CN115401192A - Method for conveniently blocking and centering lower nozzle of tundish - Google Patents

Method for conveniently blocking and centering lower nozzle of tundish Download PDF

Info

Publication number
CN115401192A
CN115401192A CN202211104494.9A CN202211104494A CN115401192A CN 115401192 A CN115401192 A CN 115401192A CN 202211104494 A CN202211104494 A CN 202211104494A CN 115401192 A CN115401192 A CN 115401192A
Authority
CN
China
Prior art keywords
tundish
nozzle
steel column
iron chain
lower nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211104494.9A
Other languages
Chinese (zh)
Inventor
陈朝
刘敬军
夏俊行
苏庆林
檀伟峰
郭春强
葛传俊
李文明
王福海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Laigang Yongfeng Steel and Iron Co Ltd
Original Assignee
Shandong Laigang Yongfeng Steel and Iron Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Laigang Yongfeng Steel and Iron Co Ltd filed Critical Shandong Laigang Yongfeng Steel and Iron Co Ltd
Priority to CN202211104494.9A priority Critical patent/CN115401192A/en
Publication of CN115401192A publication Critical patent/CN115401192A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/14Closures
    • B22D41/44Consumable closure means, i.e. closure means being used only once
    • B22D41/46Refractory plugging masses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/18Controlling or regulating processes or operations for pouring
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D2/00Arrangement of indicating or measuring devices, e.g. for temperature or viscosity of the fused mass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • B22D41/56Means for supporting, manipulating or changing a pouring-nozzle

Abstract

The application provides a method for conveniently blocking and centering a lower nozzle of a tundish, wherein an upper circular table part of a steel column is used for blocking the lower nozzle of the tundish, so that the problem that the lower end of the lower nozzle of the original tundish is difficult to take out after being blocked and pulverized by an asbestos rope is solved; the first iron chain and the hanging hammer are adopted for vertical centering up and down, so that the problem that the lower nozzle of the conventional tundish and the upper opening of the crystallizer are difficult to quickly center is solved, the centering operation is simpler and more convenient, the centering time of the lower nozzle of the tundish and the upper opening of the crystallizer is shortened, the centering time is reduced to 30 seconds from the original 3 minutes, and the temperature of the steel ladle is reduced by about 5 ℃; meanwhile, a metal rod is added to be used as a lever-type handle for mounting and picking the steel column, so that the problem that when the asbestos rope is plugged, a person is easy to scald the person due to molten steel scattering when the person is forwards going to pick the asbestos rope is solved; the risk that the occupational health of the operating personnel is influenced after the asbestos rope is blocked, dried and pulverized is eliminated.

