00038222598000000710
为未来可知的变量,例如节假日、周末等数据。将影响负荷值的历史变量和影响负荷值的未来已知变量输入到所述协变量编码器中:将影响负荷值的历史静态变量输入到静态变量选择器,得到静态变量编码值;将静态变量编码值分别输入到2个静态变量编码器,对静态变量编码值进行编码,得到2个不同的上下文向量,作为历史变量选择器与未来已知变量选择器和基于GRU的编码器-解码器的可选上下文向量输入值;将影响负荷值的历史变量与影响负荷值的未来已知变量和上下文向量分别输入到历史变量选择器和未来已知变量选择器,对各类变量进行特征的选择后,得到特征编码值;将特征编码值和上下文向量输入到编码器-解码器,解码器输出的值即为第二隐藏向量。
为了更清楚地介绍上述变量选择器,下面结合图4,对本发明实施例中所涉及到的变量选择器网络架构进行整体性说明。如图4所示,变量选择器网络架构可以包括:
所述变量选择器,对各类变量和可选的上下文向量进行特征的选择后,得到特征编码值,它主要由多个GRN组件构成:
Figure BDA0003822259800000081
Figure BDA0003822259800000082
其中,Ξt为各变量组成的矩阵,cs为可选的上下文向量,
Figure BDA0003822259800000085
为变量个数,
Figure BDA0003822259800000083
为第j个变量,
Figure BDA0003822259800000084
为权重。
为了更清楚地介绍上述GRN组件,下面结合图5,对本发明实施例中所涉及到的GRN组件网络架构进行整体性说明。如图5所示,GRN组件网络架构可以包括:
所述GRN组件处理影响负荷值的历史变量与影响负荷值的未来已知变量和负荷值之间的非线性关系,结构如下:
GRNω(x,c)=LayerNorm(x,GLUω1)) (16)
η1=Ψ1,ωη2+e1,ω (17)
η2=ELU(Ψ2,ωx+Ψ3,ωc+e2,ω) (18)
GLUω(η)=σ(Ψ4,ωη+e4,ω)⊙(Ψ5,ωη+e5,ω) (19)
其中,Ψi,ω为各层权重参数,ei,ω为各层偏置参数,⊙为哈达玛积,σ为sigmoid激活函数,LayerNorm为标准化函数。
实施例
考虑一个公开的电力负荷数据集UCI电力负荷图数据集,该数据集在2014年1月1日至2014年9月1日期间采集了500k样本,包含370个客户的用电量。本发明提供的一种基于协变量误差修正的电力负荷概率预测方法包括:
根据多维度的用户电力负荷数据,构成数据集,该数据集以小时为单位,用过去168小时的历史数据来预测未来24小时的电力负荷,将the electricity usage、day-of-week、hour-of-day、time index作为特征指标。
对数据集进行z分数标准化处理,并划分成训练集、验证集和测试集,前90%的数据为训练集,后10%的数据为验证集,测试集的数据为验证集之后的7天的数据。z分数标准化公式为:
Figure BDA0003822259800000091
根据数据集和一个目标序列编码器,该编码器分解目标序列的趋势性和周期性,得到第一隐藏变量,具体地:
Figure BDA0003822259800000092
是电力负荷数据集的目标序列历史数据,通过目标序列编码器,对Ypast序列中隐藏的时间序列信息进行提取,最终得到编码值。该编码器由2个趋势性与周期性的堆组成,每个堆由3个结构相同块构成。每个块对输入数据进行一次4层的全连接层处理:
hs,l,1=FCs,l,1(xs,l),hs,l,2=FCs,l,2(hs,l,1),hs,l,3=FCs,l,3(hs,l,2),hs,l,4=FCs,l,4(hs,l,3) (8)
FC(x)=RELU(Wx+b) (9)
其中,s为第s个堆,l为第l个块,hs,l,i为第s个堆的第l个块的第i个中间变量,RELU(·)为RELU激活函数,FC(·)为全连接层函数;
分别对hs,l,4进行线性层的处理,确定过去和未来的扩展系数
Figure BDA0003822259800000093
Figure BDA0003822259800000094
Figure BDA0003822259800000095
对扩展系数进行基础函数的计算,得到未来和过去的序列值;趋势性基础函数为:
Figure BDA0003822259800000096
其中,v=[0,1,2,…,H-2,H-1]T/H,H为预测步长,p为多项式最高次数幂;
周期性基础函数为:
Figure BDA0003822259800000097
Figure BDA0003822259800000098
根据数据集和一个协变量编码器,该编码器学习协变量对于预测值的误差影响因子,得到第二隐藏变量;本发明对协变量进行进一步的细分:
Figure BDA0003822259800000099
是静态变量,本实施例中静态变量为用户,
Figure BDA00038222598000000910
是历史协变量,例如历史的电力负荷、时间等数据,
Figure BDA0003822259800000101
为未来可知的变量,例如星期、天数等数据。将影响负荷值的历史变量和影响负荷值的未来已知变量输入到所述协变量编码器中:将影响负荷值的历史静态变量输入到静态变量选择器,得到静态变量编码值;将静态变量编码值分别输入到2个静态变量编码器,对静态变量编码值进行编码,得到2个不同的上下文向量,作为历史变量选择器与未来已知变量选择器和基于GRU的编码器-解码器的可选上下文向量输入值;将影响负荷值的历史变量与影响负荷值的未来已知变量和上下文向量分别输入到历史变量选择器和未来已知变量选择器,对各类变量进行特征的选择后,得到特征编码值;将特征编码值和上下文向量输入到编码器-解码器,解码器输出的值即为第二隐藏向量。
GRN组件来处理外生输入和目标之间的非线性关系,GRN接收主输入x和可选的外部上下文向量c:
GRNω(x,c)=LayerNorm(x,GLUω1)) (16)
η1=Ψ1,ωη2+e1,ω (17)
η2=ELU(Ψ2,ωx+Ψ3,ωc+e2,ω) (18)
其中,GLU为门控线性单元,具体公式如下:
GLUω(η)=σ(Ψ4,ωη+e4,ω)⊙(Ψ5,ωη+e5,ω) (19)
变量选择器是通过选择重要的特征,减少不必要的噪声输入,以提高建模性能,它主要由多个GRN组件构成:
Figure BDA0003822259800000102
Figure BDA0003822259800000103
其中,Ξt为各变量组成的矩阵,cs为可选的上下文向量,
Figure BDA0003822259800000108
为变量个数,
Figure BDA0003822259800000104
为第j个变量,
Figure BDA0003822259800000105
为权重。
根据目标序列编码器和协变量编码器的输出序列值之和,输入到分位数预测层,得到最终的分位数预测值。分位数预测层为一线性层:
Figure BDA0003822259800000106
其中,W为权重参数,b为偏置参数;
Figure BDA0003822259800000107
为预测电力负荷值,u为第一隐藏变量和第二隐藏变量之和;
所述模型的损失函数为:
Figure BDA0003822259800000111
Figure BDA0003822259800000112
其中,QL(·)为分位数损失函数,Ω为训练集,ω为电力负荷预测模型权重参数,
Figure BDA0003822259800000113
是分位数集合,q是
Figure BDA0003822259800000114
里的元素,
Figure BDA0003822259800000115
为预测电力负荷序列值,y为实际电力负荷序列值,H为预测长度,M是Ω的样本数量;t为当前时刻。
使用模型评价指标,使用测试集对模型的预测效果进行测试。
Figure BDA0003822259800000116
其中,
Figure BDA0003822259800000117
为测试集合。
以上所述仅是对本发明的优选实施例及原理进行了详细说明,对本领域的普通技术人员而言,依据本发明提供的思想,在具体实施方式上会有改变之处,而这些改变也应视为本发明的保护范围。

Claims (5)

1.一种电力负荷概率预测方法,其特征在于,包括:
将电力负荷值、影响负荷值的历史变量和影响负荷值的未来已知变量构成数据集,进行数据预处理,并划分成训练集和测试集;
将训练集输入到由目标序列编码器、协变量编码器和分位数输出层构成的电力负荷预测模型中,具体包括:
将训练集中的电力负荷序列值输入到目标序列编码器,分解目标序列的趋势性和周期性,得到第一隐藏变量;
将训练集中的影响负荷值的历史变量和影响负荷值的未来已知变量输入到协变量编码器,学习协变量对于预测值的误差影响因子,得到第二隐藏变量;
将第一隐藏变量和第二隐藏变量输入到分位数输出层,融合第一隐藏变量和第二隐藏变量,进行线性层输出,线性层函数为:
Figure FDA0003822259790000011
其中,W为权重参数,b为偏置参数;
Figure FDA0003822259790000012
为预测电力负荷值,u为第一隐藏变量和第二隐藏变量之和;
利用训练集对电力负荷预测模型进行第一训练,训练电力负荷预测模型使用的第一损失函数为:
Figure FDA0003822259790000013
Figure FDA0003822259790000014
其中,QL(·)为分位数损失函数,Ω为训练集,ω为电力负荷预测模型权重参数,Q是分位数集合,q是Q里的元素,
Figure FDA0003822259790000015
为预测电力负荷序列值,y为实际电力负荷序列值,H为预测长度,M是Ω的样本数量;t为当前时刻;
将测试集的变量输入到训练好的电力负荷预测模型中进行电力负荷概率预测,得到电力负荷概率预测值。
2.根据权利要求1所述的一种电力负荷概率预测方法,其特征在于,所述目标序列编码器由数个趋势性堆和数个周期性堆组成,趋势性堆和周期性堆由对应的数个块组成;目标序列编码器的输入序列值为目标序列值,第一隐藏变量为所有堆的输出和:
Figure FDA0003822259790000016
每个堆的输入序列值为:
Figure FDA0003822259790000021
其中,xs-1为第s-1个堆的输入序列值,
Figure FDA0003822259790000022
为上一个堆的输出的过去序列值,S为堆的数量,x1为目标序列编码器的输入序列值;
每个堆的输出序列值为组成该堆的所有块的输出和:
Figure FDA0003822259790000023
每个块的输入值为:
Figure FDA0003822259790000024
其中,xs,l-1为第s个堆的第l-1个块的输入序列值,
Figure FDA0003822259790000025
为第s个堆的第l-1个块的过去序列值,L为第s个堆里块的数量,xs,1为第s个堆的输入序列值;
每个块对输入序列值xs,l进行4层全连接层处理:
hs,l,1=FCs,l,1(xs,l),hs,l,2=FCs,l,2(hs,l,1),hs,l,3=FCs,l,3(hs,l,2),hs,l,4=FCs,l,4(hs,l,3)(8)
FC(x)=RELU(Wx+b) (9)
其中,s为第s个堆,l为第l个块,hs,l,i为第s个堆的第l个块的第i个中间变量,RELU(·)为RELU激活函数,FC(·)为全连接层函数;
分别对hs,l,4进行线性层的处理,确定过去和未来的扩展系数
Figure FDA0003822259790000026
Figure FDA0003822259790000027
Figure FDA0003822259790000028
对扩展系数进行基础函数的计算,得到未来和过去的序列值;趋势性基础函数为:
Figure FDA0003822259790000029
其中,v=[0,1,2,…,H-2,H-1]T/H,H为预测步长,p为多项式最高次数幂;
周期性基础函数为:
Figure FDA00038222597900000210
Figure FDA0003822259790000031
3.根据权利要求1所述的一种电力负荷概率预测方法,其特征在于,所述协变量编码器由静态变量选择器、数个历史变量选择器、数个未来已知变量选择器、数个静态变量编码器和基于GRU的编码器-解码器组成,将影响负荷值的历史变量和影响负荷值的未来已知变量输入到所述协变量编码器中,具体为:
将影响负荷值的历史静态变量输入到静态变量选择器,得到静态变量编码值;
将静态变量编码值分别输入到2个静态变量编码器,对静态变量编码值进行编码,得到2个不同的上下文向量,作为历史变量选择器与未来已知变量选择器和基于GRU的编码器-解码器的可选上下文向量输入值;
将影响负荷值的历史变量与影响负荷值的未来已知变量和上下文向量分别输入到历史变量选择器和未来已知变量选择器,对各类变量进行特征的选择后,得到特征编码值;
将特征编码值和上下文向量输入到所述的编码器-解码器,解码器输出的值即为第二隐藏向量。
4.根据权利要求3所述一种电力负荷概率预测方法,其特征在于,所述静态变量选择器、数个历史变量选择器及数个未来已知变量选择器均由数个GRN组件构成:
Figure FDA0003822259790000032
Figure FDA0003822259790000035
其中,Ξt为各变量组成的矩阵,cs为可选的上下文向量,mx为变量个数,
Figure FDA0003822259790000033
为第j个变量,
Figure FDA0003822259790000034
为权重。
5.根据权利要求4所述的一种电力负荷概率预测方法,其特征在于,所述GRN组件,处理影响负荷值的历史变量与影响负荷值的未来已知变量和负荷值之间的非线性关系,结构如下:
GRNω(x,c)=LayerNorm(x,GLUω1)) (16)
η1=Ψ1,ωη2+e1,ω (17)
η2=ELU(Ψ2,ωx+Ψ3,ωc+e2,ω) (18)
GLUω(η)=σ(Ψ4,ωη+e4,ω)⊙(Ψ5,ωη+e5,ω) (19)
其中,Ψi,ω为各层权重参数,ei,ω为各层偏置参数,⊙为哈达玛积,σ为sigmoid激活函数,LayerNorm为标准化函数。
CN202211045551.0A 2022-08-30 2022-08-30 一种电力负荷概率预测方法 Pending CN115409259A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211045551.0A CN115409259A (zh) 2022-08-30 2022-08-30 一种电力负荷概率预测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211045551.0A CN115409259A (zh) 2022-08-30 2022-08-30 一种电力负荷概率预测方法

Publications (1)

Publication Number Publication Date
CN115409259A true CN115409259A (zh) 2022-11-29

Family

ID=84162614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211045551.0A Pending CN115409259A (zh) 2022-08-30 2022-08-30 一种电力负荷概率预测方法

Country Status (1)

Country Link
CN (1) CN115409259A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117114056A (zh) * 2023-10-25 2023-11-24 城云科技(中国)有限公司 一种电力负荷预测模型及其构建方法、装置及应用
CN117977584A (zh) * 2024-04-02 2024-05-03 山东大学 电力负荷概率预测方法、系统、介质、设备及程序产品

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117114056A (zh) * 2023-10-25 2023-11-24 城云科技(中国)有限公司 一种电力负荷预测模型及其构建方法、装置及应用
CN117114056B (zh) * 2023-10-25 2024-01-09 城云科技(中国)有限公司 一种电力负荷预测模型及其构建方法、装置及应用
CN117977584A (zh) * 2024-04-02 2024-05-03 山东大学 电力负荷概率预测方法、系统、介质、设备及程序产品

Similar Documents

Publication Publication Date Title
CN115409259A (zh) 一种电力负荷概率预测方法
CN112990556A (zh) 一种基于Prophet-LSTM模型的用户用电能耗预测方法
CN111340273A (zh) 一种基于GEP参数优化XGBoost的电力系统短期负荷预测方法
CN114595874B (zh) 一种基于动态神经网络的超短期电力负荷预测方法
CN111626785A (zh) 一种基于结合注意力的cnn-lstm网络基金价格预测方法
CN111460001B (zh) 一种配电网理论线损率评估方法及系统
CN108764588A (zh) 一种基于深度学习的温度影响电力预测方法
CN111680786A (zh) 一种基于改进权重门控单元的时序预测方法
CN111784061B (zh) 一种电网工程造价预测模型的训练方法、装置和设备
CN111985719B (zh) 一种基于改进的长短期记忆网络的电力负荷预测方法
CN113935513A (zh) 一种基于ceemdan的短期电力负荷预测方法
CN113657937A (zh) 基于eemd-cnn+sae-rfr混合算法的日前电价预测方法
CN112990587A (zh) 一种对台区用电进行精准预测的方法及系统、设备、介质
CN115964932A (zh) 基于EMD-BiLSTM-Attention机制变压器数字孪生模型的气体预测方法
CN112288140A (zh) 一种基于Keras的短期电力负荷预测方法、存储介质和设备
CN113326966A (zh) 基于ceemd-lstm的综合能源系统多元负荷预测方法
CN112508286A (zh) 一种基于Kmeans-BiLSTM-DMD模型的短期负荷预测方法
CN116562454A (zh) 一种应用于bim的长短时注意力机制网络的造价预测方法
CN117293790A (zh) 一种考虑预测误差不确定性的短期电力负荷预测方法
CN114819395A (zh) 一种基于长短期记忆神经网络和支持向量回归组合模型的行业中长期负荷预测方法
CN115186910A (zh) 一种基于LSTM与XGBoost混合模型的坯布厂产能预测方法
CN113779879A (zh) 一种基于LSTM-seq2seq-attention模型的中长期用电异常检测方法
CN117725399A (zh) 一种嵌入长短期记忆细胞的编码器负荷预测方法
CN117436920A (zh) 嵌入多头注意力机制的混合神经网络日前电价预测方法
CN112767692A (zh) 基于SARIMA-GA-Elman组合模型的短时交通流量预测系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination