CN115404998A - Connecting structure of curtain wall and existing outer wall and construction method thereof - Google Patents
Connecting structure of curtain wall and existing outer wall and construction method thereof Download PDFInfo
- Publication number
- CN115404998A CN115404998A CN202211229740.3A CN202211229740A CN115404998A CN 115404998 A CN115404998 A CN 115404998A CN 202211229740 A CN202211229740 A CN 202211229740A CN 115404998 A CN115404998 A CN 115404998A
- Authority
- CN
- China
- Prior art keywords
- wall
- base
- curtain wall
- plate
- existing outer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6803—Joint covers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6806—Waterstops
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Finishing Walls (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑施工领域,特指一种幕墙与既有外墙的连接结构及其施工方法。The invention relates to the field of building construction, in particular to a connection structure between a curtain wall and an existing exterior wall and a construction method thereof.
背景技术Background technique
在改造工程项目中,有时需要在既有外墙的外侧新增幕墙,如玻璃、铝板或石材板等,幕墙需要与既有外墙进行连接收口,目前通常使用的方法是通过硬碰打胶进行收口连接,然而在新增的幕墙施工过程中,既有建筑容易发生相对形变,特别是高层建筑,从而导致收口打胶的部位产生裂缝,出现渗水的问题。In renovation projects, it is sometimes necessary to add curtain walls on the outside of the existing exterior walls, such as glass, aluminum panels or stone panels, etc. The curtain walls need to be connected to the existing exterior walls. Currently, the commonly used method is through hard-touch glue However, during the construction process of the newly added curtain wall, the existing buildings are prone to relative deformation, especially high-rise buildings, which will lead to cracks and water seepage at the glued part of the closure.
发明内容Contents of the invention
本发明的目的在于克服现有技术的缺陷,提供一种幕墙与既有外墙的连接结构及其施工方法,解决了既有外墙收口打胶处容易产生裂缝的问题,通过利用连接结构连接幕墙与既有外墙,以减小结构形变产生的影响,避免打胶处开裂,减少外墙渗水的风险。The purpose of the present invention is to overcome the defects of the prior art, to provide a connection structure between the curtain wall and the existing exterior wall and its construction method, which solves the problem that cracks are easily generated at the glued part of the existing exterior wall, and connects the existing exterior wall by using the connection structure. The curtain wall and the existing exterior wall are used to reduce the impact of structural deformation, avoid cracking at the glued area, and reduce the risk of water seepage on the exterior wall.
实现上述目的的技术方案是:The technical scheme for realizing the above-mentioned purpose is:
本发明提供了一种幕墙与既有外墙的连接结构,包括:The invention provides a connection structure between a curtain wall and an existing exterior wall, comprising:
间隔安装于既有外墙的若干底座;Several bases installed at intervals on the existing exterior wall;
固定于若干底座的龙骨;keels fixed to several foundations;
固定于龙骨且供罩住底座的基座,该基座靠近幕墙的位置向外凸伸以形成凸伸部;以及a base secured to the joist for covering the plinth, which protrudes outwardly near the curtain wall to form a protrusion; and
一端与幕墙固定连接的盖板,盖板的另一端与凸伸部相贴合。One end of the cover plate is fixedly connected with the curtain wall, and the other end of the cover plate fits with the protruding part.
本发明幕墙与既有外墙的连接结构,通过利用基座安装于龙骨,进而将盖板安装于幕墙,使得盖板与凸伸部相贴合,此时若既有外墙相对于幕墙发生位移,则盖板与凸伸部能够发生相对位移,从而抵消既有外墙的位移量,防止连接结构整体发生变形,避免打胶处产生裂缝,解决了既有外墙收口打胶处容易产生裂缝的问题,通过利用连接结构连接幕墙与既有外墙,以减小结构形变产生的影响,避免打胶处开裂,减少外墙渗水的风险。The connection structure between the curtain wall and the existing exterior wall of the present invention is installed on the keel by using the base, and then the cover plate is installed on the curtain wall, so that the cover plate and the protruding part fit together. Displacement, the relative displacement of the cover plate and the protruding part can occur, thereby offsetting the displacement of the existing external wall, preventing the overall deformation of the connection structure, avoiding cracks at the glued part, and solving the problem that is easy to occur at the glued part of the existing external wall. For the problem of cracks, the curtain wall and the existing exterior wall are connected by connecting structures to reduce the impact of structural deformation, avoid cracking at the glued part, and reduce the risk of water seepage on the exterior wall.
本发明幕墙与既有外墙的连接结构的进一步改进在于,还包括固定于龙骨且与既有外墙相平行的第一卡板以及垂直连接于第一卡板远离龙骨的端部的第二卡板;The further improvement of the connection structure between the curtain wall and the existing outer wall of the present invention is that it also includes a first clamping plate fixed on the keel and parallel to the existing external wall and a second clamping plate vertically connected to the end of the first clamping plate away from the keel. Card board;
基座呈L型,且基座的一端与龙骨固定连接,基座的另一端与第二卡板固定连接。The base is L-shaped, and one end of the base is fixedly connected with the keel, and the other end of the base is fixedly connected with the second clamping plate.
本发明幕墙与既有外墙的连接结构的进一步改进在于,还包括设置于基座与龙骨以及基座与第二卡板之间的防噪垫片。The further improvement of the connection structure between the curtain wall and the existing outer wall of the present invention is that it also includes anti-noise gaskets arranged between the base and the keel, and between the base and the second clamping plate.
本发明幕墙与既有外墙的连接结构的进一步改进在于,还包括固定于基座且供罩住基座和底座的连接件,连接件靠近幕墙的端部向外延伸以形成延伸部,盖板远离幕墙的端部贴合于延伸部。The further improvement of the connection structure between the curtain wall and the existing external wall of the present invention is that it also includes a connecting piece fixed on the base and used to cover the base and the base, the end of the connecting piece close to the curtain wall extends outward to form an extension, and the cover The end of the panel remote from the curtain wall is fitted to the extension.
本发明幕墙与既有外墙的连接结构的进一步改进在于,还包括设置于盖板和延伸部之间的挡水胶条。The further improvement of the connection structure between the curtain wall and the existing outer wall of the present invention is that it also includes a water-retaining rubber strip arranged between the cover plate and the extension part.
本发明幕墙与既有外墙的连接结构的进一步改进在于,基座靠近既有外墙的位置形成有L型的勾设部;The further improvement of the connection structure between the curtain wall and the existing exterior wall of the present invention lies in that an L-shaped hooking portion is formed at the position where the base is close to the existing exterior wall;
连接件包括一端与勾设部固定连接的第一连接板、垂直连接于第一连接板的另一端的第二连接板以及垂直连接于第二连接板远离第一连接板的端部的第三连接板,第三连接板的一端形成延伸部,第三连接板的另一端与凸伸部固定连接。The connector includes a first connecting plate fixedly connected to the hooking portion at one end, a second connecting plate vertically connected to the other end of the first connecting plate, and a third connecting plate vertically connected to the end of the second connecting plate away from the first connecting plate. As for the connection plate, one end of the third connection plate forms an extension part, and the other end of the third connection plate is fixedly connected with the protruding part.
本发明幕墙与既有外墙的连接结构的进一步改进在于,还包括填充于勾设部与既有外墙之间的第一密封胶条以及填充于盖板与幕墙之间的第二密封胶条。The further improvement of the connection structure between the curtain wall and the existing exterior wall of the present invention is that it also includes a first sealant strip filled between the hooking part and the existing exterior wall and a second sealant filled between the cover plate and the curtain wall strip.
本发明幕墙与既有外墙的连接结构的进一步改进在于,基座靠近幕墙的位置向外弯折以于凸伸部的下方形成插接部;The further improvement of the connection structure between the curtain wall and the existing exterior wall of the present invention lies in that the position of the base close to the curtain wall is bent outwards to form a socket under the protruding part;
连接结构还包括贴合于幕墙的侧部的挡水板以及固定于挡水板且供与插接部插接连接的卡接部。The connecting structure also includes a water retaining plate attached to the side of the curtain wall, and a clamping portion fixed to the water retaining plate for plugging connection with the plug-in portion.
本发明幕墙与既有外墙的连接结构的进一步改进在于,底座包括固定于既有外墙的固定板以及相对设置且固定于固定板的两块夹板,龙骨固定夹设于两块夹板之间。The further improvement of the connection structure between the curtain wall and the existing outer wall of the present invention is that the base includes a fixed plate fixed on the existing outer wall and two splints arranged oppositely and fixed on the fixed plate, and the keel is clamped between the two splints .
本发明提供了一种幕墙与既有外墙的连接结构的施工方法,包括如下步骤:The invention provides a construction method for the connection structure between a curtain wall and an existing exterior wall, comprising the following steps:
提供若干底座和龙骨,将若干底座间隔安装于既有外墙,并将龙骨固定于若干底座之间;Provide several bases and keels, install several bases at intervals on the existing exterior wall, and fix the keel between several bases;
提供基座,将基座固定于龙骨,使得基座罩住底座;Provide a base, fix the base to the keel, so that the base covers the base;
提供盖板,将盖板的一端与幕墙固定连接,将盖板的另一端与基座的凸伸部相贴合。A cover plate is provided, one end of the cover plate is fixedly connected with the curtain wall, and the other end of the cover plate is fitted to the protruding part of the base.
附图说明Description of drawings
图1为本发明幕墙与既有外墙的连接结构的一种实施方式的示意图。Fig. 1 is a schematic diagram of an embodiment of the connection structure between the curtain wall and the existing external wall of the present invention.
图2为本发明幕墙与既有外墙的连接结构的另一种实施方式的示意图。Fig. 2 is a schematic diagram of another embodiment of the connection structure between the curtain wall and the existing exterior wall of the present invention.
具体实施方式Detailed ways
下面结合附图和具体实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
参阅图1,本发明提供了一种幕墙与既有外墙的连接结构及其施工方法,通过利用基座安装于龙骨,进而将盖板安装于幕墙,使得盖板与凸伸部相贴合,此时若既有外墙相对于幕墙发生位移,则盖板与凸伸部能够发生相对位移,从而抵消既有外墙的位移量,防止连接结构整体发生变形,避免打胶处产生裂缝,解决了既有外墙收口打胶处容易产生裂缝的问题,通过利用连接结构连接幕墙与既有外墙,以减小结构形变产生的影响,避免打胶处开裂,减少外墙渗水的风险。下面结合附图对本发明幕墙与既有外墙的连接结构进行说明。Referring to Fig. 1, the present invention provides a connection structure between a curtain wall and an existing exterior wall and its construction method. The base is installed on the keel, and the cover plate is installed on the curtain wall so that the cover plate and the protruding part fit together , at this time, if the existing external wall is displaced relative to the curtain wall, the cover plate and the protruding part can be displaced relative to each other, thereby offsetting the displacement of the existing external wall, preventing the overall deformation of the connection structure, and avoiding cracks at the glued area. It solves the problem that cracks are prone to occur at the glued part of the existing exterior wall. By using the connection structure to connect the curtain wall and the existing exterior wall, the influence of structural deformation is reduced, the glued part is avoided from cracking, and the risk of water seepage on the exterior wall is reduced. The connection structure between the curtain wall of the present invention and the existing exterior wall will be described below in conjunction with the accompanying drawings.
参阅图1,图1为本发明幕墙与既有外墙的连接结构的一种实施方式的示意图。下面结合图1,对本发明幕墙与既有外墙的连接结构进行说明。Referring to Fig. 1, Fig. 1 is a schematic diagram of an embodiment of the connection structure between the curtain wall and the existing exterior wall of the present invention. Below in conjunction with Fig. 1, the connection structure between the curtain wall of the present invention and the existing exterior wall will be described.
如图1所示,本发明的幕墙与既有外墙的连接结构,包括:As shown in Figure 1, the connection structure between the curtain wall of the present invention and the existing exterior wall includes:
间隔安装于既有外墙21的若干底座11;Several bases 11 installed on the existing
固定于若干底座11的龙骨12;
固定于龙骨12且供罩住底座11的基座13,该基座13靠近幕墙22的位置向外凸伸以形成凸伸部131;以及A
一端与幕墙22固定连接的盖板16,盖板16的另一端与凸伸部131相贴合。One end of the
进一步的,还包括固定于龙骨12且与既有外墙21相平行的第一卡板121以及垂直连接于第一卡板121远离龙骨12的端部的第二卡板122;Further, it also includes a
基座13呈L型,且基座13的一端与龙骨12固定连接,基座13的另一端与第二卡板122固定连接。The
具体的,还包括设置于基座13与龙骨12以及基座13与第二卡板122之间的防噪垫片133。Specifically, it also includes
进一步的,还包括固定于基座13且供罩住基座13和底座11的连接件14,连接件14靠近幕墙22的端部向外延伸以形成延伸部,盖板16远离幕墙22的端部贴合于延伸部。Further, it also includes a connecting
具体的,还包括设置于盖板16和延伸部之间的挡水胶条1431。Specifically, it also includes a
具体的,基座13靠近既有外墙21的位置形成有L型的勾设部132;Specifically, the
连接件14包括一端与勾设部132固定连接的第一连接板141、垂直连接于第一连接板141的另一端的第二连接板142以及垂直连接于第二连接板142远离第一连接板141的端部的第三连接板143,第三连接板143的一端形成延伸部,第三连接板143的另一端与凸伸部131固定连接。The
较佳地,还包括填充于勾设部132与既有外墙21之间的第一密封胶条1321以及填充于盖板16与幕墙22之间的第二密封胶条161。Preferably, it also includes a
进一步的,底座11包括固定于既有外墙21的固定板111以及相对设置且固定于固定板111的两块夹板112,龙骨12固定夹设于两块夹板112之间。Furthermore, the base 11 includes a fixing plate 111 fixed on the existing
作为本发明的一较佳实施方式,结合图2所示,基座13靠近幕墙22的位置向外弯折以于凸伸部131的下方形成插接部134;As a preferred embodiment of the present invention, as shown in FIG. 2 , the position of the
连接结构还包括贴合于幕墙22的侧部的挡水板15以及固定于挡水板15且供与插接部134插接连接的卡接部151,卡接部151能够沿插接部134来回移动,以抵消既有外墙21的变形量,且插接部134和卡接部151的端部均形成有限位块,能够防止卡接部151从插接部134中滑脱。The connection structure also includes a
本发明的具体实施方法如下:The concrete implementation method of the present invention is as follows:
将固定板111通过螺栓固定于既有外墙21的表面,进而在固定板111上焊接相对的两块夹板112,将龙骨12夹固于两块夹板112之间;The fixing plate 111 is fixed on the surface of the existing
在龙骨12上固定于既有外墙21相平行的第一卡板121并在第一卡板121垂直连接第二卡板122,将基座13的一端与龙骨12固定连接,将基座13的另一端与第二卡板122固定连接,此时基座13罩住了龙骨12和底座11,可在基座13与龙骨12和第二卡板122的连接处设置防噪垫片133;On the
将盖板16固定于幕墙22的铝合金边框,在盖板16与幕墙22之间设置第二密封胶条161;Fix the
将连接件14的第一连接板141与勾设部132固定连接,使得第二连接板142平行于既有外墙21,第三连接板143的一端与基座13的凸伸部131固定连接,第三连接板143的另一端与盖板16相贴合,在第三连接板143和盖板16之间设置挡水胶条1431,在勾设部132与既有外墙21之间设置第一密封胶条1321,此时若既有外墙21发生相对位移,则第三连接板143和盖板16发生相对滑动,从而抵消既有外墙21的变形量;The first connecting
还可以进一步在幕墙22的铝合金边框靠近既有外墙21的一侧固定挡水板15,并在挡水板15固定卡接部151,将卡接部151卡设于基座13的插接部134,若既有外墙21发生相对位移,则卡接部151能够沿插接部134来回移动,从而抵消既有外墙21的变形量,且卡接部151与插接部134端部的限位块也能够防止卡接部151从插接部134中脱出;It is also possible to further fix the
各部件均为金属件,实现幕墙22与既有外墙21的柔性连接,能够减小既有外墙发生形变所产生的影响,有效避免打胶处开裂、既有外墙渗水风险。Each component is a metal part, realizing the flexible connection between the
本发明还提供了一种幕墙与既有外墙的连接结构的施工方法,包括如下步骤:The present invention also provides a construction method for the connection structure between the curtain wall and the existing exterior wall, comprising the following steps:
提供若干底座11和龙骨12,将若干底座11间隔安装于既有外墙21,并将龙骨12固定于若干底座11之间;Provide several bases 11 and keels 12, install several bases 11 on the existing
提供基座13,将基座13固定于龙骨12,使得基座13罩住底座11;Provide a
提供盖板16,将盖板16的一端与幕墙22固定连接,将盖板16的另一端与基座13的凸伸部131相贴合。A
本发明提供的施工方法实际实施的操作方式如下:The mode of operation that construction method provided by the present invention actually implements is as follows:
将固定板111通过螺栓固定于既有外墙21的表面,进而在固定板111上焊接相对的两块夹板112,将龙骨12夹固于两块夹板112之间;The fixing plate 111 is fixed on the surface of the existing
在龙骨12上固定于既有外墙21相平行的第一卡板121并在第一卡板121垂直连接第二卡板122,将基座13的一端与龙骨12固定连接,将基座13的另一端与第二卡板122固定连接,此时基座13罩住了龙骨12和底座11,可在基座13与龙骨12和第二卡板122的连接处设置防噪垫片133;On the
将盖板16固定于幕墙22的铝合金边框,在盖板16与幕墙22之间设置第二密封胶条161;Fix the
将连接件14的第一连接板141与勾设部132固定连接,使得第二连接板142平行于既有外墙21,第三连接板143的一端与基座13的凸伸部131固定连接,第三连接板143的另一端与盖板16相贴合,在第三连接板143和盖板16之间设置挡水胶条1431,在勾设部132与既有外墙21之间设置第一密封胶条1321,此时若既有外墙21发生相对位移,则第三连接板143和盖板16发生相对滑动,从而抵消既有外墙21的变形量;The first connecting
还可以进一步在幕墙22的铝合金边框靠近既有外墙21的一侧固定挡水板15,并在挡水板15固定卡接部151,将卡接部151卡设于基座13的插接部134,若既有外墙21发生相对位移,则卡接部151能够沿插接部134来回移动,从而抵消既有外墙21的变形量,且卡接部151与插接部134端部的限位块也能够防止卡接部151从插接部134中脱出;It is also possible to further fix the
各部件均为金属件,实现幕墙22与既有外墙21的柔性连接,能够减小既有外墙发生形变所产生的影响,有效避免打胶处开裂、既有外墙渗水风险。Each component is a metal part, realizing the flexible connection between the
以上结合附图实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为本发明的保护范围。The present invention has been described in detail above with reference to the embodiments of the accompanying drawings, and those skilled in the art can make various changes to the present invention according to the above description. Therefore, some details in the embodiments should not be construed as limiting the present invention, and the present invention will take the scope defined by the appended claims as the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211229740.3A CN115404998B (en) | 2022-10-08 | 2022-10-08 | Connection structure of curtain wall and existing outer wall and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211229740.3A CN115404998B (en) | 2022-10-08 | 2022-10-08 | Connection structure of curtain wall and existing outer wall and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115404998A true CN115404998A (en) | 2022-11-29 |
CN115404998B CN115404998B (en) | 2023-08-29 |
Family
ID=84169052
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211229740.3A Active CN115404998B (en) | 2022-10-08 | 2022-10-08 | Connection structure of curtain wall and existing outer wall and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115404998B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2128369A1 (en) * | 1993-12-29 | 1995-06-30 | David M. Rinehart | Co-extruded polymer pressure plate |
KR101047934B1 (en) * | 2011-02-24 | 2011-07-11 | (주)건축사사무소위드웍스 | Curved curtain wall structure of hexagonal structure using triangle cell structure |
WO2013037181A1 (en) * | 2011-09-13 | 2013-03-21 | 恒豪国际贸易(上海)有限公司 | Metal curtain wall system of monolayer structure and construction method thereof |
WO2018018408A1 (en) * | 2016-07-26 | 2018-02-01 | 余卫平 | Structure for blocking heat transfer through thermal bridge of curtain wall building and construction method therefor |
CN110952697A (en) * | 2019-12-10 | 2020-04-03 | 北京城建集团有限责任公司 | Curved glass curtain wall system |
CN113502958A (en) * | 2021-03-10 | 2021-10-15 | 中国建筑第二工程局有限公司 | Curtain wall keel reverse installation system and construction method thereof |
CN216195552U (en) * | 2021-09-23 | 2022-04-05 | 烟台市飞龙建筑工程有限公司 | External curtain takes precautions against earthquakes type deformation joint structure |
CN216380020U (en) * | 2021-10-16 | 2022-04-26 | 武汉华隆建筑安装有限公司 | Curtain wall deformation joint structure |
-
2022
- 2022-10-08 CN CN202211229740.3A patent/CN115404998B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2128369A1 (en) * | 1993-12-29 | 1995-06-30 | David M. Rinehart | Co-extruded polymer pressure plate |
KR101047934B1 (en) * | 2011-02-24 | 2011-07-11 | (주)건축사사무소위드웍스 | Curved curtain wall structure of hexagonal structure using triangle cell structure |
WO2013037181A1 (en) * | 2011-09-13 | 2013-03-21 | 恒豪国际贸易(上海)有限公司 | Metal curtain wall system of monolayer structure and construction method thereof |
WO2018018408A1 (en) * | 2016-07-26 | 2018-02-01 | 余卫平 | Structure for blocking heat transfer through thermal bridge of curtain wall building and construction method therefor |
CN110952697A (en) * | 2019-12-10 | 2020-04-03 | 北京城建集团有限责任公司 | Curved glass curtain wall system |
CN113502958A (en) * | 2021-03-10 | 2021-10-15 | 中国建筑第二工程局有限公司 | Curtain wall keel reverse installation system and construction method thereof |
CN216195552U (en) * | 2021-09-23 | 2022-04-05 | 烟台市飞龙建筑工程有限公司 | External curtain takes precautions against earthquakes type deformation joint structure |
CN216380020U (en) * | 2021-10-16 | 2022-04-26 | 武汉华隆建筑安装有限公司 | Curtain wall deformation joint structure |
Also Published As
Publication number | Publication date |
---|---|
CN115404998B (en) | 2023-08-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106368345B (en) | Assembled non-bearing wall body and its construction method | |
AU2008229694B2 (en) | External wall construction structure | |
CN115404998B (en) | Connection structure of curtain wall and existing outer wall and construction method thereof | |
CN207484706U (en) | A kind of seamless mounting structure of construction and decoration plank | |
CN207484711U (en) | A kind of antiseep construction of horizontal structure deformation joint | |
CN110984408B (en) | A sealing device between external wall panels for assembled buildings | |
CN115478660B (en) | Connection structure of curtain wall and exterior wall decorative panel and its construction method | |
CN217049965U (en) | Connecting mechanism for connecting containers | |
KR20210026830A (en) | Dry wall structure for bathroom | |
CN108468405A (en) | A kind of new type purification plate connection accessory | |
CN211473104U (en) | Flashing water-proof structure for parapet wall | |
CN208884792U (en) | Novel curtain wall structure | |
CN208235858U (en) | First fill the precast concrete wall panel of decorative panel | |
CN206143954U (en) | Assembled non -bearing wall body | |
CN206337975U (en) | A kind of installation node of Passive low-energy window | |
CN217974841U (en) | Caulking structure of external wall insulation board | |
CN221372623U (en) | Connecting assembly and connecting structure for wall and inclined roof | |
CN220226591U (en) | Door and window frame seam cock crack resistance structure with fixing piece | |
CN113550469B (en) | Open aluminum plate's waterproof connection structure | |
CN211850038U (en) | A prefabricated external wall panel and prefabricated beam-column connection node structure | |
CN216865586U (en) | Anti-leakage structure used between outer frame and wall body of sunlight room | |
CN220790235U (en) | Corner joint structure and stone curtain wall | |
CN217631978U (en) | Novel building section bar | |
CN219280999U (en) | A kind of exterior wall cladding board for building roof | |
CN210369363U (en) | Environment-friendly heat insulation plate structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Unit 01, 02, 03, 16 / F, 1568 Century Avenue, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122 Patentee after: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION DECORATION ENGINEERING Co.,Ltd. Country or region after: China Patentee after: China Construction Eighth Engineering Division Engineering Co.,Ltd. Address before: Unit 01, 02, 03, 16 / F, 1568 Century Avenue, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122 Patentee before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION DECORATION ENGINEERING Co.,Ltd. Country or region before: China Patentee before: China Construction Bureau 8 decoration curtain wall Co.,Ltd. |
|
CP03 | Change of name, title or address |