Description

Method for conveniently blocking and centering lower nozzle of tundish
Technical Field
The invention relates to the technical field of pouring of a tundish, in particular to a method for conveniently blocking and centering a lower nozzle of the tundish.
Background
The tundish of the continuous casting machine is also called a tundish, generally the tundish is respectively provided with a heat insulation layer, a permanent layer and a working layer from outside to inside, and meanwhile, a flow stabilizer, a slag blocking wall or a dam can be built inside the tundish. The tundish is an intermediate link of a steelmaking production flow, the lower end of a water outlet of the tundish is plugged by an asbestos rope before baking, then drainage sand is added into the water outlet, the water outlet is baked by coal gas or natural gas to meet the use requirement, and the tundish is shut down and moved to a casting area. Because the lower end of the lower nozzle of the tundish is stuffed by the asbestos cord, when the upper opening of the crystallizer is centered, a common centering tool is difficult to quickly center, the centering time of the lower nozzle of the tundish and the upper opening of the crystallizer is influenced, the baking temperature of an inner cavity of the tundish and the temperature of molten steel in a ladle are reduced along with the time extension, the asbestos cord blocking the lower end of the lower nozzle of the tundish is dried and pulverized in the baking process, when an operator takes the asbestos cord out, the pulverized asbestos cord is easily broken in the lower nozzle, the casting time delay is further caused, the low-temperature flocculation phenomenon occurs in the casting process of the tundish is caused, the casting failure of the tundish is caused to be unplanned seriously, the labor intensity of the operator is increased, the operation rate of a continuous casting machine is reduced, and when the operator takes the asbestos cord in the lower end of the lower nozzle, the upper half body of the operator leans forward, is close to the ladle wall, and the molten steel is easily scattered and scalded.
Disclosure of Invention
The invention aims to provide a method for conveniently blocking and centering a lower nozzle of a tundish, which aims to solve the problem of blocking the lower end of the lower nozzle of the tundish, solve the problem that the conventional asbestos cord blocking is difficult to take out after pulverization, solve the problem that the lower nozzle of the conventional tundish and an upper nozzle of a crystallizer are difficult to quickly center, solve the problem that personnel are easy to scatter molten steel and scald the personnel when the asbestos cord blocking is carried forward to pick the personnel, and solve the problem that the occupational health of the operating personnel is influenced after the asbestos cord blocking is dried and pulverized.
In order to solve the technical problems, the technical scheme provided by the invention is as follows:
a method for facilitating plugging and centring of a downcomer of a tundish comprising the following sequential steps:
1) Processing and manufacturing the blocking device: the blocking device comprises a steel column, a first iron chain, a hanging hammer, a metal rod, a balancing weight and a second iron chain;
determining the size of a steel column for blocking according to the size of a water outlet of a tundish, wherein the steel column comprises an upper circular table part and a lower cylindrical part;
the upper end of the first iron chain is connected to the central point on the bottom end face of the steel column in a hanging mode, and a hanging hammer is hung at the lower end of the first iron chain;
one end of the metal rod in the length direction is welded on the bottom end face of the steel column, and the other end of the metal rod in the length direction is provided with a balancing weight;
the lower end of the second iron chain is connected with the middle part of the metal rod in a hanging manner, and the upper end of the second iron chain is connected on the outer surface of the ladle wall of the tundish in a hanging manner, so that the metal rod forms a lever structure;
2) Manually holding one end of the metal rod, which is provided with the balancing weight, and inserting the upper circular table part of the steel column into a lower pipe orifice of a lower water port of the tundish from bottom to top by utilizing the lever action;
3) Adding drainage sand into a water feeding port of the tundish;
4) Baking the tundish, sintering the drainage sand into a drainage sand sintered layer, moving the tundish to a casting area after baking is finished, then taking away a cover plate at the upper opening of the crystallizer, enabling the first iron chain and the hanging hammer to freely fall, and observing the centering condition of the hanging hammer and the upper opening of the crystallizer;
after the hanging hammer is aligned with the upper opening of the crystallizer, connecting an upper pipe opening of the submerged nozzle with a lower pipe opening of the lower nozzle, and inserting the submerged nozzle into the upper opening of the crystallizer;
5) After 5t of molten steel is poured into the tundish from the ladle, the steel column is taken out from the lower nozzle, then the blocking device is taken down from the tundish, then the gravity of the molten steel in the tundish breaks and scatters the sintered layer of the drainage sand, and the molten steel in the tundish flows through the upper nozzle, the sliding nozzle, the lower nozzle and the submerged nozzle in sequence and is poured into the crystallizer.
Preferably, the inner diameter of the lower nozzle is 16mm, the outer diameter of the lower cylindrical part of the steel column is 17mm and the height is 90mm, and the minimum outer diameter of the upper circular table part is 15mm and the height is 10-30mm.
Preferably, the metal rod is deformed steel bar with the length of 700mm, and the balancing weight is an iron block.
Preferably, the length of the first iron chain is 500mm, and the hanging hammer is conical.
Compared with the prior art, the method has the following beneficial technical effects:
the lower nozzle of the tundish is blocked by the upper circular table part of the steel column, so that the problem that the lower end of the lower nozzle of the original tundish is difficult to take out after being blocked and pulverized by an asbestos rope is solved; the first iron chain and the hanging hammer are adopted for vertical centering up and down, so that the problem that the lower nozzle of the conventional tundish and the upper opening of the crystallizer are difficult to quickly center is solved, the centering operation is simpler and more convenient, the centering time of the lower nozzle of the tundish and the upper opening of the crystallizer is shortened, the centering time is reduced to 30 seconds from the original 3 minutes, and the temperature of the steel ladle is reduced by about 5 ℃; meanwhile, a metal rod is added to be used as a lever-type handle for mounting and picking the steel column, so that the problem that when the asbestos rope is plugged, a person is easy to scald the person due to molten steel scattering when the person is forwards going to pick the asbestos rope is solved; the risk that the occupational health of the operating personnel is influenced after the asbestos rope is blocked, dried and pulverized is eliminated.
Drawings
Fig. 1 is a schematic structural view of a plugging device in a method for facilitating plugging and centering of a collector nozzle of a tundish according to the present application.
In the figure: 1, a steel column, 101, an upper circular table part and 102, a lower circular cylinder part;
2, a first iron chain, 3, a hanging hammer;
4 metal rod, 5 balancing weight;
6 second iron chain.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are a part of the embodiments of the present invention, but not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
As shown in fig. 1: a steel column 1, an upper circular table part 101 and a lower cylindrical part 102; a first iron chain 2, a hanging hammer 3; a metal rod 4 and a balancing weight 5; a second iron chain 6.
The application provides a method convenient for blocking and centering a water outlet of a tundish, which comprises the following steps of:
1) Processing and manufacturing the blocking device: the blocking device comprises a steel column 1, a first iron chain 2, a hanging hammer 3, a metal rod 4, a balancing weight 5 and a second iron chain 6;
determining the size of a steel column 1 for blocking according to the size of a water outlet of a tundish, wherein the steel column 1 comprises an upper circular table part 101 and a lower cylindrical part 102;
the upper end of the first iron chain 2 is connected to the central point on the bottom end face of the steel column 1 in a hanging manner, and the lower end of the first iron chain 2 is suspended with a hanging hammer 3 in a hanging manner;
one end of the metal rod 4 in the length direction is welded on the bottom end face of the steel column 1, and the other end of the metal rod 4 in the length direction is provided with a balancing weight 5;
the lower end of the second iron chain 6 is connected with the middle part of the metal rod 4 in a hanging way, and the upper end of the second iron chain 6 is connected with the outer surface of the ladle wall of the tundish in a hanging way, so that the metal rod 4 forms a lever structure;
2) Manually holding one end of the metal rod 4, which is provided with the balancing weight 5, and inserting the upper circular platform part 101 of the steel column 1 into a lower nozzle of the tundish from bottom to top by utilizing the lever action;
3) Adding drainage sand into an upper water gap of the tundish, and enabling the drainage sand to fall into a lower water gap;
4) Baking the tundish, sintering the drainage sand into a drainage sand sintered layer in a lower nozzle, moving the tundish to a casting area after baking is finished, taking away a cover plate of an upper opening of the crystallizer, enabling the first iron chain 2 and the hanging hammer 3 to freely fall, and observing the centering condition of the hanging hammer 3 and the upper opening of the crystallizer;
after the hanging hammer 3 is aligned with the upper opening of the crystallizer, the submerged nozzle is arranged on the lower nozzle, the upper nozzle of the submerged nozzle is connected with the lower nozzle of the lower nozzle, and the submerged nozzle is inserted into the upper opening of the crystallizer;
5) After 5t of molten steel is poured into the tundish from the ladle, the steel column 1 is taken out from the lower nozzle, then the blocking device is taken down from the tundish (the upper end of the second iron chain 6 is taken down from the outer surface of the ladle wall of the tundish and is not suspended), then the gravity of the molten steel in the tundish breaks and scatters the drainage sand sintered layer, and the molten steel in the tundish flows through the upper nozzle, the sliding nozzle, the lower nozzle and the submerged nozzle in sequence and is poured into the crystallizer.
In one embodiment of the present application, the inner diameter of the lower nozzle is 16mm, the outer diameter of the lower cylindrical portion 102 of the steel column 1 is 17mm and the height is 90mm, and the minimum outer diameter of the upper circular table portion 101 is 15mm and the height is 10-30mm.
In one embodiment of the present application, the metal rod 4 is a screw steel having a length of 700mm, and the weight 5 is an iron block.
In one embodiment of the present application, the first iron chain 2 has a length of 500mm, and the hammer 3 has a conical shape.
In the application, a sliding plate in a sliding water gap for a tundish is generally of a three-layer type, an upper sliding plate and an upper water gap are fixed during operation, a lower sliding plate and a lower water gap are fixed, and interception and throttling are performed through a middle sliding plate; the upper water gap and the lower water gap are both hollow pipes with the upper end and the lower end open; asbestos ropes and steel columns 1 are arranged in a lower nozzle of a tundish, and drainage sand is placed at a zirconium core part in the lower nozzle. The lower end of the lower nozzle is also connected with an immersion nozzle, the immersion nozzle is finally inserted into the molten steel in the crystallizer and needs to be frequently replaced, and the upper nozzle, the sliding nozzle and the lower nozzle do not need to be frequently replaced; the upper water gap, the sliding water gap, the lower water gap and the submerged nozzle are arranged from top to bottom in sequence.
In this application, the cooperation of slide gate nozzle and drainage sand realizes respectively that the ladle is from moving to water and the automatic pouring of centre package is moved to water, for example: when the tundish is automatically cast, the drainage sand sintering layer is crushed by using the static pressure of molten steel and the instantaneous negative pressure difference of the opening of the sliding water gap, then the crushed and scattered drainage sand automatically flows out of the submerged water gap, and then the molten steel in the tundish flows out of the submerged water gap into the crystallizer.
The application provides a working principle of a method convenient for blocking and centering a water outlet of a tundish:
1) In order to solve the problem that the asbestos rope blocks the lower nozzle of the tundish and is difficult to take out after pulverization, the steel column 1 is used for replacing the asbestos rope, the size of the flow blocking steel column 1 is determined according to the size of the lower nozzle of the tundish, the upper end of the flow blocking steel column is processed into a circular truncated cone shape with a certain height, and the upper circular truncated cone part 101 blocks the lower nozzle of the tundish; in order to be convenient to take, a deformed steel bar with the length of 700mm is horizontally welded on the bottom end face of the steel column 1, a balancing weight 5 is welded at the tail end of the deformed steel bar, a first iron chain is welded at the center point of the bottom end of the steel column 1, and a hanging hammer 3 is hung at the lowest end of the first iron chain;
2) The upper circular table part 101 of the steel column 1 is blocked in a lower pipe orifice of a lower water gap of a tundish, the steel column is hung on a hook on the outer wall of the tundish by utilizing the lever principle, the steel column is ensured to be stable and not to fall, the tundish car is driven to a casting area, and a hanging hammer 3 hung at the lower end of a first iron chain by visual inspection is perpendicular to the upper opening of a crystallizer under the action of gravity, so that the steel column is quickly centered, and is simple and convenient.
Methods and devices not described in detail in the present invention are all the prior art and are not described in detail.
The above description of the embodiments is only intended to facilitate the understanding of the method of the invention and its core idea. It should be noted that, for those skilled in the art, it is possible to make various improvements and modifications to the present invention without departing from the principle of the present invention, and those improvements and modifications also fall within the scope of the claims of the present invention.

Claims (4)

1. A method for facilitating the plugging and centring of the outlet of a tundish, comprising the following successive steps:
1) Processing and manufacturing the blocking device: the blocking device comprises a steel column, a first iron chain, a hanging hammer, a metal rod, a balancing weight and a second iron chain;
determining the size of a steel column for plugging according to the size of a water outlet of the tundish, wherein the steel column comprises an upper circular table part and a lower cylindrical part;
the upper end of the first iron chain is connected to the central point on the bottom end face of the steel column in a hanging mode, and a hanging hammer is hung at the lower end of the first iron chain in a hanging mode;
one end of the metal rod in the length direction is welded on the bottom end face of the steel column, and the other end of the metal rod in the length direction is provided with a balancing weight;
the lower end of the second iron chain is connected with the middle part of the metal rod in a hanging manner, and the upper end of the second iron chain is connected on the outer surface of the ladle wall of the tundish in a hanging manner, so that the metal rod forms a lever structure;
2) Manually holding one end of the metal rod, which is provided with the balancing weight, and inserting the upper circular table part of the steel column into a lower nozzle of the tundish from bottom to top by utilizing the lever action;
3) Adding drainage sand into a water feeding port of the tundish;
4) Baking the tundish, sintering the drainage sand into a drainage sand sintered layer, moving the tundish to a casting area after baking is finished, then taking away a cover plate at the upper opening of the crystallizer, enabling the first iron chain and the hanging hammer to freely fall, and observing the centering condition of the hanging hammer and the upper opening of the crystallizer;
after the hanging hammer is aligned with the upper opening of the crystallizer, connecting an upper pipe opening of the submerged nozzle with a lower pipe opening of the lower nozzle, and inserting the submerged nozzle into the upper opening of the crystallizer;
5) After 5t of molten steel is poured into the tundish from the ladle, the steel column is taken out from the lower nozzle, then the blocking device is taken down from the tundish, then the gravity of the molten steel in the tundish breaks and scatters the sintered layer of the drainage sand, and the molten steel in the tundish flows through the upper nozzle, the sliding nozzle, the lower nozzle and the submerged nozzle in sequence and then is poured into the crystallizer.
2. A method for facilitating the plugging and centering of a tundish nozzle according to claim 1, wherein the inner diameter of the nozzle is 16mm, the outer diameter of the lower cylindrical portion of the steel column is 17mm and the height is 90mm, and the minimum outer diameter of the upper dome is 15mm and the height is 10-30mm.
3. A method for facilitating the plugging and centring of the downcomer of a tundish according to claim 1, wherein the metal rod is deformed steel with a length of 700mm and the counterweight is an iron block.
4. A method for facilitating the plugging and centring of the downcomer of a tundish according to claim 1, wherein the first iron chain is 500mm in length and the hammerhead is conical.
CN202211104494.9A 2022-09-09 2022-09-09 Method for conveniently blocking and centering lower nozzle of tundish Pending CN115401192A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211104494.9A CN115401192A (en) 2022-09-09 2022-09-09 Method for conveniently blocking and centering lower nozzle of tundish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211104494.9A CN115401192A (en) 2022-09-09 2022-09-09 Method for conveniently blocking and centering lower nozzle of tundish

Publications (1)

Publication Number Publication Date
CN115401192A true CN115401192A (en) 2022-11-29

Family

ID=84165340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211104494.9A Pending CN115401192A (en) 2022-09-09 2022-09-09 Method for conveniently blocking and centering lower nozzle of tundish

Country Status (1)

Country Link
CN (1) CN115401192A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010019979A (en) * 1999-08-31 2001-03-15 이구택 Blocking apparatus of non-solidifying molten steel in tundish
CN201728343U (en) * 2010-07-30 2011-02-02 攀钢集团钢铁钒钛股份有限公司 Submerged nozzle blockage structure of intermediate tank
CN203380359U (en) * 2013-08-12 2014-01-08 莱芜钢铁集团有限公司 Crevasse forming device for steel ladle filler sand sintered layer
CN208696294U (en) * 2018-05-16 2019-04-05 武钢集团昆明钢铁股份有限公司 A kind of tundish, which is opened, pours closing device
CN208800776U (en) * 2018-07-18 2019-04-30 中天钢铁集团有限公司 Brick cup and immersible ladle nozzle centering device in tundish
CN212822663U (en) * 2020-07-24 2021-03-30 山东莱钢永锋钢铁有限公司 Centering device for pouring box bottom nozzle and crystallizer of continuous casting machine
CN215144676U (en) * 2021-02-22 2021-12-14 阳春新钢铁有限责任公司 Quick-changing and fixing device for pouring box bottom nozzle
CN114453577A (en) * 2022-01-25 2022-05-10 北京瑞普同创科技发展有限公司 Sizing quick-change tundish drainage rod and casting process thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010019979A (en) * 1999-08-31 2001-03-15 이구택 Blocking apparatus of non-solidifying molten steel in tundish
CN201728343U (en) * 2010-07-30 2011-02-02 攀钢集团钢铁钒钛股份有限公司 Submerged nozzle blockage structure of intermediate tank
CN203380359U (en) * 2013-08-12 2014-01-08 莱芜钢铁集团有限公司 Crevasse forming device for steel ladle filler sand sintered layer
CN208696294U (en) * 2018-05-16 2019-04-05 武钢集团昆明钢铁股份有限公司 A kind of tundish, which is opened, pours closing device
CN208800776U (en) * 2018-07-18 2019-04-30 中天钢铁集团有限公司 Brick cup and immersible ladle nozzle centering device in tundish
CN212822663U (en) * 2020-07-24 2021-03-30 山东莱钢永锋钢铁有限公司 Centering device for pouring box bottom nozzle and crystallizer of continuous casting machine
CN215144676U (en) * 2021-02-22 2021-12-14 阳春新钢铁有限责任公司 Quick-changing and fixing device for pouring box bottom nozzle
CN114453577A (en) * 2022-01-25 2022-05-10 北京瑞普同创科技发展有限公司 Sizing quick-change tundish drainage rod and casting process thereof

Similar Documents

Publication Publication Date Title
CN103114177B (en) Gas-blowing and slag-gathering spray gun for assisting slag-off of molten iron and using method of spray gun
CN107803467A (en) A kind of running gate system of large-scale valve casing class steel-casting
CN212822661U (en) Self-drainage device for sizing nozzle of small square billet tundish
CN111659870A (en) Centrifugal roller die casting tool and casting process thereof
CN105710344B (en) A kind of high temperature alloy base material vacuum casting device and application method
CN201098734Y (en) Plug-stick bottom casting type molten iron pouring ladle
CN114247877A (en) Device and method for casting of square billet continuous casting tundish
CN115401192A (en) Method for conveniently blocking and centering lower nozzle of tundish
CN204209119U (en) Metallurgical ladle adds the device of stuffing sand
CN105969926A (en) Electric furnace smelting and inoculation treatment device
CN112945634A (en) Molten steel sampler and molten steel sampling method of vacuum induction smelting furnace
CN204700257U (en) A kind of molten steel casting ladle with suspending agent injection device
CN208960983U (en) A kind of steel ladle residue cleaning plant
CN205043150U (en) A casting device for small -size cast product
CN107142357A (en) Blow poly- slag top angle-inserting type spray gun, preparation method and application method
CN202079262U (en) Steel ladle drainage agent adding apparatus
CN206373354U (en) A kind of big back stall brick fixed structure of continuous casting
CN207026469U (en) The flow control device of Cleanliness of Molten Steel in a kind of raising casting process
CN218252875U (en) Movable casting pouring device
CN207043277U (en) The casting system of injection machine class template casting
CN213002627U (en) Water gap mould for steel ladle and tundish
CN204262344U (en) A kind of ladle draining sand mozzle
CN206500612U (en) A kind of continuous casting production slag separator
CN211386891U (en) Sand filling device for ladle nozzle
CN213162987U (en) Centrifugal roller die casting frock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination